Reviewable Projects Regulation, B.C. Reg. 243/2019
Section 12
Whether modification results in significant adverse effects
Cite as Reviewable Projects Regulation, B.C. Reg. 243/2019, s. 12 · last amended December 15, 2025 · read from BC Laws on November 17, 2026
The text
For the purpose of determining whether the modification of an offshore oil or gas project is prescribed as a reviewable project, the chief executive assessment officer must determine whether the modification has the potential to result in a significant adverse environmental, economic, social, cultural or health effect.
Table 7 — Electricity Projects
[am. B.C. Reg. 237/2025, Sch. 3, s. 2.] Column 1
Project Category Column 2
New Project Column 3
Modification of Existing Project Column 4
Dismantling and Abandonment of Existing Project 1 Power Plants. Criteria: (1) A new project with a rated nameplate capacity of ≥ 50 MW of electricity that is (a) a hydroelectric power plant, (b) a thermal electric power plant, or (c) another power plant, not including a power plant referred to in subsection (4) or (5). (2) Repealed. [B.C. Reg. 237/2025, Sch. 3, s. 2 (b).] (3) A new project that is a wind generating facility with at least one turbine located in water and a total of 10 or more turbines. (4) A new project with a rated nameplate capacity of ≥ 15 MW of electricity that is an in-stream tidal power facility. (5) A new project, other than a project referred to in subsection (4), that is a tidal power generating facility. Criteria: (1) Subject to subsections (2) and (3), the existing project, or the project after modification, were it a new project in the same category, would increase by at least the amounts set out in Column 2. (2) The following types of modifications are not reviewable under subsection (1): (a) replacement of generators or turbines; (b) other maintenance repairs. (3) Subsection (1) does not apply to projects described in subsection (5) of Column 2. (4) Modification of an existing project described in subsection (5) of Column 2, if the modification would increase production capacity by 50% or more. Criteria: (1) Dismantling or abandonment of an existing dam project associated with an existing hydroelectric power plant of any size, if the dam is, or was, permitted under the Water Sustainability Act to impound ≥ 10 million m3 of water. 2 Transmission Lines. Criteria: (1) Subject to subsection (2), a new transmission line of 345 kV or higher voltage and of 40 km or more in length, if the land on which the line is built is not alongside and contiguous to an area of land previously developed for a transmission line, transmission pipeline, public highway or railway. (2) Assessment of a new project under subsection (1) does not include the dismantling and abandonment phases. Criteria: (1) Subject to subsection (2), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the land in which the modified line is built is 40 km or more in length and is not alongside and contiguous to an area of land previously developed for a transmission line, transmission pipeline, public highway or railway. (2) Assessment of the modification of an existing project under subsection (1) does not include the dismantling and abandonment phases.
Table 8 — Petroleum and Natural Gas Projects Column 1
Project Category Column 2
New Project Column 3
Modification of Existing Project 1 Energy Storage Facilities. Criteria: (1) Subject to subsection (2), (a) a new liquefied natural gas facility with the design capacity to store ≥ 136 000 m3 of liquefied natural gas, or (b) any other energy storage facilities for a project with a total design capacity to store one or more energy resources in a quantity that can yield by combustion ≥ 3 PJ of energy. (2) Development or use of naturally occurring underground reservoirs for the storage of petroleum or natural gas is not reviewable under subsection (1) if those reservoirs are located in the Western Canadian Sedimentary Basin of northeast British Columbia within the map groups and blocks set out in Appendix 2. Criteria: (1) Subject to subsections (2) and (3), modification of an existing project if (a) the existing project, or the project after modification, were it a new project, would meet the criteria set out opposite in Column 2, and (b) the modification results in an increase in the capability of the project to store one or more energy resources, other than electricity, by a quantity that can yield by combustion ≥ 3 PJ of energy or, for liquefied natural gas, increase by ≥ 136 000 m3. (2) Replacement of project components solely for maintenance purposes is not reviewable under subsection (1). (3) Development or use of naturally occurring underground reservoirs for the storage of petroleum or natural gas is not reviewable under subsection (1) if those reservoirs are located in the Western Canadian Sedimentary Basin of northeast British Columbia within the map groups and blocks set out in Appendix 2. 2 Oil Refineries. Criteria: (1) A new project, including a heavy oil upgrader, with an input capacity of ≥ 10 000 m3/day. Criteria: (1) Modification of an existing project that would result in an increase in input capacity of ≥ 50% and total input capacity of ≥ 10 000 m3/day. 3 Natural Gas Processing Plants. Criteria: (1) A new natural gas processing plant facility that will result in sulphur emissions to the atmosphere of ≥ 2 tonnes/day. Criteria: (1) Modification of an existing facility if (a) the existing facility, or the existing facility after modification, were it a new facility, would meet the criteria set out opposite in Column 2, and (b) the modification results in an incremental increase in sulphur emissions to the atmosphere of ≥ 2 tonnes/day. 4 Transmission Pipelines. Criteria: (1) Subject to subsection (2), a new transmission pipeline facility with (a) a diameter of ≤ 114.3 mm and a length of ≥ 60 km, (b) a diameter of between 114.3 and 323.9 mm and a length of ≥ 50 km, or (c) a diameter of > 323.9 mm and a length of ≥ 40 km, if the land on which the pipeline is built is not alongside and contiguous to an area of land previously developed for a transmission line, transmission pipeline, public highway or railway. (2) Assessment of a new facility under subsection (1) does not include the dismantling and abandonment phases. Criteria: (1) Subject to subsections (2), modification of an existing facility if (a) the existing facility, or the existing facility after modification, were it a new facility, would meet the criteria set out opposite in Column 2, and (b) the modification results in (i) for a facility that when modified will have a diameter of < 114.3 mm, an extension of ≥ 60 km in length on land, in which the modified pipeline is built, that is not alongside and contiguous to an area of land previously developed for a transmission line, transmission pipeline, public highway or railway, (ii) for a facility that when modified will have a diameter of between 114.3 and 323.9 mm, an extension of ≥ 50 km in length on land, in which the modified pipeline is built, that is not alongside and contiguous to an area of land previously developed for a transmission line, transmission pipeline, public highway or railway (iii) for a facility that when modified will have a diameter of > 323.9 mm, an extension of ≥ 40 km in length on land, in which the modified pipeline is built, that is not alongside and contiguous to an area of land previously developed for a transmission line, transmission pipeline, public highway or railway. (2) Assessment of the modification of an existing facility described in subsection (1) does not include the dismantling and abandonment phases. 5 Offshore Oil or Gas Facilities. Criteria: (1) A new offshore oil or gas facility. Criteria: (1) Modification of an existing facility if (a) the existing facility, or the existing facility after modification, were it a new facility, would meet the criteria set out opposite in Column 2, and (b) the chief executive assessment officer has determined that the modification has the potential to result in a significant adverse environmental, economic, social, cultural or health effect.
Read the Reviewable Projects Regulation on BC Laws ↗
Made under Environmental Assessment Act, SBC 2018, c. 51.