Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- MILITARY CONSTRUCTION, VETERANS AFFAIRS, AND RELATED AGENCIES APPROPRIATIONS FOR FISCAL YEAR 2023 [Senate Hearing 117-] [From the U.S. Government Publishing Office] MILITARY CONSTRUCTION, VETERANS AFFAIRS, AND RELATED AGENCIES APPROPRIATIONS FOR FISCAL YEAR 2023 ---------- WEDNESDAY, MAY 18, 2022 U.S. Senate, Subcommittee of the Committee on Appropriations, Washington, DC. The subcommittee met at 3:35 p.m. in room SD-124, Dirksen Senate Office Building, Hon. Martin Heinrich, (chairman) presiding. Present: Senators Heinrich, Tester, Boozman, Murkowski, Hoeven, and Collins. DEPARTMENT OF DEFENSE Military Construction and Family Housing STATEMENT OF MR. PAUL CRAMER, PERFORMING THE DUTIES OF ASSISTANT SECRETARY OF DEFENSE FOR SUSTAINMENT OPENING STATEMENT OF SENATOR MARTIN HEINRICH Senator Heinrich. Good afternoon, everyone. This Hearing of the Military Construction, Veterans Affairs, and Related Agencies Appropriations Subcommittee is now called to order. The purpose of this hearing is to receive testimony from the representatives of the Office of the Secretary of Defense, and the Military Services regarding their fiscal year 2023 Military Construction and Family Housing Budget Request. This year, with the addition of a witness from the Space Force, our hearing will consist of two panels. Our first panel includes witnesses from the Office of the Secretary of Defense, the Navy, and the Marine Corps. The second panel will consist of witnesses from the Army, the Air Force, and the Space Force. I would like to say, thank you, to our first panel of witnesses for being here today. From OSD, Mr. Paul Cramer, performing the duties of Assistant Secretary of Defense for Energy, Installations, and Environment. From the Navy, Vice Admiral Ricky Williamson, Deputy Chief of Naval Logistics--Naval Operations for Fleet Readiness and Logistics. And Marine Corps, Lieutenant General Edward Banta, Deputy Commandant for Installations and Logistics. This year the Department has sent over a budget request of $12.15 billion for the Military Construction and Family Housing accounts, a 23 percent increase over last year's request. It is also the highest request level since fiscal year 2012. That said, the Department has relied on, and apparently will continue to look towards congressional increases year- over-year, to get at the true MILCON funding needs. While it is clear more needs to be done, I am encouraged to see DOD continuing to increase its request. This year's request includes a significant investment in several major infrastructure programs. The Navy is asking for nearly $1.2 billion for three construction projects, and 88 million in design funding supporting the Shipyard Infrastructure Optimization Program. In recent years, this committee has been supportive of the Navy's effort to overhaul our four public shipyards, and we will continue to keep a close eye on the program. The Marine Corps has identified $330 million to continue the construction of a new base on Guam. The Air Force request addresses several new missions, and includes over 200 million for projects supporting B-21 beddown, and 444 million in funding for the Ground-Based Strategic Deterrent Infrastructure. We know that each of these programs will require many years of dedicated funding. I am pleased that the request includes 553 million for the Energy Resilience and Conservation Investment Program, or ERCIP, the highest amount since the creation of the program. The request underscores this administration's commitment to investing in critical energy resilience projects, and a clear understanding of their tie to readiness. I will also note that the future Years Defense Program shows continued increases to the Energy Resilience and Conservation Investment Program (ERCIP) account year-over-year, given the clear demand for and increased complexity, and cost of projects, I expect the Department to hold to that plan. I have been vocal about the need for the United States to embrace and accelerate electrification, and I am encouraged by the Army's commitment to install a microgrid on every installation by 2035, while each service and indeed installation is unique in its energy needs, I expect that each of you is looking closely at how to build a more resilient, efficient, and clean energy, and water for that matter, systems. I look forward to hearing from you on that subject today. The request also includes significant investments in our overseas posture, for design and construction of the infrastructure supporting the European Deterrence Initiative; the request provides $430 million. The administration also asked for over 1.2 billion for the Pacific Deterrence Initiative. At the same time, the need for recapitalization of existing facilities continues to grow. This year, we received unfunded priority lists from the services and defense-wide agencies that totaled nearly $4 billion. Many of the projects that were pushed out of the budget support enduring missions and quality of life investments, such as construction of new troop and family housing, child development centers, and critical training and maintenance infrastructure. We continue to see facilities age, often held together by short-term maintenance fixes, while the complexity of our infrastructure grows, and global market volatility drives up costs. The vulnerability of this aging infrastructure to climate, cyber, and energy threats also cannot be understated. As such I must note that the request once again clearly prioritizes new mission infrastructure over current mission and existing facility recapitalization. And I look forward to hearing about the installation investment strategies across the Department. With that, I will thank our witnesses again for being here today. And I will turn things over to Ranking Member Boozman for his opening statement. STATEMENT OF SENATOR JOHN BOOZMAN Senator Boozman. Thank you very much, Mr. Chairman. And I also would like to extend a warm welcome to our witnesses here today. And just thank you for you and the audience, you know, we look out and see all of these uniforms, just thank you for your service to our country in so many different ways. It is greatly appreciated. I was pleasantly surprised to see this year's budget request at $12.2 billion, which is an increase over last year's request of $9.8 billion. It is one of the highest MILCON requests in years, but is also an 18 percent decrease from the fiscal year 2022 enacted level of 14.9 billion. The fiscal year 2022 bill included unprecedented funding levels, which was necessary as the MILCON portfolio is routinely underfunded, and has been taking on increasing levels of risk for years. Unfortunately, this trend doesn't seem to be changing as this year's request remains only 1.5 percent of the total DOD budget. I am also concerned about multiple aspects of this year's budget that further compound the challenges presented to MILCON, and quickly dilute this year's increased request. Further, I would like to address increments. Not that long ago, $100 million was an expensive price tag, and increments were the exception rather than the rule. Now, we are looking at projects that exceed $1 billion with increments that are becoming a common way of doing business, nearly one-third of this year's request, $3.5 billion; is for 27 incremented projects, and we know more will be added in future requests. We have known for years that more complex and large-scale projects would start to take up a greater share of the budget, but without corresponding top-line increases an already constrained budget is squeezed even further to accommodate increments for these expensive projects. Another challenge is the impact of inflation and supply chain issues on the construction market, and the corresponding increased cost of projects. One of the challenges of MILCON is the delay between budget development and project execution, with the current environment exacerbating this issue greatly. I am concerned about market volatility, supply chain disruptions, worker shortages, the cost of fuel, unprecedented increases in material cost, and record inflation, and how these impact the projects in this budget, as well as projects currently in execution. I would like to know what the Department is doing to address these issues and incorporate these variables in the budget estimates and project execution. I know that is a big task. We have already been notified of projects in this request whose costs are outdated, which doesn't bode well for the health of the program. I look forward to working with the Department to address these issues, and continue the work needed to ensure a successful MILCON Program. And with that, I yield back, Mr. Chairman. Senator Heinrich. Thank you, Senator Boozman. We will now proceed with witness statements, starting with Mr. Cramer; then Admiral Williamson, and finishing with General Banta. Mr. Cramer you are recognized for your opening statement. And your full, written testimony will be included in the record. SUMMARY STATEMENT OF MR. PAUL CRAMER Mr. Cramer. Thank you, Mr. Chairman; Ranking Member Boozman, distinguished members of the subcommittee, thank you for the opportunity to present the President's Fiscal 2023 Budget Request for the Department's Energy, Installations, and Environment programs; while my full written statement has been submitted for the record, I will highlight a few areas. Our installations remain one of our primary weapon systems, but the stark reality is that we must ensure that our installations are not only postured to support the Joint Force, but they are resilient against the full range of natural and man-made threats. Our 2023 budget request supports our efforts to address mission requirements, ensure service members have a safe place to live and work, and also addresses resilience challenges. We requested $29.2 billion for military construction, and sustainment restoration modernization funding for our facilities to address critical mission requirements, and life- health safety concerns within the current fiscal environment. This funding will be used to replace, restore, and modernize enduring facilities to enhance their resilience to climate events, and promotes elimination of excess and obsolete facilities. The Department is also addressing a range of technical, operational, and policy initiatives to enhance the use of energy in warfighting. Our $1.9 billion request for installation energy resilience, and energy conservation initiatives will ensure our energy supplies and methods of supply are resilient, sustainable, and affordable. The backbone of these efforts is the Energy Resilience and Conservation Investment Program, which provides a full range of projects and technologies but will increase focus on building cybersecurity, microgrids that incorporate energy generation, and power storage technologies. Our request for this vital program is $553 million, nearly double our fiscal year 2022 request, and it reflects the increased planning and design work required for the more complex projects in the program. A key focus of this year's budget request is addressing climate change. The changing climate will continue to amplify operational demands on the Force, degrade installation and infrastructure, increase health risks to our service members, and require modification to much of our existing and planned equipment. Extreme weather events are already costing billions of dollars, and those costs are likely to increase. Our resilience investments are guided by the Department of Defense Climate Adaptation Plan, which provides a roadmap for DOD activities and investments to enable operations to continue under changing conditions, while preserving operational capability, and enhancing the natural and man-made systems essential for the Department's success. We are also committed to protecting the quality of life for our personnel and their families. Our primary focus here is to ensure access to safe, high quality, affordable family and unaccompanied housing. Our budget includes $1.9 billion to support our worldwide, non-privatized family housing inventory, which includes more than 34,000 government-owned, 5,800 leased units. With regard to privatized housing, the Department continues to prioritize actions that improve the tenant experience and rebuild tenant trust. Our initial phase was predominantly focused on implementing the MHPI Tenant Bill of Rights, and the NDAA provisions embedded within those rights. The Department will now ensure the oversight measures that have been put into place are being put into action at each of our installations. We appreciate Congress, and the support you have given us in the fiscal year 2022 budget, and we appreciate your continued support as we work together to provide the best possible support for soldiers, sailors, airmen, marines, and Guardians. I look forward to your questions. [The statement follows:] Prepared Statement of Mr. Paul Cramer introduction Chairman Heinrich, Ranking Member Boozman, and distinguished members of the subcommittee: Thank you for the opportunity to discuss the President's Fiscal Year 2023 budget request for the Department of Defense's (DoD) Military Construction and Family Housing programs. Our installations remain one of our primary weapon systems. For nearly 80 years, we have been able to operate from our bases around the world with near-impunity, which has afforded us unprecedented power projection capabilities. However, the stark reality is that the homeland is no longer a sanctuary. In line with the 2022 National Defense Strategy, we must ensure a resilient Joint Force and defense ecosystem. Our installations must not only be postured to support the Joint Force, but also be resilient against the full range of man-made and natural threats. We continue to address these resilience challenges, while also addressing mission requirements and ensuring Service members have a safe and resilient place to live and work. reestablishment of ei&e As part of the larger reorganization within the Under Secretary of Defense for Acquisition & Sustainment, the Office of the Assistant Secretary of Defense for Energy, Installations & Environment (EI&E) was merged with Office of the Assistant Secretary of Defense for Logistics & Material Readiness (L&MR) into the Assistant Secretary of Defense for Sustainment in 2018. While there were benefits in bringing these two portfolios under a single organization, the breadth of the merged portfolio required the leadership team to focus on a narrower set of priorities at the expense of other, equally important priorities. Recognizing that each portfolio warranted an Assistant Secretary- level oversight, Section 904 of the fiscal year 2021 NDAA restored EI&E as a distinct organization. The Department formally split EI&E and Sustainment on February 10, 2022. We appreciate Congress's support in ensuring that the Department has the senior visibility needed for us to effectively confront the energy, environment, military construction, housing, and real property challenges we face. taking action on climate change Secretary Austin noted that the Department faces a ``growing climate crisis that is impacting our missions, plans, and capabilities and must be met by ambitious, immediate action.'' As such, climate change will continue to amplify operational demands on the force. It will degrade installations and infrastructure, increase health risks to our service members, and require modifications to much of our existing and planned equipment. The Biden Administration, through Executive Order (EO) 14008 ``Tackling the Climate Crisis at Home and Abroad'' and Executive Order 14057 ``Catalyzing Clean Energy Industries and Jobs through Federal Sustainability,'' places climate change at the center of the Department's national security planning and our installation and business operations. To do this the Department will take steps to adapt to the unavoidable impacts of climate change to our missions, while also working to mitigate the future effects of climate change by taking steps to reduce emissions of greenhouse gas emissions (GHG). climate change adaptation The effects of climate change-drought, heat, forest fires, and extreme weather events-are already costing the Department billions of dollars. These costs will only increase as climate change accelerates. The National Defense Strategy describes how climate is transforming the entire context in which the Department operates and will increasingly stress the Joint Force. To address this, the Department is taking a number of actions to improve our adaptive capacity, centered around the DoD Climate Adaptation Plan (CAP), which was signed by the Secretary of Defense on September 1, 2021 and publicly released by the White House on October 7, 2021. Actions under the Plan will ensure the DoD can operate under changing climate conditions, preserving operational capability and enhancing the natural and man-made systems essential to the Department's success. To do so the CAP takes an expansive approach to the concept of adaptation, seeking to integrate climate resilience thinking across all agency programs and real property management practices. A companion document providing highlights and examples of the Department's climate adaptation efforts was released in November 2021. Supporting this effort is the Defense Climate Assessment Tool (DCAT), which was developed to assist in understanding installation climate exposure. Outputs from this tool can be used to inform development of an ``all hazards'' threat assessment for installations and subsequently be incorporated into master plans and military construction projects. A summary of these exposures was presented in the April 2021 report, ``DoD Installation Exposure to Climate Change at Home and Aboard.'' climate change mitigation The entire nation faces broad exposure to the mounting risks caused by climate change which pose an existential threat if left unmitigated. Recognizing this, the Department is committed to reducing its GHG emissions through a variety of efforts. We are committed to ensuring net-zero GHG emissions across our entire civilian enterprise--our installations, non-tactical vehicles and procurement efforts, by or before 2045. While significantly more challenging, we are also working to reduce emissions throughout our operational forces and formations by deploying new technologies that concurrently add capability and reduce vulnerabilities in an era of contested logistics. These efforts are aligned with the 2021 Interim National Security Strategic Guidance as well as the 2022 National Defense Strategy. Across DoD's we are engaged in a number of specific initiatives. First, in concert with the General Services Administration DoD was the first Federal agency to initiate procurement actions aiming to obtain 24/7 Carbon Pollution Free Electricity, with the intention to transition all of DoD's utility procurement to this model by 2035. Second, we are leveraging the prominent role that installation micro- grids will play in our installation energy resilience efforts, which will allow for significant deployments of on-site renewable power. Third, we are updating all Unified Facilities Criteria to dramatically improve the energy performance of newly-constructed buildings and designing them to easily operate within an installation micro-grid. And finally, the Department has begun the planning and design efforts to deploy the charging infrastructure essential to transition our non- tactical vehicle fleet to one that does not rely on fossil fuels, with the aim of having this transition complete by 2035. military construction and family housing The President's fiscal year 2023 budget requests $12.2 billion for the Military Construction (MilCon) and Family Housing appropriation. This represents a $2.3 billion or 23 percent increase from the fiscal year 2022 budget request of $9.8 billion, and addresses critical mission requirements as well as life, health, and safety concerns. These efforts directly support operations, training, maintenance, production, and projects to take care of our people and their families, such as medical treatment facilities, unaccompanied personnel housing, and schools. military construction We are requesting $10.2 billion in the budget for Military Construction across the Department, an increase of 18 percent from last year's request, primarily due to infrastructure requirements for the Pacific Deterrence Initiative, European Deterrence Initiative, beddown of the B-21 aircraft, investments in KC-46A depot maintenance facilities, recruit dormitories, facilities and land acquisition in support of Ground Based Strategic Deterrent program, continued Guam relocation efforts, and investments in the Shipyard Infrastructure Optimization Program. Slightly more than half of this request provides readiness improvements in facilities to support operations, training, maintenance and production, and supply. Another $1.1 billion funds medical facilities, troop housing, and community support, and $210 million funds DoD's continued support to the NATO Security Investment Program. This request also includes $2.4 billion for the Defense-Wide Components, including: --$151 million for dependent educational facilities --$129 million for incremental funding of fuel infrastructure; --$518 million for incremental funding of recapitalization of National Security Agency facilities; --$296 million to address new capabilities/mission, force structure growth, and infrastructure for Special Operations Forces; --$18 million for Washington Headquarters Services facilities; and --$329 million for the Energy Resilience and Conservation Investment Program; and --$422 million for planning and design of future year projects. In addition, the Defense-Wide request contains $434 million for medical facility recapitalization including $153 million for the sixth increment (of a $695 million project) for the Walter Reed Medical Center Addition/Alteration at Naval Support Activity Bethesda, Maryland; $300 million for the tenth increment (of a $1.513 billion project) for the Medical Center Replacement at Rhine Ordnance Barracks, Germany; and $58 million for an ambulatory care center replacement at Joint Base San Antonio, Texas. These projects are critical for our continued delivery of the quality health care that our service members and their families deserve. The Department continues to make progress on its Military Construction Reform initiative. We codified the responsibilities of the major stakeholders involved in construction projects to enable the consistent delivery of projects across the DoD. Additionally, a forthcoming data management policy will ensure project sponsors and DoD construction agents are sharing information about critical details such as project requirements, acquisition timelines, and construction status to ensure that components make proactive decisions and manage scope and cost changes with minimal impact to project delivery. facilities sustainment, restoration, and modernization Facilities sustainment represents the Department's largest category of facilities spending. It provides for the regularly scheduled maintenance and repair or replacement of facility components. Ongoing and predictable investments are required throughout the service life of a facility to optimize its performance and support the safety, productivity, and quality of life of our personnel, while also reducing avoidable costs associated with premature deterioration. In addition to facilities sustainment funding, the Department relies upon its Restoration and Modernization (R&M) program funding to provide ongoing support to assigned missions by countering obsolescence and reversing degraded conditions of existing facilities. The Department's fiscal year 2023 budget request includes $12.6 billion of sustainment funding for the Military Services and the major Defense-wide organizations. This represents an increase from the $12.3 billion in the fiscal year 2022 budget request and a slight increase in the overall sustainment rate from 82 percent to 85 percent. Within the budget request, each Military Component and Agency, excluding the Marine Corps, is funded to at least 85 percent of the modeled requirement. We are working with the Marine Corps to pilot a comprehensive model that would optimize FSRM and MilCon facility investments across their real property portfolio. In addition to facilities sustainment funding, the Department relies upon its Restoration and Modernization (R&M) program funding to provide ongoing support to assigned missions by countering obsolescence and reversing degraded conditions of existing facilities. The fiscal year 2023 budget request includes $5.4 billion in Operations and Maintenance appropriations for facilities R&M, a 35 percent increase compared to our $4.0 billion fiscal year 2022 budget request. Historically, the Department has managed the budgeting for sustainment of assets at the portfolio level with a sustainment model. This model, however, relies on an inventory approach to requirements development, which does not directly align asset investment requirements to expenditures. OASD (EI&E) has been maturing a tool that helps capture facility inspection data. The system not only considers the asset's condition, but also individual components that make up those assets to provide a much more granular assessment of the entire facility. It is guiding our transition to an asset management approach for budgeting for and managing the Department's infrastructure that addresses facility investment as a holistic program instead of independent sustainment, restoration and modernization programs. As the system is implemented over the next few years, the Department intends to set baseline parameters using factors such as mission criticality to set a minimum condition standard on its facilities. family and unaccompanied housing One of the Department's principal priorities is to support military personnel and their families and improve their quality of life by ensuring access to suitable, affordable housing. Service members are engaged in the front lines of protecting our National security and they deserve the best possible living and working conditions. Sustaining the quality of life of our people is crucial to recruitment, retention, readiness, and morale. The Department owns, operates, and maintains nearly 36,000 family housing units, most of which are on enduring bases in overseas locations, and leases approximately 5,200 family housing units where government-owned or privatized housing is unavailable. The Department's housing inventory also includes more than 500,000 government-owned unaccompanied personnel housing (UH) bed spaces, and over 2,000 government-leased UH bed spaces. Our fiscal year 2023 budget request includes $2.0 billion to fund construction, operations, and maintenance of government-owned and leased family housing worldwide; provide housing referral services to assist military members in renting or buying private sector housing; and oversight of privatized family housing. The fiscal year 2023 request is $533 million (37 percent) higher than the fiscal year 2022 request, and $432 million (28 percent) higher than the fiscal year 2022 enacted amount to sustain our increased focus on ensuring the delivery and maintenance of quality housing for military families. The fiscal year 2023 request includes $739.4 million for construction and improvements to meet the Department's goal to maintain at least 90 percent of the world-wide Family Housing inventory at Good and Fair condition levels, to include $95.0 million for construction of 107 Army family housing units at Vicenza, Italy; $248.6 million for three projects at Joint Region Marianas--Andersen Air Force Base, Guam; and $230.1 million for the restructure of three Air Force Military Housing Privatization Initiative projects. The O&M budget request of $1.21 billion represents a $86.2 million (8 percent) increase compared to the fiscal year 2022 request and enacted amount. This funding request supports more than 35,000 government-owned family housing units, most of which are on enduring bases in overseas locations, and approximately 5,800 government-leased family housing units where government-owned or privatized housing is unavailable. The requested funding will ensure that U.S. military personnel and their families continue to have suitable housing choices. The Department's fiscal year 2023 budget request demonstrates our continued commitment to modernize Unaccompanied Personnel Housing (UPH) to improve privacy and provide greater amenities. The fiscal year 2023 budget request includes nearly $1.2 billion for 17 construction projects that will improve living conditions for permanent party personnel. This includes $105 million for an Army barracks at Fort Stewart, Georgia; $103 million for a barracks and dining facility at East Camp Grafenwoehr, Germany; $101 million for phase II of a Navy barracks project at Kaneohe Bay, Hawaii; $101 million for a Marine Corps Barracks Complex at Kadena, Japan; and $131 million for two Air Force dormitory projects at Joint Base San Antonio, Texas; With these investments, the Department remains committed to ensuring that our government- owned and leased family housing provides a high quality of