Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 18
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 18 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) Within 30 days after the completion of a well or the recompletion of a well into a different producing interval or a workover operation, a report in triplicate shall be filed with the Oil Conservation Engineer on a form approved by the Chief by the permittee, lessee or his authorized agent.
(2) Within 30 days after the initial production test following completion, recompletion or any workover operation, a supplemental well completion report in triplicate shall be filed with the Oil Conservation Engineer on an approved form.
(3) During any period of testing as required by the Oil Conservation Engineeer following completion, recompletion or workover operation, the licensee, permittee or lessee shall report weekly, if mail service permits, in duplicate, the daily production and such report shall be specific as to the recovery of oil or gas and the period of time in which production was obtained.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.