Drilling and Production Regulation, B.C. Reg. 282/2010

Section 34

Tests, analyses, surveys and logs

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 34 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) Subject to subsections (2) and (2.1), before a well is completed, suspended or abandoned, a well permit holder must ensure that (a) a gamma ray log is taken from ground level of the well to total depth, (b) a neutron log is taken from 25 m below ground level to the base of the surface casing, and (c) a resistivity and porosity log is taken from the base of the surface casing to (i) the total depth of the well of a vertical pilot hole, if one exists, or (ii) the lowest point in the vertical portion of one horizontal well beyond which the logging tool cannot be lowered by gravity. (2) Subsection (1) (b) applies only to wells the drilling of which begins after the date this regulation came into force. (2.1) If more than one well has been drilled or has been permitted to be drilled from a common drilling pad location in an unconventional zone listed in Schedule 2, the logs referred to in subsection (1) must be taken in at least one of the wells and, in the case of the other well or wells, (a) subsection (1) does not apply, and (b) a gamma ray log must be taken from the base of the surface casing of each well to the total depth of each well. (3) Within 30 days after the date on which a log was run, the well permit holder must submit a copy of the log to the regulator. (4) A well permit holder must submit to the regulator (a) a pressure chart, and (b) a report containing complete details on fluid recoveries for each drill stem test or wire line test taken on a well within 30 days of the date on which the test was made. (5) A well permit holder must submit the following to the regulator within 30 days of analysis completion: (a) if tests from a well allow good sampling, a report of all analyses made of any oil, gas, hydrocarbon liquid or formation water recovered from each formation; (b) if performed, a report of all isotopic analyses of mud gas, headspace gas, produced gas, surface casing flow gas, or any other gas associated with a well. (6) On obtaining the data and results of a bottom hole sample analysis or other pressure-volume-temperature analysis, the well permit holder must submit the data and results to the regulator within 30 days of analysis completion. (6.1) A well permit holder of an exploratory outpost well or an exploratory wildcat well must (a) capture a minimum of 15 mud gas isotope data samples per 1 000 m interval between the base of the surface casing and either (i) the total depth in a vertical well, or (ii) the point where deviation exceeds 80° from the vertical in a horizontal well, and (b) submit an analysis of the isotope data samples captured under paragraph (a) to the regulator within 30 days of analysis completion. (7) Repealed. [B.C. Reg. 48/2021, App. 2, s. 2.]
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.