Drilling and Production Regulation, B.C. Reg. 282/2010

Section 44

Flaring performance requirements

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 44 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) A permit holder of a well or facility must ensure all of the following: (a) that flare stacks are adequately anchored; (b) that unsupervised flare stacks where flaring may occur are equipped with an adequate auto-ignition system; (b.1) if the hydrogen sulphide content of the gas to be flared does not exceed one mole percent, that unsupervised flare stacks where continuous flaring will occur are (i) equipped with a continuous monitoring device that monitors whether a flame is present, or (ii) inspected at least every 7 days to determine whether a flame is present; (c) if the hydrogen sulphide content of the gas to be flared exceeds one mole percent, that (i) unsupervised flare stacks where continuous flaring will occur are equipped with a flame-out detection device with operation shut down capability that provides an immediate alarm to the permit holder, and (ii) the minimum height of flare stacks is 12 m; (c.1) that a flare pit is constructed only if the construction is specifically authorized in the well or facility permit; (d) flare and incinerator systems installed after the date this regulation came into force are designed by and operated within the limits specified by a professional engineer licensed or registered under the Professional Governance Act; (d.1) flare and incinerator systems installed after January 1, 2025 are designed for a 98% carbon conversion efficiency; (e) flaring does not result in the emission of black smoke. (2) A permit holder must maintain records of inspections under subsection (1) (b.1) (ii).
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.