Drilling and Production Regulation, B.C. Reg. 282/2010
Section 35
Wellsite geology reports
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 35 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) Within 14 days after the date of rig release of the drilling rig, a well permit holder must submit to the regulator the final as-drilled survey plan, showing the surface location and bottom hole location of the well and including the following for each:
(a) northing and easting coordinates, determined using the North American Datum of 1983, also known as NAD 83;
(b) north and east offsets to the nearest corner of the spacing unit in which each is located, and identifying the reference corner.
(2) Within 60 days after the date of rig release of the drilling rig, a well permit holder must submit to the regulator a wellsite geology report
(a) for a well or portion of a well classified exploratory outpost or exploratory wildcat, or
(b) regardless of the well classification, if a wellsite geological report has been compiled.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.