Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517
Section 16
Cite as Canada Oil and Gas Drilling and Production Regulations, C.R.C., c. 1517, s. 16 · current to July 24, 2025 · regulation last amended March 22, 2006
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
The licensee, permittee or lessee shall, as soon as weather or ground conditions permit, upon the final abandonment and completion of the plugging of any well or structure test hole, clear the area around the location of all refuse material, burn waste oil, drain and fill all excavations, remove concrete bases, machinery and materials other than the marker provided for in subsection 15(5) and level the surface to leave the site as nearly as possible in the condition encountered when operations were commenced.
Read the Canada Oil and Gas Drilling and Production Regulations on the Justice Laws Website ↗
Made under Territorial Lands Act, R.S.C. 1985, c. T-7.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.