Drilling and Production Regulation, B.C. Reg. 282/2010
Section 66
Overproduction of gas
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 66 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) A permit holder must determine the accumulated overproduction for the period November 1 to October 31 for each gas well or group of wells and, during the subsequent 3 months, the permit holder must ensure that the production rate is adjusted so that all accumulated overproduction is retired by January 31.
(2) A permit holder must submit to the regulator a report of any accumulated overproduction for the period November 1 to October 31, and the submission must be made in time for it to be received on or before December 16 for each gas well or special project under section 75 of the Act.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.