This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Hydropower Improvement Act of 2015 This bill declares that hydropower is a renewable resource for purposes of all federal programs and is an essential source of energy in the United States. The Federal Power Act is amended to limit the conditions placed on construction licenses issued for dams, conduits and reservoirs within any federal to those that: (1) pertain to the reservation land on which project works are located; and (2) have a clear and direct nexus to the presence or operations of the project being licensed, as determined by the Federal Energy Regulatory Commission (FERC). Preliminary permits issued to maintain priority of application for a license may be extended from three years to four years. FERC may: (1) extend the period of a preliminary permit for up to four additional years beyond the initial four years, and (2) grant the permittee an additional permit if extraordinary circumstances warrant that action. When determining the term of a license, FERC must consider project-related investments by the licensee over the term of the existing license that resulted in new development, construction, capacity, efficiency improvements, or environmental measures, but which did not result in FERC extension of the license term. FERC shall also determine alternative prescriptions for a fishway license instead of the Department of the Interior. FERC shall require a licensee to construct, maintain, and operate fishways only if the fishways are necessary to mitigate effects of a project upon fish populations, have a clear and direct nexus to the presence or operations of the project being licensed, and are submitted in accordance with a specified schedule. FERC shall in addition: (1) investigate best practices in performing licensing studies, including methodologies and the design of studies to assess the full range of any environmental impacts of a project; (2) compile a comprehensive collection of studies and data accessible to the public that could be used to inform license proceedings; and (3) act as the lead agency coordinating all applicable federal authorizations. FERC may, upon request, designate staff to hold informal meetings to discuss technical or procedural matters relating to any ongoing license proceeding. The bill revises requirements regarding the entitlement of a license applicant, including any party to the proceeding, to a determination on the record, after opportunity for a trial-type hearing, concerning disputed issues of material fact with respect to an applicable covered measure. In implementing the Hydropower Regulatory Efficiency Act of 2013, FERC must consider a closed loop pumped storage project to include one: (1) in which the upper and lower reservoirs do not impound or directly withdraw water from a navigable stream, and (2) that is not continuously connected to a naturally flowing water feature.
Bill Text
- Introduced Introduced in Senate Current html May 06, 2015
Sections of law this bill changes
8 sections in 2 lawsFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Federal regulation and development of power · 16 U.S.C. ch. 12 6 sections Amends the act as a whole
-
§ 797 General powers of Commission Amends
16 U.S.C. § 797 — at 797(e)
The law today
The Commission is authorized and empowered— (a) Investigations and data To make investigations and to collect and record data concerning the utilization of the water resources of any region to be developed, the water-power industry and its relation to other industries and to interstate or foreign commerce, and concerning the location, capacity, development costs, and relation to markets of power sites, and whether the power from Government dams can be advantageously used by the United States for its public purposes, and what is a fair value of such power, to the extent the Commission may deem necessary or useful for the purposes of this chapter. (b) Statements as to investment of licensees in projects; access to projects, maps, etc. To determine the actual legitimate original cost of and the net investment in a licensed project, and to aid the Commission in such determinations, each licensee shall, upon oath, within a reasonable period of time to be fixed by the Commission, after the construction of the original project or any addition thereto or betterment thereof, file with the Commission in such detail as the Commission may require, a statement in duplicate showing the actual legitimate original cost of construction of such project addition, or betterment, and of the price paid for water rights, rights-of-way, lands, or interest in lands. The licensee shall grant to the Commission or to its duly authorized agent or agents, at all reasonable times, free access to such project, addition, or betterment, and to all maps, profiles, contracts, reports of engineers, accounts, books, records, and all other papers and documents relating thereto. The statement of actual legitimate original cost of said project, and revisions thereof as determined by the Commission, shall be filed with the Secretary of the Treasury. (c) Cooperation with executive departments; information and aid furnished Commission To cooperate with the executive departments and other agencies of State or National Governments in such investigations; and for such purpose the several departments and agencies of the National Government are authorized and directed upon the request of the Commission, to furnish such records, papers, and information in their possession as may be requested by the Commission, and temporarily to detail to the Commission such officers or experts as may be necessary in such investigations. (d) Publication of information, etc.; reports to Congress To make public from time to time the information secured hereunder, and to provide for the publication of its reports and investigations in such form and manner as may be best adapted for public information and use. The Commission, on or before the 3d day of January of each year, shall submit to Congress for the fiscal year preceding a classified report showing the permits and licenses issued under this subchapter, and in each case the parties thereto, the terms prescribed, and the moneys received if any, or account thereof. (e) Issue of licenses for construction, etc., of dams, conduits, reservoirs, etc. To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as here...21 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 798 Purpose and scope of preliminary permits; transfer and cancellation Amends
