Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
[House Hearing, 117 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 117-53] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2022 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED SEVENTEENTH CONGRESS FIRST SESSION __________ SUBCOMMITTEE ON READINESS HEARING ON FISCAL YEAR 2022 BUDGET REQUEST FOR MILITARY CONSTRUCTION, ENERGY, AND ENVIRONMENTAL PROGRAMS __________ HEARING HELD JULY 14, 2021 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] __________ U.S. GOVERNMENT PUBLISHING OFFICE 48-442 WASHINGTON : 2023 ----------------------------------------------------------------------------------- SUBCOMMITTEE ON READINESS JOHN GARAMENDI, California, Chairman JOE COURTNEY, Connecticut DOUG LAMBORN, Colorado JACKIE SPEIER, California JOE WILSON, South Carolina JASON CROW, Colorado AUSTIN SCOTT, Georgia ELISSA SLOTKIN, Michigan, Vice JACK BERGMAN, Michigan Chair MIKE JOHNSON, Louisiana JARED F. GOLDEN, Maine MARK E. GREEN, Tennessee ELAINE G. LURIA, Virginia LISA C. McCLAIN, Michigan KAIALI'I KAHELE, Hawaii BLAKE D. MOORE, Utah MARILYN STRICKLAND, Washington Jeanine Womble, Professional Staff Member Ian Bennitt, Professional Staff Member Sean Falvey, Clerk C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Garamendi, Hon. John, a Representative from California, Chairman, Subcommittee on Readiness...................................... 1 Lamborn, Hon. Doug, a Representative from Colorado, Ranking Member, Subcommittee on Readiness.............................. 2 WITNESSES Cramer, Paul D., Performing the Duties of the Assistant Secretary of Defense for Sustainment, Office of the Secretary of Defense. 4 Miller, Jennifer L., Acting Assistant Secretary of the Air Force, Installations, Environment, and Energy, Department of the Air Force.......................................................... 7 Schafer, Todd L., Acting Assistant Secretary of the Navy, Installations, Environment, and Energy, Department of the Navy. 6 Surash, J.E. ``Jack,'' Acting Assistant Secretary of the Army, Installations, Environment and Energy, Department of the Army.. 5 APPENDIX Prepared Statements: Cramer, Paul D............................................... 41 Garamendi, Hon. John......................................... 39 Miller, Jennifer L........................................... 85 Schafer, Todd L.............................................. 75 Surash, J.E. ``Jack''........................................ 60 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: Mr. Lamborn.................................................. 115 Ms. Strickland............................................... 115 Questions Submitted by Members Post Hearing: Mr. Golden................................................... 122 Mr. Kahele................................................... 122 Mr. Scott.................................................... 119 Mr. Wilson................................................... 119 FISCAL YEAR 2022 BUDGET REQUEST FOR MILITARY CONSTRUCTION, ENERGY, AND ENVIRONMENTAL PROGRAMS ---------- House of Representatives, Committee on Armed Services, Subcommittee on Readiness, Washington, DC, Wednesday, July 14, 2021. The subcommittee met, pursuant to call, at 4:00 p.m., via Webex, Hon. John Garamendi (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. JOHN GARAMENDI, A REPRESENTATIVE FROM CALIFORNIA, CHAIRMAN, SUBCOMMITTEE ON READINESS Mr. Garamendi. Good afternoon, ladies and gentlemen. I call to order this hearing of the Readiness Subcommittee of the House Armed Services Committee. Today's witnesses oversee a wide range of programs that are of great interest to this committee, including military construction, installations, installation resiliency, housing, environmental programs, and response to emerging contaminants-- also, energy resiliency and climate change. Earlier this year, we held a hearing focused on installation resiliency in which we questioned the uniformed leadership of the services' installation commands. Today, I will pose similar questions to the Department's civilian leadership: What are you doing to ensure our installations are resilient to the specific hazards that they face, be [they] increasingly frequent storm events, droughts, wildfire, flooding, sea-level rise, pandemics, or cybersecurity? How are you incorporating climate-change adaptation measures to ensure long-range resiliency of our Nation's installations and to ensure taxpayers get their full benefit of the military construction investments? Are you incorporating new materials that are more resilient in your construction? Does your installation master planning incorporate microgrids, environmental charging infrastructure-- excuse me, that's EV [electric vehicle] charging infrastructure, and the ability to island in the event of natural or manmade grid disruptions? Getting the answers to these questions correct is not just about addressing climate change but about ensuring that our installations can continue to perform their critical missions without disruption. In addition to resiliency, this subcommittee has put considerable focus in the past few years on privatized housing for military families. I assure you that we will continue until all the service members have high-quality places to live, free from environmental hazards and chronic maintenance problems. However, privatized housing is not the only place where our service members live. Most of our junior enlisted service members live in barracks or dormitories. Through chronic neglect, these buildings have been allowed to fall into disrepair and create substandard living spaces for service members. We know that these poor-quality living conditions contribute to poor retention. The Army announced a $10 billion plan to overhaul substandard barracks by the end of fiscal year 2030, yet only one barrack appeared on the President's budget request for Army military construction. In 2020, the Army announced that people were its top priority, but it seems the Army actually meant that people were their top unfunded priority. Lip service is simply not enough. With that said, at least the Army has publicly acknowledged the deficiencies in their barrack facilities. I have seen no similar statements from the other military departments, yet I know that similar rates of barracks and dormitories in poor conditions and failing conditions exist within the Navy and the Air Force. I also look forward to hearing about the witnesses' budget request in support of their environmental programs. In particular, I am surprised to see that the President's budget request for environmental restoration funds, the money used to conduct environmental cleanup, were down considerably from fiscal year 2021 enactment amounts. With thousands of cleanup sites across the country, 698 of which are installations with known or suspected releases of AFFF [aqueous film forming foam] and potential PFASes [per- and polyfluoroalkyl substances] contaminating the surrounding communities, I am surprised by the lack of emphasis on environmental programs. However, with the 2024 AFFF phase-out looming, the Department must be increasing its efforts to address PFASes and not putting them on the back burner. With that said, I would like to turn to our ranking member, Congressman Doug Lamborn of Colorado, for any remarks you may have. [The prepared statement of Mr. Garamendi can be found in the Appendix on page 39.] STATEMENT OF HON. DOUG LAMBORN, A REPRESENTATIVE FROM COLORADO, RANKING MEMBER, SUBCOMMITTEE ON READINESS Mr. Lamborn. Thank you, Chairman Garamendi. I would like to welcome our witnesses here today to discuss their fiscal year 2022 budget request for military construction, environmental and energy programs, as well as base and facility accounts. Over the past several months, this subcommittee has held focused hearings on many of the core issues within these accounts. It remains clear that the services are struggling to prioritize important investments in our aging and failing infrastructure. That is one of the reasons I am a strong advocate for a higher top line. We cannot continue kicking the can down the road. I look forward to hearing from OSD [Office of the Secretary of Defense] and the services about what they are doing to address degraded facilities. Years of deferred maintenance have made facilities inefficient, have negatively impacted readiness and retention, and left us exposed to extreme weather events. Deferred maintenance is also bad business and a waste of taxpayer dollars. In fact, Federal disaster mitigation efforts can save up to $6 for every $1 spent. I am particularly concerned with our organic industrial base and facilities and utilities that were built, in many cases, over 50 years ago. The Navy has a particularly acute problem in this area. The GAO [Government Accountability Office] has assessed that all four public shipyards are in poor or failing condition, with too few functional dry docks. The recent Navy disclosure of the Portsmouth Naval Shipyard dry- dock cost growth from $750 million to almost $2 billion does not engender faith that the Navy has completely bound the overall cost of this essential Navy repair capability. As to ranges, we still have a myriad of problems that appear to be unfocused. Despite the increased emphasis on our Nation's hypersonic shortfalls, for instance, I am concerned about the Department's ability to adequately test hypersonic weapons. Clearly, range limitations will impede DOD's [U.S. Department of Defense's] ability to adequately develop this capability, yet not one word on this glaring shortfall in any of the witnesses' testimony. And if you look at what China is doing, they are definitely investing heavily in testing capability for hypersonic glide vehicles. Even in my district, at Fort Carson, there is a continuing lack of emphasis on providing adequate ranges for the garrisoned forces. We have to do better and ensure that our ranges are ready. There are many other important issues that I am confident will be discussed today. All services must remain focused on the privatized military housing projects. Given the recent troubles and prolonged implementation of the Tenants' Bill of Rights, oversight is critical. The services' testing, cleanup, and replacement efforts related to PFAS and AFFF is another issue with bipartisan attention. The services must do a better job preventing accidental releases, of which there seem to be too many, as well as finding a suitable replacement for AFFF. With much competition for dollars in this year's budget, I want to emphasize the need for good investments that can [stave] off the need for additional resources down the road. I again want to thank today's witnesses, and I look forward to our discussion. Mr. Chairman, I yield back. Mr. Garamendi. Thank you, Mr. Lamborn. We will now turn to the witnesses, and I would like to welcome them to this hearing. They are all gathered together at some office building, I suspect at the office at the Department of Defense. First time for them to get together, so we got them all in one place at one time. We have Mr. Paul Cramer, performing the duties of Assistant Secretary of Defense for Energy, Installation, and Environment, Office of the Secretary of Defense. And then I will introduce the others in order, so--well, let's go here: Mr. Jack Surash, Acting Assistant Secretary of the Army for Energy, Installations, and Environment, Department of the Army; Mr. Todd Schafer, Acting Assistant Secretary of Navy for Energy, Installations, and Environment, Department of the Navy; and Ms. Jennifer Miller, Acting Assistant Secretary of the Air Force for Energy, Installations, Environment, Department of the Air Force. So, with that, Mr. Cramer, if you would like to begin. STATEMENT OF PAUL D. CRAMER, PERFORMING THE DUTIES OF ASSISTANT SECRETARY OF DEFENSE FOR SUSTAINMENT, OFFICE OF THE SECRETARY OF DEFENSE Mr. Cramer. Thank you. Chairman Garamendi, Ranking Member Lamborn, distinguished members of the subcommittee, on behalf of myself and my service colleagues, thank you for the opportunity to present the President's fiscal year 2020 budget request for the Department's energy, installations, and environment programs. I will highlight a few key areas. Our 2022 budget request supports our efforts to address mission requirements, ensure service members have a safe and resilient place to live and work, and also begins to address resilience challenges. We are requesting $26.1 billion for military construction and sustainment, restoration, and modernization funding to address critical mission requirements and life, health, and safety concerns within our current fiscal environment. This funding will be used to replace, restore, and modernize enduring facilities to enhance their resilience to climate events and promotes elimination of excess and obsolete facilities. We are committed to protecting the quality of life of our personnel and their families. Our primary focus here is to ensure access to safe, quality, affordable family and unaccompanied housing. Our budget includes $1.4 billion to support our worldwide nonprivatized family housing inventory, which includes more than 34,000 government-owned and 5,800 leased family housing units. This request also demonstrates our continued commitment to modernizing unaccompanied personnel housing, with more than $477 million requested for eight construction projects. With regard to privatized housing, the Department continues to prioritize actions that improve the tenant experience and rebuild tenant trust. Our initial phase was predominantly focused on implementing the MHPI [Military Housing Privatization Initiative] Tenant Bill of Rights and the NDAA [National Defense Authorization Act] requirements embedded in those rights. The Department has issued all policy guidance necessary to implement all rights at all MHPI housing projects. With few exceptions, all 18 tenant rights are now available. Our budget also requests approximately $3.6 billion for environmental programs, supporting activities ranging from managing critical habitat and avoiding training restrictions to addressing drinking water health advisories and making the best use of our cleanup dollars. Finally, the Department depends on resilient installations. To prepare for peer competition where even the homeland is contested, the Department is addressing a change of technology, operational, and policy initiatives to enhance the use of energy in warfighting. To that end, we are requesting $4.3 billion in energy investments, including both installation energy and operational energy. This includes approximately $287 million for the Energy Resilience and Conservation Investment Program, or ERCIP, a significant increase over last year's request to reflect the significance of risk to energy systems. We appreciate Congress and this subcommittee's continued support as we work together to provide the best possible support for our soldiers, sailors, airmen, Marines, guardians, and their families. I look forward to your questions. [The prepared statement of Mr. Cramer can be found in the Appendix on page 41.] Mr. Garamendi. Mr. Cramer, thank you very much. Let's now turn to the Army and Mr. Jack Surash. STATEMENT