United States 111th Congress Status: Died

S 539 — Clean Renewable Energy and Economic Development Act

Last action — Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S2839-2845)

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Clean Renewable Energy and Economic Development Act - Amends the Federal Power Act to require the President to designate as national renewable energy zones areas that have: (1) the potential to generate in excess of one giawatt of electricity from renewable energy; (2) insufficient electric transmission capacity to achieve such potential; and (3) the capability to contain additional renewable energy generating facilities if there were a sufficient transmission capacity. Excludes specified areas from such zones, including national parks, wilderness areas, and historic sites. Sets forth provisions concerning: (1) the certification by the Federal Energy Regulatory Commission (FERC) of regional planning entities to coordinate planning efforts to integrate renewable energy resources from such zones into the interstate electric transmission grid and to make such resources fully deliverable to electricity consuming areas; (2) interconnection-wide green transmission grid project plans (grid project plans) and cost allocation plans; (3) the participation of specified federal transmitting utilities in the planning process; and (4) a federal transmission surcharge to generate revenue to enable entities and states to recover costs of planning activities. Authorizes FERC to issue construction permits, that may permit the acquisition of a necessary right-of-way through eminent domain, for interconnection-wide green transmission grid projects (projects) that meet specified conditions. Directs the Secretary of Energy (Secretary) to make grants to states and planning entities that submit or implement grid project plans for specified activities. Requires the Bonneville Power Administration and the Western Area Power Administration (WAPA) to establish: (1) wind integration programs; and (2) a joint geothermal integration program. Requires each of the Federal Power Marketing Administrations and the Tennessee Valley Authority to establish a solar integration program. Requires: (1) federal transmitting utilities to undertake geographically diverse projects within their service territories to acquire and demonstrate electric and hybrid vehicles and related technologies as part of their fleets; and (2) the Secretary of the Interior and the Secretary of the Army to study reregulating facilities and pumped storage units at federal dams. Authorizes WAPA to fund a wind-hydro or solar-hydro integration demonstration project. Sets forth provisions concerning the creation and development of solar energy reserves on federal land. Expands the purpose of incentive-based rate treatments for the transmission of electric energy by public utilities to include integrating renewable energy resources into the transmission system. Amends the Energy Policy Act of 2005 to: (1) increase the maximum amount the Secretary may accept for transmission investments in WAPA and the Southwestern Area Power Administration territories; and (2) revise provisions concerning the Federal Permit Streamlining Pilot Project, including requiring the Secretary of the Interior to designate Bureau of Land Management (BLM) field offices in specified states to serve as Renewable Energy Pilot Project Offices for coordination of federal permits for renewable energy projects and renewable energy transmission involving federal land.

Bill Text

Sections of law this bill changes

6 sections in 3 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Federal regulation and development of power · 16 U.S.C. ch. 12 2 sections Amends the act as a whole
  • § 824s Transmission infrastructure investment Amends

    16 U.S.C. § 824s — at 824s(a)

    The law today

    (a) Rulemaking requirement Not later than 1 year after August 8, 2005, the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion. (b) Contents The rule shall— (1) promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities; (2) provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies); (3) encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and (4) allow recovery of— (A) all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824o of this title; and (B) all prudently incurred costs related to transmission infrastructure development pursuant to section 824p of this title. (c) Incentives In the rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Transmission Organization. The Commission shall ensure that any costs recoverable pursuant to this subsection may be recovered by such utility through the transmission rates charged by such utility or through the transmission rates charged by the Transmission Organization that provides transmission service to such utility. (d) Just and reasonable rates All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are subject to the requirements of sections 824d and 824e of this title that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential.

    9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 825o-1 Enforcement of certain provisions Amends

    16 U.S.C. § 825o-1

    The law today

    (a) Violations It shall be unlawful for any person to violate any provision of subchapter II or any rule or order issued under any such provision. (b) Civil penalties Any person who violates any provision of subchapter II or any provision of any rule or order thereunder shall be subject to a civil penalty of not more than $1,000,000 for each day that such violation continues. Such penalty shall be assessed by the Commission, after notice and opportunity for public hearing, in accordance with the same provisions as are applicable under section 823b(d) of this title in the case of civil penalties assessed under section 823b of this title. In determining the amount of a proposed penalty, the Commission shall take into consideration the seriousness of the violation and the efforts of such person to remedy the violation in a timely manner.

