Drilling and Production Regulation, B.C. Reg. 282/2010
Section 11
Drilling fluid system
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 11 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
A well permit holder must ensure that
(a) the drilling fluid system and associated monitoring equipment is designed, installed, operated and maintained to allow for proper well evaluation, to ensure safe drilling operations and, except when drilling underbalanced, to provide an effective barrier against formation pressure, and
(b) the indicators and alarms associated with the monitoring equipment are located at appropriate locations on the drilling rig to alert onsite personnel of well conditions that could lead to a loss of well control.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.