Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010
Section 2
Prescribed requirements for smart meters
Cite as Smart Meters and Smart Grid Regulation, B.C. Reg. 368/2010, s. 2 · last amended December 27, 2012 · read from BC Laws on November 17, 2026
The text
For the purposes of the definition of "smart meter" in section 17 (1) of the Act, the prescribed requirements for a meter are that it is capable of doing all of the following:
(a) measuring electricity supplied to an eligible premises;
(b) transmitting and receiving information in digital form;
(c) allowing the authority remotely to disconnect and reconnect the supply of electricity to an eligible premises, unless
(i) the point of metering for the eligible premises
(A) is greater than 240 volts,
(B) is greater than 200 amperes, or
(C) is three phase, or
(ii) the eligible premises
(A) has a bottom-connected meter,
(B) has an output or input pulse meter, or
(C) has a meter that measures maximum electricity demand in watts;
(d) recording measurements of electricity, and recording the date and time of the recording, at least as frequently as in 60-minute intervals;
(e) being configured by the authority at a location either remote from or close to the meter;
(f) measuring and recording measurements of electricity generated at the premises and supplied to the electric distribution system;
(g) transmitting information to and receiving information from an in-home feedback device, unless the point of metering for the eligible premises meets any of the criteria set out in paragraph (c) (i) or the eligible premises meets any of the criteria set out in paragraph (c) (ii).
Read the Smart Meters and Smart Grid Regulation on BC Laws ↗
Made under Clean Energy Act, SBC 2010, c. 22.