Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 7
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 7 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) In proven areas, the use of blowout preventers is obligatory and they shall be used in accordance with established good practice.
(2) In unproven areas, all drilling wells shall be equipped with minimum blowout-control equipment consisting of
(a) equipment that will completely close off the open hole;
(b) equipment that will completely close off around the drill pipe, casing and tubing that are being employed in the drilling operations; and
(c) a bleed-off line and valve of the proper size and working pressure.
(3) Controls for the blowout preventers shall be located at a point not less than two feet outside the substructure.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.