Drilling and Production Regulation, B.C. Reg. 282/2010

Section 10

Testing of well control equipment

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 10 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(0.1) This section does not apply with respect to a well drilled to access usable groundwater. (1) A well permit holder must ensure that (a) pressure-control equipment associated with well operations is pressure-tested on installation and as often as necessary during well operations to ensure the continued safe operation of the equipment, and (b) the rig crew conducting the well operation has an adequate understanding of, and is able to operate, the blowout prevention equipment. (2) At the request of an official, a well permit holder's contractor or rig crew, when it is safe to do so, must test the operation and effectiveness of the blowout prevention equipment installed on the permit holder's well in accordance with the Well Control Procedure placard issued by the Canadian Association of Oilwell Drilling Contractors or well control procedures approved by an accepted safety training organization. (3) A well permit holder must maintain, for 60 days from the date of rig release, a record of the results of tests required under subsection (1) (a).
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.