Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.55
Specifications and plans
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.55 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) Before a tilt-up project begins the employer must ensure that a comprehensive set of plans and specifications is prepared, detailing
(a) all erection and bracing procedures,
(b) the type, size and location of all lifting inserts, brace inserts, braces, fittings and anchors for each panel,
(c) the required strength to be reached by the concrete before panel lifting can begin,
(d) the design wind pressure used to determine temporary bracing requirements,
(e) the wind gust speed above which the site must be cleared of workers when panels are supported by the temporary bracing,
(f) the requirements for supplementary reinforcing steel, strongbacks, or other reinforcement to be used during panel erection,
(g) the method of rigging for lifting and handling each panel,
(h) procedures for unique job conditions such as the method of temporary storage on site, and
(i) the weight of each panel.
(2) The plans and specifications for tilt-up panel erection and bracing must be certified by a professional engineer.
(3) Any change to the plans and specifications required by subsection (1), including the use of alternate accessories or erection and rigging procedures, must
(a) provide at least the same margin of safety as required by the original design and specifications, and
(b) be detailed on the documents and be certified by a professional engineer before it is carried out.
(4) One set of up-to-date certified plans and specifications must be maintained on site during lifting and as long as bracing is required to be in place, and the documents must be available for inspection by an officer.