Canada Offshore Renewable Energy Regulations, SOR/2024-272

Section 19

Integrity management program

Cite as Canada Offshore Renewable Energy Regulations, SOR/2024-272, s. 19 · current to December 2, 2025 · regulation last amended December 16, 2024

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) The integrity management program must be aimed at ensuring that all facilities, equipment and systems related to the offshore renewable energy project or offshore power line (a) meet the requirements of all applicable laws in respect of the design of such facilities, equipment and systems; (b) are tested, inspected, monitored, maintained and operated in such a way as to ensure safety, security and environmental protection under the operating conditions and maximum loads that are likely to exist during any authorized work or activities; and (c) remain fit for the purposes for which they are to be used and can be operated without posing a threat to safety, security or the environment. (2) The integrity management program must be based on a risk assessment that is conducted in accordance with industry best practices and that takes into account the assumptions on which the design is based. (3) The integrity management program must set out the measures to be taken by the operator to monitor the condition of the facilities, equipment and systems related to the offshore renewable energy project or offshore power line and to conduct periodic inspections and testing, and must include (a) the measures to be taken to evaluate the condition of the facilities, equipment and systems and the operational, physical and environmental conditions to which they are subjected; (b) the scope and frequency of the periodic inspections that are necessary to ensure the continued performance and safe functioning of the facilities, equipment and systems; (c) a description of the incidents, including natural events and accidents, that will trigger an inspection; and (d) the scope of the inspection to be conducted after an incident occurs. (4) The finalized version of the integrity management program must also include the certification statement referred to in paragraph 40(3)(c). (5) The operator must document the results of the monitoring, inspection and testing carried out for the purposes of the integrity management program.
Read the Canada Offshore Renewable Energy Regulations on the Justice Laws Website ↗

Made under Canadian Energy Regulator Act, S.C. 2019, c. 28, s. 10.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.