Reviewable Projects Regulation, B.C. Reg. 243/2019
Section 10
Criteria for proposed modifications of mine projects
Cite as Reviewable Projects Regulation, B.C. Reg. 243/2019, s. 10 · last amended December 15, 2025 · read from BC Laws on November 17, 2026
The text
(1) For the purposes of this Part, threshold E is met for a proposed modification of an existing project if
(a) the existing project, or the proposed project, were it a new project in the same category as the existing project as described in Column 1 of the applicable table, would meet the criteria set out opposite in Column 2, and
(b) the modification will result in the disturbance of an area of land that was not previously permitted for disturbance and that is at least 50% of the area of land that was previously permitted for disturbance at the existing project.
(2) In this Part, threshold F is met for a proposed modification of an existing project if
(a) the existing project, or the proposed project, were it a new project in the same category as the existing project as described in Column 1 of the applicable table, would meet the criteria set out opposite in Column 2, and
(b) the modification will result in the disturbance of an area of land that was not previously permitted for disturbance and that is at least 35% of the area of land that was previously permitted for disturbance at the existing project.
(3) In this Part, threshold G is met for a proposed modification of an existing project if
(a) the existing project, or the proposed project, were it a new project in the same category as the existing project as described in Column 1 of the applicable table, would meet the criteria set out opposite in Column 2, and
(b) the chief executive assessment officer has determined under subsection (4) that the modification has the potential to result in a significant adverse environmental, economic, social, cultural or health effect.
(4) For the purposes of a modification of an existing project in the offshore mine project category, the chief executive assessment officer must determine whether the modification has the potential to result in a significant adverse environmental, economic, social, cultural or health effect.
Table 6 — Mine Projects Column 1
Project Category Column 2
New Project Column 3
Modification of Existing Project 1 Coal Mines — SIC code 063. Criteria: (1) A new mine facility that, during operations, will have a production capacity of ≥ 250 000 tonnes/year of clean coal or raw coal or both. Criteria: (1) Modification of an existing mine facility that meets threshold E. 2 Mineral Mines. Criteria: (1) A new mine facility that, during operations, will have a production capacity of ≥ 75 000 tonnes/year of mineral ore. Criteria: (1) Modification of an existing mine facility that meets threshold E. 3 Sand and Gravel Pits — SIC code 082. Criteria: (1) A new pit facility that will have a production capacity of (a) ≥ 500 000 tonnes/year of excavated sand or gravel or both during at least one year of its operation, or (b) over a period of < 4 years of operation, ≥ 1 000 000 tonnes of excavated sand or gravel or both. Criteria: (1) Modification of an existing pit facility that meets threshold F. 4 Placer Mineral Mines. Criteria: (1) A new mine facility that, during operations, will have a production capacity of ≥ 250 000 tonnes/year of pay dirt. Criteria: (1) Modification of an existing pit facility that meets threshold F. 5 Construction Stone and Industrial Mineral Quarries. Criteria: (1) A new quarry facility or other operation that (a) involves the removal of construction stone or industrial minerals or both, (b) is regulated as a mine under the Mines Act, and (c) during operations, will have a production capacity of ≥ 250 000 tonnes/year of quarried product. Criteria: (1) Modification of an existing mine facility that meets threshold E. 6 Offshore Mines. Criteria: (1) A new offshore mine facility. Criteria: (1) Modification of an existing facility that meets threshold G.
Read the Reviewable Projects Regulation on BC Laws ↗
Made under Environmental Assessment Act, SBC 2018, c. 51.