    7 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Leases and prospecting permits · 30 U.S.C. ch. 3A 1 section
  • § 191 Disposition of moneys received Amends

    30 U.S.C. § 191 — at 191(c)(3)

    The law today

    (a) In general All money received from sales, bonuses, royalties including interest charges collected under the Federal Oil and Gas Royalty Management Act of 1982 [30 U.S.C. 1701 et seq.], and rentals of the public lands under the provisions of this chapter and the Geothermal Steam Act of 1970 [30 U.S.C. 1001 et seq.], shall be paid into the Treasury of the United States; and, subject to the provisions of subsection (b), 50 per centum thereof shall be paid by the Secretary of the Treasury to the State other than Alaska within the boundaries of which the leased lands or deposits are or were located; said moneys paid to any of such States on or after January 1, 1976, to be used by such State and its subdivisions, as the legislature of the State may direct giving priority to those subdivisions of the State socially or economically impacted by development of minerals leased under this chapter, for (i) planning, (ii) construction and maintenance of public facilities, and (iii) provision of public service; and excepting those from Alaska, 40 per centum thereof shall be paid into, reserved, appropriated, as part of the reclamation fund created by the Act of Congress known as the Reclamation Act, approved June 17, 1902, and of those from Alaska, 90 per centum thereof shall be paid to the State of Alaska for disposition by the legislature thereof: Provided, That all moneys which may accrue to the United States under the provisions of this chapter and the Geothermal Steam Act of 1970 from lands within the naval petroleum reserves shall be deposited in the Treasury as “miscellaneous receipts”, as provided by section 8733(b) of title 10. All moneys received under the provisions of this chapter and the Geothermal Steam Act of 1970 not otherwise disposed of by this section shall be credited to miscellaneous receipts. Payments to States under this section with respect to any moneys received by the United States, shall be made not later than the last business day of the month in which such moneys are warranted by the United States Treasury to the Secretary as having been received, except for any portion of such moneys which is under challenge and placed in a suspense account pending resolution of a dispute. Such warrants shall be issued by the United States Treasury not later than 10 days after receipt of such moneys by the Treasury. Moneys placed in a suspense account which are determined to be payable to a State shall be made not later than the last business day of the month in which such dispute is resolved. Any such amount placed in a suspense account pending resolution shall bear interest until the dispute is resolved. (b) Deduction for administrative costs In determining the amount of payments to the States under this section, beginning in fiscal year 2014 and for each year thereafter, the amount of such payments shall be reduced by 2 percent for any administrative or other costs incurred by the United States in carrying out the program authorized by this chapter, and the amount of such reduction shall be deposited to miscellaneous receipts of the Treasury. (c) Rentals received on or after August 8, 2005 (1) Notwithstanding the first sentence of subsection (a), any rentals received from leases in any State (other than the State of Alaska) on or after August 8, 2005, shall be deposited in the Treasury, to be allocated in accordance with paragraph (2). (2) Of the amounts deposited in the Treasury under paragraph (1)— (A) 50 percent shall be paid by the Secretary of the Treasury to the State within the boundaries of which the leased land is located or the deposits were derived; and (B) 50 percent shall be deposited in a special fund in the Treasury, to be known as the “BLM Permit Processing Improvement Fund” (referred to in this subsection as the “Fund”). (3) Use of fund.— (A) In general.— The Fund shall be available to the Secretary of the Interior for expenditure, without further appropriation and without fiscal year limitation, for t...

    60 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

National energy policy and programs · 42 U.S.C. ch. 149 2 sections
  • § 15924 Project to improve Federal permit coordination Amends

    42 U.S.C. § 15924

    The law today

    (a) Establishment The Secretary of the Interior (referred to in this section as the “Secretary”) shall establish a Federal Permit Streamlining Project (referred to in this section as the “Project”). (b) Memorandum of understanding (1) In general Not later than 90 days after August 8, 2005, the Secretary shall enter into a memorandum of understanding for purposes of this section with— (A) the Secretary of Agriculture; (B) the Administrator of the Environmental Protection Agency; and (C) the Chief of Engineers. (2) State participation The Secretary may request that the Governors of the States in which Project offices are located be signatories to the memorandum of understanding. (c) Designation of qualified staff (1) In general Not later than 30 days after the date of the signing of the memorandum of understanding under subsection (b), all Federal signatory parties shall, if appropriate, assign to each of the field offices identified in subsection (d) an employee who has expertise in the regulatory issues relating to the office in which the employee is employed, including, as applicable, particular expertise in— (A) the consultations and the preparation of biological opinions under section 1536 of title 16; (B) permits under section 1344 of title 33; (C) regulatory matters under the Clean Air Act (42 U.S.C. 7401 et seq.); (D) planning under the National Forest Management Act of 1976 (16 U.S.C. 472a et seq.); and (E) the preparation of analyses under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). (2) Duties Each employee assigned under paragraph (1) shall— (A) not later than 90 days after the date of assignment, report to the Bureau of Land Management Field Managers in the office to which the employee is assigned; (B) be responsible for all issues relating to the jurisdiction of the home office or agency of the employee; and (C) participate as part of the team of personnel working on proposed energy projects, planning, and environmental analyses. (d) Project offices The following Bureau of Land Management Offices shall serve as the Project offices: (1) Rawlins Field Office, Wyoming. (2) High Plains District Office, Wyoming. (3) Montana/Dakotas State Office, Montana. (4) Farmington Field Office, New Mexico. (5) Carlsbad Field Office, New Mexico. (6) Grand Junction/Glenwood Springs Field Office, Colorado. (7) Vernal Field Office, Utah. (8) Any other State, district, or field office of the Bureau of Land Management determined by the Secretary. (e) Report to Congress Not later than February 1 of the first fiscal year beginning after the date of enactment of the National Defense Authorization Act for Fiscal Year 2015 and each February 1 thereafter, the Secretary shall report to the Chairman and ranking minority Member of the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, which shall include— (1) the allocation of funds to each Project office for the previous fiscal year; and (2) the accomplishments of each Project office relating to the coordination and processing of oil and gas use authorizations during that fiscal year. (f) Additional personnel The Secretary shall assign to each field office identified in subsection (d) any additional personnel that are necessary to ensure the effective implementation of— (1) the Project; and (2) other programs administered by the field offices, including inspection and enforcement relating to energy development on Federal land, in accordance with the multiple use mandate of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.). (g) Omitted (h) Transfer of funds For the purposes of coordination and processing of oil and gas use authorizations on Federal land under the administration of the Project offices identified in subsection (d), the Secretary may authorize the expenditure or transfer of such funds as are necessary to— (1) the United States Fish and Wildlife Service...

    10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16421 Third-party finance Amends

    42 U.S.C. § 16421

    The law today

    (a) Existing facilities The Secretary, acting through the Administrator of the Western Area Power Administration (hereinafter in this section referred to as “WAPA”), or through the Administrator of the Southwestern Power Administration (hereinafter in this section referred to as “SWPA”), or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, an electric power transmission facility and related facilities (“Project”) needed to upgrade existing transmission facilities owned by SWPA or WAPA if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project— (1) (A) is located in a national interest electric transmission corridor designated under section 216(a) of the Federal Power Act [16 U.S.C. 824p(a)] and will reduce congestion of electric transmission in interstate commerce; or (B) is necessary to accommodate an actual or projected increase in demand for electric transmission capacity; (2) is consistent with— (A) transmission needs identified, in a transmission expansion plan or otherwise, by the appropriate Transmission Organization (as defined in the Federal Power Act [16 U.S.C. 791a et seq.]), if any, or approved regional reliability organization; and (B) efficient and reliable operation of the transmission grid; and (3) would be operated in conformance with prudent utility practice. (b) New facilities The Secretary, acting through WAPA or SWPA, or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, a new electric power transmission facility and related facilities (“Project”) located within any State in which WAPA or SWPA operates if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project— (1) (A) is located in an area designated under section 216(a) of the Federal Power Act [16 U.S.C. 824p(a)] and will reduce congestion of electric transmission in interstate commerce; or (B) is necessary to accommodate an actual or projected increase in demand for electric transmission capacity; (2) is consistent with— (A) transmission needs identified, in a transmission expansion plan or otherwise, by the appropriate Transmission Organization (as defined in the Federal Power Act [16 U.S.C. 791a et seq.]) if any, or approved regional reliability organization; and (B) efficient and reliable operation of the transmission grid; (3) will be operated in conformance with prudent utility practice; (4) will be operated by, or in conformance with the rules of, the appropriate (A) Transmission Organization, if any, or (B) if such an organization does not exist, regional reliability organization; and (5) will not duplicate the functions of existing transmission facilities or proposed facilities which are the subject of ongoing or approved siting and related permitting proceedings. (c) Other funds (1) In general In carrying out a Project under subsection (a) or (b), the Secretary may accept and use funds contributed by another entity for the purpose of carrying out the Project. (2) Availability The contributed funds shall be available for expenditure for the purpose of carrying out the Project— (A) without fiscal year limitation; and (B) as if the funds had been appropriated specifically for that Project. (3) Allocation of costs In carrying out a Project under subsection (a) or (b), any costs of the Project not paid for by contributions from another entity shall be collected through rates charged to customers using the new transmission capability provided by the Project and allocated equitably among these project beneficiaries using the new transmission capability. (d) Relationship to other laws Nothing in this section affects any requirement of— (1) any Federal environmental law, including the National Environmental Polic...