life for U.S. military personnel and their families, and will continue our efforts to modernize and ensure safe, quality unaccompanied personnel housing with improved privacy and greater amenities for junior personnel. military housing privatization initiative (mhpi) Under the overall direction the Chief Housing Officer, the Department has made significant progress to enhance the Military Housing Privatization Initiative (MHPI) and our oversight of the private sector MHPI companies that own and operate MHPI housing projects. Central to this oversight, the Department has issued all policy guidance necessary to implement, prospectively, all 18 tenant rights at all MHPI housing projects. This includes a revised Tenant Bill of Rights, which was issued on August 1, 2021 and expands the version previously submitted to Congress in February 2020. As Congress has recognized, retroactive application of the Tenant rights requirements at existing projects requires voluntary agreement by the respective MHPI companies; the Department cannot unilaterally change the terms of the complex, public-private partnerships that established the MHPI housing projects. As a result of our collaboration with the private-sector MHPI companies that own and operate the MHPI housing projects, all 18 rights are fully available at all but five of the nearly 200 installations with privatized housing. The Department continues to pursue select agreements not yet reached at the five remaining installations. Our other key completed initiatives include strengthening oversight through improved training; reinforcing installation commander responsibilities; hiring more than 600 housing-related staff including resident advocates and increasing training; improving communication with residents and the annual tenant satisfaction survey; ensuring increased transparency and reporting of maintenance and repair work orders; revising project performance incentive fee metrics; establishing housing standards and inspection requirements; establishing policies and procedures for health hazard assessments and mitigation; and expanding MHPI project and program oversight at all levels. Our next phase of MHPI reform actions will continue to prioritize key reforms that will improve the safety, quality, and habitability of privatized housing; enforce performance standards established for the MHPI companies; and monitor individual MHPI project performance to ensure the long-term financial viability of the MHPI projects and program. These efforts include examining ways to improve processes to enhance the housing experience for military families who have accessible housing needs and improving coordination with the Exceptional Family Member Program. The Department of Defense understands that family is important and honors the sacrifice that military members and their families make to serve our Nation. We recognize that the environment where Service members and their families live impacts their quality of life, their ability to do their jobs, and the Department's ability to recruit and retain the force. We are committed to working closely with you and the committee staff to ensure the long-term success of the MHPI program, and will remain diligent in our oversight to ensure MHPI projects deliver quality housing and a positive living experience for Service members and their families. department of defense installation energy programs The Department spent $3.3 billion in fiscal year 2021 on electricity to power facilities at over 500 installations worldwide. This amount of energy consumption represents how great our dependency is on energy, underscoring the importance of our need to ensure our energy supplies and methods of supply are resilient, sustainable, and affordable. threats to energy Energy is an essential enabler of military capability, and the Department depends on energy- resilient forces, weapon systems, and facilities to achieve its mission. At home and abroad, installations are reliant on commercial, municipal, and host nation power grids for day-to-day operations, including command and control systems, communications, lighting, heating, and cooling. Adversaries recognize the strengths of U.S. power projection and sustainment, and possess long- range weapons, significant anti-access/ area-denial (A2/AD) systems, and substantial cyber capabilities able to degrade the Department's ability to provide energy to forces and facilities. In response to these threats and in alignment with statute, the Department is working to ``ensure readiness of the armed forces for their military missions by pursuing energy security and energy resilience'' (10 U.S.C. Sec. 2911) and ``ensure the types, availability, and use of operational energy promote the readiness of the armed forces'' (10 U.S.C. Sec. 2926). In addition, the Department's ability to provide energy to critical missions is affected by the climate. For instance, floods, storms, and other severe weather can degrade energy generation and distribution infrastructure on our installations, as well in the surrounding communities. In fact, severe weather can degrade supply chains beyond energy, with ``last-mile'' delivery systems for a range of mission critical commodities, goods, and services being particularly at risk. Therefore, climate resilience must be built into the supply chain as well, and the Department must ensure that key suppliers and industries can still operate though impacted by climate change, with special attention given to ``last-mile'' resilience. installation energy resilience The President and the Secretary of Defense have directed the Department to ensure installations and forces are resilient to all hazard risks--kinetic, cyber, and climate--and that the use of energy promotes the readiness of the armed forces for their military missions. In response, the Department is making significant energy investments in installation energy resiliency to increase the resilience of bases and facilities critical to generating, deploying, operating, and sustaining military capabilities. This includes a $1.9 billion request for installation energy resilience and energy conservation initiatives, most of which are directed to existing buildings. energy resilience and conservation investment program (ercip) The fiscal year 2023 budget request includes $553.25 million for the Energy Resilience and Conservation Investment Program (ERCIP), which is one the Department's key mechanisms for building both energy resilience and reducing greenhouse gas emissions. The ERCIP program has executed over 511 high-priority projects from FY 2009-2021 including the implementation of micro-grids, renewable energy generation (i.e., solar PV, solar thermal, wind, etc.), building efficiency enhancements, and utility distribution improvements. ERCIP supports a full range of projects and technologies, but will be increasingly focused on building cyber-secure micro-grids that incorporate energy generation and power storage technologies. The fiscal year 2023 ERCIP budget request includes an increase in Planning and Design (P&D) to accommodate the design required for the more complex projects in the program. Additionally, the increase in P&D for fiscal year 2023 will build a pipeline of projects with more improved and timely project execution. As ERCIP transitions to a standardized MilCon program and projects become larger and more complex, we are improving project planning & design, and enhancing execution oversight of these projects. We continue to make ERCIP the backbone of our energy resilience investments and prioritize energy project investments where they can best support the defense posture--based on the critical missions they support and the quality of Installation Energy Plans (IEPs). We recently updated ERCIP Guidance to the Services to reflect the statutory changes to the program stemming from the fiscal year 2022 NDAA. At the same time, we are working to prioritize projects that support energy resilience for critical mission requirements (10 U.S.C. Sec. 2920). As Department focuses on reducing the carbon footprint at our military installations, ERCIP will continue to support a range of technologies and efforts, including renewable energy and energy storage, geothermal, accelerated deployment of air source heat pumps, and infrastructure projects directly supporting electrical vehicle (EV) charging stations. The Department also has a number of energy conservation initiatives, most of which are directed to existing buildings. These include sustainment and recapitalization projects, which generally involve retrofits to install improved lighting, high-efficiency HVAC systems, double-pane windows, facility related control systems (FRCS), and new roofs. The Department is also giving increased attention to Micro Reactors and Next Generation Geo-Thermal as zero-carbon technologies capable of providing consistent baseload power. installation energy resilience policy and governance To continue infusing the installation energy programs across the Department with an urgent sense of traceability, accountability and purpose, we are continuing to develop and promote a data- and metrics- driven approach to our energy planning and programming. This approach is reflected in our recent and continuing efforts to develop or update installation energy policy across the Department. Last year, we updated our policies for energy resilience planning and metrics at installations to reflect the 10 U.S.C. Sec. 2920 energy resilience requirements added by the fiscal year 2021 NDAA. These updated policies set forth energy availability standards for critical missions; directs the Military Departments to promote the use of multiple and diverse sources of energy in their planning, with prioritization of energy resources originating on the installation; encourages the use of micro grids; and favors the use of full-time, installed energy sources rather than emergency generation in their energy resilience solutions. We are also working to harmonize the definitions and planning and assessment processes for critical missions across the Department, and improve our Installation Energy Plans (IEPs) to ensure alignment with the Installation Resilience Plans (IRPs) required by 10 U.S.C. Sec. 2864. More than 158 IEPs were complete by the end of last year, and with an additional 200 expected to be completed this year. Currently, these plans establish the basis for planning energy performance projects, and provide a roadmap for integrating appropriated and public-private partnership authorities to close energy resilience gaps. Going forward, the IEPs will also document critical load requirements, lessons learned from black start exercises, and the ability of installations to withstand a 14-day energy disruption. We plan to eventually integrate the IEPs into the IRPs to reflect an ``all hazards'' approach that addresses a range of climate hazards and energy resilience gaps at priority installations and critical missions. black start exercises Black start exercises are an important component of the Department's approach to risk assessment and for identifying gaps in our installations' electrical infrastructure, such as previously- unknown interdependencies between various systems, so that we can best prioritize our resilience resources and planning. In the coming year, the Department will issue uniform black start exercise guidance and monitor a schedule of planned exercises through fiscal year 2027, for no less than five exercises per Service per year, in accordance with new Title 10 requirements stemming from the fiscal year 2021 National Defense Authorization Act. Over the past year, we continued to transition execution of black start exercise to the Services. Across the Department in 2021, the Services conducted exercises at Marine Corps Air Station Miramar, Eielson Air Force Base, Wright Patterson Air Force Base, and Ohio Air National Guard bases Springfield-Beckley and Blue Ash. This brings the total number of black start exercises performed to date across the Department to 10. The Services have also begun planning for larger, regional black start exercises that cover several bases at once to more effectively test outage effects on Operation Plans, and the effectiveness of Continuity of Operations (COOP) plans. performance contracting authorities The Department continues to utilize performance contracting (i.e., ESPCs/UESCs) as a significant part of its efforts to enhance energy resilience through energy efficiency. Energy efficiency bolsters installation energy resilience by helping reduce the energy demand from distributed energy production resources during commercial grid disruptions. Energy efficiency is also a practical approach for the DoD to reduce its carbon footprint in response to the imperatives of EO 14008 and EO 14057, the Energy Act of 2020, the Federal Sustainability Framework, and DoD's Climate Action Plan. DoD will continue to use these contracts where they enhance DoD mission readiness, mission assurance, and ultimately DoD's warfighting capability, guided by the outcomes of the Installation Energy Planning process. environmental cleanup at base realignment and closure (brac) locations To date, the Department, in cooperation with State agencies and the Environmental Protection Agency, has completed cleanup activities at 94 percent of Base Realignment and Closure (BRAC) sites and has conveyed many of these sites to other entities for further development. To continue this progress, we are requesting $260 million for BRAC Environmental, a $4 million decrease from the fiscal year 2022 request. DoD is still executing the generous additions provided by Congress in recent years. While the Department continues to make progress completing cleanup, the remaining sites are complex and require more time or a remedy based on more advanced technology, or they are sites impacted by chemicals of emerging concern. Our focus remains on continuous improvement in the environmental restoration program by developing technologies to reduce costs and accelerate cleanup and establishing policies and guidance that maximize cleanup program efficiency and effectiveness. DoD also partners with regulatory and community stakeholders throughout the cleanup process to maximize transparency, public participation, and collaboration. Partnering is vital to ensuring DoD makes cost effective and efficient decisions. These initiatives help ensure that DoD makes the best use of available resources to steadily move sites through the cleanup process while protecting human health, safety, and the environment. conclusion Thank you for the opportunity to discuss DoD's programs supporting energy, installations, and environment. We appreciate Congress' continued support for our enterprise and look forward to working with you. STATEMENT OF VICE ADMIRAL RICKY WILLIAMSON, DEPUTY CHIEF OF NAVAL OPERATIONS FOR FLEET READINESS AND LOGISTICS, UNITED STATES NAVY Admiral Williamson. Chairman Heinrich, Ranking Member Boozman, and distinguished members of the committee, in conjunction with the other members of the panel, I appreciate the opportunity to provide an update on the quality and resilience of our Navy installations. On behalf of our sailors and their families, thank you for your continued support of the Navy, its Military Construction Program, and our 71 installations around the world, which enable us to strengthen readiness, and to support delivery of new and more lethal platforms. Additionally, thank you for your ongoing focus on the Navy's Quality of Life programs which are critical to the overall success of our Navy. In December of last year the Chief of Naval Operations issued a call to action for every Navy leader to apply a set of Navy-proven leadership, and problem-solving best practices that empower our people to achieve exceptional performance. We have embraced this call because this is how we have always conducted our business, constantly self-assessing as part of an effort to get real and self-correcting our discrepancies to get better. To meet the challenges of strategic competition and evolving theater environment, we must enable global logistics, resilient shore infrastructure, and be honest about our current performance. Maintaining our advantage at sea requires transformational change ashore to support and sustain the fleet of the future. We recently released the Navy Global Strategy Ashore, which is the Navy's strategic direction for the Navy Shore Enterprise aligned with the National Defense Strategy. Our Navy requires shore platforms to be capable of supporting full-spectrum, multi-domain conflicts with near-peer competitors, while also protecting against, responding to, and recovering from attacks or disruptions intended to degrade operations. This strategy provides a roadmap for identifying and resourcing all shore operations, activities, and investments, enabling fleet warfighting capabilities that are aligned to the CNO's navigation plan. Navy installations located in the United States and around the world are essential shore platforms from which naval forces train, deploy, and maintain forward presence to enable geographic combatant commanders to meet operational requirements. A modernized and ready organic industrial base is a vital component of readiness. The Navy is leading the efforts to take an enterprise-wide approach to optimize infrastructure at the shipyards, depots, and logistics complexes that repair and modernize our ships, submarines, and aircraft. The Shipyard Infrastructure Optimization Program, SIOP, is a critical program to prepare the Nation's four public shipyards to meet the further needs of the Navy's nuclear- powered submarine and aircraft carrier force. Funding applied to our installations also supports climate resilience which is an important component of installation readiness. The Navy works to ensure installations and infrastructure are resilient to a range of challenges, including extreme weather. It is a privilege to testify before the committee today. And I look forward to answering your questions. [The statement follows:] Prepared Statement of VADM Ricky Williamson Chairman Heinrich, Ranking Member Boozman, and distinguished members of the Committee, it is an honor to appear before you representing the thousands of Navy Sailors and civilians at our 70 installations worldwide. Thank you for the opportunity to testify about the importance of our infrastructure, its resiliency, and the entire base operating support required to meet critical Navy and, ultimately, Joint Force missions. The Navy's contribution to the Joint Force includes readiness for high-end lethal combat in the maritime environment in order to deter great power aggression and, if deterrence fails, to defeat a peer or near-peer adversary in conflict. Our goal is to shape a Navy that is lethal, resilient, sustainable, agile, and responsive. Balancing the requirement to field the future Fleet while maintaining the sustainable forward posture that keeps Americans safe and prosperous is our central challenge. As we acknowledge and address that challenge, we focus on four priorities: readiness, capabilities, capacity, and our Sailors. To that end, the Navy works to ensure tight linkages between our strategies, operational concepts, warfighting capabilities, and our resources to achieve strategic objectives. For the Naval Services, these imperatives are outlined in the Joint Publication 5.0; Tri-Service Maritime Strategy, Advantage at Sea; Transforming Naval Logistics for Great Power Competition (TNLFGPC); the Navy Global Strategy Ashore: Transforming the Shore Enterprise for Strategic Competition; and the Chief of Naval Operations' (CNO) Navigation Plan (NAVPLAN). These Service-level strategies align with the President's Interim National Security Strategic (NSS) Guidance and the recently released National Defense Strategy (NDS). Consistent with the NSS Guidance, the 2022 NDS sets out how the Department of Defense (DoD) will contribute to advancing and safeguarding vital U.S. national interests--protecting the American people, expanding America's prosperity, and realizing and defending our democratic values. The NDS expertly outlines today's growing multi- domain threat. Our strategic environment is characterized by the re- emergence of long-term strategic competition with the People's Republic of China and Russia, along with persistent threats from North Korea, Iran, and violent extremist organizations. Individually and collectively, these forces are producing significant, overt challenges to the free and open international order. In response, the NDS outlines the need for a more lethal, resilient, and rapidly innovating Joint Force, combined with a robust constellation of Allies and Partners, to sustain American influence and ensure a favorable balance of power that safeguards the free and open international order. Collectively, our force posture, alliances and partnerships, and force modernization will provide the capabilities and agility to prevail in conflict and preserve peace through strength. In support of this end state, the CNO issued the TNLFGPC in early 2021, which provides a strategic roadmap for the Naval Logistics Enterprise and aligns its transformation with the NDS and Advantage at Sea. The TNLFGPC provides details on how the Navy will transform logistical support to the Fleet across the logistics continuum. The logistics continuum encompasses: 1) the industrial base, 2) the inter- theater, 3) the intra-theater, and 4) the last tactical mile. The overall goal of this transformation is to establish naval logistics systems and structures aligned with the new strategic environment. The TNLFGPC identifies four lines of efforts (LOEs): 1) Integrate Command and Control, 2) Enable Assured Power Projection, 3) Strengthen Sustainment for Distributed Operations, and 4) Improve Logistic Resilience. The LOEs are our principle focus areas in improving our ability to sustain the force in the new environment. We do this through five Maritime Sustainment Vectors, distilled from the eight pillars of Logistics from Joint Publication 4.0: Rearm, Refuel, Repair, Resupply, and Revive (called the ``5Rs''). The 5Rs constitute both a structure and a system to help us transform logistics to better sustain the Fleet--for identifying gaps and performing the analytics on potential solutions. The Maritime Sustainment Vector, or 5R model, focuses Navy Logistics Enterprise activities on sustainment as a warfighting function. The model captures the essential functions required to posture capability ashore and at sea in ways that allow the Fleets and Force to operate globally, at a pace that can be sustained over time. It is important to note that all readiness starts from the Shore, which makes Shore readiness and investment critical. It is imperative to ensure the Shore is mission- ready, secure, sustainable, and maintaining pace alongside our Fleet. Operating in a contested environment requires a Shore enterprise that is integrated completely into the fight. This requires persistent, agile, and flexible naval combatants, and a logistics enterprise that mirrors these characteristics. Fleet readiness and lethality rely on a combination of afloat and ashore ``platforms'' and ``payload''. The Navy Global Strategy Ashore, released in summer 2021, illustrates how the Shore enterprise enables Fleet readiness. Shore platforms are the locations that develop, generate, and employ forces for direct support to the Fleet. Shore payload is the infrastructure and support services at an installation. The Shore payload also includes the people and services that make the payload and platforms function. The Shore platforms and payload make up strategic and operational mission sets, such Air/Port Operations, Protection, Logistics, Warfighter Resilience/Quality of Life, and Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR). These mission sets are inextricably linked to Force Development (Fd), Force Generation (Fg), and Force Employment (Fe). In the Navy Global Strategy Ashore, the Navy created four LOEs to posture the Shore in enhancing Fleet readiness by aligning the Shore and sea lines of communication across the competition continuum. These LOEs are: 1) Restore Readiness to Shore Platforms, 2) Cost-Effective Maintenance and Modernization of Infrastructure, 3) Enhance Shore Resiliency, and 4) Posture the Shore to be Agile and Responsive to the Threat Environment. Implementation of these LOEs will establish a sustainable, modern, resilient, and ready network of installations and contingency locations that deliver capability and capacity to produce and sustain Fleet readiness and logistics in a contested environment. Another key component to Shore readiness is resiliency. Energy and climate resiliency are critical pieces to the Naval Global Strategy Ashore, as they are integral to the long-term ability of our Navy to support ongoing operations, and ensure our Sailors are equipped to meet adversity. Resiliency ensures our military bases can continue to perform their critical missions in the wake of natural disasters or disruptions to the grid. It is a national security and warfighting imperative for the Navy to address the impact of climate change on our readiness, operations, and ability to fight and win. Climate change increases risk and exposes vulnerabilities to our people, installations, platforms, and operations, and ultimately affects our mission. Climate resilience focuses on consideration of environmental vulnerabilities in installation master planning, management of natural resources, design and construction standards, utility systems/service, and emergency management operations. By tackling climate challenges holistically across the range of resilience threats, by how we operate and the decisions we make in the planning, design, location, and construction of facilities, we are ultimately addressing readiness since climate and environment are the foundations from which everything else develops. The Secretary of the Navy set operational energy priorities for the Department of the Navy in 2019, which included increasing energy resilience of forward bases, supply depots, and cooperative security locations as part of an effort to get more energy to the warfighter. Several operational energy initiatives implemented so far have resulted in cost savings reinvested for additional operational energy resilience, efficiencies, mission assurance, energy conservation, or energy security initiatives within the Navy. Moving forward, the Navy will continue to prioritize all facets of resilience in installation decisions to ensure the ongoing, highest level of mission capabilities. The Navy must deliver affordable, sustainable, environmentally compliant, and resilient Shore platforms through improved processes and investment prioritization. Targeted sustainment of existing assets and modernization of our infrastructure will ensure readiness at the lowest overall lifecycle cost. Investments to increase resilience of Navy installations to extreme weather events and sea-level rise will result in long- term cost avoidance. Continued use of standard design criteria, increased use of expeditionary standards, and mandated use of standard designs for new construction will reduce delivery costs and increase buying capacity. Finally, to optimize the Shore footprint and maximize resources, the Navy must consolidate and divest infrastructure that does not contribute directly to Fleet readiness and lethality. American security rests upon our ability to control the seas and project power ashore. Currently, the Navy's Logistics Enterprise is mission capable for day-to-day operations, but is not postured for a sustained increase in Fleet operational tempo, particularly given the tyranny of distance across the INDOPACOM AOR. The Logistics enterprise must be prepared to enable and sustain readiness across the competition continuum--from Phase 0 peacetime mindset to Phase II crisis and conflict. In particular, the Navy Logistics Enterprise must be postured to fight and win in a high-end fight where Shore platforms will be the linchpin for delivery of the 5Rs of logistics in support of Distributed Maritime Operations and Expeditionary Advanced Base Operations. Collectively, the Navy Logistics Enterprise must prioritize operations, activities, and investments deemed critical by the Fleet to support warfare readiness and influence events ashore. military construction (milcon) execution Military Construction is one of several mechanisms that the Navy uses to modernize Navy installations to enable global logistics and warfighter development, generation, and employment from the Shore. Our PB23 request continues to invest in projects supporting new platforms and the Shipyard Infrastructure Optimization Program (SIOP). The Navy MILCON requirements far exceed the funds available to resource requirements.The CNO Guidance, Fleet and combatant command (COCOM) priorities, the Navy Global Strategy Ashore, and Fleet readiness needs inform the PB23 submission, which reflects the Navy's top priorities. The 2022 MILCON Appropriations and Authorizations included a total of $2.22 billion for 19 projects, funding for planning and design of future MILCON projects, and Unspecified Minor Construction Projects. Twelve of 13 of the Navy's original requested projects were included (incremental funding provided for one project and one project marked); among these were five overseas projects totaling $304 million supporting COCOM posture priorities and persistent presence of forward deployed naval forces. The FY22 budget provided for the second increment of P381, Multi- Mission dry-dock 1 at Portsmouth Naval Shipyard, ME, in support of SIOP, as well as additional funds for planning & design for future year SIOP projects. The Navy sincerely appreciates the $768 million in additional funds provided by Congress. This provided an additional $225 million to optimize the execution of P381 and funded seven additional projects. shipyard infrastructure optimization program The SIOP is a holistic investment plan that integrates all infrastructure and industrial plant equipment investments at the Navy's four public shipyards to meet nuclear fleet maintenance requirements and improve Navy maintenance capabilities by expanding shipyard capacity and optimizing shipyard configuration. This plan is essential to supporting the future needs of the Navy's nuclear submarine and aircraft carrier force. The average age of the naval shipyard facilities and related infrastructure is 61 years, while the average dry-dock age is approaching 100 years. Dry-dock re- capitalizations must be completed to accommodate future platforms such as the Ford Class aircraft carriers and new configurations of the Virginia Class submarines. In April 2022, the Department of the Navy provided an updated SIOP Five-Year Plan to Congress and updated reporting relationships required to ensure disciplined execution of construction efforts managed within the program while maintaining uninterrupted support to the Fleet. The Navy established a Program Executive Office Industrial Infrastructure (PEO II) in March 2022, aligned with Naval Facilities Engineering Systems Command, and reporting directly to the Assistant Secretary of the Navy for Research, Development, and Acquisition. The Department also realigned Program Management Office 555 to report directly to PEO II. The Navy awarded a $1.7 billion contract to construct two new dry docks at Portsmouth Naval Shipyard (PNSY) and completed the first phase of industrial modeling and simulation at all four naval shipyards. Finally, the Navy released the Draft Environmental Impact Statement for construction and operation of Dry Dock 3 Replacement and a Waterfront Production Facility project at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) for public comment this February. infrastructure sustainment and restoration When viewed as platforms, Navy installations enable Air/Port Operations, Protection, Logistics, Warfighter Resilience/Quality of Life, and C5ISR. Investment in Facility Sustainment, Restoration, and Modernization (FSRM) is critical to supporting CNO's NAVPLAN and Fleet outcomes. The recent trend of increased FSRM investment directly benefits maintenance of critical infrastructure that enables the Fleet and warfighting missions. The Navy's PB23 request funds Sustainment to 85 percent of the DoD-modeled requirement. Restoration and Modernization program funding increase is necessary to keep pace with the unprecedented increases in material costs, supply- chain disruptions, and labor services in the construction industry. Navy Base Operating Support (BOS) comprises fleet operations, safety and security, facility support, quality of life, and mission support and management programs provided to 70 Navy installations. BOS funding has been essentially flat over the past decade and remains so for the upcoming Future Year Defense Program. Accounting for inflation, this translates to reduced buying power, creating challenges as new priorities arise each year, requiring resourcing at the expense of other programs and services. To address that challenge, the Navy has embarked on an effort to baseline BOS costs and prioritize BOS investments based on mission output. climate resiliency Climate resilience is an important component of installation mission readiness. The Navy works to ensure installations and infrastructure are resilient to a wide range of challenges, including extreme weather events, water scarcity, sea level rise, recurrent flooding, wildfires, and other environmental considerations and threats that can affect operations. The Navy's Mission Assurance Assessment Process is an ``all hazard threat assessment'' that is used to ensure the continued function and resilience of capabilities and assets by reviewing both the probability and the mission impact of climate risks tailored to specific geographic locations. Our Climate Change Planning Handbook: Installation Adaptation and Resilience, updated in 2021, provides an analytical framework and methodology for identifying and assessing viable adaptation measures to inform the installation resilience master planning process. By incorporating climate change considerations into the decision-making process, the Navy gains operational and tactical advantages, remains agile, preserves decision space, and reduces climate hazard risks to missions and operations. Climate change is already affecting the Navy in significant ways, and the threat will only intensify in coming years. The Navy is making meaningful progress with PB23 investments as the magnitude and urgency of the climate crisis increases. We are investing in efforts to optimize energy and utilities usage, planning and execution of Environmental Resilience projects, planning, and installation of Electric Vehicle Support Equipment, and converting our non-tactical fleet from gas to Zero Emission Vehicles. child development centers (cdc) Navy Child and Youth Programs (CYP) provide affordable, quality child and youth program services. The Navy has the capacity to provide care for 45.9K children ages 0-12. The current waitlist is 6.7K. Quality of programs is high overall but challenged with capacity shortfalls for ages 0-5. This is most prevalent in the fleet concentration areas of Norfolk, VA; San Diego, CA; Bremerton, WA; Pearl Harbor, HI; and the National Capital Region. Efforts are in place to reduce wait times for childcare, to include enhanced efforts to recruit and retain childcare professionals, expand community-based fee assistance and the Navy Family Child Care program, and leveraging community partnerships. Due to limited commercial capacity to support fee assistance and a lack of viable public/private partners, military construction of new or expanded CDC facilities may still be necessary to achieve capacity goals. Additionally, because COVID has had a significant impact on both commercial and military CDC staffing levels, the Navy is increasing pay and recruitment and retention bonuses to ensure adequate staffing levels. The Navy increased our fee assistance cap to $1,500 per month, making higher cost commercial programs more accessible to military members and expanding fee assistance enrollment. We also implemented required Federal employee minimum wage ($15/hour) across the enterprise. The new starting caregiver salary of $16.70/hour + locality pay will make Navy CYP positions more competitive with the private sector and positively impact recruitment and retention. Finally, the Navy released a Request for Proposal in the San Diego Metro location for leasing partnerships, but received limited interest from the community, so the Navy's PB23 request includes funding for construction of a new CDC at Naval Base Point Loma. The Navy continues to adapt to these challenges, implement lessons learned, and leverage a variety of approaches to CYP to ensure that we can provide safe, quality, and affordable childcare for our Sailors. conclusion Fundamental changes are necessary to meet the challenges facing the Shore. The effective development, generation, employment, and sustainment of naval forces by Shore platforms and payloads require that we confront the status quo and drive institutional change. We must address and improve how the Shore enterprise functions as a force multiplier, enabling the Navy to succeed in strategic competition as it supports the Fleet within the unified readiness picture assessed by and reported through Fleet Commanders. As threats change, concepts of operation evolve, planes and ships retire and are replaced by new platforms, support from the Shore will require deliberate focus, prioritized investment, and more effective portfolio risk assessment to ensure the capabilities and capacities are postured for a scalable response across the competition continuum. With the ultimate focus on Mission, we will be able to optimize support from the Shore with a focused prioritization and long-term investment strategy. Doing so requires a unified understanding of agile response across global functions for employment, generation, and development. The Navy Global Strategy Ashore will eventually combine with TNLFGPC to create an overarching strategy for logistics and installations. Thank you for the opportunity to testify before you today. We look forward to working with you to continue to enhance and enable warfighting capability and readiness through optimization, modernization and increased resiliency of our installation platforms to support Navy critical missions across the spectrum of competition. STATEMENT OF LIEUTENANT GENERAL EDWARD BANTA, DEPUTY COMMANDANT, INSTALLATIONS & LOGISTICS, UNITED STATES MARINE CORPS General Banta. Chairman Heinrich, Ranking Member Boozman, and distinguished members of the committee, thank you for the opportunity to discuss the Marine Corps' fiscal year 2023 Military Construction Budget Request today. First, I would like to thank you for the funding of last year's budget request, and our unfunded priorities list. That funding which totaled over 2 billion accelerates the Commandant's Force Design Initiative, supports Quality of Life projects, and invests in the Marine Corps' ability to fulfill its Title 10 obligations now, and in the future. Our installations play a key role in meeting the challenges facing our Nation. The Marine Corps' overseas installations are especially critical as advanced naval bases in support of naval and joint operations. We need modernized infrastructure that is resilient against threats, ranging from kinetic attack, to cybersecurity breaches, to damage from extreme weather. To meet these challenges the Marine Corps has requested over $1.2 billion for military construction projects in fiscal year 2023. This year's request has a broad focus, and includes projects that invest in several key areas, including life health and safety issues, quality of life projects, and infrastructure support for new platforms. Over half of this request is focused on the Pacific, including four projects in Guam that will help posture the 22,000 marines located west of the international dateline, in a fighting stance. The quality of life of our marine, sailors, and their families is integral to the readiness and effectiveness of our force. A new child development center at Marine Corps Air Station, Miramar, will be completed this summer, and three more projects are planned in the FYDP. The Marine Corps is in the process of renovating 12 barracks in fiscal year 2022, and we plan to renovate 15 more in fiscal year 2023, which will improve the lives of approximately 4,000 marines. Last year, the Marine Corps' focus on family housing included implementation of the remaining provision of the Tenant's Bill of Rights. The Marine Corps continues to work with its housing partners, and the other services, to ensure that our housing is safe and meets the needs of our residents. This year we plan to invest over $230 million in family housing construction and operations, including building family housing units in Guam. The Marine Corps strives to invest in resilient installations that enable operational readiness. Recent infrastructure investments include projects that reduce our reliance on fossil fuels, and off-base energy grids. For example, Marine Corps Logistics Base Albany is the first Marine Corps Net Zero Installation. The base generated more power through green energy sources than it consumed in calendar year 2021, and provided about 8 megawatts back to the local grid. The Marine Corps has also invested in microgrids at five installations that can power mission-essential functions for more than two weeks, ensuring continuity of operations. Finally, the Marine Corps is investing in the modernization of its Organic Industrial Base. These projects optimize existing facilities, construct new facilities, and improve workflow processes and productivity at the Marine Corps' two depots. The Marine Corps is currently undergoing a significant transition in how it is organized, trained, and equipped to meet current and evolving threats from peer adversaries. Our operational capabilities are adapting to meet threat changes, and we need to invest in next-generation infrastructure to match our evolving capabilities. Thank you for the opportunity to testify before you today, and for your oversight, input, and support as we determine the infrastructure requirements that will best position the Marine Corps for mission accomplishment. I look forward to working with you to sustain our warfighting capability and the readiness of our power projection platforms. I look forward to your questions. Thank you. [The statement follows:] Prepared Statement of Lt. Gen. Edward D. Banta introduction Chairman Heinrich, Ranking Member Boozman, and distinguished Members of the Committee, I appreciate the opportunity to discuss the Marine Corps' FY23 military construction budget request. Thanks to the strong support we have received from Congress, the Marine Corps continues to improve the quality and resiliency of our installations which are critical to our ability to train forces and maintain readiness. First, I would like to express my sincere gratitude for the funding provided for the Marine Corps' Fiscal Year 22 military construction program. The over $2B of total funding for these projects accelerates support for the Commandant's Force Design through projects like modernization of the electrical distribution grid at Marine Corps Base (MCB) Hawaii and aircraft maintenance facilities at Marine Corps Air Station (MCAS) Beaufort and MCAS Miramar. The additional funding provided supports the quality life for our Marines by investing in unaccompanied housing projects at MCAS Yuma and MCB Hawaii. I am very grateful for Congress' interest in supporting these critical infrastructure projects that will enhance the Marine Corps' ability to fulfill its Title X obligations and meet the challenges presented by current and future threats. role of installations The Marine Corps 2030 Strategic Logistics Plan outlines the enterprise's strategy for configuring and enhancing future logistics capabilities to sustain the force in the 21st century in terms of four objectives: enabling global logistics awareness, diversifying distribution, improving sustainment, and optimizing installations for sustained operations. Optimizing our installations is critical for achieving the objectives of this plan, and providing the logistics support that will ensure operational readiness for the future force. Our installations play a key role in meeting the challenges that our Nation faces. The Marine Corps' overseas installations are especially critical as advanced naval bases in support of naval and joint operations. This infrastructure must be properly maintained to prevent degradation of our capability to train and generate readiness for global employment to support our mission-essential tasks. The readiness of this infrastructure cannot just be measured in terms of the physical condition of our buildings but must also consider the optimal posture of the force around the globe and our resilience against the impacts of climate change and extreme weather events. We must have resilient infrastructure, both in CONUS and abroad, to enable delivery of capabilities from across the service enterprise. Resiliency efforts require hardened critical infrastructure to maintain support to the force across the competition continuum and before, during, and after deployment. Increasing the capability and capacity of our installations underpins our forward presence. In this new environment there is no sanctuary and our bases require modernization against future threats ranging from conventional kinetic attack to cybersecurity breaches to damage from extreme weather events. fy23 milcon budget request To meet these challenges, the Marine Corps has requested over $1.2B for military construction projects in FY23. This budget request supports the National Defense Strategy and long-term implementation of the Commandant's Infrastructure Reset Strategy. This year's request has a broad focus and includes projects that invest in: --Life, health, and safety issues such as the Basilone Road realignment project at Camp Pendleton; --Quality of life projects, including a barracks at Kadena Air Force Base in Okinawa, Japan; --Infrastructure support for new platforms and investments in utilities infrastructure; and --Projects that support the Marine Corps' current and future presence in the Pacific. On any given day, more than 22,000 Marines are forward-postured west of the International Date Line, and many are inside China's weapons engagement zone. In support of this posture, over half of the Marine Corps' FY23 military construction budget is focused on Pacific installations. Of these Pacific projects, four are on Guam totaling over $381M. Although this is a $149M decrease from FY22, there will be over $1.5B in projects in execution on the island in FY23. Construction at MSB Camp Blaz is currently 13 percent complete, with 34 active projects. In spite of a few delayed starts due to last year's continuing resolution, this program is currently on track to comply with the international agreement. Funding modern and resilient infrastructure in the Pacific is critical, so that Marines are postured in a fighting stance for crisis response and campaigning. quality of life The quality of life of our Marines, Sailors, and their families, is integral to the readiness and effectiveness of our force, and the Marine Corps recognizes the critical importance of our child development centers, family housing, and unaccompanied housing portfolios. Construction on the new child development center at MCAS Miramar will be complete this summer, with three more projects planned in the Future Years Defense Program. In its unaccompanied housing portfolio, the Marine Corps renovated 16 barracks in fiscal year 2021 and is in the process of renovating 12 barracks in FY22; we anticipate renovating an additional 15 barracks in FY23 at a cost of $110M. The renovations completed in fiscal year 2021 to FY23 will positively impact approximately 4,000 Marines living in the barracks. The Marine Corps' focus on family housing in fiscal year 2021 included implementation of the four remaining provisions in the Tenant's Bill of Rights: universal lease, dispute resolution, 7-year maintenance summary, and rent withholding. The Marine Corps continues to work with its housing partners and the other Services to ensure that our housing is safe and meets the needs of our residents. The Marine Corps has requested over $230M in family housing construction and operations in FY23, of which the largest investment will be $162.3M for the construction of 116 family housing units in Guam. installations resiliency initiatives The Marine Corps views installation resiliency through an operational readiness lens: resilient installations are the platforms that enable operational readiness. This resiliency rests in the ability to maintain reliable access to critical functions, such as an effective power grid, clean water distribution, and communications capabilities, as well as the ability to train and equip Marines, and care for Marines and their families. Understanding that training and operations must continue even when there are extreme weather events, the Marine Corps has undertaken several initiatives to ensure that installation resiliency requirements are understood and appropriately prioritized. The Marine Corps is currently developing installation master plans that address the impacts of climate change, sea-level rise, and major weather events at our bases and stations. The Marine Corps has also developed two new decision support tools to help make smart facility investment decisions. These tools focus investments on the most critical and significant assets and maintains the installations enterprise at a higher state of readiness. Recent infrastructure investments have included projects that reduce reliance on fossil fuels and off-base energy grids. For example, Marine Corps Logistics Base Albany is the first Marine Corps Net Zero Installation: the base generated more power through green energy sources than it consumed in calendar year 2021, and provided 7.9 MWh back to the local grid. The transition to Net Zero has improved the resiliency of the base while reducing reliance on traditional energy sources and cutting back on greenhouse gas emissions. Building on the success of the smart grid at MCAS Miramar, the Marine Corps has also invested in a microgrid at Marine Corps Recruit Depot Parris Island. These microgrids can power mission essential functions for up to 21 days in the event of an energy blackout, ensuring continuity of operations and can provide a resource to local governments in the event of an emergency. The Marine Corps will use lessons learned from these projects to make smart, resilient investments both in CONUS and overseas. Continuing to invest in projects such as Net Zero initiatives and smart grids will place the Marine Corps on a trajectory to meet future requirements while withstanding disruptive weather events. Finally, the Marine Corps is also investing in the modernization of its Organic Industrial Base (OIB). In 2019, the Marine Corps OIB Facilities Plan and the United States Senate Report on the Readiness of the Marine Corps OIB were developed. This 25-year plan provides the strategy to optimize existing facilities, construct new facilities, and improve workflow processes and productivity at the Marine Corps' two depot production plants and long-term equipment storage sites in Albany, Georgia, and Barstow, California; and at Marine Corps Support Facility at Blount Island Command, Florida. To date, the Marine Corps has completed five projects; two are under construction, and one is planned to start construction in summer 2022. conclusion The Marine Corps is undergoing a significant transition in how it is organized, trained, and equipped, to meet current and evolving threats from our adversaries. In addition to developing new operating concepts, increasing integration with the Navy, and modernizing the equipment we employ, the Marine Corps' installations infrastructure must also evolve. Our operational capabilities are adapting to meet threat changes, and we need to invest in the next generation installation infrastructure to match the Marine Corps' evolving capabilities. Thank you for the opportunity to testify before you today, and for your oversight, input, and support as we determine the infrastructure requirements that will best position the Marine Corps for mission accomplishment. I look forward to working with you to sustain our warfighting capability and the readiness of our power projection platforms. Senator Heinrich. Thank you, General. We are going to take a brief recess while the two of us go and vote, and then we will come back and start five-minute round questions. [Recess.] Senator Heinrich. I call this hearing back to order, and start the standard five-minute rounds. I will begin by recognizing myself, and then we will go to Senator Boozman, and trade it back and forth Mr. Cramer, I mentioned in my opening statement that I was encouraged by the ERCIP request in this budget, and of particular interest is the increase in planning and design funding, which should help build out the projects there that are ready to execute in the coming years. It is also my understanding that the ERCIP program is undergoing some reforms to improve planning and execution. Can you talk a little bit about the need for significant planning and design request, and how the Department is improving how it identifies requirements as well as how it develops and executes ERCIP projects. Mr. Cramer. Yes Senator, thanks for that question. Yeah, so it is a--so ERCIP has a long history of getting to where we are at today. It used to be a program that was lump sum funded, and we developed the projects, and the projects would then take four-plus, 5 years in order to actually get under contract and executed. In a lot of cases the projects would fall off. And so over the years we have been trying to get ERCIP to look more like the MILCON process, where we have a Future Years Defense Program (FYDP). And then so this year for the first year's we are actually going to see that effectuated, because we have got the leadership commitment to fund the P&D, so the $200-plus million is a surge that is going to allow us to get more projects to that 35 percent design mark, so that we can get projects awarded in the year of appropriation. I think that is where you will see where the inflation, cost of living growth, eats away at our ability to do projects that we are just not quite, frankly, ready. And so what the surge in P&D is going to allow us to do is build the FYDP for ERCIP projects. And we have done the notifications, so you can see some of that types really going after the microgrids that are going to make a difference on the installations. And then so without the----without the P&D, we are not going to be able to then get the energy projects that we need in the time that we need it. And that is more to the left, not to the right, so we are really going to rely on that P&D to get an ERCIP FYDP. And I will let my two colleagues answer if they want. Senator Heinrich. Admiral. Admiral Williamson. Yes, sir. We are very excited about ERCIP, particularly from improving our theater posture. We have $133 million right now going in for eight projects, a large portion of those are in Guam. In addition to that, keeping the operational output and the resilience of our bases, SIOP, ERCIP fits very nicely into that as well. Norfolk Naval Shipyard, we are looking at a project there, Joint Base Pearl Harbor, Hickam the same. In addition to that, we also are taking a look at the controls. One of the other things, ERCIP, we can leverage and bring into it, is also cybersecurity. Those three things go very much hand-in-hand. We take a look at that holistically, not only from an investment of the infrastructure, but also from a logistics perspective, anything we can do to help with our energy consumption allows us freedom of maneuver. In addition to that, taking full advantage of electrification also related to ERCIP, kind of looking at the whole package, if you will. We are increasing from 1,300, roughly, vehicles, electric vehicles to 1,600 this year. In addition to that we are putting another 1,200 outlets in. That allows us now to take a look at how we support Distribution Management Office (DMO) and the AVO in the Pacific, working with Ted and his team. In addition to that, I also think assessment, and something my Chief taught me a long time ago, you must be proficient. So we have also incorporated a handbook which we have given to our base commanders, we do exercises now which actually test the electrical infrastructure to help highlight potential areas for us to invest in. And I will turn over to Ted now. General Banta. Thanks Ricky. Senator, thanks for the question. So similar to the Navy, we really appreciated the opportunity to use the ERCIP program to improve the resiliency of some of our installations. I mentioned in my opening statement about the microgrids that we have developed on five of our installations right now, quite a bit of support from the ERCIP program to develop those. And it really improves our operational readiness, and our operational resiliency, not only here in CONUS, but also as we move further west into the Pacific, what we would call our advanced naval bases. So we have made pretty good use of the program, seven projects from fiscal year 2018 to 2022. We have got one in fiscal year 2023, for a microgrid at Bridgeport, and then we have got five more in fiscal year 2024, and we are looking at trying to develop seven more in fiscal year 2025. Senator Heinrich. Great. General Banta. So tremendously valuable, it has been helpful to us, and it is not just microgrids, it is also controls, as Admiral Williamson had mentioned. So thank you for the opportunity to comment, sir. Senator Heinrich. Absolutely. And I am really thrilled to see the use of storage, in particular within those microgrids. We have come a long way in just a couple of years. So with that, Ranking Member Boozman. Senator Boozman. Thank you, Mr. Chairman. What I would like to do is trade with Senator Collins. Senator Collins. Thank you very much. I very much appreciate that, Senator Boozman, and Mr. Chairman. Admiral Williamson, this year's budget requests more than $500 million for the third increment of the Multi-Mission Dry Dock Number One extension at the Portsmouth Naval Shipyard, in Kittery, Maine. This