Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR FISCAL YEAR 2020 [Senate Hearing 116-] [From the U.S. Government Publishing Office] ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR FISCAL YEAR 2020 ---------- WEDNESDAY, MAY 1, 2019 U.S. Senate, Subcommittee of the Committee on Appropriations, Washington, DC. The subcommittee met at 2:33 p.m. in room SD-138, Dirksen Senate Office Building, Hon. Lamar Alexander (chairman) presiding. Present: Senators Alexander and Feinstein. U.S. NUCLEAR REGULATORY COMMISSION STATEMENT OF HON. KRISTINE SVINICKI, CHAIRMAN ACCOMPANIED BY: HON. JEFF BARAN, COMMISSIONER HON. ANNIE CAPUTO, COMMISSIONER HON. DAVID WRIGHT, COMMISSIONER opening statement of senator lamar alexander Senator Alexander. The Subcommittee on Energy and Water Development will please come to order. At today's hearing, we will review the administration's fiscal year 2020 recess for the U.S. Nuclear Regulatory Commission. This is the last of our subcommittee's four budget hearings. This year in April, we heard from the Department of Energy, the National Nuclear Security Administration, the Army Corps, and Bureau of Reclamation about their funding requests. Senator Feinstein and I will each have an opening statement. The two of us are very proud of the fact that we have been able to work well together and with our agencies that are within our jurisdiction, and as a result, last year we were able to agree on a bill, get it to the floor, get it passed and into law before the fiscal year began, which we hope made your work more efficient and more enjoyable. It is our goal to do that again, if our leadership would get with the President and agree on a budget number, so we will know how much money we have. But it is always a great pleasure to work with Senator Feinstein on this and other issues. We have votes at three o'clock. Senator Feinstein has a Judiciary Committee hearing, which she may need to go back to at some point, but we will proceed with our opening statements and then the chairman's statement, and then we will go from there, depending on the other Senators that are here. We run a real risk of losing our best source of carbon-free power just at a time when most Americans are increasingly worried about climate change. Nuclear power must be a part of our energy future if we want clean, cheap, reliable energy that can create good jobs and keep America competitive in the global economy. Today 98 reactors provide about 20 percent of electricity in the United States and 60 percent of all carbon-free electricity in our country, but nuclear plants are closing because they cost too much to build and cannot compete with natural gas. Two reactors have announced they will retire later this year, and 10 more have announced retirements by 2025, 6 years away. So let us do a little math here. If we close these 12 reactors, that would mean a 17 percent decline in carbon-free nuclear power by 2025, which is 10 percent of carbon-free electricity. Today, by comparison, solar power, despite impressive reductions in cost, provides 4 percent; and wind power provides 20 percent of carbon-free electricity, despite billions of dollars of subsidies for wind. To replace those 12 reactors that have announced they will close with other carbon non-free electricity, we would have to almost triple the entirety of U.S. solar power or increase wind power by another 50 percent. If half of our nuclear reactors were to close, we would have to double the amount of wind energy produced and or increase the amount of solar power by 10 times. Nuclear power, of course, is much more reliable than solar or wind. It is available when the sun does not shine and the wind does not blow. The bottom line is we will not replace nuclear power with just wind and solar. It is not possible. We would have to use natural gas to replace nuclear power, which would increase carbon emissions in our country. Unfortunately, we do not need to speculate about what might happen when a major industrialized country eliminates nuclear power. We have seen what happened in Japan and in Germany for different reasons. Major industrialized economies similar to ours lost their emission-free, low-cost, reliable electricity. Prices went up. Pollution went up. Manufacturing became less competitive in the global marketplace, and that is where we are headed in the next 10 years if we do not do something. Stakes are high. In Japan, the cost of generating electricity increased 56 percent after the Fukushima accident in 2011 when Japan went from obtaining 30 percent of its power from nuclear to less than 2 percent. Before 2011 in Germany, that country obtained one quarter of its electricity from nuclear. Now that number is cut in half, down to about 12 percent. Germany now has the highest household electricity rates in Europe, after replacing nuclear power with wind and solar as part of an expensive cap-and-trade policy. And, ironically, Germany also had to build new coal plants to meet the demand, which increased emissions. In late March, I proposed that the United States should launch a New Manhattan Project for Clean Energy, a 5-year project with Ten Grand Challenges that will use American research and technology to put our country and the world firmly on the path toward cleaner, cheaper energy. These Grand Challenges call for breakthroughs in advanced nuclear reactors, natural gas, carbon capture, better batteries, greener buildings, electric vehicles, cheaper solar, and fusion. I put advanced reactors first on the list for a reason. To make sure nuclear power has a future in this country, we need to develop advanced reactors that have the potential to be smaller, to cost less, to produce less waste, and to be even safer than today's reactors. We need to stop talking about advanced reactors and actually build something. Within the next 5 years, we need to build one or more advanced reactors to demonstrate the capabilities they may bring, and as we review the Commission's fiscal year 2020 budget request, I want to make sure the Commission has the staff and resources it needs to respond to the changing industry. I want to thank our witnesses for being here. They include Kristine Svinicki, Chairman of the Nuclear Regulatory Commission; Commissioner Jeff Baran; Commissioner Annie Caputo; and Commissioner David Wright. Commissioner Stephen Burns retired just yesterday after 40 years of distinguished service with the Commission. He started as an attorney in 1978, rose to General Counsel, and then retired to head Legal Affairs at the Nuclear Energy Agency in Paris. He returned to the Commission in 2014 as Commissioner and Chairman. He was well respected in every position he held. I would like to thank Stephen Burns for his service to our country. We are here today to review the administration's fiscal year 2020 budget request for the U.S. Nuclear Regulatory Commission, the independent regulatory agency regulating the safety of our Nation's 98 commercial nuclear power plants and other civilian uses of nuclear material. The Commission's budget request this fiscal year is $921 million, about $10 million less than Congress provided last year. The request includes $38.5 million for the Yucca Mountain licensing process. It has become increasingly difficult for the nuclear industry to compete with other sources of electricity, especially natural gas. One of the concerns the industry had was the amount of regulatory fees charged by the Commission. Currently, $760 million of the Commission's budget comes from fees paid by utilities and other facilities that are licensed to possess and use nuclear materials. So over the last 5 fiscal years, we have worked with the Commission to reduce its overall budget by about $100 million, which represents about a 10 percent reduction in budget, which means a roughly 10 percent reduction in fees and more closely reflects its actual workload while maintaining its gold standard of safety. These savings are important because they lower the fees utilities must pay the Commission, and these savings can be passed on to utility customers. These reductions have not been arbitrary. They represent the type of oversight the Senate is supposed to do. Our subcommittee has only reduced the Commission's budget in areas that we have identified as unnecessary to its important safety mission. To ensure nuclear power will continue to play a significant role in our Nation's electricity generation, I would like to focus my remarks on four areas: (1) licensing small modular and advanced reactors; (2) solving the nuclear waste stalemate, something Senator Feinstein and I have been working on for years; (3) safely extending licenses for existing reactors; and (4) maintaining adequate staffing for the Commission. Now, on advanced reactors and small reactors, they represent the future of nuclear power. The Commission needs to be ready to review applications for these new reactors. In fiscal year 2017, we provided enough funding to complete the Small Modular Reactor Licensing Technical Support program at the Department of Energy. NuScale, which was one of the technologies selected in that program, filed an application for design certification of a small modular reactor with the Commission in December of 2016. A utility group has been working with NuScale and Idaho National Laboratory to build and demonstrate a small modular reactor in Idaho. TVA also has an application under review for a permit to build and demonstrate a small modular reactor at the Clinch River site in Tennessee. Licenses to build and demonstrate small modular reactors is an important step, and we need to make sure the Commission has the resources it needs to review the applications. I also understand the Commission expects to receive an application in fiscal year 2020 for a construction and operating license for an advanced, non-light water reactor. The fiscal year 2019 bill includes $10 million for the Commission to prepare to review advanced reactor designs, and the current budget request includes $15.5 million for fiscal year 2020. I would like to know what the Commission plans to do with that funding so we can make sure things stay on track. Now, on the stalemate of nuclear waste, to ensure that nuclear power has a strong future, we have to resolve the decades-long stalemate over what to do about used fuel from our reactors. We have been working on that for years, as I said, and I want to compliment Senator Feinstein for her persistent and consistent leadership on the subject. The only way to break the stalemate, in my opinion, is to get a final decision on whether Yucca Mountain is safe or not, and this year's budget request for the Commission includes $38.5 million to begin to answer that question by restarting the licensing process for the Yucca Mountain repository. This is the next step the Department of Energy must follow to determine whether it can begin construction of Yucca Mountain. After a public hearing where all parties, including the State of Nevada, can provide expert testimony and evidence, the Commission will make a final determination upon whether it is safe to build Yucca Mountain. I strongly believe Yucca can and should be a part of the solution to the nuclear waste stalemate. Federal law designates Yucca Mountain as the Nation's repository for used fuel, and the Commission's own scientists have told us that we can safely store nuclear waste there for up to 1 million years. But even if we had Yucca Mountain open today, we would still need to look for another permanent repository. We already have more than enough used fuel to fill Yucca Mountain. The quickest and probably least expensive way for the Federal Government to start to meet its used nuclear fuel obligations is for the Department of Energy to contract with a private storage facility for used nuclear fuel. I understand that two private companies have submitted license applications to the Commission for private consolidated storage facilities, one in Texas and one in New Mexico, and that the Commission's review is well under way. I will be asking some questions about that. I want to make sure the Commission has all the resources it needs in 2020 to review these applications for consolidated storage facilities because we have to start working together to solve the nuclear waste stalemate. Senator Murkowski along with Senator Feinstein and I have introduced a bill this week to implement the recommendations of the Blue Ribbon Commission on America's Nuclear Future that came from the Obama administration, which include using temporary private storage facilities. This legislation complements Yucca Mountain and would create a new Federal agency to find additional permanent repositories and temporary facilities for used fuel. Now, in safely extending licenses for existing reactors, instead of building more windmills, which only produce 20 percent of our carbon-free electricity, or solar farms, which only produce 4 percent of it, the best way to make sure the United States has a reliable source of inexpensive, efficient, carbon-free electricity is to extend the licenses of our existing nuclear plants, which produce 60 percent of our carbon-free electricity when it is safe to do so. Most of our 98 reactors already have extended their operating licenses from 40 to 60 years, though many have decided to close prematurely for economic reasons, and some utilities are beginning the process to extend their licenses from 60 to 80 years. The Commission has spent the past several years developing the framework to review these types of license renewal applications to make sure the reactors can continue to do that safely. This year's budget request includes funding to review what the Commission calls subsequent license renewal applications for six reactors in Florida, Pennsylvania, and Virginia. If just these six extensions would equal about what solar power currently produces in the whole country and a fourth of what wind power currently produces, that is just accounting for the six reactors that have applied to extend their license rather than shut down. Even if half of the remaining 92 reactors decided to extend their licenses another 20 years, it would produce almost double the amount of wind power that is currently produced and as much as 10 times the amount of solar power. So if you care about carbon emissions, the short-term solution for the next 20 years is, where safely, extend the licenses of these reactors. I want to make sure the Commission has the resources to consider that. The Commission's budget reduction has been steep for the past fiscal years. As part of its effort to reduce the budget, it has limited hiring, especially entry-level hiring. We have heard that of its 2,900 current employees, 24 percent are currently eligible for retirement. Four years from now, 42 percent will be eligible for retirement. These numbers are not a concern as long as Commission has a younger staff ready to take over the important work of the agency, but I understand that only 2 percent of the Commission employees are under 30. To have nuclear power in the future, we need to have a nuclear regulator. I would like to understand how the Commission is ensuring that the next generation is in place. So I look forward to working with the Commission as we begin putting together our Energy and Water Appropriations bill for fiscal year 2020, and I look forward also to working with Senator Feinstein, who I now will recognize for her opening statement. [The statement follows:] Prepared Statement of Senator Lamar Alexander The Subcommittee on Energy and Water Development will please come to order. Today's hearing will review the administration's fiscal year 2020 budget request for the U.S. Nuclear Regulatory Commission. This is the last of the Subcommittee's four budget hearings this year. In April, we heard from the Department of Energy, the National Nuclear Security Administration, the Army Corps of Engineers, and Bureau of Reclamation about their funding requests. We run a real risk of losing our best source of carbon-free power just at a time when most Americans are increasingly worried about climate change. Nuclear power must be part of our energy future if we want clean, cheap, and reliable energy that can create good jobs and keep America competitive in a global economy. Today 98 nuclear reactors provide about 20 percent of electricity in the United States, and 60 percent of all carbon-free electricity in the United States. But nuclear plants are closing because they cost too much to build and cannot compete with natural gas. Two reactors have announced they will retire later this year, and ten more have announced retirements by 2025. Let's do a little math here. If we closed those 12 reactors, that would mean a 17 percent decline in carbon-free nuclear power by 2025, which is 10 percent of carbon-free electricity. Today, solar power--despite impressive reductions in cost--provides 4 percent and wind provides 20 percent of carbon-free electricity despite billions of dollars in subsidies. To replace those 12 reactors that have announced they will close with other carbon-free electricity, we would have to almost triple the entirety of U.S. solar power or increase wind power by another 50 percent. If half of our existing nuclear reactors were to close, we would have to double the amount of wind energy produced and or increase the amount of solar energy produced by as much as 10 times. Nuclear power is much more reliable than solar or wind power. It is available when the sun doesn't shine and the wind doesn't blow. The bottom line is, we can't replace nuclear power with just wind and solar. We would have to use natural gas to replace nuclear power, which would increase emissions in our country. Unfortunately, we do not need to speculate about what happens when a major industrialized country eliminates nuclear power. We have seen what happened in Japan and Germany for different reasons. Major industrialized economies similar to ours lost their emission-free, low- cost, reliable electricity. Prices went up, pollution went up, and manufacturing became less competitive in the global marketplace. And that is where we are headed in the next 10 years if we do not do something. Stakes are high. In Japan, the cost of generating electricity increased 56 percent after the Fukushima accident in 2011 when Japan went from obtaining 30 percent of its power from nuclear to less than 2 percent. Before 2011, Germany obtained one quarter of its electricity from nuclear. Now that number is down to 12 percent. Now Germany has among the highest household electricity rates in the European Union after replacing nuclear power with wind and solar as part of an expensive cap- and-trade policy. Germany also had to build new coal plants to meet demand, which increased emissions. In late March, I proposed that the United States should launch a New Manhattan Project for Clean Energy, a five-year project with Ten Grand Challenges that will use American research and technology to put our country and the world firmly on a path toward cleaner, cheaper energy. These Grand Challenges call for breakthroughs in advanced nuclear reactors, natural gas, carbon capture, better batteries, greener buildings, electric vehicles, cheaper solar, and fusion. I put advanced reactors first on the list for a reason. To make sure nuclear power has a future in this country, we need to develop advanced reactors that have the potential to be smaller, cost less, produce less waste, and be safer than today's reactors. We need to stop talking about advanced reactors and actually build something. Within the next 5 years, we need to build one or more advanced reactors to demonstrate the capabilities they may bring. As we review the Nuclear Regulatory Commission's fiscal year 2020 budget request we need to make sure the Commission has the staff and resources it needs to respond to the changing industry. First, I would like to thank our witnesses for being here today, and also Senator Feinstein, with whom I have the pleasure to work again this year to draft the Energy and Water Appropriations bill. Our witnesses today include: Kristine Svinicki, Chairman of the Nuclear Regulatory Commission; Commissioner Jeff Baran; Commissioner Annie Caputo; and Commissioner David Wright. Commissioner Stephen Burns retired yesterday after forty years of distinguished service at the NRC. He started as an attorney in 1978, rose to General Counsel, and then retired from the agency to head Legal Affairs at the Nuclear Energy Agency in Paris. He returned to the NRC in 2014 as a Commissioner and Chairman. He was well respected in every position he held. I would like to thank him for his many years of service. We're here today to review the administration's fiscal year 2020 budget request for the U.S. Nuclear Regulatory Commission, the independent Federal agency responsible for regulating the safety of our Nation's 98 commercial nuclear power plants and other civilian uses of nuclear material. The Nuclear Regulatory Commission's budget request this fiscal year is $921 million, which is about $10 million less than Congress provided last year. The request includes $38.5 million for the Yucca Mountain licensing process. It has become increasingly difficult for the nuclear industry to compete with other sources of electricity, especially natural gas. One of the concerns the industry had was the amount of regulatory fees charged by the Commission--currently, $760 million of the Commission's budget comes from fees paid by utilities and other facilities that are licensed to possess and use nuclear materials. So over the last five fiscal years, we have worked with the Commission to reduce its overall budget by about $100 million, which represents about a 10-percent reduction in budget--which means a roughly 10%-percent reduction in fees--and more closely reflects its actual workload while maintaining its gold standard of safety. These savings are important because they lower the fees utilities must pay the Commission, and these savings can be passed on to utilities' customers. These reductions have not been arbitrary and represent the type of oversight the Senate is supposed to do. Our subcommittee has only reduced the Commission's budget in areas that the Commission has identified as unnecessary to its important safety mission. To ensure nuclear power will continue to play a significant role in our Nation's electricity generation, I'd like to focus my remarks on four main areas: licensing small modular and advanced reactors; solving the nuclear waste stalemate; safely extending licenses for existing reactors; and maintaining adequate staffing at the Nuclear Regulatory Commission. Advanced reactors and small modular reactors represent the future of nuclear power. The Commission needs to be ready to review applications for new these new reactors. In fiscal year 2017, we provided enough funding to complete the Small Modular Reactor Licensing Technical Support program at the Department of Energy. NuScale, which was one of the technologies selected in that program, filed an application for design certification of a small modular reactor with the Commission in December of 2016. A utility group has been working with NuScale and Idaho National Laboratory to build and demonstrate a small modular reactor in Idaho. TVA also has an application under review for a permit to build and demonstrate a small modular reactor at the Clinch River site in Tennessee. Licenses to build and demonstrate small modular reactors is an important step, and we need to make sure the Commission has the resources it needs to review the applications. I also understand that the Commission expects to receive an application in fiscal year 2020 for a construction and operating license for an advanced, non-light water reactor. The fiscal year 2019 appropriations bill included $10 million for the Commission to prepare to review advanced reactor designs, and the current budget request includes $15.5 million for fiscal year 2020. I'd like to know what the Commission plans to do with the funding Congress provided for advanced reactors so that we can make sure the development of advanced reactors stays on track. To ensure that nuclear power has a strong future in this country, we must solve the decades' long stalemate over what to do with used fuel from our nuclear reactors. Senator Feinstein and I have been working on solving the nuclear waste stalemate for years, and I'd like to take the opportunity to compliment Senator Feinstein on her leadership and her insistence that we find a solution to this problem. The only way to break the stalemate is to get a final decision on whether Yucca Mountain is safe or not. And this year's budget request for the Nuclear Regulatory Commission includes $38.5 million to begin to answer that questions by restarting the licensing process for the Yucca Mountain repository. This is the next step the Department of Energy must follow to determine whether it can begin construction of Yucca Mountain. After a public hearing where all parties, including the State of Nevada, can provide expert testimony and evidence, the Commission will make a final determination whether it is safe to build Yucca Mountain. I strongly believe that Yucca Mountain can and should be part of the solution to the nuclear waste stalemate. Federal law designates Yucca Mountain as the Nation's repository for used nuclear fuel, and the Commission's own scientists have told us that we can safely store nuclear waste there for up to one million years. But even if we had Yucca Mountain open today, we would still need to look for another permanent repository. We already have more than enough used fuel to fill Yucca Mountain to its legal capacity. The quickest, and probably the least expensive, way for the Federal Government to start to meet its used nuclear fuel obligations is for the Department of Energy to contract with a private storage facility for used nuclear fuel. I understand that two private companies have submitted license applications to the NRC for private consolidated storage facilities, one in Texas and one in New Mexico, and that the NRC's review is well underway. I'll be asking some questions about that today. I want to make sure that the Commission has all the resources it needs in fiscal year 2020 to review the applications for consolidated storage facilities because we have to start working together to solve the nuclear waste stalemate if we want a strong nuclear industry. Senator Murkowski, along with Senator Feinstein and I, introduced a bill this week to implement the recommendations of the Blue Ribbon Commission on America's Nuclear Future, which include using temporary private storage facilities. The legislation complements Yucca Mountain, and would create a new Federal agency to find additional permanent repositories and temporary facilities for used nuclear fuel. Instead of building more windmills, which only produce 20 percent of our carbon-free electricity, or solar farms, which only produce 4 percent of our carbon-free electricity, the best way to make sure the United States has a reliable source of inexpensive, efficient, carbon- free electricity is to extend the licenses of our existing nuclear plants--which produce 60 percent of our carbon-free electricity--if it is safe to do so. Most of our 98 reactors have already extended their operating licenses from 40 to 60 years (although many have decided to close prematurely for economic reasons), and some utilities are beginning the process to extend their licenses from 60 to 80 years. The Commission has spent the past several years developing the framework to review these types of license renewal applications to make sure the reactors can continue to operate safely from 60 to 80 years. This year's budget request includes funding to review what the Commission calls ``subsequent'' license renewal applications for six reactors in Florida, Pennsylvania, and Virginia. Just those 6 reactor extensions would equal about what solar power currently produces and a fourth of what wind power currently produces. That is just accounting for the 6 reactors that have applied to extend their licenses rather than shut down. If even half of the remaining 92 reactors decide to extend their licenses another 20 years, it would produce almost double the amount of wind power that is currently produced and as much as 10 times the amount of solar power produced. So if you care about carbon free emissions, the short term solution for the next 20 years is, where safely, to extend the licenses for these reactors. I want to make sure that the Commission has the resources it needs to review those applications in fiscal year 2020, because I think it is important to maintain our existing nuclear power when it is safe to do so. The Commission's budget reduction has been steep over the past five fiscal years. As part of its effort to reduce its budget, the Commission has limited hiring, especially entry-level hiring. We have heard from the Commission that of its 2,900 current employees, 24 percent are currently eligible for retirement. Four years from now, 42 percent will be eligible for retirement. Those numbers are not a concern as long as the NRC has younger staff ready to take over the important work of the agency. But I understand that only 2 percent of NRC employees are under 30 years old. To have nuclear power in the future, we need to have a nuclear regulator. I would like to understand how the Commission is ensuring that the next generation is in place. I look forward to working with the Commission as we begin putting together our Energy and Water Appropriations bill for fiscal year 2020, and also with Senator Feinstein, who I will now recognize for her opening statement. STATEMENT OF SENATOR DIANNE FEINSTEIN Senator Feinstein. Thank you very much, Mr. Chairman. As you know, I very much welcome working with you. We have always worked out our problems together and moved on, and the relationship is very much appreciated, so thank you. And thank you for holding this hearing. Ten years ago, this subcommittee was preparing for the renaissance of nuclear power in the United States, and today we find ourselves in a very different position. There are now 20 shutdown reactors in the Country, with six of those in the last 6 years. According to the Nuclear Energy Institute, there are 12 more reactors for shutdown between now and 2024. The pressures on the industry are well documented: low natural gas prices are making large investments in nuclear uneconomical, a stalemate on the nuclear waste issue letting an undermined support for nuclear power locally and nationally, high up-front costs for construction of new nuclear plants that put utility balance sheets at risk, increased deficiency and modest economic growth that have severely dampened demand for large sources of generation; and finally, a robust and flexible grid, along with advance for storage technology, that better integrate renewables and make large baseload sources obsolete. The industry is enthusiastic, I understand, about the potential for advanced reactors to overcome these challenges. That may be, but I do not think we can lose sight of our responsibility for the safety and security of our existing nuclear sites. In particular, the decommissioning of former power plants now must become, Mr. Chairman, an increasingly important oversight responsibility of the Nuclear Regulatory Commission. For example, Southern California Edison and its contractor, Holtec, are decommissioning the San Onofre Nuclear Generating Station near San Diego. As part of that work, they are transferring approximately 3,800 spent fuel assemblies out of the spent fuel pools and into some 120 dry casks. These casks will be stored on-site, right on the Pacific Ocean. I am not sure that this should be the case at all until we find a solution to our nuclear waste problem and they can be transported safely off-site. So I want to know, ladies and gentlemen, more about that right now, today, because I have real concern about it. The work of loading casks is roughly 60 percent complete, as I understand it, but it has been suspended for the last 9 months, pending the results of several NRC (Nuclear Regulatory Commission) investigations. In August, I learned, of 2018, a dry cask got stuck as it was lowered down into its concrete vault. It sat suspended 18 feet above the bottom for 45 minutes until it was finally lowered into place. As a result of this mishap, the NRC fined Southern California Edison $116,000 last month for a civil infraction of its safety regulations, which I am told is an uncommon and serious rebuke. Further, the NRC also found fault with Holtec, the cask manufacturer and decommissioning contractor. NRC discovered that external surfaces of the canisters are being scratched during the normal course of loading, which is not something that Holtec had planned for. Finally, the NRC cited Holtec last week with two violations for faulty design processes and regulatory reporting that were uncovered only when loose parts were discovered within one of their canisters. This is unacceptable to me. These incidents raise important questions about safety. They diminish my trust, and I believe if the public knows it, it diminishes the public trust in the packaging of waste at San Onofre. I have asked the NRC to add a full-time on-site inspector to oversee operations at the facility. Have we heard back? I would like to ask that at least we hear back whether this is going to be the case or not. If it is not, take another road. Given the pressure that operating and decommissioning plants are under, it is more important than ever that we have an independent and robust regulator in the NRC. Neither NRC's oversight nor the fees paid by industry to fund that oversight are hampering the expansion of nuclear power, nor are they hastening its demise. We would do well to remember that as the industry renews calls for a smaller NRC, self-inspections by nuclear plant owners and lower fees. We really have to take a good look at what the future is, Mr. Chairman. Recent experience at San Onofre proves the value of an adequately funded independent and diligent regulator. Thank you, Mr. Chairman. I look forward to hearing from our witnesses. Senator Alexander. Thank you, Senator Feinstein. We will now recognize Chairman Svinicki to provide her testimony on behalf of the Commission. Chairman Svinicki, please proceed. SUMMARY STATEMENT OF HON. KRISTINE SVINICKI Ms. Svinicki. Good afternoon, Chairman Alexander and Ranking Member Feinstein. My colleagues and I appreciate the opportunity to testify this afternoon on the U.S. NRC's fiscal year 2020 budget request. I have submitted on behalf of the Commission a longer statement for the hearing record, which I will just briefly summarize. The funding we are requesting provides the resources necessary to accomplish our mission to license and regulate the civilian use of radioactive materials to ensure adequate protection of public health and safety and to promote the common defense and security. The 2020 budget request, including resources for the NRC's Office of the Inspector General, is $921.1 million, which would include 3,062 full-time equivalent positions, or FTE. This budget request represents an increase of $10.1 million when compared to the 2019 enacted budget; however, this increase is due principally to the inclusion of $38.5 million to support licensing activities for the proposed Yucca Mountain deep geologic repository for spent fuel and other high-level radioactive waste. As noted by Senator Alexander, the NRC proposes to recover $760 million of the requested budget from fees assessed to NRC's licensees and applicants. This would result in a net appropriation of $161.5 million, again, with approximately $38 million of that to come from the Nuclear Waste Fund. The budget request for the Nuclear Reactor Safety Program is approximately $450 million. This reflects a modest decrease of $10 million when compared to the enacted budget, but the budget, as noted, also proposes $15.5 million for the continued development of the regulatory infrastructure to review advanced nuclear reactor technologies. In the area of materials and waste safety programs, the budget request for 2020 is approximately $166 million. This reflects an increase of $38.7 million. The budget includes resources for reviewing two applications for proposed consolidated interim storage facilities in New Mexico and Texas. The NRC anticipates the completion of both reviews by the middle of 2020. The NRC has initiated efforts to implement requirements of the Nuclear Energy Innovation and Modernization Act, which was passed and signed by the President earlier this year. We are progressing in each area to ensure timely implementation of the Act's requirements. Of note, the NRC submitted the first set of congressional reports required by the Act in April of this year. We are mindful of the importance of the highly skilled staff that we have and the need to maintain our expertise while our workload continues to evolve. In addition, the NRC's focus on transformation and innovation continues. The Commission has met with NRC staff and external panels that included the nuclear industry, other Federal agencies with ongoing innovation efforts, and nongovernmental organizations to discuss the NRC staff's efforts. We have also explored broader organizational strategies and innovation perspectives from a range of external experts. In summary, the fiscal year 2020 budget request reflects the NRC's continuing efforts to achieve efficiencies while maintaining reasonable assurance of adequate protection of public health and safety and safeguarding the security of our Nation. On behalf of the Commission, thank you for the opportunity to appear before you and for the subcommittee's consistent support of the NRC's importance mission. My colleagues and I look forward to your questions. Thank you. [The statement follows:] Prepared Statement of Kristine L. Svinicki Good afternoon Chairman Alexander, Ranking Member Feinstein, and distinguished members of the Subcommittee. My colleagues and I appreciate the opportunity to appear before you to discuss the U.S. Nuclear Regulatory Commission's (NRC) fiscal year 2020 budget request. The NRC is an independent Federal agency established to license and regulate the civilian use of radioactive materials in the United States to ensure adequate protection of public health and safety and to promote the common defense and security. The funding that we are requesting for fiscal year 2020 provides the resources necessary to accomplish the NRC's mission while improving the agency's efficiency and effectiveness. This testimony will also provide an update on the NRC's ongoing regulatory activities and our continuing efforts to adopt efficiencies and streamline agency processes where possible, while continuing to uphold the agency's important safety and security mission. In addition to our inspection and oversight programs, areas of significant activity include overseeing new reactor construction, reviewing applications for small modular reactors (SMRs), preparing to review advanced non-light water reactor designs and accident tolerant fuel (ATF) designs, and reviewing applications for subsequent license renewal and consolidated interim spent fuel storage facilities. We recognize that the agency needs to enhance our use of risk- informed, innovative approaches and embrace new and diverse ideas in a changing regulatory environment. If the number of operating plants continues to decrease in the coming years, the agency's budget will reflect appropriate and commensurate decreases. The NRC will continue to improve the accuracy and realism of its cost and schedule projections for regulatory actions so that the Congress, the public, and regulated entities will be more fully informed. fiscal year 2020 budget request The NRC fiscal year 2020 budget request, including resources for the NRC's Office of the Inspector General (OIG), is $921.1 million, including 3,062 full-time equivalents (FTE). The fiscal year 2020 budget request represents an increase of $10.1 million, or 1.1 percent, when compared to the fiscal year 2019 enacted budget. This requested increase in resources is due to the inclusion of $38.5 million, including 77 FTE, to support licensing activities for the proposed Yucca Mountain deep geologic repository for spent nuclear fuel and other high-level radioactive waste. In fiscal year 2020, the NRC proposes to recover $759.6 million of the requested fiscal year 2020 budget from fees assessed to NRC licensees and applicants. This will result in a net appropriation of $161.5 million, which is an increase of $31.4 million when compared to the fiscal year 2019 enacted budget, with $38.5 million to be derived from the Nuclear Waste Fund for licensing activities related to Yucca Mountain. fiscal year 2019 proposed fee rule I would like to turn briefly to some key elements of the fiscal year 2019 Proposed Fee Rule. Annually, the NRC adjusts its licensing, inspection, special project, and annual fees charged to its applicants and licensees. These adjustments are necessary to implement the requirements of the Omnibus Budget Reconciliation Act of 1990. The Act requires the NRC to recover approximately 90 percent of its annual budget through fees. Based on the Act and the fiscal year 2019 enacted budget, the following items are excluded from the fee-recoverable portion of the budget in the fiscal year 2019 Proposed Fee Rule: international activities, advanced reactor technologies regulatory infrastructure activities, generic homeland security activities, Waste Incidental to Reprocessing activities, and Inspector General services for the Defense Nuclear Facilities Safety Board. Based on the fiscal year 2019 enacted budget, the NRC is currently proposing to collect $781.9 million in fees for fiscal year 2019, a decrease from $789.3 million in fiscal year 2018. Proposed annual fees for fiscal year 2019 have increased for operating reactors, some materials users, and Department of Energy (DOE) transportation activities, while the annual fees for spent fuel storage/reactor decommissioning, research and test reactors, fuel facilities, and the facilities covered by the DOE Uranium Mill Tailings Radiation Control Act Program have decreased. Proposed annual fees for non-DOE uranium recovery licensees remained unchanged. The NRC held a public meeting on the proposed fee rule on February 13, 2019, which included presentations relating to budget formulation. The public comment period for the fiscal year 2019 Proposed Fee Rule ended on March 4, 2019. Regulated entities continue to express concerns regarding fee increases, particularly in areas where the number of licensees is declining. The NRC is mindful of the impact on fees as the number of licensees declines within a fee category. Our goal is to ensure that fees are equitable, fair, and transparent. We monitor these dynamics and seek to mitigate the impact on the remaining licensees, where possible. fiscal year 2020 budget request I would now like to highlight specific elements of the fiscal year 2020 budget request. Nuclear Reactor Safety The NRC's Nuclear Reactor Safety Program encompasses licensing and oversight of civilian nuclear power plants, research and test reactors, and medical isotope production facilities to protect public health and safety. This program contributes to the NRC's safety and security strategic goals through the activities of the Operating Reactors and New Reactors Business Lines that regulate existing and new nuclear reactors and medical isotope production facilities to ensure their safe and secure operation. Overall resources requested in the fiscal year 2020 budget for Nuclear Reactor Safety are $449.5 million, including 1,824 FTE. This represents a funding decrease of $9.9 million when compared to the fiscal year 2019 enacted budget. Primarily, the reduction is a result of activities associated with the planned merger of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO). These two program offices are on track to integrate by October of this year, earlier than previously planned. The merger of NRR and NRO will provide flexibility and improved agility to manage uncertainties associated with the workloads in both the Operating Reactors and New Reactors Business Lines. In addition, there will be efficiencies gained and elimination of redundancies in certain technical programs, administrative support, and supervisory and management oversight. The budget request also proposes $15.5 million for the continued development of a regulatory infrastructure for advanced nuclear reactor technologies. Operating Reactors The Operating Reactors Business Line portion of the Nuclear Reactor Safety Program encompasses the regulation of 96 operating civilian nuclear power reactors and 31 research and test reactors. The NRC is requesting $361.6 million for operating reactors, including 1,485 FTE, which represents a decrease of $3.6 million from the fiscal year 2019 enacted budget. When compared to the fiscal year 2019 enacted budget, the resources for research activities appear to increase because $10.4 million was funded through the application of authorized prior-year carryover in fiscal year 2019. Overall, resources decrease when compared to the fiscal year 2019 total budget authority. The decrease in funding within the Operating Reactors Business Line is primarily due to the permanent closure of Oyster Creek Nuclear Generating Station and the pending closures of the Pilgrim and Three Mile Island reactors. The decrease is also a result of fewer requests from the States for replenishment of potassium iodide supplies, efficiencies in processing licensing actions, and the completion of post-Fukushima flooding and integrated assessment work. The NRC is reviewing three applications for subsequent license renewal for Turkey Point Nuclear Generating Station in Florida, Peach Bottom Atomic Power Station in Pennsylvania, and the Surry Power Station in Virginia. If approved, they would extend operations at each of these plants for an additional 20 years. The NRC is committed to enabling the safe use of existing and new technologies, especially those that have the potential to increase safety at NRG-regulated facilities. The U.S. nuclear industry, with DOE's assistance, is planning to deploy ATF in the operating fleet by the mid2020s. In 2018, the NRC developed a project plan to align agency regulatory readiness with industry and fuel vendor plans for regulatory submittals. In fiscal year 2020, the NRC staff will continue to engage with vendors, licensees, DOE, and other stakeholders to ensure that all sides are prepared for licensing and oversight of ATF. New Reactors The New Reactors Business Line portion of the Nuclear Reactor Safety Program is responsible for licensing and overseeing the design, siting, and construction of new nuclear power reactors, including SMRs and advanced reactors, in an efficient manner. The new reactors activities are designed to ensure that new civilian nuclear power reactor facilities are developed in a manner that protects the health, safety, and security of the public. The fiscal year 2020 budget request for new reactors is $87.8 million, including 339 FTE, a funding decrease of $6.3 million when compared to the fiscal year 2019 enacted budget. The decrease in funding within the New Reactors Business Line is primarily due to delays in application submittals, projects nearing completion, and efficiencies gained in several critical areas, including the merger of NRR and NRO. During fiscal year 2020, the NRC expects to continue reviewing the reactor design certifications for the NuScale SMR and the U.S. Advanced Pressurized-Water Reactor (a large light water reactor), as well as the renewal of General Electric-Hitachi's Advanced Boiling- Water Reactor design certification. The NRC is accelerating its activities related to the development of regulatory infrastructure to support reviews of advanced reactor technologies. Regarding future new reactors, the NRC continues to interact with vendors about prospective SMR and advanced reactor applications. Additionally, we will continue to refine our regulatory processes as we prepare to review these potential applications. nuclear materials and waste safety The Nuclear Materials and Waste Safety Program is responsible for licensing, regulating, and overseeing nuclear materials in a manner that adequately protects the public health and safety. The agency's work provides assurance of the physical security of the materials and waste and protection against radiological sabotage, theft, or diversion of nuclear materials. Through this program, the NRC regulates uranium processing and fuel facilities; research and pilot facilities; and other nuclear materials licensees such as medical, industrial, research, and academic uses. Additionally, through this program, the NRC regulates the following: spent fuel storage; spent fuel and other nuclear material transportation and packaging; decontamination and decommissioning of facilities; and low-level and high-level radioactive waste. The fiscal year 2020 budget request for this program is $165.7 million, including 564 FTE. This funding level represents an increase of $34.7 million when compared to the fiscal year 2019 enacted budget. This increase is due to the inclusion of $38.5 million in the budget request for continuing licensing activities for the proposed Yucca Mountain deep geologic repository for spent nuclear fuel and high-level radioactive waste. Spent Fuel Storage and Transportation The Spent Fuel Storage and Transportation Business Line is responsible for licensing and overseeing the safe and secure storage of spent fuel and the safe and secure transport of radioactive materials. The fiscal year 2020 budget request for spent fuel storage and transportation is $24.2 million, including 101 FTE. When compared to the fiscal year 2019 enacted budget, the resources for licensing activities appear to increase because $2.4 million was funded in fiscal year 2019 through the application of authorized prior-year carryover. However, resources decrease when compared to the fiscal year 2019 total budget authority. In addition to licensing and overseeing independent spent fuel storage installations, transportation packages, and storage casks, this business line has two reviews under way for consolidated interim spent fuel storage facilities--one submitted by Holtec International for a proposed facility in New Mexico and another requested by Interim Storage Partners for a facility in Texas. The NRC anticipates the completion of both reviews by mid-2020. Nuclear Materials Users The Nuclear Materials Users Business Line portion of the Nuclear Materials and Waste Safety Program supports the licensing and oversight necessary to ensure the safe and secure processing and handling of radioactive materials in medical, industrial, and academic applications. This business line also provides Tribal coordination and programmatic oversight of Agreement States that have assumed NRC regulatory authority under the Atomic Energy Act of 1954. The fiscal year 2020 budget request for this business line is $59.1 million, including 205 FTE, a funding decrease of $1.4 million when compared to the fiscal year 2019 enacted budget. The recent agreement with the State of Wyoming was signed on September 25, 2018, and became effective on September 30, 2018. The State of Vermont has applied to become an Agreement State and, if approved, would bring the total number of Agreement States to 39 by fiscal year 2020. Decommissioning and Low-Level Waste The Decommissioning and Low-Level Waste (LLW) Business Line portion of the Nuclear Materials and Waste Safety Program supports licensing and oversight of uranium recovery facilities, sites undergoing decommissioning, and disposition of LLW from all civilian sources. The fiscal year 2020 budget request for decommissioning and LLW is $22.9 million, including 93 FTE, an overall funding decrease of $1.9 million when compared to the fiscal year 2019 enacted budget as a result of overseeing fewer operating uranium recovery facilities; completing support to the State of Wyoming for the Agreement State transition; and nearing the expected license terminations for the former Humboldt Bay Power Plant in California, Zion Nuclear Power Station in Illinois, and Lacrosse Boiling Water Reactor in Wisconsin. The fiscal year 2020 budget request provides funding for a number of major activities to include oversight of the national LLW management program , monitoring of DOE's Waste Incidental to Reprocessing determinations and related disposal actions at the Savannah River Site and the Idaho National Laboratory, and decommissioning activities for four research reactors and 20 power reactors. Fuel Facilities The Fuel Facilities Business Line portion of the Nuclear Materials and Waste Safety Program is responsible for ensuring that commercial nuclear fuel cycle facilities are licensed and operated in a manner that adequately protects public health and safety and promotes the common defense and security. The fiscal year 2020 budget request for fuel facilities is $21 million, including 88 FTE, which represents a funding decrease of $2.2 million when compared to the fiscal year 2019 enacted budget. This decrease in funding is primarily due to an expected decline in work associated with license renewal applications, a decrease in the anticipated number of license amendments, efficiencies gained as a result of changes to the Fuel Facilities Inspection Program and workload projections, a reduction in rulemaking activities involving enhanced security for special nuclear material, and elimination of workload associated with the MixedOxide Fuel Fabrication Facility. High-Level Waste The High-Level Waste Business Line portion of the Nuclear Materials and Waste Safety Program supports the NRC's activities for the proposed Yucca Mountain deep geologic repository for the disposal of spent nuclear fuel and other high-level radioactive waste using appropriations from the Nuclear Waste Fund. The fiscal year 2020 budget request for high-level waste is $38.5 million, including 77 FTE. The fiscal year 2020 resources would include support for the adjudicatory proceeding; infrastructure activities for facilities and information technology (IT) capabilities; rulemakings associated with the geologic repository operations area; and related support activities such as acquisitions, recruitment, staffing, and training. The NRC continues to provide monthly updates to Congress on its activities in response to the decision issued by the U.S. Court of Appeals for the District of Columbia Circuit in In re Aiken County, these updates provide information on our effort to effectively spend the remaining limited unobligated carryover funds appropriated from the Nuclear Waste Fund for Yucca Mountain activities. At the beginning of fiscal year 2019, there was approximately $430,000 remaining. corporate support The NRC's corporate support involves centrally managed activities that are necessary for agency programs to operate and achieve goals more efficiently and effectively and includes acquisitions , administrative services, financial management, human resource management, IT and information management, training, outreach, and policy support. The fiscal year 2020 requested budget for corporate support comprises approximately 32 percent of the agency's total budget and reflects a decrease of $0.4 million when compared to the fiscal year 2019 enacted budget. Within the Corporate Support Business Line, $6.6 million was funded in fiscal year 2019 through the application of authorized prior-year carryover. However, when compared to the fiscal year 2019 total budget authority, the fiscal year 2020 budget request reflects a decrease of $7.0 million. The budget request supports continuing efforts to modernize IT, leverage common contracts and best practices to drive cost reductions and efficiencies, improve the management of major acquisitions, focus on the highest value work, and improve the customer experience with Federal services. Office of the Inspector General The NRC's OIG is a statutory entity whose mission is to independently and objectively audit and investigate programs and operations to promote effectiveness and efficiency and to prevent and detect fraud, waste, and abuse. The fiscal year 2020 budget request for the NRC OIG is $13.3 million, which includes $11.3 million in salaries and benefits to support 63 FTE and $2.0 million in program support. These resources will support Inspector General auditing and investigation functions for both the NRC ($12.1 million) and the Defense Nuclear Facilities Safety Board ($1.2 million). changing regulatory environment The NRC has initiated efforts to implement requirements of the Nuclear Energy Innovation and Modernization Act, which was signed into law on January 14, 2019. The legislation changes the way the NRC determines how fees are assessed to licensees and applicants, including limiting the annual charge to each operating reactor licensee, and includes requirements related to our fee invoicing process. The Act also specifies a cap on the percentage of the annual budget request that the NRC can devote to corporate support costs. These fee- and budget-related requirements take effect on October 1, 2020 (fiscal year 2021). In addition, the legislation requires the NRC to take certain actions related to the licensing process for advanced reactors and research and test reactors while soliciting input from DOE, industry, a diverse set of technology developers, and other public stakeholders. The legislation also includes a number of other provisions related to various topics. The NRC is progressing in each area to ensure timely implementation of the Act's requirements and submitted the first set of congressional reports required by the Act in April 2019. In January of this year, the NRC directed the staff to publish the Mitigation of Beyond-Design-Basis Events Rule, based on lessons learned from the March 2011 accident at Japan's Fukushima Daiichi plant. This rule is the result of 7 years of activities that have tangibly enhanced safety at U.S. nuclear power plants. The NRC and its nuclear power plant licensees will continue to monitor and review post-Fukushima efforts outside of the rulemaking context, including analyses of whether additional safety improvements are necessary in response to updated site-specific seismic and flooding risk assessments. We are mindful of the importance of a highly skilled staff and the need to maintain our expertise while our workload continues to evolve. Strategic Workforce Planning is vital to helping the NRC identify the knowledge, skills, and abilities necessary to perform our mission now and into the future. In addition to our continuing efforts to find efficiencies, use resources wisely, and streamline processes, the NRC has undertaken additional initiatives to ensure that our workforce is trained, equipped, and resourced to address current and future challenges. The NRC's focus on transformation and innovation continues. At last year's hearing, we reported that the Executive Director for Operations had established a Transformation Team whose charter was to identify potential transformational changes to our regulatory framework, culture, and infrastructure. In October of 2018, the Commission held a public meeting, entitled Transformation at the NRG. At this meeting, the Commission met with NRC staff and two external panels that included nuclear industry, other Federal agencies, and non-governmental organizations to discuss the NRC staff's recommendations in a paper that is now before the Commission. In March of this year, the Commission held a second public meeting with NRC staff on this topic, as well as external panelists with a wealth of knowledge and experience related to transformation and innovation at other agencies and in the private sector. During this meeting, the external panelists shared best practices , success stories, and lessons learned. Separately, the agency sought assistance from a consulting firm to evaluate how industry and the NRC's regulatory environment might look in 2025 and beyond. In January 2019, the NRC published a report on those findings. The report, entitled ``The Dynamic Futures for NRG Mission Areas,'' describes four possible scenarios or hypotheses to inform the agency's near- and mid-term planning related to budget, workload, workforce issues, agency organization and structure, and opportunities to innovate. The NRC staff is currently evaluating the report and will prepare a paper seeking Commission approval by June 30, 2019. This paper will discuss how the staff will monitor conditions to determine which scenarios may be unfolding and will identify actions that would be beneficial to meet the future regulatory environment. closing In conclusion, safety and security continue to be the NRC's main focus. The fiscal year 2020 budget request reflects the NRC's continuing efforts to achieve additional efficiencies while maintaining reasonable assurance of adequate protection of public health and safety and the security of our Nation. Chairman Alexander, Ranking Member Feinstein , and distinguished Members of the Subcommittee, this concludes my written testimony. On behalf of the Commission, thank you for the opportunity to appear before you and also for your support of the vital mission of the NRC. We would be pleased to respond to your questions. Senator Alexander. Thank you, Chairman Svinicki. Without objection, we will include your full written statement as part of the record. We will now begin our round of questions. As I mentioned, we have four votes beginning at 3:00. So we will get started and go as far as we can and perhaps submit our other questions for the record. Let me go to the interim storage sites that you mentioned. You said that you expected your review to be complete by the middle of 2020. You are talking about the Texas and New Mexico applications; is that right? Ms. Svinicki. Yes, Senator, I am. In one case, the staff expects to complete its safety and environmental review by July of 2020, and for the other site, it is August of 2020. And I apologize. For the life of me, I cannot remember which is which, but in very close succession next summer. Senator Alexander. Say it is mid-2020. What is the next step after that? For example, how long will it take to get it open? Let us put it that way. Ms. Svinicki. Well, I think a couple of things are important to note here. The first is that not included in that timeframe is that under law, there is an opportunity for petitions from the public and other organizations to contest or intervene in the licensing proceeding, and there have been petitions filed for both of these facilities. So that goes to our atomic safety and licensing boards for a hearing process that involves public participation. Senator Alexander. So would that come after 2020 or before mid-2020? Ms. Svinicki. It runs concurrent, but a factor in the timing of the issuance of an ultimate decision would be how long that public participation process takes and how long it took to resolve all the matters before in the licensing hearing. So that adds an element of uncertainty. But the staff's review of safety and environmental issues would be completed by mid, next summer. Senator Alexander. So that is an independent separate review, and then you have got your public comment period. And they run concurrently. Is that what you are saying to me, at the same time? Ms. Svinicki. Yes. Although often the issues challenged by intervenors in the proceeding are related to the safety and environmental work product that the staff has developed. So they can proceed concurrently because there can be evidentiary hearings and things that occur while the staff is still completing its review. The board is able to explore the challenges to the matter that our---- Senator Alexander. Well, is there any limit on how long that can take? Ms. Svinicki. In law, there is not a limit under law. Senator Alexander. Is there any history or rough idea how long that would take? Ms. Svinicki. Well, I would note that--I will use--this was a license renewal matter, but Indian Point, which is, of course, of great interest to the State of New York, had a license renewal that was in front of the agency for those operating reactors. I believe that went on for 7 or 9 years. Again, they are not all that complex, and there is an obligation on members of our Commission as the appellate body to exercise some sort of judicial economy in these procedures. Senator Alexander. Well, wait a minute. You mean there is a chance it should go--how could it go on for 7 or 9 years? I mean, cannot you have a time limit for getting in comments and then a time limit for studying the comments? Ms. Svinicki. Well, this is not a public comment period. If I stated that, I misspoke. It is a quasi-judicial proceeding under the Atomic Energy Act, which allows the public to challenge the matters. And I might ask if my lawyer colleague could offer a description that would be more concise than mine. Mr. Baran. Really, it is an administrative litigation. I mean, 7 or 9 years would be very, very long. That would be on the long end of how long adjudication takes. Senator Alexander. Is it on, your microphone? Mr. Baran. Yes. Senator Alexander. I did not hear you. So what was your answer? Mr. Baran. My answer was just that really the process is litigation. Administrative litigation is what we are talking about and it can last variable amounts of time, but 7 to 9 years would be a very long time historically for a litigation. Senator Alexander. Is there an appeal process from an initial process in this administrative litigation, or is it decided by a single board? Mr. Baran. There is a board, an administrative law panel composed of three administrative law judges, basically, and then the Commission itself is the appellate body. If there is an appeal to the Commission, it would come to us. Senator Alexander. So it comes back to you? Mr. Baran. Not always, but it can. Senator Alexander. Well, why cannot you set a time schedule for that? Mr. Baran. Well, I do not believe historically there has ever been a precise time limit placed on it because it is litigation, and we do not know how many claims there would be or how many parties---- Senator Alexander. Well, is there not any time limit for the amount of--do not claims have to come in by a certain time, or 25 years from now, can somebody just come up with a point? Mr. Baran. There are rules about when you need to file your claim. Senator Alexander. Well, how long? How much time do you have to file a claim? Mr. Baran. Well, it does get pretty complex, but basically our administrative law proceedings are very complex. But once a petitioner has the ability, has the information they need to file the claim, they need to do it pretty quickly thereafter. So, as the chairman mentioned, once the staff were to complete its safety analysis and environmental review, pretty quickly thereafter, any claims would need to be filed. Senator Alexander. Is there any action the Commission could take that would give you an ample amount of time to consider claims and judge safety that would avoid a dilatory set of proceedings that would take years on a subject that ought to be able to be decided within a reasonable period of time? Mr. Baran. Well, both our board, the licensing board, and the Commission are always focused on being as timely as we can on these things. There is no hard and fast rule about exactly how long it takes, but there is always a focus on making sure the process is continuing forward in an expeditious manner. Senator Alexander. Well, we can come back to that, but in my view--and I will conclude with this question, and we will go to Senator Feinstein. It seemed to me--Madam Chairman, if you look at Yucca Mountain and if you look at the interim storage facilities that Senator Feinstein and I have recommended and the Senate has approved the last 2 years and you look at the private sites, would you agree with me that the ones that are most likely to be able to open would be the private sites first? Ms. Svinicki. Well, again, if history is a guide, there was a substantively equivalent site that was pursued in Utah, I believe in the late 1990s, early 2000s, called Private Fuel Storage. The NRC after, again, a protracted public proceeding in front of the licensing board did eventually issue a permit for that facility, but I believe that there were other Department of Interior rights-of-way and things that were never granted. Of course, the facility was opposed very strongly by the Utah Members of Congress and others. So I think that that--again, it is very difficult to know what set of circumstances need to line up for these sites to open. In that case, it was matters outside of the NRC's control. Senator Alexander. Well, within the NRC in the Utah case, how long did it take for the Commission and its boards to do their work? Ms. Svinicki. You know, this precedes my time on the Commission, and I am not---- Senator Alexander. Well, I will just conclude by--I do not think the public interest is served. Members of Congress--at least these two Members of Congress are very interested in getting used nuclear fuel out of California, out of Maine, out of other places where it should not be. And while, of course, the sites have to be safe, but we ought not to have dilatory proceedings. So I would hope that the Commission would, as long as you can make your determinations fairly, look for ways to avoid dilatory tactics. Senator Feinstein. Senator Feinstein. Well, I mean, I would like to have all of this out of California. We are now over 40 million people, bigger than 22 States and the District of Columbia put together in population, and I just have no faith that this is the right way to go after sitting on this committee for what? 25 years, just about. Let me ask you, Madam Chairman. How does the NRC plan to ensure the corrective actions taken by Edison and Holtec to address the spent fuel loading issues will be sufficient to ensure safety going forward? Ms. Svinicki. Thank you, Senator Feinstein. Your opening statement summarized very well the enhanced inspections upon discovery of these events, the enhanced inspections that NRC began, and also the enforcement actions that we have taken were described in your opening statement. The fuel loading activities are still currently suspended until the NRC is satisfied that the corrective action measures, which we are aware of some--we are looking at the sufficiency of we know what they have proposed to do as corrective actions. We have not signed off on all of that yet. So those operations continue to be suspended until we are satisfied. Senator Feinstein. Well, I am pleased to hear that. I think it is very important. I would like to be advised of what your actions are, if I may---- Ms. Svinicki. Yes, Senator. Senator Feinstein [continuing]. Because I care very much about this. We have got fault lines virtually within every 5 miles of wherever anybody stands, and we are earthquake-prone, and we are on the shores of a major ocean. Let me ask you this. As part of the response to Fukushima, it is my understanding that the NRC asked all nuclear plants for information regarding seismic and flooding hazards. The NRC staff recommended changes in nuclear plant preparations based on what we learned at Fukushima. So far so good? Ms. Svinicki. Yes, although some of the reviews are still ongoing. Senator Feinstein. Okay. We will get to that. It is my understanding the Commission rejected the recommendations of the staff. So the first question is, What did the staff recommend that nuclear operators do differently based on their analysis of risk? Ms. Svinicki. Senator, there is a divided view on our Commission on this matter, and my colleague may want to give his perspective. But, in my view, all of the site-specific evaluations and any mandated actions that arise from that continue under the Commission's action on the form of the final rule that made generic some of these requirements. So the matters that we ordered after the events in Fukushima were done by site-specific orders to every operating reactor in the U.S., and that work continues. Again, many of the reevaluations of natural hazards are completed, but some are still---- Senator Feinstein. Let me ask you because I do not understand a word you are saying. Speak plain English. What is the situation now, and what is the Commission going to do, and what is the problem? Ms. Svinicki. The situation now is that the work that is being done at each site to reevaluate the flooding and seismic hazard continues. Some sites have completed their evaluations, and we have reviewed those. There are some sites that are not yet finished, or we have and are reviewing their evaluations. The Commission's action on the final rule did not alter any of those activities. Senator Feinstein. My understanding, there is a different point of view? Mr. Baran. Yes, I do have a different view on that. Senator Feinstein. Introduce yourself please. Mr. Baran. Sure. Commissioner Baran. There were two major things, in my mind, that happened post-Fukushima. I think the most important, most significant safety improvement was this new flex equipment at all the plants nationwide--pumps, generators, hoses--new equipment that was not there before Fukushima. That equipment is there now. It is really important. The other thing that was happening was what you were talking about in your statement, which is that for all these sites, the flooding and earthquake hazards are being reevaluated, using modern science. It had been decades in some cases since those hazards had been determined. We are using modern science and the licensees were--what are the real hazards today? This rule was going to bring those two pieces together. It was going to require that the flex equipment be protected against the actual modern-day hazards at the sites. I believe that is what the rule should do. It is not what the majority decided to do. Instead, the majority---- Senator Feinstein. Why would that be? Mr. Baran. I will let them present their view. My view is it makes no sense to have that flex equipment there and not have it reasonably protected from the actual hazards. That, I think, is a fundamental lessons learned from Fukushima. My colleagues--Commissioner Burns agreed with me--my colleagues disagreed about that. Senator Feinstein. Why do the colleagues disagree? Somebody who disagrees, please speak up. Ms. Caputo. The final rule implements the orders, makes permanent the orders that were issued previously, and what we decided ultimately to do is to have the plants as a whole upgraded to that level of hazard in their site-specific evaluations that were completed as a result of the initial order. So the final rule that I voted in support of makes all of those actions permanent. I think the disparity, if I can say so, I think the difference of opinion that I have with Commissioner Baran is whether the separate buildings and the separate equipment is raised to that level as well. Senator Feinstein. So who believes it should be, and who believes it should not be raised to that level? Commissioner Baran and why? Ms. Caputo. By the final rule---- Senator Feinstein. I think this is really important. Ms. Caputo. Yes. Well, under the final rule that majority voted in support of, we are updating the requirements for existing plants on a site-specific basis, and I think the distinction comes between whether we are increasing safety to a level for the plant. And then there is equipment that would be available for anything that would exceed this new evaluated hazard. And the discussion I think is whether or not you take actions necessary to make all of--to take this reevaluated hazard and apply it to these, shall we say--I do not want to say surplus facilities, but this additional layer of protection. So the plants themselves will have upgraded protections, and the question is whether or not to expand it beyond the plants to include this additional facility. Senator Feinstein. Well, let me put it sort of bluntly. We have got 41 million-plus people living in California, and if we cannot guarantee real safety, that is a problem. So what is going on, Mr. Baran? Why is not there an agreement on the level of safety that has to be provided? Senator Alexander. We have 3 minutes to vote. Senator Feinstein. We have 3 minutes to vote. Two votes? Oh my. I am on the coast of California. Senator Alexander. So we could finish up here and submit the rest of our questions in writing, or you can come back. Senator Feinstein. Let me do this. I would like to sit down--and I cannot sit down with the majority, I guess, of the Commission, but members on both sides of this subject, relating to my State, which is California, of what the pluses are and what the negatives are and particularly with respect to earthquake and weather. Mr. Baran. I would be happy to do that. Senator Feinstein. Okay. Will you set it up, please? Mr. Baran. I am happy to work with your staff to do that, yes. Senator Feinstein. Can we do it in the next 2 weeks, please? Mr. Baran. Whatever your timeframe is, I am happy to do it. Senator Feinstein. Okay. Thank you very much. Senator Alexander. Thank you, Senator Feinstein. I will say to the Commission, we have four votes. We have a couple of minutes left on the first vote, theoretically, which means we need to leave now. But I think what we will do, subject to the approval of Senator Feinstein, is submit our questions for the record, ask that you answer them, and have the meeting with Senator Feinstein that she asked for on that specific issue. I think you have seen that my interest is on advanced reactors, on safely extending the licensing of reactors wherever we can, on small modular reactors. And I want to make sure that if we are able to move ahead with our proposal for consolidated and interim waste sites and private sites, that you are able to move as swiftly as possible, as consistent with safety, so that we can begin to get used nuclear fuel out of the places where it is, to the place where it is supposed to be. Senator Feinstein. Mr. Chairman, may your staff join my staff and me in that meeting? Senator Alexander. We would be glad to. Senator Feinstein. I appreciate it. Senator Alexander. We would be glad to. We will work together on that. Senator Feinstein. Thank you. Senator Alexander. Anything else, Senator Feinstein? Senator Feinstein. No. I think that is it. Thank you very much. Senator Alexander. Thank you. The hearing record will remain open for 10 days. Senators may submit additional information or questions for the record within that time if they would like. The subcommittee requests all responses to questions for the record be provided within 30 days of receipt. SUBCOMMITTEE RECESS Thank you for being here. The committee will stand adjourned. [Whereupon, at 3:17 p.m., Wednesday, May 1, the subcommittee was recessed, to reconvene subject to the call of the Chair.]