Chromium Electroplating, Chromium Anodizing and Reverse Etching Regulations, SOR/2009-162

Section 9

Cite as Chromium Electroplating, Chromium Anodizing and Reverse Etching Regulations, SOR/2009-162, s. 9 · current to July 24, 2025 · regulation last amended March 16, 2020

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Subject to subsection (2), every person referred to in section 8 must prepare and implement an inspection and maintenance plan that (a) is in accordance with the instructions of the manufacturer of the tank cover; and (b) includes at least the following tasks: (i) induction of an external pressure on the membrane while the tank cover is closed and the tank is in operation to verify that the membrane moves outward, each day that the cover is used, (ii) drainage of the air inlet by purging the air valves at the end of each day during which the person operates the tank or at the end of each plating, anodizing or reverse etching cycle and, if the membrane does not move inward during the purge, verification of the seal of the tank cover, (iii) inspection of the access doors and membranes at least once per week to determine whether the tank cover leaks and whether there are any tears in the membrane, (iv) drainage of the evacuation device into the tank at least once per week, (v) inspection of the membrane for perforations at least once per month using a light source that illuminates the membrane, (vi) inspection, at least once per month, of all clamps that hold the tank cover closed in order to verify that they keep the cover closed, and replacement of any defective clamps, (vii) inspection of all piping to and all piping from the evacuation device at least once every three months to verify that there are no leaks and no evidence of deterioration, and (viii) replacement of the HEPA filter on the evacuation device at least once per year. (2) If a tank cover is being used to control the release of hexavalent chromium compounds from a tank located at a facility at which chromium electroplating, chromium anodizing or reverse etching is carried out on the day on which this section comes into force, subsection (1) applies six months after that day. (3) Every person performing an inspection or maintenance task under the inspection and maintenance plan must (a) if they identify any defect in the course of the inspection or maintenance task, cease any chromium electroplating, chromium anodizing or reverse etching, correct the defect and verify that the defect has been corrected before resuming any of those activities; and (b) keep a record that contains the following information: (i) the date on which each inspection and maintenance task was performed, (ii) a description of each inspection and maintenance task performed, (iii) the date on which each defect was identified, and (iv) a description of the measures taken to correct the defect.
Read the Chromium Electroplating, Chromium Anodizing and Reverse Etching Regulations on the Justice Laws Website ↗

Made under Canadian Environmental Protection Act, 1999, S.C. 1999, c. 33.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.