Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010

Section 3

Installation of smart meters and related equipment

Cite as Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010, s. 3 · last amended December 27, 2012 · read from BC Laws on November 17, 2026

The text

(1) Subject to subsection (3), by the end of the 2012 calendar year, the authority must install and put into operation (a) a smart meter for each eligible premises, and (b) all of the following related equipment: (i) communications infrastructure for transmitting information among smart meters and the computer hardware and software systems described in subparagraph (ii); (ii) secure computer hardware and software systems that enable the authority to do all of the following: (A) monitor, control and configure smart meters and the communications infrastructure referred to in subparagraph (i); (B) store, validate, analyze and use the information measured by and received from smart meters; (C) provide, through the internet, to a person who receives electricity from the authority secure access to information about the person's electricity consumption and generation, if any, measured by a smart meter; (D) establish a secure telecommunications link between in-home feedback devices and smart meters that are compatible with each other; (E) bill customers in accordance with rates that encourage the shift of the use of electricity from periods of higher demand to periods of lower demand; (F) integrate the systems with the authority's other business systems. (2) The communications infrastructure referred to in subsection (1) (b) (i) must include a telecommunications network that is capable of delivering two-way, digital, and secure communication. (3) If it is impracticable because of distance, electromagnetic interference, physical obstruction or other similar cause for the authority to establish a telecommunications link between the smart meter at an eligible premises and the computer hardware and software system referred to in subsection (1) (b) (ii), the authority is not required to install or put into operation the communications infrastructure referred to in subsection (1) (b) (i) for the purpose of establishing that telecommunications link. (4) The authority must integrate the operation of smart meters and related equipment with the authority's other operations.
Read the Smart Meters and Smart Grid Regulation on BC Laws ↗

Made under Clean Energy Act, SBC 2010, c. 22.