(1) In this section:
“cross the neutral conductor” means to move the platform of an insulated aerial device through the space between the neutral conductor of a power system and one or more overhead conductors;
“overhead conductor” means an energized high voltage conductor that is immediately above the neutral conductor of a power system.
(2) This section applies if
(a) a certified utility arborist is on the platform of an insulated aerial device and intends to prune or remove vegetation in accordance with section 19.34,
(b) it is not practicable, because of terrain or other obstacles, to position the insulated aerial device in a location that is on the same side of an overhead conductor as the vegetation to be pruned or removed, and
(c) in order to move the platform of the insulated aerial device to the location described in paragraph (b), the certified utility arborist who is on the platform must cross the neutral conductor.
(3) A certified utility arborist who is crossing the neutral conductor in the circumstances set out in subsection (2) may come closer to an overhead conductor than the limits of approach under section 19.34 (1), but only if all of the requirements of this section are met.
(4) A certified utility arborist must not cross the neutral conductor unless
(a) the employer of the certified utility arborist has implemented written safe work procedures to ensure that all of the requirements of this section are met,
(b) the certified utility arborist has been trained in the work procedures referred to in paragraph (a),
(c) the certified utility arborist has demonstrated to the satisfaction of the employer that the certified utility arborist has the knowledge and ability necessary to cross the neutral conductor in accordance with
(i) the work procedures referred to in paragraph (a), and
(ii) the requirements of this section, and
(d) the certified utility arborist is satisfied that the clearance distances under subsection (5) (b) can be maintained at all times during the crossing.
(5) When the certified utility arborist is crossing the neutral conductor,
(a) the certified utility arborist must not perform any work other than work related to crossing the neutral conductor,
(b) if an overhead conductor has a voltage within a range set out in column 1 of Table 19-4, the following must maintain at least the clearance distance from the overhead conductor that is set out in column 2 opposite that range of voltage:
(i) the certified utility arborist;
(ii) the platform and the boom of the insulated aerial device;
(iii) any tool or device that is in or on the platform of the insulated aerial device, and
(c) a safety watcher who meets the requirements of subsection (6) must be present on the ground to assist the certified utility arborist in maintaining the clearance distances required under paragraph (b) of this subsection.
(6) The requirements for the purposes of subsection (5) (c) are as follows:
(a) the safety watcher must be trained in the work procedures referred to in subsection (4) (a);
(b) the safety watcher must have demonstrated to the satisfaction of the employer that the safety watcher knows
(i) the clearance distances that must be maintained under subsection (5) (b),
(ii) how to use the lower controls of the insulated aerial device, and
(iii) the procedure for rescuing a worker from the platform of the insulated aerial device.
(7) An apprentice utility arborist may work up to the limits of approach permitted for a certified utility arborist under this section if
(a) the apprentice utility arborist is in the presence of and under the direct supervision of a certified utility arborist,
(b) the certified utility arborist meets all of the requirements of subsection (4) (b) to (d), and
(c) the apprentice utility arborist complies with all of the requirements of subsections (4) and (5) and for this purpose, those subsections apply as if the apprentice utility arborist were a certified utility arborist. Table 19-4 Column 1
Voltage Column 2
Minimum clearance distance from overhead conductor when crossing the neutral conductor Phase to phase Metres Feet Over 750 V to 20 kV 0.60 2.0 Over 20 kV to 30 kV 0.75 2.5 Over 30 kV to 75 kV 0.90 3.0
Read the Occupational Health and Safety Regulation on BC Laws ↗
Made under Workers Compensation Act, RSBC 2019, c. 1.