OF J.E. ``JACK'' SURASH, ACTING ASSISTANT SECRETARY OF THE ARMY FOR INSTALLATIONS, ENERGY AND ENVIRONMENT, DEPARTMENT OF THE ARMY Mr. Surash. Thank you very much, Mr. Chairman, Ranking Member Lamborn, members of the subcommittee. On behalf of the soldiers, families, and civilians of United States Army, thank you for the opportunity to discuss the Army's fiscal year 2022 budget request. The request works to address the challenges the Army faces in privatized housing and barracks while at the same time working to increase the climate resilience of our infrastructure. While we face a challenging task, we are making measurable and continuous progress in a challenging budget environment. We have developed and are executing complementary strategies that inform our actions. The Army Installations Strategy supports the Army People Strategy and the Army Modernization Strategy and together encompass our efforts in taking care of people, strengthening readiness and resilience, modernizing and innovating, and promoting stewardship. As you know, housing has been a key focus area. Our soldiers and their families deserve high-quality, safe housing. Our focus is on fixing the privatized housing issues brought to light in 2018 while at the same time working with the privatized companies to strengthen the long-term financial health of the housing portfolio. We are conducting 100 percent quality assurance inspections on change of occupancy and on all life, health, and safety maintenance work orders. The Army fully implemented all 18 Tenant Bill of Rights at the majority of our 44 installations. We will execute the remaining three tenant rights at eight installations by the end of the summer. The privatized housing providers are spending $1.5 billion and reinvesting another $1.3 billion on housing improvements over the next 5 years. In regards to barracks, the Army has invested $2.1 billion for construction, operations and maintenance, and restoration and modernization over the last 3 years. The Army is focused on modernizing barracks standards that incorporate user feedback and the latest technology. The Army will continue to work to increase the overall quality of housing, both Army-owned and privatized housing as well as barracks. All of this is occurring while the Army is working to maintain and increase the resilience of our installation infrastructure. Energy and water resilience, or uninterrupted access to energy and water, are essential for Army readiness and ensuring the Total Army can deploy, fight, and win. Among the threats we face, climate change is a direct threat to Army readiness and our ability to accomplish the mission. To combat this threat, the Army is proactively taking steps to address the impacts and causes of climate change and extreme weather at our installations and upon our operational forces. Army readiness begins on our installations. Through adaptation, mitigation, and innovation, the Army will work to secure the readiness and resilience of forces, functions, and facilities. Thank you for the opportunity to present this testimony and for your continued support of our soldiers, civilians, and families. [The prepared statement of Mr. Surash can be found in the Appendix on page 60.] Mr. Garamendi. I thank you, Mr. Surash. We will now turn to Mr. Schafer, Acting Assistant Secretary of the Navy. STATEMENT OF TODD L. SCHAFER, ACTING ASSISTANT SECRETARY OF THE NAVY FOR ENERGY, INSTALLATIONS AND ENVIRONMENT, DEPARTMENT OF THE NAVY Mr. Schafer. Thank you, Chairman Garamendi, Ranking Member Lamborn, and distinguished members of the committee. I thank you for the opportunity to testify on the Department of the Navy's fiscal year 2022 budget request for energy, installations, and environmental programs. The Department of the Navy appreciates the committee's continued support of Navy and Marine Corps installations. These installations directly enable the lethality and warfighting readiness of our maritime forces. The Department of the Navy's military construction request for 2022 includes $2.3 billion for 29 projects that invest in new platforms and technology as well as replace and modernize an aging infrastructure. Eight construction projects support the relocation of our Marine Corps forces from Okinawa to Guam. This request also reflects our commitment to the Shipyard Infrastructure Optimization Program and to ensure the Navy's public shipyards are ready and able to support the maintenance plan for current and future submarines and aircraft carriers. To take care of our existing infrastructure, our 2022 budget request funds the sustainment of Navy and Marine Corps facilities at 80 percent of the Department of Defense Facilities Sustainment Model. The Department of the Navy is also requesting nearly $1 billion to fund projects that restore and modernize existing infrastructure, to include naval shipyards, utility infrastructure, runways and taxiways, hangars, training facilities, and waterfront structures. Our 2022 budget request sustains the funding needed to ensure military families receive safe, quality, and well- maintained housing and fair treatment from the military housing companies that own, operate, and maintain privatized housing. Over the past 2 years, all levels of leadership across the Department of the Navy have been laser-focused on improving the privatization housing experience for sailors, Marines, and their families. Although work remains, we are beginning to see improvement in the operation, maintenance, and customer service provided by our privatized housing partners. Navy and Marine Corps installations face threats from natural disasters and climate change, as well as risk to energy, water supplies, and industrial cyber control systems. Our 2022 budget request continues the Department of the Navy's commitment to installation resiliency and treats it as a crosscutting consideration integrated into all of our installation planning. We also include it in our environmental conservation and restoration, our facility design and construction, and in all of our decisionmaking processes. Finally, we appreciate this committee's continued attention and the urgent need to modernize the Navy's premier aviation training range, the Fallon Range Training Complex in Nevada. The Department of the Navy remains committed to working closely with Tribal governments; environmental organizations; the State, county, and local community; and the Department of Interior to develop a solution that meets the desires of all stakeholders while providing our warfighters a range complex that meets their critical training and readiness needs. As directed by the fiscal year 2021 National Defense Authorization Act, the Department of the Navy has collaborated with the Secretary of Interior to establish the Fallon Range Training Complex Intergovernmental Executive Committee to obtain views of stakeholders on Fallon Range Training Complex modernization and information related to management of natural and cultural resources on the range. Thank you for the opportunity to provide this opening statement. We look forward to the continued support and attention of this subcommittee, and I am ready to address your questions. Thank you. [The prepared statement of Mr. Schafer can be found in the Appendix on page 75.] Mr. Garamendi. I thank you, Mr. Schafer. We now turn to Ms. Miller, Assistant Secretary of the Air Force, Energy, Installations, Environment. STATEMENT OF JENNIFER L. MILLER, ACTING ASSISTANT SECRETARY OF THE AIR FORCE FOR ENERGY, INSTALLATIONS AND ENVIRONMENT, DEPARTMENT OF THE AIR FORCE Ms. Miller. Chairman Garamendi and Ranking Member Lamborn and distinguished members of the committee, thank you for the opportunity to testify today. I am here with you to review the status of our installation and energy priorities to ensure the Department of the Air Force continues to provide installations as power-projection platforms in support of the National Defense Strategy. The fiscal year 2022 President's budget request supports the Interim National Security Strategic Guidance and lays out a plan to modernize our military capabilities. The military construction budget prioritizes nuclear enterprise modernization and combatant command infrastructure in Europe and the Pacific. The budget also funds high return on investment in operational energy initiatives and provides for the quality of life of our airmen, guardians, and their families through investments in housing, dorms, child development centers, and community support facilities. Secretary Austin identified tackling climate as one of the top efforts in support of the ``defending the Nation'' priority. Changing climate and severe weather events are a continual threat to our installations. Over the past several years, the Department has seen firsthand the impacts climate and severe weather can have on our installations. As a result, we are smartly moving forward with the rebuild efforts at Tyndall Air Force Base following Hurricane Michael in 2018 and Offutt Air Force Base following the flooding in 2019. Additionally, the Department enhanced installation resilience, or the ability to continue military operations in the face of challenges, to bounce back from adversity across numerous fronts. Climate and energy resiliency considerations are being incorporated into installation development plans. Last year, we published a ``Severe Weather and Climate Hazard Screening and Risk Assessment Playbook.'' This gives installation-level planners a consistent and systematic framework to screen for severe weather and climate hazards and assess current and future risks. We remain firmly committed to a robust environmental conservation program, responsible environmental restoration, and protecting human health. Regarding PFAS, the Department developed a framework to identify and remediate impacted areas. While there are no national primary drinking water regulations for PFAS, the EPA [U.S. Environmental Protection Agency] established lifetime drinking water health advisories for two--PFOS [perfluorooctane sulfonic acid] and PFOA [perfluorooctanoic acid]. Our strategy focuses first and foremost on ensuring that no one, on or off our installations, is drinking water with a Department-related PFAS or PFOA above that health advisory. And, second, I am using those CERCLA [Comprehensive Environmental Response, Compensation, and Liability Act of 1980] authorities to investigate, define, remediate groundwater and soil impacted by the Department activities. The Department also communicates and collaborates with local communities, State and Federal agencies, and elected officials at all levels. Regarding privatized housing, the Department, with the support of Congress, took substantive action to address concerns and make meaningful changes to our privatized housing program. Nearly all the housing companies have agreed to implement the additional 18 tenant rights. Some privatized housing highlights we have implemented in the last year include increasing program and project oversight, as well as 60 new resident advocates that directly support military families. We will keep focus on improved oversight, long-term project health, and sustainment of housing inventory to provide military families access to safe, quality, and affordable housing communities. Finally, the Department continues to develop an agile and optimized approach to powering our aircraft and providing airmen with the fuel when and where they need it. We are improving enterprise-wide fuel-use data collection and conducting analysis to identify areas where existing missions can be performed more effectively with fewer resources. Through partnerships with aviation and commercial industries, we identify innovative solutions to modernizing legacy aircraft and weapon systems while maintaining our lethality. Mr. Chairman and Ranking Member Lamborn, that completes my remarks. Thank you for the opportunity to testify today, and I look forward to your questions. [The prepared statement of Ms. Miller can be found in the Appendix on page 85.] Mr. Garamendi. Thank you very much, Ms. Miller. We are now going to questions. We want to try to maintain the 5-minute clock as we go through this, although the chairman has some leeway, as does the ranking member. The rest of you, it is 5 minutes or out. So we will carry on here. I am going to do mine very quickly. Earlier, I had a discussion, Mr. Cramer, about the Department of Defense and what you are doing to carry out the President's executive order with regard to climate change. Could you speak to us about what the Department, the Secretary of Defense office, and then the various departments are doing to carry out that instruction at the Department, that all Federal agencies aggressively address the climate-change challenge? Mr. Cramer. Mr. Cramer. All right. Thank you, Mr. Chairman. First of all, before I start, I want to, you know, take the opportunity now to thank the great team of professionals that we have assembled within the Department of Defense in very short order. So the President's executive order came out, one of his first ones, in the early part of January. So we rapidly organized a team of professionals to address the executive order, led at the Department of Defense level by DASD [Deputy Assistant Secretary of Defense] Richard Kidd and Dr. Kate White, who is an expert in climate. This is kind of their pinnacle of success, if you will. They have been, you know, training their whole career to get at this. And where we are at within the Department is all telling. And so I don't need to go into too much details about the effects of climate, because I think we all realize that. But the Executive Order 14008, ``Tackling the Climate Crisis at Home and Abroad,'' in our response to that we put together the DOD Climate Adaptation Plan, which is in final draft, going up to the Secretary for signature. It is an all-of-the-Department plan, and we are all going to sign that. In response to the EO, we have been asked not to publish that officially until all the rest of the executive branch plans get done. And that will be no later than 1 September. Or, if we get direction, we will release it early. But I am able to go through some of the highlights within our Climate Adaptation Plan [CAP]. And the primary purpose of our CAP is to integrate climate- change adaptation and climate resilience across our programs, management of real property, our public lands and waters, and financial services. The Department is responding to climate in two ways: adaptation to enhance resilience--these are actions and adjustments in natural or DOD systems in anticipation of or response to a changing environment in a way that effectively uses beneficial opportunities to reduce negative effects of climate--and our mitigation efforts that are being used to reduce greenhouse gas emissions. The basis of our plan is wrapped around five lines of effort, and I will briefly go through each one of those. Line of effort number one is climate-informed decisionmaking. What that is is climate considerations must continue progress towards becoming an integral element of DOD's enterprise resource allocations and operational decisionmaking process. Line of effort number two: train, test, and