Drilling and Production Regulation, B.C. Reg. 282/2010

Section 56.1

Report required

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 56.1 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

A permit holder must submit to the regulator, within 60 days of initial oil production, a detailed report of (a) any oil well flow test for which temporary flow testing equipment is used to measure pressures and rates of each fluid, and (b) any cleanup flow that results in oil coming to the surface.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.