Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117

Section 23

Cite as Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117, s. 23 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Every operator who is conducting an onshore geophysical operation shall ensure that, when a detonating cord is used in water, (a) the end of the cord is sealed; (b) the entire length of cord is submerged before the firing cable is connected to the blasting equipment; and (c) the charge is detonated as soon as possible after loading. (2) Every operator who is conducting an onshore geophysical operation shall ensure that, when a detonating cord is used on damp ground, the charge is detonated as soon as possible after loading. (3) Every operator who is conducting an onshore geophysical operation shall ensure that no vehicle is driven over a detonating cord.
Read the Canada Oil and Gas Geophysical Operations Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.