equip a climate-ready workforce. This LOE will help shape the Department's efforts across activities related to developing, acquiring, fielding, and sustaining equipment and services. Line of effort number three: resilient built and natural infrastructure. Built and natural infrastructure are both necessary for successful mission preparedness and readiness. Built infrastructure serves as the staging platform for the Department's national defense and humanitarian missions. Natural infrastructure supports military combat readiness by providing realistic operational testing to combat environments and conditions. Line of effort number four: supply-chain resilience and innovation. A climate-resilient supply chain is one in which the Department has ensured that key suppliers and industries can still operate while impacted by climate change, with uninterrupted access to key supplies, materials, chemicals, and services. Line of effort number five: enhance adaptation and resilience through collaboration. The Department will build unity of effort in mission across DOD components to exploit lessons learned and economies of scale and integrate that into existing DOD missions, not as a subset from that. And I will turn it over to my colleagues, if they want to amplify anything. Mr. Garamendi. Let's stay with this. We will go with the amplification from each of the departments, and then we will turn to Mr. Lamborn. Shall we go in reverse order? Let's go with Air Force one. That is not an airplane; that is you, Ms. Miller. Ms. Miller. Well, Congressman, thank you. So we have started working on our climate goals in support of the executive order and the climate action plan. And, as part of doing that, as Mr. Cramer briefed, we have two main lines. The difference particularly with the Air Force, I think, is some of the initiatives that we are able to implement in the operational energy arena, because that is over 80 percent of our consumption comes from operational energy. So we are looking at a lot of things there, some of them big items. But one of the things that we have been able to get funded this year is some of the relatively small items, whether it is the angling of our windshield wipers on our aircraft, to little winglets, to things that we have been able to modify the aircraft, often stealing good ideas from industry. All of these things that we have been able to implement for less than $40 million this year have a return on investment within the FYDP and have some real opportunities for big savings, although little investments. Some of the other areas that we are looking at with mitigation for our installations include things like, you know, reducing the footprint, increased demolition; trying to look at, with new telework policies, is there a way to reduce the requirements when we are building new; in our acquisition policies, being able to leverage the existing infrastructure and consider that as part of our acquisition; and then some of the things that we can do with a climate-literate workforce, including climate in all of our considerations. On the adaptation piece, the installation energy plan, so we are well on our way to that. And by the end of next year, we will have 75 percent of our major energy-consuming installations complete. We will work those into our installation development plans. And then some real good work that has been done with the pull-the-plug exercises. We have actually three more on the books. We have had great success so far and support from our leadership in doing that to try to determine where we have some installation energy vulnerabilities and water vulnerabilities, that then lead to where we invest our resources and prioritize our resources to get after those vulnerabilities. I know I have probably already taken too much time, sir. Happy to answer any additional questions on those, or I can turn it over to my service counterparts. Mr. Garamendi. Let's go to the Navy. Mr. Schafer. Thank you, Mr. Chairman. Climate resiliency, environmental issues, these are very important to us. As we are following the lead from the Department of Defense, we, too, are working on our climate- change issues. It is a national security concern for us. And, as we are working through this, we think about sea- level rise for a lot of our installations that are on coastal areas. When we are working to build a resilience plan, we work with local, county, and State governments to ensure that we are good partners with the community. We are also looking at the effects of climate change on things such as energy, water, and also the cyber piece of this, what it can do for our control systems. My colleague from the Air Force mentioned that they have run some black-start exercises where we actually disconnect the base from the electric grid. We have done that out at Marine Corps Air Station Miramar. We have actually done that twice, where we have turned the commercial power off there. And by the use of a microgrid and 11 megawatts on-site energy capability, we were able to support the 100-plus critical mission facilities for 14-plus days. So we are certainly taking advantage of providing energy security for things that may happen from a climate environment. And another example is that, in August of 2020, during the heatwave out in California, we actually used our microgrid to prevent rolling brownouts in the California area there at Miramar. So, clearly, climate is a big deal for us. We are prioritizing it into all the actions we do. And we are doing that to build climate resiliency into all of our infrastructure. So that includes our master planning, our development, our design and construction. And it also is in all of our decisionmaking processes, just as the Secretary of Defense has directed, that we need to consider climate issues in all of our processes and decisionmaking. Mr. Garamendi. Thank you very much. And we will end with the Army and then turn to Mr. Lamborn. Mr. Surash. Thank you, Mr. Chairman. So, along the lines of what you just heard, what the Army is doing is, of course, working very closely with the Office of the Secretary of Defense and our sister services with respect to all things climate change. What we have chosen to do in the Army is, starting in late February, we have put together a Climate Change Working Group. This is an across-the-Army effort. Because we really see climate change having a big effect on the operating forces of the Army, training, deployment, employment of operating forces and the need for such, as well as very obvious implications on our installation side. So the [inaudible] is we will have a climate-change strategy that the Secretary of the Army will release probably within 60 days or so. And then we will have a very detailed climate-change action plan that will lay out a multiyear effort that covers everything with respect to the operating forces and installations that the Army is going to attempt to do, sir. Mr. Garamendi. Well, very good. Thank you very much. You can be assured that we will be following up at the 60 days, so that will fit into our schedules also. In any case, this is extremely important in every way. We last year called it conservation, energy conservation, and the like. We will follow up with more detail from you and from us. Mr. Lamborn, if you would care to proceed. Mr. Lamborn. Thank you, Mr. Chairman. I would like to ask Mr. Cramer about hypersonic ranges. Our Nation is late in developing adequate hypersonic weapons but is starting to expand our industrial base to support a near-term hypersonic capability. But we do have a glaring shortfall in range capabilities, and because of this deficit, industrial base partners may have to field more antiquated approaches, because range limitations prohibit testing the latest technology. Do you share this concern, and do you have any solutions going forward, Mr. Cramer? Mr. Cramer. Congressman, I do share that concern. We have had some conversations within the Department on how we are going to achieve the maximum range of the hypersonic systems. I do not have any solutions I will talk to here, but I would be glad to have folks get on your calendar and come down and sit down and kind of go through, you know, what those possible solutions would look like. Mr. Lamborn. Okay. Let's do that. Because I don't want to continue losing ground to China and Russia on this important issue. Mr. Surash, the Pinon Canyon Range near Fort Carson has a multitude of existing limitations, including utility easements and airspace limitations. Does the Army have a plan to address these limitations? And can you explain any corrections that you are anticipating? Mr. Surash. Sir, I am aware that we are working on this. I don't have the details at my fingertips, but I will be happy to follow up with you on that, sir. Mr. Lamborn. Okay. Thank you. Ms. Miller, with the transfer of installations from the Air Force to the new Space Force, there will be a corresponding shift in how these installations support the space mission. For example, flying and fighting and winning in the space domain obviously requires less focus on airfields and more on critical infrastructure for launch and for controlling assets once they are operating in space. So my question is, to what extent has the Space Force developed standards and measures for assessing the readiness of its critical infrastructure systems? Ms. Miller. So, Congressman, thanks for that question. We are actually going to be supporting within the Department of the Air Force the space installations from a secretariat. And many of the functions that our A4 logistics/ engineering staff performs now will be continued to be performed by the secretariat, and many of those functions by the Air Staff. So a lot of the prioritization, the support, the assessments will be done in the same way. It will be fairly transparent. Now, the difference will be, as we transfer the FSRM [facilities sustainment, restoration, and modernization] and then in a couple years the MILCON [military construction] authority over to the Space Force, then those will be prioritized within the service, but then ultimately brought together at the secretariat for the assistance on the budget prioritization. So the readiness assessment ought to be fairly similar, and I haven't see proposals for a transfer on that. Mr. Lamborn. Okay. Thank you for that update. And are the Space Force missions being reported for readiness on the Defense Readiness Reporting System? Maybe I didn't catch that, but for the system itself, what is the status there? Ms. Miller. So, for readiness, I can speak to installation investments, sir, but I would have to reach out to our probably J3 or our readiness experts, either an S3 or A3, on that. So we can take that for the record, on how they are reporting space readiness. [The information referred to can be found in the Appendix on page 115.] Mr. Lamborn. Okay. Thank you. Yeah, please let us know on that one. And then, finally, what plans does the Space Force have for identifying, prioritizing, and resourcing installation military construction requirements that do align with its new mission? Ms. Miller. Yes, sir. So, right now, the MILCON process still runs through the same, so the Department of the Air Force is managing the MILCON for the Space Force and the Air Force until 2024. At that time, assuming that the capabilities exist within the Space Force to prioritize their MILCON, then they would transition. I presume that they would use much of the similar methodology that we use within the Department of the Air Force, but, at that time, in 2024, the Space Force will have entire control of both the MILCON and the FSRM accounts. Mr. Lamborn. Okay. Thank---- Ms. Miller. So we---- Mr. Lamborn [continuing]. You all for being here. Ms. Miller. Oh. Sorry, sir. Mr. Lamborn. Oh, I was just--if you have something else to say, please finish. Otherwise, I was going to transition back. Ms. Miller. Yeah. So we will still consolidate for both the Space Force and the Air Force within the Department of the Air Force for the policy guidance, the budgetary oversight, et cetera. So there still will be the consolidating and review function by the secretariat for both departments. Mr. Lamborn. Okay. Thank you. And thank you all for being here. Mr. Chairman, I yield back. Mr. Garamendi. Thank you, Mr. Lamborn. The gavel order is--well, let me find it here--Mr. Courtney, Mr. Wilson. And then we will have more beyond that. I will make an announcement as soon as I get the order. So, Mr. Courtney, you are up. Mr. Courtney. Great. Thank you, Mr. Chairman. And thank you to the witnesses for being here today. You know, we had a subcommittee hearing not too long ago about the chronic, sort of, delays in terms of turning around ship repairs and submarine repairs, particularly the attack submarines, which the public yards have really struggled in terms of finding capacity to get those platforms turned around and back out in deployment. You know, Mr. Schafer, you mention on page 2 of your testimony the Shipyard Infrastructure Optimization Plan, the SIOP, which was established in 2018. Looking at the actual numbers which were in the budget for, you know, real construction, the Navy requested $250 million for a dry dock at Portsmouth and $156 million for dry-dock improvements at the Ford-class aircraft carrier at Norfolk, and that is it. And, I mean, looking at the SIOP plan, which was about $21 billion of work, it seems like we are just really moving at a snail's pace. At the same time, you know, many of us in our committee has been pushing to expand the size of the Navy's fleet. We still have a lot of aging ships out there. Is this enough for us to really achieve the goal of SIOP, which, you know, even the CNO [Chief of Naval Operations] has been coming before us and talking about the, you know, critical piece of the spectrum in term of the Navy's ability to get ships and submarines out there. This seems, really, like a meager request for the scale of the need that is out there for SIOP. Mr. Schafer. Rep. Courtney, you certainly hit on a very important program for the Department of the Navy and our ability to generate ready forces. Our SIOP plan is a long-term plan, as you probably know, that is going to go over multiple years and be multiple billions of dollars at the end. We are in the process of completing a 5-year plan to share with you all on this committee and others on Capitol Hill. We certainly have to keep in mind that we have got to-- we've kind of got to--I am going to use an Air Force example-- we've kind of got to build a plane as we fly it, because we can't take down all our dry docks at once. We have to continue to do maintenance. So that is part of what may make our submission look like it's a little meager to get going, but this is all a complex problem. And our Naval Sea Systems Command, who does our maintenance on our ships, has laid all this out and worked with our operating forces to ensure that we've got a SIOP program that will still allow us to meet the demands of the combatant commanders for force employment going forward, sir. Mr. Courtney. Great. Well, I mean, the good news is, I think you have a lot of support on this subcommittee for SIOP. I mean, I