Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 6

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 6 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) Surface casing satisfactory to the Oil Conservation Engineer shall be used in wells and shall be placed to the depth required by him. (2) Surface casing shall be cemented by the pump and plug or displacement method from the bottom to top and cement shall be allowed to set for not less than 12 hours under pressure before drilling the plug. (3) Production casing or intermediate strings of casing when run shall be of a design to meet safety factors of 1.60 in tension, 1.125 in collapse and 1.0 in burst. (4) The casing design shall be submitted in triplicate to the Oil Conservation Engineer on a form approved by the Chief. (5) Production casing shall be cemented to a height sufficient to ensure isolation of the productive zones. (6) The pump and plug method of cementing shall be used and the cement shall be allowed to set for not less than 24 hours and shall be pressure tested in accordance with good oil field practice before the cement plug is drilled.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.