16 U.S.C. § 798
The law today
(a) Purpose Each preliminary permit issued under this subchapter shall be for the sole purpose of maintaining priority of application for a license under the terms of this chapter for such period or periods, not exceeding a total of 4 years, as in the discretion of the Commission may be necessary for making examinations and surveys, for preparing maps, plans, specifications, and estimates, and for making financial arrangements. (b) Extension of period The Commission may— (1) extend the period of a preliminary permit once for not more than 4 additional years beyond the 4 years permitted by subsection (a) if the Commission finds that the permittee has carried out activities under such permit in good faith and with reasonable diligence; and (2) after the end of an extension period granted under paragraph (1), issue an additional permit to the permittee if the Commission determines that there are extraordinary circumstances that warrant the issuance of the additional permit. (c) Permit conditions Each such permit shall set forth the conditions under which priority shall be maintained. (d) Non-transferability and cancellation of permits Such permits shall not be transferable, and may be canceled by order of the Commission upon failure of permittees to comply with the conditions thereof or for other good cause shown after notice and opportunity for hearing.10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 806 Time limit for construction of project works; extension of time; termination or revocation of licenses for delay Amends
16 U.S.C. § 806
The law today
The licensee shall commence the construction of the project works within the time fixed in the license, which shall not be more than two years from the date thereof, shall thereafter in good faith and with due diligence prosecute such construction, and shall within the time fixed in the license complete and put into operation such part of the ultimate development as the commission shall deem necessary to supply the reasonable needs of the then available market, and shall from time to time thereafter construct such portion of the balance of such development as the commission may direct, so as to supply adequately the reasonable market demands until such development shall have been completed. The periods for the commencement of construction may be extended for not more than 8 additional years, and the period for the completion of construction carried on in good faith and with reasonable diligence may be extended by the commission when not incompatible with the public interests. In case the licensee shall not commence actual construction of the project works, or of any specified part thereof, within the time prescribed in the license or as extended by the commission, then, after due notice given, the license shall, as to such project works or part thereof, be terminated upon written order of the commission. In case the construction of the project works, or of any specified part thereof, has been begun but not completed within the time prescribed in the license, or as extended by the commission, then the Attorney General, upon the request of the commission, shall institute proceedings in equity in the district court of the United States for the district in which any part of the project is situated for the revocation of said license, the sale of the works constructed, and such other equitable relief as the case may demand, as provided for in section 820 of this title.5 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 808 New licenses and renewals Amends
16 U.S.C. § 808 — at 808(e)
The law today
(a) Relicensing procedures; terms and conditions; issuance to applicant with proposal best adapted to serve public interest; factors considered (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in section 807 of this title, the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in section 807 of this title: Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid. (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in making this determination the Commission shall ensure that insignificant differences with regard to subparagraphs (A) through (G) of this paragraph between competing applications are not determinative and shall not result in the transfer of a project. In making a determination under this section (whether or not more than one application is submitted for the project), the Commission shall, in addition to the requirements of section 803 of this title, consider (and explain such consideration in writing) each of the following: (A) The plans and abilities of the applicant to comply with (i) the articles, terms, and conditions of any license issued to it and (ii) other applicable provisions of this subchapter. (B) The plans of the applicant to manage, operate, and maintain the project safely. (C) The plans and abilities of the applicant to operate and maintain the project in a manner most likely to provide efficient and reliable electric service. (D) The need of the applicant over the short and long term for the electricity generated by the project or projects to serve its customers, including, among other relevant considerations, the reasonable costs and reasonable availability of alternative sources of power, taking into consideration conservation and other relevant factors and taking into consideration the effect on the provider (including its customers) of the alternative source of power, the effect on the applicant’s operating and load characteristics, the effect on communities served or to be served by the project, and in the case of an applicant using power for the applicant’s own industrial facility and related operations, the effect on the operation and efficiency of such facility or related operations, its workers, and the related community. In the case of an applicant that is an Indian tribe applying for a license for a project located on the tribal reservation, a statement of the need of such tribe for electricity generated by the project to foster the purposes of the reservation may be included. (E) The existing and planned transmission services of the applicant, taking into consideration system reliability, costs, and other applicable economic and technical factors. (F) Whether the plans of the applicant will be achieved, to the greatest extent possible, in a cost effective manner. (G) Such other factors as the Commission may deem relevant, except that the terms ...9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 811 Operation of navigation facilities; rules and regulations; penalties Amends
16 U.S.C. § 811
The law today
The Commission shall require the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate. The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such fishways. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection 1 and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission. The operation of any navigation facilities which may be constructed as a part of or in connection with any dam or diversion structure built under the provisions of this chapter, whether at the expense of a licensee hereunder or of the United States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of the Army; and for willful failure to comply with any such rule or regulation such licensee shall be deemed guilty of a misdemeanor, and upon conviction thereof shall be punished as provided in section 825o of this title.13 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 823d Alternative conditions and prescriptions Amends
16 U.S.C. § 823d
The law today
(a) Alternative conditions (1) Whenever any person applies for a license for any project works within any reservation of the United States, and the Secretary of the department under whose supervision such reservation falls (referred to in this subsection as the “Secretary”) deems a condition to such license to be necessary under the first proviso of section 797(e) of this title, the license applicant or any other party to the license proceeding may propose an alternative condition. (2) Notwithstanding the first proviso of section 797(e) of this title, the Secretary shall accept the proposed alternative condition referred to in paragraph (1), and the Commission shall include in the license such alternative condition, if the Secretary determines, based on substantial evidence provided by the license applicant, any other party to the proceeding, or otherwise available to the Secretary, that such alternative condition— (A) provides for the adequate protection and utilization of the reservation; and (B) will either, as compared to the condition initially by the Secretary— (i) cost significantly less to implement; or (ii) result in improved operation of the project works for electricity production. (3) In making a determination under paragraph (2), the Secretary shall consider evidence provided for the record by any party to a licensing proceeding, or otherwise available to the Secretary, including any evidence provided by the Commission, on the implementation costs or operational impacts for electricity production of a proposed alternative. (4) The Secretary concerned shall submit into the public record of the Commission proceeding with any condition under section 797(e) of this title or alternative condition it accepts under this section, a written statement explaining the basis for such condition, and reason for not accepting any alternative condition under this section. The written statement must demonstrate that the Secretary gave equal consideration to the effects of the condition adopted and alternatives not accepted on energy supply, distribution, cost, and use; flood control; navigation; water supply; and air quality (in addition to the preservation of other aspects of environmental quality); based on such information as may be available to the Secretary, including information voluntarily provided in a timely manner by the applicant and others. The Secretary shall also submit, together with the aforementioned written statement, all studies, data, and other factual information available to the Secretary and relevant to the Secretary’s decision. (5) If the Commission finds that the Secretary’s final condition would be inconsistent with the purposes of this subchapter, or other applicable law, the Commission may refer the dispute to the Commission’s Dispute Resolution Service. The Dispute Resolution Service shall consult with the Secretary and the Commission and issue a non-binding advisory within 90 days. The Secretary may accept the Dispute Resolution Service advisory unless the Secretary finds that the recommendation will not adequately protect the reservation. The Secretary shall submit the advisory and the Secretary’s final written determination into the record of the Commission’s proceeding. (b) Alternative prescriptions (1) Whenever the Secretary of the Interior or the Secretary of Commerce prescribes a fishway under section 811 of this title, the license applicant or any other party to the license proceeding may propose an alternative to such prescription to construct, maintain, or operate a fishway. (2) Notwithstanding section 811 of this title, the Secretary of the Interior or the Secretary of Commerce, as appropriate, shall accept and prescribe, and the Commission shall require, the proposed alternative referred to in paragraph (1), if the Secretary of the appropriate department determines, based on substantial evidence provided by the license applicant, any other party to the proceeding, or otherwise available t...4 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
National energy policy and programs · 42 U.S.C. ch. 149 1 section
-
§ 15852 Federal purchase requirement Amends
42 U.S.C. § 15852 — at 15852(b)(2)
The law today
