Occupational Health and Safety Regulation, B.C. Reg. 296/97
Section 20.26
Inspections
Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.26 · last amended September 1, 2027 · read from BC Laws on November 17, 2026
The text
(1) Subject to subsection (4), immediately before placement of concrete or other intended loading of specified formwork and any associated falsework or reshoring, the employer must ensure that
(a) the formwork, falsework and reshoring are inspected by a professional engineer, and
(b) the professional engineer issues a certificate that
(i) indicates the specific areas inspected, and
(ii) certifies that the formwork, falsework and reshoring have been erected in accordance with up-to-date worksite-specific plans.
(2) The certificate required by subsection (1) (b) must be available at the worksite for inspection by an officer.
(3) If ganged forms are being reused on the same worksite with any modification to the design or method of erection of the ganged forms, subsection (1) applies in relation to the reuse of the ganged forms.
(4) If ganged forms are being reused on the same worksite without modification to the design or method of erection of the ganged forms certified under subsection (1), immediately before placement of concrete or other intended loading of the ganged forms, the employer must ensure that the ganged forms are inspected by a qualified person who
(a) confirms that the ganged forms have been erected in accordance with up-to-date worksite-specific plans, and
(b) documents the inspection and the confirmation, including the specific location where the ganged forms are being reused and the date of the inspection.
(5) The documents required by subsection (4) (b) must be available at the worksite for inspection by an officer.
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.