Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517

Section 17

Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 17 · current to July 24, 2025 · regulation last amended March 22, 2006

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

(1) A report in triplicate on a form approved by the Chief shall be forwarded to the Oil Conservation Engineer within 30 days of (a) the abandonment of a well; or (b) the suspension of drilling of a well. (2) The licensee, permittee or lessee shall, within 30 days of receiving core, oil, gas or water analyses by him or caused to be made by him, submit copies in duplicate to the Oil Conservation Engineer. (3) Upon completion of a structure test hole program the licensee, permittee or lessee shall submit to the Oil Conservation Engineer a report on a form approved by the Chief in triplicate on each hole drilled.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗

Made under Territorial Lands Act, R.S.C. 1985, c. T-7.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.