project, I don't have to tell you, is vitally important to the readiness of the submarine fleet. Beginning in 2024, scheduled Virginia class maintenance availabilities at the shipyard will exceed its capacity, and failure to complete this project would result in 20 deferred maintenance availabilities through 2040. This project simply must be completed on time or we will risk our submarines not being available to accomplish their missions. We are faced with high inflation, as far as labor costs, and construction materials are concerned, and they have an impact on this project. Is the Navy committed to ensuring that this project remains on track and on time? Admiral Williamson. Yes ma'am. Absolutely, we are committed for all the reasons you just said. As we look at the costing, as going forward, applying lessons learned from the first time out the gate, obviously are going to be very important to maintain our ability to stay on scope, stay on cost, and stay on schedule. As we mature our area development plans, as we build our dry docks, as that vision is getting much clearer now, we are beginning to find opportunities to push things to the left without then cause any risk to either maintenance critical path, or the SIOP critical path. And so we have taken into account cost for inflation, material cost, cost of labor. We are using third-party estimators and economists now to help us better refine that. So also within our budget you will also see us ask for the money to make up some of the difference from the projects from 2022. But we are committed to that, ma'am. Senator Collins. Thank you. I am very glad to hear that. As you know, the Portsmouth Naval Shipyard is considered the gold standard among our public shipyards, and we are very proud of the contribution that the Portsmouth Naval Shipyard makes to our Navy and our national security. Mr. Cramer, I just returned from a Senate trip to Kyiv in Ukraine, to Sweden, and Finland. So I am particularly interested in the European defense--or Deterrence Initiative. The Department's budget request also includes $746 million for infrastructure projects in Europe, to help deter Russian aggression against NATO, and to reassure our allies. This includes MILCON for two training complexes at Grafenwoehr, Germany, which I visited in France--not France--in March to observe the training operations of Army units that deployed in response to the Russian invasion of Ukraine. How is the Department planning for infrastructure changes that may result from adjustments to our force posture in Europe following Russian's invasion? Mr. Cramer. Senator, it is a great question. I will be out--speaking out of my lane if I talk about force posture, but I can--I do want to extend the thanks to Congress for the past funds that were provided under the EDI, ERI, going way back to 2014. So our ability to surge in Europe today, in the current crisis, was based on all of those investments that we have done over the last 8 years. And so I think what you will find is the investments going forward, will expand upon previous investments that are going to allow us to then shape the force the way that the Secretary and the President want to, as we go forward. I don't know that we are at the position where we can commit to force structure or force posture, but we have capitalized on previous investments that allow us to surge to the point where we are quite successful today. Senator Collins. Thank you. Senator Heinrich. Senator Tester. Senator Tester. Thank you, Mr. Chairman. I appreciate the work you and the ranking member do on this committee. Mr. Cramer, your opening statement talked about Military Housing Privatization Initiative, even as privatized housing is seen, it has been faced with challenges recently, there is still a critical housing shortage for our Service members. Does this budget support any new privatized housing projects? Mr. Cramer. So privatized housing, as you are aware, is the new houses are funded through basic allowance for housing, a private partner, except in the cases where we have some projects and the Air Force has these mainly as they have funds within their budget that are going to then support their projects going forward, and that would then support new housing construction at specific bases to support the Air Force. But specifically, the current budget does not envision new houses directly for privatized housing. We do have dollars in there to build our--or excuse me--DOD-owned housing in the Marine Corps, as General Banta had mentioned, and in the Army, and the Air Force, so we do within our owned inventory. Senator Tester. I will get to that in a second. So I have heard from many of the secretaries that it is hard to meet the goals of where we want to be as far as end force strength. The housing issue, my guess is, it is the same in Arkansas, and the same in New Mexico, as it is in Montana. There are no houses off base. There are just none. And the houses that are off base, the rents have gone through the roof. So the question is, if we are going to expect, or demand, that the Air Force, Army, Navy, Marine, Coast Guard, the works, meets our end strength, how is it even possible without housing? Mr. Cramer. So it is, as you reference, Senator, yeah the housing shortage is not just specific to the Department, it is a nationwide issue. And so within the Department of Defense, another Under Secretary Office, P&R, actually runs the BAH Program, and that is a survey of the rents in order to set that allowance so that we can afford--or our Service members can afford to rent off post. It doesn't do much for the inventory, you know, and actually to expand the inventory it is going to be a couple of years down the road, but we do have a mechanism within, to allow--to get the right entitlements in, and Service members' pockets; the Secretary did approve some temporary BAH increases prior to the end of last year that will, in certain areas, where we saw a high cost of rents. This is the time of the year when we start doing the BAH surveys for next year. So the military installations are part and parcel within the contractors that go out and test that rent. So I know it doesn't help ease any housing crisis today but it allows the entitlements to match what the projected housing costs are going to be going into next year. Senator Tester. I have got you. I think it is--and I appreciate everything that has been done, because I think it is stuff that has to be done. I think the problem is, we don't have inventory. We just don't have inventory. And if we bring up your counterparts, and beat the hell out of them, because they don't have their end strength where they are, I think we have really put them in a bind, if there is really no place to live. And by the way, they know it. I mean, they know it. And so let us talk about the on-base stuff more, because that is where the young service members, single service members live, and that environment for them, from a recruitment and a retention standpoint, it is also very, very important much less, very important for the job that they do in making sure that they are able to do the job that they are assigned. So give me an idea about what is in this budget for the DOD to improve the living conditions for our young, unaccompanied service members? Mr. Cramer. So I would think---- Senator Tester. You can defer it. Mr. Cramer. Yeah. I was going to say, we do fund within our normal--I will just start with a top line message--our sustainment, restoration, modernization funds do have funds in there to sustain the inventory. We have put in a number of projects. And General Banta had mentioned, some for the Marine Corps, and the Navy, for this panel. But we do have an investment, it is a continual investment in our unaccompanied housing, and I will defer to---- Senator Tester. Just before you start, Lieutenant General. So sustainment is important, but growth is also important. And so I want you to address both of them, if you could. General Banta. Thank you, Senator. So the Secretary is correct, that we have made investments in both growing our BEQ, Bachelor Enlisted Quarters capacity, but also looking at what will it take to sustain it. Very quickly, a total of 680 barracks across the Marine Corps, the vast majority are actually in pretty decent shape, either Q1 or Q2 on the Facilities Condition Index, and that is about 84 percent of them, that is not to say that there isn't more work to do, and we have done work over the years to include investing 3.3 billion from fiscal year 2008 to 2023. Moving forward, we have got 12 renovations that are underway this year, and then we have got 15 additional renovations planned for fiscal year 2023. So as far as improving---- Senator Tester. And that is just for the Marine Corps, correct? General Banta. That is just for the Marine Corps. Senator Tester. The other services have equivalent or more? General Banta. I would defer to the other services, Senator. Senator Tester. Okay. We will assume they are, and we will find out. General Banta. Yes, sir. And then I would just say for the projects in actual new construction, we have got two bachelor- enlisted quarters in fiscal year 2023, over in Japan, one on Kadena Air Base, and one on Camp Butler. And then we have requested four additional BEQs on our unfunded priority list, to help expand capacity at bases at our recruit depots, as well as Hawaii. Senator Tester. Thank you, Mr. Chairman. I apologize. Senator Heinrich. No worries. Ranking Member Boozman. Senator Boozman. Thank you, Mr. Chairman. I mentioned earlier the many economic factors facing the Department in budget development, project execution, such as extreme market volatility and record inflation. Vice Admiral Williamson, and Lieutenant General Banta, I would like to know, one, how these are impacting your fiscal year 2023 Budget estimates, and your plan to address cost increases? And two, the impacts you are seeing on project execution? And what you are doing to mitigate the issues? And very importantly, is there anything that we can do as a committee? Admiral Williamson. Yes, sir. Thank you very much for the question. I will start with the projects that are in execution now from fiscal year 2022. We are experiencing somewhere between a 16 to 33 percent increase due to inflation. We are working very diligently to make sure those projects stay on schedule, but obviously there will be some impacts from that. Projecting forward, how do we handle this going forward? Looking at fiscal year 2023 projects, and beyond, we are estimating right now somewhere between 9 to 17 percent increase to the price, due to interruptions in the supply chain, and increased cost of fuel, increased cost of material, increased costs to the workforce. So we are monitoring those very closely. As I said earlier, we are pulling some of the lessons we learned out of the SIOP, and using third-party assessors and economists to help us stay ahead of these things, so that we can plan better. In addition to that, we have also found that by putting more money into planning and designing helps us get closer to cost schedule and scope, which will allow us to maintain--stay ahead of those issues. You asked, you know, what would benefit? I think increasing our reprogramming thresholds, I think that would give us greater flexibility to execute the projects, particularly reprogramming within the MILCON to stay on schedule. In addition to that, a lot of projects are also FSRM, O&M-related. Multi-year funding I think would also allow us, not only to deal with inflation, but continuous resolution, and things like that. That would give us the flexibility to stay on track. Ted? General Banta. Thanks Admiral. So Admiral Williamson and I both draw from the same data sources here, from Naval Facilities Engineering Systems Command (NAVFAC), so the inflation estimates that he referenced we agree with, and we have the similar concerns. I would say in terms of where it helps us, he specifically mentioned the FSRM, and OMMC being a multi-year appropriation, for the reasons he said. That would be tremendously helpful, it would give us more flexibility, and the ability to plan and then execute over a long period of time, and mitigate the impact of continuing resolutions. So I think that would be helpful. We do have a number of homes that we are currently constructing over on Guam, the area cost factor there is significant, and then compounded by inflation, so there has been a significant cost increase with those that we are looking at as well. Thank you, sir. Mr. Cramer. If you don't mind. Just to put a finer point on it. So you had mentioned incremental funding, and that actually helps us then hedge some inflation, because we are not having to pay that full bill during high years, because as most of the data will show, high inflation is always followed by some lower number. And so with, you know, excess today turns into bid savings later on and so, you know, we can do split funding to account for a lot of that as we go forward. Incremental funding is a definite help going forward. Senator Boozman. Very good. Have you gotten any guidance put out by OSD addressing this? Mr. Cramer. So we are now in trying to analyze as we are looking to 2023, because that is the budget in front of us, but the 2022 is also going to have an impact on it. So we have done some analysis of--as Admiral Williamson, and General Banta had mentioned, with Naval Facilities Engineering Systems Command (NAVFAC) looking at it, the Corps of Engineers is also looking at, what is the cost of construction. Senator Boozman. Right. Mr. Cramer. And on the A&S side, our acquisition folks are looking at what is the greater, you know, cost of growth within all of our programs, because 2022, what we do or do not get done in 2022, will affect 2023. Senator Boozman. Right. Mr. Cramer. And so we are not only looking at, you know, the projections we have done for fiscal year 2023, but we have to be informed about what we are going to actually get done this year. And split funding in MILCON allows us to hedge some of that bet but, you know, not all of it. As we said O&M, we have got to get all those done this year, and what we don't buy, we then buy next year. So it is a compounding effect. Senator Boozman. All right; very good. Thank you, Mr. Chairman. Senator Heinrich. Thank you. In the interest of getting to the second panel, we are going to skip a second round. But Admiral Williamson, I have a couple of questions for the record regarding the situation at Red Hill, the lack of cost estimates and ongoing assessments, given some of the commitments that have been made there, in particular with the Hawaiian Department of Health. So I will get you those for the record, and you can get back to me. And with that we can let our first panel go. And ask our second panel to take their seats. Senator Boozman. And I think I will be submitting some too. So we will give you all some homework to do. So thank you all. Senator Heinrich. I would like to welcome our second panel. Representing the Army is Lieutenant General Jason Evans, Deputy Chief of Staff, G-9 Installations. From the Air Force we have Lieutenant General Warren Berry, Deputy Chief of Staff for Logistics, Engineering, and Force Protection. And Mr. Bruce Hollywood, Associate Chief of Operations Officer for the United States Space Force. We will ask our witnesses to make opening statements, beginning with General Evans followed by General Berry, and then Mr. Hollywood. General Evans, you can proceed with your opening statement. STATEMENT OF LIEUTENANT GENERAL JASON EVANS, DEPUTY CHIEF OF STAFF, G-9, INSTALLATIONS, UNITED STATES ARMY General Evans. Chairman Heinrich, Ranking Member Boozman, and distinguished members of the committee. On behalf of 1 million soldiers and 2.2 million family members, thank you for your continued support of our Army, and for supporting our budget request for fiscal year 2023, and for providing additional billion dollars in funding for key programs, such as barracks, childcare facilities, housing. The Army's budget for installations is aligned with priorities set by the Army senior leaders, people, modernization, readiness, alliances, and partnerships. In this year's fiscal 2023 budget, we are requesting $8.1 billion for the Army's Installation Infrastructure, $1.9 billion of that is military construction; $6.2 billion is facilities, sustainment, restoration, and modernization. Our MILCON request is focused on improving soldier and family quality of life. It also includes projects to improve readiness, and modernization, for all components at various locations throughout the United States. To make the best use of funding allotted to the Army, we are working to balance sustainment, restoration, modernization, and demolition across all components, especially as projects typically have a faster impact on improving our facilities rather than just a pure MILCON solution. We must continue to ensure our soldiers and their families have access to safe, and high quality housing, by remaining focused on improving our privatized housing portfolio, and by continuing to implement measures to increase the safety, quality and habitability of the privatized housing, by ensuring military privatized housing companies, are accountable for project performance. During February of 2022, the Army released a comprehensive climate strategy that is well nested with DOD's climate adaptation plan. The Army climate strategy directs actions to enable our force to operate in changing environments, strengthens the resilience of our installations, and increases the capabilities of our force, while also reducing our greenhouse gas emissions. We also continue to leverage the Defense Climate Assessment Tool, to identify potential hazards caused by climate change, and inform our mitigation planning efforts. I appreciate this opportunity to discuss the importance of the Army's Military Construction's initiatives. At every Army installation we endeavor to take care of soldiers, their families, by ensuring access to quality facilities, housing, barracks, and childcare. And to do that, we need your continued support by providing timely, adequate, sustainable, and predictable funding, so our installations remain ready, and resilient, and provide the quality of life that our soldiers and families deserve. Again, I appreciate this opportunity, and look forward to your questions. [The statement follows:] Prepared Statement of LTG Jason T. Evans Chairman Heinrich, Ranking Member Boozman, and members of the subcommittee: on behalf of the soldiers, families, and civilians of the United States Army, thank you for allowing me the opportunity to present the Army's Fiscal Year 2023 budget request for installation infrastructure. I would like to begin by thanking the members of this subcommittee for your strong support of Army installations, soldiers, and families. Your support of the Army's fiscal Year2023 Budget request allows us to move forward with essential projects such as improvements to barracks, family housing, and childcare facilities. These key projects will greatly assist the Army in addressing quality of life issues of concern to Congress and to Army leadership at every level. Most importantly, your actions directly enable the Army's continued support of our soldiers, their families, and our civilian workforce. As Secretary Wormuth stated, people remain the Army's greatest strength and our most valuable asset. Our people live, train, and deploy from our installations. The Army is committed to ensuring that our installations provide the quality of life services that members of the Army family deserve, as well as modernized infrastructure and related services for training and readiness. Installations are the places where unit cultures, cohesive teams, and resilient soldiers are forged, improvements to Army installations and quality of life services directly support the Army's ``people first'' priority, while posturing the Army to recruit, train, and retain high-quality soldiers, prepared to win against any foe. I look forward to sharing with you those components of our fiscal Year2023 President's Budget Request that reflect the Army's need for developing modern, resilient, sustainable installations; enhancing strategic readiness to operate in a contested environment; and delivering quality facilities, services, and quality of life initiatives to support to our soldiers, their families, and our Army civilians. the army installations strategy The Army Installations Strategy (AIS) sets the framework for how we prioritize our people through installation management. With a Stated focus of taking care of people, strengthening readiness and resilience, modernizing and innovating, and promoting stewardship, the AIS represents a data-driven way of doing business that can adapt to changing circumstances. taking care of people The AIS is the framework for how the Army keeps its promise to take care of our people. The investments we make to sustain and improve our installations directly support our people, prioritize critical quality of life programs, and provide soldiers, families, and civilians access to high-quality housing, healthcare, and childcare family housing and barracks We rely on our soldiers to keep this country safe, and in turn, it is our obligation to treat our soldiers and their families with dignity, by ensuring their access to safe, high quality on-base housing. We must not break trust with those who serve this great country so very well. The Army remains focused on improving our privatized housing portfolio and will continue to implement measures to increase the safety, quality, and habitability of privatized housing and to ensure the MHPI companies are held accountable for project performance. The Army has made significant progress in taking actions to enhance our oversight of privatized housing and holding MHPI companies accountable for delivering housing and providing customer service that meets our high standards. For example, we have hired an additional 114 full-time professionals to oversee the Army's entire housing portfolio, whose responsibilities include advocating for and providing referral services to military families needing housing. In addition, the Army conducts comprehensive housing quality assurance inspections at each change of occupancy and we are implementing third-party housing inspections of all Army privatized housing (and government-owned family housing) as required by the fiscal Year2020 and fiscal Year2021 NDAAs. In 2021, the Army conducted a third party, pilot inspection of privatized housing units at Fort Belvoir, Virginia, allowing the Department to consider the results and feedback from this pilot inspection before finalizing the newly released DoD Uniform Housing Standard and inspection requirement. The pilot inspections, which cost about $1,000 per home, were completed for 90 percent (1,879) of Fort Belvoir's 2,078 privatized family housing units; the inspections were not completed at homes where the residents refused access by the inspection team, typically due to health-related (e.g., COVID-19) concerns. The inspections found that the majority of MHPI housing units at Fort Belvoir are in good or excellent condition and identified no systemic issues impacting habitability. In December 2021, the Army initiated third-party inspections of all privatized housing at Fort Meade, Maryland, using the DoD Uniform Housing Standard, with funding for additional inspection requirements included in the Army's fiscal Year2023 budget request. In addition, the Army has fully implemented all 18 of the MHPI Tenant Bill of Rights at all of our installations, thereby providing soldiers and their families negotiating power with the private companies, including a process for resolving disputes and gaining access to maintenance records. We continue to host weekly meetings with stakeholders and privatized housing companies to review the physical and financial condition of our MHPI housing stock, as well as the status of families displaced due to maintenance and repair actions. Furthermore, independent third-party experts are performing comprehensive audit reviews of the privatized housing companies' financial and business practices, with reviews completed at 14 MHPI projects and another seven reviews in progress. In accordance with the MHPI project legal agreements, the Army controls the payment of financial incentives to privatized housing companies as a means to encourage improved work order response times, achieve better quality work, and increase resident satisfaction. Where the MHPI housing companies do not achieve desired performance, the Army will evaluate the appropriateness of such incentive payments and take action to encourage and hold the MHPI company accountable for project performance. The Army has continued our collaboration with the MHPI companies to explore and execute opportunities within the MHPI housing project to improve the quality and safety of the homes by accelerating renovation or replacement, doing so in a manner that does not jeopardize the long- term financial viability of the MHPI project. The Army's privatized housing providers have committed to a $3 billion investment in MHPI housing over the next 10 years to make or accelerate needed improvements across the portfolio. Half of that money will come from new private investments and half will come from funds accumulated in project reinvestment accounts. Likewise, the Army has invested over $900 million in the past three fiscal years (FY 2019-2021) on construction, improvements, and maintenance for Army-owned family housing. The Army's fiscal Year2023 budget request includes $605.7 million to fund construction, operation, and maintenance of government-owned and leased family housing worldwide to continue to provide quality family housing for soldiers and their families stationed overseas. In addition, we are addressing our unaccompanied housing (UH) challenges with Facilities Sustainment, Restoration, and Modernization funds, as well as Military Construction. The result has been a $2.4 billion investment in barracks construction, restoration, and modernization over the last three fiscal years (FY 2019-2021), with billions more programed for the future to ensure improved conditions in barracks. The Army is focused on modernizing barracks by providing each soldier his/her own room, enhancing security through the use of video cameras, and for new construction, updating suite amenities to commercial standards. To ensure we are able to address maintenance needs in a timely fashion, we have implemented the Army Maintenance Application, which allows soldiers to directly submit a maintenance claim without having to wait for their chain of command to input a work order. Finally, the Army is evaluating opportunities to address UH requirements within a more holistic Army Barracks Strategy. In sum, the Army's goal is to apply multiple solutions across our installations to ensure every soldier lives in a high quality, fully functional home environment that is conducive to military readiness and family safety. We will continue to engage with Congress at every step of the way as we implement necessary reforms to our housing program. We appreciate the Congress' past support of our investment in Army housing, and we ask for your continued funding support for the Army's operations and maintenance, and construction investment to ensure that our government-owned, leased, and privatized family and unaccompanied housing provides a high quality of life for U.S. military personnel and their families. historic housing program Many of our soldiers and families live in historic housing on installations around the world; historic housing brings with it a unique set of modernization challenges for high quality living standards. The Army is facing the extraordinary challenge of managing the largest inventory of historic housing in the Federal Government. This requires the Army, and our privatized housing companies, to confront the high costs of historic renovation; mitigate hazards found in historic building materials such as lead- based paint and asbestos; and address the need for expanded living space and modernization, all while preserving the historic features of over 30,000 historic homes. Following the Army's September 2020 agreement with the National Council on Historic Preservation, the Army and our MHPI housing projects have more efficiently and cost effectively renovated more than 3,200 Inter- War Era homes. This has directly improved the living conditions and the quality of life, health, and safety for the thousands of Army family members who live in Inter-War Era housing, while ensuring the preservation of the historic and architectural character of this housing. child care Another important component of taking care of our people is by providing quality childcare where availability of off-post care is limited. The Army is implementing strategies to improve access to the best childcare available. This includes funding seven new Child Development Centers by fiscal Year 2027, an estimated $120 million investment, and hiring and retaining highly qualified childcare providers. We also continue to invest in the Army fee assistance program to buy down the cost of off-post services where on-post services are unavailable, with the goal of further alleviating this burden on our families. The Army knows that these services are critical to supporting the needs of our people, and we greatly appreciate recent actions by Congress in funding new facilities in Hawaii, Fort Wainwright, Fort Knox, and Fort Leavenworth. Recognizing that our installations are also hometowns, we can, and will do better at providing services to those children who accompany our Army across the country and globe. strengthen readiness and resilience Every operational deployment starts at an installation where our soldiers work, train, drill, and live. Given current threats, we must plan for any future deployments to be conducted from a contested homeland. Only a modern, resilient installation will give the Army the capability to project power effectively under any adverse condition. The Army must adapt its installations, acquisitions programs, and training programs to be able to operate in a changing environment. army climate strategy Our installations are the Army's front line, and we must be able to project installation power sources under any adverse condition, including those caused by a changing climate. Our installations, our soldiers and families are experiencing the direct effects of climate change all too frequently, ranging from flash flooding at Fort Hood in 2016, to wildfires at Fort Hunter Liggett in 2019, and a significant ice storm at Fort Hood in 2021. The Army is regularly called upon to interrupt training and other mission-related activities to aid in civilian disaster response operations following climate change- induced weather events. In response to these realities, and recognizing the National security threat posed by climate change, in February 2022, the Army became the first service to release a comprehensive climate strategy. The Army Climate Strategy (ACS) directs actions to enable our force to operate in a changing environment, strengthens the resilience of our installations, and increases the capabilities of our force, while also reducing our own greenhouse gas emissions. ACS establishes objectives which will enable our forces to operate more effectively in a climate-altered world through three lines of effort-installations, acquisition and logistics, and training. For example, to increase the resilience of our installations, the ACS targets carbon-free, installation-based energy generation, which, paired with battery storage and microgrids, will enable the Army to self-sustain our critical missions by making us less vulnerable to local power outages. On the operational side, greater fuel efficiency of our tactical vehicles will increase our capabilities by extending the range of our combat forces, while simultaneously reducing the vulnerability and burden of supply lines that often must move through contested areas. This will result in greater protections for our soldiers. Electric hybridization of our combat vehicles will allow for silent overwatch and will reduce the acoustic and thermal signature of our platforms, thereby greatly increasing the safety of our soldiers. In sum, the ACS not only reduces greenhouse gas emissions, it also enhances the capability of our fighting force and resilience of our installations. energy and water resilience The Army is the largest consumer of installation energy and water in the DoD, spending more than $1 billion per year on these core commodities. With few exceptions, our installations rely on commercial energy and water sources to accomplish critical missions. The vulnerabilities in the interdependent electric grids, natural gas pipelines, and water resources supporting our installations jeopardize mission infrastructure, installation security, and the Army's ability to project power and sustain global operations. The Army Installation Energy and Water Strategic Plan establishes goals, strategic objectives, and measurable targets to achieve long- term infrastructure resilience and independence, while promoting efficiency and affordability. Building resilience enables Army readiness by insulating installations from disruptions in delivery of vital energy and water utility services. By including measurable targets as part of the strategic plan, we are gathering critical data to inform future planning, such as energy and water usage and the condition of related infrastructure. Installation Energy and Water Plans (IEWPs) relying on this data are then developed to outline critical mission needs, characterize energy and water baseline conditions, and propose projects and operational activities to increase energy and water resilience. The Army has completed 61 IEWPs, with most installations scheduled to have these plans completed by the end of fiscal Year 2022. The Army is also making use of Black Start Exercises (BSE) to assess capabilities and reveal energy resilience gaps, which are not always discoverable during tabletop exercises. These exercises have resulted in improved communication among the Army, local communities, and utility companies. We have conducted two BSEs in fiscal Year 2022 at Fort Hood, Texas, and Fort Leavenworth, Kansas, and another is scheduled for later this year at Rock Island Arsenal, Illinois. In compliance with the fiscal Year 2021 NDAA, we have five BSEs scheduled at Army installations in fiscal Year 2023 and each year thereafter. The Army recognizes the importance of Energy Savings Performance Contracts (ESPC) and Utility Energy Service Contracts (UESC) to improve efficiency and contribute to resilience. While these privately financed projects are targeted at reducing energy and water consumption, they also enable the Army to address maintenance and repair backlogs sooner than if we rely solely on appropriated funds. To date, we have awarded three ESPCs and one UESC in fiscal Year 2022 and anticipate awarding an additional eight contracts this fiscal year; providing a total estimated capital investment value of approximately $400 million. The Army also utilizes the DoD Energy Resilience and Conservation Investment Program (ERCIP) to reduce reliance on the grid and allow us to construct on-site power generation and associated infrastructure. The fiscal Year 2023 President's Budget includes $119.1 million for five additional ERCIP projects at Army installations. safety and occupational health Ensuring our soldiers and civilians are ready to support the Army mission requires continual investments in proactive injury and illness prevention-both on the installations and during mission execution. The Army is transforming its traditional safety and occupational health program through the implementation of an integrated management systems approach, with the goal of reducing safety risks at all facility life cycle stages, from design and construction through disposal. To ensure these techniques are adequately implemented and evaluated, the Army continues to invest in the readiness of its safety and occupational health workforce through training, education, and partnerships. support and resilience We continue to place special emphasis on installations with critical and unique needs such as U.S. Army Alaska, Fort Polk, LA, Fort Irwin, CA and Ft. Hood, TX, to review and integrate installation resources. Some examples include the Assignment Preference Pilot Program for U.S. Army Alaska, as well as Assignment Incentive Pay for specific locations (e.g., Alaska and Fort Irwin), and improved health care provider staffing and behavioral services and working with the Office of the Secretary of Defense (OSD) to review military and family life counselor assignments to meet soldiers and family needs. There is also a joint Spiritual Readiness initiative between the Office of the Chief of Chaplains and the Office of the Surgeon General that connects Chaplains and behavioral health professionals with first-term soldiers. Moreover, we continue to work with local education authorities at those locations to support virtual education pilot programs and efforts. Along with promoting spiritual, financial, and medical readiness, we continue to promote quality of life through our Morale, Welfare, and Recreation programs as well as those programs and services offered through installation Army Community Service centers. modernize and innovate Modernized installations enable a modernized force. The Army Modernization Strategy requires installations to modernize ``at pace'' with the rest of the Army to support a modernized Army by 2035. To do this, installations must provide facilities, ranges, airfields, and support infrastructure that possess the appropriate physical characteristics required by new Army weapons systems. The Army is programming upgrades to maintenance facilities, motor pools, ranges, readiness centers, network infrastructure, administrative facilities, secure facilities, and utilities to facilitate a modern and ready Army. Force projection requires assessment of roads and highways, bridges, ramps, marshaling yards, ammunition supply points, railways, and airfields. Real property master plan processes will become more technically sophisticated, using data- informed analysis and modeling to integrate new specifications of modern equipment. We are also coordinating closely with the Assistant Secretary of the Army for Installations, Energy, and Environment, Deputy Chiefs of Staff for the G-3/5/7, Army Materiel Command, and Installation Management Command to sequence planning actions and to complete, in a timely manner, the required environmental analyses under the National Environmental Policy Act (NEPA), as new weapon systems are fielded. promoting stewardship The Army's mission is inseparable from the natural habitat that is critical to accomplishing that mission. Readiness training for multi- domain operations, high intensity conflict, and development, testing, and fielding for combat system modernization all require access to realistic natural landscapes, ecosystems, and environmental conditions. Conserving these assets in a sustainable manner is critical not only to Army readiness, but also to the well-being of the Total Army and those communities that surround and support Army installations. conserve natural resources The Army's focus on conserving its natural infrastructure ensures training and testing in realistic conditions, and makes certain these natural assets remain viable, accessible, and resilient into the future. Mission supporting capabilities of our training and testing sites are directly impacted by the loss or alteration of the natural infrastructure. Documented impacts to the mission include limitations on training and testing due to factors such as loss of range facilities and assets from wildfires and/or floods, and training restrictions due to endangered species and critical habitats. For example, the 226 threatened or endangered species found on 170 Army installations in the United States result in species-related training and testing restrictions on over two million acres of land. However, as the Army sustains and improves the natural infrastructure providing endangered species habitats on our installations, endangered species populations can recover over time, thereby reducing the restrictions necessary to protect those species. encroachment mitigation Army installations are vulnerable to outside encroachment, incompatible development, and climate related threats to operations and readiness. The Readiness and Protection Integration Program (REPI) enables the Army to cooperatively address these impediments while providing the flexibility needed for training, testing, and modernization, including long-range testing and training land capability. The REPI program provides valuable tools for off-base conservation partnerships with States, Tribes, private landowners and other Federal agencies. These measures support the readiness mission by providing buffers around installations as well as other natural resource protections. The REPI program can also assist with endangered species management by providing off-base mitigation habitat as necessary. environmental compliance The Army's environmental compliance program encompasses a broad range of legal compliance and management efforts that support clean air and water, maintain natural and cultural resources, and sustain soldier training and readiness on the Army's 13.6 million acres of land. The compliance program includes actions to meet the requirements of the Clean Water Act, the Safe Drinking Water Act, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the Clean Air Act, the Resource Conservation and Recovery Act, the National Historic Preservation Act, as well as NEPA, among others. By way of example, the Army maintains 4,902 environmental permits. The Army has an excellent environmental compliance record. The vast majority of legacy Army CERCLA sites have been remediated, and of 787 inspections on Army installations by environmental regulatory agencies in fiscal Year 2021, only 34 Enforcement Actions were issued. environmental remediation The Army is also taking measures to address the presence of chemicals of emerging concern, including per and polyfluoroalkyl substances (PFAS). The Army has taken a three-pronged approach to PFAS, focusing on cleaning up past releases, testing drinking water, and phasing out the use of PFAS-containing aqueous film- forming foam (AFFF) in accordance with the deadlines established by Congress. As of March 31, 2022, the Army is conducting PFAS assessments at 337 installations. We continue to test Army-owned drinking water systems regularly and take immediate action if we find exceedances of EPA's lifetime Health Advisory level of 70 parts per trillion for PFAS. Finally, the Army only uses AFFF for fire emergencies and intends to phase out its use in accordance with NDAA requirements. The Army is committed to prioritizing cleanups at those sites where conditions warrant doing so. The Army will be fully transparent about our cleanup progress, and we will expand public outreach to neighboring communities. The Army's priority remains the health and safety of our Service members, their families, Army civilians, and the communities surrounding our installations. fy 2023 budget request for installation infrastructure The Army's fiscal Year 2023 budget requests funding for near-term requirements to help modernize installations and make them multi-domain ready and resilient. military construction Army Military Construction and Family Housing. The Army's fiscal Year 2023 military construction and Family Housing request for $1.9 billion will improve installation readiness, industrial base readiness, and soldier quality of life. The quality of life investments consists of two new barracks projects for $153 million and two family housing projects for $169.3 million. The total request includes $846 million for the Active Component (AC), $297 million for the Army National Guard (ARNG), $100 million for the U.S. Army Reserve (USAR), and $68 million in the Base Closure Account for environmental remediation, caretaker services, and program management costs at BRAC sites. Military Construction, Army (MCA). Inside the active Army's request there is $409 million supporting installation and soldier readiness ($74 million for training, $64 million for operations, $141 million for the industrial base and $130 million in support of quality of life and community services) and $153 million for barracks. The active Component also has $26 million for host nation support. Military Construction, Army Reserve (MCAR). The fiscal Year 2023 MCAR budget request supports two major construction projects: Army Reserve Center at Perrine, Florida, ($46 million) and an Army Reserve Center at Fort Buchanan, Puerto Rico, ($24 million). Military Construction, Army National Guard (MCNG). The National Guard's request supports readiness by funding $160 million for nine readiness centers and $59 million for four maintenance facilities. Minor Construction/Planning & Design. All three components have funds planned for Unspecified Minor Construction and Planning and Design. Army Family Housing (AFH). The Army's request for $169.3 million in construction funding supports two new/replacement projects providing 107 new homes in Vicenza, Italy; 64 new homes in Baumholder, Germany; and the necessary planning and design funds. The Army's request for $436.4 million in Family Housing Operations funding provides for Army Family Housing operations, maintenance and repair, utilities, and management of the privatized housing Residential Communities Initiative. Base Realignment and Closure (BRAC). The Army's request for $67.7 million includes $9.9 million for continuing caretaker and program management requirements at remaining BRAC installations closed or realigned under the five previous BRAC rounds (1988, 1991, 1993, 1995, and 2005) and $57.8 million for environmental cleanup requirements. The Army continues to work with Federal and State regulators to resolve complex environmental issues that exist on the Army's BRAC sites, and to allow each property to be conveyed and used for a beneficial non- military purpose. operation and maintenance of facilities Facilities Sustainment, Restoration, and Modernization (FSRM). The Army is requesting $6.1 billion in FSRM to address our backlog of facilities maintenance, provide sustainment to slow degradation of facilities, and demolish facilities ($80 million) that are no longer required. The Army is working with OSD to develop an asset management approach to optimizing sustainment, restoration, and modernization, demolition, and MILCON funding for facility requirements. The emphasis of the approach is to enhance the Army's building condition indices. Army Sustainment. The Army's fiscal Year 2023 Facilities Sustainment request for $4,008 million (Active $3,006 million, USAR $263 million, ARNG $739 million) will provide 85 percent of the Facility Sustainment Model requirements for all components. Restoration and Modernization (R&M), Active Army. The fiscal Year 2023 request for the AC is $1,593 million, which will primarily fund restoration projects for quality of life facilities, including barracks and Child Development Centers, as well as readiness and power projection facilities including airfields and utilities at key installations. Restoration and Modernization (R&M), Army Reserve. The fiscal Year 2023 request for the USAR is $95 million. This funding will primarily fund restoration projects for barracks, maintenance activities, and reserve centers. Restoration and Modernization (R&M), Army National Guard. The fiscal Year 2023 request for the ARNG is $304 million, which will primarily fund restoration projects for collective training barracks, reserve component readiness facilities, and recapitalization of training facilities. beyond the budget Leveraging Partnerships. The Army has a long history of leveraging public and private partnerships to optimize use of other than appropriated funds to improve Army readiness, create efficiencies, and address underfunded requirements. These agreements come in a variety of forms, but generally lead to increased investment on Army installations, enhanced provision of services, and modernized infrastructure. Many of these partnerships have tremendously improved the quality of life for Soldiers and their families. Through the powerful language that Congress enacted in 10 USC 2679, the Army has signed more than 100 Intergovernmental Support Agreements (IGSAs) that save $28 million annually and have resulted in a $42 million cost avoidance. These partnerships create efficiencies, enhance quality of life, build resiliency, and develop deeper bonds with the communities. Examples include improving the emergency response time at Fort Detrick, MD; creating utility resiliency at Fort Carson, CO; supporting environmental stewardship at Fort Benning, GA through Auburn University, and creating life skills programs at Fort Drum, NY through the State University of New York. The Army sincerely appreciates Congressional support for these authorities and will continue to actively engage with our local communities to make use of this program. conclusion Ready and resilient installations will ensure our soldiers are able to train properly and deploy globally to fight and win our Nation's wars. Modern installations enable a modern Army. Your continued support helps to ensure we retain the current force and recruit new soldiers by providing high-quality living conditions and quality of life services as key elements of the modern installation. Thank you for the opportunity to present this testimony and for your continued support of our soldiers, families, and civilians. STATEMENT OF LIEUTENANT GENERAL WARREN BERRY, DEPUTY CHIEF OF STAFF FOR LOGISTICS, ENGINEERING, AND FORCE PROTECTION, UNITED STATES AIR FORCE General Berry. Good afternoon, Chairman Heinrich, Raking Member Boozman, distinguished members of this subcommittee. I am honored to appear before you today to discuss the fiscal year 2023 Air Force Military Construction and Family Housing Programs. I would like to begin by thanking the subcommittee first, for your steadfast support and generous Military Construction funding contained within the fiscal year 2022 Consolidated Appropriations Act. I am also thankful for the fiscal year 2022 NDAA technical amendment, which enables us to award over a billion dollars of natural disaster recovery projects, at Tyndall Air Force Base in the next few months. I look forward to working with the subcommittee on our fiscal year 2023 Air Force Military Construction Budget Request, and tackling new challenges to improve this vital program. Our Nation faces an array of complex challenges in a rapidly evolving global environment. In addition to the threat imposed by pacing adversaries and other non-state actors, trans-boundary challenges such as climate change, also demand our attention. Our fiscal year 2023 Military Construction Budget Request supports the 2022 National Defense Strategy, by investing in our airmen and their families, accelerating the recapitalization of two legs of the nuclear enterprise, and supporting combatant command infrastructure requirements across the European and the Indo-Pacific theaters. Our fiscal year 2023 request is consistent with last year's request, and we have taken great strides in process improvements to create a more stable Military Construction Program that will yield an increase in the number of projects awarded in the year of appropriation, and better define cost estimates, reducing potential project delays through reprogramming requests. However, we continue to work through numerous external influences affecting this portfolio, be it from increased global market prices for commodities and labor, ongoing impacts from the COVID-19 pandemic, or from the effects of a changing climate. In the face of these challenges, the Air Force continues to balance risk and installation investment with the necessity to modernize and meet our most critical mission needs. Over time, though, this has resulted in atrophied facilities and infrastructure. In order to mitigate some of this risk, we optimized our use of Military Construction, as well as the Operations and Maintenance Funding Accounts. These two funding streams serve as the foundation of sustainable air and space force installations through a combination of well- timed Military Construction projects and continued facility sustainment, restoration and modernization funding. We are able to recapitalize when required, and sustained through day-to-day maintenance and repair, in order to maximize the lifespan of those facilities. Lastly, while we remain focused on the health of our infrastructure, and we keep in mind that our installations are more than just where our airmen work, it is where many of them and their families call home. Our fiscal year 2023 request includes $678 million for efforts which directly support service members and their families, including housing construction improvements, operations and maintenance, and privatized housing oversight, and the continued construction, of our basic military training dormitories, at Joint Base San Antonio, Lackland. Infrastructure investment in our critical quality of life facilities plays a vital role in ensuring the well-being of our airmen, and is integral to mission success. Again, thank you for your continued support, and the opportunity to testify today, and we look forward to your questions. [The statement follows:] Prepared Statement of Lt. Gen. Warren D. Berry introduction Chairman Heinrich, Ranking Member Boozman, and distinguished members of the subcommittee. Thank you for the opportunity to discuss the Department of the Air Force (DAF) Fiscal Year 2023 Military Construction Program. Installations are platforms to enable and project combat power in support of the 2022 National Defense Strategy (NDS). Every mission starts and ends on an installation. We train and equip for joint operations, provide portions of the nuclear deterrent, project power, generate readiness, test new weapon systems to build and maintain an enduring advantage, and provide safe and healthy communities at our Air and Space Force installations. Our installations also serve as key nodes in a global network of operating locations enabling Joint Force mission success around the world. Additionally, for a significant number of our 700,000 Airmen, Guardians, and their families, Air and Space Force installations are ``home.'' Hence, the readiness, resiliency, and sustainability of installations are matters of strategic importance. Our Nation faces the nexus of complex challenges: the rise of great power competition with China and Russia; the increasing complexity of multi-domain threats; economic pressures; the competition for access to resources in the Global Commons; and the increasing rate of technology change. The FY23 President's Budget Request supports the NDS and lays out a plan to modernize our military capabilities. Finally, we continue to experience the effects of changing climate, exemplified by the growing strength and frequency of extreme weather events, wildfires and droughts. Unmitigated, these endanger not only our Airmen, Guardians, and the places where they live and work, but our weapon systems, infrastructure, and water and power networks. In the face of these challenges, the Department of the Air Force has made hard choices to prioritize decisions focused on integrated deterrence in an environment of shrinking advantage against aggressive competitors, operating in an evolving natural environment. The DAF Military Construction (MILCON) program prioritizes nuclear enterprise modernization and Combatant Command (CCMD) infrastructure support in the European and Pacific theaters. The centralized Facilities Sustainment, Restoration and Modernization (FSRM) portfolio continues to focus on infrastructure risk to mission, with prioritization based on ``probability of failure'' and ``consequence of failure'' methodology, ensuring timely maintenance and life-cycle repairs at our installations. We remain committed to sustaining the DAF's power projection and enabling platforms-our installations-and appreciate the continued partnership with Congress to ensure the Air and Space Forces are well-postured to compete, deter and win. installations The Air Force continues to balance risk in installation investment in order to prioritize resources to our most mission-critical needs, ensuring the Air Force can continue to deliver combat capability to the Joint Force. The Air Force is performing installation investment through implementation of our Infrastructure Investment Strategy (I2S), increased senior leader oversight of the portfolio, and reforms within our MILCON program. First introduced in 2019, the I2S is the Air Force of the Air Force's long-term strategy to cost-effectively modernize and restore infrastructure readiness, improve the resiliency of mission- critical nodes, and drive innovation in installation management practices. tackling the climate crisis Last fall, the Secretary of Defense released the DOD Climate Adaptation Plan and DOD Climate Risk Analysis, emphasizing climate as a national security priority. Over the past several years, we have seen first-hand the impacts climate and severe weather can have on our installations and operations. Increasing temperatures, changing precipitation patterns, and more extreme and unpredictable weather conditions pose new risks to Air Force operations, readiness, installations, and facilities. The effects of climate change on the Air Force are accelerating; the time for action is now. As the largest fuel consumer in the DOD, the Air Force is not only addressing the need for climate adaptation to improve our resilience, but introducing climate mitigation efforts to optimize fuel consumption and reduce our logistics burden, while simultaneously reducing greenhouse gas emissions. Additionally, the Air Force is developing a comprehensive Climate Action Plan aligned with our National security imperatives that lays out our climate priorities and actionable goals to address the complex threat of climate change. In recent years, Congress has included numerous provisions in legislation to enhance installation resilience efforts across the Department of Defense. The Air Force, in conjunction with Additionally, as of the end of 2021, we completed 42 Installation Energy Plans at our critical and high-energy use installations to identify risks and track and adjust requirements to advance energy and water resilience goals. The Air Force is integrating resilience considerations into MILCON and other construction projects as well. We assess all projects to determine if the planned facility could be impacted by current or future mean sea level fluctuations or if it is located in a 100-year floodplain for non- critical facilities and a 500-year flood plain for critical facilities. We implement resilience actions when required by the mission or when feasible and cost-effective. The Air Force drives changes to the Unified Facilities Criteria (UFCs) and then applies those revised building codes to all MILCON projects. Many of these UFCs have been updated to specifically incorporate resilience considerations, such as sea level rise scenario planning and updated structural engineering criteria to address wind, seismic, and flood threats. To help address these challenges, the Air Force is leveraging data and analytics to make climate-informed decisions based on lessons learned from previous storm-related events. Climate considerations will continue to be incorporated into our guidance, plans, and policies to ensure our Air Force investments in facilities, infrastructure, and installation energy promote resilience to more frequent and severe weather events, while maximizing our readiness with a reduced energy footprint. special interest items natural disaster recovery efforts Through the Natural Disaster Recovery program, the Air Force will rebuild Tyndall AFB, FL, and Offutt AFB, NE, in a more efficient and resilient manner. We are designing and constructing facilities using the latest UFCs. We used a minimum design wind speed of 165 miles per hour for all new mission-critical facilities, exceeding the highest wind speed captured during Hurricane Michael, and incorporated best practices from the Florida Building Code's High Velocity Hurricane Zone for Miami- Dade, Broward, and coastal Palm Beach Counties. Facilities are also being designed 14 to 19 feet above today's mean sea level, which incorporates a 7-foot projected sea level rise scenario through the year 2100. Additionally, we emphasized coastal resilience in the plan for Tyndall AFB. This partnered approach includes cost-shared investments, which combine with Air Force investments to attenuate storm energy through natural infrastructure before it reaches built infrastructure. Key partners such as the Defense Advanced Research Projects Agency, Fish and Wildlife Service, Bay County, the Florida Department of Environmental Protection, and the University of Florida are working together as part of OSD's Readiness and Environmental Protection Integration Program. At Offutt AFB, we are consolidating facilities to higher ground-out of the 100-year floodplain. taking care of people In early 2020, the Air Force established a cross-functional Child Care Capacity Initiative Working Group to address unmet child care needs. This team prioritized child development and school age care facility projects based on unmet child care demand, staffing, and building conditions. We issued a Strategic Enterprise Executive Decision memo directing installations to initiate planning actions for 14 projects identified on the prioritized list. The Air Force is using the $11 million in MILCON Planning and Design (P&D) funds provided in FY20 to initiate designs and posture these projects for future execution. Five of our top priority child development centers (CDCs)- Sheppard AFB, TX; Joint Base San Antonio (JBSA)-Lackland, TX; JBSA-Fort Sam Houston, TX; Wright-Patterson AFB, OH; and Royal Air Force (RAF) Lakenheath, in the United Kingdom-were authorized in the FY22 NDAA and funded within the FY22 Consolidated Appropriations Act. Construction of a new CDC at Tyndall AFB is scheduled to be complete by December 2022, and construction of a new CDC at Joint Base Andrews, MD, is expected to be ready to award in the summer of 2022. Because CDCs have not historically competed well against other mission-related priorities in the MILCON program, we have turned to FSRM resources to address childcare facility concerns while we posture MILCON projects for future execution. In FY22, we have prioritized 6 CDC FSRM projects, valued at $19.7 million. The Air Force is also committed to ensuring unaccompanied service members are provided quality housing on our dormitory campuses. The Air Force has underscored the roles and responsibilities of Commanders in protecting the health and safety of unaccompanied Airmen. Commanders enforce inspection criteria to identify and report conditions requiring immediate and future maintenance, as well as adequately resource maintenance and repair programs to effectively address requirements. Funded from the Air Force FSRM account, the investment strategy for dormitories focuses on sustainment, restoration and modernization of these facilities in their existing configurations. This enables the Air Force to focus MILCON funds on modern, formal training facilities for newly recruited Airmen, such as the Airman Training Center at JBSA- Lackland. fy23 air force milcon program In FY23, the Air Force MILCON request is $2.05 billion. This request will support the Air Force's commitment to fulfilling National Defense Strategy (NDS) requirements, posturing for the future high-end fight, and taking care of our Airmen by providing functional operational work spaces. The program supports Combatant Commanders with a focus on the Pacific and European theaters and modernizing the nuclear enterprise. Our request also focused on P&D to reinforce the Air Force's MILCON program stability and consistency. Additionally, the MILCON program continues efforts to bed down new weapons systems and seeks to recapitalize facilities that have outlived their useable life or no longer meet mission requirements. combatant commander infrastructure The FY23 MILCON program prioritizes Combatant Commander requirements with a particular emphasis on the Indo-Pacific and European theaters. Support to U.S. Indo-Pacific Command will enhance the United States defensive posture in the region, reassure allies and partners, and increase readiness capabilities. The request included $451 million for projects in Alaska, Japan, and the Northern Mariana Islands to recapitalize key facilities, disperse resources, and construct operational and maintenance facilities, as well as provides Pacific-focused P&D. The request also included construction of fuel storage and aircraft parking apron on Tinian, aircraft operations and maintenance facilities in Japan, and a runway extension to increase airfield capacity in Alaska. The Air Force remains committed to European Defense Initiative (EDI) efforts to reassure North Atlantic Treaty Organization (NATO) allies and other European partners of United States commitment to collective security and territorial integrity. In FY23, the Air Force requested $244.9 million for EDI to include support for the prepositioning of equipment in Italy, Iceland, Spain, and Hungary, as well as base perimeter security in Norway. These projects will further improve deterrence efforts in the theater and enable joint and coalition forces to quickly respond to aggressive regional actors. The Air Force request also included support to Combatant Commands within the United States to include a continued focus on Weapons Generation Facilities directly supporting U.S. Strategic Command; and fuel and maintenance facilities supporting U.S. Central Command. new mission bed downs The FY23 budget request also supported the bed down of new weapons systems and missions, with a heavy focus on modernizing the nuclear enterprise. The request included two projects at Ellsworth AFB, SD, to bed down the first B-21 Raiders. It also included three projects at F.E. Warren AFB, WY; two projects at Hill AFB, UT; and one project at Vandenberg Space Force Base (SFB), CA, to support transition from the Minuteman III intercontinental ballistic missile weapon system to the Ground Based Strategic Deterrent (GBSD). The NDS directs the Department of Defense to build a force that is lethal, resilient, sustainable, survivable, agile, and responsive through modernization of key capabilities, the first of which are nuclear forces. Once on-line, these weapons systems will ensure the Air Force can effectively supply two-thirds of the Nation's nuclear triad well into the future. The Air Force appreciates the legislative authorities which posture the GBSD program for success. The fiscal year 2021 NDAA provided significant flexibility for the Launch Facility/Launch Center conversion under MILCON authorization, authorized $15 million of MILCON P&D for GBSD, enabled all GBSD construction to be carried out under direction and supervision by the Secretary of the Air Force, and allowed a single prime contractor to plan, design, and construct all GBSD projects. The Air Force will continue to inform Congress on the Air Force's progress during design, construction, and commissioning of GBSD facilities. The FY23 President's Budget did not include funding requests for the F-35A bed down program. After the generous FY22 F-35A bed down support for facilities at RAF Lakenheath and Luke AFB, AZ, funding requests will resume in future years to complete the full bed down program. Lastly, the budget request included a three-bay depot maintenance hangar at Tinker AFB, Oklahoma to directly support reliable and responsive infrastructure for the KC-46A weapons system depot maintenance. existing mission recapitalization The FY23 request also sought $218.3 million to recapitalize facilities that surpassed their useable life or no longer met mission requirements. This request included additional funding for our Basic Military Trainee Recruit Dormitory modernization, to include an increment for Dormitory 7 at JBSA-Lackland. Other recapitalization projects included a supplement to the MIT- LL West Lab CSL/MIF at Hanscom AFB, MA, and a RAPCON facility at Shaw AFB, SC which is a resilience project designed with previously appropriated resilience funds. planning and design P&D remains a central focus of the Air Force MILCON program to reinforce program stability and consistency. Sufficient P&D enables projects to progress rapidly through design and meet maturity criteria for admissibility into the program, provides more accurate cost estimates, and maximizes opportunity to award projects in the year of appropriation. Without sufficient P&D, the Air Force must award designs by design phase, which adds risk associated with costs and timely delivery of design. With the FY23 P&D request of $136 million, the Air Force intends to fully fund designs for our planned FY24 and FY25 projects, as well as initiate design for FY26 projects. The outcome of our 2 year budget lock policy is a stable MILCON program allowing us to efficiently use P&D for future projects. facility sustainment, restoration, and modernization (fsrm) We view the FSRM and MILCON programs as interdependent; together, these two funding streams serve as the foundation of sustainable Air Force installations. FSRM provides a non- MILCON pathway to repair facilities and infrastructure, maximizing their lifespan. Our I2S drove changes in how we execute the FSRM program by prioritizing projects based on mission risk and timing investments at the optimal point in the asset lifecycle. The centralized FSRM scoring model targets investments at an asset's ``sweet spot'' in its life cycle rather than at end-of-life failure, which is significantly more expensive. FSRM funding distributed directly to installations (considered decentralized FSRM), empowers Commanders to make the right local investment decisions, including day-to-day maintenance and smaller scale repair and sustainment projects, based on mission requirements and I2S guidance. The Air Force will continue to utilize I2S principles to restore the health of our installations by refining business processes and implementing private sector best practices. These include implementing cost management strategies specific to different spending categories, leveraging data to improve the timing of sustainment and recapitalization actions, and establishing standards of services and equipment to achieve economies of scale. In order to maximize the near- term impact of current funding levels, the Air Force will also continue to assess mission thread vulnerabilities and prioritize infrastructure repair requirements which directly affect an installation's primary mission. housing construction, operation and maintenance The Air Force prioritizes providing safe and healthy homes to our families. The Air Force Housing program provides for housing construction, P&D, and operations and maintenance. The military construction funding enables planning studies and design for future construction projects and supporting the restructures of privatized housing projects. The military family operations and maintenance program supports the day-to-day operations and administration of our military and privatized family housing, correcting health and safety deficiencies, and provides for the alterations and major repair projects to sustain and modernize the housing inventory. The high cost of construction continues to present challenges to improvements of Air Force-owned family housing. The increased cost of construction will require solutions within the Air Force family housing construction program to achieve full scope on projects. The Air Force continues to focus investment in the Air Force housing inventory to provide adequate housing for all service members and their families. Our military family housing operation and maintenance enables us to sustain, improve, and modernize our Government-owned inventory of approximately 15,200 family housing units and provide enhanced oversight of over 52,000 privatized homes. Combined, the family housing operations and maintenance and construction programs will ensure continued support for the housing needs of Airmen, Guardians, their families, and our Army, Navy, and Marine Corps teammates housed in government-owned and privatized inventory. privatized housing The Air Force is committed to ensuring that Military Housing Privatization Initiative (MHPI) projects provide safe, quality, well- maintained housing where military members and their families will want and choose to live. We remain focused on improving our privatized housing portfolio and addressing the remaining elements of the MHPI reforms set out in the fiscal Year 2020, fiscal year 2021 and fiscal year 2022 National Defense Authorizations Acts (NDAA). The Air Force has made significant progress implementing reforms to enhance our oversight of privatized housing and hold MHPI companies accountable for delivering quality housing that provides a positive living experience for tenants. An important effort is the DOD MHPI Tenant Bill of Rights. On August 1, 2021, DOD issued a revised and updated MHPI Tenant Bill of Rights that includes all 18 rights set out in 10 U.S.C. 2890. Applying many of these rights at existing MHPI housing projects requires voluntary agreement by the private companies who own, operate, and maintain the projects. Most Air Force companies have agreed to implement all 18 rights at their existing projects. With few exceptions, all rights are fully available at all installations with Air Force MHPI housing. The Air Force has improved oversight by adding 218 government positions across the privatized housing program, increasing inspections, providing additional training to housing personnel and revamping housing governance placing more structure to housing policy and management. Resident Councils have been established at Air Force sites to provide two-way communication between the residents and installation and project owner leadership. Additionally, the feedback from tenant satisfaction surveys (work order and annual) are used to develop action plans for improving the resident experience. The Air Force has also established Resident Advocates at Air Force sites to engage with residents, installation leadership and MHPI company and its property management representative to help resolve any disputes at the lowest level and improve communications with all stakeholders. In addition, the Air Force established a toll free housing call center where tenants have 24-hour access to elevate concerns. The Air Force has expanded its metrics for assessing the health of the privatized housing portfolio, particularly with regards to resident satisfaction, maintenance quality and responsiveness, and property management operations. Many of these business health metrics are now also included in the new Performance Incentive Fee (PIF) agreements Air Force has negotiated with its largest private partners giving them a financial incentive to meet or exceed the standards established for our MHPI program. Timeliness and thoroughness of repairs continues to be a challenge, compounded by the National labor shortage and complications posed by COVID; however, indications are that maintenance quality is holding steady or improving, as evidenced by work order survey data and Military Housing Office change of occupancy maintenance inspections. The Air Force has implemented a Portfolio Assessment Program that places increased emphasis on maintenance performance and change of occupancy maintenance, driving engagement at all levels with the project owners to improve performance. The Air Force continues to remain focused on improved oversight, long-term project health, and sustainment of the housing inventory to provide military families access to safe, quality, affordable, and well-maintained housing communities where they choose to live. Some privatized housing projects will require financial restructuring to continue to remain financially stable and market comparable. The restructure goals are to fully fund operational expenses, debt servicing, and sustainment of the homes for the life of the lease and to fund reinvestment needs during the mid-term reinvestment period. The Air Force included $230 million in the FY23 request to complete the required Air Force MHPI restructures at select locations. base realignment and closure (brac) The FY23 request includes $107 million for the BRAC cleanup program for environmental restoration and property transfer activities at 34 former Air Force installations closed through prior BRAC initiatives. Our BRAC cleanup program focuses on protecting human health and the environment, projects that transfer acreage and achieve beneficial reuse of property, and investigations and response actions associated with PFAS. Through the BRAC process the Air Force has closed 40 installations and sites and transferred more than 98 percent of the property back to communities for beneficial use, producing $2.9 billion in annual savings. Property transfer is complete for 35 former installations, and we expect to complete transfer of the remaining 1,858 acres at five former installations by 2027. The Air Force greatly appreciates Congressional support for our efforts to address PFAS contamination and continue the cleanup and transfer of BRAC properties. united states space force In accordance with Department of Defense direction that the Space Force be established as a lean, agile, mission-focused military Service, the Space Force will rely on the Air Force for infrastructure, logistics, security, medical services, and a host of other support functions at their bases. Formal agreements and implementation plans are in place to codify all stakeholder roles and responsibilities. In FY22, the Air Force transferred FSRM, unaccompanied housing, and facilities operations funds to the Space Force for planning, programming, budgeting, and execution. In FY23, the Department will allot MILCON funding based on Space Force's portion of the total plant replacement value rather than transferring MILCON funds. This approach was chosen to provide flexibility to resolve any resource challenges supporting Space Force requirements. The Space Force also developed a separate governance process for their infrastructure investments, leveraging current DAF processes, to ensure strategic alignment of investments to Space Force priorities. Space Force's FY23 MILCON program priorities support US SPACE COMMAND through the beddown of a new weapon system, the Long Range Discrimination Radar (LRDR). An eighty-four person dormitory at Clear Space Force Station, Alaska, eliminates a dormitory deficit and provides bed spaces needed to accommodate LRDR support personnel. Additionally, the FY23 MILCON program is focused on P&D to prepare future requirements for execution and reinforce program stability, as well as execute one Unspecified Minor Military Construction project at Vandenberg Space Force Base to stabilize a road that provides sole access to a radar site and is prone to landslides. Space Force's FY23 Facility Sustainment, Restoration and Modernization priorities include reducing risk to mission and force by addressing energy redundancy and resilience, physical security, and quality of life requirements. conclusion The Department of the Air Force supports the 2022 National Defense Strategy and laid out a plan to defend the homeland, deter pacing threats, and modernize our military capabilities while taking care of our Airmen, Guardians, and families. The I2S continues to guide MILCON and FSRM budget decisions and business practices as we endeavor to deliver ready, resilient installations as cost effectively as possible. The MILCON program prioritizes nuclear enterprise modernization and supports Combatant Commanders, with particular focus on the European and Pacific theaters. The housing program provides the resources needed to sustain and improve the DAF's inventory of government-owned homes, and oversight of privatized housing project owners. The Department of the Air Force remains committed to working through challenges affecting this portfolio and delivering effective, efficient installation engineering services. DAF energy, installation, and environment priorities ensure that our Airmen, Guardians, weapon systems, and installations continue to be ready to defend American interests now and in the future. Thank you for the opportunity to discuss the Department's FY23 MILCON program. We appreciate Congress' continued support for our enterprise and look forward to working with you on our FY23 priorities. STATEMENT OF MR. BRUCE HOLLYWOOD, ASSOCIATE CHIEF OPERATIONS OFFICER, UNITED STATES SPACE FORCE Mr. Hollywood. Good afternoon, Chairman Heinrich, Ranking Member Boozman, and distinguished members of the subcommittee. Thank you for the opportunity to discuss Space Force Installations, and our Military Construction Program. The capabilities and benefits provided in and through space are vital to our way of life and a critical prerequisite to effective military operations across all other domains. Over the past two decades the space domain has shifted from a benign environment to one that is contested where our adversaries are increasingly active and disruptive. We are our Nation's newest Military Service, purpose built to organize, train, and equip Space Forces, to protect America's interest in the space domain, and provide critical capabilities to the Joint Force in accordance with the 2022 National Defense Strategy. Our installation investments through Military Construction and Operations and Maintenance funding are especially vital to the Space Force mission, because the bulk of our forces are employed in place, and our installations serve as our power projection platforms. Our Space Force bases and stations also serve as home to many of our Guardian, supporting airmen, and their families. We work ceaselessly to provide them a comfortable and safe place to live. As one of two services within the Department of the Air Force, and in line with the Department's guiding principle of ``One team, one fight'' we will remain partnered with the Air Force as it provides foundational installation support to the Space Force. To remain a lean and mission-focused Service, as directed by Congress, and in accordance with our Chief of Space Operations Planning Guidance, the Space Force will continue to rely on the Air Force, for infrastructure, logistics, security, medical services, and a host of other support functions at our bases. Formal agreements and implementation plans are in place to codify stakeholder roles and responsibilities. We plan resilience into our mission operations and protect the guardians, airmen and families stationed in locations at risk from severe weather. Additionally, we are active partners in the Department's facility, and infrastructure readiness initiatives, and participate in the energy and water resilience conversations being discussed across the Department. This past year, the Space Force developed an independent process for prioritizing requirements through a deliberate, collaborative planning effort, that accounts for our operational, and community priorities. We are focused on infrastructure improvements in areas to reduce risk to mission while, simultaneously, reducing risk to the Force by improving the quality of life for our Guardians, supporting Airmen, and their families. Our installation investments, through the Military Construction Program, and our operations and maintenance accounts, and our collaborative relationships across the Department of the Air Force, especially with Lieutenant General Berry's office, are critical to performing our mission, and to the well-being of our guardians, supporting airmen and their families. Thank you for your time and continued support. I am truly honored for the opportunity to testify today, and I look forward to our dialogue. Senator Heinrich. Thank you, Mr. Hollywood. For General Evans, and General Berry; in our fiscal year 2022 Bill, we included 125 million for design and both minor and major construction of laboratory infrastructure, to modernize our Research, Development, Testing, and Evaluation Base, this funding helped buy down unfunded requirements at installations across the country, including at White Sands Missile Range, still we know there to be a significant need for such funding. As it pertains to Military Construction, how are you identifying and prioritizing laboratory infrastructure? General Evans. Sir, thank you for the question. Laboratories, as you articulated, are very important. We have two laboratories in the Walter Reed, Dietrich area that DHA will fund for critical medical research. We have got two laboratories on the UPL for Vicksburg and Redstone, and then we have another five in the FY DP. So a total of I think eight there, sir. So this is vitally important to us. Senator Heinrich. General Berry. General Berry. So Mr. Chairman, the fiscal year 2022, Section 129, the Air Force got about 25 million of the 125 million that was appropriated. From that 25 million we have in place, we are still working the Spend Plan, but it looks like we will be able to get to about seven test projects that we will do planning and design across the Air Force, to get after some critical capabilities for the test and evaluation enterprise. I think if you look across our FYDP as well, you will see that, for example, just in hypersonic test infrastructure across the fiscal year 2023 FYDP, we will put about $336 million into that test infrastructure. Not all facilities, obviously there are other things that the test infrastructure needs, but that is a huge investment for us, and recognizing the importance of that mission set. Senator Heinrich. For General Evans. The Army Climate Strategy released earlier this year, lays out a pretty ambitious objective of installing a microgrid on every installation by 2035, indeed, most of the ERCIP funding for the Army over the past few years, has focused on microgrids. How are you determining the order in which installations are prioritized, and what are some of the most significant challenges that you anticipate facing in trying to get to that objective? General Evans. Sir, so right now the installations, through their internal energy and water plans, do the assessment and determine the criticality or the need for the microgrids. We did five last year. We are scheduled to do 12 ERCIP programs this year, 11 of which are microgrids, and then another 5 next year. So we are absolutely invested in this technology, as was mentioned before, it is good for energy conservation. We think it has applicability to the electrification, as we pursue electrification of the vehicle fleet. So, sir, we are all in. Senator Heinrich. It is my understanding that there is design funding included in the ERCIP request this year for a microgrid at White Sands Missile Range. Is that something you can confirm? General Evans. Yes, sir. We do have approximately $29 million for planning design for a microgrid in White Sands Missile Range. Senator Heinrich. Excellent. Mr. Hollywood, last year I included designed funding, I included design funding, the Space Rapid Capabilities Office, at Kirtland Air Force Base, and I am pleased that full funding for the construction project has been identified in the FYDP, and hope design is able to get underway soon. I understand that the Space Force now has dedicated obligation