think, you know, it took a while for people to sort of recognize, you know, how critical this is, but now I think the interest is sky-high. And, you know, as soon as we can get that multiyear, sort of, view of what the plan is, I think, frankly, it will increase people's comfort level. So we certainly anxiously await that analysis. Thank you for your answer. And, with that, I yield back. Mr. Garamendi. Thank you, Mr. Courtney. I have repeatedly asked for the--not the 20-year plan, but what are you going to do in the next 5 years? I am not going to badger you further today, but, guaranteed, I will badger you again tomorrow and the day after that until I get that 5-year plan. What are you going to do in the next 5 years? How much money do you need? Where is it going to be spent? What will be the effect of it? So I will just let it go at that. Now, Mr. Wilson, it is your turn. Mr. Wilson. Thank you, Mr. Chairman. And I want to assure our witnesses--thank you today--that there is not badgering from the chairman; he is just making inquiries. Okay? And so---- Mr. Garamendi. No, no. This is badgering. Mr. Wilson. No, no, no, no, no. Hey, hey, hey. This is inquiry. But, Secretary Miller, the fiscal year 2019 NDAA requires the Department of Energy to study the deployment of microreactors, small modular reactors, at DOE facilities for energy security. And, earlier this year, there was issued an executive order requiring the Department of Defense to make a report on microreactors, small modular reactors, and their implementation at domestic military installations. What is the status of looking into enhanced energy resilience using these small modular reactors? Ms. Miller. Congressman, we have a great interest in it. I was actually able to go up about a year ago to Eielson and physically tour the coal plant there and look at and talk to the folks about their excitement with the pilot program out there. So we are just getting underway on the pilot program, but we are excited to see what capabilities that provides us for our CONUS [continental United States] installations and then the potential to have those be mobile for other locations. Mr. Wilson. And, to me, the energy stability and dependability would just be fantastic for island installations, including an entire island, the territory of Guam. But, over and over, I wish you well in looking into that. And for any one of you, I would like to receive back--you don't have to do it right now. I am keenly interested in having from any one of you a prognostication of rising sea levels. What level of rise do you anticipate? What years of anticipation? Is there a variance by location on east coast, west coast? Additionally, I am interested in a prognostication of rising temperatures. Again, what is the anticipated rise and what year? And then also the prognostication--since I represent South Carolina, we are keenly interested in hurricanes. What is your prognostication of Atlantic hurricanes? How many and which year? And for the three different issues of rising sea level, temperature, and hurricanes, I would really appreciate that in a narrative but also a graph format. And if you would please provide that to me. I would like to see what is being done. And then, Secretary Surash, I am grateful to represent Fort Jackson, which serves as the public face of our Army for more than 45,000 basic trainees and their families every year. Despite the efforts to have the reception barracks complex completed, it is still not being included in the budget. What is the anticipation of what can be done for the reception barracks? Mr. Surash. Congressman, thank you for that question. Sir, I am showing that our request has $34 million for phase two of the reception barracks at Fort Jackson, sir. Mr. Wilson. Well, hey, I appreciate that very, very much. That is going to be very positive. Additionally, we have, sadly, effective cuts in the fiscal year 2022 budget. And for Secretary Surash, what is the long- term impact on Army families of delayed investments in the base housing and childcare centers? Mr. Surash. So, sir, we've got a real focus on housing and childcare centers. I think we are moving along fairly smartly. With respect to child development centers, we were not able to include any child development centers in the military construction portion of the bill. Over the next 10 years, we are looking to invest in about 21 additional child development centers, and I think that is going to provide about 4,500 spaces; and, through the restoration and modernization program, about 10,500, again, over the next 10 years, sir. Mr. Wilson. Well, hey, thank you again for your efforts. And back again on the different graphs as to rising sea level, temperature, hurricanes, if you could get that to Drew Kennedy in my office, I would really appreciate it--1436 Longworth House Office Building. That would be very helpful. I would love to see those graphs as soon as possible so that we can get prepared. Thank you. And, Mr. Chairman, I yield back. Mr. Garamendi. Thank you very much, Mr. Wilson. Your inquiries were well put. Now, the gavel order going forward--let's see here. We have Jason Crow, Mark Green, and Kai Kahele, in that order. Jason, you are up. Mr. Crow. Thank you, Mr. Chairman. And thank you all to the witnesses for joining us today. In the March 26 hearing entitled ``Lessons Learned from Winter Storm Uri,'' I asked about the MIRA Act, my Military Installation Resiliency Assuredness Act, which was included in the fiscal year 2020 NDAA and requires all major military installations to integrate into their master plan assessments of resiliency, climate effects, and extreme weather. To our knowledge, none of those assessments have been conducted by any major military installations during their planning process updates. At the hearing, I asked General Gabram when he expects the master plan updates relative to the MIRA Act to be provided to Congress. General Gabram told me that he would take it for the record and get back to me on that. We have not received any information from the Army or any service, so that taking for the record did not actually occur as promised. So, starting with the Army, when are we going to get that information? And can we expect it from every other service as well? Mr. Surash. Sir, we are very aware of--I believe it was an amendment that you personally sponsored, sir, and what it requires. I can assure you, we have rolled those requirements into the master planning process within the Army. I know we are working on this. I will you get you what our plan is looking like over the next couple years, sir. Mr. Crow. Thank you, and I appreciate that. I guess it is good to know that you are aware of it and you have rolled it into the process. What we were looking for was an update as to how many, if any, of those master plan updates have occurred. If the answer is zero, that is fine. I think we just want an answer. If it is one, if it is three, we just want some sense as to where are we in effectuating that requirement. Any of the other services have updates in that regard? Ms. Miller. Sir, so I can tell you, what we did in the Air Force is we did issue, last year, our guidance on that. And so it was done through ``Severe Weather and Climate Hazard Screening and Risk Assessment Playbook,'' which may sound fairly simple to issue the guidance, but it was a 40-page analysis that really provided good information for the installation planners on how we wanted them to assess. And it included the 16 risks, from hurricanes to fires, that we needed each installation to assess against and what criteria, mostly using our A3 weather office, would be the, kind of, authoritative source upon which they could rely. We did that initial screening for over 80 of our installations. And then what we have done with that now is start putting that into our installation development plans. So, within the next 5 years, now that everyone has done the initial assessment, that will roll into our installation development plans. As we have that information, though, it allows us to modify, as an example, the Tyndall rebuild and the Offutt floodplain rise, to modify based on the risk assessment, not only of what type of risk it would be, but then we also assess each as a yellow, green, red for the 0-25-year and then also the 25-50-year look. Mr. Crow. Thank you. That is very helpful. I appreciate that response. Mr. Schafer. And, sir, from the Department of the Navy, we have actually completed one of those at Indian Island. We are in the process of continuing to train our Navy Facilities Command engineers and others on how to do that. And those too will roll into our installation master plans over the next 5 years as they are updated. Mr. Crow. Thank you. Well, in the remaining minute here, I have a question about the DCAT, the Defense Climate Assessment Tool. I wanted views from the services, all of you, on how that process is going. I understand upwards of 1,300 of those have been used service- wide. I would love any thoughts on how it is working and whether any changes need to be made to make it a more effective, more efficient tool for all of you. Whoever wants to take that. Mr. Cramer. So let me start, and then I will transition over to the military departments. Yeah, this, actually--I am glad you brought it up, Congressman. So the DOD Climate Assessment Tool actually helps answer Congressman Wilson's question, too, about sea-level rise. So the DCAT is just a higher level assessment tool of the most vulnerable things for an installation. Obviously, on a coast, it could be sea-level rise. If you are in interior, much like Colorado, really, your issues are more like drought, desertification, those kinds of things. And the DCAT looks at it at a higher level, and it could go all the way down to a facilities-level look, which then informs those master plans, those installation energy plans as you go forward. So we view, in the DOD, the DCAT model in high regard, because it does provide that upper-level assessment based on the [inaudible] that we [inaudible]. And then we project out two iterations, one 2050 and then one 2085, and then you can then plan accordingly as you move into that. What comes out of the DCAT, then, would be those installation energy plans, those master plans. And then I will turn it over to my colleagues. Mr. Crow. Thank you. And I would love to hear more, but I am out of time. So, respectful of my other colleagues, I will yield back, Mr. Chairman. Thank you to all of you. Mr. Garamendi. Thank you, Mr. Crow. We may come back to this issue. There may be other folks who want to ask the same question. Mr. Green, you are nodding your head as though it is your turn, and it is. Go wherever you would like to with the questions. Dr. Green. Well, thank you, Mr. Chairman. And I am confident that that will be brought back up. I am going to focus on something different in this first round. And, Mr. Chairman, thank you and ranking member for having the witnesses here today. And I want to thank our witnesses for being here. Thanks, too, for your service to the country. As we seek to ensure that our military is prepared to face the challenges of the coming decades and this new sort of major-competitor paradigm that we are in, one of my primary concerns is that we are taking care of those warriors' needs when they are back at home station. It is a fundamental obligation with very far-reaching effects on retention and, thus, readiness. Unlike almost all of our competitors, America's military is an All-Volunteer Force. No one I served with or Jason served with or others on the committee here served with anyone who was forced to be there. They were all volunteers. And it imposes a challenge on our leadership, both in the military and in Congress. Our men and women in uniform are disciplined, they are hardworking, and that makes them excellent recruits for the private sector. If we want to maintain or retain talented, experienced service members, we have to take care of them. And one key aspect is making sure that base housing meets those needs, those individual needs. Base housing at my base, Fort Campbell, which is in my district, has some significant issues. Many facilities are over 50 years old. They are in poor condition--mold, mildew. I have visited many of them. Other damage has accumulated over the years. There are outdated barracks there that no longer suit the demands of the units that they house. And, in particular, the barracks for the 1st Brigade of the 101st Airborne Division--a very proud unit with a proud history at Fort Campbell. They are living in dilapidated, mold-filled-- they are continuously moving the soldiers out, getting the mold out, putting them back in, but the way that those structures are built and its age, it just comes back. I get pictures of those barracks texted to me every month, and it is upsetting. Our troops deserve better. And I will actually be at Fort Campbell tomorrow looking at it again. And it is in my view that that set of barracks for the 1st Brigade has got to be a priority. And, Mr. Surash, I would like to ask you, first, in general, to address restoration and modernization of the barracks and then, specifically, if you are aware of what is going on at Fort Campbell and the 1st Brigade and there is any plan to fix that. Mr. Surash. All right, sir. Thank you very much for that. So, as I mentioned in my statement, we are very focused on taking care of people and, among those things, our barracks. So, in fiscal year 2019 through 2021, overall in the Army, we invested $2.1 billion in barracks projects. A portion of that was military construction, and the larger portion was actually restoration and modernization. What is contained in the 2022 budget request, sir, is a total of $723 million. And that is broken out between, I think it is five barracks projects that are military construction in scope, that is $262 million, and then we have a number of restoration and modernization projects, over $460 million of projects. So, in the 4-year period 2019 through 2022, that is a total investment of $2.8 billion. Now, we know we need more. So the Chief of Staff of the Army is required to submit an unfunded list, and he chose to include 13 additional barracks, valued at over half a billion dollars, in his unfunded request along with the 2022 budget, sir. Dr. Green. Anything specific to the 1st Brigade of the 10lst? Mr. Surash. Congressman, on that, I do not know the details. But I will look into that and get back to you, sir. Dr. Green. Yeah. Please. You know, one of the things--and, you know, we do our best to be bipartisan on this committee, but, you know, I am looking at the spending elsewhere in this administration, a 16 percent increase in non-DOD spending. My colleagues on the other side of the aisle and in the other side of the building are talking about now another $3.4 trillion on, you know, infrastructure stuff and climate stuff. It doesn't seem like there are any barriers to spending money. And yet, overall, we've got a $4 billion real-dollar decrease in the Defense Department and we have soldiers living in barracks that are, you know, mildewed. And I want some assurances that this is going to be a priority in this