Reviewable Projects Regulation, B.C. Reg. 243/2019

Section 14

Definitions for Part 6

Cite as Reviewable Projects Regulation, B.C. Reg. 243/2019, s. 14 · last amended December 15, 2025 · read from BC Laws on November 17, 2026

The text

In this Part: “biomedical waste” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “disposal” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “drilling rig site” has the same meaning as in the Oil and Gas Waste Regulation, B.C. Reg. 254/2005; “facility” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “hazardous waste” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “incinerator” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “land treatment” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “mobile off-site treatment facility” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “municipal liquid waste” has the same meaning as in section 23 of the Environmental Management Act; “municipal solid waste” has the same meaning as in section 23 of the Environmental Management Act; “off-site facility” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “produced water” has the same meaning as in the Oil and Gas Waste Regulation, B.C. Reg. 254/2005; “secure building” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “secure landfill” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “storage” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “thermal treatment” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “treatment” has the same meaning as in the Hazardous Waste Regulation, B.C. Reg. 63/88; “waste” has the same meaning as in the Environmental Management Act; “waste management facility” has the same meaning as in the Environmental Management Act; “well completion or workover” has the same meaning as in the Oil and Gas Waste Regulation, B.C. Reg. 254/2005. Table 10 — Hazardous Waste Management Projects [am. B.C. Reg. 187/2023, Sch., s. 12.] Column 1 Project Category Column 2 New Project Column 3 Modification of Existing Project 1 Hazardous Waste Facilities Criteria: (1) Subject to subsections (2) and (3), a project (a) for the storage, treatment or disposal of biomedical waste or hazardous waste if the proposal (i) entails facilities of a type specified under subsection (2), and (ii) is for (A) construction of a new facility, or (B) modification of an existing facility for which the storage, treatment or disposal of biomedical waste or hazardous waste has not previously been permitted under the Environmental Management Act, or (b) to use hazardous waste at an existing off-site facility whose principal function is not waste management, and that has not previously been permitted to use that type of hazardous waste under the Environmental Management Act, if there will be (i) off-site use of hazardous waste by combustion or thermal processes, or (ii) off-site use of hazardous waste other than by combustion or thermal processes if (A) one type of hazardous waste listed in Column I of Table 1 of Schedule 6 of the Hazardous Waste Regulation, B.C. Reg. 63/88, is to be used and the daily maximum use is ≥ 1 000 times greater than the registration quantity listed in Column II of that table, or (B) more than one type of hazardous waste listed in Column I of Table 1 of Schedule 6 of the Hazardous Waste Regulation, B.C. Reg. 63/88, is to be used and the cumulative maximum design use is ≥ 100 000 kg/day or ≥ 100 000 litres/day, as appropriate. (2) Subsection (1) (a) applies to the following types of facilities: (a) an off-site incinerator or thermal treatment facility, excluding (i) a thermal treatment facility that uses non-combustion technologies for the disinfection or sterilization of biomedical waste, or (ii) an incinerator or thermal treatment facility that uses combustion or other related technologies for the treatment or disposal of biomedical waste, and that has a capacity of < 5 tonnes/day; (b) an off-site secure building or secure landfill; (c) an off-site treatment facility, other than an incinerator, thermal treatment facility or land treatment facility, (i) if one type of hazardous waste listed in Column I of Table 1 of Schedule 6 of the Hazardous Waste Regulation, B.C. Reg. 63/88, is to be treated, and the daily maximum design treatment capacity is ≥ 1 000 times greater than the registration quantity listed in Column II of that table, or (ii) if more than one type of hazardous waste listed in Column I of Table 1 of Schedule 6 of the Hazardous Waste Regulation, B.C. Reg. 63/88, is to be treated, and the cumulative maximum design treatment capacity is ≥ 100 000 kg/day or ≥ 100 000 litres/day, as appropriate. (3) The following are not reviewable under subsections (1) and (2): (a) a facility for the treatment of a hazardous waste that does not use or propose to use incineration or thermal treatment if the facility is (i) a mobile off-site treatment facility, or (ii) a research and demonstration facility; (b) a facility for the thermal treatment of drilling mud in a closed-loop unit if the facility is located at (i) a drilling pad, or (ii) a secure landfill; (c) discharge to an underground formation, in accordance with the Energy Resource Activities Act, of (i) produced water, or (ii) fluids recovered from a well completion or workover; (d) any treatment authorized by Part 6 of the Hazardous Waste Regulation, B.C. Reg. 63/88. Criteria: (1) Subject to subsection (2), modification of an existing hazardous waste facility if (a) the existing facility, or the facility after modification, were it a new facility, would meet the criteria set out opposite in Column 2, and (b) the modification results in an increase of ≥ 30% in the total waste discharge from the facility. (2) The following are not reviewable under subsection (1): (a) a facility for the treatment of a hazardous waste that does not use or propose to use incineration or thermal treatment if the facility is (i) a mobile off-site treatment facility, or (ii) a research and demonstration facility; (b) a facility for the thermal treatment of drilling mud in a closed-loop unit if the facility is located at (i) a drilling rig site, or (ii) a secure landfill; (c) discharge to an underground formation, in accordance with the Energy Resource Activities Act, of (i) produced water, or (ii) fluids recovered from a well completion or workover; (d) any treatment authorized by Part 6 of the Hazardous Waste Regulation, B.C. Reg. 63/88. Table 11 — Solid Waste Management Projects Column 1 Project Category Column 2 New Project Column 3 Modification of Existing Project 1 Solid Waste Management Facilities. Criteria: (1) A new waste management facility for the treatment or disposal of municipal solid waste or non-hazardous solid waste by the operation of (a) a landfill with a design capacity of ≥ 250 000 tonnes/year, (b) a device, other than a device referred to in paragraph (c), that, with or without energy recovery, destroys the waste using high temperatures and that has a design capacity of ≥ 225 tonnes/day, or (c) a device that, with or without energy recovery, destroys the waste using high temperatures and that is located in the Metro Vancouver Regional District or the Fraser Valley Regional District. Criteria: (1) Modification of an existing waste management facility if (a) the existing facility, or the facility after modification, were it a new waste management facility, would meet the criteria set out in subsection (1) (a), (b) or (c) of Column 2, and (b) the modification results in an increase of 30% or more of the design capacity of the facility. Table 12 — Liquid Waste Management Projects Column 1 Project Category Column 2 New Project Column 3 Modification of Existing Project 1 Local Government Liquid Waste Management Facilities. Criteria: (1) Subject to subsections (2) and (3), a new waste management facility that is (a) for the treatment or disposal of municipal liquid waste, and (b) designed to serve ≥ 10 000 people. (2) Assessment of a new waste management facility under subsection (1) does not include the dismantling and abandonment phases. (3) A waste management facility that is a component of a municipal liquid waste management plan approved under the Environmental Management Act is not reviewable under subsection (1). Criteria: (1) Subject to subsections (2) and (3), modification of an existing waste management facility if (a) the existing waste management facility, or the facility after modification, were they a new waste management facility, would meet the criteria set out opposite in Column 2, and (b) the modification results in an increase of ≥ 30% in the total waste discharge from the waste management facility. (2) Assessment of the modification of an existing waste management facility described in subsection (1) does not include the dismantling and abandonment phases. (3) A modification that is a component of a municipal liquid waste management plan approved under the Environmental Management Act is not reviewable under subsection (1).
Read the Reviewable Projects Regulation on BC Laws ↗

Made under Environmental Assessment Act, SBC 2018, c. 51.