Occupational Health and Safety Regulation, B.C. Reg. 296/97

Section 20.2.1

Notice of project — hazardous substances

Cite as Occupational Health and Safety Regulation, B.C. Reg. 296/97, s. 20.2.1 · last amended September 1, 2027 · read from BC Laws on November 17, 2026

The text

(1) Subject to subsections (3) and (6), if a construction project involves a work activity set out in subsection (2), all employers responsible for the work activity and either the owner or the person engaged by the owner to be the prime contractor on the construction project must ensure that the Board receives, in writing, a notice of project that contains the information required by subsection (4) at least 48 hours before the work activity begins at the worksite. (2) The following are work activities for the purposes of subsection (1): (a) a work activity that involves working with or in proximity to asbestos-containing material, as defined in section 6.1, that is a moderate risk work activity or a high risk work activity as defined in that section; (b) the alteration, repair, dismantling or demolition of all or part of a building or structure in which asbestos-containing material has been processed, manufactured or stored; (c) a work activity that significantly disturbs lead-containing material in buildings or structures; (d) a work activity that is similar to those described in paragraphs (a) to (c) and that may expose workers to a significant risk of occupational disease from a biological or chemical agent or ionizing radiation. (3) Subsection (1) does not apply if the work activity is carried out (a) for the purposes of section 20.112 (2) or (6) [hazardous materials], (b) during a site inspection conducted to identify hazards, (c) to determine the types of tasks required for the construction project, or (d) to estimate the cost of labour and materials for the construction project. (4) The notice of project must contain the following information: (a) the name and contact information of all employers responsible for the work activity, of the owner and of the person engaged to be the prime contractor, if any; (b) the address of the construction project or its location in relation to the nearest highway; (c) the scope of the construction project and of the work activity; (d) the starting date and the estimated duration of the construction project and of the work activity; (e) the safe work procedures specific to the work activity, and the hazardous substance involved in the work activity, that will be used to minimize the risk of occupational disease to the workers; (f) if section 20.112 applies, a written report made under section 20.112 (3) (e) and, if applicable, section 20.112 (6) (e). (5) Subject to subsection (6), all employers responsible for the work activity and either the owner or the person engaged by the owner to be the prime contractor must ensure that a copy of the notice of project is posted at the worksite before the work activity begins at the worksite and is kept posted for the duration of the construction project. (6) If it is necessary to do immediate work in order to prevent the risk of injury to workers or other persons, the risk of occupational disease or damage to property, a work activity referred to in subsection (2) may begin at the worksite immediately, and all employers responsible for the work activity and either the owner or the person engaged by the owner to be the prime contractor must ensure that (a) the Board receives, in writing, a notice of project that contains the information required by subsection (4) as soon as possible, and (b) a copy of the notice of project is posted at the worksite as soon as possible and is kept posted for the duration of the construction project. (7) If any of the information required by subsection (4) changes significantly, all employers responsible for the work activity and either the owner or the person engaged by the owner to be the prime contractor must ensure that (a) the Board receives, in writing, the new information as soon as possible, and (b) a copy of the new information is posted at the worksite as soon as possible and is kept posted for the duration of the construction project. (8) All employers responsible for a work activity to which subsection (1) applies must retain a copy of the notice of project respecting the work activity for at least 10 years from the starting date of the construction project as set out in the notice of project.
Read the Occupational Health and Safety Regulation on BC Laws ↗

Made under Workers Compensation Act, RSBC 2019, c. 1.