administration over the next several years. Somebody, please tell me that this is going to be addressed. I mean, $460 million in projects and I think you said a couple billion over a few years is a drop in the bucket for the need. And in light of all of the other money that is being spent by this administration, I would like to see these soldiers taken care of. Mr. Surash. Congressman, I can speak on behalf of the Army. We are very focused on this. We would plan to invest approximately $10 billion over the next 10 years. And we are also at the initial stages of looking at, are there any policy changes that we can make that would maybe reduce that requirement, that would involve possibly some soldiers being able to live off-installation? Our installations are very different. You know, that might work in some installations. I don't believe it---- Dr. Green. Sure. And unit missions will probably drive that, too. I get that. I like that out-of-the-box thinking. I just--I need you guys clamoring to your boss, saying, ``We got to take care of these guys.'' If we are going to spend 16 percent increase elsewhere, let's at least take care of these warriors who are going to fight to defend us. And that is really on your shoulders, to go to your boss and make those demands. Mr. Chairman, I yield. Thank you. Mr. Garamendi. Thank you very much, Mr. Green. The recapture of the MILCON money that was sent to the border for border walls, that money is back in the Department of Defense now, at least a good portion of it. The question of how it is going to be used in the Department of Defense I don't believe has been answered in the current budget. We are going to look at that in detail, since a lot of that or most of that money was MILCON money. It may very well be that this---- Dr. Green. That would be good. Mr. Garamendi [continuing]. Issue of housing on base could be a use of that money. We will see. We are looking at it in detail. Mr. Green, you are interested. We will follow through-- -- Dr. Green. Thank you. Mr. Garamendi [continuing]. And see where it may be going. It seems to me, if MILCON is MILCON and housing is MILCON and barracks are MILCON, maybe. Okay? We will work on that. Dr. Green. Thank you, Mr. Chairman. Mr. Garamendi. Ah, let's see. Kai Kahele, you are on. Mr. Kahele. Aloha, Mr. Chairman. Thank you so much, and for our testifiers today. I am going to jump over to Hawaii's Second Congressional District and touch on UXOs [unexploded ordnance] and FUDS, formerly used defense sites. In particular, one, the Waikoloa Maneuver Area, covers approximately 220,000 acres on the northwest side of the island of Hawaii. This was an area used for extensive training and artillery practice during World War II. A portion of these lands fall under the Military Munitions Response Program. And, although munitions continue to be discovered and cleared today, while those numbers fluctuate, about 29,000 acres have still not been cleared to date--or have been cleared to date. Excuse me. The process from initial review to an actual cleanup award takes a very long time. There is additional frustration when a surface cleanup results in significant findings of UXO to warrant a subsurface cleanup, at least in areas where development or projects are planned. Extreme weather, including heavy rains and flooding, allows more UXOs to easily rise to the surface. After a surface sweep, however, surface and subsurface cleanups are currently conducted as a separate process. This makes little sense when UXO teams are already on site and can easily initiate a subsurface cleanup concurrently. So my question is for Mr. Surash and the Army. Can you shed some light on why surface and subsurface cleanups of UXOs are not allowed to be undertaken concurrently? And would it make sense to allow concurrent surface and subsurface cleanups as a time-critical removal action, especially if it is in the interest of public safety and if the lands are being used for redevelopment for a future project? Mr. Garamendi. Did we lose the Department of Defense here? They have gone blank on my screen. Mr. Kahele. Yep. I don't have them, Chair. Mr. Garamendi. Okay. I am going to get the gavel order. We are going to stop your clock at 3 minutes. Mr. Kahele. Okay. Mr. Garamendi. And we will see if we can get the Department of Defense back on. The gavel order going forward--hang on a second--will be Blake Moore, Strickland, and Luria. Wait a minute. I got this wrong. Moore, Luria, Speier. And that is corrected too. I am getting corrections one after the other. So hang on, folks. We will get it right. Okay. It is Blake Moore, Strickland, Luria, and Speier. Okay? Apparently, that is when all of you got on the screen. Normally this problem is a problem that is unique to me, and that is, I depend upon AT&T fixed wireless. If you have any other option, take it. And I will continue to badmouth AT&T fixed wireless until something is done about it, bringing us back to the infrastructure bill and rural broadband. Are you guys listening to my plea? Apparently not. Okay. We are going to stand by for a few moments. Grab your coffee or--Elaine doesn't have any questions? What is that about? Come on, Elaine. Okay. All right. We will see what is going on here. Dr. Green. I have to say, I can't believe Elaine isn't--no comments, Elaine? I actually sit with anticipation to hear you grill the Navy people. I love it. Mrs. Luria. I had an opportunity to speak to them at length this morning before the hearing, so I will cede that time to others. I got my questions answered. Dr. Green. Cheers. Mr. Garamendi. Oh, come on, share with us, Elaine. You don't get these private audiences without sharing the enthusiasm that Mr. Green has for your questions. I don't know if you are still recording all of this or not, but they can mute the recordings, and we will have a good discussion here. The Department of Defense has left the meeting. Yes, that is true. But my guess is they may be coming back on. Kai, I think you were talking about unexploded ordnances? Mr. Kahele. Yes, sir. Mr. Garamendi. My personal experience with this goes back to the 1990s, when we were trying to clean up another place in Hawaii---- Mr. Kahele. Yep. Mr. Garamendi [continuing]. And also at--let's see--and the Monterey Bay and a few other places. I was at the Department of Interior. And most of that land reverted back to the Department, and the military left the Department with a big burden. Fortunately, there was a good law that came along and said, no, no, you guys get to continue to be responsible. So we will see what happens here, Kai. Mr. Kahele. Okay. No worries. Mr. Garamendi. We shall see. Dr. Green. We should take this moment--Chairman, we should take this moment to let you know that the Army, Navy, Air Force, Marine Congressmen have all got a bet, and we all have to wear the winner of the Commander-in-Chief's Trophy's tie or scarf or brooch at the State of the Union this year. Mr. Garamendi. When do we find out what the attire is? Ms. Miller. Congressman, are you able to hear us through the microphone? Mr. Garamendi. Yeah, we got you back. We are just kind of talking about things that are important, like the Commander's Trophy. Kai, you are on. Do you want to finish up on your munitions issue? Mr. Kahele. Yeah, you bet. So my question--I don't know where I cut off---- Ms. Miller. Wait. We have no audio. I don't know if you can hear us. We have no audio here, but we can see your video. So they are still trying to connect us. Mr. Garamendi. Well, then, please stand by. We do have your video. We've got your video. You don't have our audio. We've got video and audio from the Department. Okay. Ms. Miller. Ah, there we go. We can hear you, sir. Mr. Cramer. Can you hear us? Mr. Garamendi. Very good then. We were talking--Kai Kahele had the floor, and he was talking about unexploded ordnances on the island of Hawaii. Kai, would you like to go forward? You've got 3 full minutes. Mr. Kahele. Okay. Great. Yeah, I don't know where I left off, but my question was for the Army and Mr. Surash. And I was asking a question about shedding light on why surface and subsurface cleanup of UXOs are not allowed to be undertaken concurrently, and would it make more sense to allow those surface and subsurface cleanups to be concurrently as time- critical removal actions, especially in the interest of public safety and if the lands are being utilized for redevelopment. Mr. Surash. Congressman, can you hear me okay? Mr. Kahele. Yes, sir. Mr. Surash. Yes, sir. I totally agree with your statement. And I was able to check on this, and, sir, it is my understanding that, starting about 2 years ago, we actually moved to a process that allows concurrent surface and subsurface cleanup, you know, at the Waikoloa, you know, site that you mentioned. So I just want to assure you that we are prioritizing the work with respect to the priorities of the landowners and the planned redevelopment plans to our very best, sir. Mr. Kahele. Okay. Great. Let me jump over to the Air Force. Ms. Miller, for Bellows Air Force Base over in Waimanalo, there's been--the Waimanalo Bay Recreation Area is there. A big issue in the community is UXO fencing that have gone up. You know, fencing is cheaper than the cleanup, but this, you know, cuts off the community from traditional fishing grounds and things of that nature. And so I don't know how much you know about this. I don't expect you to know too much about it. But I would love to get your commitment to work together with myself and the community members on finding a path for UXO cleanup at Bellows Air Force Station and, you know, maybe get some updates from you on the issue. Ms. Miller. Yes, Congressman. I was actually out there on Fourth of July and saw the beautiful area. I spent my family vacation out there on Bellows and know exactly the area you are talking about. So I asked my team to look into this a little bit. I know we just, I think 2 months ago, had the Restoration Advisory Board that--we have looked at four COAs [courses of action]. And the initial COA that we proposed was to fence it off because of the cost associated with that. I understand the community's concerns, and I know we have received public input and are now taking comments, working with the State. So we will continue to do that. That is only a couple months old, understanding that the Air Force's chosen COA doesn't really support the needs of the community. So tracking that, and we will continue to work that. And I will follow up with your office as soon as we have an update on whether or not we can pursue another COA. Mr. Kahele. Okay. Great. I have 22 seconds left, so let me jump to the Navy. Mr. Schafer, UXO is starting to be discovered off the waters of Lanai. I know there was unexploded ordnance off of Molokini. Do you have any status updates on this UXOs risk assessment on the island of Lanai and also working together with myself and the local community on it? Mr. Schafer. Sir, I do not. I will have to take that for the record and get back to you. [The information referred to was not available at the time of printing.] Mr. Kahele. Okay. All right. And thank you so much. And thank you, Chair. Sorry about the technical difficulties. Mr. Garamendi. Yeah, we are not blaming you on it. It is not your problem, Kai. Mr. Kahele. All right. Mr. Cramer. It was ours. Mr. Garamendi. There you go. The order going forward: Moore, Strickland, Speier. Luria has left. So Blake Moore. Mr. Moore. It's not my fault either. But if it's going to somebody's, it's gonna be Kai's. So, we'll go with that. Mr. Garamendi. It's always the chairman's fault. Mr. Moore. Yeah. Thank you, everyone. Thank you, Chairman. Thank you for being here. I was pleased to see the robust increase in the fiscal year 2022 MILCON budget. However, significant backlog of MILCON requirements means that many projects may never receive funding due to competing needs. It is a reality that I think all of us on this hearing can recognize and we will all face it. I have seen firsthand the impact of deferred funding in facility and infrastructure investments at Hill Air Force Base in my district of Utah 1. Hill currently has a grouping of 66 buildings, known as the 1200-series buildings, that aren't fit to house the 4,000 DOD personnel found working in them. They were constructed over 80 years ago, initially built as ammunition warehouse space during World War II. Over the years, these buildings have been modified to house administrative functions and are in complete disrepair. These buildings not only lead to poor working conditions but have contributed to recruiting challenges for programs at Hill, like GBSD [Ground Based Strategic Deterrent] and other really high-profile, awesome projects that Hill gets to work on, but this has been a thorn in their side. This is something that was brought up to me during the campaign, even. I was aware of this well before I even was in this role. This 1200 series is a significant issue. The DOD urgently needs to find a way to replace these facilities. A recent economic analysis indicated a potential savings of $400 million over 20 years if these facilities were demolished and replaced. The replacement of these facilities through MILCON would cost nearly $750 but realistically cannot compete with limited MILCON funding. That is where I bring in the reality and where I am sincerely hoping--and I will continue to push on this particular topic of, there are solutions, and they are based in our local economies and our local stakeholders wanting to engage. I am proposing a provision in this year's NDAA that would expand the definition of ``installation support services'' in title 10, section 2679, that allows local government to construct, manage, and operate a facility on or near a military installation for a period of up to 10 years. Unfortunately, we have run into a scoring implication that has stymied this simple solution. This scoring issue is in the Congressional Budget Office. It considers such lease agreements--I won't get into the details of it, but it is a scoring implication, when there is broader embrace from the local governments to help out in this regard. So my question for Ms. Miller is, can you commit to examining innovative financing options and working with OMB [U.S. Office of Management and Budget] to facilitate local communities' desire to assist bases with their infrastructure and military construction needs? Ms. Miller. Congressman, yes, I would love to help tackle some of the scoring issues and have argued, where it makes financial sense, understanding that we will continue to be scored to the extent that we have a long-term responsibility for the project funding. I know we have implemented some creative solutions at Hill, and, in fact, the building--I worked on the Hill EUL [enhanced use lease] that has been really successful out there, a huge EUL. We continue to take--I think we are on site development lease nine now, and working with MIDA [Military Installation Development Authority], which you guys have been probably the leader, of any of the States, in that organization and the support that you have been able to provide. I think some other creative financing, besides the enhanced use lease