Drilling and Production Regulation, B.C. Reg. 282/2010
Section 57
Measurement of total oil production
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 57 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) If, during calibration of a meter, a permit holder finds that a consistent meter factor is unattainable, the permit holder must take corrective action without delay.
(2) A permit holder must maintain a record of the calibration of the oil meter installation.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.