authority within the Air Force top line. As the Space Force carves out its own Military Construction program could you discuss how you are identifying developing and prioritizing those projects within that program? Mr. Hollywood. Thank you for that question, sir. And thank you very much for the funding for the Space RCO. That is going to be an important piece of our technology and building going forward. As we work within the Department of the Air Force, MILCON, it is a single-funding stream, and that that gives the secretary flexibility to perhaps give us more on those times when we need a little bit more, and to balance it across. But, sir, the way that we prioritize is by trying to reduce the risk to mission, and effectiveness of the mission by looking at resilience, readiness, and in our training, and infrastructure, and then by reducing the risk to our people by working on our quality of life initiatives. Senator Heinrich. Ranking Member Boozman. Senator Boozman. Thank you, Mr. Chairman. I asked this question to the first panel, and I would really like to get your input also, because it is also very important. We are really just in a unique time right now. How are economic factors, such as extreme market volatility, and record inflation impacting your fiscal year 2023 Budget Request, and project execution, what is your plan to address the cost increases? And very, very importantly, you know, what can we do to help you? General Evans. Sir, thank you for the question. We have experienced over the last year about a 24 percent increase for MILCON projects, which is really attributed to labor, the supply line, and materials. Now, we are experiencing with the 6 percent increase in fuel, of approximately 30 percent. We work closely with the Corps of Engineers, what this has done is we are no longer having the contractors hold their bids before they--we would have them hold their bids for about 6 months until we got the authorized threshold reprogramming. That is no longer the case. So what you will see in the 2023 UPL is about 22 cost to completes. That is about half of the 46 projects, and that is a result of the cost increases. We believe, like the Navy, that we can work with your staff and OSD, to probably get the authorized threshold reprogramming raised, and probably try to reduce that time to hold the contractors in place to get the bid on the MILCON. Senator Boozman. Mm-hmm. Very good. General Berry. Senator, thanks for the question. I think my answer will mimic a lot of what my Navy and Army counterparts have said, right. So certainly continuing resolutions are not helpful for us because it delays our ability to advertise an award, and in construction business time is money, and that does tend to lead us to higher bids than what we would have originally anticipated. Senator Boozman. That is definitely noted. Yes. General Berry. Yes, sir. Clearly, as I mentioned in my opening comments, we are doing a lot more planning and design, being much more rigorous in our process for planning and design, to get projects to 35 percent so that they are more mature, so when we come to you for funding we have a higher confidence level that what we are going to build will cost what we think it will cost. But without a doubt there are inflationary pressures on us today that we haven't seen before. And while we have taken a large portion of our professional engineers, about 1,200 so far, and put them through some cost estimating courses, and improve their capabilities there to do cost estimating, sometimes you can't predict all of those inflationary pressures. And they are real, steel is up 110 percent, aluminum is up about 34 percent, and it just comes to--it comes to roost, right, when the contractors give their bids, or cost to complete, as General Evans said. I will echo what Admiral Williamson said as well. I think it may be time to look at the reprogramming thresholds. I think the last time we did a reprogramming threshold change was in 1982, for reference, I was a high school senior, I am not that anymore. And I think gas was a $1.30 a gallon. So it is not hard to exceed a $2 million threshold in today's environment given the complexity, and then add to it the increasing pressures from inflation, it tends to eat into those project costs pretty quickly. So certainly, I think the Air Force would welcome a conversation about looking at those reprogramming thresholds again. Thank you. Senator Boozman. Very good. Mr. Hollywood. Sir, there is really not a whole lot to add to what has been said. We benefit from all the hard work the Air Force has done in recent years on refining their bidding process to get that as right as it can be before they even begin construction, but any help with multi-year funding, with incremental funding, and with increasing the thresholds, would be extremely helpful. Even as small as we are, we have got projects that have been impacted by having to come back and be delayed during a reprogramming action. Senator Boozman. Very good. Thank you. Lieutenant General Evans, over the last few years there have been multiple issues with privatized housing, I am really following up on Senator Tester's remarks earlier. You and I have had some great discussions about this. I know that nobody cares more about this than you do, taking care of the men and women that are serving. But again, privatized housings and barracks, in the last few weeks the Army has had some tough, pointed questions at other hearings on their quality of life investments or lack thereof. Can you share the Army's investment strategy, and what you are doing to improve housing for soldiers? General Evans. Yes, sir. Thank you, for the question. So we talk about housing, we talk about both privatized housing Army- owned housing, and then barracks, and that is the number one priority under the Quality of Life Initiative for the Army. We have, currently, for barracks we have got a ten-year MILCON R&M plan that will address over 1,600 barracks, and to date, in 2021 of 2022, that will be about $10.3 billion, we are about $2.3 billion into that now. We have got two barracks in the program for 2023, along with 78 R&M projects, because we believe the R&M sustainment is just as important as the military construction. For the privatized housing, we continue to hold ourselves accountable, as well as the private partners for performance. We have implemented the 18 Bill of Rights across the 44 installations that have privatized housing. Right now we have a couple partners that have invested about $3 billion to build new homes. That work has started for lend-lease in places like Fort Hood, about 586 homes; in places like Fort Campbell. For Army-owned housing, which the preponderance about 93 percent of that is overseas, we are investing about $1.5 billion in that, and in much needed places like the Vicenza housing area. And so to add to that, I would like to throw in, also the child care, because that is an important facility investment, or a capacity issue that we have in the Army. And we thank the committee for their support for three of the child-care facilities in 2021 that are in high wait areas, or high demand areas, like Alaska, and too in Hawaii. And then last year on a UPL you gave us one for Leavenworth, and one for Fort Knox, and then we have seven more in the program. So we are very appreciative of the support of the committee, and we think we are on a good path to create increased capacity with childcare, along with incentivizing staff, incentivizing family childcare homes, by providing $1,000 for people getting that. The Fee Assistance Program, that monthly will raise the fee assistance for folks who take advantage of that, from 1,500 to 1,700. And so we are ecstatic about where we are going with increasing the capacity for all of those. Senator Boozman. Good. And that is a good story. Senator Murkowski. Senator Murkowski. Thank you, Mr. Chairman. And General Evans, I was glad to hear your response to Senator Boozman's question here. Obviously housing is a key priority, but we also need to focus on childcare, and what we are doing to provide for our families there. The number one item listed on the Army's unfunded priorities list is a new multi-purpose field house, physical fitness facility. I think we recognize, maybe it is not so apparent in a place like Arkansas where your weather is more decent most times of the year and we require a level of readiness, and you can't just be out jogging when it is 40-below, and getting the fitness training that you need without appropriate facilities. And so I appreciate the focus and the attention that has been made to this field house or this fitness facility. We are all very, very targeted on what we are seeing, with alarming rates of suicide, and we recognize that when we provide for certain quality of life initiatives, whether it is childcare, whether it is fitness centers, these are just not nice to haves, this is part of what our soldiers need. I had an opportunity at a recent SACD hearing, to hear from the secretary as well as the chief of staff of the Army on the importance of this particular facility up north. And I asked the question about why this fitness facility is needed, why it is number one on the unfunded priority list. And also I asked about the price tag, because we sit here on the Appropriations Committee, and it is $99 million. And that figure will get the attention of folks. And I would like you to, for the record, provide to this committee the reason why it is your number one unfunded priority? And to the issue of cost, we recognize that it is just more expensive to build up north. But I don't want people to think that this is some gold-plated Taj Mahal, what we are doing is we are building a necessary facility. But I would like you to speak to that, if you would? General Evans. Yes, ma'am. Thank you for the question. First of all, I had the opportunity to travel to Alaska during the winter months with the vice chief of staff of the Army. Senator Murkowski. It was kind of dark. General Evans. Yes, ma'am. It is kind of dark there for a longer period of time, and it is kind of dark here, and the extreme weather conditions do not lend themselves to soldiers performing physical exercise outside. The physical fitness center gets directly to soldier resiliency, as well as fitness, and the ability to be ready, combat ready, physical ready, because you can perform the Army combat physical fitness test indoors. The price tag, ma'am, in the area cost factor is much higher there in Alaska because only from early spring to early fall when that is the only time that you can really conduct construction. We are in a planning and design phase now, and we anticipate construction in early 2024 in completion, and we are just ecstatic about this. This is the chief of staff's number one priority, is that physical fitness center, because it gets directly to our number one priority of people, and supporting soldiers. And you mentioned the issues we have had up there, and we think this is something that gets right at that, in terms of resiliency and fitness for the soldiers. Senator Murkowski. Appreciate that, and know that we are looking forward to seeing that completion. Let me turn to you, Lieutenant General Berry. With Eielson Air Force Base now home to 54F-35s, where we are looking at areas within the MILCON budget request, there is an absence, in my view, when it comes to increased storage and coverings to protect them from these winter climates. You not only can't--your soldiers can't train out there--it is tough on those airplanes, it is tough on the aircraft. We are going to get four additional KC-135s in addition to the F- 35s, but what I am hearing is that we just don't have enough hangars and storage to safely accommodate this influx of aircraft and equipment. I am told that the Air Force often uses off-base civilian storage to rent space for large exercises when we have things like Arctic Edge, but it is becoming more challenging, I guess it is less reliable as the civilian companies are increasingly utilizing their own space. So I don't know if you can speak to whether or not the Air Force currently has a plan to address this shortfall through future military construction projects; if you are looking at the issue of hangar and storage space in the Arctic and what you can share here. General Berry. Thank you, Senator. I will say, in the 2017 Appropriations we had $161 million to build two 16-bay weather shelter facilities for the F-35s, those are in place. There are another 18 parking locations indoors for F-35, and when necessary then we can clear out some more space to make room for another 4, which handles all of 54 of the F-35s. So from what we see, we don't see a shortfall of storage locations for housing F-35s indoor. If you are hearing something different, we will probably need to go reconcile that, and we will go back up to the folks at Eielson to make sure we have the same site picture. But that is how we view the situation up there at Eielson. And we also had, in fiscal year 2020, a project to build storage facilities for the support equipment that goes for the F-35s as well, so that project is underway to provide some indoor storage for those support equipment--requirements for the F-35. The KC-135, we will have to take a closer look and see what that requirement will be. Those airplanes won't start arriving right now until fiscal year 2023, so we will go back to Eielson and make sure that we have that ground covered as well. And then as far as Arctic Edge, I will have to get back to you on that one. I had not heard that as a concern for off-base storage for that particular exercise. But we will go back up and make sure that that is--square in that corner as well. Senator Murkowski. I appreciate that. And particularly as it relates to the KC-135s there, and just anticipating their arrival. But thank you for that. Mr. Chairman, I am out of time, but I do want to just note to Mr. Hollywood, my appreciation that this year's budget request does include this dormitory to house 84 Guardians at Clear Space Force Station. I think it was recognized in the budget that this place, Clear, is one of the most strategically important installations in our country. We know that, but we also have to have a place to house our Guardians there at Clear Space Force Station. The community just doesn't have a lot of housing, and I certainly know that, and I am sure that you do as well, so we were pleased to see that addition. Mr. Hollywood. Thank you for your support, Senator. Senator Murkowski. Thank you. Thank you, Mr. Chairman. Senator Boozman. Senator Hoeven. Senator Hoeven. Are you the chairman? Senator Murkowski. Yes. Senator Hoeven. Are you the chairman now? I thought you were the ranking member. When did you switch parties? Senator Boozman. Behave. [Laughter.] Senator Hoeven. Thank you, Mr. Chairman. My first question is for General Evans. We expected the Jamestown Readiness Center, which is the 817th Engineer Company, Sapper Company. We expected that they would be in the FYDP. Can you tell me how come they are not, and when they are going to be? General Evans. Thank you for the question, sir. So we prioritize based on the Army simulators, and the top line. I will go back to see where that project is for 2024, sir. Senator Hoeven. Yeah. That was their number one ask, so we need to get them in the FYDP, so I would appreciate that very much, if you would. General Evans. Yes, sir. Senator Hoeven. And then also the Line of Communications Bridge, can you tell me where you are in terms of the LOCB training capability, are you familiar with that? General Evans. Sir, I am not, but I can get you the answer to that question. Senator Hoeven. Okay; because we had included in the Approps Bill, report language directing you to establish a training pipeline for that program. General Evans. Yes. Senator Hoeven. So if you would check on that and let us know; will you? General Evans. Yes, sir. Senator Hoeven. Okay. Thank you, General. General Berry, Minot Air Force Base is the only base that has a dual nuclear mission, both the bombers, B-52 bombers, with the ALCM nuclear weapon, but also then the ICBMs. And so we need a new weapons generation facility. And I guess my question is; where are we in terms of the design, and then getting that new facility underway? General Berry. Yes, Senator. I think we agree with you, there is a need for a weapons generation facility at Minot. It is not yet in our FYDP. As we discussed, I think last year, the complexity of this particular weapons generation facility, having to deal with both the large missiles and the bomber, make it a uniquely difficult program and project to design, and then build. So our strategy is to learn the lessons that we can learn from the big missile bases, i.e. F.E. Warren, we have learned some lessons in that design on blast containment and fire suppression. Those are informing future designs so that we can correct those and make sure that we have robust designs in the future ones. And then with the bomber bases such as Barksdale, again, learning from those construction efforts as to what will be a good design for something that gets very complex because of Minot, which will have both missions. So we will, we will get to it, we are committed to do a WGF at Minot but we, our strategy is to learn those lessons first. Senator Hoeven. Yeah. But you are you are actually moving forward on both, so it seems to me, unless you tell me you are going to build some--either a deficient facility for the ICBMs, or a deficient facility for the nuclear bombers. I don't understand why you don't use those designs and proceed with ours. General Berry. We are going to be---- Senator Hoeven. It seems like more of a reason to push it back in the FYDP---- General Berry. No. Actually we are going to use those designs to inform the Minot design, so for example---- Senator Hoeven. Starting when? General Berry. We don't have it right now in the FY DP, so I think we still need to mature the design on Barksdale and Ellsworth to understand what that facility looks like and what a good design is. So when we did F.E. Warren, as I said, we learned some lessons there with blast suppression--I am sorry blast containment and fire suppression that actually changed the design at Malmstrom. And so those lessons I think are very important for us to learn before we start putting designs together for a complex facility like North Dakota. Senator Hoeven. The ranking member here, now acting chairman I guess, and I worked very hard to support the B-21, so now you are putting weapons generation facilities in the bases that will get the B-21, which moved them ahead of Minot Air Force Base wherein we are reengineering the B-52 as part of that whole process, but which will carry that same weapon system. Now, they are all ahead of us in terms of getting new weapons generation facility, as well as the other missile bases. And I keep getting these rationales that we are going to learn from everybody else. Well, why don't we start building something at the Minot Air Force Base and learn from the Minot Air Force Base? We can't be--we are the only dual nuclear base, and we are behind everybody else, and we keep getting pushed back. That is not acceptable. General Berry. Senator, what I can do, is I can offer to come talk to you, and have our team come talk to you about the lessons that we are learning, and why we think that is a good strategy. We would be happy to dive into those details for you. Senator Hoeven. Let us do that. General Berry. Okay. Senator Hoeven. Thank you. On the Grey Wolf, I guess this one you are progressing on, and I do thank you for that, and if you could, please give me an update on the hangar for the Grey Wolf helicopter? Also, worked very hard with Senator Tester to make sure we funded new helicopters for those missile fields, so we need a place to house them. The current ``Hueys'' are older than the fantastic Air Force Pilots that are flying them. General Berry. Yes, sir. Sadly true. The facilities are currently out for bid, and so those bids should close the end of May for that facility. They will go through the source selection process; we think that will be done later in the summer. Unfortunately, I think last year I told you that we were trying to reconcile the bids because it was coming in higher than we thought for some of the inflationary pressures we had---- Senator Hoeven. And we added after the first 66 million another 5-plus million to your appropriation. General Berry. We did, and we think we are going to be higher than that. And we think we are going to be higher than that. So that will drive another reprogramming much to the inflationary pressures we are talking about. Senator Hoeven. We will work with you to get it, but you have got to prioritize it. General Berry. Yeah. Sir, we will. We will absolutely prioritize that. But we expect it to be awarded in March of 2023, and with the first helicopter coming in fiscal year 2027, we think that is pretty good timing. Senator Hoeven. Yes. General Berry. But we are committed to that. Senator Hoeven. And again, this is the only dual nuclear base. General Berry. Yes, sir. Senator Hoeven. We do need some more security work on the front gate. Which is another thing we are working with you on. General Berry. Yes, sir. And we will continue to work with the installation commander up there to understand those requirements to make sure they get programmed. Senator Hoeven. Yeah, and I think you are--yeah? General Berry. Yes, sir. Senator Hoeven. That being said, can I just thank all of you, and tell you how much we appreciate you, and all you do. You do an incredible job and we really appreciate it. Thank you, so much for your service. Thank you, Mr. Chairman. Senator Boozman. Thank you. On behalf of Chairman Heinrich and myself, we want to thank both panels of witnesses, and the senators who participated today, in today's hearing. I look forward to working together on this year's appropriations to ensure we are providing the Department Service members and their families with the military construction, and family housing resources that they need. And I know you all are totally committed in that regard also. ADDITIONAL COMMITTEE QUESTIONS Finally, we will keep the hearing record open for one week. Committee members who would like to submit written questions for the record should be able to do so by 5:00 p.m., Wednesday, May 25th. We appreciate the Department responding to them in a reasonable period of time. Questions Submitted to Mr. Paul Cramer Questions Submitted by Senator Senator Brian Schatz pacific deterrence initiative (pdi) Question. Expanding our posture and sphere of influence in INDOPACOM heavily relies on investments made in infrastructure, responsiveness, and resilience throughout the Indo-Pacific. How is the Department addressing the infrastructure needs in the Indo-Pacific to address the region's scant logistical concerns and projected force posture in a way that is responsible and assumes climate change and environmental risk mitigation? Answer. INDOPACOM is undertaking a review of past climate events at its posture locations to inform how future planning for exercises, basing, and strategies should incorporate components of resilience. Additionally, the Department is supporting INDOPACOM in its development of design criteria that address the twin challenges of reducing the risks of climate change and utilizing local materials and techniques. defense community resilience Question. Our military and civilian communities are becoming increasingly integrated and dependent on each other. According to the Pentagon, there are over 4,000 military installations in the U.S., most of which are surrounded by local communities that are tightly linked to their military neighbors. These ``defense communities'' have a close civil-military connection that presents both challenges and opportunities for local governments and stakeholders. The military are trained and equipped to assist in community resiliency, further cultivating and building upon defense community partnerships. Would it benefit defense communities to conduct vulnerability assessments with local stakeholders to determine the current and projected risks to military and surrounding community infrastructure that could affect installation resilience? Answer. Recognizing the importance of partnering with the States and communities that support our installations, the Department works to ensure that vulnerability assessments and response actions leverage the expertise of local public and private civilian stakeholders, consider the economic and environmental comparative advantages of options, embrace an actionable plan, and continue to work together to address the risks appropriately. The Office of Local Defense Community Cooperation provides assistance to civilian jurisdictions to enable them to work closely with installations to undertake and respond these assessments. Question. Does DoD share projections and vulnerability models with state, Tribal, and local officials? Answer. Yes, to the extent possible, DoD shares with the neighboring jurisdiction working with the installation. red hill Question. It has been brought to my staff's attention that 8-10 percent of the $1 billion president's budget request for Red Hill will supposedly be going to RDT&E. Which DoD directorate will serve as the lead to manage this account? Answer. The Department of Defense is still developing plans for the permanent closure of the Red Hill Bulk Fuel Storage Facility (RHBFSF). Specific costs and the appropriate accounts are not yet known for (1) permanently closing RHBFSF, (2) conducting any and all necessary environmental remediation around the facility, or (3) any other associated longer term activities. The management of the Red Hill Recovery Fund requested in the fiscal Year2023 President's Budget will require an integrated approach across the Department. The Department is in the early stages of planning the complex, multi-step process to defuel and permanently close the RHBFSF. The Department's plan for permanent closure is due to the Hawaii State Department of Health in November 2022. The Department expects that in the next few months, it will begin to have a better understanding about the costs associated with the longer-term requirements, including which components will be responsible for meeting such requirements. The Department will provide a spend plan to the committees by September of 2022. To the extent the Department has reasonably reliable information on long-term costs by that time, the Department will incorporate that information into the spend plan ______ Questions Submitted by Senator Bill Hagerty Question. The National Defense Strategy States that the Chinese Communist Party wants to shape a world consistent with its authoritarian model-gaining veto authority over the economic, diplomatic, and security decisions of other nations. Each day the Chinese Communist Party is strengthening its military- posing an ever-incurring threat to the United States and our allies. That is why military posture of the United States and our allies in the Indo-Pacific region is more important than ever. As the former U.S. Ambassador to Japan, I worked with U.S. Forces in Japan, Indo-Pacific Command, and the Japanese Government to strengthen our military coordination. Can you describe the strategic environment of the Indo-Pacific today? Answer. The Indo-Pacific area of operations is characterized by strategic competition with our pacing challenge, China. The tyranny of distance poses an especially significant challenge to our efforts to counter Chinese influence in the region, as it places a heavy burden on the infrastructure necessary to deploy and operate in a contested environment. Question. Which aspects of the Chinese military concerns you the most? Answer. China recognizes the strengths of our power projection and sustainment, and possesses long-range weapons, significant anti-access/ area-denial (A2/AD) systems, and substantial cyber capabilities to disrupt our operations in the Indo-Pacific AOR. I am concerned with the Chinese military's continued development of these capabilities, as they threaten both our installations and operations in the region, as well as the energy and logistics infrastructure that support them. Question. How should the United States address these concerns? Answer. The United States must ensure that its installations, operational forces, and supporting infrastructure can operate in contested or degraded environments, regardless of the origin of the threat. Therefore, the Department must build resilience against the full range of man-made and natural threats through efforts such as: building microgrids to mitigate disruptions to the power grid; increasing the range and endurance of platforms to reduce operational energy demand and risk; and improving the cybersecurity of Facility Related Control Systems. Question. Tennessee plays a vital role in the development of our country's hypersonic systems. Tullahoma, Tennessee is home to the Arnold Engineering Development Complex (AEDC), a hypersonics testing complex critical to the success of U.S. efforts to rapidly field hypersonic systems. On May 18, 2022, I meet with representatives of the Arnold community and they told me the two most critical areas Congress must invest in to meet our goals to develop hypersonics are testing infrastructure and workforce development. They also tell me, increased activity in hypersonic systems has resulted in a very high-test tempo for these test capabilities and there is no single test cell or single wind tunnel that can fully duplicate all the key parameters of hypersonic flight simultaneously. How would you characterize the state of our current hypersonics testing infrastructure? Answer. The Department's infrastructure can adequately support the testing of current hypersonic prototypes; however, additional investment may be needed to meet future hypersonic acquisition program and operational test requirements along with the accelerated prototyping program schedules. For hypersonics testing infrastructure, the Department forecasts that aerodynamic wind test facilities demand will increase up to three times current throughput, aeroshell test facilities demand will increase up to five times current throughput, and long-range flight testing demand will increase up to three times the current throughput. Anticipated hypersonic test infrastructure shortfalls will be amplified by concurrent and overlapping test infrastructure requirements for strategic systems (nuclear modernization) and missile defense further reinforcing the need to assess and plan for capacity requirements moving forward. Question. What are the limiting factors in modernizing our existing facilities to meet the demand of today's testing operational tempo? Answer. Several factors limit modernizing existing hypersonic facilities to meet the demand of today's testing operational tempo, including limited downtime due to program schedules, limited availability of core infrastructure, substantial security requirements, and existing scheduled maintenance. Most significantly, modernizing an existing facility reduces testing throughput by taking the facility offline in order to accomplish upgrades and delays the schedule for accelerated programs requiring facility use. Hypersonics testing requires extensive core infrastructure (high- pressure air, cooling water, electrical power, and vacuum) which may not fit in the available footprint of the existing facility. Building new facilities, provides the opportunity to incorporate additional core infrastructure for hypersonics and to optimally design the facility to satisfy security requirements and enable concurrent testing of highly classified hypersonic systems, with minimal downtime for scheduled maintenance. Question. With the increased demand for testing, does the U.S. require additional testing facilities, to include wind tunnels or investments in our existing infrastructure? Answer. Future testing requirements may require additional U.S. hypersonics testing facilities. To support testing across the hypersonic spectrum, the Department has prioritized investments to ensure the most critical hypersonic capability and throughput needs are met to include the development of new facilities, upgrade of existing facilities, and reactivation of mothballed facilities. Investments in additional hypersonic test facilities include: development of new aeroshell test facilities at Arnold Engineering Development Complex (AEDC) in Tullahoma, TN and at CUBRC in Buffalo, NY; development of a new propulsion hypersonic ground test facility at AEDC in Tullahoma, TN; reactivation of a mothballed propulsion hypersonic ground test facility at NASA Armstrong Test Facility in Sandusky, OH; and restoration of the Holloman High Speed Test Track at Holloman AFB, NM. These investments enhance infrastructure to support test demand for hypersonic system development. ______ Questions Submitted to VADM Ricky Williamson Questions Submitted by Senator Brian Schatz red hill Question. The Navy waived its right to contest the most recent Hawaii DOH-issued emergency order on the defueling and closure of the Red Hill storage facility. The DOH emergency order requires the Navy to provide a plan to defuel by June 30th and a plan for closure by November 1st. How does the Navy plan to comply with the emergency order without an appropriate cost estimate? Answer. The superseding Emergency Order allows the Navy to provide its plans in two parts: a defueling plan that was submitted on 30 June and a tank closure plan due in November 2022. The DoD Defueling Plan submitted to the Hawaii Department of Health includes five phases; the Navy and Defense Logistics Agency are currently in Phase 2 of that plan, which is the planning/cost estimation phase. The ASD A&S has committed to providing a spend plan for defueling costs to Congress in September. The Secretary of Defense also decided to stand up a Joint Task Force for defueling; the JTF will be led by a senior Navy Flag Officer that will report to the Secretary of Defense via INDOPACOM. The JTF will execute the funds, the majority of which will flow through the Defense Logistics Agency rather than the Navy. Question. As the Deputy Chief of Naval Operations for Fleet Readiness and Logistics, how does Secretary Austin's assessment on the redistribution of the Red Hill fuel reserve best support the Warfighter and do you agree with his assessment? Answer. With the Secretary's decision to stand up a Joint Task Force to oversee the defueling action, Secretary Austin has made it clear that defueling of Red Hill and distribution of fuel in the INDOPACOM area of responsibility are very high priorities. The Navy supports the Secretary's decision. Question. It has been brought to my staff's attention that 8-10 percent of the $1billion president's budget request for Red Hill will supposedly be going to RDT&E. Which DoD directorate will serve as the lead to manage this account? Answer. Please redirect this question to OSD Comptroller, as the funding line in the President's Budget Request is an OSD line. ______ Questions Submitted by Senator Marco Rubio Question. According to recent reporting, junior sailors at Naval Air Station Key West (NASKW) are struggling to find housing accommodations due to the closure of two of the base's barracks, high prices for off base housing, and scarcity of available units. How much advance notice did NASKW give its sailors living in the barracks that they would have to move out during the enlisted barracks renovation? Answer. Late January 2022, Installation leadership and Unaccompanied Housing (UH) staff began notifying residents of the upcoming renovation project and indicating the Unaccompanied Housing facilities would close in May 2022. Communications continued with residents and leadership of tenant commands throughout the process via town halls, command leadership meetings, flyers, and personal interactions with residents until actual closure occurred on 1 June 2022. Question. What plans were in place prior to the closure of the two base barracks to help sailors find housing? Answer. The Installation Housing Service Center instituted a roommate program with either residents selecting roommates or being included in a roommate-matching program. Navy Housing Service Center provided lists of available rentals in the community as well as options for installation housing through the Public Private Venture (PPV) partner. When initial notification of the UH closure was provided, 60 Sailors were residing in the facilities. 41 Sailors took immediate action and found suitable housing in the community, 17 of which took advantage of PPV housing. 19 Sailors remained in the UH facility in the beginning of May. Of those 19, two enacted Permanent Change of Station (PCS) orders, two returned to their USCG vessels, 10 moved into the local community and five will take advantage of the vacation rentals. Question. How long will the renovations take? What is the expected date of return into the barracks? Answer. Renovations are expected to take 18--24 months with the building being returned for service in Fiscal Year 2024. Question. Will the renovated barracks be able to house the same number of enlisted members who lived there prior to the renovation? Answer. Yes, the building previously and will continue to house 60 sailors after renovation is complete. Question. For sailors having found other temporary housing, how many used the trailers intended as ``vacation rental units?'' Answer. Five Sailors will take advantage of the vacation rentals. Vacation rentals were delayed for occupancy until 1 July 2022. Those Sailors are currently staying in Navy Gateway Inns and Suites. Question. How much time will elapse from the point a sailor applies for the ``partial dislocation allowance'' until it is paid to the sailor? Answer. The average time to process the partial DLA was 3--5 days per Sailor. One Sailor needed to resubmit the request per the processing administrative office. Question. Is it a one-time payment? Answer. Yes. Question. Is it a set payment amount or does it vary depending a sailor's rank? Answer.. Set amount of $840.07 to help offset costs associated with moving into a new residence, such as security deposits or advances. Question. How is the Navy notifying incoming sailors who are coming to NASKW with Permanent Change of Station (PCS) orders about the barrack shutdown and the need to find alternate living arrangements? Answer. NAS Key West is working closely with all the tenant commands to modify the command's Welcome Aboard information and ensure sponsors are aware of the barracks closure during renovations. Welcome Aboard packages will include instructions on how to apply for Basic Allowance for Housing (BAH) and detail all housing options available on and off the installation. The packets will also include information on the roommate program and contact information for the Navy Housing Service Center. Question. Is it true that the sailors PCSing to NASKW are not eligible for the partial dislocation allowance? Answer. Yes, that is correct. Only Sailors dislocated from barracks were eligible for the partial dislocation allowance. PCSing personnel are authorized Temporary Lodging Expense (TLE), a 10-day allowance to cover costs while securing permanent arrangements. Question. What is the minimum time onboard NASKW or other Navy facility before a sailor is eligible for the partial dislocation allowance? Answer. All Sailors that were residing in barracks after 27 April 22 were authorized, regardless of time onboard. Question. Are there any other Navy installations in Florida where sailors are or will have to relocate to temporary housing due to barracks renovations now or through the end of the year? Answer. There are no other Navy installations in Florida where this will occur now or through the end of year. Question. If so: How many Sailors are impacted? When will they be notified? When will the renovations start? How long will they be displaced to other housing? Answer. N/A ______ Questions Submitted to Lt. Gen. Edward Banta Questions Submitted by Senator Bill Hagerty united states marine corps from Question. The National Defense Strategy States that the Chinese Communist Party wants to shape a world consistent with its authoritarian model-gaining veto authority over the economic, diplomatic, and security decisions of other nations. Each day the Chinese Communist Party is strengthening its military- posing an ever-incurring threat to the United States and our allies. That is why military posture of the United States and our allies in the Indo-Pacific region is more important than ever. As the former U.S. Ambassador to Japan, I worked with U.S. Forces in Japan, Indo-Pacific Command, and the Japanese Government to strengthen our military coordination. Can you describe the strategic environment of the Indo-Pacific today? Answer. The current strategic environment of the Indo-Pacific theater is a complex system of systems where both nation States and non-state actors are competing for ever-diminishing natural resources. This is occurring while we see the People's Republic of China (PRC) continuing to rapidly modernize in order to challenge the current order in an attempt to ensure that it benefits the PRC's continued global rise. Question. Which aspects of the Chinese military concerns you the most? Answer. The People's Liberation Army (PLA's) rapid modernization, including investment in new capabilities and greater capacities are very concerning. More concerning than PLA modernization alone is how the PRC views and leverages all instruments of national power to achieve its ends. While the U.S. separates conflict from competition, viewing those as discrete events handled by different government agencies, the PRC is willing and able to use all instruments to wage war. This directly challenges the U.S. way of war, with kinetic and non-kinetic effects that can contest the homeland and deter U.S., allies' and partners' intervention. Question. How should the United States address these concerns? Answer. While PLA increased modernization and aggressive actions represent a formidable adversary for current and future policy makers, we also have systemic tools which will both give the PRC pause and blunt future global growth and influence. A coherent, whole of government approach to align and coordinate efforts across the government agencies would facilitate integrated deterrence and build the connections needed to rapidly respond to PRC malign actions. While the PRC also now has a global reach, and significant soft power through both official government channels and state- owned enterprises, the US has a network of allies and likeminded partners to counter the PRC's transactional, bilateral approach. This network, buttressed by codified agreements and military presence, supports legitimacy of action and forces the PRC to contend with multiple stakeholders contesting their malign actions. ______ Questions Submitted to LTG Jason Evans Questions Submitted by Senator Senator Brian Schatz hawaii installation investments Question. The Hawaii Infrastructure Readiness Initiative (HIRI) is the Army's $2.6 billion 30-year plan to improve readiness and addressing critical shortfalls in facilities on Hawaii, including at Schofield Barracks, Fort Shafter, and Pohakuloa Training Area (PTA). This year's Presidential Budget Request (PBR) does not include any funding for critical infrastructure improvements in Hawaii; however, a 2018 MOU formalized a commitment to provide at least $100 million in annual funding to address a backlog of infrastructure needs for the Army in Hawaii. HIRI requires high-level attention and vigilance from USARPAC to ensure the Army does not delay projects, including planning and design funds. Given the importance of the Indo-Pacific, particularly in a changing threat environment, why were there no funds requested in the PBR? Does that reflect the prioritization the Army places on critical infrastructure in Hawaii? Answer. The Army recognizes the original HIRI program outlined in the 2018 MOU was to execute $1.02B over 10 years. The Army also recognizes the importance of continued facility investment in the Indo- Pacific Region. While constrained top lines and competing facility priorities prevented the Army from making any investments in Hawaii in Fiscal Year 2023, the Army plans to invest $1.37B in the Indo-Pacific through the FY23-27 Future Years Defense Program, $575M of which is planned for projects in Hawaii. including two projects upgrading water distribution systems, two projects for training range modernization, and $496M towards projects that were identified in the Hawaii Infrastructure Readiness Initiative. Question. My office was recently informed about the substandard training and living conditions for Federal firefighters at PTA. How is the Army addressing these concerns and when can we expect suitable living conditions for Federal fire fighters on PTA? Does the Army have a named project and budget estimate to upgrade existing--or construct new--facilities at PTA? Answer. The Army is aware of the substandard facility conditions of its Operational Readiness Training Complex at the Pohakuloa Training Area (PTA) in Hawaii and the U.S. Army Garrison-Hawaii. A staff assistance visit is being conducted to identify areas for improvement, share best practices, and provide recommendations. The team will also look at staffing, equipping, maintenance, current living quarters, the new firefighting facility currently under renovation, and will speak with members of the PTA Fire team. Once the visit is complete, I understand that USAG-Hawaii will prioritize recommendations from the visit requiring funding. Question. What risk is the Army assuming by allowing the Pacific's land force to train, live, and work in substandard facilities? Answer. The Army is aware of the substandard facility conditions of its Operational Readiness Training Complex at the Pohakuloa Training Area (PTA) in Hawaii and the U.S. Army Garrison. Hawaii is conducting a staff assistance visit to identify areas for improvement, share best practices, and provide recommendations. Our focus is on facilities with a poor/failing rating, which includes, U.S Army Kwajalein Atoll and U.S. Garrison Hawaii. Our current projected Restoration and Modernization costs to bring these facilities at these garrisons up to 100 percent is approximately $3.8B. Question. Will you commit to reengaging and reprioritizing HIRI so we can avoid any long-term impacts to readiness as DoD prioritizes Hawaii's role in the Pacific Deterrence Initiative? Answer. The Army will continue to address the former Hawaii Infrastructure Readiness Initiative (HIRI) projects as priority facility investments, in consideration of the Army's overall facility requirements. The Army plans to invest $1.37B in the Indo-Pacific through the FY23-27 Future Years Defense Program, $496M of which support projects that were identified in HIRI. All of these investments promote force readiness under the Pacific Deterrence Initiative. Question. What is the Army doing at Schofield Barracks, Fort Shafter, and PTA to mitigate the effects of climate change to buildings and family housing to effectively manage the future costs associated in maintaining a degraded infrastructure? Answer. The Army uses the DoD Climate Assessment Tool to understand an installations' vulnerability to climate-related hazards. Using the Climate Assessment Tool as part of a comprehensive analysis will help the Army determine where best to apply resources to improve climate adaptation and resiliency for facilities in Hawaii (e.g. Schofield Barracks, Fort Shafter, and PTA) to mitigate the effects of climate change to buildings and family housing. ______ Questions Submitted by Senator Mitch McConnell housing at kentucky's military installations Question. Fort Knox is currently investing in renovating the installation's junior enlisted housing and building new general/flag officer quarters and four bedroom homes. Please provide an update on these housing projects, including an estimated timeline for completion. Answer. Over the next 5 years, Lendlease will fund and construct four (4) new homes, renovate more than 1,600 homes, and replace more than 500 roofs at its Fort Knox MHPI project. Lendlease has completed 400 renovations and over 200 roofs to date. Target completion date for all development/construction work in 2025. The construction of 50 new 4-bedroom homes as well as the GFOQ homes are on hold pending a final determination regarding the stationing of V Corps command headquarters. Question. Fort Campbell is currently in a partnership with Lendlease to renovate more than 1,100 junior enlisted homes. However, it is my understanding that the installation will still have more than 1,800 legacy homes at the end of this project. What is Army's plan for renovating or replacing all legacy homes in Fort Campbell's inventory? Answer. The Army and Lendlease are in a privatized housing partnership at Fort Campbell. The Army will not invest any funding in the homes at Fort Campbell; instead, the Army has approved Lendlease's plan to demo/replace up to 680 homes and complete Major Renovations on an additional 444 homes at Fort Campbell through 2026. Upon completion of the work there will be an estimated 1,500 legacy homes remaining. All Army echelons are working with Lendlease on a strategy to continue to either replace or renovate the remaining legacy homes at Fort Campbell after 2026. Question. The Fiscal Year 2022 omnibus appropriations bill provided additional funding to increase the pace of renovating Fort Campbell's 1970's Volunteer Army (VOLAR) era barracks. What is Army's updated timeline for renovating all remaining VOLAR barracks at Fort Campbell to ensure the installation can provide updated housing for the 1st Brigade Combat Team, a key readiness and retention issue? Answer. There are 17 VOLAR barracks at Fort Campbell that require renovation. However, not all of the barracks can be renovated at the same time due to a lack of temporary space to house Soldiers whose buildings are being renovated. Renovation projects for two barracks were awarded in fiscal Year 2021 (in progress); and renovation projects for three more barracks are scheduled for award in fiscal Year 2022. The remaining 12 barracks are scheduled for renovation from fiscal Year 2023 to fiscal Year 2029. ______ Questions Submitted by Senator Marco Rubio Question. I continue to hear from operators from the 7th Special Forces Group stationed at Camp Bull Simons at Eglin Air Force Base about how the lack of child care has impacted readiness and quality of life at the base. With traffic, service members have to drive three hours every day to access a childcare facility, and while the conversations with a potential provider have been encouraging, I still have several concerns. --Can the Army ensure that any new child care facility for 7th Group operators will consider the accurate need at the facility specifically for all of the children of 7th group operators? --How is the Army working with operators and their families to ensure that their voices are heard in the process, including potential concerns over distance from the 7th Group compound, affordability, and accessibility? Answer. The Army continues to work with the Air Force to address childcare needs to support the 7th Special Forces Group and the population that lives north of the main post of Eglin Air Force Base main post. The Air Force is working with the Army to pursue an agreement with two private providers to construct a child development center in Crestview for 300 child care spaces for military families. These spaces will be eligible for Army Fee Assistance. 7th SFG families would pay the same fee that they would using an installation child care center. Should these providers not meet the Army's child care requirements, the Army plans to fund the construction of a Child Development Center in FY25 to serve the tenant Army population at Eglin AFB should suitable installation land be identified. ______ Questions Submitted by Senator Bill Hagerty Question. The Fiscal Year 2023 President' Budget Request cuts Army military construction by 39% compared to what Congress provided in Fiscal Year 2022. The Army also transmitted to Congress a $1.4 billion ``unfunded requirements list'' for Army military construction. These are just priority unfunded requirements, which I will note do not include World War II-era barracks or the 46-year-old Aircraft Control Tower at Fort Campbell. At the same time, the U.S. is facing historic inflation, I am told that military construction is facing even higher inflation, about 22%. Lieutenant General Evans, can you describe how this ``unfunded priorities list'' is formulated? And how a project moves onto or off the list? Answer. Each component reviewed its highest priority facility requirements that were not included in the President's Budget Submission. These projects were further evaluated to ensure that they supported the Army's top priorities of People, Readiness and Modernization. Question. Additionally, can you discuss what the risks will be if Congress does not address these requirements that the President's budget neglects. Answer. If not funded the Army will be delayed in getting these priority facilities constructed. Omission in this President's budget could potentially delay construction starts to FY25 and beyond. ______ Questions Submitted to Lt. Gen. Warren Berry Questions Submitted by Senator Marco Rubio Question. As you are aware, in March 2021, the Air Force announced that Tyndall Air Force Base would be the official location to host three new squadrons of F-35s. Yet, in recent testimony to the House Armed Services Committee, Air Force Secretary Frank Kendall's stated that the plans for the F-35s are currently on hold due to maintainers who would be needed to support the aircraft being tied up supporting A- 10 warthogs. Can you confirm the Air Force will continue all planned military construction at Tyndall to ensure the base becomes the ``base of the future,'' and that the F-35s are able to arrive at Tyndall without issue? Answer. The Air Force continues to execute all planned military construction at Tyndall Air Force Base to include the beddown of the F- 35 mission. We remain on track for the first F-35 aircraft arrival in late September 2023 using temporary facilities while construction of permanent facilities, awarded in May 2022, continues. Question. What workforce challenges does the current need for the A-10s present for the F-35s both now and in the long term, and what is the Air Force doing to address this situation? Answer. The A-10 divestment restrictions have put pressure on the Air Force's already strained maintenance and pilot manpower. As such, the Air Force will be challenged to find the experienced personnel needed to stand up the first of the three squadrons at Tyndall AFB on the originally planned timeline. Until the Air Force can source personnel required for the three combat-coded squadrons planned for Tyndall AFB, the Air Force may need to accept risk and take experienced pilots and maintainers from other currently operating F-35 locations, leaving them undermanned. As we continue to work through the barriers of legislative divestment restrictions, we believe we are on path to a solution for the first squadron at Tyndall. We are committed to meeting the September 2023 date for the first aircraft, as we continue exploring solutions for the second and third squadrons. More details regarding F-35 manpower and MILCON at Tyndall AFB are addressed in the following article: Insinna, VI, (2022, 14 June) As Tyndall Tries to Rebound, A-10 Fight Prompts F-35 Maintainer Shortfall, 'Significant Risk ', Breaking Defense: https://breakingdefense.com/ 2022/06/as-tyndall-tries-to-rebound-a-10-fight-prompts-f-35- maintainer-shortfall-significant-risk/ ______ Questions Submitted by Senator Bill Hagerty Question. Tennessee plays a vital role in the development of our country's hypersonic systems. Tullahoma, Tennessee is home to the Arnold Engineering Development Complex (AEDC), a hypersonics testing complex critical to the success of U.S. efforts to rapidly field hypersonic systems. On May 18, 2022, I meet with representatives of the Arnold community and they told me the two most critical areas Congress must invest in to meet our goals to develop hypersonics are testing infrastructure and workforce development. They also tell me, increased activity in hypersonic systems has resulted in a very high-test tempo for these test capabilities and there is no single test cell or single wind tunnel that can fully duplicate all the key parameters of hypersonic flight simultaneously. How would you characterize the state of our current hypersonics testing infrastructure? Answer. The AF recognizes the criticality of hypersonic test infrastructure investment and accordingly, with support from the Office of the Secretary of Defense (OSD) Test Resource Management Center (TRMC), is making significant investments to include open air range test capability (Edwards AFB), high-speed test track capabilities (Holloman AFB) and high-temperature test facilities (Arnold Air Force Base). Question. What are the limiting factors in modernizing our existing facilities to meet the demand of today's testing operational tempo? Answer. Currently, the AF, in conjunction with the Office of the Secretary of Defense (OSD) Test Resource Management Center (TRMC), is addressing throughput limitations of our hypersonic ground test facilities via the development of a new thermal protection test facility, Dragon Fire, as well as planned improvements to other hypersonic wind tunnels and a hypersonic high speed test track. Question. With the increased demand for testing, does the U.S. require additional testing facilities, to include wind tunnels or investments in our existing infrastructure? Answer. OSD/TRMC has created an extensive hypersonic investment roadmap and has determined that the AF has the appropriate number of wind tunnels.OSD/TRMC, as the lead for all Department of Defense hypersonic investment, is in the best position to address the Department's plans for additional testing facilities. SUBCOMMITTEE RECESS Senator Boozman. And again, thank you, all very much for being here. Thank you for all you represent. [Whereupon, at 5:15 p.m., Wednesday, May 18, the hearing was adjourned, and the subcommittee was recessed, to reconvene at a time subject to the call of the Chair.]