and continuing to use the revenue for that for demolition, are things like intergovernmental support agreements [IGSA], potentially extending the duration of those beyond the existing 10-year statutory authority to allow us to enter into sole-source, non-FAR [Federal Acquisition Regulation] service contracts with the local State and community. But our MILCON budget is tight. You know, we spend a third on COCOM [combatant command] requirements, a third on new- mission MILCON, and then we have less than 20 percent left for the entirety of all of our existing infrastructure. Hill is getting one project, though, as part of the B-21 in our fiscal year 2022, so that is good news. But, yes, we will commit to continuing to work to tackle some of the scoring issues. Mr. Moore. And if my opening wasn't convincing enough, like, I am willing to dig into the details--our team, full disposal of our military legislative aide. We are all in on this. The community is amazing in Utah, and we want to embrace as much as possible. So I will just reiterate that here. And then, as we continue to work together, we would love to find solutions. There is a lot of options there. And, again, I recognize the reality, so I am never--I am not one to come out and ask--you know, just recognizing those realities and trying to find solutions. The other question that I have--you already started talking about it--was just, what other types of, you know, options might there be, doing things at a cheaper cost and accelerated timeline? I will pause there if you don't have anything else in response to that. I think my clock actually started a little bit late, and so I will gladly yield back some of my time. But if there are any other suggestions or financing options, I am open to hear it right now. Ms. Miller. Sir, from the Air Force perspective, no, I think it is leveraging--so the MIDA unique opportunity with the tax increment financing that they were able to do and may be able to do up at Park City, Deer Valley, that is State-specific legislation, which we very much appreciated. From a Federal standpoint, other than extending the IGSA authority, the scoring would be great to get after, but I don't know that that can be addressed by statute, maybe by persuasion. So, happy to partner with you on that. But I have no other creative solutions, sir. Mr. Cramer. You've got scoring on both ends, CBO and OMB Circular A-11. So a lot of folks have worked that, and we will continue to also work it from the Department. Mr. Moore. Yes. And I appreciate your mention of EUL. It is a value proposition. It is a solid option that others could adopt as well. So, if anybody ever wants to learn--she already mentioned Deer Valley. So anybody on the committee is welcome to come to Deer Valley. I will gladly accept a CODEL to my district and would be a gracious host. So thank you for those comments. Chairman, I will yield back. Mr. Garamendi. Thank you, Mr. Moore. You raised the scoring issue. This is a problem in most everything we do. And, frankly, the scoring, as you have described your particular problem, is found in everything in the government. And we really need to address it. It seems to me very foolish and very unwise, prohibiting us to take advantage of many of the private partnerships that are out there, some of which you mentioned. And so I will look forward to working with you on that, and I suspect there are others on this who find the same. And, I don't know, maybe one or two of the folks at the table have an answer on how we can get past that scoring problem. Okay. Let's see. We now have Ms. Strickland, followed by Ms. Speier. Ms. Strickland. Thank you, Mr. Chair. And thank you to our witnesses today. I will have three lines of questioning: first around housing, the second one about the unique role of Joint Base Lewis-McChord that I represent, and then earthquake resiliency. So I have the privilege of representing Joint Base Lewis- McChord, or JBLM, as we call it, and its 40,000 service members call it home. JBLM is the Army's only power [inaudible] Department continues to focus on the Indo-Pacific. Our Air Force personnel perform strategic vital airlift missions and are the only wing tasked with prime nuclear airlift mission. One of the issues I hear about consistently, both on post and off post, is housing. We have a housing supply crisis here in the greater metropolitan region. And the South Sound that I represent is about 30 miles south of Seattle. Between 2010 and 2019, for example, over 180,000 households moved into my district, compared to 54,000 the decade prior. So housing affordability is a major issue, both on and off post. And currently, on post, there are 776 households on a waiting list at JBLM, while 70 percent of those who serve live off post. And so it is my understanding that even if all the houses on JBLM were fully renovated, there would still be a significant waiting list. So housing access is a huge readiness issue. It affects families, and we know it has to be addressed. So, Mr. Surash, what can the Department do to address the housing shortage on JBLM, given the high demand for it? And what do you think we in Congress can do to help alleviate some of those issues? Mr. Surash. Congresswoman, thank you very much for that question. So I am aware of plans by the privatized, you know, housing provider there, which I believe is Lincoln at the moment. Ms. Strickland. Yep. Mr. Surash. So there is a plan to renovate about--over the next 5 years, between now and 2025, to renovate just under 600 homes, you know, major renovations, and another 500 with minor renovations. I will get back to you to see if there are any other plans involving adding new homes, you know, from this point on. There have been homes, I believe, added, you know, since the deal was put in place. But I will get back to you on any plans to add additional housing going forward. [The information referred to can be found in the Appendix on page 115.] Ms. Strickland. Great. Thank you for that. And please include metrics about how you measure what is an acceptable time for a family to find housing. I will move on to the next question, and this is for Ms. Miller. Our testing and research and development facilities do significant work, but, unfortunately, they are underresourced and underfunded. Can you tell me how the Air Force can maintain our innovative edge when we chronically underfund testing, research, and development facilities, including the Precision Measurement Equipment Labs? Ms. Miller. Yes, ma'am. So I visited JBLM and met with the wing commander and toured, I think, the exact facility that you are talking about. So, as a joint base, we work prioritization of the military construction on that base through the Army and identify the prioritization of that through the Army. But I am not trying to throw the ball at the Army here, because we are all facing the same challenges with the prioritization being on modernization, new-mission MILCON, and the combatant command support. So I can't speak to where within the Army prioritization that particular facility is, but we are tracking in the Air Force the importance of it. Even where we have a joint base, I think we are effectively implementing our joint base agreements and effectively communicating with the local commander. When we had the big--I don't even--culvert, the gigantic culvert, up on the airfield there, we really appreciated the Army's support in getting after and prioritizing the improvement of that facility. I think that is a good example of the joint base working like it should with the Army prioritizing a key Air Force issue. Ms. Strickland. And I have a very brief question that you can answer offline with my staff. But, in March, General Gabram said that 60 percent of the buildings at JBLM are not up to code for earthquake, which is a big concern. So I will take that answer offline with my staff, but thank you very much for being here today. And I will yield my time. Mr. Garamendi. Ms. Strickland, earlier in this hearing, we spoke extensively about risks at every base. And every base has a different set of risks, and you certainly have your share of them there. If I recall, back in the day, there was talk about, what if your little mountain to the east were to have a serious mudslide? What would that mean to your community and to the base? The answer is not good. So there are many, many different risks. Please continue to pursue these issues. Now we go to Ms. Speier. And then we will start a second round. So, if you wanted to have a second round, please let the staff know. Jackie, your turn. Ms. Speier. Thank you. Can you--for some reason, my video has gone. Can you hear me? Mr. Garamendi. Yes, we can. Ms. Speier. All right. Thank you, Mr. Chairman. Thank you all for being here. I must say that there is great frustration by members on both the Republican and Democratic side in this hearing about the inability, for whatever reasons, for the military to beef up barracks, housing, and childcare. Mr. Surash, let me start with you. The Army announced with a great deal of fanfare its $10 billion, 10-year plan to bring all the barracks up to a good condition. But in the budget for this year, you are only requesting $260 million. So, you know, there is a lot of talk, but the walk isn't there. So, at $260 million a year, you are never going to meet that 10-year, $10 billion. And, meanwhile, many of these barracks are really unacceptable. When we were at Fort Hood, a number of my colleagues on the CODEL who have served in the military said they had never been in barracks that were as bad as some of those. So why didn't you request more funds for barracks? Mr. Surash. Congresswoman, thank you for that question. So, between 2019 and 2021, ma'am, we invested $2.1 billion in barracks for both military construction as well as restoration and modernization. You are totally accurate on the military construction request in 2022 for $262 [million], but there is another $461 [million] in restoration and modernization projects for barracks. So that will give us a total of about $720 million in 2022. And then, if we were to add up 2019 through 2022, that is $2.8 billion. We know we need more, and the Chief of Staff of the Army chose to include 13 barracks projects on his unfunded requirements list. That totals a little bit over a half a billion dollars. And I believe there were 2--2 of those 13 projects on the unfunded list were specifically at Hood, ma'am. Ms. Speier. So are you still committed to $10 billion over 10 years? Mr. Surash. We do have that plan, and we will do our best to properly resource it. We are also taking a look at other things we can do to possibly reduce the overall requirement. But we are---- Ms. Speier. All right. Mr. Surash [continuing]. On that plan. Ms. Speier. I think what you are hearing from all of us, though, is: We want action. The talk is just talk. Let me move to Ms. Miller and the Air Force. You have identified more than 70 childcare development centers in poor or failing condition, yet the Air Force only requested funds for one child development center in fiscal year 2022. Why is this not more of a priority? We have 9,000 families that have their children on waiting lists throughout the military. And if you can identify poor and failing facilities but then only fund one, we've got a problem. So why is there not a higher priority for this? Ms. Miller. Yes, ma'am. So we do have in the Air Force 222 child development centers [CDCs] and school-age centers. Of those, only one on the Building Condition Index was poor or red, and that one has a $3.6 million renovation pending. For the other ones, we have amber, which is still acceptable, it could use improvement, for 144, and then 74 that are green. So, of those, I acknowledge that we have not historically funded CDCs at the level that we ought to. So we stood up a working group in 2020 and had the master plan, much like the Army, and then provided a memo where we were looking what is the prioritized list and what are those projects. You are correct that we only have one MILCON project for a CDC on our primary fiscal year 2022 budget, but that we have five total that are ready for fiscal year 2022 execution, with four of those on our unfunded priority list. So, as mentioned, we have very few--you know, less than 20 percent of our MILCON funds go to existing projects, but, of those, we are prioritizing the very next items that weren't funded as hopefully getting funded with those CDCs. And then we are also addressing this with---- Ms. Speier. Ms. Miller, excuse me a moment. What is your waiting list in the Air Force right now? Ms. Miller. We have 5,100 families--5,116 kids that had unmet childcare needs. Ms. Speier. All right. And what is the wait time? Ms. Miller. The average wait time was a 151-day wait. Ms. Speier. Okay. We have heard horror stories of over a year. But with 5,100 unmet, you can see that we have got to make this a higher priority. Answer for me, what is meant by a poor- or failing- condition childcare center? Ms. Miller. So we do a Building Condition Index, ma'am, that assesses the physical infrastructure requirements. So anytime there is a life, health, or safety issue, those are identified immediately; none of those go unresolved. This is where we anticipate that, without investment--and so a red is a facility that requires significant investment over the next couple of years or it is going to result in a failed facility. So these aren't failed facilities. These are poor, requiring investment. So that one facility, as mentioned, has the major renovation planning, with the funding lined up for that. The other ones that are yellow, though, those do deserve our attention. Right now, we have 144 of those, so that is where-- -- Ms. Speier. All right. Ms. Miller [continuing]. We are working with the prioritization to put---- Ms. Speier. Excuse me, Ms. Miller. I would like for you to provide the committee and me personally with a list of all of those that are red or yellow---- Ms. Miller. Yes, ma'am. Ms. Speier [continuing]. And at what bases they are located and, also, the definition for ``poor'' or ``failing'' and what comes under that, if you would. All right? Ms. Miller. Yes, ma'am. Ms. Speier. Thank you. Mr. Chairman, I don't know how much time I have left, since I can't see the screen. I have one more question on PFAS, if that is possible. Mr. Garamendi. Well, Ms. Speier, as chairman of the Personnel Committee, why don't you go ahead and take some of your own time here. You are actually 32 seconds over, but we are going to cut you a wide swath. Ms. Speier. All right. Thank you. I will just ask one question. My understanding is that NATO [North Atlantic Treaty Organization] and some of our civilian European airports are phasing out fluorinated firefighting foam. Why hasn't the Department taken steps to replace AFFF [aqueous film forming foam] with non-fluorinated formulations? I guess this would be for the Department. Mr. Cramer. So, Congresswoman, this is Paul Cramer, in case you can't see me. So we are making--we have made some significant strides in finding a replacement for the fluorinated AFFF, and so we are cautiously optimistic we will meet the timeline. In fact, we