Reviewable Projects Regulation, B.C. Reg. 243/2019

Section 13

Definitions for Part 5

Cite as Reviewable Projects Regulation, B.C. Reg. 243/2019, s. 13 · last amended December 15, 2025 · read from BC Laws on November 17, 2026

The text

In this Part: “aquifer” has the same meaning as in the Water Sustainability Act; “dam” has the same meaning as in the Dam Safety Regulation; “deep groundwater” has the same meaning as in section 51 of the Water Sustainability Regulation, B.C. Reg. 36/2016; “hydroelectric power plant” has the same meaning as in Part 4; “mine” has the same meaning as in the Mines Act; “oil and gas purpose” has the same meaning as in section 2 of the Water Sustainability Act; “periodic maintenance dredging” means dredging undertaken at regular intervals to keep an existing waterway in a condition that allows the waterway to be used as designed and authorized, but does not include the initial dredging of the waterway. Table 9 — Water Management Projects [am. B.C. Reg. 32/2023, Sch. B, s. 12.] Column 1 Project Category Column 2 New Project Column 3 Modification of Existing Project Column 4 Dismantling and Abandonment of Existing Project 1 Dams. Criteria: (1) Subject to subsection (2), a new dam project that (a) is ≥ 15 m high, measured in accordance with section 1 (4) of the Dam Safety Regulation, or (b) under the Water Sustainability Act, will be permitted to impound a reservoir containing ≥ 10 million m3 of water above the natural boundary of the streams that supply the water to the reservoir. (2) The following are not reviewable under subsection (1): (a) a dam that is a tailings impoundment constructed and operated solely to serve a single mine; (b) a dam or reservoir that is associated with a hydroelectric power plant. Criteria: (1) Subject to subsection (2), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the modification results in an increase of the flooded area of the reservoir, as permitted under the Water Sustainability Act, by ≥ 20 ha. (2) The following are not reviewable under subsection (1): (a) a dam that is a tailings impoundment constructed and operated solely to serve a single mine; (b) a dam or reservoir that is associated with a hydroelectric power plant. Criteria: (1) Subject to subsection (2), dismantling or abandonment of an existing dam project that is, or was, permitted under the Water Sustainability Act to impound ≥ 10 million m3 of water. (2) The following are not reviewable under subsection (1): (a) a dam that is a tailings impoundment constructed and operated solely to serve a single mine; (b) a dam or reservoir that is associated with a hydroelectric power plant. 2 Dikes. Criteria: (1) A new dike project that protects from flooding an area of ≥ 10 km2. Criteria: (1) Subject to subsection (2), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the modification results in the raising of the entire length of the dike. (2) A modification is not reviewable under subsection (1) if the modification (a) replaces, repairs or improves an existing dike, (b) is undertaken by a municipality or regional district, and (c) entails no new land disturbance. Criteria: (1) Dismantling or abandonment of an existing project that, if it were a new project, would meet the criteria set out opposite in Column 2. 3 Water Diversion Projects. Criteria: (1) Subject to subsection (2), a project incorporating new works that are (a) constructed for the diversion of water, and (b) designed to divert water at a maximum rate of ≥ 10 million m3/year. (2) The following are not reviewable under subsection (1): (a) works for the diversion of water that have been authorized under section 10 of the Water Sustainability Act; (b) works that are intended solely for the purposes of a tailings pond constructed and operated to serve a single mine; (c) a water diversion project that is associated with a hydroelectric power plant. Criteria: (1) Subject to subsection (2), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the modification results in an increase of ≥ 35% in the maximum rate per year at which the project is designed to divert water. (2) The following are not reviewable under subsection (1): (a) works for the diversion of water that have been authorized under section 10 of the Water Sustainability Act; (b) works that are intended solely for the purposes of a tailings pond constructed and operated to serve a single mine; (c) a water diversion project that is associated with a hydroelectric power plant. Criteria: (1) Subject to subsection (2), dismantling or abandonment of existing works that, if it were a new project, would meet the criteria set out opposite in Column 2. (2) The following are not reviewable under subsection (1): (a) works for the diversion of water that have been authorized under section 10 of the Water Sustainability Act; (b) works that are intended solely for the purposes of a tailings pond constructed and operated to serve a single mine; (c) a water diversion project that is associated with a hydroelectric power plant. 4 Groundwater Extraction Projects. Criteria: (1) Subject to subsection (2), a new project that (a) consists of the extraction of groundwater from one or more aquifers, (b) is operated intermittently or continuously for ≥ 1 year, and (c) is designed to be operated so that groundwater is extracted at a rate of ≥ 75 litres/second. (2) The following are not reviewable under subsection (1): (a) a project for the extraction of groundwater solely for the following purposes: (i) providing groundwater data for an application for an environmental assessment certificate; (ii) providing groundwater data, if the testing is conducted by or under the supervision of a registrant of the Association of Professional Engineers and Geoscientists of British Columbia with competency in the field of hydrogeology; (b) a project for the extraction of deep groundwater solely for an oil and gas purpose. Criteria: (1) Subject to subsection (2), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the modification results in (i) an increase of ≥ 35% over the current extraction rate at which the project has been designed to be operated, or (ii) an increase of > 75 litres/second over the current extraction rate at which the project has been designed to be operated. (2) The following are not reviewable under subsection (1): (a) a project for the extraction of groundwater solely for the following purposes: (i) providing groundwater data for an application for an environmental assessment certificate; (ii) providing groundwater data, if the testing is conducted by or under the supervision of a registrant of the Association of Professional Engineers and Geoscientists of British Columbia with competency in the field of hydrogeology; (b) a project for the extraction of deep groundwater solely for an oil and gas purpose. 5 Shoreline Modification Projects. Criteria: (1) Subject to subsections (2) and (3), a new project that (a) results in changes in or about a stream, marine coastline or estuary, and (b) entails dredging, filling or other direct physical disturbance of (i) ≥ 1 000 m of linear shoreline, or (ii) ≥ 2 ha of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary. (2) Area flooded is not included in the calculation of area directly disturbed under subsection (1) (b) (ii). (3) The following are not reviewable under subsection (1): (a) periodic shoreline cleanup projects; (b) periodic maintenance dredging of the foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary; (c) a ferry terminal or marine port project. Criteria: (1) Subject to subsection (2), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the modification results in an increase of ≥ 35% in (i) the length of linear shoreline that is directly disturbed by dredging, filling or other physical action, or (ii) the area of foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary that is so disturbed. (2) Area flooded is not included in the calculation of area directly disturbed under subsection (1) (b) (ii). (3) The following are not reviewable under subsection (1): (a) periodic shoreline cleanup projects; (b) periodic maintenance dredging of the foreshore or submerged land, or a combination of foreshore and submerged land, below the natural boundary of a stream, marine coastline or estuary; (c) a ferry terminal or marine port project. Criteria: (1) Dismantling or abandonment of an existing shoreline modification project that, if it were a new project, would meet the criteria set out opposite in Column 2.
Read the Reviewable Projects Regulation on BC Laws ↗

Made under Environmental Assessment Act, SBC 2018, c. 51.