Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117

Section 22

Cite as Canada Oil and Gas Geophysical Operations Regulations, SOR/96-117, s. 22 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

Every operator who is conducting an onshore geophysical operation shall ensure that (a) detonator lead wires remain shunted at all times except when the charges are ready to be fired and during circuit testing after loading; (b) all blasting equipment at the blasting site is under the direct supervision and control of the shooter; (c) when conducting a blasting operation in the vicinity of buildings, railways, roads or inhabited areas, the shooter (i) takes adequate precautions to prevent any damage to property, and (ii) places warning signs or barricades or uses flagpersons to ensure that no persons other than those engaged in the blasting operation remain in the area made dangerous by the blasting operation; (d) when blasting operations are being carried out, the shooter takes adequate precautions to ensure that no charge is fired until all persons in the vicinity of the charge are protected by suitable cover from falling rocks, flying debris, mud and any other material disturbed or displaced as a result of the detonation or are at a safe distance from the charge; (e) detonators that are used near the surface of the ground are covered in such a manner that any fragments of metal and debris resulting from the detonation are confined; (f) a radio transmitter is not used at or near a blasting site when there are detonators outside of a magazine and above ground; (g) all blasting equipment is maintained in good working condition; (h) repair work to blasting equipment or to the firing cable is not conducted while the firing cable is wired to charges; (i) the blasting equipment is disconnected from the blasting circuit and the ends of the lead wires connected to the charge are twisted together (i) immediately after firing, if the charge fails to detonate, and (ii) before any member of the geophysical crew inspects any shot hole that contains or may contain explosives; (j) every detonator remains disconnected from the firing cable until the next charge or the next series or pattern of charges is ready to be fired and until the shotpoint is clear of all persons; (k) all shot holes containing a charge are fired before the termination of the operation; (l) blasting operations are not carried out during an electrical storm or when an electrical storm is imminent; (m) anti-static detonators are used where possible for all blasting operations; and (n) all electric detonator lead wires and other refuse from the blasting operation are retrieved from the field location of the operation.
Read the Canada Oil and Gas Geophysical Operations Regulations on the Justice Laws Website ↗

Made under Canada Oil and Gas Operations Act, R.S.C. 1985, c. O-7.