Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117

Section 24

Cite as Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117, s. 24 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Every operator who is conducting an onshore geophysical operation shall, in respect of any charge that has not detonated as a result of misfire, ensure that (a) no attempt is made to remove the charge from the shot hole; and (b) an attempt is made to detonate the charge promptly by means of a fresh primer or by inserting and detonating another charge in that shot hole. (2) When a charge fails to detonate after an attempt is made under paragraph (1)(b), the operator shall ensure that the charge and the lead wires that are connected to it are buried in the shot hole and that the shot hole is plugged in accordance with section 25. (3) Every operator who is conducting an onshore geophysical operation shall, on completion of the operation, report in writing to a conservation officer the location of all charges that failed to detonate.
Read the Canada Oil and Gas Geophysical Operations Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.