Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117

Section 25

Cite as Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117, s. 25 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Every operator who is conducting an onshore geophysical operation shall, after a charge has detonated, ensure that the shot hole is plugged by (a) filling the shot hole with drilling mud or cuttings to the point where the plug required by paragraph (b) is to be inserted; (b) inserting a shot hole plug of a type approved by the Chief Conservation Officer to a depth of at least 30 cm below the surface; (c) filling the shot hole above the plug with drilling mud or cuttings and tamping the contents into the shot hole; and (d) spreading any remaining drilling mud or cuttings over the ground in the vicinity of the shot hole. (2) Where, during an onshore geophysical operation, water or gas comes to the surface of a shot hole, the operator shall (a) in the case of water, immediately attempt to plug the shot hole to confine the water; and (b) in the case of gas, immediately evacuate the site until the gas has dissipated. (3) Every operator who, during an onshore geophysical operation, disturbs a shot hole from a previous geophysical operation shall ensure that the shot hole is plugged in accordance with subsection (1).
Read the Canada Oil and Gas Geophysical Operations Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.