Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 21.85
Avalanche control
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 21.85 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) Charges must not be placed manually on site by workers or projected by any means for the purpose of avalanche control, until the proposed work procedures have been submitted to and accepted by the Board.
(2) Explosives must not be primed until the last most practicable moment which means that point in time when the explosives are as close to the control route as possible, in a safe, sheltered location excluded from public access.
(2.1) An employer must ensure there is an effective means for a worker to separate the primed charge to be deployed from the other primed charges in order that the pull-wire lighter is not accidentally placed on the safety fuse assembly of one of the other primed charges.
(3) The pull-wire lighter must not be placed on the safety fuse assembly until immediately before placing the charge.
(4) The employer must ensure that procedures are reviewed annually and that proposed changes to the procedures are submitted to the Board for approval before implementation.