(a) Requirement The President, acting through the Secretary, shall seek to ensure that, to the extent economically feasible and technically practicable, of the total amount of electric energy the Federal Government consumes during any fiscal year, the following amounts shall be renewable energy: (1) Not less than 3 percent in fiscal years 2007 through 2009. (2) Not less than 5 percent in fiscal years 2010 through 2012. (3) Not less than 7.5 percent in fiscal year 2013 and each fiscal year thereafter. (b) Definitions In this section: (1) Biomass The term “biomass” means any lignin waste material that is segregated from other waste materials and is determined to be nonhazardous by the Administrator of the Environmental Protection Agency and any solid, nonhazardous, cellulosic material that is derived from— (A) any of the following forest-related resources: mill residues, precommercial thinnings, slash, and brush, or nonmerchantable material; (B) solid wood waste materials, including waste pallets, crates, dunnage, manufacturing and construction wood wastes (other than pressure-treated, chemically-treated, or painted wood wastes), and landscape or right-of-way tree trimmings, but not including municipal solid waste (garbage), gas derived from the biodegradation of solid waste, or paper that is commonly recycled; (C) agriculture wastes, including orchard tree crops, vineyard, grain, legumes, sugar, and other crop by-products or residues, and livestock waste nutrients; or (D) a plant that is grown exclusively as a fuel for the production of electricity. (2) Renewable energy The term “renewable energy” means marine energy (as defined in section 17211 of this title), or electric energy produced from solar, wind, biomass, landfill gas, geothermal, municipal solid waste, or new hydroelectric generation capacity achieved from increased efficiency or additions of new capacity at an existing hydroelectric project. (c) Calculation (1) In general For purposes of determining compliance with the requirement of this section, the amount of renewable energy shall be doubled if— (A) the renewable energy is produced and used on-site at a Federal facility; (B) the renewable energy is produced on Federal lands and used at a Federal facility; or (C) the renewable energy is produced on Indian land as defined in title XXVI of the Energy Policy Act of 1992 (25 U.S.C. 3501 et seq.) and used at a Federal facility. (2) Separate calculation (A) In general For purposes of determining compliance with the requirement of this section, any energy consumption that is avoided through the use of geothermal energy shall be considered to be renewable energy produced. (B) Efficiency accounting Energy consumption that is avoided through the use of geothermal energy that is considered to be renewable energy under this section shall not be considered energy efficiency for the purpose of compliance with Federal energy efficiency goals, targets, and incentives. (d) Report Not later than April 15, 2007, and every 2 years thereafter, the Secretary shall provide a report to Congress on the progress of the Federal Government in meeting the goals established by this section.32 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Also cites: 16 U.S.C. § 2705
Action History
-
Committee on Energy and Natural Resources. Hearings held.
-
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
- Lisa Murkowski · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 547 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (547)
547 members have not signed on to this bill.
Show all 547 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Frequently asked questions
- What does S 1236 do?
- Hydropower Improvement Act of 2015 This bill declares that hydropower is a renewable resource for purposes of all federal programs and is an essential source of energy in the United States. The Federal Power Act is amended to limit the conditions placed on construction licenses issued for dams, conduits and reservoirs within any federal to those that: (1) pertain to the reservation land on which project works are located; and (2) have a clear and direct nexus to the presence or operations of the project being licensed, as determined by the Federal Energy Regulatory Commission (FERC). Preliminary permits issued to maintain priority of application for a license may be extended from three years to four years. FERC may: (1) extend the period of a preliminary permit for up to four additional years beyond the initial four years, and (2) grant the permittee an additional permit if extraordinary circumstances warrant that action. When determining the term of a license, FERC must consider project-related investments by the licensee over the term of the existing license that resulted in new development, construction, capacity, efficiency improvements, or environmental measures, but which did not result in FERC extension of the license term. FERC shall also determine alternative prescriptions for a fishway license instead of the Department of the Interior. FERC shall require a licensee to construct, maintain, and operate fishways only if the fishways are necessary to mitigate effects of a project upon fish populations, have a clear and direct nexus to the presence or operations of the project being licensed, and are submitted in accordance with a specified schedule. FERC shall in addition: (1) investigate best practices in performing licensing studies, including methodologies and the design of studies to assess the full range of any environmental impacts of a project; (2) compile a comprehensive collection of studies and data accessible to the public that could be used to inform license proceedings; and (3) act as the lead agency coordinating all applicable federal authorizations. FERC may, upon request, designate staff to hold informal meetings to discuss technical or procedural matters relating to any ongoing license proceeding. The bill revises requirements regarding the entitlement of a license applicant, including any party to the proceeding, to a determination on the record, after opportunity for a trial-type hearing, concerning disputed issues of material fact with respect to an applicable covered measure. In implementing the Hydropower Regulatory Efficiency Act of 2013, FERC must consider a closed loop pumped storage project to include one: (1) in which the upper and lower reservoirs do not impound or directly withdraw water from a navigable stream, and (2) that is not continuously connected to a naturally flowing water feature.
- Who sponsors S 1236?
- S 1236 is sponsored by Lisa Murkowski (R).
- What is the current status of S 1236?
- This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 1236?
- Track S 1236 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 1236
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 1236
Last checked for changes 16 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →