Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- [H.A.S.C. No. 117-83] F-35 SUSTAINMENT [House Hearing, 117 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 117-83] F-35 SUSTAINMENT __________ HEARING BEFORE THE SUBCOMMITTEE ON READINESS OF THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED SEVENTEENTH CONGRESS SECOND SESSION __________ HEARING HELD APRIL 28, 2022 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] U.S. GOVERNMENT PUBLISHING OFFICE 48-447 WASHINGTON : 2023 ----------------------------------------------------------------------------------- SUBCOMMITTEE ON READINESS JOHN GARAMENDI, California, Chairman JOE COURTNEY, Connecticut MICHAEL WALTZ, Florida JACKIE SPEIER, California JOE WILSON, South Carolina JASON CROW, Colorado AUSTIN SCOTT, Georgia ELISSA SLOTKIN, Michigan, Vice JACK BERGMAN, Michigan Chair MIKE JOHNSON, Louisiana JARED F. GOLDEN, Maine MARK E. GREEN, Tennessee ELAINE G. LURIA, Virginia LISA C. McCLAIN, Michigan KAIALI'I KAHELE, Hawaii BLAKE D. MOORE, Utah MARILYN STRICKLAND, Washington Melanie Harris, Professional Staff Member Ian Bennitt, Professional Staff Member Naajidah Khan, Clerk C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Garamendi, Hon. John, a Representative from California, Chairman, Subcommittee on Readiness...................................... 1 Waltz, Hon. Michael, a Representative from Florida, Ranking Member, Subcommittee on Readiness.............................. 2 WITNESSES Fick, Lt Gen Eric T., USAF, Program Executive Officer, F-35 Lightning II Joint Program Office, U.S. Department of Defense.. 4 Maurer, Diana, Director, Defense Capabilities and Management, U.S. Government Accountability Office.......................... 6 Morani, Steven J., Acting Assistant Secretary of Defense for Sustainment, U.S. Department of Defense........................ 3 APPENDIX Prepared Statements: Fick, Lt Gen Eric T.......................................... 46 Garamendi, Hon. John......................................... 31 Maurer, Diana................................................ 66 Morani, Steven J............................................. 35 Waltz, Hon. Michael.......................................... 33 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: [There were no Questions submitted during the hearing.] Questions Submitted by Members Post Hearing: [There were no Questions submitted post hearing.] F-35 SUSTAINMENT ---------- House of Representatives, Committee on Armed Services, Subcommittee on Readiness, Washington, DC, Thursday, April 28, 2022. The subcommittee met, pursuant to call, at 2:43 p.m., in room 2118, Rayburn House Office Building, Hon. John Garamendi (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. JOHN GARAMENDI, A REPRESENTATIVE FROM CALIFORNIA, CHAIRMAN, SUBCOMMITTEE ON READINESS Mr. Garamendi. The meeting will come to order. The lawyers say I've got to read something for every hearing. It has to do with the hybrid hearings that we're doing. We have about an hour and 15 minutes unless votes are moving faster than we would anticipate, all of which means I would love not to have to read this. Are there any lawyers here that--okay. Can I deem it read? Oh, God. Okay. I'm going to do this as quick as I can. First some administrative and technical notes. Members are reminded they must be visible on screen within the software platform for the purpose of identity verification. Members must continue to use the software platform's video function while attending the hearing unless they experience connectivity issues or otherwise technical problems that render the Member unable to fully participate on the camera. If you experience technical difficulties, good luck. Please contact the committee staff, maybe you'll get help. When you are recognized, the video will be broadcast via television and internet feeds. You will be recognized as normal for questions, but if you want to speak at any other time, you must seek recognition verbally. Please mute your microphone when you are not speaking and remember to unmute prior to speaking and, please, lawyers, let's get rid of this wasted time. Please be aware that there's a slight lag between when you start speaking and when the camera switches to you. Please remember to keep the software platform video function on for the entirety of time you are attending the hearing. If you leave for a short period for other reasons to join a different proceeding, I will remember when it comes time for your turn. Please leave your video function on if you would leave to join a different proceeding or will be absent for a significant period of time, you should exit the software platform entirely and then rejoin it when you return. Be advised that I've designated a committee staff member to mute unrecognized members' microphones if necessary. Please use the platform chat feature to communicate with staff regarding the technical or logistical support issues. Finally, you will see a 5-minute video countdown clock on the software platform's display, but if necessary, I will remind you. Now, we're going to begin this in 5, 4, 3, 2, 1. Good afternoon. The committee will come to order. I'm going to dispense with the opening statement. Without objection, we'll put it in the record. I will simply make a few comments. The F-35 has been before this committee and other committees too many times. It's a 20-year program. And we still don't have it right, particularly on the maintenance of the platform. I am told that the current numbers are about 85 percent of the total cost of this system is in sustainment; that leaves about 15 percent of the total cost to buy it and then we've got to repair it. Obviously, it's over a long period of time. We've got to get this right. It's not right yet. The sustainment of this platform is not where it needs to be. With that, I'll yield to my ranking member, Mr. Waltz. [The prepared statement of Mr. Garamendi can be found in the Appendix on page 31.] STATEMENT OF HON. MICHAEL WALTZ, A REPRESENTATIVE FROM FLORIDA, RANKING MEMBER, SUBCOMMITTEE ON READINESS Mr. Waltz. Thank you, Mr. Chairman. And I, too, without objection, will submit my opening statement into the record so that we can have a more fulsome discussion given votes. I will just add to--I think we had on our call yesterday, and just add to the chairman's comments, that the concerns here are bipartisan and the concerns here are longstanding. And so what I'm interested in is how do we get to right and not be having these same types of hearings next year and the year after and the year after with all new faces, same issues. If you buy into the intelligence, at least I do, I think it's largely accurate from the briefings I've received from Secretary Kendall, the overmatch briefing and others, that the Chinese Communist Party will believe they have overmatch within the next 5 to 7 years, then the clock is ticking to get this right. And we don't want to be in a situation where, you know, perhaps Members of Congress felt back in the 1930s, and they see what could be coming--I hope it's deterred--but what could be coming. And we have a system that's 25 years in the making and still not sustained and ready. And I'll just close with saying I think we all have a teachable moment right now in Ukraine in watching the Russian Army what readiness can mean to the performance of a military. And I don't ever want to put our soldiers, sailors, airmen, Marine, guardians in that position. So I really look forward, as the chairman said on the call, to getting to real solutions that we can support you to get there so that we have a fully operable--68 percent in terms of the A variant at least from what I'm seeing, I believe that's the number GAO [U.S. Government Accountability Office] is reporting, is just unacceptable. I mean, it's just unacceptable to the taxpayer and to our military members. And with that, I yield. [The prepared statement of Mr. Waltz can be found in the Appendix on page 33.] Mr. Garamendi. Thank you, Mr. Waltz. Let's now turn to the witnesses. I welcome all of you. We have Steven Morani, Acting Assistant Secretary of Defense for Sustainment. We have Lieutenant General Eric Fick, Program Executive Officer of the F-35 Joint Program Office. And we have Ms. Diana Maurer, Director, Defense Capabilities and Management at GAO. Let's start with Mr. Morani if you would. STATEMENT OF STEVEN J. MORANI, ACTING ASSISTANT SECRETARY OF DEFENSE FOR SUSTAINMENT, U.S. DEPARTMENT OF DEFENSE Mr. Morani. Thank you, Chairman Garamendi. Ranking Member Waltz and distinguished members of the subcommittee, thank you for the opportunity to update you on the Department's progress on improving F-35 fleet readiness and affordability. I'm pleased to be joined with Lieutenant General Fick and Ms. Diana Maurer to discuss the state of the F-35 program. With more than 770 aircraft fielded across the enterprise, our U.S. and coalition warfighters are operating true cutting-edge combat capability, strengthening our alliances and building fifth-generation warfighter readiness. I'm proud of the many accomplishments achieved by our enterprise team of professionals to provide this critical warfighting capability to our joint force and international partners. That said, we recognize these capabilities are only useful if they are actually available to our warfighter, and the Department continues to prioritize improving F-35 readiness rates with a particular focus on improving air vehicle and propulsion reliability and maintainability in collaboration with our industry partners. This month the Department delivered a report to Congress on F-35 sustainment affordability in response to section 165(b) of the FY20 NDAA [fiscal year 2020 National Defense Authorization Act]. The report states that the Department reduced fleetwide sustainment costs per tail per year by 22 percent between 2014 and 2020 and has made notable progress during the past year on managing sustainment costs and improving affordability as a result of the F-35 Joint Program Office's negotiation of the FY21-23 annualized air vehicle sustainment contract. While this is noteworthy progress, we fully understand that we still have work to do as we plan to support critical depot activations, address unscheduled and scheduled engine overhauls, and align spares requirements with our procurement schedules. The section 165(b) report also explains that the F-35 affordability is a component of broader tactical aviation sustainment affordability challenges. The services are enduring the added cost pressure of operating and sustaining newer weapon systems while simultaneously maintaining aging legacy fleets. As such the Department requires congressional support for divestiture of aging weapon systems consistent with the President's FY23 budget request. The F-35 program sustainment challenges must also be understood in the context of the Department's programmatic and statutory responsibilities to sustain its current and future aviation portfolio with a capable, modernized, and resilient organic industrial base [OIB]. In my testimony before this committee in October of last year, I mentioned that the OIB is the Nation's readiness and war-sustaining insurance policy. Maintaining proper balance between organic and contractor sustainment will be a continuing challenge. This problem will only be exacerbated as legacy systems, which are largely sustained organically, are divested. As such the health of the OIB and the working capital funds that support it depends upon optimizing organic capacity to support the Department's newer weapon systems. Access to required technical data is a key enabler of any effort to increase the organic role in F-35 sustainment. The Department remains committed to obtaining the provisioning and cataloging technical data needed to transition to organic sustainment for supply chain management. With regards to F-35 provisioning of fiscal year 2020 NDAA, the Department acknowledges congressional intent and will actively support compliance with those provisions. The sustainment challenges facing the F-35 are reflections of similar issues affecting the Department's overall sustainment enterprise, which requires both government and industry teamwork to deliver effective warfighting readiness at an affordable cost. Ensuring accountability will be key. And I appreciate the opportunity to have these meaningful discussions with this committee as we aggressively address F-35 sustainment requirements and the capabilities of the defense sustainment enterprise. Thank you very much for your time, and I look forward to answering your questions. [The prepared statement of Mr. Morani can be found in the Appendix on page 35.] Mr. Garamendi. Mr. Morani, thank you very much. We now turn to General Fick. You are responsible for this program, so tell us how you are improving it. STATEMENT OF LT GEN ERIC T. FICK, USAF, PROGRAM EXECUTIVE OFFICER, F-35 LIGHTNING II JOINT PROGRAM OFFICE, U.S. DEPARTMENT OF DEFENSE General Fick. Yes, sir. Chairman Garamendi, Ranking Member Waltz, and distinguished members of the subcommittee, thank you for this opportunity to provide you with an update on the F-35 program. As I briefed you last April, our mandate remains the delivery of a capable, affordable, and available F-35 air system. Outpacing the competitors to win tomorrow's fight as we develop, deliver, and sustain this fifth-generation capability at high-end fourth-generation costs. To that end, here is a quick update on the big hitters from a readiness perspective. Organic depot standup remains critical to long-term affordability and availability. In March, the Ogden Air Logistics Complex declared repair capability for the gun system control unit. This marks the 39th workload established across 6 organic U.S. depots. For activated workloads, our organic depots today produce 73 percent of the component repairs in the ecosystem. We will activate 13 additional workloads this year, 4 of which were pulled forward from it in 2023. While this progress greatly enhances capacity, we're also building velocity, with 20 of those activated workloads already beating our targeted 30-day repair turnaround time. As you know, this velocity is critical to minimizing the requirement to buy extensive spares. We've also made significant progress against our most critical sustainment degrader across 2020 and 2021, the F135 power module availability. This progress is due to increased production at the Air Force Sustainment Center's Heavy Maintenance Center at Tinker Air Force Base, increasing the capacity of the global power module repair network, and maturing our inspection procedures and damage tolerance limits to keep aircraft on wing longer--I'm sorry, engines on wing longer. We made real progress in all three of these areas, but Tinker really crushed the F135 power module production plan for 2021, reducing turnaround time from 240 days to 122 and delivering 51 power modules against a target of 40. Tinker is on track to deliver over 60 power modules this year, and FRC [Fleet Readiness Center] Southeast is on track for initial depot capability in 2024. Our collective repair network, including our international facilities, will deliver 122 power modules in 2022 compared to 76 last year, enabling us to accelerate our power module recovery by years. As nations increasingly rely on the F-35 to reinforce regional security, we must also be ready to surge sustainment support. Our global pooling business rules feature a mechanism for allocation and prioritization of our limited resources. This system differentiates between competing needs and ensures responsiveness to customer requirements in peacetime and in wartime. That sustainment surge is not limited to parts and material as we are actively deploying support personnel in response to increased demand signals today. Historically, the program has endured initial spare shortages due to underexecuted appropriated funds and shortages in participant funding. Reversing this trend between FY15 and FY21, the program invested $4.8 billion in initial spares. For the past 3 years, the program met appropriated execution targets of 93 percent and our on-time delivery rate is currently 92 percent. Beyond those initial spares we're also maturing our afloat spares packages, our deployable spares packages, with lessons learned from recent CONUS [continental United States] and OCONUS [outside continental United States] deployments aboard Navy, Marine Corps, and Royal Navy cruises. I appreciate the committee's continued attention to F-35 data rights. This attention has served to leverage industry accountability and fairness while facilitating organic capability. While we have struggled to secure the funding required to procure the provisioning and cataloging data we require to establish an organic supply chain function, we are working another initiative designed to deliver those data through pilot programs with the component OEMs [original equipment manufacturers] at low to no cost. Finally, we continue to make strides in driving down our sustainment costs. Mr. Morani already mentioned that our 2021 through 2023 annualized air vehicle sustainment contract represents the first multiple-year sustainment contract for our program. And it's a quantum leap forward in securing affordable lifecycle costs for this program. It drives performance through an incentive structure that's focused on year-over-year improvements in full mission capability rate and select supply metrics. Under this contract, our cost per flight hour is projected to be reduced from our estimates by 8 percent in 2023. Additionally, the pathfinder initiative I just mentioned has us looking at methodologies and opportunities to contract directly with original equipment manufacturers rather than our prime contractor. Ultimately, this move will unlock the door to future competition, which unlocks the door to cost reduction and performance improvement. These topics are front and center in my mind every day as I lead this organization. We have made significant progress but I, like you, am not yet satisfied. The air system we are delivering today is unmatched capability- wise, and it is becoming increasingly affordable and available. With your continued support and your continued oversight, I am confident the F-35 will remain the premiere fifth-generation air system for the U.S. and her allies for decades to come. I thank you for your time and look forward to your questions. [The prepared statement of General Fick can be found in the Appendix on page 46.] Mr. Garamendi. I thank you, General Fick. I'm quite certain you are doing everything you can. I'd like to hear from Ms. Maurer about what is not being done. STATEMENT OF DIANA MAURER, DIRECTOR, DEFENSE CAPABILITIES AND MANAGEMENT, U.S. GOVERNMENT ACCOUNTABILITY OFFICE Ms. Maurer. Thank you very much, Mr. Chairman and Ranking Member Waltz, other members, and staff. It's a pleasure to be back before the committee this afternoon to talk about GAO's work on F-35 sustainment. Since last year's hearing, we've visited F-35 bases, and we've talked to pilots and maintainers and commanders. And we've heard that when it's flying, the F-35 is an impressive aircraft with cutting-edge capabilities. We're also encouraged that the Joint Program Office, OSD [Office of the Secretary of Defense], the services, and the prime contractors have increasingly focused on sustainment and that focus has yielded some improvements. ALIS [Autonomic Logistics Information System] servers are smaller and easier to deploy. The global supply chain is more responsive to user needs, and repair times for engine modules have improved significantly. However, the program's own measures show how much additional progress is needed. F-35 sustainment is getting better, but it is far from good. The F-35 still is not flying as often as the services would like. Mission capable rates have declined over the last year, and full mission capable rates are far below service goals. The program is still not meeting more than half of its reliability and maintainability goals. That means all too often the aircraft requires repairs sooner and takes longer to fix than expected. The F-35 also remains very expensive to operate and support. And the Air Force in particular faces substantial gaps between what it costs to fly the plane and what they can afford to pay. In other words, F-35 sustainment currently costs too much and does not deliver enough and that's not a reassuring bottom line for a $1.7 trillion investment into something that's so vital to our Nation's security. To improve that outlook, the program needs to address several interlinked sustainment challenges and uncertainties. Many of them stem from too many years of thinking about sustainment as something that can be addressed later. Well, it's no longer later. With over 450 F-35s in service in the U.S., now is the time to get sustainment right. And as General Fick and Mr. Morani just made clear, they understand this and they are grappling with several key issues to get this done. For example, DOD [U.S. Department of Defense] is reconsidering the division of sustainment responsibilities and control between contractors and the government, and striking the balance on access to technical data is a centerpiece of that issue. And those decisions are inevitably linked with whether, how, or when to pursue a performance-based logistics approach to sustainment. The program also needs to decide whether to upgrade the existing engine on the aircraft or develop new ones. Either path is going to have substantial implications for sustainment, both for the services and our international partners. DOD also needs to plan and execute moving sustainment responsibilities from the Joint Program Office to the services. This represents a major change in developing a clear path, and consensus for this handoff is vital. Now, our independent oversight at the GAO will continue to help in these efforts. Since 2014, we have recommended DOD develop or revise strategies for technical data, global supply chain, ALIS, affordability, and now engines, 34 recommendations in all. To its credit, DOD has generally agreed and taken some action on most but 21 of 34 still remain open. So the question was asked earlier, what should DOD do to fix F-35 sustainment? Well, first I'll waive my GAO flag and say fully implement GAO's recommendations. But second, maintain the focus on sustainment. Fielding new aircraft with new technology is important, but they won't contribute much if they're not sustained. Third, build on the progress we've seen in specific aspects of the program. These tactical successes should become a springboard to address the many strategic challenges we've highlighted in our reports. And finally, ensure that F-35 decisions support broader departmental sustainment needs. This won't be easy. It won't happen overnight. But taking these steps will help DOD fly the F-35 as intended, sustain it as planned, and be able to afford to do so. Thank you for the opportunity to testify this afternoon. I look forward to questions. [The prepared statement of Ms. Maurer can be found in the Appendix on page 66.] Mr. Garamendi. I'm going to take a deep breath. I'm going to be as polite as possible. However, Mr. Morani, you and I had a clear conversation yesterday. Mr. Fick, we've had conversations over and over. But I will not tolerate any longer what has been--we're going to get on with it. We're going to do it. It hasn't been done. I've been watching the F-35 for a decade. And it has not been solved. It has not been--the attention necessary to sustain this $1.7 trillion platform has not occurred, plain and simple. We're going to go off and buy new bright shiny airplanes. They're going to be flying probably well for a few months and then they're going to wind up with a problem. They're going to go to a depot that's not prepared for them. They're going to have to go--maybe the engine is not working, which is a Pratt & Whitney problem. And they're going to be before this committee soon. And if they're in the audience and if they're listening, watch out. I'm coming at you in a very angry mood. You gave us an engine, and it doesn't work. Oh, it worked for a little while until it gets some dust around and then it doesn't work. What the hell? What's going on here? General, you and your predecessors have promised us a solution to ALIS. The entire thing is based upon ALIS, and ALIS doesn't work. Does not work. And can ALIS be compromised? Do you want to go into a classified hearing? I'd love to hear your answer to that. ODIN [Operational Data Integrated Network] is going to be the solution until it's not. And so ODIN becomes a new updated box. But it's connected back to ALIS, and ALIS doesn't work. What's going on here? We've got a contractor out there, Lockheed, that would love to build new airplanes. And I've got a lot of my colleagues that get off on buying new planes. This committee is responsible for making sure the planes are able to be flown. And they're not. Are you listening to what the GAO has put forward? Twenty- one of thirty-four. Well I suppose if you were a big league slugger, you could get by with that kind of a percentage. You cannot get by with that kind of percentage here nor can the military get by with it nor can our warfighters get by with that kind of a percentage. It cannot be done. The message from me, and I hope from my committee, and I know I'm going to raise hell in the full committee, is we're not going to buy more planes until we figure out how to maintain them. It is a fool's errand. It is a waste of money by the taxpayers. It is a bright, shiny machine until it doesn't work. So where shall we start? I know if I ask you about the engine, you are going to say that's Pratt & Whitney's problem. No, sir. Mr. Morani, Mr. Fick, Air Force, all of you, it is your problem. And if you're not jumping up and down on Pratt & Whitney about why they gave us an engine that works well until it doesn't work, and that period is very, very short, what's going on here? Some people tell me we're going to go back and revisit what we did a decade ago and that's have a great war between GE and Pratt & Whitney over whether we're going to have one or two engines. We made a mistake. We should have had two so that probably both of them can fail. For the contractors out there, what in the hell are you doing? Why can't you give us a piece of equipment that actually works? You should never have a contract. And for Lockheed, you want a 5-year maintenance contract, and you can't do what you're doing today? Come on. What are we thinking? I can consume a lot of time here. If I have not adequately expressed my frustration, I would assume that my frustration is less than the frustration of the pilots and the maintenance out there, the maintainers out there. We have to give them the tools that they need and that may be money, it may be direction. And in fact we gave direction in last year's NDAA. We're not going to buy more of these things until they will be able to be maintained. The primary maintenance responsibility on this is Lockheed, and you gentlemen. So, where do we go, ALIS, ODIN? General, bring us up to date on ALIS, ODIN, and tell me why I shouldn't be concerned. Everything is cool? Is that the case? General Fick. Sir, so first let me start by saying I share your frustration. The frustration you feel likely pales in comparison to those who confront it every day as we work to make it better. When I look at ALIS and ODIN, I think back to 2 years ago when I sat before this committee and talked about a very, very rapid transition, a light switch if you will, from one to the other. And we were educated over time that that was a foolish way to proceed. So I have a new material leader working ALIS. He arrived shortly before that hearing, and he's got a very, very solid plan in place. Mr. Garamendi. And if it fails, will he just get another promotion? General Fick. No. Mr. Garamendi. Okay. Carry on. General Fick. So our plan to transition from ALIS to ODIN contains four key elements, and you've seen and heard about the first of those elements, the rollout of the ODIN Base Kit, or OBK, right, 70 percent smaller, 30 percent cheaper, significantly faster from a throughput perspective, to replace the oldest squadron operational units out in the field and to give them enhanced capability from a processing perspective. Think about it from the context of the computer you had on your desk in the year 2000 versus the computer you have on your desk today. That's the order of magnitude shift that we've just given those folks as we've changed out that equipment. We're also working software updates, right? We have continued to accelerate the delivery of new capabilities on the ALIS baseline to the units in the field because that's the baseline that we have today. We changed from a paradigm that had us delivering software on 2-year centers to one that targets 6-month centers--actually targets quarterly centers. In most cases, we've now pushed those back to 6 months because those are easier for the field to digest. We're fielding two of those quarterly releases now, and we'll have one final quarterly release that's under development now and will release in 2023. And that will be the last release that we develop the way we're doing it now as we containerize that software, elevate it into the cloud and then do the development on the next release from the cloud. It will still field to the legacy architecture. But this is the beginning of now doing software development for our maintenance data system in the cloud. At the same time we're doing that, we're modernizing the underlying data infrastructure to take us away from that 2000- era infrastructure and into something that's more modern and scalable as the fleet scales in size and complexity. And then finally, we're changing the way we interact with the system, and we're disaggregating the software from the underlying hardware so that we can start to