Drilling and Production Regulation, B.C. Reg. 282/2010

Section 65

Restriction of gas production

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 65 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) In this section, “retrograde condensate” means any hydrocarbon fluid which exhibits an increased liquid volume fraction at pressures below the dew point, yet will also begin to significantly revapourize on some further reduction of pressure. (2) A permit holder may not produce from any of the following types of gas wells unless a DGA for the well has been established by the permit holder's permit or by a designation made under section 75 of the Act: (a) a producing well under a special project for concurrent production designated under section 75 of the Act; (b) a producing well from a retrograde condensate reservoir; (c) a producing well from a pool with suspected water drive; (d) a gas well to which an off-target penalty factor applies as set out in section 7 (3) of this regulation. (3) For gas wells that are part of a special project designated under section 75 of the Act and that have been assigned a project DGA, the DGA may be applied to the entire project area as though it were a single well. (4) Subject to section 49.1 (1) (c) of the Act, if a DGA has been established for a well by permit or a designation under section 75 of the Act, the well permit holder must ensure that natural gas production from the well (a) does not in any one day exceed the daily production limit, and (b) does not exceed the daily gas allowable multiplied by the number of days in the production period, or multiplied by the number of days from the date of initial production to the end of the production period. (5) A permit holder must not produce from a gas well that is in a gas cap.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.