Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010

Section 4

Smart grid

Cite as Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010, s. 4 · last amended December 27, 2012 · read from BC Laws on November 17, 2026

The text

(1) The program required under section 17 (4) of the Act must be established by the end of the 2015 calendar year and include the following components: (a) the establishment and operation of a connectivity model and the installation and operation of (i) at least 9 000 but no more than 35 000 system devices, and (ii) computer hardware and software systems to enable the authority to (iii) perform electricity balance analyses for the electric distribution system, and (iv) estimate the amount of electricity supplied from a portion of the electric distribution system to unmetered loads that are not known to the authority and to estimate the location of those loads; (b) the acquisition of investigation devices and computer software to enable the authority to identify the location of the unmetered loads referred to in paragraph (a) (iv); (c) the establishment and operation of telecommunications networks that (i) have sufficient speed and bandwidth, and (ii) enable two-way, digital, and secure communication among system devices, automation-enabled devices and the systems and equipment used by the authority for monitoring and controlling its electric system to facilitate (iii) the operation of the authority's electric system, (iv) the integration, on a large scale, of distributed generation into the electric distribution system, and (v) the provision of electricity service that allows for the large-scale use of electric vehicles by its customers. (2) The authority must integrate the operation of the smart grid with the authority's other operations.
Read the Smart Meters and Smart Grid Regulation on BC Laws ↗

Made under Clean Energy Act, SBC 2010, c. 22.