Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 8
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 8 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Before commencing to drill, proper and adequate slush pits shall be constructed for the reception of mud of sufficient quality and quantity so that such mud may be available if and when the hole is plugged, and where cable tools are used, sufficient surface casing shall be set to a depth specified in the notice of intention to drill and cemented from bottom to top and no natural gas that may be encountered in any section of a cable tool drilled hole above the ultimate objective may be permitted to blow while drilling proceeds, but shall be shut off either by mudding or by the running of a string of casing, and, if the latter method is used, such string of casing shall be tested by bailing to insure shut-off before drilling proceeds.
(2) The casing program adopted for cable tool drilled wells shall be planned to protect any potential oil or gas bearing horizons penetrated during drilling from infiltration of injurious waters from other horizons and to prevent the migration of oil or gas from one horizon to another.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.