be--to use much less touch labor when it comes to pushing new software to the field and having to interact with the system in that way. So we're calling that infrastructure as code, and the IT [information technology] guys know far more about that than I do. But those four initiatives, all executed in parallel, are what is moving us closer and closer to ODIN. Think of it as the dimmer switch now instead of a binary light switch as we move from one to the other, increasing capability, increasing cybersecurity, decreasing weight, increasing responsiveness, as we add those capabilities into the ecosystem. Mr. Garamendi. Thank you, General. Ms. Maurer, are you buying that? Ms. Maurer. I think there's no doubt that ALIS has been getting better. It's certainly better than it was 2 years ago when we had the hearing. From our point of view from the GAO, there is still an open recommendation that the program develop clear measures of success, what is good enough, what is good. And that has been one of the challenges that we faced in assessing ALIS to ODIN over the years is that we hear about new initiatives or we hear about improvements. And we've seen, frankly, some demonstrable improvements. But it's not clear yet whether that is good enough. We do know that when we go out and we talk to maintainers in the field, they say that there's still a good level of frustration in working with the system; it still requires these ALIS expediters to navigate through the system. They will say that it's getting better, but it is not what it needs to be, currently. Mr. Garamendi. General, I would appreciate if you would give to this committee a specificity on the four projects that you just told us about. General Fick. Okay. Mr. Garamendi. Exactly what they are and exactly what you expect from them and exactly when you will get it done. General Fick. Absolutely. Mr. Garamendi. With that there is about 1,000 other--well, at least another question. I'm going to turn to my ranking member---- General Fick. Sir---- Mr. Garamendi [continuing]. And invite him to have a shot at this while I sit here and take a---- General Fick [continuing]. I'd be happy to add one more piece if you don't mind, and it's a reflection of the progress that we've made. As we've worked our way through the requirements for the upcoming year, the first, I'll say, daylight that we've started to see is that the Air Force has actually reduced their request for ALIS administrators on our annualized sustainment contract by 16 heads in this coming year. That is due to the enhancements made to the system. And it is due to the standup of what we call the National ALIS Support Center, or the NASC, which is a centralized troubleshooting node to help the field. If you multiply those 16 technicians times the number of years left in the program, it's about a $250 million lifecycle cost reduction and that's just a start. Those are just at a couple of the training and test bases. As we stand up more of those installations and take advantage even more broadly, we'll start to see that compound. Mr. Garamendi. I am certain that all of us are pleased to see there is some progress along the line. Going forward, this year, from now until 365 days from now, exactly what are your priorities on ALIS and exactly what those will be, what the result of them will be, and exactly how you will get it done. I'm going to hold you accountable. General Fick Yes, sir. Mr. Garamendi. 365 days. I expect to be back here. I've got an election between now and then. But if I'm back here and I'm in this job, I want to see what it is you are going to accomplish with regard to ALIS-ODIN in the next 365 days. I'm going to hold you accountable? Okay? Very good. Mr. Waltz. Mr. Waltz. Thank you, Mr. Chairman. And just as something, I think, to think about 365 days from now when I hope we're both here is just to have industry at the table because I know we both will go visit industry, whether it's Pratt or Lockheed or whomever, and we get a very different story. And to get everybody in the same room, which I know that JPO [Joint Program Office], you know, that's the reason why you stood up, but from our perspective to get everybody on the record, and we can't get--any of this, I think, would be really helpful. I just have even--to take a step back. We just had the Air Force posture hearing. We're talking about NGAD, we're already talking about the Next Generation Air Dominance fighter but yet we can't take Joint Strike Fighter, which has roughly been around 20, 25 years, to Milestone C. What lessons would you take--before we dive into GAO and what you're doing now, I mean, just conceptually, did we try to make the Swiss Army knife and make this fighter everything, all things to all services and all partners? Did we not invest and look at sustainment first? Did we not hit that continuum between contractor and government the right way? What assumptions did we make? What should this committee be learning? What should we all be learning from, both industry and government, as we're already talking about the next fighter when we still have such issues with this one? General Fick. Sir, I think we've actually already learned a fair number of lessons from F-35. When I think about the origins of the F-35 and the timeline on which it was initially conceived and developed, we were in a far different place from an acquisition workforce perspective. We had just come down off of the Desert Shield, Desert Storm timeframe. We were eliminating dozens of thousands of acquisition professionals and no longer had the intellectual capacity to do the kinds of things internally that we had done for so many years before through the 1950s, 1960s, and 1970s. And we conceived this notion that we called TSPR, total system performance responsibility. And we decided that we were going to give that to the contractor and say, look, it is over to you. You make this work forever. That was the environment that was in place when the F-35 was born. Several years later, early 2000s, 2003, 2004, 2005 timeframe, on a couple of other programs, probably including F- 35, we realized that's really not where we wanted to be. We were kind of driven there by necessity, but we really didn't want to be there as we were seeing programs not succeed in delivering the outcomes that we wanted. And so we've begun to dig back out, to take more things back into our own hands organically. Dr. LaPlante, when he was the Air Force acquisition executive, talked about owning the technical baseline. We had no people to own the technical baseline in that time, but we are building them today. Right. My daughter is a computer programmer at Kessel Run. She is going to be able to own the technical baseline as she grows up within the Air Force. Our sons and daughters, our brothers and sisters can do that. So we had an organizational construct, an acquisition strategy that I think we decided was fundamentally flawed, and we backed away from it on almost every program and even F-35. And so we're still digging out of that. Right? That's one thing I don't think we'll ever do again. I do think that this program was extraordinarily complex. When you think about the capabilities that we deliver to the field today, for the threats against which it was designed, its capabilities are unparalleled. It is the best in the field because it was reaching, right? It was not something that had been done before. Sensor fusion, stealth, interoperability, those characteristics are unique to the F-35 and to some extent the F-22. No one else in the world was doing that. And so being on the bleeding edge of technology is very expensive. And so the complexity and the technological leaps required to bring this airplane to life were very, very challenging. We've adjusted to that. We've addressed that. We've learned from that when we look at how we're doing the B-21 and how we're looking at NGAD, how we're looking at open systems, right, how we're looking at competition, and how we're incorporating those things into the very basic acquisition strategy for those programs moving forward. So I think we've learned those lessons. We've taken them to heart. And as we look at other successes in the Air Force, whether you want to call it--within the Department, whether you want to call it B-21, whether you want to look at T-7, you look at other programs that are now taking those things that we learned through some blood, sweat, and tears, I think they're doing good things for us. Mr. Waltz. I appreciate that. And I know this is a longer conversation, Mr. Chairman. But, you know, the jury is still out in terms of B-21 sustainment, right? I mean, I think Ms. Maurer described it accurately. It's a fantastic platform when it works. General Fick. Yes. Mr. Waltz. But that leads me to my next question, I mean, what's the service's goals for FMC [full mission capable]? I know when I came up in the Army, if you were below 90 percent, you were fired. You were relieved. But yet I think the goal now is even less than that and then where are we sitting? We're sitting in the 60s for the A variant? General Fick. So for FMC, no. The numbers are below that. If I can pull up my chart here real quick to look. Our threshold for FMC, for the F-35A, in FY21 is 48 percent. Mr. Waltz. Is that acceptable? I mean, do you find that acceptable? General Fick. On one hand I would say no, absolutely not. On the other hand, this aircraft, even in PMC mode, this air system, even in a partial mission capable mode, delivers capabilities that other aircraft simply cannot do. I'll use an example. I had a weapons school instructor come when I was the deputy PEO---- Mr. Waltz. I hear you. Just for the sake of time, but that is not what the taxpayer bought, right? And that's not what they were promised through this committee. And I would appreciate a follow-on briefing. I don't want to dominate the time in terms of how we get from 48 percent to where the---- General Fick. Sir, I can help you with that. My perspective on it is this. My dad used to say when you're up to your neck in alligators, sometimes it's easy to forget you are there to drain the swamp. Mr. Waltz. Yes. General Fick. We have to do both things. We have to kill the alligators and drain the swamp, which means that we have near-term degraders that we're working on---- Mr. Waltz. Right. General Fick [continuing]. Against mission capable rates and against full mission capable rates. Mr. Waltz. I've got that. And just last question. My understanding is most platforms, F-18, F-22, you can go down the list, in terms of engine sustainability, you're sitting at an acceptable about 1 to 2 percent. Although it is built in here as 6 percent, 6x, 3x or 6x, depending on how you want to look at it, 6 times the rest of the platforms and the engines. I mean, I'm just looking at what the standards are, what the reality is, and then how do we help you get there? So, I mean, are you satisfied with 6 percent of the engines? General Fick. So, candidly, no, I'm not. When the---- Mr. Waltz. Why is that goal? General Fick. We're actively working with the services to determine what that right number is or if that's the right strategy. We're assessing whether the strategy that relies upon a 6 percent NMC [not mission capable] rate as a target is acceptable or not. And if you multiply that by the number of aircraft we'll eventually have, that's a huge number. So intuitively you say that does not make sense. If I wind the clock back 2 years though, right, while we had that 6 percent objective, right, we were hovering around 1 percent or better. It wasn't until our power module crisis hit that we really started to dig at something that was more than about a percent or two. I remember looking at our early metric slides going why are we even tracking that? It is so low, but ultimately it ballooned. We figured out that the strategy that we have in place really works well at steady state, and it assumes that the spares are at the appropriate level. It assumes that our depot capacity is at the appropriate level and the appropriate velocity. And it assumes that we consume them at some set level, right? Only when all those things work does it all come together appropriately. And up until 2020, we were doing that. When the crisis hit, though, that's when the numbers went down. Mr. Waltz. Mr. Morani, when will we get the--what's the plan to address the GAO's recommendations? Why are we still sitting at 21 of 34? Mr. Morani. Ranking Member Waltz, thank you for the question. So we recognize we are late with that plan. We should have submitted an interim. That plan is in work with our staff. I will say that we have regular engagements even though we are late with the plan and the results, we do meet with GAO on a weekly basis to talk about this platform and other sustainment challenges. So it is not as if we are not addressing your concerns, sharing what we are doing, and working together to get to yes on these recommendations. We feel we probably need another 60 to 90 days to get it through coordination. It's about 80 percent right now. And I will let---- Mr. Waltz. To be clear, just for everybody's baseline, this is just a plan to address the recommendations, not to actually implement the recommendations, correct? Mr. Morani. No, no. General Fick. So this response more accurately reflects the current status of our actions against each of those recommendations. I anticipate that when you see the final product here in 90 days or so it is going to recommend that a fair number of those recommendations actually close. Mr. Waltz. Okay. Thank you, Mr. Chairman. Mr. Garamendi. Thank you. We'll now turn to Ms. Speier. Ms. Speier. Mr. Chairman, thank you. Thank you all for being here. You know, this reminds me on a much larger scale of the debacle with the LCS [littoral combat ship]. We are incapable of turning off the spigot when something doesn't work. So this is a $400 billion program to build them, and a $1 trillion program to sustain it over the life cycle. And we're asking the American people to pay for F-35s, only 55 percent of which are considered mission capable, when the standard is supposed to be 75 percent. That only about 30 to 35 percent of the F-35s are fully mission capable compared to a target of 60 percent. And maintenance is taking twice as long as originally intended, and there is a shortage of replacement parts. And on top of all of that, we created a sustainment contract much like we did with ALIS where we're not in charge. And Lockheed Martin has the maintenance contract. So it's a cash cow for them for the future. And since we have a record that the sustainment costs are double and a record that we can't keep those planes in air, how can we look the taxpayers in the face and say, well, that's just the way it is and shrug our shoulders? So my first question is, when are we going to take over maintenance? General Fick. So, ma'am, that's a multifaceted question as I'm sure you know. Ultimately, we have begun to do it already, right? We've stood up 39 of the 68 organic depots, depot workloads, that are basically bringing all of that product support provider work into the organic sphere. And we're going to continue to stand up those depots now until about 2028. And there's actually 31 additional activations in work to include 13 more in this calendar year. So that is the organic depot work. We have taken from Lockheed the domestic warehousing function and assigned that to the Defense Logistics Agency [DLA]. We've taken the CONUS transportation network from Lockheed Martin and assigned that to USTRANSCOM [U.S. Transportation Command]. We've taken the disposition or the demilitarization of old parts and also assigned that to DLA. We are very gradually and deliberately, in ways that are intended to not adversely influence the warfighter, effecting that transformation even as we speak. My team is working very, very close with Mr. Morani's team to also explore pathfinder initiatives that allow us to work directly with the subsuppliers to stand up the more organic maintenance of that supply chain. And then furthermore as we look at the 2021 to 2023 annualized sustainment contract that we mentioned, what that contract does is it ratchets up the requirements and aligns Lockheed's incentive fee to the achievement of those milestones from both the full mission capable perspective as well as different supply support metrics, what we call gross issue effectiveness and customer wait time. All of those things intended to hold them accountable to deliver the effects that we desire. Ms. Speier. So according to the GAO, the unscheduled maintenance is the highest sustainment risk for the F-35. And if it's not fixed, 43 percent of the F-35 fleet could be grounded in 2030 for lack of engines. What are we doing about that? Mr. Morani. So, ma'am, that goes back to the engine recovery conversation we had a few moments ago. When we discovered this accelerated wear on the hot section of the F135 power module, we put into effect a three-pronged initiative aimed at increasing the production of power modules at Tinker's Heavy Maintenance Center, aimed at increasing the global production via both our OEM suppliers as well as some of our OCONUS depots for MRO&U [maintenance, repair, overhaul, and upgrade] of the F135 engine. And we also did accelerated engine testing to examine the limits that we had put upon the damage in the engine so that we can update them based upon actuals from the field and not engineering estimates. The combined effect of those three initiatives all together brought our recovery from the power module crisis back from sometime in the 2030s to 2026. So we have very, very deliberately worked to bat on a multiphased approach to bat back that crisis and turn it into something we can manage and not something that's going to ground 48 percent of the fleet. Now a lot of those numbers weren't in place by the time Ms. Maurer wrote her report because we have been moving that fast to make a difference across those three different lines of effort. So it's not surprising to me that the report says what it does. But when she comes back and we have the conversation this year, she's going to see the results that we've been able to accomplish together. Ms. Speier. My time has expired, Mr. Chairman, but if there is a second round, I would like to have Ms. Maurer actually respond to those comments. Mr. Garamendi. I would like to have you have that right now, but the normal processes here don't allow me to do that. We now turn to Mrs. McClain. Mrs. McClain. I'm learning the rules, so thank you. Thank you, Mr. Chairman. Thank you all for being here. As you know, an essential responsibility of this subcommittee is to ensure that the appropriate resources are being authorized to meet mission readiness requirements yet unfortunately we consistently lack the level of detail in the annual budget request to conduct this critical oversight work. The first question we must answer, and we really must answer this question, is what are DOD's mission readiness requirements in support of the national defense strategy? To that end, Congress required in fiscal year 2021 in the NDAA for all the services to submit readiness metrics for every major weapon system within the President's budget request starting this year. Secretary Morani, the Department of Defense has yet to submit these materials. Unless I'm missing something, and I've missed it, which could possibly happen, when can we expect the Department to comply with this requirement, because it kind of seems to be a pattern of lack of requirement? Mr. Morani. So, ma'am, I'm going to take that one for the record so that I give you the right response. I believe that the first reporting period was last year for that, and I believe we did submit that. That in conjunction with other NDAA---- Mrs. McClain. Well, I'll take it for the record because I had an opportunity to question General Milley and Secretary Austin, and they said they would get me that information. And I still have yet to receive it. So it seems like pretty important information that we should have before we spend the taxpayers' dollars. The second question is why was the budget even submitted without this information? If that's a requirement, why was it even submitted? Mr. Morani. So, ma'am, you're asking me questions that in my capacity that I don't have the authority to determine whether it should be submitted or not. So I will take that for the record and get you an answer from the appropriate office. Mrs. McClain. Do you think we should have criteria before we spend taxpayer dollars, and do you think we should adhere to that criteria? Do you think that's important? Mr. Morani. I do. Mrs. McClain. Thank you. General Fisk, another question we need answered is what is our return on investment for the F-35 program in terms of readiness? In other words, for example, when you put a dollar into that program, are we getting, in your opinion, adequate return on that dollar of investment in terms of readiness? General Fick. So, ma'am, that's an outstanding question. I'm not entirely sure how to answer it, but what I can relate it to is one of the things that we do to improve readiness is we put reliability and maintainability improvement program [RMIP] initiatives into the hopper. This program was very, very slow to get started on RMIP. From 2015 through 2019, I think we invested a total of about $10 million, maybe $20 million. In 2019--I'm sorry, 2020 and 2021, the total was about $100 million. And as we look at what that $120 million has done or is expected to do, we are expecting that to net about a $5\1/2\ billion return. Mrs. McClain. When? General Fick. Over the life cycle of the program. So---- Mrs. McClain. Roughly 50 percent capacity in readiness, that's a good return on investment is what you're saying? You're pleased with the return on that investment? General Fick. No, ma'am. These are things that we are doing, identifying systems within the aircraft that need to be fixed to allow us---- Mrs. McClain. So we're not really pleased with the return on that investment? Let me move on. If this committee requires you to provide that information with the objectives and metrics required within the budget, can I get your commitment to actually deliver them? Mr. Morani. Ma'am, you have my commitment. Mrs. McClain. Thank you, sir. How would this readiness and sustainment information improve the GAO's ability to audit and assess the F-35 program? Ms. Maurer. Yes. Thank you for the question. We're always happy to have additional information, additional facts. It enhances our ability to---- Mrs. McClain. Would it help you? Ms. Maurer. It would be helpful, yes. Mrs. McClain. I have 12 seconds left so with that, I will yield back, sir. Mr. Garamendi. If we have time for another round, I'll add 12 seconds. Mrs. McClain. Thank you, sir. Mr. Garamendi. Very good. I will now turn to Mr. Courtney. Mr. Courtney. Thank you, Mr. Chairman. Ms. Maurer, in the last NDAA, there was actually some movement in terms of sustainment issues. There were four different provisions that were included in the bill. One involved the comptroller general so that obviously they're not here to, you know, update us; but there were, I mean, first of all, what was your general take on the changes or the amendments that were passed last year in terms of just where GAO is with your recommendations? Ms. Maurer. Sure, absolutely. Let me just state that I work for the comptroller general so I can certainly speak to that requirement. It's a reporting requirement. We have ongoing work right now looking at the status of maintenance, both field- level and depot-level maintenance, for the F-35. In terms of the other requirements, we're always pleased to see Congress playing an active role in providing oversight of this program, both because it involves so much money but also because it's so vital to national security. We're not going to take a position on whether the specific changes were good or bad because we serve the Congress as a whole. But it is good to see Congress weighing in directly on issues of sustainment concern: engines, trying to find a better balance between contractor and government led work, for example. Mr. Courtney. So, again, we're not that far away from markup for 2023. If you had, again, in terms of based on the GAO recommendations, what would be your recommendation today in terms of what you would like to see us do? Ms. Maurer. Well, I think first and foremost continue to have hearings like this because I think the visibility is important, the oversight and attention is important. In terms of areas of emphasis, continue to focus on sustainment. I think the Congress is asking the right questions about decision-making around purchasing additional number of aircraft. I'm being very careful here that we do not have a position---- Mr. Courtney. Right. Ms. Maurer [continuing]. At GAO what those numbers should be. But having good robust conversations around striking that balance, right, between new capabilities and the ability to sustain those capabilities is very important. Mr. Courtney. So, I mean, there was in one of the sections, you know, some incentives or handcuffs that actually tied the number of aircraft to, you know, the affordability issue. So, I mean, I think there really was an attempt to try and use the law, you know, to really stimulate change. Ms. Maurer. And exactly. I think that was in alignment with one of the matters we had for Congress in a report last year on F-35 affordability. We asked Congress to consider making that direct linkage, seeing progress on affordability or lack thereof and using that to drive decision-making on future purposes. And Congress did exactly that. Mr. Courtney. Right. Thank you. So, General, in your opening remarks you talked about, again, the effort to sort of shift the balance between contractor and government. You described again some of the, you know, concrete actions that have taken place. I think I heard you say that there was some funding limitations in terms of, you know, that process of trying to either acquire the data or take ownership of the data. I'm not sure I--did I hear you right? General Fick. Yes, sir, you did. Mr. Courtney. And could you sort of tease that out a little? General Fick. Sure. So as we have talked about--with the U.S. services about their role in F-35 sustainment, they have expressed an interest and a desire and an intention to more organically manage the sustainment supply chain. Associated with that activity, we need to be able to deliver to them the provisioning and cataloging data associated with the parts within that ecosystem. We have the rights to that data. It's not a matter of data rights. It's a matter of data delivery, right, and being able to have that data delivered is going to cost money. And that money is going to be somewhere in the neighborhood of about a half a billion dollars divided amongst the services to help enable that activity to stand up. Mr. Courtney. So---- General Fick. Because we haven't been able to make that happen, that is why we've started exploring these pathfinders as ways to have that data delivered as a matter of course at low to no cost. And so we're trying to find ways to keep moving---- Mr. Courtney. Got it. Got it. General Fick [continuing]. [Inaudible]. Mr. Courtney. So based on what the general just said, Ms. Maurer, if, you know, we were able to find that half billion, would that be an investment that would show a good rate of return for the taxpayer? Ms. Maurer. I think there is the potential for it doing that. You know, one of the things that we hear a lot when we were talking to maintainers in the field is their--and we're talking about service members on the flight line--their frustration with the limitations and being able to repair the aircraft. And it comes down to very specific things like is this particular part of the F-35, is it broken enough for us to take it off the plane? If it needs to come off the aircraft, what tool do we use? How do we replace it? What tool do we use to put it back on? Those are the kind of specific levels of information that is part of technical data sort of writ large. And that is one of the challenges that we're making--that they face. Mr. Courtney. If I heard you correctly, General, again you sort of saw this as something that could be spread out amongst the Navy and the Air Force in terms of the service budgets? General Fick. Sir, I believe that is the intent is that both departments are participants within that ecosystem. I know that the Air Force probably has voiced the most overtly their desire to do this work, but I think the Navy is onboard as well. Steve, I do not know if you can help. Mr. Morani. No. I would confirm that. And I would want to go back to what General Fick said about other options to get that data and to work directly with some of the sub-tier suppliers. We have arrangements in place with many of these vendors today where we can leverage those contracts and become that provider. Our FRCs, you know, our NAVSUP [Naval Supply Systems Command], ICP, the Air Force's 448th supply chain wing, they all have those professionals that do that kind of work and have those arrangements. So we can leverage those contracts and through that scale. And, again, we don't want to pay for it twice. We want to move it into the organic supply chain management role because we do that work. And we are responsible to you to do that work as well. So if we can do that without paying for the data, that is the path we want to go. Mr. Garamendi. I believe we are going to have time for a second round amongst the three of us that remain here. And we will go until we have to go to votes, which is unknown but will happen. So I'm going to get this started, this second round. Several issues have been illuminated by the questions and the answers. This committee needs to have a serious conversation with Pratt & Whitney about the engine. In the meantime, I won't go into it now, but to note that that is a problem we discussed earlier, planes with holes in them, in other words, no engines. General, you mentioned something. I don't want to ask a question about it, but there are limits on performance of the aircraft because the engine may not work at a super high performance level. Is that correct? No? I'm pleased to learn that. You shook your head yes, no. General Fick. Sir, I don't know what you're referring to. I apologize. Mr. Garamendi. Well, this is supposed to be the super plane. General Fick. Yes. Mr. Garamendi. There appear to be limits on what it can do because the engine may not be able to perform. Mr. Morani. Chairman, I believe--I mean, this current engine can meet the current specifications for the aircraft and for the TR-3 [Technical Refresh 3], Block 4, if that's what you mean. The performance specifications, it's sized to be able to---- Mr. Garamendi. If you're going to tell me I'm wrong, this is a good one to tell me I'm wrong about. And I thank you for that. We do need to get into this engine issue in great detail. And I know that we are going to be faced with the issue of two engines. And General Electric is going to make a full attack on the committee to come back--you know, General, you can laugh, but that's what's going to happen. And they are going to want us to authorize two engines. So we're going to have to deal with that. I also know that in the President's budget, there is depot money that is going to slide forward. We'd like to say to the right. And I'm going to have a problem with that. The issue of the depots being fully capable of taking up their tasks remains a major concern for this committee and for the chairman. So we're going to look carefully at that if there's a question about whether there is adequate money for the depots to be fully prepared to take on their tasks. Tell me that I don't have to worry about it, General. General Fick. So, sir, what I think you are referring to is we've had conversations. And I can't go into the details of our ongoing production contract negotiations, but historically the Department has taken some risk at what we call the below the line or support costs associated with things like depot standup and have counted on us to yield savings in those negotiations that can then be used to shore up those funds. The headwinds we are facing due to COVID amongst other things are limiting our ability to do that, we believe, in this year and that is what we're struggling to work with both the SAEs [service acquisition executives] and the DAE [defense acquisition executive] to chart a path forward. Mr. Garamendi. Is that a nice way of saying that you intend to pull money out of the current money for updating all of the depots? Tell me that's not what you said. General Fick. Sir, that's not exactly what I said. What I said was historically the Department has underfunded that line within the budget. And they've relied upon us to negotiate savings in our contracts that we can then apply to that delta so that they are fully funded. We are going to have trouble doing that this year, I believe. So the Department does not want to not fund the depots. And so they've tasked us to come back to them and figure out what are the COAs [courses of action], whether it be through internal funding from other sources or ATRs [above threshold regrogrammings]. What would be required to make sure that we keep that depot infrastructure whole? That is the task that we've been given. Mr. Garamendi. I'm reading you to say that the money necessary to prepare the depots to carry out their tasks is at risk and that the risk is you have to find the money to do what the Department is unwilling to directly fund. Correct? General Fick. Yes, sir. Mr. Garamendi. The problem of the F-35 is a shared problem. It's a problem of the contractor, Lockheed Martin, and others. It is a problem of the Department of Defense not paying attention to sustainment. And it is a problem of this committee and the Senate wanting to buy new bright shiny things and not paying much attention to the sustainment of what the [inaudible] has been purchased. I've seen it here over and over again. Every year, it is this committee together with the appropriators and the Senate, that buy new equipment and shortchange the sustainment money necessary. I am not going to go through this next. If anybody out there is listening, if any of my colleagues are listening, I'm going to raise holy hell about what we have failed to do and that is our share of this responsibility. I see Mr. Moore. I welcome you back. I'm going to cut off my own comments here and go to you. Thank you for rejoining us, Mr. Moore. Mr. Moore. Thank you, Chairman Garamendi. I appreciate you highlighting the F-35. I expressed my commitment to it as well. Utah-1, Utah's First District, heavily committed to the F-35 and making sure we find the solutions. No weapon system is perfectly rolled out. We understand that. We do. And I appreciate how you've mentioned the various stakeholders that are involved and the roles that we all play. And I remain committed in this role to make sure we see this through. The perspective that I would say matters the most is from those that fly and maintain the plain. At the Hill Air Force Base, our F-35 pilots have made it very clear in multiple conversations and business I've had with them that when this plane is operational, it simply cannot be beat. The Ogden Air Logistics Complex, where all F-35A depot maintenance is performed, our maintainers are proud to work on the Joint Strike Fighter, the most capable and lethal fighter ever in operation. While a program of this scale is not without challenges as we have discussed, when our pilots are flying in the war, they want to be in an F-35. And I believe two things can be true at once. We can exercise aggressive oversight to improve sustainment while also not permitting these challenges to disrupt our commitment to the present and future American air superiority. Ms. Maurer, when it comes to sustainment costs tied to the program, what do you see as the breakdown of costs tied to who owns the costs among U.S. Government, Lockheed, and Pratt & Whitney? What do you see as the breakdown of that? And then, you know, recommendations to provide full transparency in ownership costs to develop a plan to drive sustainment costs across the enterprise. I appreciate your context. Ms. Maurer. Great. Thank you very much for the question. Broadly speaking, the cost of F-35 sustainment ultimately all goes back to the U.S. taxpayer and to DOD. So DOD is responsible for the oversight. In terms of execution, the vast majority of sustainment responsibilities falls on Lockheed as a primary contractor for the airframe and Pratt & Whitney as a primary contractor for the engine. So in terms of the breakout of the costs and responsibility, I think that's pretty much how the way it does play out. And the issue that you raise about the sort of the disconnect between the way pilots view the aircraft and the sustainment outcomes is something that we saw when our team visited Hill Air Force Base 2 months ago. And one of the most striking things we heard from folks on the ground there, was that the essential message was that they had just completed a deployment, a successful deployment of F-35s to Europe at a time of great national need. And they showed great resilience, and they showed great creativity in doing that. But what we heard from them was they did that despite the way the program is currently set up from a sustainment perspective. And I think that's a good informal measure of ultimately reaching success. That they are able to make those deployments successfully because of the way the program is structured for sustainment, and we're not there yet. Mr. Moore. Thank you. I appreciate the context. General Fick, pilots that have deployed downrange have expressed concerns over the DOD's reliance on contractors and the lack of proprietary flexibility. Could you please describe the Department's efforts to acquire the necessary technical data to transition to more organic sustainment and what barriers might prevent this effort from succeeding? General Fick. Certainly. So we're working today. We just had a conversation a few moments ago before you came online about how we are working to procure the technical data that will allow us to take a greater role in the management of the F-35 supply chain. So that is one way in which the Department is looking to take a more significant role. Today the product support integrator, the hybrid product support integrator for the F-35, is an Air Force officer whose name is Shane Henderson. He's stationed at Wright-Patterson Air Force Base, and he runs the HPSI op center there. He is in the middle, they are in the middle, we are in the middle of all of those sustainment decisions from an F-35 perspective today. And we're going to continue to mature the HPSI construct, the op center construct, there at Wright-Patt as we work our way into the future. Mr. Moore. Thank you, General. Chairman, I appreciate your adjustments in letting me ask my questions. I will yield back but just end with a firm commitment to being a part of the problem-solving aspect of this. And I appreciate people's honesty and context to helping us get there and being a reasonable and productive stakeholder here. So thank you all. Mr. Garamendi. Thank you, Mr. Moore. I will note that from time to time you have brought to my attention the depot problems at Hill. Mr. Moore. From time to time. From time to time or every day. Mr. Garamendi. We have votes underway. The reality is there is probably 15, maybe 20 minutes, before we're going to have to run. I am going to do--Mr. Kahele has returned. We're going to do a lightning round here. Mr. Kahele, your late arrival limits your time to about 2 minutes. So one question and then we'll come back through from here. Thank you. Mr. Kahele. All right. Thank you, Chair. I'll be quick then. I guess I'll just right in to General Fick. Can you give us an update at all on supply issues with the fan modules and the power modules from Pratt in regards to the F-35? General Fick. So I'm tracking very, very closely the power module issue broadly within the enterprise. What I can tell you is that right now at the fleet level we have about a 5 percent not-mission-capable rate associated with power modules. We are down from a much, much larger number over the course of the summer. But the three-pronged effort we put in place to increase throughput at Tinker, increase global throughput and keep engines on wing longer by expanding operating limits have really helped us to recover from that crisis much, much faster than normal. Fan modules is popping onto my radar as well. I'm tracking Tinker as my primary repair source for the fan modules, but I don't have much more of an update on the fans. Mr. Kahele. Part of it, sir, is what I have been hearing is coming out of Nellis and, you know, the high OPSTEMPO [operations tempo] with the F-35 there with Red Flag [exercises], and issues that they're having with fan modules, power modules, the FAD [force activity designator] code, you know, real specific things that the maintainers are having in regards to the F-35. General Fick. Right. Certainly the FAD codes assigned to units are associated with the activity that they undertake. And we, as an enterprise, establish those FAD codes to prioritize units in combat or directly supporting combat knowing that sometimes that meant the test or training units that were back home suffered a little bit longer waits for parts that were limited in their supply. Obviously the solution to this problem, I don't think, is to change the FAD code system but to fix the supply problem so that we have fewer parts that are actually in that limited mode. Mr. Kahele. I guess it is fair to say then that deployable units always get higher priorities than other units. General Fick. And you see that reflected in the MC [mission capable] and FMC [full mission capable] numbers even today. Those units that deploy forward, deploy forward and frequently operate at MC and FMC rates in the high 80s and even in the 90s. Mr. Kahele. Right. Mahalo, Mr. Chair. I think that was my 2 minutes. Two minutes? I'll take the other 2 minutes, but no, I'll yield, Mr. Chairman, and if I have another opportunity, I'll ask another questions. Mr. Garamendi. You've got another minute. Mr. Kahele. All right. Let's go. All right. A question then for Lieutenant General Fick again in terms of are there trade- offs involving upgrading fourth-gen versus retrofitting F-35s with increased Block 4 capability? Are there any attempts to analyze the cost and capability of those impacts? General Fick. So ultimately, I think that is a better question for the Air Force than it is for the JPO. But when you think about it, the F-35s that came off the line at the end of the system development design phase, the SDD phase, were designed against the Eastern European threat that we knew about back in 2000. The Block 4 capability suite was really designed to go after the emerging and evolving threat from China and the more advanced systems from Russia. So depending upon what you need to do with the aircraft or you intend to employ it, is it a training jet or is it one that you're going to take downtown, that would help to determine whether or not you need the full capabilities of Block 4 or whether you can stay in a legacy TR-2 or--configuration. Mr. Kahele. Okay. Mahalo, Mr. Chairman. Mr. Garamendi. That question needs to be fully understood by us. There's really a differential here between what will be the training and then the actual downtown used for work. So we want to keep that in mind because there is a differential. Mr. Moore. Excuse me, Mr. Waltz. Mr. Waltz. If I could get just a quick update. I believe you mentioned it, General, on the Navy's Fleet Readiness Center in southeast--or Navy's Fleet Readiness Center Southeast in Jacksonville. And then a broader question on, if there was one thing this committee could do in this next NDAA to get those FMC rates where they need to be, what would that be? And if you want to take that for the record, and Ms. Maurer, I'd throw that one at you as well. Thank you, Mr. Chair. Are we doing a lightning round, Mr. Chairman? All right. General Fick. Sir, I'd be happy to chew on that one and get back to you with a more complete answer. From an FRC Southeast perspective in JAX, they are going to be standing up to go initial depot capability for F135 power modules in 2024, towards the end of 2024. And then I believe there's a MILCON [military construction] request pending that will allow them to ramp production from 24 to 120 and that comes in, I think, the 2025 timeframe. Mr. Garamendi. A very, very good important point. Ms. Maurer. Do you want me to do 15 seconds on that? Right. So I think if you want to get after FMC rates, I would imagine R&M metrics, reliability and maintainability metrics. Make sure that the parts that you are putting onto the aircraft and maintaining the aircraft with are reliable and that when it comes time to fix it you can do it within the allotted time would help with FMC rates. But a lot else goes into that in achieving high FMC rates. Mr. Waltz. Thank you. Thank you, Mr. Chair. Mr. Garamendi. There's a lot more detail in that very quick answer that we really need to understand how to get to what you described. Ms. Speier. Ms. Speier. One clarification. We're spending $400 billion on these planes. Lockheed Martin is obviously receiving a profit from that. And then the technical data that we need to be able to maintain it, we can't get from them. We can only leverage it through some subcontractors? Is that what I understand it? General Fick. So, ma'am, in most cases the technical data that we're looking for is actually data that comes from those vendors. It's not Lockheed's IP [intellectual property]. It's the vendor's IP. Ms. Speier. All right. Ms. Maurer, there's been a lot said about the questions that I asked, and I wanted you to be able to respond. Ms. Maurer. So real quickly, on the engines piece, in our most recent report, and some of the summary of that information is contained in my statement for the record today, we point to three different baselines that have been developed by the Joint Program Office for getting to a better position on engines. The original baseline, which was the one that you cited, showed about 43 percent of the aircraft sitting on the tarmac and that was based on where the program was about a year or so ago. They have gotten some--they have seen some improvements. It looks like the outyear is not going to reach at that dire of a situation. That is sort of reflected in our numbers. We are waiting to see the full execution of what they want to do, but we have seen some improvements. So some of the things that General Fick and Mr. Morani were talking about, we've seen some improvements. So the engines are staying on the wings longer. They are repairing them faster at the depot. And they have made other improvements in the process as well. So it's not going to be as bad as 43 percent, but I can't predict from a GAO angle how much better it's going to be down the road. General Fick. And, ma'am, we're happy to share those projections with you as well. Ms. Speier. Can I ask one last question? I know, General, you're leaving, probably gleefully from this position, is that correct? General Fick. Ma'am, the Department of Defense has not made any public announcement relative to my position. Ms. Speier. Oh, you said something that gave me the impression that you were--normally, there's a period of time that you serve and then move on to something else, correct? General Fick. Yes, ma'am. Ms. Speier. So my question is, to anyone, because this is so important, because this is so expensive, does it not make sense to have someone in your role for a longer period of time to be able to get a handle on the long-term ramifications and fixes? General Fick. Yes, ma'am. Ultimately, the Joint Program Office charter was updated back in 2015 to remove what used to be seen kind of as term limits relative to a PEO's tenure, a program executive officer's tenure. You may remember General Chris Bogdan, he was the PEO for 5 years prior to Admiral Mat Winter, who was my predecessor. If I add my deputy PEO time and my PEO time together, I come up with 5 years so that seems like a long time to me. But I certainly appreciate that you don't want a revolving door for someone just to walk in and then back out and not have to eat their own dog food so to speak relative to making progress with plans that they put in place. Ms. Speier. All right. Thank you. I yield back. Mr. Garamendi. I have not had an opportunity to talk to the professional staff on my own team as well as on the minority team. However, I would like to schedule briefings, not formal hearings because we don't have a space for that, but briefings, informal, but I think very informative to go after these issues in greater depth. We're going to write an NDAA, and we absolutely have to get it right and move this thing along with both authorities as well as responsibilities. We haven't had time to talk about a joint simulation environment. We could. We haven't talked about a lot of things here. So be prepared. I would like very much if we can schedule it, to go back with briefings rather than a formal hearing. Melanie, get ready for that. With all of you, thank you so very much for the testimony today. We've made progress. I think this whole system has made progress, insufficient, but nonetheless progress. I thank you for that effort. This meeting is adjourned. [Whereupon, at 4:04 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X April 28, 2022 ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD April 28, 2022 ======================================================================= [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] [all]