have done some very robust testing on alternatives that will be a drop-in replacement using the existing apparatus, and that helps us meet the 2024 timeline. With respect to the question about NATO and Europe, the formation they use to replace AFFF in their apparatus caused them to replace the whole apparatus. The viscosity of the agent was much different than they had to do before. So it added significant cost, where we have taken the approach where we are going to control the use of AFFF, capture that so it no longer gets into the groundwater, and then find an alternative that will [inaudible] drop into the existing apparatus and then save taxpayers a lot of dollars. And so we have at least four or five formations that are fluorine-free that will drop into existing apparatus, and those have now moved from the testing to put out the fire. They have all not met our current MILDEP [Military Department] standards, but they have achieved an acceptable standard to put out a fuel-based fire that our Fire Advisory Board is somewhat comfortable with that. So we have now moved into the stage where we are testing those new formations for ECOTOX [environmental toxicity]. In essence, you know, we want to make sure that our replacement chemical isn't any more toxic than the current one we use. In fact, what we don't want to do is create another environmental hazard, you know, decades down the road, so we want to have one that is actually better than the formation we are using today. And that is the stage we are at now, is to go through that testing. So we are cautiously optimistic that we will have a formation, fluorine-free, drop-in replacement into the existing apparatus, by the timeline that we have been asked to meet. Over. Ms. Speier. Thank you. Mr. Garamendi. Jackie, thank you for the question. A very good one, and a good answer for all of us. I believe it is now my turn for a second round. I am going to go very quickly here. In the testimony that all of you have provided, you have talked about the resiliency and various steps that you are taking to understand the threats that exist in your area. In response to Mr. Wilson and his request for maps of the sea- level rise and flooding in South Carolina, similar information is available on various bases. What I would like to offer to the committee and ask of the witnesses here is a briefing sometime during the month of September in which those maps and information would be available to the committee members, the subcommittee as well as the full committee, so that we might all become aware of the threat that you need to meet in your resiliency requirements. So if you would take a look at that at the Department, think about how you might best inform us of these threats that exist out there. Ms. Strickland is interested in earthquakes, and I think the rest of us have our own backyard to care for. We will do that. I offer that to the committee. We will make that available, with perhaps a week or two heads-up so that you can be there. And we will do that informally as a briefing. And nice of my staff to know about this ahead of time so that they now have 2\1/2\ months to get it done and for the Department to prepare the maps and prepare the briefings for us. So we want to go over resiliency, and thank you---- Mr. Cramer. Mr. Chairman, if you don't mind, along that line, so DCAT is a web-based system, so we can actually go through the DCAT model for each one of the installations, and the members--as opposed to printing maps, we could actually do, you know, an interactive discussion with them using the DCAT model. And we will take that on and schedule it accordingly. Mr. Garamendi. Well, bring your big screen. Mr. Cramer. Yes. Mr. Garamendi. I would like to do this for all of us, so that all of us become aware of the extent of the problem. And then I am quite certain that Mr. [Moore] and others, Kahele and others, want to drill down and talk about meter by meter or inch by inch, as they should. So let's put that together. Let's look at September to put that together. Mr. Cramer. Will do. Mr. Garamendi. Okay. I am going to let my questions go at that point. We will go back through this. Mr. Wilson, you would be next. Mr. Wilson. Thank you, Mr. Chairman. And, indeed, I look forward to the hearings in September or whenever, because I just have such an interest in working for the benefit of all. So, hey, thank you, Mr. Chairman, for having this, and just keep us informed. Thank you. I yield back. Mr. Garamendi. Thank you. I think the next would be Mr. Kahele--Mr. Green--excuse me. Mr. Kahele and then Mr. Green. Unmute, Kai. Mr. Kahele. Oh, sorry, sir. I am here. Okay. My next question is directed to OSD, and it has to do--you mentioned climate change and sea-level rise. And my question is specific to the Runit Dome, the lagoon in the center of the atoll in the Republic of the Marshall Islands [RMI]. As you all know, this is an area where we did extensive nuclear testing back in the 1950s and 1960s. There is U.S. nuclear bomb waste that is there. The threat of sea-level rise due to climate change poses a very real threat to the entire country and the surrounding region. The potential of leakage of nuclear bomb waste due to seepage through the sand base under the dome has generated concern from the highest levels. President Biden recognized this extraordinary threat of climate change to the RMI in a March 25th letter to President Kabua, in which he stated that the RMI is especially vulnerable to climate impacts among the world's nations. So I will jump to my question. Is the Pentagon and Secretary Austin similarly committed to addressing the threat of climate change at former U.S. nuclear testing sites? And can you also comment on the DOD's commitment to supporting our Freely Associated States, those allies in the Pacific, including the Republic of the Marshall Islands? Mr. Cramer. So, Congressman, I am not familiar with the specific topic, but I will gladly take it back. But to answer your question, is the Secretary of Defense committed to climate change, the answer is yes. And he is also committed to the President of the United States. So we will honor those commitments within the existing laws and agreements within the Marshall Islands. I have been there myself, and it is a pristine area. So I will have my staff look into this and get on your schedule and come and meet with you and give you a proper response. Mr. Kahele. Okay. Great. Well, then I will use the balance of my time just to educate on the subject. So the United States detonated 67 bombs, nuclear bombs, over 12 years, with a force equal in radiation to 1.6 of the Hiroshima bombs that were detonated in Hiroshima. The dome, the Runit Dome, which was built in the 1970s, contains more than 3.1 million cubic feet of radioactively contaminated soil and debris that were dumped into a nuclear bomb test crater on the north end of Runit Island, and this is covered by a concrete dome. And part of the threat is that, with rising sea levels, there could potentially be leakage from under the dome, which threatens the population area and the Pacific, of course, affecting fish stocks and coral reefs. It is my understanding in previous NDAAs required the Department of Energy to conduct a study, but that report, delivered by the Trump administration in June 2020, did not adequately respond to Congress' concerns. The report concluded that the contents within the dome are not expected to have an adverse impact on the environment in the coming years. And so, if you would, sir, take a look at this particular issue out in the Republic of the Marshall Islands. It is very important. The compact agreement that we have with the Republic of the Marshall Islands expires in 2023. Those negotiations are happening now. But, you know, Kwajalein, you know, the importance of the Marshall Islands in the Pacific Deterrence Initiative, you know, those agreements that we have and the compact agreements we have with the Marshallese community is going to be really important. You know, China is in the area. We know that. And we want to make sure that we maintain our competitive edge, especially as it relates to our missile defense testing and those types of systems we have out at Kwaj. And this Runit Dome is something that, when you get a chance, please take a look at it. I would love to work together with you on it, and appreciate your attention to it. Mr. Cramer. Will do. Mr. Kahele. Thank you, sir. And I will yield back 18 seconds of my time. Mr. Garamendi. We will put that in your list of opportunities for the future, Kai. Thank you for bringing the Pacific, all the Pacific, to our attention. Mr. Kahele. Okay. Mr. Garamendi. We now turn to Mr. Green and the 101st Division. Mr. Green, are you still with us? Mr. Green. We will now turn to Mr. Blake--Blake Moore. You are up. Mr. Moore. No, thank you. I am doing another markup at the moment anyway, so thank you. Mr. Garamendi. I am not quite sure I understood that. Blake Moore, if you want to come on, I think Mr. Green is busy with another piece of work. Blake, do you want to come on? Mr. Moore. Sorry. Could you repeat that, Chairman? Mr. Garamendi. It is your turn, Blake Moore. Mr. Moore. Yeah, I will forgo any more questioning. Thank you. I am in the middle of another markup meeting at the time. Thank you all for being here. Mr. Garamendi. Okay. Very good. Thank you for your participation. I believe we have run through all the members. Is that the case? I think we have gone through all of this. I want to end this with a big thank you to the four witnesses, not only for what you have done today in informing us but really for your careers. All of you are career civil servants. Through the years, you have gathered incredible knowledge, not only about your current job but about a variety of tasks that you have undertaken. And you have served this Nation very well, and I know you will continue to do that. As the political appointees are eventually put in place, you will provide them with the knowledge and information and the history that you carry with you. And so, for all of you, thank you. I look forward to working with you in the days ahead. We have some significant challenges, many of which we have talked about today but many more that are on the agenda but not yet discussed. So, with that, I will call this hearing to adjourn, and thank you all. [Whereupon, at 5:47 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X July 14, 2021 ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD July 14, 2021 ======================================================================= [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] ======================================================================= WITNESS RESPONSES TO QUESTIONS ASKED DURING THE HEARING July 14, 2021 ======================================================================= RESPONSE TO QUESTION SUBMITTED BY MR. LAMBORN Ms. Miller. The USSF is currently utilizing the Defense Readiness Reporting System (DRRS) to report readiness, with adjustments in work to make it a better readiness tool for space forces The USAF Air Expeditionary Task Force (AETF) model within DRRS does not sufficiently portray readiness of Employed-in-Place (EiP) USSF forces USSF is in the process of defining and implementing a new USSF force presentation model that will enable more robust DRRS utilization and readiness reporting The standup of the USSF required changes to the Unit Identification Codes (UIC) for the new Service that current DRRS tools do not accept (requires manual workaround) USSF is investing in Space Force specific DRRS input tools to account for the new UIC nomenclature and to enable timely and accurate readiness reporting [See page 13.] ______ RESPONSE TO QUESTION SUBMITTED BY MS. STRICKLAND Mr. Surash. In February, almost 700 of the privatized homes at JBLM were unavailable for occupancy due to a significant between-occupancy maintenance backlog that resulted from labor shortages in the Fort Lewis area. The Army approved the Military Housing Privatization Initiative (MHPI) housing project at JBLM to use $7M in project Reinvestment Account funds to bring on additional, dedicated contractor firms to accelerate between occupancy maintenance of vacant quarters during the current Permanent Change of Station (PCS) season. The Amy Material Command (AMC) and Army Installation Management Command (IMCOM) are closely monitoring the MHPI housing project's progress towards the goal of reducing the vacant quarters backlog to less than 100 by September 2021. In addition, the MHPI hotel at JBLM that is part of Army's Privatization of Army Lodging (PAL) program is offering soldiers the option to remain in the hotel at a room rate equal to their Basic Allowance for Housing (BAH) rate, pending permanent assignment to on or off-post housing. [See page 27.] ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING July 14, 2021 ======================================================================= QUESTIONS SUBMITTED BY MR. WILSON Mr. Wilson. Microreactors not greater than 50 MW in size offer the opportunity for significant national security benefits to DOD. Microreactors could power critical facilities in island mode separate from the commercial electric grid, and could operate for several years without need to shut down for refueling, with the ability to protect against cyber threats and natural phenomena. Some advanced reactor designs have demonstrated unlimited coping time in the event of a blackout or other emergency, and can provide black start capabilities. Please explain how DOD views mobile vs. stationary NRC licensed reactors for potential application at DOD facilities. Mr. Cramer. The Department seeks to use innovative technology to improve energy resilience against all hazards, to include the effects of climate change. Stationary Nuclear Regulatory Commission (NRC)- licensed microreactors are an option for permanent DOD installations within the United States and its territories, especially those in remote locations, to enhance energy security and energy resilience. In coordination with DOE, DOD is pursuing the demonstration of a stationary NRC-licensed reactor at a permanent installation in the continental United States as a pilot program to validate microreactor technology and determine the viability of microreactors for future energy resilience efforts. If the demonstration is successful, DOD could pursue additional projects similar to the pilot initiative at suitable locations in the future, incorporating lessons learned from the pilot. To provide increased operational capabilities and energy resiliency in strategic and operational support areas, the Strategic Capabilities Office, within the Office of Secretary of Defense, is pursuing the design and development of a working prototype under their program, Project Pele. Currently there are two vendors in a design competition, for which final designs will be due in March 2022, with a potential prototype construction and initial operation by Spring, 2024. Mr. Wilson. Executive Order 13972, ``Promoting Small Modular Reactors for National Defense and Space Exploration,'' signed January 5, 2021, requires that DOD ``implement a plan to demonstrate the energy flexibility capability and cost effectiveness of a Nuclear Regulatory Commission licensed microreactor at a domestic military installation.'' Please provide a status update on this report. If the report is complete, please provide a copy of the report. Mr. Cramer. DOD has prepared a draft Demonstration Plan to meet the requirements of Executive Order 13972 and is currently coordinating this plan among various Department stakeholders. Mr. Wilson. Executive Order 13972, ``Promoting Small Modular Reactors for National Defense and Space Exploration,'' signed January 5, 2021, requires that DOD ``implement a plan to demonstrate the energy flexibility capability and cost effectiveness of a Nuclear Regulatory Commission licensed microreactor at a domestic military installation.'' Please provide a status update on this report. If the report is complete, please provide a copy of the report. Mr. Schafer. [No answer was available at the time of printing.] Mr. Wilson. Executive Order 13972, ``Promoting Small Modular Reactors for National Defense and Space Exploration,'' signed January 5, 2021, requires that DOD ``implement a plan to demonstrate the energy flexibility capability and cost effectiveness of a Nuclear Regulatory Commission licensed microreactor at a domestic military installation.'' Please provide a status update on this report. If the report is complete, please provide a copy of the report. Ms. Miller. The report in question is under development by the Office of the Secretary of Defense (OSD). While the Department of the Air Force did provide inputs, OSD will need to provide the up-to-date status of the report. ______ QUESTIONS SUBMITTED BY MR. SCOTT Mr. Scott. Does the National Guard have access to the same authorities and funding source for environmental clean up as the rest of DOD installations? What are the risks to the cleanup program when they don't have access to the same authorities and funding source? Mr. Cramer. State-owned or -operated National Guard facilities have the same DOD authorities and funding source for environmental cleanup to address PFOS and PFOA, as well as what DOD considers the first two investigation phases (e.g., preliminary assessment (PA) and site investigation (SI)) under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA, aka Superfund). The Defense Environment Restoration Program (DERP) law provides DOD the authority to perform and fund its environmental restoration responsibilities arising under CERCLA. CERCLA responsibility (i.e., liability) extends to, among others, the owner and operator of the facility. DOD reemphasized in FY18 that the use of DOD environmental restoration funds does not extend to releases that occurred at State- owned, State-controlled, and State-operated National Guard facilities. However, Congress amended DERP in FY20 and FY21 to allow the use of DERP funds for PFOS and PFOA cleanups at National Guard facilities. Where National Guard facilities are ineligible for these DERP funds, they are eligible for other federal funds (i.e., Army and Air Force National Guard Operation and Maintenance appropriations) for environmental cleanup actions to address contaminants at state-owned or operated National Guard facilities. The National Guard works with the Army or Air Force, as applicable, to receive federal funds for cleanup actions, and have been doing this for over 30 years. Because the National Guard must conduct its cleanups in accordance with CERCLA, and federal funds are used for these cleanups (regardless of whether they are DERP or federal O&M funds), there are no identified risks. Mr. Scott. Why were National Guard restoration sites pulled out of the Defense Environmental Restoration Program under an OSD policy in FY18 when they were successfully cleaning up sites under the Defense Environmental Restoration Program for over 30 years? Mr. Cramer. State owned or operated National Guard facilities have the same DOD authorities and funding source for environmental cleanup to address PFOS and PFOA, as well as what DOD considers the f irst two investigation phases (e.g., preliminary assessment (PA) and site investigation (SI)) under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA, aka Superfund). The Defense Environment Restoration Program (DERP) law provides DOD the authority to perform and fund its environmental restoration responsibilities arising under CERCLA. CERCLA responsibility (i.e., liability) extends to, among others, the owner and operator of the facility. DOD reemphasized in FY18 that the use of DOD environmental restoration funds does not extend to releases that occurred at State- owned, State-controlled, and State-operated National Guard facilities. However, Congress amended DERP in FY20 and FY21 to allow the use of DERP funds for PFOS and PFOA cleanups at National Guard facilities. Additionally, federal funds (i.e., Army and Air Force National Guard Operation and Maintenance appropriations) have been used for over 30 years for environmental cleanup actions to address contaminants at state-owned or operated National Guard facilities. Mr. Scott. When National Guard installations are not eligible for the Defense Environmental Restoration Program, what do they have to do to be eligible and how long does it take? Mr. Cramer. State-owned or -operated National Guard facilities are eligible for Defense Environment Restoration Program (DERP) funds to address PFOS and PFOA, what DOD considers the first two investigation phases (e.g., preliminary assessment (PA) and site investigation (SI)) phases under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA, aka Superfund). Where National Guard facilities are ineligible for these DERP funds, they are eligible for other federal funds (i.e., Army and Air Force National Guard Operation and Maintenance appropriations) for environmental cleanup actions to address contaminants at State-owned or -operated National Guard facilities. The National Guard works with the Army or Air Force, as applicable, to receive federal funds for cleanup actions, and have been doing this for over 30 years. Mr. Scott. The FY20 NDAA authorized National Guard PFOS/PFOA sites to be moved into DERP. Have all of the sites been transferred? If not, why? Mr. Cramer. DOD already uses DERA to fund its initial investigations under CERCLA (i.e., preliminary assessment/site inspection) at Guard sites. The FY20 NDAA allowed DERA to be used to address later phases in the CERCLA process for PFOA and PFOA. DOD issued guidance on September 29, 2020 for the transfer of eligible National Guard PFOS/PFOA sites into DERP. The only requirement is for the Deputy Assistant Secretary of the Army or Air Force, as applicable, to provide the Deputy Secretary of Defense for Environment and Energy Resilience a list of eligible sites that will be moving to DERP. As of the end of July 2021, DOD has only received this notification for a small number of sites. Mr. Scott. What steps has DOD taken to proactively engage with technical experts and industry to address any concerns about the use of variable refrigerant flow (VRF) equipment before modifications to Unified Facilities Criteria's (UFC) VRF requirements are issued? Mr. Cramer. DOD first published HVAC design criteria on the installation of new VRF systems in January 2017. Prior to that, DOD had significant direct involvement with the HVAC industry in general, including several industry reviews of various proposed updates to HVAC controls specifications, and several industry forums that included soliciting industry comments. These engagements were not focused on VRF systems in particular, but were open to industry representatives of all HVAC systems, to include VRF systems. During this process, neither industry associations nor VRF manufacturers raised any issues or concerns with DOD's proposed HVAC control system requirements that later surfaced as the VRF- specific problem. The January 2017 restrictions in HVAC design criteria were based upon analysis of VRF manufacturer's technical literature, experience with previously-installed VRF systems, and review of Department of Energy studies on VRF systems which were available for DOD technical personnel to review. This analysis was supported by the broader industry engagement on HVAC control systems already mentioned. As a result of the design criteria restrictions, DOD arranged an in-person meeting of its entire technical team and UFC program managers with VRF industry representatives at the offices of AHRI in Arlington, VA in May 2017, focused on understanding respective concerns and sharing of technical papers and presentations. This engagement ultimately led to several subsequent updates to DOD criteria that were informed by, and resulted from, DOD-industry engagement during this three-year period. The first such update replaced the general ``blanket'' restrictions on new VRF installations with specific design criteria equivalent to other HVAC systems, effectively placing VRF systems on a level playing field with other types of HVAC systems. DOD afforded AHRI the opportunity to review and comment upon this proposed update prior to its approval and publication. A later update for key HVAC control system specifications was preceded by DOD seeking industry-wide input via FedBizOps as described above to both refine DOD's specification and inform DOD of industry capability to satisfy it. Based upon its accumulated industry input, DOD subsequently updated its design criteria yet again to provide VRF system installations under particular circumstances an exception from meeting DOD's open protocol control system specification. Mr. Scott. Given that the Critical Change Request (CCR) process is largely retroactive, requires industry to submit individual requests for each proposed UFC revision, and lacks a public platform to track the resolution status of CCRs submitted, do you believe this process is sufficient in creating opportunities for DOD and industry to work together to mitigate technical concerns, optimize equipment performance, minimize energy consumption, and maximize energy savings? Mr. Cramer. The Criteria Change Request (CCR) process is but one tool that DOD can use to engage with stakeholders both internal and external to the Department; all of these tools are necessary to fully engage with industry to address issues and develop opportunities in technical criteria and specifications. A CCR initiates a formal process that is logged and tracked within the Unified Facilities Criteria (UFC) program management structure and visible by the affected technical experts in the Army, Navy, and Air Force for collective action to adjudicate the submission. The tool enables a direct response back to CCR submitter as to its disposition once it has been fully reviewed by DOD technical personnel. A such, it serves as an efficient means of communication, albeit of a very focused nature and dependent upon the scope of the CCR itself as it relates to already-published documents. Other tools offer broader and more open-ended dialog between DOD and industry, such as ``Industry days'' where DOD invites the public and specific industries of interest to attend public DOD presentations and provide live feedback and discussion, typically in advance of adopting new criteria or specifications. Additionally, the Solicitations and Awards Management (SAM) process includes formal ``Sources Sought'' actions to solicit industry information on capabilities to meet DOD requirements, as well as complimentary ``Requests for Industry'' process to solicit input to specific draft criteria and specifications. The combination of all these tools provides the necessary opportunities for DOD and industry to resolve technical concerns and develop new opportunities. ______ QUESTIONS SUBMITTED BY MR. GOLDEN Mr. Golden. As we work to advance DOD's readiness capabilities regarding increased extreme weather events, it will be important that the Department approaches this issue by investing in innovative and new building technologies. What are some barriers that the DOD faces in acquisition of innovative building products that can mitigate the damage caused by extreme weather events? Mr. Cramer. DOD generally seeks to adopt new technologies only after they been tested and certified for the commercial market, as long as the technology is not military-specific. Once new technologies have been demonstrated as viable, the greatest barrier is typically the effort required to adopt or establish a suitable specification (or multiple specifications) for DOD use that ensures DOD receives what it expects. Even with a suitable specification, the remaining potential barrier is that of cost-risk-benefit analysis, where cost is weighted against benefits (such as risk reduction). DOD may avoid a new technology that mitigates damage from extreme weather if its cost outweighs the expected cost avoidance from its use. Mr. Golden. The DOD follows the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), which is a Federal clean-up law. Where the DOD is the known source of contamination, CERCLA allows the DOD to provide bottled water, filter systems, and other removal actions to quickly assure no one is drinking water above the EPA PFOS/PFOA lifetime Health Advisories level. When a State establishes their own drinking water standard, the Department evaluates this as part of an overall site remediation strategy during the feasibility study (FY) phase of CERCLA. Can you explain what happens during the DOD's feasibility study phase and what remedial steps the DOD takes when a State's PFOS/PFOA acceptability standards are less than the EPA standards? When a State changes its own PFOS/PFOA drinking water standard and the DOD is the contaminating source, how is the DOD notified about the State's change and how does that affect the DOD's remediation strategy for that State? Mr. Cramer. During a CERCLA Feasibility Study (FS), site-specific options for remedial action are developed, screened, and evaluated. This FS process includes evaluating promulgated federal and state standards as identified in section 121(d) of CERCLA. This is referred to as the Applicable or Relevant and Appropriate Requirements (ARARs) process. If a more stringent state drinking water standard qualifies as an ARAR, it is incorporated into the cleanup levels that must be attained at the site upon completion of the remedial action. As part of the ARARs process, consistent with the NCP, at the Remedial Investigation (RI) scoping phase, DOD, as the lead agency, initiates the identification of potential state ARARs. During the FS phase, States should identify their potential ARARs for evaluation which would include any new potential state ARARs so they could be incorporated into the ARARs evaluation process. ______ QUESTION SUBMITTED BY MR. KAHELE Mr. Kahele. Earlier this year in March, a UXO's was discovered in the waters off Lanai. Mr. Schafer, do you have any status updates on this UXO's risk assessment? Can you commit to working with me and the local community to explore alternatives to blowing up the UXO? There was a similar case near Molokini and there was strong public outcry against exploding the UXO near the fragile coral reefs. Mr. Schafer. [No answer was available at the time of printing.] [all]