Reviewable Projects Regulation, B.C. Reg. 243/2019
Section 11
Definitions for Part 4
Cite as Reviewable Projects Regulation, B.C. Reg. 243/2019, s. 11 · last amended December 15, 2025 · read from BC Laws on November 17, 2026
The text
In this Part:
“another power plant” means a project for the generation of electricity from the sun or the movement of tidal water, and includes all associated structures, machinery, appliances, fixtures, equipment and storage and handling facilities;
“energy resource” means natural gas and oil, and all other forms of petroleum and hydrocarbon, in gaseous or liquid state, and electricity;
“energy storage facility” means a place where an energy resource is accumulated or stored in bulk as part of the process of being transported or distributed, but does not include
(a) a compressor, separator or dehydrator if the compressor, separator or dehydrator is used as a part of the production of natural gas or oil, or both, from a well, or
(b) underground facilities used in conjunction with the production of natural gas or oil, or both, from a well and located at the wellhead;
“hydroelectric power plant” means a project for the generation of electricity from the motion of water, or from the position or potential motion of water, and includes associated dams, diversion works, water conduits and all structures, machinery, appliances, fixtures and equipment;
“municipal solid waste” has the same meaning as in section 14 and includes fuels derived by processing municipal solid waste;
“natural gas processing plant” means a project for processing natural gas by removing from it natural gas liquids, sulphur or substances other than water so that the natural gas meets transmission pipeline specifications;
“offshore oil or gas facility” means a platform, artificial island or other physical work or structure, including any associated facilities, that is intended to be used, or is used, for the exploration for or production of oil or natural gas from the foreshore or submerged land along a marine coastline, or from an offshore site located in salt water;
“process” means any process designed to remove elements or compounds, whether hydrocarbon or non-hydrocarbon, from gas, and includes absorption, adsorption and refrigeration, but does not include field processing that normally takes place on or near the extraction site, such as natural pressure reduction, mechanical separation, heating, cooling, dehydration and compression;
“sulphur emissions” means the total mass of sulphur, including elemental sulphur and all sulphur in compounds, expressed as elemental sulphur;
“thermal electric power plant” means a project for generating electricity from the combustion of natural gas, oil, petroleum products, coal, wood, wood waste, plant products or municipal solid waste or from the use of geothermal energy or from nuclear fission or fusion, and includes all associated structures, machinery, appliances, fixtures and equipment, and storage and handling facilities;
“transmission pipeline” means a pipe or system of pipes through which natural gas, oil or solids, or a liquid or gas derived from natural gas, oil or solids, whether in suspension or some other form, is transported, and includes compressor or pumping facilities and other equipment related to the operation of the transmission pipeline, associated terminal or storage facilities.
Read the Reviewable Projects Regulation on BC Laws ↗
Made under Environmental Assessment Act, SBC 2018, c. 51.