    9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Also cites: 16 U.S.C. § 824o, 43 U.S.C. § 1714

Action History

  1. Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S2839-2845)

  2. Sponsor introductory remarks on measure. (CR S2838-2839)

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 303 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (303)

303 members have not signed on to this bill.

Show all 303 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 539 do?
Clean Renewable Energy and Economic Development Act - Amends the Federal Power Act to require the President to designate as national renewable energy zones areas that have: (1) the potential to generate in excess of one giawatt of electricity from renewable energy; (2) insufficient electric transmission capacity to achieve such potential; and (3) the capability to contain additional renewable energy generating facilities if there were a sufficient transmission capacity. Excludes specified areas from such zones, including national parks, wilderness areas, and historic sites. Sets forth provisions concerning: (1) the certification by the Federal Energy Regulatory Commission (FERC) of regional planning entities to coordinate planning efforts to integrate renewable energy resources from such zones into the interstate electric transmission grid and to make such resources fully deliverable to electricity consuming areas; (2) interconnection-wide green transmission grid project plans (grid project plans) and cost allocation plans; (3) the participation of specified federal transmitting utilities in the planning process; and (4) a federal transmission surcharge to generate revenue to enable entities and states to recover costs of planning activities. Authorizes FERC to issue construction permits, that may permit the acquisition of a necessary right-of-way through eminent domain, for interconnection-wide green transmission grid projects (projects) that meet specified conditions. Directs the Secretary of Energy (Secretary) to make grants to states and planning entities that submit or implement grid project plans for specified activities. Requires the Bonneville Power Administration and the Western Area Power Administration (WAPA) to establish: (1) wind integration programs; and (2) a joint geothermal integration program. Requires each of the Federal Power Marketing Administrations and the Tennessee Valley Authority to establish a solar integration program. Requires: (1) federal transmitting utilities to undertake geographically diverse projects within their service territories to acquire and demonstrate electric and hybrid vehicles and related technologies as part of their fleets; and (2) the Secretary of the Interior and the Secretary of the Army to study reregulating facilities and pumped storage units at federal dams. Authorizes WAPA to fund a wind-hydro or solar-hydro integration demonstration project. Sets forth provisions concerning the creation and development of solar energy reserves on federal land. Expands the purpose of incentive-based rate treatments for the transmission of electric energy by public utilities to include integrating renewable energy resources into the transmission system. Amends the Energy Policy Act of 2005 to: (1) increase the maximum amount the Secretary may accept for transmission investments in WAPA and the Southwestern Area Power Administration territories; and (2) revise provisions concerning the Federal Permit Streamlining Pilot Project, including requiring the Secretary of the Interior to designate Bureau of Land Management (BLM) field offices in specified states to serve as Renewable Energy Pilot Project Offices for coordination of federal permits for renewable energy projects and renewable energy transmission involving federal land.
What is the current status of S 539?
This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 539?
Track S 539 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 539

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 539

Last checked for changes 20 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →