Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- MILITARY CONSTRUCTION, VETERANS AFFAIRS, AND RELATED AGENCIES APPROPRIATIONS FOR FISCAL YEAR 2020 [Senate Hearing 116-] [From the U.S. Government Publishing Office] MILITARY CONSTRUCTION, VETERANS AFFAIRS, AND RELATED AGENCIES APPROPRIATIONS FOR FISCAL YEAR 2020 ---------- TUESDAY, APRIL 9, 2019 U.S. Senate, Subcommittee of the Committee on Appropriations, Washington, DC. The subcommittee met at 2:57 p.m., in room 124, Dirksen Senate Office Building, Hon. John Boozman (chairman) presiding. Present: Senators Boozman, Murkowski, Collins, Rubio, Daines, Schatz, Leahy, Tester, Reed, Udall, Baldwin, and Murphy. DEPARTMENT OF DEFENSE STATEMENT OF HON. ROBERT MCMAHON, ASSISTANT SECRETARY OF DEFENSE FOR SUSTAINMENT opening statement of senator john boozman Senator Boozman. Good afternoon. The subcommittee will come to order. We meet today to discuss the President's fiscal year 2020 budget request for military construction, family housing, and base realignment and closure for the Department of Defense. I would like to begin by recognizing today's panel. Today, we will hear from representatives of all the military services as well as the Office of the Secretary of Defense. For three of our witnesses, this will be their final appearance in front of our subcommittee before their retirements this summer, which I am sure you have mixed emotions about being in front of the subcommittee. Joining us are the Honorable Robert McMahon, Assistant Secretary of Defense for Sustainment. Lieutenant General Gwendolyn Bingham, Assistant Chief of Staff of the Army for Installation Management, who is retiring after 38 years of service. And we very much appreciate you. Vice Admiral Dixon R. Smith, Deputy Chief of Naval Operations for Fleet Readiness and Logistics, retiring after 37 years of service. Again, thank you for your service. Major General Vincent Coglianese, Commander of the Marine Corps Installations Command and Assistant Deputy Commandant, Installations and Logistics, who is retiring after 36 years of service. And again, we appreciate all of you and all that you represent very, very much. Brigadier General John Allen, Air Force Deputy Chief of Staff for Logistics, Engineering, and Force Protection, and Director of Civil Engineers, who is not retiring, but I also want to thank you for your 27 years of service. The fiscal year 2020 base budget request of $11.2 billion reflects a 9 percent increase over the fiscal year 2019 enacted level of $10.3 billion. While it is great to see an increase in the MILCON request for the second consecutive year, reversing years of underfunding, while simultaneously building ready and resilient installations will remain a challenge. The increased complexity of facilities needed to support today's weapons systems and new platforms is driving complex designs, higher costs, and aggressive construction schedules. Additionally, efforts to support several multibillion dollar recapitalization initiatives culminate in large and complex projects taking up a greater share of the budget. We are all aware that this portfolio has been taking on increasing levels of risk for years, and affordability continues to decrease as cost of the construction projects continues to rise. This is evident in this year's request as the top 20 percent of projects account for half of the budget. The fiscal year 2020 budget request begins to improve our infrastructure, but the total MILCON request is still less than 3 percent of the total Department of Defense budget. Congress and departments must collaborate to find innovative solutions to deliver facility investments with constrained resources. This is an urgent need, given that MILCON not only supports new weapon platforms, but are interdependent on purpose-built infrastructure, but it also provides for hospitals, schools, and housing to improve the quality of life for our service members and their families. To that end, I am pleased that the Office of the Secretary of Defense and the services are developing and implementing efforts on infrastructure management and reform. I look forward to learning more about the services implementing these initiatives and hearing how they will improve existing processes. The fiscal year 2020 Overseas Contingency Operation European Deterrence Initiative request is $645 million, a decrease from the fiscal year 2019 enacted level of $921 million. I would be remiss if I didn't note that the $9.2 billion emergency request to support hurricane reconstruction efforts and the national emergency at the southern border. The damage at Tyndall Air Force Base and Camp Lejeune is truly devastating, and I think we must rebuild in a smart, thoughtful manner as quickly as we responsibly can. I also believe that border security is an urgent need that should be a priority. Clearly, work remains to be done in order to achieve the level of border security that the American people are calling on Congress to deliver, and this will require a whole of government effort. I don't think I am exaggerating if I say the specific request in front of the subcommittee is unprecedented and will spark passionate debate among my colleagues. However, I remain hopeful that the subcommittee can work together in our traditional bipartisan fashion to develop a bill that supports the Department and our service members. Before we turn to our witnesses, I would like to recognize my colleague Senator Schatz for his opening remarks. opening statement of senator brian schatz Senator Schatz. Thank you very much, Mr. Chairman, and thank you to all of these great public servants on the panel. Reviewing the Defense Department's military construction request for fiscal year 2020 means that we are also reconsidering the projects that Congress funded for fiscal year 2019. We funded those projects because the Department asked for them, because you told us that they were necessary. Now Acting Secretary Shanahan has directed the services to go back and take a second look to see if that is still true. No one has outlined the criteria DoD is going to use to decide what projects to delay or defund to pay for the wall. The Department needs to provide specifics on how it will decide which projects are now on the chopping block. And when we finally see the list of projects that DoD is willing to cut for the wall, we need to know how the Department decided because there is a concern that the White House may have promised to protect projects in certain States in exchange for votes by members of this body on the President's emergency declaration. So let us be clear about what will happen if this process remains obscured. If you decide a prior year project is worth cannibalizing to pay for the wall, you also just decided that it is less important than every other project in the Future Years Defense Program. It falls off for 10 years. That goes for service-specific projects as well as Defense-wide agency projects. Additionally, the Department is asking us to write a separate check for $3.6 billion to pay for what, I am not entirely sure. And it is not clear the Department has fleshed that out either. We have to assume it is to pay for fiscal year 2020 projects that you are up here defending that may get cut next year, for next year's emergency declaration and raid for the border wall. I see no reason to provide that funding. There is also this idea that there will be--that we will backfill any project that DoD delays to pay for a wall that Congress has already said it won't do. We have to reject this for what it is, an undermining of our constitutional role as appropriators. This committee has a tradition of giving the Department flexibility to move money to meet urgent needs, but we will not weaken our oversight by giving you lump sum funding for some unknown purposes, whether it is for border wall construction, hurricane recovery, or housing. If you don't give us more information, we will be forced to put more restrictions around funds that we appropriate. Every day this goes on, we are seeing the erosion of our trust and confidence that has been part of this committee's work with the Department. We get that none of this is your call. You are responding to a policy directive, but you need to know that this whole process and the uncertainty around it has frayed our working relationship. We do need answers, and we expect you to carry the messages you are hearing back to your service chiefs and the Acting Secretary. Setting aside the border wall, the fiscal year 2020 request is largely a good news story. The base budget request recognizes that we badly need to invest in military infrastructure, and you have used less war funds to fund your total requirement. The request includes important improvements to training ranges, piers and wharfs, and airfields. We are also seeing increases across the Guard and Reserve, and I hope the Department can continue to build on this. And let me end by recognizing three of our witnesses who are making their last appearance: Lieutenant General Bingham, Vice Admiral Dixon Smith, and Major General Coglianese. I want to thank you for your decades of service. I want to thank you all for everything you do for our country. I want to especially recognize Dixon Smith, his wife, Kiki, their service in Hawaii and our friendship. Thank you, Mr. Chairman. Senator Boozman. Mr. McMahon, I now recognize you for your opening statement. summary statement of hon. robert mcmahon Mr. McMahon. Chairman Boozman, Ranking Member Schatz, distinguished members of the subcommittee, on behalf of myself and my service colleagues, thank you for the opportunity to present the President's fiscal year 2020 budget request for the Department's sustainment programs. My written statement has been submitted for the record. As the Assistant Secretary for Sustainment, I focus on supporting the National Defense Strategy through three strategic objectives. First, creating and sustaining resilient installations. Second, ensuring safe places for our members and their families to live, work, play, and pray. And third, enhancing material availability of Department of Defense weapons systems. Our fiscal year 2020 request continues the Department's efforts in achieving these objectives and rebuilding our military into a more capable, lethal, and ready joint force. Our installations are our power projection platforms. And investments in infrastructure, environment, and energy ensure they are ready to support the defense of the Nation. We are requesting $21 billion for the military construction and family housing appropriations to construct or acquire facilities needed to beddown new mission capabilities, restore and modernize enduring infrastructure, eliminate those that are excess or obsolete, and begin hurricane recovery. Aside from MILCON, we are requesting $10.4 billion for sustainment and almost $5 billion for restoration and modernization, a 7 percent and 80 percent increase over our 2019 request, respectively. While this is a significant improvement, we continue to take risk in these areas. Because we must adapt to a variety of threats in increased installation resilience, we will continue to focus on robust infrastructure, sound land management, increased energy resilience, improving cybersecurity, and the effects of a changing climate. We are also committed to protecting the quality of life for our personnel and their families. Our primary focus here is ensuring access to safe, high quality, affordable family, and unaccompanied housing. To that end, our budget includes $1.3 billion to support our worldwide non-privatized family housing inventory, which includes more than 34,000 Government-owned and 7,100 leased units. This request also demonstrates our continuing commitment to modernized, unaccompanied personnel housing, with more than $674 million requested for construction and renovation projects supporting more than 3,900 trainees and permanent party personnel. With regard to housing privatization, it was the right thing to do, improving the quality of on-base housing and providing the necessary long-term investment our personnel deserve. That said, recent media coverage reveals deficiencies that we must address. The Department is committed to working with our housing privatization partners and you to provide the best housing possible. Last month, I testified on the potential support the Department of Defense may provide in the construction of a border barrier. This request includes $9.2 billion of emergency funding to restore resources that may be reallocated in fiscal year 2019 should the Acting Secretary of Defense choose to exercise 10 U.S.C. 2808 authority and for unspecified fiscal year 2020 military construction to build border barriers. Additionally, this amount includes funding to rebuild facilities damaged by Hurricane Florence and Michael. Our 2020 budget also requests $3.6 billion for environmental programs, a $188 million increase over last year's request. This includes $254 million in the BRAC environmental account, focusing on restoration, compliance in adopting new technologies to reduce cost and accelerating cleanup. Finally, energy is an essential enabler of military capability. And to that end, we are requesting $150 million for the Energy Resilience and Conservation Investment Program to fund projects that improve resilience and security, save energy and water, reduce costs, and most importantly, contribute to our mission readiness. We appreciate Congress' and this subcommittee's continued support as we work together to provide the best support possible to our soldiers, sailors, airmen, and Marines, and their families. And I look forward to your questions. [The statement follows:] Prepared Statement of Hon. Robert McMahon introduction Chairman Boozman, Ranking Member Schatz and distinguished members of the Subcommittee: Thank you for the opportunity to present the President's fiscal year 2020 budget request for the Department of Defense programs supporting Sustainment. The New Sustainment Organization With my confirmation as the Assistant Secretary of Defense for Sustainment, we have consolidated the former Logistics and Materiel Readiness and the Energy, Installations & Environment portfolios into a more holistic organization focused on sustaining warfighter support. As the principal sustainment official within the senior management tier of DoD, my mission is to advise and assist the Undersecretary of Defense for Acquisition and Sustainment, the Deputy Secretary of Defense, and the Secretary of Defense in providing guidance to the Secretaries of the Military Departments with respect to sustainment support. I prescribe policies and procedures for facilities management, energy, environment, infrastructure, logistics, materiel readiness, and product support. In addition, I exercise authority, direction and control over the Office of Economic Adjustment and Director of the Defense Logistics Agency. Sustainment is big business. We support warfighter capabilities through over 585,000 facilities, located on more than 500 bases, posts, camps, stations, yards, and centers around the world, with a facility replacement cost exceeding $1 trillion, not including the value of the 27 million acres of land that our installations occupy. Additionally, defense logistics alone represents a quarter of the Department's budget, while sustaining nearly $1 trillion in materiel assets, including 275 ships, 14,000 aircraft, and almost 500,000 combat and other ground vehicles. We manage approximately, 5,000,000 stock numbers, 100,000 suppliers, 90,000 requisitions per day and an inventory valued at nearly $100 billion. The Defense Logistics Agency has annual sales of $38 billion. As the head of this enterprise, my strategic objectives are to a) enhance materiel availability of DoD weapon systems; b) create and sustain resilient installations; and c) ensure safe places for our members and their families to live, work, play, and pray. The fiscal year 2020 budget request supports the National Defense Strategy's (NDS) three lines of effort: rebuilding readiness and lethality; strengthening alliances and partnerships; and improving performance and affordability through reform. Investments in infrastructure, environment, energy, logistics, materiel readiness, and weapons support are crucial for NDS implementation. Every mission the DoD Components undertake to defend this nation is supported by DoD installations, which are our power projection platforms. fiscal year 2020 budget request--military construction and family housing The President's fiscal year 2020 budget requests over $21 billion for the Military Construction (MilCon) and Family Housing appropriation, which includes $9.9 billion for the base budget MilCon requirements, $1.3 billion for family housing, $0.6 billion for Overseas Contingency Operations, and $9.2 billion for responding to emergencies. This represents a $9.8 billion increase from the fiscal year 2019 enacted level primarily due to the aforementioned emergency funding, which will be used to restore funding which may be reallocated in fiscal year 2019 to build border barriers should the Acting Secretary of Defense choose to exercise the 10 U.S.C. 2808 authority. This funding will also be used to rebuild facilities damaged by Hurricanes Florence and Michael, and for unspecified military construction to build border barriers. This budget request continues the Department's priorities to establish a foundation for rebuilding the U.S. military into a more capable, lethal, and ready Joint Force. This funding will be used to construct or acquire facilities needed to bed-down new mission capabilities, restore and modernize enduring infrastructure, eliminate those that are excess or obsolete, and begin implementing projects supporting hurricane recovery. military construction We are requesting $9.9 billion in the base budget for military construction across the Services and Defense Agencies--an increase of approximately $1.1 billion from the fiscal year 2019 enacted base budget. This increase is largely due to a need to fund the balance of projects that Congress incrementally funded in fiscal year 2019; to support new capability/mission (e.g., F-35A and KC-46) bed down requirements, force structure growth, operations and training, maintenance and production, unaccompanied personnel housing, and replacing antiquated infrastructure at enduring installations in the United States and overseas. This request includes $2.6 billion for the Defense-Wide Components including $267 million for fuel infrastructure; $697 million for recapitalization of National Security Agency and National Geospatial Intelligence Agency facilities; $494 million to address new capabilities/mission, force structure growth, and infrastructure for Special Operations Forces; and for specific programs such as the NATO Security Investment Program and the Energy Resilience and Conservation Investment Program. In addition, the Defense-Wide request also contains $256 million for medical facility recapitalization including the third increment of $97 million of a $510 million project for the Walter Reed Medical Center Addition/Alteration; $50.0 million for the second increment (of a $381 million, five increment project) for a new hospital at Fort Leonard Wood, Missouri; and other smaller ambulatory care center/dental and support facilities. All the projects are crucial for our continued delivery of the quality healthcare that our service members and their families deserve. overseas contingency operations The fiscal year 2020 OCO budget request includes $645 million in MilCon, a decrease of $277 million from the fiscal year 2019 enacted amount, to support critical global defense posture requirements focused primarily in European areas, including the ongoing European Deterrence Initiative (EDI). EDI enhances readiness in Europe to deter Russian aggression and provides our allies a clear indication of the United States' long-term commitment to Europe. This MilCon funding includes unspecified minor military construction and planning and design funds for airfield, facility, and force protection upgrades. The improvements continue our efforts to strengthen combat readiness and theater Joint Reception, Staging, Onward Movement, and Integration capabilities in the region. dod emergency funding As noted earlier, the fiscal year 2020 budget request includes $9.2 billion of emergency funding to restore resources that may be reallocated in fiscal year 2019 to build border barriers should the Acting Secretary of Defense choose to exercise the 10 U.S.C. 2808 authority, to rebuild facilities damaged by Hurricanes Florence and Michael, and for unspecified military construction to build border barriers. family and unaccompanied housing In return for the sacrifices they make in service to our nation, Service members and their families expect a safe and secure place to live, good schools for their children, access to good medical care, and a viable relocation process that respects their household goods. The Department is committed to protecting the quality of life for military personnel and their families by ensuring access to safe, high-quality, affordable Family and Unaccompanied Housing where they will want to live. The environment in which our Service members and their families live impacts their quality of life, their ability to do their job, and the Department's ability to recruit and retain. Ensuring a positive housing experience and quality of life is critical to support personnel readiness for new and current missions and strategic initiatives worldwide. Our fiscal year 2020 budget request includes $1.3 billion to support our worldwide family housing inventory, which includes more than 34,000 government-owned and 7,100 leased family housing units. This request contains $293 million for construction of new housing and about $1 billion for operation and maintenance of DoD's government- owned and leased family housing units, oversight of privatized housing on our U.S. installations, and provisioning of housing support services to assist military members with housing issues such as resolving landlord issues or providing information on the local housing market. The requested funding demonstrates our commitment to provide safe, quality, affordable housing and housing support services to U.S. military personnel and their families. The Department's fiscal year 2020 budget request also demonstrates our continued commitment to modernizing Unaccompanied Personnel Housing, with more than $674 million requested for nine construction and renovation projects that will improve living conditions for more than 3,900 trainees and permanent party unaccompanied personnel. This includes $73 million for the second phase of a training barracks at Fort Sill, OK; $164 million for a bachelors enlisted quarters complex at Navy Base Guam; $110 million for a recruit barracks at Joint Base San Antonio, TX; and $134 million for a bachelor enlisted quarters project at Marine Corps Base Hawaii. Our modernization effort includes a focus on improving privacy and access to amenities that are important to our unaccompanied personnel. Now that the Department has privatized most of its CONUS-based housing, a primary role for the Office of the Secretary of Defense is to ensure these projects maintain quality housing where military families will enjoy living while sustaining the projects' long-term financial viability. To support this goal, the Department is requesting $3.5 million to help administer the Military Housing Privatization Initiative (MHPI) program. These funds are critical for us to monitor MHPI project financial health; respond to Office of the Management and Budget guidance related to oversight of Federal credit including annual credit subsidy re-estimates for government direct loans and loan guarantees; and conduct analyses of MHPI projects under financial stress that may require a restructure or modification (e.g., as a result of hurricane damage). Our oversight of the MHPI program includes privatized family and unaccompanied housing, as well as lodging the Army privatized at 40 U.S. installations over the last 13 years. military housing privatization initiative Under the Military Housing Privatization Initiative (MHPI) legislation established in 1996, the Military Departments have privatized 99 percent (more than 200,000 units) of installation family housing in the U.S., with more than 80 MHPI projects currently in place across approximately 150 installations. The Department is confident that housing privatization was the right thing to do. Privatization has dramatically improved the quality of on-base housing and has facilitated the long-term investment necessary to maintain high quality housing. The MHPI allowed the Military Departments to leverage private sector expertise and funding to improve the quality of installation housing in the United States much faster than DoD could have done through traditional military construction and ongoing operation and maintenance funding. Under the MHPI, Military Departments conveyed their existing government housing units to competitively selected privatization entities (i.e., the MHPI projects). MHPI projects operate under long- term (50-year) ground leases and associated legal agreements with a Military Department, with one 25-year option period. In return, the MHPI projects assumed ownership of the houses and the responsibility for operation, maintenance, construction, and replacement of the housing during the lease term, in accordance with the authorities as defined in Title 10, United States Code. In light of the media reports and recent hearings on the poor conditions and service some military families experienced over the last several years, I am increasing the oversight my office provides to ensure the Military Departments fully and effectively exercise their responsibilities to ensure that privatized housing is managed in a manner protective of human health and the environment. This includes establishing new reporting requirements and programmatic reviews regarding Military Department monitoring of potential hazards in privatized housing, such as reporting on the number of child falls from windows in MHPI (or military-operated) housing. The Department and our housing privatization partners are committed to working together to increase our collective communication with military families to better ensure they have a positive experience living in privatized housing. This will start with the issuance of a Resident Bill of Rights. We will be working with Congress, the Military Departments, the privatized housing owners, and military families to articulate the responsibilities and expectations between renters and lessors. We will also be increasing our engagement with military families throughout their residency. Through increased engagement, we will better educate military families about their roles and responsibilities to help identify any issues with housing conditions, and the roles and responsibilities of the privatized partner and the installation housing teams. Our commitment to increase engagement also extends to Military and Veteran Support Organizations and advocacy groups such as the Military Family Advisory Network. In all cases, we commit to work with our housing privatization partners to ensure any and all resident concerns are addressed in a highly responsive, timely and professional manner, with emphasis on expediting resolution of any concerns involving potential health or safety issues. We want our military families to know that we truly care about their experience living in privatized housing and that we want to collectively do better in delivering safe, high quality, affordable housing where our military members and their families will want and choose to live. The Department of Defense understands that the family is important, and we honor the sacrifice that Service members and their families make to serve our nation. The Department recognizes we have a moral obligation to military families to provide safe and quality housing, and we take that obligation seriously. We are committed to the long- term success of the MHPI projects and MHPI program, and will continue our oversight of the MHPI portfolio to ensure delivery of quality housing for Service members and their families over the life of the projects. Bottom line, this requires a twin focus: ensuring our residents have a positive experience living in privatized housing, and ensuring the long-term viability of the MHPI projects for future military families. facilities sustainment and recapitalization In order for the Department's facilities to support the goals of the National Defense Strategy, they must be well maintained and renovated periodically. Over the last 2 years, the Department has increased its funding to sustain and modernize existing facilities. While our Components must still take risks in maintaining facilities, this budget request continues to improve our overall funding and reduce risk in our most important infrastructure. Facility Sustainment funding, which includes the regularly scheduled maintenance and repair or replacement of facility components, is the foundation of the Department's investment to maintain the condition of our facilities. These periodic and predictable investments must be made across the service life of a facility to slow its deterioration and optimize its performance to support the safety, productivity, and quality of life of our personnel, while also reducing long-term recapitalization requirements. The Department's Operations and Maintenance (O&M) funding for Facility Sustainment in the fiscal year 2020 budget request is $10.4 billion, representing a 7 percent increase compared to our fiscal year 2019 budget request. This investment improves our collective sustainment rate to over 86 percent of our Facilities Sustainment Model requirement. This is still short of our 90 percent goal, but nonetheless represents significant movement in the right direction. In addition to Sustainment funding, Restoration and Modernization funding enables renovations and upgrades to ensure a facility can support assigned missions. Thanks to authority provided in the fiscal year 2017 National Defense Authorization Act, the DoD Components are increasing their pursuit of opportunities to more cost-effectively repurpose existing facilities to accommodate new missions. Our fiscal year 2020 budget request includes almost $5 billion in the Operations and Maintenance account for facilities restoration and modernization, an increase of almost 80 percent over our fiscal year 2019 request. As with our sustainment program, this also represents movement in the right direction to address the backlog of requirements in aging and obsolete facilities. environmental and safety programs Installations are key platforms for our nation's defense. Therefore, we must make them resilient and a ``safe'' place for not only our service members, but their families living on our installations and our surrounding communities. The Department's environmental investments support these objectives through activities ranging from managing critical habitat and avoiding training restrictions to addressing drinking water health advisories and making the best use of limited cleanup dollars. The President's fiscal year 2020 Budget requests $3.6 billion for environmental programs, which is an increase of $185 million compared to the fiscal year 2019 request. We are requesting $1.3 billion to continue cleanup efforts at the remaining Installation Restoration Program (IRP) sites and Military Munitions Response Program (MMRP) sites. The IRP is focused on cleanup of hazardous substances, pollutants, and contaminants, while the MMRP is focused on responding to unexploded ordnance and munition constituents at former military ranges. This includes $1.1 billion for ``Environmental Restoration,'' which encompasses active installations and Formerly Used Defense Sites (FUDS--sites that DoD transferred to other Federal agencies, States, local governments, or private landowners before October 17, 1986). The remaining $254 million is for ``BRAC Environmental.'' Progress Towards Cleanup Goals Goal: Achieve Response Complete at 90 percent and 95 percent of Active and BRAC IRP and MMRP sites, and FUDS IRP sites, by fiscal year 2018 and fiscal year 2021, respectively ---------------------------------------------------------------------------------------------------------------- Status as of the end of Status as of the end of Projected status at the fiscal year 2017 fiscal year 2018 end of fiscal year 2021 ---------------------------------------------------------------------------------------------------------------- Army................................. 91% 91% 94% Navy................................. 82% 83% 88% Air Force............................ 83% 86% 92% DLA.................................. 86% 85% 95% FUDS................................. 84% 86% 92% Total............................ 86% 88% 92% ---------------------------------------------------------------------------------------------------------------- By the end of 2018, the Department, in cooperation with State agencies and the Environmental Protection Agency, completed cleanup activities at 88 percent of Active and BRAC IRP and MMRP sites, and FUDS IRP sites, and is now monitoring the results. During fiscal year 2018 alone, the Department completed cleanup at over 469 sites. Of the roughly 39,500 restoration sites, more than 33,500 are now in monitoring status or have completed cleanup. Our focus remains on continuous improvement in the restoration program: minimizing overhead; adopting new technologies to reduce cost and accelerate cleanup; refining and standardizing our cost estimating; and improving our relationships with State regulators through increased dialogue. All of these initiatives help ensure that we make the best use of our available resources to complete cleanup. However, challenges remain that slow our progress. For example, unregulated or emerging chemicals of concern, such as perfluorooctane sulfonate (PFOS) and perfluorooctanoic acid (PFOA), are becoming a top priority and require the DoD to reprioritize or reopen previously made decisions which will cause delays in achieving our goals. Additionally, some sites have no feasible solution to clean up the contamination, and as a result, the Department is making significant investments in environmental technology to identify new potential remediation methods. environmental technology A critical part of DoD's approach to meeting its environmental obligations and improving its performance is the continued pursuit of advances in science and technology. The Department has a thirty-year record of researching, developing, and transferring innovative environmental technologies from the laboratory to actual use in the field. Many of these technologies are also now widely used by other Federal agencies and industry, benefitting the nation as a whole. The overall fiscal year 2020 budget request for Environmental Technology is $178 million, centered on two key programs--the Strategic Environmental Research and Development Program (SERDP--focused on basic and applied research) and the Environmental Security Technology Certification Program (ESTCP--focused on validating more mature technologies to transition them to widespread use). The fiscal year 2020 budget request includes $66 million for SERDP and $39 million for ESTCP for environmental technology demonstrations, with an additional $27 million requested specifically for energy technology demonstrations. These Defense-wide environmental technology programs coordinate closely with the Military Services to ensure research, demonstration, test and evaluation are focused on the Departments most pressing environmental needs. These programs have already achieved noticeable results and have the potential to significantly reduce long-term costs by implementing new ways of treating groundwater contamination, to increasing training land availability by developing more effective management strategies for installation managers, and to reduce the life-cycle costs of multiple weapons systems through development and demonstration of innovative coatings and materials. During the past 2 years, we have also launched an aggressive initiative to address management issues associated with the use of Aqueous Film Forming Foam (AFFF) including development of fluorine-free alternatives for AFFF, as well as development of more efficient and cost-effective sampling, analysis, and treatment options for AFFF-related chemicals including perfluorooctane sulfonate (PFOS), perfluorooctanoic acid (PFOA), and related per- and polyfluoroalkyl substances (PFAS). In the critical area of installation energy, we are focused on proving technologies and solutions that cost-effectively improve the energy security and resiliency of our installations, and that protect our energy assets and facilities from cyber-attacks. improving installation and climate resilience DoD must adapt current and future operations to address a variety of threats and increase the resilience of our installations. We recognize the effects of a changing climate are a national security issue with potential impacts to Department of Defense missions, operational plans, and installations. We have been and will continue to be proactive in developing comprehensive policy, guidance, and tools to mitigate these impacts, with a focus on robust infrastructure, sound land management policies, and increased energy resilience. From a resources perspective, DoD is incorporating climate resilience as a cross-cutting consideration for our planning and decisionmaking processes, and not as a separate program or specific set of actions. Specifically, the Department considers resilience in the installation planning and basing processes. This includes consideration of environmental vulnerabilities in installation master planning, management of natural resources, design and construction standards, utility systems and service, as well as emergency management operations. The Department has been proactive in developing policy, guidance, and tools to mitigate the impacts of a changing climate. These mitigation strategies focus on infrastructure and land management. From a policy perspective, the Department has published several issuances to ensure the Services and Joint Staff integrate climate scenarios into planning. DoD Directive 4715.21, Climate Change Adaption and Resilience, assigns responsibilities to components to incorporate climate considerations into planning for infrastructure and operations. DoD Instruction 4715.03, Natural Resources Conservation Program, requires consideration of climate impacts during development of Installations Natural Resources Management Plans. In 2017, the Department updated DoDI 6055.17, DoD Emergency Management Program, to ensure the consideration of an all hazards approach to manage risks, including weather and climate related impacts on military installations. Additionally, the Department regularly updates its building codes, known as Unified Facilities Criteria (UFCs), to reflect updated or more stringent industry and Federal standards. Over the past year, DoD has updated the Master Planning and High Performance and Sustainable Building Requirements UFCs to strengthen climate considerations. The Department has and will continue to develop tools for installation planners and engineers to assess climate impacts and develop mitigation strategies. Recent examples include The Planning Handbook on Climate Change Installation Adaptation and Resilience, produced by Naval Facilities Command (NAVFAC) in January 2017, and the Coastal Assessment Regional Scenarios Database (CARSWG) database with regionalized sea level scenarios for DoD sites worldwide. environmental conservation and compatible development The Department continues to manage its land, water, and airspace to ensure our military and civilian personnel have the access they need to conduct mission-essential activities. As training, testing, and operational requirements expand and new weapons systems are introduced, access and use of ranges becomes increasingly important. The fiscal year 2020 budget request for Conservation is $445 million. The Department will invest these funds to maximize our flexibility to use lands for military purposes and to address incompatible land uses beyond our fence lines. The Department's lands and waters are vital to readiness. However, they also support a diverse array of fish and wildlife species, including nearly 500 that are federally protected under the Endangered Species Act, and over 550 that are at risk of needing listing protection. Managing for healthy and resilient natural landscapes, such as reducing fire risks, avoiding wildlife conflicts, removing invasive species, and improving range and training areas, provides the conditions necessary for mission-essential activities. Regulatory protections related to threatened and endangered species and their habitats can pose significant mission challenges by restricting use of our existing ranges and training areas, or limiting our development of new infrastructure. In recent years, there has been a marked increase in the number of species being petitioned and evaluated for listing under the Endangered Species Act. To better address these issues, we have initiated a partnership with the Department of the Interior to target conservation efforts for species of primary concern to the Department. The three primary goals of this initiative are to facilitate species recovery and de-listing, establish local and regional partnerships to recover species or prevent new species from being listed, and to develop innovative tools and approaches that provide greater regulatory predictability. The Department's participation in broader conservation partnerships for listed species is beginning to see returns on those long term investments. This past year the Lesser Long-Nosed Bat, a species that resides on three Southwest installations, was considered recovered and removed from the list of threatened and endangered species. This success alleviated training restrictions related to Unmanned Aerial Vehicle (UAV) operations and use of pyrotechnics on 18,743 acres at Fort Huachuca, AZ. Four additional species are also currently being evaluated or have been proposed for either a status change from endangered to threatened, or removal from the list of threatened and endangered species. Building on this success, we will continue to work with our Federal, state and non-governmental partners to develop new and innovative regulatory approaches that streamline processes and provide greater mission flexibility. We will also be working to develop more comprehensive initiatives that better capitalize on both our on- installation conservation programs and our off- installation conservation partnerships through the Readiness and Environmental Protection Integration Program. readiness and environmental protection integration program The Readiness and Environmental Protection Integration (REPI) program supports DoD's efforts to build a more lethal and resilient force. Investments protect training, testing, and operational assets of the Department, contributing to installation resilience and sustainment of existing and new mission capabilities. Through the REPI program, we engage in a long-term and cooperative strategy to ensure military mission sustainability by limiting incompatible development near our installations and ranges. Protecting these lands using the REPI program is a more cost-effective approach to sustain military readiness for the Department and the taxpayer than settling for suboptimal test and training alternatives or workarounds, such as replacing compromised assets with new range construction or relocating missions. This cooperative land protection also provides direct benefits to our partners and neighboring communities through the conservation of limited resources shared by the installation and its neighbors. REPI initiatives contribute to the longevity of working farms, forests, and ranchlands; increase recreational opportunities for nearby residents, active military families, and veterans; and increase the installation's military value. The REPI program invigorates public-private partnerships that strengthen military installation ties to local communities. These local alliances help to foster an increased level of communication and cooperation, which enables installation commanders to better accomplish their vital test, training, and operational missions. In the last 16 years, REPI partnerships have protected more than 586,000 acres of land around 106 installations in 33 states. In addition to the tangible benefits of preserving DoD's existing training, testing, and operational assets, these efforts have resulted in significant contributions to the economic health and recreational opportunities for local communities. One example of a REPI initiative is working to sustain the F-35 mission at Hill Air Force Base (AFB). Located in the fastest developing locale in the state of Utah, Hill AFB anticipates that without the REPI program, the arrival of the F-35 will face significant encroachment challenges in the next 5-10 years. Challenges such as public safety concerns, noise and nighttime lighting complaints, and water availability pose potential threats to the F-35 mission. Experts at Hill AFB say flight test patterns may have to be rerouted or aircraft launch hours may have to be restricted without encroachment mitigation. In addition to directly preserving and enhancing key mission capabilities through innovative partnerships, the REPI program has developed an approach that supports land use and habitat conservation practices beyond installation boundaries to ensure military installations do not become refuges of last resort for threatened, endangered, or at-risk species. Under this approach, DoD engages with other governmental and non-governmental partners who work with private landowners to develop voluntary initiatives and agreements that promote practices that help avoid or mitigate regulatory restrictions on training, testing, and operations on DoD lands. These efforts ease the on-installation species management burden and reduce the possibility of restricted activities. Within the Department's $445 million budget for conservation, $75 million is directed to the REPI program. The REPI program is a cost- effective tool to protect the nation's existing training, testing, and operational capabilities at a time of decreasing resources. To further REPI investments, DoD, along with the Departments of the Interior and Agriculture, continues to advance the Sentinel Landscapes Partnership to work with private and non-Federal landowners to conserve large landscapes where conservation, working lands, and national defense interests converge. Established in 2013, the Sentinel Landscapes Partnership further strengthens interagency coordination and provides taxpayers with the greatest leverage of their funds by aligning Federal programs to advance the mutually beneficial goals of each agency. From 2014 through 2018, seven Sentinel Landscapes have been designated. In 2018, DoD and the Military Services invested approximately $22 million in the seven Sentinel Landscapes, which will further leverage funds from Federal, state, local, and private partners. In 2018, the U.S. Department of Agriculture Natural Resources Conservation Service awarded $7 million in Regional Conservation Partnership Program funding to develop the North Carolina Sentinel Landscapes High Priority Protect Program. The investments made in Sentinel Landscapes help ensure readiness and protect operational flexibility. addressing perfluorooctane sulfonate (pfos) and perfluorooctanoic acid (pfoa) Ensuring the health and safety of our Service members, the families living on our installations, and the surrounding communities is one of our top priorities. This includes the investigation and cleanup of PFOS and PFOA in drinking water where previous Department of Defense activities are determined to be the source. DoD has committed substantial resources in the last 3 years and has taken significant actions to respond to concerns with PFOS and PFOA. One commercial product that contains PFOS and PFOA is Aqueous Film Forming Foam, or AFFF. Besides D)D, this highly effective firefighting foam has been used by airports, fire departments, and the oil and gas industry, among others. However, AFFF only accounted for approximately 3-6 percent of PFOS production in 2000 and DoD is just one of many users. The Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) provides a consistent approach across the Nation for cleanup. This includes prioritizing sites for cleanup using the CERCLA risk-based process--essentially worst first. The Defense Environmental Restoration Program statute provides authorities to DoD to perform and fund cleanup actions and requires they be carried out in accordance with CERCLA. The first step is to identify known or suspected releases. DoD has identified 401 active and Base Realignment and Closure installations with at least one area where there is a known or suspected release of PFOS or PFOA. The Military Departments then determined if there was exposure through drinking water. If so, DoD's priority is to quickly address unacceptable levels of PFOS/PFOA in drinking water. As of today, no one is drinking water above EPA's drinking water lifetime health advisory of 70ppt where DoD is the known source. With the exposure pathway broken, the Military Departments are prioritizing sites for further action using the longstanding CERCLA risk-based process--essentially worst first. These known or suspected PFOS and PFOA release areas are in various stages of assessment, investigation, and cleanup. As DoD moves through the CERCLA process, we will work in collaboration with regulatory agencies and communities, and share information in an open and transparent manner. We are committed to funding the remainder of assessments and investigations as we move into the later phases of CERCLA process. DoD has also committed significant funds in research and development to identify and test fluorine-free AFFF. As previously discussed, our SERDP and ESTCP programs launched numerous efforts and on-going projects from small scale to field demonstrations. At the conclusion of these projects, the Department will have invested $60 million in PFAS-related research and development, with additional research and demonstration projects under consideration for funding beginning in fiscal year 2020. We have already taken steps to remove and replace AFFF containing PFOS from our supply system and to prevent new releases of AFFF. The Military Departments no longer use AFFF for maintenance, testing, and training activities. When AFFF is used to fight a fire, it is contained to prevent releases to ground water. Currently, no fluorine-free version of AFFF meets the military's stringent performance requirements to extinguish petroleum fires. We have solicited research projects to identify and test the performance of fluorine-free AFFF. These efforts support DoD's commitment to finding an AFFF alternative that meets critical mission requirements, while protecting human health and the environment, and will represent $10 million in research and development funding. In summary, DoD is taking immediate actions to reduce the risks from PFOS and PFOA. Our efforts reinforce DoD's commitment to meeting critical mission requirements while protecting human health and the environment. The Department recognizes that this is a national problem involving a wide array of industries and commercial applications, as well as many Federal and state agencies. Therefore, it needs a nation- wide regulatory solution. department of defense energy programs Energy is an essential enabler of military capability and the Department depends on energy- resilient forces and facilities to achieve its mission. In fiscal year 2018, the Department consumed over 85 million barrels of fuel to power ships, aircraft, combat vehicles, and contingency bases at a cost of nearly $9.2 billion. At over 500 worldwide military installations, the Department spent $3.4 billion in fiscal year 2018 on energy to power over 585,000 facilities and 160,000 non-tactical vehicles. The National Defense Strategy outlines an operational environment where ``every domain is contested--air, land, sea, space, and cyberspace,'' and the ``homeland is no longer a sanctuary.'' Preparing for the battlefield of 2025 and sustaining installation and operational energy resilience necessitates the assured delivery of cyber-secure fuel and power in contested environments against near-peer competitors. To enable resilient, efficient, and cyber-secure energy for Joint forces, weapon systems and installations, the fiscal year 2020 President's Budget includes approximately $4.2 billion in energy investments, including both operational energy (the energy required for training, moving, and sustaining military forces and weapons platforms for military operations) and installation energy (the energy used to power permanent installations and non-tactical fleet vehicles). In support of operational energy, the Department is requesting $3.5 billion to upgrade and procure new equipment, improve propulsion, adapt plans, concepts, and plan wargames to account for increasing risks to logistics and sustainment, and enhance how the Department considers energy in developing new capabilities. As the Department responds to changing threats in Europe, the Indo-Pacific, and the Middle East, these initiatives are increasing capability and decreasing risks for warfighters deployed around the globe. In support of installation energy, the Department is requesting $698 million to for energy resilience and energy conservation initiatives, most of which are directed to existing buildings. This includes $548 million in the Military Component Operations and Maintenance accounts for sustainment and recapitalization projects, which generally involve retrofits to install improved lighting, high- efficiency HVAC systems, double-pane windows, energy management control systems, and new roofs. The remainder ($150 million) is for the Energy Resilience and Conservation Investment Program (ERCIP), which is a MILCON account that funds projects to improve energy resilience and security, save energy and water, reduce energy costs, and most importantly, contribute to the mission readiness of our military installations. Our mission is to sustain warfighting readiness and lethality by providing all energy-related policy and governance for programs and activities that enable resilient, efficient, and cyber- secure energy for Joint forces, weapon systems and installations. To do so, the fiscal year 2020 President's Budget supports initiatives across four primary areas, outlined below. energy resilience As defined in Section 101 of Title 10, energy resilience is the ``ability to avoid, prepare for, minimize, adapt to, and recover from anticipated and unanticipated energy disruptions in order to ensure energy availability and reliability sufficient to provide for mission assurance and readiness, including mission essential operations related to readiness, and to execute or rapidly reestablish mission essential requirements.'' To this end, the Department has been engaged in the following programs that increase energy resilience for our weapons systems and installations. Energy Resilience and Conservation Investment Program (ERCIP).-- ERCIP is a key Department tool to enable more robust energy security. DoD is requesting $150 million for this program for fiscal year 2020, including $113 million for energy resilience projects and $37 million for energy conservation projects. The ERCIP portfolio has a combined Savings to Investment Ratio (SIR) of 1.63. In other words, every dollar we invest in ERCIP is returned to the Department with a discounted cost savings of $1.63 over the lifetime of the project, demonstrating that, in many cases, energy resilience does not have to come at a price premium. For example, at Beale Air Force Base, ERCIP funding will provide an electrical substation which will provide a secondary source of power from an alternate power provider to ensure the Global Hawk mission has the reliable power it needs. At Anniston Army Depot, the project will provide on-site generation and grid controls which assure critical production and maintenance of combat vehicles during extended grid outages. Both projects provide improved energy resilience to their critical missions. Micro-reactor Demonstration.--As directed in the fiscal year 2019 National Defense Authorization Act, DoD and DoE are in the planning stages for a pilot program to demonstrate a commercially developed, Nuclear Regulatory Commission (NRC) licensed, micro-reactor to power critical loads at a permanent domestic military installation by December 2027. The demonstration will evaluate the energy resilience capability and the cost effectiveness of micro-reactor technology. Operational Energy Capability Improvement Fund (OECIF).--Overseen by the Under Secretary of Defense for Research & Engineering, OECIF supports operational energy research programs. The fiscal year 2020 President's Budget requests $70 million to initiate new projects and sustain projects started in fiscal years 2017-2019. Ongoing initiatives include efforts to increase the energy performance of unmanned systems, enhance power and thermal management for high pulse power weapons, wirelessly transmitting energy in the far field, and 1 year analytical studies to identify operational energy science and technology gaps. Installation Energy Resilience Policy and Governance.--The Military Departments continue to implement energy resilience initiatives aligned with Department of Defense Instruction 4170.11, Installation Energy Management. This is the first policy the Department issued to define energy resilience; critical energy requirements; and operation, maintenance, and testing requirements for energy resilient systems. Standardized Mobile Electric Power Systems.--In August 2018, the Department established a DoD family of mobile electric power generation, distribution, storage, and management systems. This policy addresses the growing need for power at contingency bases with a standardized, interoperable, and maintainable family of equipment, while allowing mission-driven exceptions. The effort decreases the logistics burden--and risk--for deployed forces while enabling advanced equipment to reach the field at lower cost in less time. Installation Energy Plans.--The Department's ongoing energy efficiency efforts not only contribute to energy resilience by reducing critical loads, but have also lowered our base operating costs by $5.4 billion since fiscal year 2005. In May 2018, the Department expanded its Installation Energy Plan (IEP) policy to require the integration of energy resilience and cybersecurity at all installations. The process of comprehensive energy planning will provide a holistic approach to identifying, evaluating, and mitigating energy risks to critical missions. The IEPs are slated for completion by the end of fiscal year 2021. Training and Education.--Across the Force, there is a need for uniformed and civilian personnel who are prepared to develop and implement effective solutions for energy resilience and cybersecurity. For civilian and military installation energy managers, we finalized the Energy Manager Competency Model. Additionally, we foster collaboration among the Sustainment organization, the Department of Energy, and other agencies to communicate key priorities and coordinate inter-departmental events. For example, the annual Energy Exchange, Defense Logistics Agency's Worldwide Energy Conference, and the Federal Utility Partnership Working Group, provide relevant training for our workforce. In addition, for uniformed personnel, we are working to bolster energy-informed, risk-based decisions by expanding the Defense Logistic Agency's Joint Petroleum Seminar and Joint Petroleum Officers Course. energy risk To prioritize resources, the Department is identifying, assessing, and integrating energy-related analyses and risks into Department decisionmaking, as follows: Energy Informed Wargames.--To better evaluate and mitigate the effects of energy disruptions on the mission, we are actively engaged in integrating energy risks into our wargames and exercises. In 2018, my office participated in three events sponsored by the Army, Defense Logistics Agency, and USTRANSCOM. With the integration of realistic constraints to logistics capacity and threats to our fuel storage and distribution, our efforts will improve Department decision- making in operation plans, concept and capability development, and program investments. Looking ahead, the Department anticipates executing a Joint energy wargame by the end of fiscal year 2019 that evaluates energy risks in the Indo-Pacific area of operations. Energy Resilience Exercises.--In alignment with U.S. Code and DoD instruction, we are performing full-scale and black-start energy disruption exercises of our energy resilience and backup power systems to evaluate risks to the readiness of our military installations. In fiscal years 2018 and 2019, the Department will have completed three tabletop exercise and five black-start readiness exercise tests at critical military installations. There is another planned black-start readiness exercise to be completed by the conclusion of fiscal year 2020. Energy Resilience Tools and Analyses.--The Department continues to identify and develop critical energy requirements, models, and metrics for decisionmaking across the installation and operational energy portfolios. For installation energy, the DoD commissioned the Massachusetts Institute of Technology Lincoln Laboratory (MIT-LL) to address a congressional requirement to evaluate the costs, risks, and benefits associated with energy resilience and mission readiness against energy supply disruptions on military facilities and installations. Site-level assessments conducted across a number of military installations identified critical energy requirements and metrics for the purposes of identifying energy resilience projects. Also, the life-cycle cost analysis tool, which assesses tradeoffs between mission performance and costs, is now being assessed for enterprise-wide adoption across the Department. energy performance The Department continues to leverage alternative financing authorities that ensure lower cost, resilient energy performance across DoD installations. Through mechanisms such as power purchase agreements, performance-based contracts, enhanced use leases, utility energy service contracts (UESCs), utilities privatization, and energy savings performance contracts (ESPCs), the Department has awarded over three billion dollars in alternative finance contracts to ensure energy performance, efficiency, and resilience on our military installations since 2011. In accordance with more recent congressional direction, the Department issued revised policy to integrate energy resilience and cybersecurity considerations into these alternative financing mechanisms. The Department takes full advantage of non-Federal financing for distributed energy projects to ensure the energy resilience of our installations. This approach minimizes DoD capital investment by using contracts that incentivize industry to fund infrastructure resilience improvements. When the business case supports it, the Department pursues distributed energy projects with microgrid-ready applications able to sustain continuous power in the event of a disruption. Both the Air Force at Hill Air Force Base and the Army at Fort Huachuca awarded ESPCs last year, which included implementation of on-site generation. In addition, the project at Fort Huachuca includes a microgrid, which will ensure the delivery of available, reliable, and resilient power while reducing life cycle costs through an ESPC with our industry partners. Further, my Energy team is conducting a Defense Energy Resilience Bank study, also known as the DERB, to review best practices from the commercial finance industry and lenders to implement and accelerate alternative finance for energy resilience project development. This multi-stakeholder collaboration with government and industry partners is critical to develop integrated and holistic alternative finance projects that ensure the Department's energy resilience objectives are met cost effectively. cyber secure facilities Reflecting the role of our facilities as nodes for projecting and sustaining power, the Department is reducing the cyber risks to facility related control systems (FRCS) to ensure reliable power for critical missions. Similar to our approach to energy resilience, the department integrated cyber security into our energy policies and guidance of the course of the last year. For example our military installations are including cyber security considerations in the development of their installation energy plans, along with the pursuit of alternative finance. Specifically, FRCS considerations are now integral to utility privatization agreements, ESPCs, and UESCs. Further, to build a FRCS defense posture, the Department recently began developing cybersecurity plans to account for the capabilities and resources required to implement controls on its highest prioritized assets and systems. We will continue to work with the Department's Chief Information Officer and Principal Cyber Advisor toward solutions and resources ensuring FRCS are defensible, survivable, and resilient to operate and sustain critical functions in a cyber- contested environment. Additionally, in July 2018, the Deputy Secretary of Defense issued a memorandum, Enhancing Cybersecurity Risk Management for Control Systems (CS) Supporting DoD Owned Defense Critical Infrastructure, mandating the Components cyber secure these critical systems. additional high interest programs border security On April 4, 2018, the President directed the Secretary of Defense to support the Department of Homeland Security (DHS) in securing the southern border, including assistance to ``stop the flow of deadly drugs and other contraband, gang members and other criminals, and illegal aliens into the country.'' On February 15, 2019, the President declared that a national emergency exists at the southern border of the United States that requires the use of the armed forces, making available certain emergency authorities, including Section 2808 of Title 10, U.S. Code. Section 2808 provides that, in the event of a national emergency declaration requiring use of armed forces, ``the Secretary of Defense, without regard to any other provision of law, may undertake military construction projects, and may authorize the Secretaries of the military departments to undertake military construction projects, not otherwise authorized by law that are necessary to support such use of the armed forces.'' At this time, the Acting Secretary has not decided whether use of Section 2808 authorities is necessary. No military construction funds may be obligated under Section 2808 unless the Acting Secretary determines that military construction projects are necessary to support the use of the armed forces in addressing the national emergency for which the armed forces are required. To inform his decision, the Acting Secretary has requested from DHS a list of proposed border barrier construction projects, prioritized in order of effectiveness, that DHS considers to be most effective in improving the effectiveness and efficiency of DoD personnel supporting Customs and Border Protection (CBP) and securing the southern border. DHS provided its input to DoD on March 20, 2019. In support of the Acting Secretary's consideration of Section 2808, DoD is conducting a deliberate process to identify MILCON projects that could be used as funding sources, if necessary, for MILCON projects to support the use of the armed forces in connection with the national emergency. Should the Acting Secretary determine that use of Section 2808 authorities is necessary, we will provide you the information on affected projects as soon as it is available. Additionally, the Defense Logistics Agency (DLA) is supporting Secretary of Defense-approved Requests for Assistance from the Department of Homeland Security via validated and Service- funded requisitions. As of February 28, 2019, DLA has provided over $7.7 million worth of Class IV materials for the construction of 202 miles of fencing, in addition to over $3 million in subsistence, $56,000 in clothing and individual equipment, and $3.3 million of re-utilized material in support of operations. DLA remains well positioned to support additional requirements. military construction reform Reform of the military construction process, although not represented as a budget request item, continues as an important effort of my office. Our goal is nothing less than to ensure warfighters are provided delivery of fully-mission-capable facilities within the timelines stated. We are looking for ways to reduce cost where possible, but perhaps more importantly, to improve communication between stakeholders and timeliness of completed facilities which fully meet user requirements over their expected service lives. We are continuing our proactive assessment of recent challenges in MilCon project delivery and program management to identify improvements in the MilCon process and implement reforms in a number of key areas, to include: improving identification of project requirements; enhancing collaboration between resource sponsors, end users, and construction agents to ensure projects meet mission requirements within budget constraints; selecting the best engineering and acquisition strategy to cost-effectively meet mission requirements; identifying risk mitigation measures before cost or schedule changes adversely impact the mission; and increasing awareness and accountability at all levels of management and performance as problems arise. The Department is also consulting with our industry partners to identify commercial best practices to lower costs, save time, measure performance differently, and improve project quality in support of the warfighter. guam and the commonwealth of the northern mariana islands (cnmi) As Acting Secretary Shanahan recently testified, China's increasingly provocative behavior in the Indo-Pacific, particularly in the South China Sea (SCS) should concern us all. Between 2013 and 2018, China increased its air and sea incursions into the SCS twelvefold. Our posture in the Indo-Pacific, specifically in Guam and the Commonwealth of the Northern Mariana Islands (CNMI) continues to be critical to countering China's influence. The Department continues to work on the relocation of approximately 5,000 Marines from Okinawa to Guam. This initiative reduces the burden on our Japanese allies, while bolstering regional security in the Pacific. Its focus is on sustaining a forward-deployed responsive force that counters the reach of the People's Republic of China, the aggressions of North Korea, and other regional threats, while ensuring the capability to provide regional support at a moment's notice. Marine Corps forces realigning in the Pacific will establish an improved force composition, installation construction and modernization, and new strategic hubs, of which Guam will be the most significant. This venture between the U.S. and the Government of Japan will enhance interoperability and strengthen deterrence in the Indo-Pacific Region. The main cantonment area on Guam for the Marine Corps will be known as Marine Corps Base Blaz, to honor Marine Brigadier General Vicente ``Ben'' Tomas Garrido Blaz, the highest ranking Chamorro to have served in the Marines, located at Finegayan in the Northwest. We are still in the land clearing phase of construction with approximately 85 percent of land clearing complete. The North Ramp of Andersen Air Force Base (AAFB) will be home to the USMC Air Combat Element housing the MV-22 (Osprey), the H-1, and the CH-53 platforms. Hangar 1, which houses the Ospreys is completed and operational. Overall, the North Ramp construction is approximately 50 percent complete. AAFB Northfield, which is directly above the cantonment area, provides a live-fire training range for small arms and will provide a multi-purpose machine gun range. The south side of AAFB will provide urbanized training. Apra Harbor, located in the southwest of the island, will be a sea embarkation hub. It will have the capability to support all vessels that support USMC operations, black bottom vessels and high speed vessels. Apra Harbor will also provide forces with refueling piers and an ammunition wharf. Improvements at Apra are approximately 60 percent complete. The relocation is expected to achieve initial support capability in the mid-2020s, contingent on affordability and environmental analyses. The fiscal year 2020 budget request includes $277 million in MilCon and Planning & Design funding, including $91.2 million for the second increment of a multi-purpose machine gun range on Guam. Overall, the Government of Japan has committed $3.1 billion to fund this relocation and has already transferred $2.023 billion of its commitment to the U.S. Treasury. We are also asking your support to authorize the use of up to $13 millionof funds appropriated in 2014 to mitigate the effects of the military construction workforce on the healthcare system of Guam, as identified during the National Environmental Policy Act process related to the Marines' relocation to the Territory. Another initiative to increase our capabilities in the Indo-Pacific region is the Air Force's construction of facilities and infrastructure for Divert operations at Tinian International Airport. The Department signed a lease purchase agreement in November of last year and anticipates signing the final lease agreement this May. This represents a major milestone in one of the more challenging transactions we have worked. Divert operations would occur as training exercises to support readiness in the event other locations in the western Pacific are unavailable to support standard operations. For example, humanitarian assistance staging, including noncombatant evacuation operations, could also occur at the airport in the event of an emergency or disaster.The Divert initiative is estimated to cost $380 million. For fiscal year 2020, the budget request includes $316 million to construct fuel tanks, a fuel pipeline, hydrant system, taxiway, and parking apron. As the westernmost U.S. territory in the Pacific, Guam and CNMI offers tremendous potential to posture the U.S. for the future, engage with our regional partners, and train to maintain core competencies. This is why we continue to pursue live-fire training ranges and training areas in the CNMI. These capabilities would fulfill INDOPACOM training shortfalls and be the only U.S. venue to conduct Marine Air Ground Task Force, Joint, and Combined-level live-fire amphibious assault and maneuver from the sea, with supporting naval gunfire and close air support. The environmental analysis for this is on-going. A key element of the analysis is a construction capacity study that will forecast the amount of construction activity CNMI can support. I would be remiss if I did not mention the devastation caused by Super Typhoon Yutu. On October, 24, 2018, the Category 5 hurricane- equivalent storm made landfall on CNMI. Its 180 mph winds caused devastating destruction in the region and according to the National Oceanic and Atmospheric Administration, it was the second strongest system to hit U.S. soil in recorded history. However, despite the catastrophic damage from the typhoon, the CNMI has chosen to continue moving the Air Force Divert initiative forward, demonstrating the strength of our relationship. Workforce Issues in Guam and Commonwealth of Northern Mariana Islands Stable economies in Guam and the CNMI, underpinned by a sustained labor pool, are critical to the Department's ability to implement the National Defense Strategy. Reliable access to a sustained labor pool in these forward-most territories is a national security issue that must be addressed if we hope to mitigate expanding Chinese influence and achieve our national security objectives in the region. We thank Congress for the relief provided in the Northern Marianas Island U.S. Workforce Act of 2018 passed last July. Extending the transition period for the full application of Federal immigration laws by 10 years (to December 31, 2029), and Guam and CNMI's exemption from the H-2B nationwide cap, will buy Guam and the CNMI time to work toward an interagency endorsed, long-term solution for ensuring sustained access to a viable labor pool Without long- term access to a foreign labor pool, the economies of these isolated U.S. territories will suffer and the cost of ongoing defense projects could skyrocket beyond their current estimates. military aviation and installation assurance siting clearinghouse The Military Aviation and Installation Assurance Siting Clearinghouse continues to protect the Department of Defense's ability to train, test, and operate as the nation expands its renewable and other commercial energy development and power transmission. The Department appreciates the statutory changes made by Congress in the fiscal year 2018 National Defense Authorization Act to codify the Clearinghouse role in DoD's Title 10 responsibilities, and is actively implementing the new requirements to better protect DoD missions. As an example, the Clearinghouse now notifies state Governors and solicits their input on energy projects where DoD has made an initial determination that a project will have an adverse impact to a mission. This increase in visibility helps protect DoD missions by identifying any state concerns with an energy project at an early point in the review process, as well as by identifying any state procedures that may assist DoD in finding a compatible siting solution. As a result of congressional direction and our own efforts, we are effectively evaluating the mission impact of commercial energy projects and implementing affordable and feasible mitigation solutions to protect DoD missions. In CY 2018, the Department reviewed over 5,000 applications for energy projects through the FAA's Obstruction Evaluation Process, which continues our historical increase of approximately 20 percent per year. Of these 5,000 projects, 795 were wind development projects. Commercial wind development typically poses the greatest compatibility challenge to DoD due to the height and the physical obstruction that wind turbines can pose in low level flight routes, and adverse impacts to radar systems. DoD has resolved concerns with numerous energy projects though collaboration between the Clearinghouse, the Military Departments, local communities, states, and energy developers, thereby maintaining the Department's ability to train, test, and operate while enabling development of alternative energy resources. Protecting and Enhancing our Training and Test Range Infrastructure The Clearinghouse is also leading the Department's efforts to develop a strategic plan for training range investments. In order to ensure that our testing and training range infrastructure is sufficient to support the National Defense Strategy, we are assessing our ranges' ability to support training for peer and near-peer adversaries. This assessment will result in a strategic plan for range investment to address identified gaps, improving combat credibility by offering opportunities for more realistic maneuver, attack, and opposing force engagement. The strategic plan will be completed in fiscal year 2020 and will complement a parallel assessment of test ranges by the Test Resource Management Center. accelerating materiel readiness recovery Accelerating materiel readiness recovery is one of my near-term imperatives in alignment with the National Defense Strategy to increase lethality. Overall sustainment readiness is a foundational component of military strategy and pacing aspect of producing uninterrupted U.S. military capability. There is no one-size-fits-all approach--no silver bullet solution to the challenge before us today. Effective and efficient public and private industrial capabilities & capacity is the end state we seek as the Department's accountable agent for enterprise level sustainment outcomes. Our strategy for accomplishing this follows three lines of effort; accelerating materiel availability improvement, strengthening the viability of the organic industrial base, and operationalizing sustainment reforms. Maintenance, at both the field and depot levels, is foundational to our ability to rebuild readiness, as our National Defense Strategy directs us to do. My team is laser- focused on getting Mission Capable (MC) and Operational Availability (Ao) rates where they should be--challenging the status quo, reversing negative trends, and driving an aggressive reform agenda based on improved data-driven decisionmaking and leveraging best commercial practices. This is no small task given a $78 billion annual spend for maintenance activities alone, and a workforce of over 606 thousand DoD personnel. You are undoubtedly aware of the 80 percent Mission Capable memo that was signed this past September for F-16, F/A-18, F-22, and F-35 critical aviation assets. Our intent is to apply that same level of attention and visibility across all of our fleets--air, ground, and sea. So let me focus on what we are doing at the enterprise level to drive enduring change and improvement. Foremost, we are accelerating Materiel Availability improvements across our fielded fleets. I've charged my team with setting performance targets and measuring progress across the entire enterprise. I now can access and leverage over 1.5 billion maintenance and supply transactions going back to 2005; a virtual goldmine in my estimation. We are refining our capabilities to understand the specific causes of availability loss and/or cost drivers at the enterprise level and synthesizing that information to inform decision makers about cost and availability relationships for every weapon system. We are also improving the viability of our organic industrial base capabilities. While our metrics initially focused primarily on mission and field-level outcomes, our next priority is depot performance and its contribution to overall supply chain effectiveness. We are working in concert with the Deputy Chief Management Officer's Cost Management team to map baseline costs of material and maintenance operations and to improve enterprise supply demand visibility and decisionmaking. We are also exploring and applying opportunities for broader application of commercial best practices within our public depots and repair activities. product support for weapons systems Sustainment supports Department decision makers with comprehensive, timely, relevant and actionable assessments for weapon system development and acquisition. More specifically, we provide the DoD enterprise with policy, processes, guidance and tools that drive effective product support planning and execution at best value; and lead the cultural transformation necessary to deliver optimal life cycle product support. As part of these efforts, we are pushing initiatives to address Operating & Support (O&S) Cost projections early in the program life- cycle that do not fully capture the cost to achieve the readiness levels our warfighters need. Requiring Sustainment Risk and O&S Cost Risk analysis significantly earlier than is currently the norm, by the Analysis of Alternatives (AoA) Phase, will enable Affordable Readiness of critical sustainment cost drivers (manpower, spares, consumables, and fuel efficiency). In addition to establishing and filling the supply chain, it also means establishing essential and early repair capability of depot level reparable and line replaceable units (DLR and LRU) by the scheduled Materiel Support Date--well-prior to initial operating capability (IOC) plus 4 years. We must balance near-term production cost with the long-range readiness of deployed fleets and fielded systems--that in reality coexist in the POM process. We also continue to improve policy and governance of the ``middle tier acquisition authority'' granted to the Department by Congress in order to accelerate the delivery of emerging capabilities into the hands of the warfighter. This authority provides streamlined pathways for middle tier acquisition technologies that can be prototyped within two to 5 years, or be put into production within 6 months and completely fielded within 5 years. My Product Support team is especially focused on improving aircraft availability and reducing sustainment cost for the F-35 program. We are working with our allies and partners to develop sustainment capabilities where appropriate; supporting numerous ongoing cooperation efforts, including information exchanges and engagements to facilitate interoperability and enhance relationships; providing logistical expertise to develop partner logistics capacity; and supporting Geographic Combatant Commands in developing their country assessments, their Security Cooperation Programs, and their Foreign Military Sales packages. logistics support to the warfighter The core competencies of Supply, Transportation, Equipment Management, Contingency Support, and Logistics Policy and Compliance were integrated under the Deputy Assistant Secretary of Defense for Logistics as part of forming the new Sustainment organization. The Defense Logistics Agency (DLA) also performs a critical logistics role as the nation's combat logistics support agency. DLA manages the global supply chain--from raw materials to end user to disposition--for the Army, Navy, Air Force, Marine Corps, Coast Guard, 10 combatant commands, other Federal agencies, and partner and allied nations. We secure our supply chains, institutionalize Operational Contract Support, and implement policies and strategies to mitigate threats from vendors in overseas locations. The Department seeks ways to strengthen our supply chains to support critical capabilities. Logistics personnel work closely with the Acquisition community to prevent procurement of counterfeit, defective, and malicious material. Efforts to encourage the development of supply chain standards is paying off as the Government Accountability Office (GAO) removed Supply Chain Management from its 2019 High Risk Report. Additionally, DLA supply chains drive over $35 billion in goods and services annually, providing 86 percent of the Military Services' spare parts, and nearly 100 percent of fuel. By staying synchronized with the Services' plans, DLA will take the required steps to proactively acquire and position material for aviation systems, land systems, and maritime systems, as well as industrial hardware, clothing and textiles, construction and equipment, medical, subsistence, and fuel and energy to ensure the readiness of our military forces. Since 2007 the Department has consistently worked to establish Operational Contract Support (OCS) as an enduring capability to support current and future operations. In August 2018, the Department began implementing 15 critical actions endorsed by the Joint Requirements Oversight Council (JROC) to fully integrate OCS across the Department, to strengthen the ability to perform OCS tasks, and ensure OCS supports all phases and ranges of joint military operations. Within OCS, Vendor Threat Mitigation (VTM) is critical. VTM is the capability to identify, assess, and mitigate risks posed by vendors supporting DoD operations outside the United States to ensure we do not do business with those entities that support our adversaries. Efforts are underway to mitigate risk to operational effectiveness and institutionalize OCS solutions by the end of 2022. We also understand the need to build logistics-related alliances within and outside our Federal Government structure and have taken action to build ties with other Agencies, industry leading companies, and allies to improve operations. One partnership success example is the General Service Administration (GSA) acquiring more mission support vehicles for conversion from an expensive DoD-owned to a DoD-leased fleet. This action reduced DoD vehicle sustainment cost over the past 5 years by $217 million (15.7 percent). Additionally, DLA provides some level of materiel or service support to about 40 Federal agencies, 50 states, 300 localities, and 115 international partners. DLA has the capacity to augment Federal contingency responses domestically and internationally. Hurricane-season demand topped $1.2 billion in support in 2017 and $105 million in 2018. Another important effort is the Logistic Reform Team, with a focus on identifying common sets of metrics and tools to measure and monitor our contribution to warfighting capability in terms of availability of weapon systems and cost per day of availability. Continued support of ongoing efforts to reform logistics processes not only increases weapon system readiness, but also drives down sustainment costs. The Team is evaluating sources of sustainment and commodity procurement processes, innovating our logistics processes to outpace our adversaries, and increasing transparency and governance across the enterprise. Readiness for the warfighter is also improved through DLA's organic industrial base program, where appropriated funds are used to enable industry a means to meet known surge requirements within our long term contracts when they don't have business case to do so otherwise. Reaching beyond sustainment organizations, we are partnering with the personnel community to improve the military personnel relocation experience by modifying the household goods relocation process. In support of audit readiness, we are taking actions to improve accountability of mission critical assets and to achieve a clean audit in the Department. We are reviewing notices of findings and recommendations received from independent public accounting firms and performing assessments of potential valuation methodologies for General Equipment, including weapon systems, for consideration as the Department-wide approach for properly valuing them. This will improve the integrity of financial data, which positions the Department to operate more efficiently and apply costs savings toward improving lethality. Additionally, we are working with the audit community and USTRANSCOM on the implementation of an enterprise-level transportation management system that will be a significant building block towards auditability. f-35 enterprise The Sustainment organization touches the F-35 enterprises across multiple domains. F-35 sustainment continues to be a major focus area of the Department, as we work to increase readiness to meet the 80 percent Mission Capable rate goal set as well as reduce F-35 sustainment cost to align with the Service-budget-informed affordability constraints. As part of the strategy to meet these goals within the fiscal year 2019-2024 timeframe, the Department named U.S. Transportation Command (USTRANSCOM) and the Defense Logistics Agency (DLA) as the Global Transportation and Distribution Provider, as well as the Product Support Provider for F-35 North American Warehousing. In this capacity, they will provide wholesale and retail warehousing infrastructure and management supporting Air Logistics Complexes and Fleet Readiness Centers, along with management of designated commercial warehouses within the North American Region. Additionally, DLA and the Services have developed organic supply chain initiatives to improve readiness and lower total lifecycle costs. Further, we issued an updated F-35 Life Cycle Sustainment Plan fiscal year 2019 that identified eight success elements necessary for the Department to improve readiness and cost to meet warfighter needs. In fiscal year 2018, the Department accomplished a major acquisition milestones across the F-35 sustainment enterprise. Our teams improved air vehicle availability by 3 percent through our reliability/maintainability progress, delivered Block 3F Air System, completed Phase 2 Global Supply Solution Capability and Capacity (for fiscal years 2020-2022), reduced DoD ownership costs from fiscal year 17 actuals, and planned for the Autonomic Logistics Information System re-architecture. state and community engagement--office of economic adjustment The request for the Office of Economic Adjustment ensures it may continue to support its many engagements with states and communities who are key partners to help the Department meet our mission. Specific program lines supported by this request include: compatible use engagements to lessen the impairments on our local missions brought about by civilian development and activity, including energy project siting; industry efforts that promote installation resilience through improved understanding of local and regional supply chains' susceptibility to funding fluctuations and cyber attacks; mission growth efforts to plan and deliver the necessary public services and infrastructure to support our forces; and, in a few rare circumstances, operational support to sustain Local Redevelopment Authorities as they await the disposal of property previously excessed through base closure actions. These funds will also permit the necessary oversight and execution of more than $700 million in obligated projects to improve public schools on our military installations that support the education of 11,000 military dependents annually; nearly $300 million in transportation improvements to improve access to many of our premier medical facilities for wounded warriors, their families, and our medical personnel; and, close to $180 million in outside the fence investments on Guam for water and waste water systems to support our Indo Pacific efforts. These projects are critical to support quality of life issues for our service members and their families. conclusion Thank you for the opportunity to present the President's fiscal year 2020 budget request for DoD programs supporting sustainment. We appreciate Congress' continued support for our enterprise and look forward to working with you as you consider the budget request. Senator Boozman. Lieutenant General Bingham. STATEMENT OF LIEUTENANT GENERAL GWENDOLYN BINGHAM, UNITED STATES ARMY, ASSISTANT CHIEF OF STAFF FOR INSTALLATION MANAGEMENT General Bingham. Thank you, and good afternoon, Chairman Boozman, Ranking Member Schatz, and the distinguished members of this committee. On behalf of over 1 million soldiers and 2.2 million family members serving on installations around the globe, we are grateful for your timely passage of the fiscal year 2019 authorization and appropriations bills and for your continued support. Thank you, too, for the opportunity to discuss the importance of installations to Army readiness. Soldier and family housing and quality of life programs are an investment in the Army's most valuable asset, our people. To that end, we remain deeply troubled by the media reports and firsthand accounts from our soldiers and families of poor environmental health and safety conditions, as well as poor customer service in Army privatized housing. The Army and CEOs of our privatized housing companies have heard loud and clear that we must do a better job for our soldiers and their families. Soldiers and families who choose to reside on our installations have an enduring right to safe and healthy homes and barracks. The Army completed a 100 percent review of our total housing inventory, inclusive of Government-owned housing, privatized housing, and unaccompanied soldier barracks. We will use the information obtained from these visits and inspections and subsequent ones to continually address all life, health, and safety deficiencies and to improve existing processes and controls for housing oversight. We are enhancing training for our commanders, improving work order tracking processes, conducting quarterly town halls, and implementing accountability in the entire system. This accountability is an enduring mandate and mission. We owe this to our soldiers and their families. Army installations generate, project, and sustain every aspect of combat power. Our military construction budget request for $2.3 billion is aligned with the Secretary of the Army's priorities of readiness, modernization, and reform, with an enduring commitment to caring for our soldiers, civilians, and their families. America's Army stands ready to deploy, fight, and win our Nation's wars. With your continued support in providing predictable, adequate, sustained, and timely funding, our installations will remain ready, secure, and resilient, enabling mission readiness and quality of life for soldiers, civilians, and families. Again, thank you for this opportunity to appear before you today. I look forward to your questions. [The statement follows:] Prepared Statement of Lieutenant General Gwen Bingham introduction Chairman Boozman, Ranking Member Schatz, and Members of the Subcommittee: Thank you for your continued support to our Soldiers, Civilians and their Families who serve this nation. The Army is grateful for the diligent work of this Committee and Congress on timely passage of the fiscal year 2019 Authorization Act and Defense and Military Construction (MILCON) appropriations bills. Your support provides greater flexibility to address mission critical infrastructure requirements that affect warfighting readiness. Army Installations generate, project, and sustain every aspect of combat power. Our facilities and infrastructure support one million Soldiers and 2.2 million Family members serving on installations worldwide. In this fiscal year 2020 Budget, the Army is requesting $2.3 billion in Military Construction appropriations, a 13 percent ($264 million) increase over our fiscal year 2019 request. This budget will improve installation readiness, strategic power projection, and Soldier and Family readiness. Predictable, adequate, sustained and timely funding for installations enables all aspects of warfighting readiness--our top priority. Installations support the National Defense Strategy by generating and projecting ready forces from locations around the globe. Army installations, National Guard Readiness Centers, and Army Reserve Centers must be ready, secure, and resilient to enable the Army to train, fight, and win our nation's wars. We are focusing our efforts and resources on the priorities of Readiness, Modernization, and Reform, with an enduring commitment to care for our Soldiers, Civilians, and their Families. As a result of deliberate investment in places where our Soldiers and Families live, we have made significant improvements in our barracks and government-owned housing. With the fiscal year 2020 budget request, our cumulative investments since fiscal year 2017 will have improved 21 thousand barracks spaces and increased the proportion rated as good and adequate to 87 percent. The fiscal year 2020 request will also allow us to achieve a 90 percent good or adequate quality level for all Army-owned Family housing. Specific projects are listed later in this statement. The President's fiscal year 2020 budget request includes increased investment levels for Facility Sustainment Restoration and Modernization (FSRM). Increased funding will allow us to address some of the maintenance backlog; conduct more deliberate preventive maintenance activities and recap our most critical need facilities. Working with all Army Commands, we have made great strides over the past year to identify those facilities that directly contribute to the Army's highest priority operational missions. We will allocate the funds you provide to us, now and in the future, on facilities that support power projection, mobilization, and warfighter mission needs such as barracks, airfields, ranges, and maintenance facilities to achieve installation readiness. soldier and family readiness Soldier and Family Housing and Quality of Life programs are an investment in the Army's most valuable asset--our people. We are deeply troubled by the reports in the media and from our Soldiers and Families of poor conditions and poor customer service associated with privatized housing. We have prioritized and implemented changes in processes and procedures across the installation management enterprise to address known issues, and our assessments continue. The Army remains committed to improving infrastructure and services that enable Soldier readiness and support Soldier and Family resilience, thus allowing Soldiers to focus on their mission. The Army Family Housing budget allows us to provide homes and related housing services to Soldiers and their Families living around the world. For fiscal year 2020, the Army requests $141 million for Family housing construction. This will fund the fourth and final increment of $83 million for new housing at Camp Humphreys, South Korea, which meets Commander, U.S. Forces Korea requirements for on- post housing. The request also improves poor and failing housing units in Baumholder, Germany, for $30million, and replaces failing housing at Tobyhanna Army Depot, Pennsylvania, for $19 million. We are requesting $358 million to sustain all Family Housing operations; cover utility costs; ensure proper maintenance and repair of government Family Housing units; lease properties where required; and provide privatized housing oversight. We are committed to providing our Soldiers and Families the best living conditions possible, commensurate with their service to our nation. We are also investing in our unaccompanied Soldiers' quality of life by constructing a $32 million permanent party barracks at Fort Hood, Texas. To address deficits at our Initial Military Training locations, we are requesting funds for Advanced Individual Training (AIT) barracks complexes at Fort Sill, Oklahoma, and Joint Base Langley-Eustis, Virginia for $73 million and $55 million, respectively, and a reception barracks complex at Fort Jackson, South Carolina for $54 million. strategic power projection The Army's request for MILCON provides secure and sustainable facilities to meet the Army's emergent needs in three critical subsets of installation readiness: Power Projection, Mobilization, and Warfighter Lethality. For fiscal year 2020, we apply $1.8 billion of our budget request to Strategic Power Projection; $1.4 billion for the Regular Army; $211 million for the Army National Guard (ARNG); $61 million for Army Reserve (USAR); and $66 million for the Army portion of the Base Closure Account. The $1.4 billion Regular Army MILCON request will allow us to move forward with critical projects that enhance the Army's ability to compete against our Nation's adversaries. fiscal year 2020 projects include a Cyber Instructional Facility ($107 million) at Fort Gordon, Georgia; an Aircraft Maintenance Hangar ($62 million) at Hunter Army Airfield, Georgia; and a Powertrain Facility Maintenance Shop ($86 million) at Corpus Christi Army Depot. Our $211 million ARNG budget request is focused on recapitalizing readiness centers--the heart and soul of the National Guard--as well as ranges to allow the Guard to be ready to perform Federal missions. Several of these projects will consolidate units and functions into a single facility allowing the Guard to close multiple older facilities. The $61 million fiscal year 2020 budget request for the USAR replaces our most dilapidated and failing facilities. An additional $9 million will support critical needs through the Unspecified Minor Military Construction account. We appreciate the funding Congress provided the Army in recent years to meet the most pressing needs on our installations. The fiscal year 2020 $5.9 billion FSRM budget request sustains this trend and gets us closer to meeting our full sustainment requirements. The $3.5 billion sustainment portion of the request represents an increase to 85 percent of the total modeled requirement and will allow us to conduct more deliberate preventive maintenance activities. The $2.2 billion restoration and modernization portion of the request, an increase of $600 million over the fiscal year 2019 request, will enable the Army to continue addressing our most critical maintenance backlog requirements. Commanders continue to optimize their resources and facilities by consolidating units into our best facilities; maximizing space utilization; and disposing of excess facilities. installation readiness The Army's energy security and sustainability program continues to reduce our reliance on external utility systems; improve energy and water efficiency; increase reliability and efficiency of energy and water systems; and enable mission readiness. As our adversaries continue to develop capabilities to disrupt commercial power grids, we appreciate the continued support of Congress for the Army's energy security and resilience initiatives in order to ensure our ability to train, mobilize, and project power from our installations to support warfighter requirements. Reliable energy and water supplies are crucial enablers for maintaining Army mission readiness. The potential disruption of energy and water services from cyber- attack or extreme weather events pose a continuous threat to installations and the missions they support. The Army has established requirements to secure critical missions by ensuring secure access to energy and water; reliable infrastructure conditions; and effective system operations, including holistic planning and exercising of emergency operations plans with scenarios that address grid outages. Our installation energy budget request is focused on enhancing mission effectiveness. The Army continues to leverage private sector expertise and investment to improve system reliability; reduce consumption; and improve energy and water resilience. The Army leads the Federal government in the use of Energy Savings Performance Contracts and Utility Energy Service Contracts. Our fiscal year 2020 environmental program budget request of $914 million will keep the Army on track to meet cleanup goals and maintain full access to important training and testing land, both integral components of Army readiness. The Army manages more than 13.8 million acres of land on which we interact with endangered species; preserve historic sites; and restore critical or contaminated land. Performing these functions effectively permits us to respect environmental requirements and continue Army operations while protecting our Soldiers and Families. conclusion America's Army stands ready to deploy, fight and win our Nation's wars. With your continued support, our installations will remain ready, secure and resilient to enable Total Army mission readiness and provide a high quality of life for Soldiers and Families. As the Army modernizes its weapon systems, our facilities must keep pace. We appreciate your continued assistance to ensure our Army has the best facilities for the best fighting force in the world. Senator Boozman. Thank you. Vice Admiral Smith. STATEMENT OF VICE ADMIRAL DIXON R. SMITH, UNITED STATES NAVY, DEPUTY CHIEF OF NAVAL OPERATIONS FOR FLEET READINESS AND LOGISTICS Admiral Smith. Thank you, sir. Chairman Boozman, Ranking Member Schatz, and distinguished members of the subcommittee, I appreciate the opportunity to provide an overview of the Navy's fiscal year 2020 military construction budget request. On behalf of our sailors and their families, thank you for your continued support of the Navy, its military construction program, and our 71 installations around the world, which enable the Navy the Nation needs. The missions accomplished at and from the shore enable a bigger, better, and more ready Navy as we engage in a great power competition. We undertake a deliberate annual review to prioritize our proposed investments and ensure that we provide the necessary investments to underpin the fleet's mission in support of the National Defense Strategy. The Navy's fiscal year 2020 MILCON budget request of approximately $1.5 billion, includes 22 projects that will increase lethality and strengthen alliances. The proposed investments deliberately target new platform capability, fielding and employment, recapitalization of waterfront and shipyard infrastructure, foundational warfighting missions, including power projection and shore requirements to maintain our global presence. Additionally, our facilities sustainment, restoration, and modernization request of $2.3 billion will help to improve sustainment of our most critical facilities. This is the fourth consecutive year Navy has increased FSRM funding. The Navy will begin to reduce the facilities maintenance backlog with the fiscal year 2020 budget request, but it will take several years of a consistent resourcing to achieve full recovery. Recognizing that shore readiness is an enabler for force generation and critical logistics capabilities to support the fight, our fiscal year 2020 request helps to maintain the positive momentum from the three previous budget cycles. However, the path to full readiness recovery will take a long- term commitment of resources, predictable funding, and time. It is a privilege to testify before the committee today and share the details of our proposed fiscal year shore investments. Congress is our critical partner to achieve the Navy the Nation needs. With stable and predictable funding, we continue to invest smartly, driving efficiency and ensuring the best return on the investment for the Nation, our sailors, and civilians. Again, thank you for your support for the Navy's shore infrastructure programs, and I look forward to your questions. Thank you. [The statement follows:] Prepared Statement of Vice Admiral Dixon R. Smith Chairman Boozman, Ranking Member Schatz, and distinguished members of the Committee, it is an honor to appear before you representing the thousands of Navy Sailors and civilians at our seventy-one installations worldwide. Thank you for the opportunity to testify about how our fiscal year 2020 Military Construction (MILCON) request best provides these dedicated professionals the facilities they require to carry out their mission aligned to strategy. The President's National Security Strategy clearly sets forth the priorities directing our Navy to maintain ready forces and invest in readiness to maintain ``The Navy the Nation Needs'' which includes infrastructure maintenance and modernization. Further, the Navy is supporting the National Defense Strategy (NDS) that articulates the Department of Defense's mission--to maintain a lethal, resilient, and rapidly innovating force. Today I look forward to sharing with you our proposed MILCON projects that enable fleet lethality as well as support for our service members and their families. Our shore infrastructure is an integral component to achieving the six pillars of the Navy's mission: (1) a bigger, (2) better, (3) networked, (4) talented, (5) agile, and particularly (6) ready fleet. To enable that ready fleet in fiscal year 2020, the Navy is requesting nearly $2.3 million in facility sustainment to support infrastructure worldwide. The MILCON resourcing of $1.47 billion allows for the execution of 22 projects, to include six overseas projects in support of the global reach and persistent presence of a forward-deployed naval force. On behalf of the CNO, I also want to express the Navy's appreciation to Congress for enacting the fiscal year 2019 Appropriations Bill that funds increased shipyard investments and contributes to improving necessary infrastructure that enables the Fleet and our warfighting missions. Today I would like to share with you how the Navy plans to align our Shore Infrastructure portfolio in fiscal year 2020 to maintain resiliency and lethality in The Navy the Nation Needs. military construction In fiscal year 2020, the Navy made a deliberate investment in military construction (MILCON) to increase lethality, capacity and capability. The MILCON budget request includes 22 projects, planning and design (P&D), and unspecified military construction at a value of $1.47 billion. More than 80 percent of the MILCON program is in direct support to the National Defense Strategy's highest priorities of increasing lethality, strengthening alliances, and enabling new Navy Platforms and Missions. This program also invests in restoring warfighting readiness and further advancing the restoration of our Naval Shipyards and support to the Navy Reserves. Increasing Lethality/New Platform ($898 million, 14 projects) --Ammunition Pier--Seal Beach, CA ($95 million) --CMV-22B Maintenance Hangar--Coronado, CA ($87 million) --Alert Force Facility--Fairfield, CA ($64 million) --Pier 8 Replacement--San Diego, CA ($59 million) --Replace SSN Berthing Pier 32--New London, CT ($72 million) --Master Time Clocks and Operations Facility--Washington, DC ($76 million) --Targeting and Surveillance System Facility--Jacksonville, FL ($32 million) --EOD Compound Facilities--Guam ($62 million) --Magazine Consolidation, Phase 1, West Loch--Pearl Harbor, HI ($54 million) --Runway 08/26 and Taxiway Hotel Extension--China Lake, CA ($65 million) --D5 Missile Motor Receipt/Storage Facility--Hill Air Force Base, UT ($51 million) --Mariner Skills Training Center--Norfolk, VA ($79 million) --Undersea Vehicle Maintenance Facility--Kitsap, WA ($25 million) --Communications Station--Sigonella, Italy ($77 million) Strengthen Alliances/European Deterrence Initiative (EDI) ($298 million, 5 projects) --Pier 5 Replacement--Yokosuka, Japan ($175 million) --Electrical System Upgrade--Bahrain ($53 million) --EDI: Joint Mobility Center--Rota, Spain ($47 million) --EDI: Small Craft Berthing Facility--Rota, Spain ($13 million) --EDI: In-Transit Munitions Facility--Rota, Spain ($$10 million) Shipyard Investment ($100 million, 2 projects) --Dry Dock Flood Protection Improvements--Norfolk, VA ($49 million) --Dry Dock 4 and Pier 3 Modernization--Puget Sound NSY, WA ($51 million) Supporting the Navy Reserves ($25 million, 1 project) --Main Gate Relocation--New Orleans, LA ($25 million) MILCON Planning and Design ($100 million) MILCON Planning and Design ($100 million) Unspecified Minor Construction ($46 million) facilities sustainment, restoration, and modernization (fsrm) Further, the fiscal year 2020 budget requests $2.3 billion to sustain infrastructure, and improve our facility sustainment from 80 percent of the Department of Defense (DoD) model in fiscal year 2019 to 85 percent in fiscal year 2020. While still below the DoD goal of 90 percent facilities sustainment, this is the fourth straight year the Navy has increased this funding level in its budget request, acknowledging our commitment to a more balanced investment to support Navy wholeness. The Navy will begin to reduce the facilities maintenance backlog with the fiscal year 2020 budget request with consistent resourcing to achieve full recovery. family housing Our Sailors and their families deserve safe, quality living quarters and commands must advocate for their health, safety, and well- being. The Navy takes this issue very seriously, and is taking deliberate action to identify problems and work with our commands and Public Private Venture (PPV) partners to ensure we develop a working relationship that supports the provision of quality housing operations. Immediate action has been taken to reach out to every family in Navy housing and to develop remediation plans to ensure our Sailors' living conditions in government family and PPV housing offers the quality of life standards which they deserve. To that end, we have directed required actions by our Navy commands to assess current conditions, address family concerns, evaluate PPV relationships and oversight, and provide findings to Commander, Navy Installations Command to adjust business practices that will ensure an expeditious, enduring, and comprehensive resolution. In order to continue operations while planning for overall housing improvement, the fiscal year 2020 Family Housing budget request provides $281.3 million for the operation and maintenance of almost 7,000 government-owned homes, leases for approximately 1,700 units, major maintenance and repair to more than 500 units, and oversight of nearly 40,000 privatized housing units. The Family Housing construction request of $27.8M million will assist in the elimination of inadequate units at Naval Station Rota, Spain and Fleet Activities Yokosuka, Japan by renovating 82 homes. base operating support Our fiscal year 2020 budget request invests $4.73 billion in base operating support, a slight decrease from fiscal year 2019 ($4.75 billion), essentially unchanged since the enactment of the Budget Control Act in 2013. This funding level provides compliant outputs and service levels at our installations, and we prioritize resources to minimize impact to mission, force protection, and quality of life at the expense of other base operating support functions. While funding for installation services and facility support has been constrained, the Navy remains committed to deliberately and effectively managing each base operating support program within available resourcing. base realignment and closure (brac) The Navy's fiscal year 2020 budget request includes $158 million for installations closed in previous BRAC rounds; $148 million of this is for environmental cleanup. The Navy has completed disposal of 94 percent of property (177,842 acres) with the remaining 6 percent representing 11,151 acres at 16 former installations. Over 50 percent of the remaining property is at two BRAC 2005 installations (NAS Joint Reserve Base Willow Grove, PA, and NWS Concord, CA). The majority of the remaining property transfers are planned to occur by 2027. There are 27 former installations (with no property remaining for transfer) which still require environmental cleanup or monitoring. I appreciate Congress' support of the environmental cleanup efforts at the former Hunters Point Naval Shipyard. Fraudulent contractor work delayed property transfers in support of redevelopment, and extensive rework on low-level radiological cleanup is expected to begin in 2019. Additionally, PFOS and PFOA have impacted public and private drinking water supplies at multiple BRAC installations. In fiscal year 2019, initial sampling and/or evaluations will be completed at 35 former installations with known or suspected PFOS and PFOA. Over $73 million has been spent as of 1 October 2018 and future costs for cleanup are expected to increase as EPA and state guidance/regulations evolve. conclusion The Navy the Nation Needs requires shore infrastructure worldwide that can support and win both a short and prolonged fight. Therefore, the Navy continues to prioritize the readiness of the force through the balance of resourcing. We are steadfastly focused on prioritizing investments that increase naval power as directed by the National Defense Strategy. Thank you for your unwavering support and commitment to our Navy's readiness, as well as your dedication to the Navy's service members and their families. Senator Boozman. Thank you. Major General Coglianese. STATEMENT OF MAJOR GENERAL VINCENT A. COGLIANESE, UNITED STATES MARINE CORPS, COMMANDER, MARINE CORPS INSTALLATIONS COMMAND, AND ASSISTANT DEPUTYCOMMANDANT, INSTALLATIONS AND LOGISTICS (FACILITIES) General Coglianese. Thank you, sir. Chairman Boozman, Ranking Member Schatz, and distinguished members of the committee, as the Commander for Marine Corps Installations Command, I am eager to continue to work with you to improve our installation infrastructure. Marine Corps installations represent an invaluable national asset. They are fundamental to combat readiness and to generate combat power. As stated in the National Defense Strategy, our installations are both at stateside and forward deployed, are vulnerable to a growing host of sophisticated threats. Mitigating these threats requires continuous support from Congress to strengthen our ability to operate and maintain these assets and to set the condition for future development and the relevance of our installations. Additionally, our installations are home to our Marines, sailors, and families. We must provide safe housing and sufficient community support infrastructure for their well- being. Although Florence hit landfall over 6 months ago, the Marine Corps at Base Camp Lejeune, Marine Corps Air Station New River, and Marine Corps Air Station Cherry Point are still reeling from the impact. The storm was a gut punch. It was the second-wettest storm on record. We sustained damage from 35 inches of rain and a hurricane-force wind that was crawling over our base at single-digit miles per hour. Additionally, other Marine Corps regionals--regions and installations took a knee on their critical readiness projects that are focused on life, health, and safety as we diverted funds to the affected bases on the east coast. We are grateful to OSD and Congress for recently approving $400 million in O&M reprogramming for fiscal year 2019. These funds will immediately go to recovering operations down at Camp Lejeune, yet the money is not enough for this year. We still need to pay back the Marine Corps' other installations across the other regions. It will require additional funding in 2019 and the support of Congress. The total hurricane recovery is a cost of $3.7 billion, including 31 replacement projects. The 31 projects will actually replace 133 buildings. That will cost nearly $2 billion to repair--to replace, I am sorry. The repairs to the existing buildings will cost $1.3 billion. The remaining $400 million will go towards related equipment. Since the storm, the Marine Corps and Navy Facilities Engineering Command have been driving at the problem shoulder to shoulder and have addressed the immediate life, health, and safety concerns at a cost of about $244 million with our limited operations and maintenance accounts. Marines and sailors are still occupying buildings and homes in need of repairs. Over 3,300 Marines and sailors are displaced across Camp Lejeune area and now are determined to make do in degraded facilities or poorly configured workspaces such as trailers. Due to Hurricane Michael, we have depot-level maintenance facilities exposed to the elements at Marine Corps Logistics Base Albany, impacting mission readiness. Over 900 facilities across our east coast bases have been compromised. Five hundred of these buildings have been severely damaged and cannot be occupied. Camp Lejeune is home to the II Marine Expeditionary Force and represents over one-third of combat power in the Marine Corps. Critical ranges and training areas support II MEP and Marine Corps Special Operations Command, and they remain degraded. Damaged infrastructure to roads, railroad trestles, beaches impede our strategic mobility and capacity to deploy. Family housing, both on base and the surrounding community, has been severely impacted. We have Marines executing permanent change station orders to Camp Lejeune this summer, and due to lack of housing, many are making the hard choice to temporarily leave their families behind. Marines are resilient, expeditionary, and adaptable. However, we are going to need some help to keep faith with them and ensure their optimal readiness. The Marine Corps fiscal year 2020 military construction budget includes 18 projects valued at approximately $1.5 billion. It focuses on supporting recapitalization and new platforms and training. The Commandant's infrastructure reset strategy, when properly resourced and implemented, will improve infrastructure lifecycle management. We must prioritize infrastructure reset over the long term. We must improve infrastructure lifecycle management and ensure the infrastructure investments are aligned with the Marine Corps capability-based requirements that support our warfighting mission and contribute directly to the current and future force readiness. The amount of damages these hurricanes caused to our infrastructure cannot be overstated. More importantly, it has impeded our ability to support the mission and the capabilities of Marines and sailors stationed in North Carolina and Georgia. With your continued support, we will fix these bases while improving their resiliency. Thank you for your time and the opportunity to speak on behalf of the Marines, sailors, and civilians, and their families. I look forward to your questions. [The statement follows:] Prepared Statement of Major General Vincent A. Coglianese preface Chairman Boozman, Ranking Member Schatz, and distinguished Members of the Committee, I appreciate the opportunity to discuss the Marine Corps installations infrastructure programs which are critical to our ability to train forces and maintain readiness. Thanks to the strong support we have received from Congress, the Marine Corps has been able to make significant improvements in the quality and condition of our installation infrastructure. Marine Corps installations represent an irreplaceable national asset. They are fundamental to combat readiness, particularly the generation of combat power. Additionally, they are home to our Marines, Sailors and their families, and will continue to be integral to their quality of life through housing and community support infrastructure. As Commander, Marine Corps Installations Command, and the single authority on all Marine Corps installation matters, the protection of our installations is my number one priority. There are several challenges in the current operating environment, and all the signs indicate those challenges will compound and grow. The most recent National Defense Strategy asserts the homeland is no longer a sanctuary, and recent asymmetric attacks on military installations across the country highlight the insider threat. Our installations are vulnerable targets for a growing host of sophisticated threats intent on disrupting and degrading our ability to generate combat power in support of the National Defense Strategy. Ensuring the protection of life and property serves to ensure our ability to execute those essential operations that enable the training and deployment of our combat forces. Maintaining the maneuver space to adapt and evolve our protection measures must occupy a central place in our conversations of modernization and readiness. It is imperative we have the ability and authority to execute investments that afford protection against both inside and outside threats. The operation and maintenance of these installations, as well as their future development and use, require long-term planning, careful investment, and timely program execution. Implementation of the Commandant's Infrastructure Reset Strategy will ensure our installations are capable of supporting Marine Corps operations well into the future. The Marine Corps has installations and support infrastructure worldwide valued at more than $110 billion that are used to train, house, and provide quality of life for Marines and their families. This infrastructure must be properly maintained to prevent degradation of our capability to support these mission-essential tasks. Adequately protecting our installations, supporting new warfighting and training capabilities, and sustaining infrastructure are top installation management priorities for the Marine Corps. impacts of hurricanes florence and michael Although Hurricane Florence made landfall over 6 months ago, Marine Corps Base Camp Lejeune, Marine Corps Air Station New River, and Marine Corps Air Station Cherry Point are still recovering and feeling the impacts. Camp Lejeune, home to the II Marine Expeditionary Force, is a huge source of generating combat power. Several headquarters buildings, training facilities, and aircraft hangers were affected. Many of our ranges and training areas supporting II Marine Expeditionary Force and Marine Corps Special Operations Command remain degraded. Damaged infrastructure, to include roads, railroad trestles, and beaches, have degraded our strategic capacity to deploy. Roughly 800 buildings between the Marine Corps Base Camp Lejeune, Marine Corps Base New River, and Marine Corps Air Station Cherry Point have been compromised. About 500 of those buildings have been damaged severely and are incapable of being occupied. Between Hurricane Florence and subsequently Hurricane Michael which damaged facilities at Marine Corps Logistics Base Albany, we have a $ 3.4 billion requirement. For the $3.4 billion hurricane recovery requirement, 30 replacement projects--to include new military construction and demolition--will cost nearly $ 1.7 billion. Repairs to existing buildings will cost $1.3 billion. The remaining $400 million will go to replacement for destroyed IT systems and other repairs. Between September 2018 and December 2018, the Marine Corps and Naval Facilities Engineering Command addressed immediate life, health, and safety issues at a cost of $78 million in Facilities Sustainment, Restoration, and Modernization (FSRM) funding. During this same time period, the Marine Corps developed its $1.3 billion FSRM repair estimate and further transitioned to construction design and contracting strategy. Since January 2019, we have been acting on our plan by releasing requests for proposals to industry. To date, our only financial recourse has been to divert FSRM funding away from every other base and station in the Marine Corps into North Carolina and Georgia. This self-financing strategy will not fully repair the hurricane damage. A self-financing strategy guarantees degradation of our infrastructure in California, Arizona, Hawaii, Virginia, South Carolina and any other state in which there is a Marine Corps installation. Additionally, this self-financing strategy will also impact our ability to meet our Infrastructure Reset Strategy goals--especially when considering our plans for demolition and elimination of poor and inadequate facilities. Hurricane recovery will take years to complete given the impact to our previously outdated infrastructure that was not designed to survive hurricane force winds and rain. We look forward to working with Congress to implement and support recovery efforts at the impacted installations. impact of budget uncertainty With Congress' strong support, the Marine Corps has made significant progress over the last 10 years in replacing old and unsatisfactory infrastructure. We appreciate actions taken by Congress to enact the Bipartisan Budget Act of 2018 that provided relief from the Budget Control Act defense spending caps in both fiscal years 2018 and 2019. However, budget uncertainty beyond fiscal year 2019 will erode our readiness and will continue to have negative impacts on our ability to make long-term decisions necessary for a healthy infrastructure portfolio. Long-term reduced funding of installations requirements will result in gradual degradation of our infrastructure and create a bow wave of increased future costs to return these assets to adequate condition. Your Marine Corps requires continued support from Congress with predictable budgets over a sustained period in order to maintain and improve infrastructure readiness. To maintain near-term operational readiness in previous years, the Marine Corps was forced to accept risk in its infrastructure portfolio. Taking risk in the facilities sustainment, restoration and modernization, and military construction programs resulted in the degradation of our infrastructure, which in turn increases lifecycle costs. Improving the current state of our installations is the single most important investment to support training, operations, and quality of life. The Marine Corps has prioritized military construction projects that support new weapons platforms (primarily the F-35) and other projects associated with life, health, and safety concerns. Congress has been very supportive of prior military construction budget requests. Thanks to Congress, the Marine Corps has received funding for many projects that positively impact readiness and training. As part of ongoing business reform initiatives, the Marine Corps' Infrastructure Reset Strategy seeks to improve infrastructure lifecycle management and ensure infrastructure investments are aligned with Marine Corps installations that are capable, adaptive, and economically sustainable platforms from which to generate readiness and project combat power in a fiscally constrained environment. Implementation of this strategy consolidates and appropriately resets the infrastructure footprint within existing installations to improve operational readiness and generate resources for reinvestment. Successful execution of this strategy will depend on future budget stability as well the provision of additional funds to recover from Hurricanes Florence and Michael. Our installations provide three critical force enabling functions. First, they are deployment platforms from which our expeditionary forces fight and win our Nation's battles; second, they are where our Marine Air Ground Task Forces (MAGTFs) train and hone their combat readiness; and third, they house our Marines and families. We must prioritize the Infrastructure Reset Strategy--we must improve infrastructure lifecycle management and ensure infrastructure investments are aligned with Marine Corps capability-based requirements to support the warfighting mission and contribute directly to current and future readiness. military construction The Marine Corps' fiscal year 2020 Military Construction (MILCON) program includes 18 projects valued at approximately $1.488 billion which is an 89 percent increase over the fiscal year 2019 enacted budget of $786 million. This increase is primarily due to additional funding for projects supporting recapitalization, new platform, and training. Marine Corps MILCON requirements are driven by operating force and other mission requirements such as: (1) introducing new platforms or weapons; (2) relocating forces to better position assets to meet the national military strategy; (3) meeting force protection or safety standards; (4) enhancing or replacing infrastructure that is in poor or failing condition; (5) meeting new and improved training standards for the 21st century Marine Corps; (6) modernizing critical infrastructure; (7) improving utilities reliability and resilience to support readiness; (8) meeting environmental regulations and laws and energy reduction mandates; (9) improving training areas to include aerial/ ground ranges; and (10) acquiring land needed to support training. The primary focus areas of the fiscal year 2020 Marine Corps MILCON budget request include: (1) supporting the beddown of new capabilities and platforms; (2) providing infrastructure to support force relocations; (3) recapitalization and replacement of inadequate facilities; and (4) training and concept development/testing. Our fiscal year 2020 budget accomplishes the following: --Supports new platforms such as Joint Strike Fighter (F-35), CH-53K King Stallion helicopter, and Amphibious Combat Vehicle (ACV) with new aircraft and vehicle maintenance facilities and training buildings. --Supports implementation of Force 2025, the future Marine Corps, which will be increasingly reliant on naval deployment, preventative in approach, leaner in equipment, versatile in capabilities, and innovative in mindset. --Supports planning and execution of the Marine Corps' Wargaming Program of simulation and modeling of future warfighting environments. --Provides training and quality of life infrastructure to support the relocation of Marines from Japan to Guam. --Replaces and modernizes numerous inadequate and obsolete facilities and infrastructure in order to improve operations, quality of life, and training. --Supports our Reserve component with operational and training facilities via the unspecified minor construction program. infrastructure sustainment, restoration, and demolition The President's Budget for fiscal year 2020 funds 88 percent of the OSD facilities sustainment model requirement for the Marine Corps. When restoring and modernizing our infrastructure, we prioritize life, health, and safety issues and efficiency improvements to existing infrastructure and focus on repairing only the most critical components of our mission critical facilities. By deferring less critical repairs, especially for non-mission critical infrastructure, some facilities will continue to degrade causing our overall facilities maintenance backlog to increase. The first step in addressing this backlog is reflected in the Marine Corps request of $79 million in fiscal year 2020 for the demolition of 2.7 million square feet of failing and obsolete facilities to enable implementation of the Commandant's Infrastructure Reset Strategy. family housing Our worldwide family housing inventory is 93 percent privatized, which has improved the homes in which our families live and other support infrastructure such as community centers, playgrounds, and ``green spaces'' that help create neighborhoods and a sense of community for our Marines and their families. Combined with traditional military construction, privatized housing will continue to build and improve the homes necessary to supplement local community housing. The overall goal of the Military Family Housing Privatization program is to provide safe, quality, and affordable housing to our military families comparable to what is available on the local economy. Our Public Private Venture (PPV) partners are responsible for providing the day-to-day operations. The Marine Corps is responsible for providing the required oversight of the homes to ensure that they are habitable, that any identified health concerns are properly addressed and that residents are being charged fairly for services received, including billing under the Resident Energy Conservation program (RECP). The Marine Corps views their role as a top priority, and takes the following steps to hold PPV companies accountable for providing suitable housing for our service members: --Ensures that the PPV partner maintains a 24-hour hotline and responds to maintenance requests in a timely manner --Works with the PPV partner to provide seminars and educational materials to residents with tips on home maintenance and energy conservation --Tracks systemic issues on a monitoring matrix and works with the PPV partners to resolve --Requires annual certifications by the PPV Partner certifying compliance with applicable environmental regulations --Participates in annual condition assessments to assess the suitability of the homes and neighborhoods --Publicizes the three-step resolution process for residents: (1) Contact the PPV office; (2) Contact the Regional PPV Manager; (3) Contact the Installation Housing Office--ensures engagement at all levels to keep homes habitable --Requires PPV partners to disclose any known hazards at move-in and have residents sign applicable mold, lead, or asbestos addendums acknowledging their awareness of the hazard and any recommended precautionary measures --Reviews resident comments on surveys --Proactively initiates audits and/or special studies and reviews mitigation plan when warranted The Marine Corps is actively engaged with ensuring that privatized homes are safe, suitable, and affordable. The Commandant of the Marine Corps recently issued a directive to address concerns about living conditions in both on- and off-base housing. The Commandant directed all Marine Corps commanders and senior enlisted leaders to request a voluntary home visit with each Marine and Sailor in their command (regardless of rank) who resides in government quarters, privatized military housing, or an off-base civilian rental property. The intent of the visits is to: (1) raise awareness of the member's living conditions to ensure it is safe, secure, and environmentally healthy, (2) identify maintenance or safety issues affecting the residence, determine any actions taken to date to remedy them, and determine how the chain of command can assist in the resolution process, and (3) ensure our members and their families are aware of and understand the support processes and programs available. Our Marines, Sailors and their families should know their leaders care for their well-being and are both ready and willing to help. Recently, the Marine Corps stood up its Housing Improvement Team with the goal of reviewing opportunities to improve Marine Corps oversight and the performance of the PPV partners. This team is additionally working with the other services in a collaborative effort to share best practices and a universal way forward. Some of the current opportunities being reviewed by the Housing Improvement Team include: --Working with the other services on a joint Resident Bill of Rights. --Assessing areas to amend the Business Agreements to allow additional DON discretion and review of incentive fee criteria and structure. --Evaluating the Marine Corps Housing Office staffing levels to ensure the Marine Corps is appropriately staffed to complete additional oversight of our PPV partners while providing increased resident advocacy support. Marine Corps will also look to increase training and education for its housing staff. --Reviewing with our PPV partners options for maintenance process improvement, including technology based forums like mobile phone applications for tracking service tickets and other possibilities. --Educating and encouraging installation leadership to become actively engaged with the PPV partner including performance review, resident satisfaction, and budget and recapitalization input. Additionally the Marine Corps will look to better train installation leadership for PPV awareness and interaction. --Reenergizing the Operating Force Command engagement and feedback for housing improvement and resident advocacy. The Marine Corps is not requesting any new family housing construction in fiscal year 2020 through either traditional MILCON or through the use of privatization authorities. However, we are requesting $19.9 million in the family housing, construction improvements account for the sustainment and restoration of 44 enlisted family housing townhouse units at MCAS Iwakuni, Japan in order to continue with the renovation of Iwakuni housing neighborhoods along with design for future projects. This will provide much needed improvements to quality of life for our Marines and their families stationed overseas. conclusion The Marine Corps must quickly recover the devastating effects of Hurricanes Florence and Michael, and continue implementation of our Infrastructure Reset Strategy. As outlined in the National Defense Strategy, our installations must prove resilient in the face of the threats we face. We must modernize our installations to protect our blunt and surge layer forces and reassure our partners and allies. Our operational capabilities are adapting to meet these changes, and we need to invest in a next generation installation infrastructure to match the growing MAGTF capability. Your support is crucial as we begin to develop installation infrastructure to support our Next Generation MAGTF. The fiscal year 2020 budget request supports this premise. Thank you for the opportunity to testify before you today. I look forward to working with you to sustain the warfighting capability, the readiness of our power projection platforms and quality of life of the Marine Corps. Senator Boozman. Thank you. Brigadier General Allen. STATEMENT OF BRIGADIER GENERAL JOHN J. ALLEN, DIRECTOR OF CIVIL ENGINEERS, DEPUTY CHIEF OF STAFF FOR LOGISTICS, ENGINEERING, AND FORCE PROTECTION, UNITED STATES AIR FORCE General Allen. Thank you, sir. Chairman Boozman, Ranking Member Schatz, and distinguished members of the subcommittee, I am honored to appear before you today to represent the Air Force. The Air Force fights from its bases. They serve as our power projection platforms from which we build, deploy, and employ ready forces. Decades of challenging fiscal conditions and global operations have required that we accept managed risk in installation infrastructure, which, left unchecked, will negatively impact Air Force missions. The fiscal year 2020 President's budget request takes the first steps in a years- long path to recovery to ensure our installations are ready to confront future threats. The result is a budget request aligned with the National Defense Strategy to enhance readiness for the high-end fight. To stabilize and sustain our installations, the Secretary of the Air Force signed the Infrastructure Investment Strategy, which provides a framework for investments in facilities sustainment, restoration, modernization, and recapitalization. This strategy is being executed along three primary lines of effort. First, we will restore readiness to our power projection platforms. Second, we will cost effectively modernize our infrastructure. And third, we will drive innovation in installation management. Our military construction budget request is a key enabler of the Infrastructure Investment Strategy and has increased by $400 million from fiscal year 2019. Aligned with the National Defense Strategy, the MILCON program prioritizes resources to the high-end fight, demonstrates strength to our adversaries and commitment to our allies, and supports global posture through new weapon system beddowns and aging infrastructure recapitalization. In fiscal year 2020 the Air Force will leverage MILCON funds to set deterrence conditions in the European theater, enhance partnerships and regional resilience in the Indo- Pacific, and strengthen logistics infrastructure to rapidly support operations in the Levant. Our MILCON request also supports continuing modernization of our aging aircraft fleet, including hangars, maintenance and training facilities, airfields, and fuel infrastructure that aircraft require to achieve full operating capability. fiscal year 2020 MILCON funds will also address urgently needed existing mission recapitalization focused on the nuclear enterprise and research development tests and evaluation infrastructure. Equally as vital as the Air Force MILCON budget is the facilities sustainment, restoration, and modernization account, which provides a non-MILCON pathway for mission-critical projects. This year's requested FSRM budget represents a considerable increase over the previous year, setting the stage for consistent, stable, and predictable funding for Air Force installations. In addition to strong installation infrastructure, ready and resilient airmen are critical components of a lethal, powerful Air Force. The Air Force remains committed to providing airmen and their families with quality housing and a sense of community on our installations. The fiscal year 2020 President's budget request focuses military family housing funds on eliminating inadequate housing from our Government- owned inventory. The fiscal year 2020 President's budget request, coupled with the Installation Investment Strategy, invests in a resilient and lethal force ready to fight and win in an era of great power competition. I thank you again for the opportunity to testify today, and I look forward to your questions. [The statement follows:] Prepared Statement of Brigadier General John J. Allen, Jr. introduction Chairman Boozman, Ranking Member Schatz, and Members of the Subcommittee, thank you for your continued support of the U.S. Air Force. I am honored to appear before you today to represent our Airmen and their families and to discuss the Air Force's fiscal year 2020 budget request. The foundation of Air Force readiness and lethality is an integrated network of installations which enables global power projection and provides safe, healthy communities for our Airmen and their families. Decades of challenging fiscal conditions and global operations have required that we accept managed risk in installation infrastructure which, if left unchecked, will negatively impact Air Force missions. In preparing the fiscal year 2020 President's Budget request, the Air Force deliberately evaluated both today's needs and the capabilities required to confront future threats. The result is a budget aligned with the National Defense Strategy to enhance readiness for the high-end fight by supporting resilient installations and airmen. Ready and resilient installations are inextricably linked to the Air Force's ability to generate air, space, and cyber capabilities and deliver unmatched global advantage as a member of the joint team. This budget request balances installation readiness, capability, and capacity with the need to maintain and field a credible and affordable force today and into the future. Ultimately, in this era of great power competition, our priorities center on strengthening a lethal, ready Air Force positioned to compete and win in the high-end fight. infrastructure investment strategy (i2s) The Air Force fights from our installations. Generating combat power is about more than buildings and pavement; strategic location, surge capacity, airspace, and ranges are all critical components of readiness and lethality in support of the National Defense Strategy. To stabilize and sustain our installations, we introduced the Infrastructure Investment Strategy (I2S) last year. The I2S provides the framework for necessary investment in facilities sustainment, restoration, modernization and recapitalization. The I2S is being executed along three primary Lines of Effort: --Restore Readiness to Power Projection Platforms.--Resilient and ready Air Force installations demonstrate strength to our adversaries and commitment to our Allies --Cost Effective Modernization of Infrastructure.--Air Force installations require investment for sustainment and modernization to assure mission readiness --Drive Innovation in Installation Management.--Air Force installations build and rely on strong relationships with communities and private sector partners to leverage new technologies Four imperatives will align and unify these lines of effort: (1) adequate and stable funding, (2) smart infrastructure business management, (3) unified efforts across the enterprise, and (4) revitalized squadrons. The I2S ensures mission-driven investments are timed to optimize lifecycle costs, maximizing space use in facilities in good condition and demolishing or divesting from those that are not cost effective to sustain or repair. The Air Force is implementing private sector best practices to ensure that we acquire and manage facility sustainment, restoration, and modernization materials and services as a single, efficient enterprise. These include developing cost management strategies specific to different spending categories, leveraging data to improve the timing of sustainment and recapitalization actions, and establishing standards of services and equipment to achieve economies of scale. These efforts to improve enterprise-wide cost efficiency are becoming increasingly critical as highly technological, fifth generation fighter aircraft arrive at various locations, requiring a larger logistical and sustainment footprint. Additionally, the Air Force has vastly improved asset visibility through sustainment management, geospatial information systems, and in- depth facility condition assessments. As of October 2018, we have completed Facility Condition Assessments for 75 percent of all facilities, which are captured in our sustainment management system. This data enables unprecedented future requirements identification. We can ``see'' current requirements and ``predict'' future requirements through life-cycle degradation analysis. By leveraging asset visibility in conjunction with operations research analytics, we are able to run scenarios that include varying investment levels and varying policy decisions. These scenarios inform senior leaders of strategic investment trades, shaping future planning to ensure our installations remain mission- ready. military construction The I2S focuses on mission-driven, well-timed investment, but the foundation is a recommitment to adequate, stable resourcing for Air Force infrastructure through our military construction (MILCON) and facility sustainment, restoration and modernization (FSRM) accounts. To support a dynamic global posture and increase lethality, our military construction (MILCON) budget has increased by $400 million from fiscal year 2019, bringing the fiscal year 2020 request to $2.72 billion. Aligned with the National Defense Strategy, the MILCON program prioritizes resources to the high-end fight, demonstrates strength to our adversaries and commitment to our allies, and supports global posture through new weapon system bed-downs and aging infrastructure recapitalization. Combatant Command Infrastructure Our fiscal year 2020 MILCON request supports combatant commander requirements in Europe, the Indo-Pacific, the Middle East, and North America. We remain committed to efforts initiated by European Command (EUCOM) in fiscal year 15 to reassure North Atlantic Treaty Organization allies and European partners of the United States' commitment to our collective security and territorial integrity. The fiscal year 2020 European Deterrence Initiative (EDI) MILCON program builds on fiscal year 2019 efforts to set deterrence conditions in the theater and enable the joint team and our allies to respond quickly to aggressive regional actors. fiscal year 2020 EDI MILCON investment enhances EUCOM's materiel prepositioning options and improves airfield capacity, fuel systems, and munitions storage at bases in Iceland and across mainland Europe. The Air Force recognizes that a rapidly growing China aims to undermine long-standing alliances and displace American influence in the Indo-Pacific region. Our fiscal year 2020 budget request includes several infrastructure investments in the Pacific to enhance our partnerships and regional resilience. Our fiscal year 2020 budget request also enhances global reach and military cooperation between the United States and Australia through expansion of tanker capacity at RAAF Tindal, Australia. In support of Central Command, our budget request also includes two projects to continue the development of Muwaffaq-Salti Air Base in Jordan. These projects strengthen the resilience of logistics infrastructure needed to rapidly support operations in the Levant. Lastly, in support of Northern Command, our budget request includes funding for Air National Guard fighter alert shelters at Truax Field, Wisconsin. New Mission Infrastructure The fiscal year 2020 President's Budget request supports continuing modernization of our aging aircraft fleet. The request includes facilities supporting Air Force weapons system acquisition and modernization programs including the F-35A, KC-46A, T-X, Presidential Aircraft Recapitalization, and UH-1 replacement. Achieving full operational capacity for new weapons systems depends not only on the aircraft acquisition, but on the delivery of necessary hangars, maintenance and training facilities, airfields, and fuel infrastructure. Major elements of our MILCON request supporting fleet modernization include KC-46A flight training facilities at Travis Air Force Base, California; and infrastructure enabling continued beddown of F-35A aircraft at Eielson Air Force Base, Alaska, Nellis Air Force Base, Nevada, and Royal Air Force (RAF) Lakenheath, United Kingdom. Additionally, this year's budget requests funding for the final increment of the Presidential Aircraft Recapitalization hangar and maintenance complex at Joint Base Andrews, Maryland. Lastly, our request includes projects at Joint Base San Antonio, Texas, for the planned T-X replacement of the T-38C, and a project at Kirtland Air Force Base, New Mexico, supporting replacement of the UH-1. Existing Mission Infrastructure Our budget request substantially increases funding for urgently needed existing mission recapitalization compared to fiscal year 2019. Recapitalization efforts focus on two mission critical areas: the nuclear enterprise, and (2) research, development, test, and evaluation infrastructure. The fiscal year 2020 budget funds construction of a Weapons Storage Facility at Malmstrom Air Force Base, Montana, and the Ground Based Strategic Deterrent Mission Integration Facility at Hill Air Force Base, Utah. The weapons storage facility will replace an array of 24 facilities averaging over 50 years old with a modern consolidated facility, while the Ground Based Strategic Deterrent facility will provide a central hub for the research, development, and acquisition efforts necessary to replace the Minuteman III intercontinental ballistic missile. The fiscal year 2020 request also funds the second increment of construction for a new, state-of-the art laboratory space at the Massachusetts Institute of Technology's Lincoln Laboratory, a federally funded research and development center focused on solving problems with direct national security implications. facility sustainment, restoration and modernization While facility sustainment, restoration, and modernization (FSRM) funds are not appropriated by this committee, they are equally as vital as the Air Force MILCON budget, providing a non-MILCON pathway for mission-critical projects. The two funding streams work together to deliver ready, resilient installations. This year's proposed FSRM budget represents a considerable increase over the previous year. Coupled with our MILCON spending, the FSRM budget will enable our Infrastructure Investment Strategy to provide adaptive infrastructure that assures combat readiness and lethality. The fiscal year 2020 President's Budget request includes $4.1 billion in funding for Air Force FSRM, a 40 percent increase in funding over the fiscal year 2019 President's Budget request. The Air Force measures FSRM investment as a percentage of plant replacement value (PRV), which is the estimated cost to design and construct replacement facilities, utilities, and infrastructure to meet modern standards. fiscal year 2019 represented a low point for FSRM spending, reducing our infrastructure investment level to 1.5 percent of PRV. This investment level fell significantly below the Air Force minimum target of 2 percent and the industry standard of 4-6 percent. In fiscal year 2020, the Air Force will begin a substantial infrastructure investment increase to restore the health of our installations. The fiscal year 2020 President's Budget invests in FSRM at 2 percent of PRV, which represents a marked increase from last year. This correction sets the stage for consistent, stable, and predictable funding for Air Force installations and underpins the readiness and lethality those installations provide in support of the National Defense Strategy. housing Ready and resilient Airmen are a critical component of a lethal, powerful Air Force. The Air Force remains committed to providing Airmen and their families with quality housing and a sense of community on our installations. To better understand the scope of potential health and safety problems in our housing inventory, the Secretary and Chief of Staff of the Air Force directed a 100 percent review of our homes. The initial results are driving immediate fixes and will guide long term actions to ensure our families are living in healthy and safe homes. The fiscal year 2020 President's Budget seeks $398.6 million for both military family housing construction and military family housing operations and maintenance. These funds will support our continued focus on eliminating inadequate housing from our inventory and correcting health and safety deficiencies. Our military family housing construction request of $103.6 million will fund construction of 76 homes and supporting neighborhood infrastructure at Spangdahlem Air Base, Germany; whole house improvement of 12 government-owned homes on Yokota Air Base, Japan; and whole house improvement of 29 government-owned historic homes at Wright-Patterson Air Force Base, Ohio. Our military family housing operations and maintenance request of $295 million will fund efforts to sustain, improve and modernize our government-owned inventory of approximately 15,200 family housing units. Combined, these funds will ensure we continue to support the housing needs of Airmen, their families, and our Army, Navy and Marine Corps teammates housed in our government-owned inventory. In 2013, the Air Force met our goal of privatizing family housing at all stateside locations, including Alaska and Hawaii, through 32 housing projects at 63 installations with an end-state of 53,237 homes. Our focus in the United States is now on the long-term oversight of this portfolio of privatized homes. We are also committed to ensuring unaccompanied Airmen are provided quality housing on our dormitory campuses. Funded out of the Air Force FSRM account, our investment strategy for dormitories focuses on restoration and modernization of these facilities in their existing configurations. This strategy will meet the Department of Defense goal of 90 percent adequate dormitory rooms for permanent party unaccompanied Airmen and reduce the requirement for replacement construction. This enables us to focus MILCON funds on modern, formal training facilities for our newly recruited Airmen, such as the Airman Training Center at Joint Base San Antonio, Texas included in the fiscal year 2020 President's Budget. conclusion Prior years' fiscal challenges have led the Air Force to accept managed risk in infrastructure. The fiscal year 2020 President's Budget request increases infrastructure investment to strengthen the Air Force's global network of installations, focusing on innovative, cost- effective installation management and facility sustainment, restoration, and modernization. The military construction portion of the budget will support combatant command priorities, new weapon system beddown, and aging facility recapitalization. The military family housing portion of the budget will sustain and improve our inventory of government-owned homes. Together, these investments will secure our global power projection platforms and provide safe communities for our Airmen and their families. In an era of great power competition, the Air Force must prioritize enabling a lethal force to compete and win in today's and tomorrow's fights. The fiscal year 2020 President's Budget request prioritizes investment in the ready and resilient Airmen and installations that our nation's high- end fights demand. Senator Boozman. Thank you. General Coglianese, you testified that over the past 6 months, the Marine Corps has dedicated a significant amount of resources to hurricane recovery for installations at Camp Lejeune, New River, Cherry Point, and Albany, all of which have come from within current funding levels. What--I guess the question really--or two or three things. What impacts are being felt across the Marine Corps due to cash flowing recovery efforts for hurricanes Florence and Michael? So, the cash flow situation. And then also, what are the operational impacts as a result? And then, finally, what impact will those risks have on short-term and long-term funding requirements? General Coglianese. Yes, Chairman, thanks for the question. Cash flow is seriously impacting the rest of the Marine Corps. So by putting the--we had to stop the bleeding and make the repairs. If you fly over Camp Lejeune or New River today, it will look like blue tarps from the sky. So we patched it. We stopped the bleeding. We did our due diligence, 31 military construction projects that are ready to go as far as 1391. We do need PD to further refine those projects. What we basically did is, basically, the idea to stop the money going from the west coast and the Pacific and flowed it all to Camp Lejeune. So there is projects that are health and safety issues--runway repairs, gas line repairs in Camp Lejeune--they all basically came to a stop to do the right thing to help Camp Lejeune and the east coast. But unless we get additional money, those projects that are critical projects and are not ``like to have'' projects, we will not be able to restart. We have several bids in third and fourth quarter that will expire for the rest of the region. So that is impacting the entire Marine Corps. Operations, I think we made kind of a quick recovery down in Camp Lejeune. But if I can just name a couple kind of anecdotal stories. There is a control tower, range tower, at Cherry Point that controls all of the airspace for the ranges. That has been decimated. So those people now are working in a makeshift facility. So that has an impact. You have young Marines who work on aircraft, and now they have to be moved into another hangar and doubled up. Aviation maintenance is critical, and now that is going to affect aviation maintenance just because it affects the quality of life of the Marines. And then if you just kind of take the overall quality of life of the Marines, sailors, and families. If you have to PCS to Camp Lejeune, you are away from your family plenty of times because of war or deployments. If you have to now leave them at Camp Pendleton to go there because of shortage of housing and such, that just has greater impacts or long-term impacts, I think, on the health of the Corps and retention and things like that. And that is just few of many, many stories. If I could just leave you one more. There is a building in Cherry Point that all of our counselors work out of for family counseling, substance abuse, and all. And that pretty much was decimated, and now we have counselors shoved in all different nooks and crannies around Cherry Point. And what is happening, people are not going to counseling because those services are not readily available. So those kind of things are just anecdotal stories, sir. Senator Boozman. Very good. General Allen, a similar question. You are suffering the same thing. Can you tell us how that is affecting you as far as self-financing, trying to self-finance as we go forward? General Allen. Thank you, Yes, sir. Understand. First, let me thank the subcommittee for the reprogramming request that you all passed. General Coglianese mentioned it in his statement. But for the Air Force, that was $200 million in O&M, which is very helpful this fiscal year 2019. Our requirement at Tyndall for O&M is $750 million in fiscal year 2019. Five hundred fifty million dollars of that has already been cash flowed from other places where the O&M was programmed. And on top of that, we need $150 million in MILCON planning and design to be ready for the MILCON rebuild that will be ready in fiscal year 2020. So that is the magnitude of what we are dealing with at Tyndall. If you factor in where we think we may be with Offutt as a result of the flooding on the Missouri River here in the last month that number could grow to over $1 billion total that we need to be looking at cash flowing. So without an additional relief this fiscal year, our comptroller has put together a proposal for our Secretary that essentially involves a triage of how we manage O&M to get us through the rest of the fiscal year. So to your question, if we have to invoke that triage plan, we will have to really stop new recovery activity at Tyndall, probably in the May timeframe. In the Offutt timeframe, we will do the same in recovery or I am sorry, at Offutt Air Force Base, we will do the same in recovery there to slow down that recovery. In addition, about $270 million of O&M FSRM projects that won't be awarded until after the first of May will just be deferred into the next fiscal year. So that is about 62 projects. And then also our weapons system sustainment accounts, the accounts that we use to maintain airplanes, will be impacted, as will flying hours later in the fiscal year. So just an idea of some of the impacts that are resulting from the cash flow. Senator Boozman. Thank you. Senator Schatz. Senator Schatz. Thank you, Mr. Chairman. Secretary McMahon, I want to start with this $7.2 billion, and I want to make sure that we have at least a similar understanding of what is being asked for. Here is the way that I understand it, just in colloquial terms. If we could go as quickly as possible, that would be great. The first $3.6 billion is essentially backfilling. And the second $3.6 billion is sort of forward funding, running the same play in the next fiscal year. Is that about right? Mr. McMahon. Yes, sir, with $2 billion going toward hurricane relief as well. Out of the 9.2---- Senator Schatz. Out of the 7-point. Okay, so sorry. $3.6 billion backfill, $3.6 billion forward funding, running the same play, and then $2 billion for hurricane relief. Okay. Mr. McMahon. Yes, Senator, that is correct. Senator Schatz. Okay. So Acting Secretary Shanahan has asked Chairman Dunford to give his military advice on projects that can be cut for border wall construction. So who else provides input into this process? Mr. McMahon. Senator, first, rather than ``cut,'' I would use the word ``deferred.'' We have committed since day one on this, no projects will be cut. It is simply deferring. We have got a process defined that no project that is scheduled to be awarded in fiscal year 2019 will not be impacted. Senator Schatz. Okay, rather than quibble with you about language, who else is providing input into what will be moved to the right? And in my view, if it moves to the right, it may fall off, but we will have that conversation offline because it is longer. How does this process work? Who gives the input--and I will give you a couple of questions. Who gives the input? Are the service secretaries and chiefs developing prioritized lists to give to the Chairman of the Joint Chiefs? And does this process provide sort of for a pass back? In other words, can all of the people at this panel argue, I think persuasively, that there is just no room, for instance, in the Air Force MILCON budget to free up $100 million or $700 million, or whatever it may be, for the wall, given natural disasters, deployments, urgent needs? You paint a picture of pretty urgent needs and some unexpected expenses. And so the question is, are you in a position, are these individuals in a position to push back? Mr. McMahon. Senator, to the first part of your question, the Chairman of the Joint Chiefs provides independent advice to the Acting Secretary as to whether or not there are any projects that were presented by the Department of Homeland Security meet the requirements that we can utilize 2008--2808 funding. Senator Schatz. Does the information flow from the service branches to Chairman Dunford? Mr. McMahon. That is a determination looking at the list of projects that were provided by DHS back to the Department of Defense. It does not talk about specific MILCON projects. To that part of the question, each of the services and a list of all of the unawarded projects have been provided to the Congress. Within that list, they now have the opportunity, if there is a requirement--no requirement has been defined yet. Senator Schatz. ``They'' meaning the services? Mr. McMahon. The services. Senator Schatz. Okay. Mr. McMahon. Have an integral play--the four ladies and gentlemen to my left are the ones that initiate that process, working through their service secretaries. Senator Schatz. But do they get, like, do they get a target dollar amount to go and find? Or is it their discretion to say, listen, I can only free up $28 million, or are they ordered each to find some dollar amount, and how does that work? Mr. McMahon. Senator, beyond, at this point in time, that is a level of detail that, quite frankly, we are not down to yet as to what projects across the four services would actually be tagged because today there is no requirement because the Chairman of the Joint Chiefs has yet to define if any of the projects presented meet the minimum requirements to be funded under 2808. Senator Schatz. Okay, I see. So that is a fair answer. We are not there yet because you have the Chairman of the Joint Chiefs has to interact with the Department of Homeland Security and so on, pursuant to the statute. I get it. You can just see how this puts us in at a minimum, an awkward position. But to put a finer point on it, it is quite difficult to fund additional requirements, right? And to do what we normally do, which is to listen to you, to trust you, and then to lay down money for those needs when there is 9 odd billion dollars that is sort of not just outside of the regular order, but outside of our ability to even see it, right, at this point. And so this creates great difficulty for the committee to do its job in the normal fashion. And I understand, you know, you did not initiate this process. You may not even like this process. I don't want you to comment on that. But it does create difficultly when you are talking about bases and installations that have been essentially destroyed, and you need help. My view is, I am staring at this $7.2 billion and say, well, there is some money. Right? And I would argue, especially from this committee, that that $7.2 billion ought to be used for these needs and not the wall. And if we decide, as a Congress, to fund the wall, we should do it the old-fashioned way, we should fund a wall. We don't want to fund MILCON to some high amount and then let the money get raided because no one wants to admit that they are funding a wall. I will come back for a second round. Senator Boozman. Senator Murkowski. Senator Murkowski. Thank you, Mr. Chairman. General Bingham, I want to address my first question to you. And to the three of you who will be retiring, just let me add my thanks and appreciation for your years of service. This is regards to infrastructure readiness and the initiative that is being pursued in Alaska called the Alaska Infrastructure Readiness Initiative. This is to look at urgent unfunded needs, and the senior leaders in U.S. Army Pacific are working this, working a similar initiative in Hawaii. And what we are looking at in Alaska are things like indoor heated storage and maintenance facilities for the Stryker, a need for adequate indoor facilities to conduct physical training in cold conditions, improvements to JPARC to improve the training. Can you speak to me just very quickly here about whether or not we are on track with this initiative to really help advance what the senior leadership team is looking to and how we can address these unfunded needs in infrastructure? General Bingham. Thank you, Senator Murkowski. I appreciate your question. I can tell you that we are aware of several of those projects, future projects are programmed for Alaska. We are looking forward to working with General Brown and the USARPAC team on what he will bring into the building as it relates to that initiative you described. Senator Murkowski. And so do you think this is something that there can be an agreement specific to this initiative, not unlike what I understand is being pursued in Hawaii now? General Bingham. I am not the decisionmaking authority on that, your question. But we will certainly take that back to the building, as you have asked me. Senator Murkowski. Well, I appreciate that. And as you do that, I would like you to look at one of these issues that have just raised, which is this warm storage for the Stryker vehicles there at Fort Wainwright. We have got a situation where we just don't have warm storage. You have got 7-month winter season. It takes about 72 hours of winter maintenance before they can basically get warmed up to be ready to respond, which is a challenge most notably. So I guess the question is, is whether or not Congress might be able to fund a temporary solution through the Army procurement accounts in 2020 and whether or not we can work with you to address this in the short term before we can get to that longer-term solution. General Bingham. Again, thank you so much for your question. Though I am not the decisionmaking authority, we certainly recognize the need, and I look forward to working with you and your team on the issue that you just raised. Senator Murkowski. Well, I appreciate that. It is a priority for us up north. So thank you for that. This is a question for you, Vice Admiral Smith and General Coglianese. Earlier this morning in the Armed Services Committee, Senator Sullivan was able to pose a question to the Secretary of the Navy and I also understand to the Commandant. This relates to the prospects of ADAC as an opportunity for Marine training activities. Secretary Spencer was up in the State with Senator Sullivan last year, was very interested in helping to facilitate operations in this area. ADAC, as you all know, has been relatively quiet in many decades. But the potential there for training opportunities and also with existing infrastructure, I think, is quite promising. Do either one of you have anything that you would care to add to what was already discussed this morning? And I guess more specific to this committee is, what would the funding look like for us as the Appropriations Committee to consider what a training opportunity for the Marines out in ADAC would be? General Coglianese. Senator, thanks for the question. I wish I listened to the testimony, I would be better prepared for what the Commandant said. I am not sure what he said. Senator Murkowski. He was all positive and all good. He said just bring it on. General Coglianese. Well, whatever he said, I double down. Senator Murkowski. There you go. General Coglianese. But I would tell you that the Commandant, in every discussion he has about our facilities or wherever we are located, it is always about training. Whether it is Hawaii or in the Pacific or everywhere we are at, I mean, every day there is a question about training. If we cannot train, there is no sense in us being there. And I know he is very open-minded, he has talked about Alaska and the opportunities, part of Pacific, obviously. And so, he is definitely open-minded and talked about it. I have no idea about cost or funding or what the requirement would be. But I know the Commandant is definitely open-minded about using Alaska and training in Alaska. Senator Murkowski. Vice Admiral Smith. Admiral Smith. Yes, ma'am. Thank you, Senator. I know that we are looking at what is the art of the possible up in Alaska. ADAC is one of those things. There is no decisions yet, but again, we are seeing what the art of the possible is. Because, to the general's comment, where we can do training and where we can leverage opportunity for increased and advanced training, especially where we are in great power competition and what is up there in Alaska, we are going to go see what we can do, ma'am. Senator Murkowski. Well, we would certainly welcome you up to get more eyes on the situation, but we think that we have a pretty good opportunity again for training areas as well as infrastructure there. Thank you, Mr. Chairman. Senator Boozman. Senator Udall. Senator Udall. Thank you, Mr. Chairman, and thank you, all of you, for being here and very much appreciate your service. The Department of Defense, the New Mexico congressional delegation, and the Appropriations Committee worked hard to get several MILCON projects that would support national security needs, including an information systems facility at White Sands Missile Range. This project will enable White Sands to continue the missile defense, hypersonics, and other tests that are vital to national security. Furthermore, military construction projects like this one have already been approved by Congress but are at risk of being sacrificed for the President's ill-advised border wall. These MILCON projects were all requested in your budgets. So I think we can safely assume you support them and believe they are important to military needs. Is that correct? Is it just a yes--it looks like everybody is nodding. So I am going to say for the record, we are all on yes there. And I have introduced legislation that would reiterate and make crystal clear that we intended these funds to go to these projects and prevent MILCON funding from being raided for a southern border wall. Would anyone here oppose Congress including language like that on future appropriations bills to protect MILCON project funding from being taken? Mr. McMahon? Mr. McMahon. Senator, clearly, every project that comes before this subcommittee is important to the services and important to the Department. It is a matter of priorities within the Department of Defense through the President, who is the commander-in-chief, of how best to utilize that based upon the actions of the Senate and the Congress. Senator Udall. Yes, well, I just hope, and I think this was said by several other members earlier, that the advocates here for the military know and understand, the career people here, how important and how hard you have worked over the years to devise a process for MILCON to go forward. And now to have what you were really preventing, a lot of that was the politics of it, of trying to get it in to be a solid process. And now we have the politics of the White House in the middle of this. So I just hope all of you, when you get asked, as Senator Schatz was talking about, what you feel ought to go forward, that you push back. I realize what you can and can't say here, but it is very important for you to speak up in terms of what is a national security need and what isn't. Let me ask about hypersonic testing. I know General Bingham knows this well. This hypersonic testing at White Sands Missile Range, including a point-to-point testing envisioned by the Air Force for transportation and space research and development based out of the Space Rapid Capabilities Office at Kirtland Air Force Base, is an important next step toward developing a hypersonic capability. Is the Air Force or Army considering future MILCON at White Sands to support these needs? General Bingham. Well, thank you for the question, Senator Udall. And as you know, having commanded White Sands Missile Range for nearly 2 years, it is absolutely a national treasure. I will tell you that White Sands is playing a key role in implementing hypersonic test flight. We have been actively engaged in OSD's Test Resource Management Center to explore long-range flight corridors, and I suspect that will continue into the near future. Senator Udall. General Allen, anything from the Air Force perspective on that? General Allen. Senator, I will just say I don't have any hypersonic-related MILCON in the Future Years Defense Plan right now, but that very well could change in the future. Senator Udall. Great, thank you. Mr. McMahon. Senator, if I could add one comment to that? Senator Udall. Yes, please go ahead. Mr. McMahon. One of the things that we recognize is the potential encroachment in the northern areas above White Sands. We have taken action, working with local developers and some of the power companies, to ensure to the best of our ability that that encroachment will not take place because we recognize it to be a national treasure. Senator Udall. Yes, and we are working on that with you, I believe. Mr. McMahon. Yes, sir. Thank you. Senator Udall. Thank you very much. You know, military families in New Mexico live in privatized military housing, have communicated concerns about the dilapidated conditions and health issues in their homes, which include health issues like lead paint, black mold, pesticide use. I understand, responding to this, that you all or the DoD is working to propose a tenant bill of rights. What will this bill of rights entail, and how will it address the needs of military families? Mr. McMahon. Senator, if I might for my colleagues? They are intimately involved with this, as are their Assistant Secretaries with my staff. Very simply, what we are trying to do is ensure that what has occurred over the last couple of years does not happen again. It gives a greater voice to our residents. The bill of rights specifically talks about protecting them, providing them with an understanding of what they should expect from our privatized partners, as well as a methodology by which if they have an issue, that issue can be resolved. In general terms, that is what we are looking at. But provides in clear guidance, oh, by the way that our private partners have agreed to. And tomorrow, I will meet with many of the families organizations to make sure they are comfortable with that as well. Senator Udall. Yes. And when you visit with these young families and how dedicated they are to the service to the country, it is just so discouraging and disheartening to hear them describe some of the conditions in this housing. So I hope that we can all get on the same page and make sure that we are going to invest and make sure this does not happen again. Thank you very much, Mr. Chairman. Senator Boozman. Senator Collins. Senator Collins. Thank you, Mr. Chairman. And thank all of you for your service, but particularly the three of you who will be retiring, we are very grateful. Admiral Smith, speaking of national treasures, another national treasure is in the State of Maine. It is the Portsmouth Naval Shipyard, as I am sure you know. It plays a crucial role in ensuring that the Navy's submarines are able to accomplish their missions worldwide. Last year, the Navy requested and Congress appropriated $162 million for three very important military construction projects at the shipyard, including the vital Drydock Number One Super Flood Basin improvement, a portal crane rail extension project, and the replacement of a consolidated warehouse. Completing these projects on schedule will ensure that the shipyard can dock both Los Angeles Class and Virginia Class submarines and execute Los Angeles Class service life extensions by fiscal year 2021. These projects now have award dates before September 30th. Do you anticipate executing these projects on schedule? Admiral Smith. Thank you, Senator. I appreciate that. And yes, that shipyard is phenomenal. It does great work up there. As you know, I have had the opportunity to visit on more than one occasion, and it is a great workforce and a great team up there. At this point, we are on track to award those three MILCONs, ma'am. Senator Collins. Thank you. That will come as a great relief, and it is so important to the Navy as well. I want to follow up on the Senator from New Mexico's concerns about the reports of substandard housing for our military families. I have been very concerned about a report that was published in Seacoastonline.com talking about black mold, vermin, and lead paint at a particular housing, apartment building really, called Admiralty Village, which houses 200 military families who work at the Portsmouth Naval Shipyard and in other military capacities in the Seacoast region. The descriptions are very troubling. I don't think it is fair to ask you to respond on the fly to the specific allegations in this story. I would note that the Portsmouth Naval Shipyard recently held a town hall and offered all residents an inspection, and that is certainly a good first step. What I do want to do is to provide you with a copy of this story, which has much more in-depth reporting and to ask you to respond. This is an example of an apartment building that I believe was originally built by the Navy but then privatized. And it just has not been kept up to the standards that all of us would want for our military families. So I will submit this to you as part of a record question, with the permission of the chairman, and ask you to specifically respond. Admiral Smith. Yes, ma'am. Absolutely. Obviously, the care and the feeding of our sailors and their families is of the utmost importance. We have learned a lot here, as we all have stated. I have not seen that specific article, and I look forward to seeing it. And the more information we can get on where we are on housing in reality and from different perspectives to enable us to get after this aggressively is more than welcome. So I look forward to reading that and getting back to you, ma'am. Senator Collins. Thank you very much. Thank you, Mr. Chairman. Senator Boozman. Thank you. Senator Baldwin. Senator Baldwin. Thank you, Mr. Chairman and Ranking Member Schatz. I am concerned that the DoD is not addressing important readiness issues for no other reason than the President has directed billions of dollars from our defense budget to be used for a wall that he promised Mexico would pay for. General Bingham, your 2020 budget includes $211 million reserve fund to address the dangers within military housing. And if there is a need for this spending, I don't understand why it should wait a year unless it is because the Army can't afford it because of the funds that are being spent on the wall. And Admiral Smith, we have heard estimates that the shortfall in ship depot maintenance in this year alone is in the hundreds of millions of dollars and perhaps approaching $1 billion. And it doesn't seem clear if there is a strategy to fund these needed repairs in light of how much is being spent on the wall. General Coglianese, the Marine Corps reports that there is a $451 million shortfall to address hurricane damage at Camp Lejeune and Cherry Point. A reprogramming could solve this shortfall in a matter of days, and it is why General Neller wrote his memo raising alarms about the readiness and fiscal solvency of the Marine Corps. The only reason I can think of for not providing the Marine Corps with a second reprogramming is because of the amount of funding being provided for the wall. And General Allen, the Air Force reports an $899 million shortfall this year for repair of Tyndall and Offutt Air Force Bases. And again, it seems like this could be quickly addressed by a reprogramming, except that billions in defense funds are being spent on the wall. So Congress has not been presented with a request from the President to fund the disaster costs that are burdening the Marine Corps and the Air Force. Reprogramming dollars are being prioritized for the wall and not your readiness concerns. My question for the panel is simple, what is your plan for dealing with these costs, when they are clearly taking a backseat to the wall? Mr. McMahon. Senator, if I might start, and then I will let my partners respond as they need to. First, many of the things that you have identified here are significant issues exacerbated by the weather issues that we had last year with both at Tyndall and Camp Lejeune. The challenges that we face in many cases are O&M issues viz., military construction funding issues. And so, part of the effort with the reprogramming that we went through was to resolve that. That resolves in part some of the issue for fiscal year 2019, but it clearly, as you have heard in testimony thus far today, does not take care of all of the issues that we will face in 2019. I am not privy at this point to know whether or not the Department through the President will submit a supplemental, but clearly, there is a requirement out there, as is there across the board for disaster relief. With regards to military construction, I think there is a recognition within the Department that there is a need for additional dollars to be able to both support the wall and other issues. The approach that we have taken, coming before the Congress, is an attempt to recognize that there is a near- term requirement as well as a back funding that would be requested. And I think the appropriations the President's request that came forward recognizes that we can't do without that $3.6 billion that we requested and that you approved and authorized in 2019, but we are requesting that it be back funded in 2020. Senator Baldwin. Does anyone else wish to make any comments? If not, thank you, Mr. Chair. Senator Boozman. Our distinguished Vice Chairman of Appropriations, Senator Leahy. Senator Leahy. Thank you very much, Mr. Chairman. I have also had a concern about money that is being transferred for the border wall, especially as we have had a number of votes on this. As you know when the Congress voted overwhelmingly to give $1.6 billion for the wall, the President vetoed that bill saying it was not enough, closed down the Government for 35 days, cost us tens of billions of dollars, but then signed the bill for $1.3 billion. I couldn't figure that out, why that happens. There was a congressional vote on what it was, Republicans and Democrats. Now I worry that money is being taken to a backdoor way to build the wall. With a son who trained at Camp Lejeune, and I look at the damage to Camp Lejeune, and I have talked with him and with friends of mine who trained there also. I might ask, General, do you have enough money to put Camp Lejeune back where it should be? General Coglianese. Senator, good seeing you again. No, sir. We need the $451 million, as the Commandant has testified this year for fiscal year 2019 in O&M money, and that is just for repairing things. We have asked for $2 billion in military construction for 31 projects. And that is 31 military construction projects that replaces actually 133 buildings at Camp Lejeune, New River, and Cherry Point. Senator Leahy. I know that area well. I emphasize it was my son who trained there. I didn't train there. I don't think I ever would have made it through, even with my Italian half. Secretary McMahon, on March 7th, I joined Senator Schatz and Durbin, Udall, others, Democratic members of the subcommittee, to a letter to Acting Secretary Shanahan asking that he provide a list of projects deemed less important than building a wall on the southern border that could be put at risk in order to pay for the wall. We have not gotten a response. When will we be told which projects will be deferred or canceled in order to fund the wall and why they are less important? Mr. McMahon. Senator, where we are in the process today is that the next step is for the Acting Secretary to request feedback from the Chairman of the Joint Chiefs as to whether any of the efforts being requested do, in fact, meet the criteria necessary for 2808 funding. Once we understand whether or not there is a requirement that can be supported, we will work with the services to have them identify which projects could be deferred. We have provided some initial guidance-- Senator Leahy. Which projects could be deferred because they are less important than the wall? Mr. McMahon. Right now, today, Senator, what we have done is identify that any project that is scheduled to be awarded in fiscal year 2019 is taken off of that list, and a project that is scheduled not to be awarded until fiscal year 2020 would be one of those considered. Each of the services will look at that criteria. But the intent and the belief being that with the support of the Congress, that funding would be backfilled for any project that would be-- Senator Leahy. But that does--as you know, that doesn't really answer my question. We are told this is beginning right now. And that we have to take this money right now to build this wall because of the pressure on the United States. You don't have a list of what can be cancelled right now to pay for the wall. Is that correct? Mr. McMahon. That is correct, Senator. Senator Leahy. Thank you. And I appreciate that. I was encouraged to see the Army include a replacement for the Mountain Warfare School within the unfunded priorities list. The current facility is nearly 40 years old. And I will submit some questions to the record on this. Obviously, I will support a replacement. And as the Army undertakes a long-term effort to relocate and rebuild National Guard Readiness Centers, let us make sure--and I know General Bingham, I know you have been concerned about this--that we are making sure that they meet all standards regardless of gender, that they be incorporated in their design and readiness. And will you assure me of that, please? General Bingham. I can. Thank you. Senator Leahy. Thank you. Mr. Chairman, thank you for letting me step in. I apologize. It is a busy day in the Appropriations Committee. We are also holding a hearing with the Secretary of State just up the hall on his budget. But thank you all. I know most of you well and thank you for being here. Senator Boozman. Thank you. Senator Daines. Senator Daines. Thank you, Mr. Chairman. I can tell you in Montana we are very proud of the men and women of the 341st Missile Wing. They work very hard each day to maintain our nuclear arsenal. Those ICBMs, make sure at the highest state of readiness. I want to be sure from the onset that we aren't doing them a disservice with hyperbole and loose rhetoric about crumbling infrastructure for perhaps political purposes. Secretary McMahon, if our missileers got the call tonight, are you confident their systems will perform as expected? Mr. McMahon. Senator, after 34 years in the United States Air Force, I know they are. Senator Daines. Thank you. I am confident as well. And would you agree that our military installations are improving today as a result of increased investment in defense and a renewed focus by this administration on the threats facing our Nation? Mr. McMahon. Senator, they are. We have a long ways to go. There is still risk, but we are making the effort, and over the last couple of years, we have done very well in being able to reduce that risk. Senator Daines. For fiscal year 2020, the President has requested $235 million to update the structures where nuclear munitions are stored and maintained at Malmstrom Air Force Base. I feel confident the White House and the Senate both understand the value of maintaining a credible nuclear deterrent, but some of our colleagues in the House seem a bit more naive or perhaps just simply uncooperative. General Allen, how damaging would a continuing resolution be to the Air Force's modernization strategy if the House and the Senate can't reach an agreement by October 1st? General Allen. Thank you, Senator. Well, it delays our recovery. So in my opening remarks, I talked about this fiscal year 2020 budget request would be a considerable increase over fiscal year 2019. So absent that fiscal year 2020 appropriation, we won't have that considerable increase in funding to begin that recovery--to include the $235 million WGF facility at Malmstrom. Senator Daines. Thank you. And I know the Air Force is working diligently on Malmstrom's missile maintenance facility, which was slightly delayed. Are we back on track now to have a contract in place this summer? General Allen. Yes, Senator. We were working diligently to get an above-threshold reprogramming request through, and I understand that that came to the Hill today. We are on target for a June of 2019 award for that project. Senator Daines. Great. Thank you. Last year, I was pleased this committee was able to accelerate the much-needed ramp expansion at the Great Falls International Airport, where our Guard C-130s operate. I understand the design is currently about 70 percent complete. General Allen, by all indications, this project appears to be moving along and should be completed on schedule. Would you agree with that assessment? General Allen. Yes, Senator. We are looking at September for award. Senator Daines. Thank you. And with the natural disasters we saw in 2018, whether it is Montana wildfires to Gulf Coast hurricanes, how can Congress help the Air Force hedge against the risk of unforeseen expenses? General Allen. Sir, I would say right now our O&M requirements in fiscal year 2019 are our highest priority in general recovering from severe weather. Is that answering your question? Senator Daines. It does, yes. Thank you. Mr. McMahon. Senator, may I pile on for just a second to that question? Senator Daines. Yes. Mr. McMahon. I think one of the most important issues for the Department, as well as for our Congress, is how do we create resilient installations? We have talked a little bit about weather. We have talked a little bit about a climate, but it is a much broader issue than that. That gets into cyber, it gets into water, it gets into energy. And I think with the Congress, I would encourage us together to figure out how we take a more holistic approach to ensuring that our installations are fully resilient. Thank you for letting me. Senator Daines. You bet. Thank you. Thanks for that comment. In summary, and General Allen, I appreciate your time last week. I was glad with discussing the readiness and the quality of life issues facing our airmen. As you know, Montana can get kind of cold there in the wintertime. We had some 40 degree below kind of weather this past winter. To maintain the Air Force's physical standards in those conditions, you have got to have adequate facilities. For years, the indoor fitness center there at Malmstrom Air Force Base has lagged behind other northern-tier bases, but there never seems to be enough funding to bring it up to an acceptable standard. The fitness center is a priority for the military serving in Malmstrom. General Allen, I ask that you continue to work with us to get Malmstrom the improvements it needs and make this a higher priority in the Air Force. General Allen. Senator, based on our conversation, I asked my staff to reach out to the installation, which they have done. We will continue to work with the Wing, and if it will help you, we will be happy to come over and spend more time with your staff to talk about that project. Senator Daines. Thank you, General Allen. Thank you, Mr. Chairman. Senator Boozman. Thank you. Now we have talked about some, lots of really important things today. A couple of members have already brought it up, but I think maybe one of the most important things that we talked about was the privatized housing and the problems that we have had. And so what we have got this challenge. I would like to know, and we will start with you, General Bingham. I would like to know if this has changed the service's attitude as far as who is responsible. You know, when somebody complains, what are we going to do? Who in the past, it seems like we have maybe not been as good as we should be. Tell me how it has changed the services. General Bingham. And thank you, Chairman Boozman, for your question. I will tell you, first and foremost, we want to assure our service members and their families that we absolutely care for their well-being. We want them to feel safe and know that they are in safe housing. And so to that end, we are sparing no effort to make sure that this partnership, called Residential Communities Initiative, works as it was intended to do. To that end, we are putting commanders and leaders back in the process associated with hearing the voice of our service member and families as residents inside of that. And we know that is important. It is not a one-time fire and forget. This is a continual process. And as I mentioned in my opening remarks, we want to make sure that we put in place processes and procedures that are enduring because our service members and their families so deserve all of that. And I think one of the major takeaways is really trying to recapture and re-garner the trust from our families and our service members. Because what makes a ready service member is making sure that he or she does not have to worry about their families. Housing is very important to them and to us as leaders. And we want to reassure them that we are trustworthy stewards of them and all that make them the ready service members that we aim for them to be. Thank you for your question. Senator Boozman. Anybody else got anything to add. Admiral Smith. Mr. Chairman, we are clearly in a better place because of PPV housing. Having said that, we also clearly took our eye off the ball. And we have a responsibility to our sailors and their families to make sure that if they are having issues we support them. As you know, the CNO directed a 100 percent contact of all our families to understand what their issues are and concerns. He addressed small unit leadership, our chief petty officers and our division officers, to know and advocate for their sailors. And when that doesn't work, the chain of command advocate for them. So you asked, has it changed? What is different? We have refocused, doubled down on our responsibilities to take care of our men and women, sir. Senator Boozman. Very good. Does the fiscal year 2020 request include adequate funding to mitigate and address what we want to do with the issues? Mr. McMahon. Mr. McMahon. Senator, what I would tell you is that we are able to work some of the non-privatized housing issues. Quite frankly, one of the challenges that we face is an O&M shortfall and unfunded request requirement for additional manpower within our housing offices, which is one of the key issues that we identified as a root cause problem of where we are today. Support from the Congress for that funding I think would assist us to be able to get our housing offices back to where we would like them to be. Thank you for the question. Senator Boozman. Well, let us help you with that. I mean, we look as far as I am concerned, you are responsible for getting this fixed. And on the other hand, let us help. I think I can speak for the committee, this is something you heard from both sides. This is something that we are all very, very concerned about. So be sure and let us know how we can help so that we truly can fix this. Senator Tester. Senator Tester. Well, first of all, thanks. Thanks to you all for being here. And Mr. Chairman, I appreciate you taking some time so I could get back here. Thank you very much. I will be very, very quick because I think most of what I have in my portfolio to ask has already been asked, but this is a really important question for you, General Allen that I think Senator Daines touched upon. It deals with mission recapitalization, which I think we both can agree on that is very urgent, especially as it applies to our nuclear enterprise. And so I am glad to see that the weapon storage facility at Malmstrom is included in this budget request. It is a project that I have been advocating for that the base needs, that the airmen need at Malmstrom, and I can't wait for construction to begin. The question, as it applies to this budget, though, is I am concerned about possibly these dollars getting reprogrammed, creating a potential--another delay. For obvious reasons, and I know that many people have spoken about dollars taken out of the military budget to be used for a wall on the southern border, I think, quite frankly, that is a mistake. We are taking one security measure and making it weaker by trying to beef up another one. So I guess my question is, is can you assure me that these dollars will stay in the budget? That if the President asks for dollars that you will say, no, this is too important for our nuclear enterprise to put off any longer? General Allen. Senator, I can't give an assurance of what will happen should that project be appropriated. But I can assure you that I understand and advocate for its mission importance for all of the reasons that you said. Senator Tester. Well, I would just say that, and I know that the President is the commander-in-chief, and I know that there are rules that have to be put forth here. But I have been down at the southern border, and I have been at Malmstrom Air Force Base. And I understand what is going on relatively well on the southern border after spending 2 days down there. And I understand relatively well what is going on at Malmstrom Air Force Base. This facility has been on the books for a while now. You know that. I mean, what is more important than weapons storage? And this isn't talking about storing .22 rifles, this is nuclear weapons. And so, I would just say, do what you can do to push back to make sure these projects move forward. They are that important. General Allen. Yes, Senator, I agree. And it is a good project. It is a long time coming. It is pegged to the work we did at F.E. Warren for the same kind of a project. You know, site adapted for the conditions in Montana. We are very comfortable that it will be ready to go when the money comes. Senator Tester. Thank you. The only thing I would also ask you to do is hold those contractors' feet to the fire. I think we are building these in phases to save money, and it distresses me when the next one is going to cost more than the last one, not less. Thank you very much. Senator Boozman. Senator Schatz. Senator Schatz. Thank you. Secretary McMahon, on the $7.2 billion in particular, I understand where we are in the process. Do we have your commitment to keep us informed? Let us start with that. Mr. McMahon. Senator, as we move forward in the process, we will keep you informed at the different gates that we reach. If a project is selected to be deferred, that information will flow to the Senate and to the Congress as well. Senator Schatz. So there is sort of two ways to do this. First of all, I trust you. And so, I don't want to nail this down to every 10 days you write me a letter. But if we are not going to do sort of a time certain update, which I am comfortable with, then we have to be comfortable that if anything significant happens that is relevant to the jurisdiction of this committee, that you will not wait 2 or 3 weeks to tell us. Because my sense of this is that the DHS and the Joint Chiefs piece of this is the rate limiting factor, and then after that, things may move relatively quickly. So if we are on a recess for a week and you just wait for the next, you know, oversight hearing, that does not count as keeping us informed. So do I have your commitment to keep us informed as we go along? Anytime anything significant happens and erring on the side of informing us, that you will keep us abreast of every significant step in this process? Mr. McMahon. Senator, what I would like to do is rather than just give an unqualified yes, is take that question for the record, go back and make sure that it is clear in all of our collective minds how best to communicate with the Congress to ensure that we are transparent and keep you informed. If I could do that, sir? Senator Schatz. I mean, I don't love that answer, I have to tell you. I think this isn't a gotcha. I am not saying give us a letter every Friday to tell you where you are at. I am just telling you that in terms of maintaining this working relationship, we ought to be informed if anything major happens. Now if something is classified or whatever, we can sort of deal with that. But it seems reasonable that you ought to be able to tell us what is happening as we go along. Mr. McMahon. Senator, what the short answer to your question is, yes, it is reasonable that we would do that. What I want to make sure is that what you think is significant and what the Department thinks is significant rather than to commit something that is beyond my ability. Senator Schatz. Fair enough. And this is why I trust you is because when you say yes, you want to be sure that you can follow through on this. A couple of other topics. Climate change, extreme weather, severe weather. We have clearly been hit in each of the services, and it is costing us a lot of money. So without sort of getting into a solution set, is it fair to say severe weather is costing the Department of Defense more money over the last couple of years than it was previously? And what ought we to do about that? I think you know a fair amount about resilience. I am not satisfied that as, say, General Allen has sort of immediate needs to get back up and running, that he has the time to develop a plan for a new Air Force Base that is resilient in the context of climate change. So how do we make adjustments on the fly? Because some of this, we can't do a 5-year plan, but still sort of meet our needs? Mr. McMahon. Senator, there is probably both a short-term and a long-term answer to your question. For example, at Tyndall Air Force Base, I know the Air Force has taken an approach that said what is it that we build long-term resilience into the installation to get it to where it needs to be based upon weather and climate and the impact that they have had? On a longer term, as we build new facilities, what we are looking at is an entirely different set of standards than what we have used in the past that say how do we ensure that there is resilience in the installations based upon the standards that we are using for actually building it? Senator Schatz. Are those standards written yet, or you are developing them? Mr. McMahon. In many cases, those are written. They exist today. In some cases, they are evolving as we move forward. Senator Schatz. Do they differ among the services? Mr. McMahon. I don't know the answer to that question. I think they are the same. General Coglianese. So, Senator, I would say that the lens we use probably now that is most significant is the mission assurance lens. So we do assessments. And the correlation and the relationship of power, water, key structures and facilities, the information, we have a good portion of that information. What we need to do, and what we are trying to do, is take action on that information. So understanding interdependencies and the relationships, and Florence taught us a lot. Whether it is a control tower that controls air for North Carolina or a power station that is a single feed or something like that to an installation, we realize what the interdependence are and we need to invest in those interdependence to make sure we had the resiliency to withstand whether it is natural disaster or cyber or DSCA type of event. Mr. McMahon. Senator, the only thing I would add that as we talk about this in the future with you, and we need to do that, is that we take that holistic approach to installation resilience, and we look beyond just weather and climate, but we look at cyber, we look at water, we look at energy to take that holistic approach to ensure that if we fix one, we don't leave ourselves vulnerable. Senator Schatz. Right. And the beauty of the electricity piece is that it has really encouraging implications forward. And so some of what is being done at the Joint Base Pearl Harbor-Hickam and other places across the country, you know, are not just science projects, but things we can use to save lives and money over time. So I am pleased to see progress in this area. I would like to be as supportive as I can of this. And also, I would just like to understand what the new policies are and so that I can lay eyes on them as we go along. Mr. McMahon. Senator, let me take that question for record and get with you and your staff offline and share with you some of that information. Senator Schatz. Thank you. Senator Boozman. Well, thank you all again for being here. We really do appreciate you and appreciate all of your efforts. I hope we can continue to work very closely together as we try and solve the various challenges that we face. And there has been a great record of that in the past and, again, in a very bipartisan manner on the committee. To our retirees, General Bingham, Admiral Smith, General Coglianese, thank you. And then, as importantly, thank you to your families. This definitely is a family affair, and we do appreciate your service and sacrifice through the years. ADDITIONAL COMMITTEE QUESTIONS For members of the subcommittee, any questions for the record should be turned in to the subcommittee staff no later than Friday, April 19th. SUBCOMMITTEE RECESS Senator Boozman. And with that, the hearing is adjourned. [Whereupon, at 4:25 p.m., Tuesday, April 9, the subcommittee was recessed, to reconvene subject to the call of the Chair.]