Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
[House Hearing, 117 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 117-81] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2023 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED SEVENTEENTH CONGRESS SECOND SESSION __________ SUBCOMMITTEE ON TACTICAL AIR AND LAND FORCES HEARING ON FISCAL YEAR 2023 BUDGET REQUEST OF THE DEPARTMENT OF DEFENSE FOR FIXED-WING TACTICAL AND TRAINING AIRCRAFT PROGRAMS __________ HEARING HELD APRIL 27, 2022 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] __________ U.S. GOVERNMENT PUBLISHING OFFICE 48-515 WASHINGTON : 2023 SUBCOMMITTEE ON TACTICAL AIR AND LAND FORCES DONALD NORCROSS, New Jersey, Chairman RUBEN GALLEGO, Arizona VICKY HARTZLER, Missouri SALUD O. CARBAJAL, California MICHAEL R. TURNER, Ohio ANTHONY G. BROWN, Maryland ROBERT J. WITTMAN, Virginia MIKIE SHERRILL, New Jersey, Vice SCOTT DesJARLAIS, Tennessee Chair MATT GAETZ, Florida KAIALI'I KAHELE, Hawaii DON BACON, Nebraska MARC A. VEASEY, Texas MARK E. GREEN, Tennessee STEPHANIE N. MURPHY, Florida RONNY JACKSON, Texas STEVEN HORSFORD, Nevada Heath Bope, Professional Staff Member Kelly Repair, Professional Staff Member Payson Ruhl, Clerk C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Hartzler, Hon. Vicky, a Representative from Missouri, Ranking Member, Subcommittee on Tactical Air and Land Forces........... 4 Norcross, Hon. Donald, a Representative from New Jersey, Chairman, Subcommittee on Tactical Air and Land Forces......... 1 WITNESSES Adams, MajGen James H., USMC, Deputy Director, Requirements and Capability Development, J-8, Joint Staff....................... 12 Fick, Lt Gen Eric T., USAF, Program Executive Officer, F-35 Lightning II Joint Program Office.............................. 13 Hunter, Hon. Andrew P., Assistant Secretary of the Air Force for Acquisition, Technology, and Logistics......................... 6 Loiselle, RADM Andrew J., USN, Director, Air Warfare Division, U.S. Navy...................................................... 11 Ludwigson, Jon, Director, Contracting and National Security Acquisitions, U.S. Government Accountability Office............ 15 Nahom, Lt Gen David S., USAF, Deputy Chief of Staff for Plans and Programs, U.S. Air Force....................................... 7 Stefany, Hon. Frederick J., Acting Assistant Secretary of the Navy for Research, Development, and Acquisition, and Senior Acquisition Executive for the F-35 Program..................... 8 Wise, LtGen Mark R., USMC, Deputy Commandant for Aviation, U.S. Marine Corps................................................... 10 APPENDIX Prepared Statements: Adams, MajGen James H........................................ 89 Fick, Lt Gen Eric T.......................................... 96 Hunter, Hon. Andrew P., joint with Lt Gen David S. Nahom..... 50 Ludwigson, Jon............................................... 116 Norcross, Hon. Donald........................................ 43 Stefany, Hon. Frederick J., joint with LtGen Mark R. Wise and RADM Andrew J. Loiselle.................................... 71 Documents Submitted for the Record: Table 1: Approved Block 4 Capabilities....................... 147 Witness Responses to Questions Asked During the Hearing: Mrs. Hartzler................................................ 153 Questions Submitted by Members Post Hearing: Mr. Brown.................................................... 157 Mrs. Hartzler................................................ 157 Mr. Horsford................................................. 158 Dr. Jackson.................................................. 160 Mr. Turner................................................... 159 FISCAL YEAR 2023 BUDGET REQUEST OF THE DEPARTMENT OF DEFENSE FOR FIXED-WING TACTICAL AND TRAINING AIRCRAFT PROGRAMS ---------- House of Representatives, Committee on Armed Services, Subcommittee on Tactical Air and Land Forces, Washington, DC, Wednesday, April 27, 2022. The subcommittee met, pursuant to call, at 2:01 p.m., in room 2118, Rayburn House Office Building, Hon. Donald Norcross (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. DONALD NORCROSS, A REPRESENTATIVE FROM NEW JERSEY, CHAIRMAN, SUBCOMMITTEE ON TACTICAL AIR AND LAND FORCES Mr. Norcross. Good afternoon, everyone, and welcome to the first hearing of the subcommittee proposal on the Department's fiscal year 2023 budget request. We have some folks on the remote. So before we begin, I need to review all the protocols that you've heard way too many times. Members participating must be visible on screen for the purpose of identity verification, establishing and maintaining a quorum, participating in proceedings, and voting. Video of members participating on Cisco WebEx is being broadcast via HRS [House Recording Studio] Internet live stream. Members may leave and rejoin the proceeding. I've designated a member of the committee staff to, if necessary, mute unrecognized members' microphones to cancel any inadvertent background noise that may disrupt the proceedings. And now I will go back to my opening remarks and, first of all, thank you for coming here today. There are a number of issues that we are dealing with that I will review shortly, but I very much appreciate it, as we move forward. In reviewing this year's service requests for tactical aircraft, clearly, there are significant changes to programs, plans, the underpinning analysis, and the retirement of force structure proposals in this budget that certainly will require close scrutiny. Last year, I believe, the committee was very supportive of General Brown's new force structure, coined the four-plus-one, and his goal to logically reduce the types, the models, the aircraft that makes the fleet more similar and simplify current ownership cost and maintenance challenges. The framework of that plan made sense to rightsize, particularly the A-10 fleet, to 218 for steady state unless there are contingency plans supporting its safe and effective operation into the late 2030s; keeping the F-22 fleet relevant in the inventory until Next Gen [Generation] Air Dominance began fielding; buying a significant number of new F-15EX with advanced technology and an increased weapons capacity to replace the aging F-15C fleet while keeping options open to recapitalize part of the F-15E Strike Eagles; and not accelerating the F-35 until Block--or excuse me, TR-3 [Technical Refresh 3] Block 4 can overcome those development challenges. However, this year, it seems as though the four-plus-one framework has been shattered and retirements significantly accelerating. New to everyone this year is the Air Force proposed over the next 5 years to retire 646 tactical fighter aircraft while only purchasing 246 new aircraft, leaving a significant capacity and capability gap of over 400 aircraft. The A-10s are now completely out of the inventory by 2028 and the new F-15EX buy has been cut nearly in half at only 80 aircraft, one-half of the F-15E fleet. About 105 aircraft will be retiring without a plane to replace a similar quality and quantity aircraft. New F-35 aircraft purchases have been reduced by 42 and a capable portion of the F-22 fleet the Air Force has neglected over the years is being retired as the Next Gen Air Dominance program is delayed far beyond its original plans as briefed to this committee. The bottom line is that there's a dramatic shift on how four-plus-one was initially communicated to us and understood by this committee just last year. For the Navy and Marine Corps, the force structure plan analysis seems to be another challenge. The message is just as elusive. Two years ago, the Navy strike fighter shortfall would have lasted until 2030. However, last year, Navy told us that the strike fighter shortfall would be resolved to zero in 2025, primarily due to the solid justification for terminating the new F-18 Super Hornet line. Honestly, we're skeptical of this year's analysis, given the assumptions related to the overly optimistic F-35C procurement rates, the lackluster F/A-18 Super Hornet service life modification program, and the nonrapid development of the Navy's Next Generation Air Dominance. Hedging our analysis of last year's data, we authorized an additional 12 new F-18s as risk mitigation, having seen this play out before back in the 2012 timeframe when the Navy tried to convince Congress that the F-35 was on track to meet their force structure need, and 1 year later our skepticism proved warranted and the Navy now informs us that the strike fighter shortfall will not be resolved until 6 years later in 2031 because of further unplanned reductions in F-35 purchases, the reduced aircraft inductions into the F-18 modification program. Finally, the Navy is proposing to divest its entire fleet of land-based EA-18 Growlers electronic aircraft that are currently deployed in Europe supporting the NATO [North Atlantic Treaty Organization] deterrence and force posture of activities against Russian aggression. For the Marine Corps, the Commandant's Force Design 2030 plan issued just 2 years ago significantly reduces the number of tactical fighter aircraft in their squadrons and brings into question the current program of record that plans to purchase 420 F-35 aircraft. The committee has been waiting for over 2 years to officially see the analysis justifying the mandated reduction and remains frustrated. The Marine Corps has been unable to communicate a final decision on this aspect of the 2030 Force Design plan. Finally, transitioning to the F-35 program, it's widely known that Mrs. Hartzler and my views closely align on the occasional accomplishments and the many enduring challenges of this program and endeavored to overcome during greater than 20 years since the F-35 program began. And I'd just--one of the articles that were flurrying the newspapers in the last day, the military is acquiring up to 152 F-35s each year for the Air Force, Navy, and Marines. GAO [Government Accountability Office] noted that this is nearly full production rate and on track to have 1,115 fighters delivered by 2023. That would mean one-third of the total numbers of F-35s expected to be bought would have been delivered before it finishes operational testing. We'll get into that in a little while. There are a tremendous amount of talented people working on this program. But it's been our longstanding concern remains with the program's high-risk approach to planning [and] execution that have proven unrealistic, costing taxpayers much more than planned and fielding capabilities later than are needed by our warfighters. Some of those examples are the--having all the services declare that their original initial operating capacity-- capability status many years later than planned; the system design and development [SDD] was completed last year, later than planned. The program has yet to finish the initial operating, testing, and evaluation activities, which is what we just talked about--tracked to be 5 years late. TR-3 Block 4 development and fielding has slipped later than planned repeatedly. The TR-3, which was just rebaselined last summer, is not meeting its new scheduling just today, and the overrun is estimated to be nearly $550 million. Full transition legacy--and John Garamendi is certainly focused on this one--from ALIS [Autonomic Logistics Information System] to ODIN [Operational Data Integrated Network] maintenance system briefed by our subcommittee in November of 2019 and January 2020. The F-35 program leadership was supposed to be fully fielded by December of 2022 this year, and that is certainly not occurring. And finally, immature and poorly written mission system software has been rushed through development, testing, and fielding with many bugs still there--issues discovered by the warfighters, not the testers. That's not the way we want to do it. That's causing a reissue of many of these unplanned and time-consuming software updates. Finally, we have an existing F-35 propulsion system that was not designed to meet the power and thermal management specifications required to adequately support Block 4 capabilities nor is the engine currently meeting mission capable cost and maintenance enterprise metrics. This is something that we can't afford, and we talked about this in today's earlier hearing, is that nearly 70 percent of the cost of an aircraft's life is after we purchase it, and this goes right to that bottom line. With many difficult and challenging acquisitions and sustainment objectives occurring this decade, I'd like to understand what adjustments that the program's leadership is being undertaken to achieve realistic schedules and reliable cost estimates that deliver affordable full warfighting capability to the many nations that are requiring and support their national security requirements. Now, after all that and I--there was a mouthful there--I want to yield to my good friend and ranking member, Mrs. Hartzler, for opening comments. [The prepared statement of Mr. Norcross can be found in the Appendix on page 43.] STATEMENT OF HON. VICKY HARTZLER, A REPRESENTATIVE FROM MISSOURI, RANKING MEMBER, SUBCOMMITTEE ON TACTICAL AIR AND LAND FORCES Mrs. Hartzler. Thank you, Mr. Chairman, and I want to thank all our witnesses for your dedicated service to this Nation, for your support of our service members and families, and for being here to provide testimony on the fiscal year 2023 defense budget requests for fixed-wing tactical and training aircraft programs. Russia's invasion of Ukraine over the past 2 months only further highlights how critical it is that our tactical fighter aircraft force possess the capabilities and the capacity necessary to keep pace with, deter, and, if necessary, defeat any adversary threat in both the near and the long term. And I commend each of you for your tireless efforts to maintain, strengthen, and modernize the capability and lethality of your fighter aircraft fleets. But, once again, the President's fiscal year 2023 budget request fails to provide the necessary levels of funding to support you in these efforts. The administration's defense top line falls dangerously short of adequately funding the modernization and equipping of our Armed Forces, ultimately forcing each service to make tough choices between future modernization programs and the sustainment of existing aging and aircraft fleets. Recognizing the hard decisions and challenges imposed on all of you by the President's proposed budget top line, I look forward to working together to determine what is the right balance to prioritize and fund both current operational and tactical readiness and modernization investments required for future capabilities. Both are imperative to our national security. To this end, I expect our witnesses to lay out the steps you are taking to explain the funding required to ensure that our current and existing tactical aircraft fleets remain the most lethal and capable in the world, ready to fly and fight today if called upon to do so. Understanding that modernization and the development of newer capabilities are critical for our future defense posture, I believe it is equally important to ensure that our fighter aircraft and the pilots that fly them are capable and ready to deter and defeat our adversaries today and in the near term. We know that our adversaries are rapidly investing in and maximizing their tactical aircraft capabilities and are currently posing a threat to global security and stability. Just 23 years ago, China only had approximately 175 aircraft. Think of that. Only had 175. But according to open- source reports, China's air force and navy now field roughly 2,800 aircraft with approximately 2,300 of them combat-coded aircraft, making them the largest aviation force within the Pacific region and the third largest aviation force in the world. Last year, China announced its annual military budget would increase by 6.8 percent, and according to DOD [Department of Defense], China's military spending is actually much larger than reported because China omits several major categories from its official budget. Meanwhile, the budget proposed from the Air Force cuts 400 tactical aircraft over the FYDP [Future Years Defense Program] and the Navy will continue to have a strike fighter shortfall through fiscal year 2031. With China on a determined path to match and surpass the capabilities and capacity of Western air forces, sacrificing operational readiness and accepting exceptional near-term risk for future longer term modernization development is, unfortunately, no longer a luxury that the United States possesses. The large number of proposed near-term aircraft divestments coupled with decreased procurement numbers in both the Air Force and Navy budget proposals and FYDP, raise concerns that the services are being forced to use their tactical aircraft fleets as bill payers for other modernization priorities. Thus, from a strategic and operational risk management perspective, I expect the witnesses to provide a candid assessment of how their future modernization, procurement, and fleet restructuring plans are impacting the readiness of existing tactical aircraft capabilities and capacity. This committee requires a full assessment and understanding of the risks and the vulnerabilities, specifically in terms of potential aircraft shortfalls, gaps in capabilities, industrial base impacts, and future costs each of the military services is taking on within its existing tactical air programs under the President's proposed budget restraints. This information is critical as we review the military services' plans for divestments, decreasing fleet sizes, squadron relocations, and significant unfunded priority requests, and make decisions for this year's National Defense Authorization Act. So I thank the chairman for organizing this important hearing, and I yield back. Mr. Norcross. Thank you. Obviously, between Mrs. Hartzler and myself there's a mouthful and this is why we're holding this hearing, because we want to hear from you to refute and explain many of those questions. So here with us today is the Honorable Andrew Hunter, Assistant Secretary of the Air Force for Acquisition, Technology, and Logistics; the Honorable Jay Stefany, performing the duties of the Assistant Secretary of the Navy for Research, Development, and Acquisition, and Senior Acquisition Executive for F-35 program; Major General James Adams, Joint Staff Deputy Director for Requirements and Capability Development; General--excuse me, Lieutenant General David Nahom of the Air Force, Deputy Chief of Staff for Plans and Program; Lieutenant General Mark Wise, Marine Corps Deputy Commandant for Aviation; Rear Admiral Andrew Loiselle, Director of Navy Air Warfare Division; Lieutenant General Eric Fick, F- 35 Joint Program Executive Officer; and Mr. Jon Ludwigson, Director of Contracting and National Security Acquisitions for the GAO--General Accounting Office. Glad to have you here again, and we will start as I introduced you, starting with Andrew. Good to see down there and thanks for being with us. STATEMENT OF HON. ANDREW P. HUNTER, ASSISTANT SECRETARY OF THE AIR FORCE FOR ACQUISITION, TECHNOLOGY, AND LOGISTICS Mr. Hunter. Thank you very much, Chairman Norcross, and Ranking Member Hartzler and members of the subcommittee. Very glad that you have myself and Lieutenant General Nahom here to provide testimony on the Air Force's fiscal year 2023 budget request for fixed-wing tactical and training aircraft. And as a former staffer of this committee, it's great to be back and to be with friends. And it's an honor to be here for my first hearing as an Assistant Secretary of the Air Force before this committee. We come to you with a well-thought-through plan. It's a plan that reflects the completion of the 2022 National Defense Strategy and it sets a strategic direction for the Department of Defense and for our purposes for the Department of the Air Force and for the Air Force acquisition enterprise that's clear because it's a clear mandate to strengthen the capabilities of our current and future tactical aviation fleet mix to overcome the pacing challenges identified and the strategy, particularly those presented by China, and to deter the threats of other strategic competitors. And to just speak briefly to the comments both of you made in your introductory remarks, there are changes in this budget request and there should be changes in this budget request. As the Chief has said, you know, we have to accelerate, change, or lose, and so my view is if we had come to you with a budget request that was identical to what had been projected last year with a new strategy and with a changed world, then you would be in a very fair position to critique us. You're obviously always in a fair position to critique us because that's the nature of this relationship. But I think as you dig into the details on this, I hope you'll find that we have made good choices and those choices were driven by our focus on seven operational imperatives, problems that we have to solve to really meet the pacing threat and that's what's driving this tremendous change. So as I said, we faced a number of tough decisions to strike this balance between short-term and future risks. But we did through a thoughtful and deliberative process to meet the rapidly evolving threats that we see. We aim to accelerate the development of a more modern and operationally relevant fighter force, delivering capabilities to the warfighter at the pace with which the strategic environment demands, at the pace at which it's changing by balancing along several axes, balancing current capacity versus essential modernized capabilities; balancing standoff versus stand-in capabilities; balancing the ability to generate mass with the ability to have high-end solutions that meet the most acute threats. Since my arrival in the Air Force earlier this month, I've been working with the SAF--Secretary of the Air Force-- acquisition team to assess our current programs, such as the F- 35 and several others, and to evaluate our ongoing efforts to adapt our acquisition policies and processes to meet our pacing challenges. And this early stages of a number of initial focus areas, including making sure that we're delivering operational capabilities that serve our actual warfighter requirements, meet current and future needs; modernizing our nuclear enterprise to ensure safe, reliable, and credible nuclear deterrent; sustaining a complex and aging Air Force fleet and the new capabilities as we field them; fielding innovative capabilities, especially software and software-intensive systems where our system historically has struggled; advancing our capabilities for digital acquisition to strengthening and securing our supply chains and supporting and developing the acquisition workforce. And I'm going to be working throughout my early days in this job to engage with our department's senior leadership, with our PEOs [Program Executive Offices] and with industry to set and establish a clear set of priorities for the acquisition enterprise, and I welcome, you know, coming to talk to you about those priorities as I've gone through that process. I look forward to working with this subcommittee to ensure the Department of the Air Force maintains sufficient military advantage to secure our vital national interests, support our allies and partners in fiscal year 2023 and beyond, and stand ready to address your questions. [The joint prepared statement of Mr. Hunter and General Nahom can be found in the Appendix on page 50.] STATEMENT OF LT GEN DAVID S. NAHOM, USAF, DEPUTY CHIEF OF STAFF FOR PLANS AND PROGRAMS, U.S. AIR FORCE General Nahom. Chairman Norcross, Ranking Member Hartzler, and distinguished members of the subcommittee, thank you for the opportunity to testify on the fiscal year 2023 budget request in the Department of Defense for fixed-wing tactical and training programs. On behalf of the Department of the Air Force, thank you for your continued leadership and unwavering support of the United States military and the 689,000 total force airmen that serve around the world today. In recent years, the Air Force's combat advantage over potential peer adversaries has been continually challenged. As a nation, we have simply fallen behind in the rate of technological advancement demonstrated by our global competitors. Through the lens of Secretary Kendall's seven operational imperatives, we continue to look critically at our investments to ensure our resources are properly aligned to a force design that will give our adversaries pause. During my tenure as the Air Force's lead programmer, congressional support for the Air Force investment efforts has never been more apparent than with the passage of the fiscal year 2022 NDAA [National Defense Authorization Act] and Appropriations Act. We sincerely appreciate Congress' approval to divest 80 percent of the requested aircraft in fiscal year 2022, allowing over $1 billion to be invested in other top Air Force priorities. Fiscal year 2023 represents another opportunity for the Department of the Air Force and Congress to work together in an effort to remain the world's preeminent power projection force. I'd like to take a moment to highlight some of the details of our fiscal year 2023 budget submission. Future conflict will be defined by highly contested warfighting environments and driven by emergency operational concepts and rapid weapons development timelines. The Air Force remains focused on achieving fighter force mix that provides a capable, sustainable, survivable, and affordable force that can operate across the entire range of mission sets. Our proposed four fighter platforms achieves just that. Together, the Next Generation Air Dominance platform and family of systems--F-35, F-15, and F-16 platforms--will provide complementary capabilities and capacity to meet worldwide demands. Our ISR [intelligence, surveillance, and reconnaissance] fleet's visibility and persistence play a key role in shaping information warfare objectives to influence adversary actions and perceptions. Future sensing must ensure continuous sensing for foundational intelligence. Winning a future high-end conflict requires accelerated investment, transitioning our platform's structure to a connected, persistent, and survivable force. As we look to the future, we must realize that our resources are finite-- manpower, money, and time. Working with Congress and within the confines of those limited resources, it is our job to shape a force that effectively and efficiently provides the most capable airpower for our Nation. If deterrence fails, our airmen must have the training, tools, and platforms, operating systems required to win. Developing the technology of the future will require the flexibility to achieve our optimal force. Looking forward, we must balance risk today so we're capable of effectively engaging future warfare against a well- resourced adversary tomorrow. I am honored to sit here today with Honorable Hunter and my joint teammates. I look forward to answering all your questions regarding the tactical and training aircraft programs. STATEMENT OF HON. FREDERICK J. STEFANY, ACTING ASSISTANT SECRETARY OF THE NAVY FOR RESEARCH, DEVELOPMENT, AND ACQUISITION, AND SENIOR ACQUISITION EXECUTIVE FOR THE F-35 PROGRAM Mr. Stefany. Chairman Norcross, Ranking Member Hartzler, distinguished members of the subcommittee, thank you for the opportunity to appear before you today to address the Department of Navy's tactical aviation programs. A modern sustainable TACAIR [tactical aviation] capability is essential to success in the high-end fight and remains the cornerstone of the Department's deterrence and power projection capabilities. We thank Congress and this committee for your continued support of these programs. The last year has been a good year for naval aviation. The Department delivered 94 new aircraft for Navy and Marine Corps units last year, including fourth- and fifth-generation and transformational capabilities to our frontline forces. They're also in the process of stabilizing the F/A-18 service life modernization effort and have a solid path forward to achieve realistic schedule goals for the first phase of this effort. In the last year, we reached initial operational capability [IOC] of the VH-92 Presidential helicopter program, which is not necessarily the purpose of today's hearing, but I wanted to just highlight that, and we are now starting the White House commissioning efforts for that helicopter. We also completed operational testing of the H-53 heavy- lift helicopter and just yesterday--the day before yesterday declared IOC of that aircraft. The 2023 budget request continues this progress for the naval aviation enterprise. We're requesting funds for 96 fixed- wing, rotary-wing, and unmanned aircraft in fiscal year 2023, and 420 aircraft across the FYDP. Of note, though, fiscal year 2023 does mark the end of the procurement of the H-2D Hawkeye aircraft. As the service acquisition executive for the F-35 program, I see the program as being at a very important inflection point. Steady state production is in place and the program is shifting focus to sustainment of that aircraft around the world while also developing cutting--and cutting in the next evolution of vital warfighting capability that's known as Block 4. Ensuring production and sustainment of the aircraft is affordable is essential to the success of this transition. To that end, we must continue cooperative efforts across all of us here to reduce F-35's costs in all areas while also implementing a truly global sustainment strategy that supports the fleet. Key to the sustainment cost reductions is the 2023--fiscal year 2021 to 2023 air vehicle sustainment contract that was awarded last year that incentivizes our contractor partners to simultaneously control costs and improve availability. We expect this contract to continue the trend of reducing cost per tail per year to achieve the Navy and Marine Corps targets later this decade. The F-35 enterprise also continues to address engine power module shortfalls, as you mentioned, sir, in your opening. Over the past year, the Heavy Maintenance Center at Tinker Air Force Base has diligently worked to increase their throughput, reducing turnaround time by 39 percent. We are aggressively applying lessons learned from Tinker as we stand up international depots right now and plan the standup of our second domestic engine depot at Fleet Readiness Center Southeast. As a department, we are committed to SECNAV's [Secretary of the Navy's] priorities of strengthening our maritime superiority, empowering our people, and strengthening the strategic partnerships with our allies and with industry. Thank you again for the opportunity to appear before your committee today and I look forward to your questions. Thank you. [The joint prepared statement of Mr. Stefany, General Wise, and Admiral Loiselle can be found in the Appendix on page 71.] STATEMENT OF LTGEN MARK R. WISE, USMC, DEPUTY COMMANDANT FOR AVIATION, U.S. MARINE CORPS General Wise. Chairman Norcross, Ranking Member Hartzler, and distinguished members of the subcommittee, thank you for the opportunity to appear before you and discuss the Marine Corps' plan for tactical aviation. The first priority to discuss is modernizing our aircraft fleet to meet the pacing threat. During our transition to F-35B and C, the F-18A through D, as well as the AV-8B have benefitted from continued readiness and sustainment investments we initiated in fiscal year 2017. Both platforms are capable and ready but require continuous modernization to maintain lethality, survivability, availability, as well as fifth-generation interoperability. With respect to our F-35s, we have stood up two fleet replacement squadrons [FRS], one operational test squadron, and six operational line squadrons to date. The F-35 program of record remains 420 total aircraft. Operationally, we recently deployed 10 F-35Bs from VMFA-211 as part of a historic multinational carrier strike group aboard Her Majesty's ship Queen Elizabeth. During this deployment, there were more intercepts of Russian aircraft than any time since the end of the Cold War. Of note, L-class amphibious ships were critical to this deployment since Marine F-35B squadrons could only train and qualify air crew and landing signal officers for foreign carriers aboard our LHDs [landing helicopter dock amphibious assault ships] and LHAs [landing helicopter assault amphibious assault ships]. Earlier this month, USS Tripoli put to sea from San Diego with 20 F-35Bs on board as an operational test of the lightning carrier concept. When that amphibious ship left the pier, it had more fifth-generation capability aboard than any other ship in history. Another of our priorities is fleet readiness. Proper resourcing, depot maintenance throughput, and manning are all factors that contribute to aviation readiness. Aircraft and component life extension initiatives for the F/A-18 and AV-8B will allow their relevance through 2030 and 2027, respectively. Continued investment in the survivability and lethality of the Lightning II and of its current and future suite of weapons will ensure we will be prepared to compete, deter, and, if necessary, defeat our peer competitors. Another important priority for us is managing manpower across the tactical aviation fleet. As the Marine Corps continues to modernize its fleet, qualified capable Marines remain the key to our ability to meet operational requirements. To address pilot shortfalls and maintain our retention, we, as a service, are looking at monetary and nonmonetary incentives. This includes improving aircraft readiness rates and flying hours as well as bonus incentives for our pilots and maintainers. We continue aggressive management of both our enlisted and officer structure to ensure we retain the very best. In summary, the Marine Corps tactical aviation is ready, it is lethal, and it is fully integrated into operations with our partners in the United States Navy, the joint force, and with our allies and partners. Enabled through continued congressional support, the Navy and Marine Corps team is deployed forward and postured to address threats around the clock and around the world. I appreciate the opportunity to appear here today, and I look forward to your questions. STATEMENT OF RADM ANDREW J. LOISELLE, USN, DIRECTOR, AIR WARFARE DIVISION, U.S. NAVY Admiral Loiselle. Good afternoon, Chairman Norcross, Ranking Member Hartzler, and distinguished members of the subcommittee. Thank you for the opportunity to appear today and discuss the Department of the Navy's tactical aviation programs. Naval aviation's striking power resident within our carrier air wings is delivered from the 11 most survivable airfields on the planet, the nuclear aircraft carrier. It is vital to controlling the seas and providing the long-range fires necessary to win the high-end fight. As we modernize the carrier air wing to pace the threat, we continue to focus on a mix of fourth- and fifth-generation fighter aircraft. Today, the Navy is managing fourth-generation F/A-18 inventory requirements through service life modification--SLM-- and fifth-generation requirements through continued procurement of the F-35C. This is also how the Navy is managing the strike fighter shortfall in future years. For fourth-generation, we continue to work with our partners to drive down the turnaround time and cost of SLM and manage the correct footprint of tactical aviation across our naval aviation enterprise. In the past year, we have seen a 30 percent cost reduction in our Phase One 7,500-hour SLM deliveries due to the implementation of best practices such as pre-SLM grooming, engineering, reutilization, and overall touch labor learning and efficiencies. We continue--we expect continued cost savings as SLM matures and we are executing our planned transition to full kit 10,000-hour SLM inductions in fiscal 2023. Full kit inductions will provide Block III capabilities identical to new production aircraft at one-third of the cost, giving us 4,000 additional flying hours or enough to fly for 13 additional years. While higher Department of the Navy budgetary priorities meant deferred procurement of F-35, the Navy is committed to the F-35C carrier air wing transition plan and TR-3 Block 4 upgrades for all aircraft in the Navy's inventory in order to reduce long-term sustainment costs associated with maintaining both TR-2 and TR-3 configurations. After a successful first deployment with VFA-147 [Strike Fighter Squadron 147], the Navy continues to learn and better quantify costs, mission capable rates, and operations of the F- 35C. We look forward to gaining more deployment data from VMFA- 314 aboard the USS Abraham Lincoln currently deployed as part of USMC [U.S. Marine Corps] TACAIR integration. We are laying the groundwork for the highly networked air wing of the future with the sixth-generation NGAD [Next Generation Air Dominance] family of systems that leverages manned/unmanned teaming, which will deliver overwhelming firepower in contested spaces in the years ahead. Our concept refinement remains on schedule and we are prioritizing funding to accelerate development of the sixth- generation capability and other key aviation wholeness investments to ensure carrier air wing will maintain strike fighter capability and capacity to pace the most stressing threat through the 2030s and beyond. This includes the long-range weapons necessary to maximize the potential of sixth-generation systems. We are developing methods to achieve the required training and readiness required by advanced tactics, utilizing tactical surrogates, live virtual constructive range integration, and improving training fidelity at a reduced cost. As the naval aviation enterprise manages fiscal constraints, we thank Congress and this subcommittee for your continued support of important aviation priorities including flight hour funding, critical aircraft upgrades, and investment in future capabilities. I look forward to your questions. STATEMENT OF MAJGEN JAMES H. ADAMS, USMC, DEPUTY DIRECTOR, REQUIREMENTS AND CAPABILITY DEVELOPMENT, J-8, JOINT STAFF General Adams. Chairman Norcross, Ranking Member Hartzler, distinguished members of this committee, thank you for the opportunity to discuss the Department of Defense's collaborative work to identify, develop, acquire, and operate the most combat-credible mix of tactical aircraft necessary to not only address today's challenges but remain relevant in an increasingly lethal and electromagnetically complex future operating environment. Similar to other recent activity, these efforts continue to prioritize China as the pacing challenge while addressing threats emanating from other global competitors. I would also like to thank your staff and the staffs of the other defense committees for the hours they have dedicated to discussing this important topic with the Department. Their insights have been helpful. In the interest of time, I'd like to specifically address the questions you posed to me as representative of the Chairman of the Joint Chiefs of Staff. As highlighted by the committee in your first question, there have been a number of separate but closely related and, in many cases, integrated analytic efforts underway across the Department to determine the appropriate balance of sixth-, fifth-, and fourth-generation capabilities. While not an all- inclusive list, I will highlight a set of the most important efforts. Last summer, the Joint Staff, in coordination with the combatant commands and services, led a future TACAIR study exploring the benefits and risks of various fleet mixes across two timeframes during both competition and conflict. All these studies were conducted at a very, very high classification level and were inclusive of all special access program and intel information. Additionally, the Joint Requirements Oversight Council directed the completion of multiple capability portfolio reviews, four of which were specifically germane to the TACAIR portfolio. The Office of the Secretary of Defense CAPE [Cost Assessment and Program Evaluation] completed a number of internal analysis directed by Department leadership to investigate TACAIR survivability, lethality, overall affordability, and novel concepts of operation to support combatant commander needs in conjunction with their comprehensive TACAIR study. Finally, both the Department of the Air Force and the Department of the Navy conducted individual studies focused on assessing both near- and long-term TACAIR requirements. These were foundational studies that supported all the previous. This compendium of analysis provided important decision support to the Secretary and the Deputy Secretary in making final decisions related to this strategically significant portfolio. Study findings informed the development of the recently released National Defense Strategy, the forthcoming National Military Strategy, and were captured in the President's fiscal year 2023 budget submission and associated Future Years Defense Program. As we proceed with today's hearing, I'm prepared to discuss in detail any specific queries you have regarding these studies. The findings were also leveraged as inputs to the directed readiness framework to calculate and forecast near- and mid-term operational risks associated with the issue identified in your second question--what is the impact of the service divest-to-invest strategies. The operational risk associated with these plans is known. It's factored into planning and is not forecast to unacceptably affect meeting global force management plans and activities of the Department of Defense over the next 10 to 15 years. Again, thank you for your leadership and continued support of today's warfighters and those who will comprise the joint force of tomorrow. I look forward to your questions and a continued dialogue regarding the TACAIR portfolio. [The prepared statement of General Adams can be found in the Appendix on page 89.] STATEMENT OF LT GEN ERIC T. FICK, USAF, PROGRAM EXECUTIVE OFFICER, F-35 LIGHTNING II JOINT PROGRAM OFFICE General Fick. Chairman Norcross, Ranking Member Hartzler, and distinguished members of the subcommittee, thank you for this opportunity to provide an update on the F-35 program. Given ongoing aggression from Russia, competition from China, and other threats across the globe, the platform's capabilities remain more relevant and more critical than ever. To date, and to your point, Mr. Chairman, we have delivered 788 F-35s to our U.S. services, international partners, and foreign military sales customers. These aircraft have logged over a half million hours while operating from 25 bases and 8 warships worldwide. The platform's impact is real. This air system is making a difference every day. As I briefed you last April, the mandate of the JPO [Joint Program Office] remains the delivery of a capable, affordable, and available air system outpacing competitors to win tomorrow's fight as we develop, deliver, and sustain these fifth-generation warfighting capabilities at high-end fourth-generation costs. As we will discuss today, the F-35 program is not without challenges. However, these challenges pale in comparison to the progress that we have made in recent years. I am grateful for this opportunity to share some of that progress with you today. We're grateful for your support of Block 4 in the 2022 NDAA. As we have discussed previously, we have been delivering Block 4 capabilities since 2019, ensuring lethality and survivability against the world's most sophisticated threats. TR-3 hardware delivery will increase our critically needed processing, memory, and throughput, and we continue to remain laser focused on the completion of TR-3 qualification and testing and the delivery of our first TR-3 equipped aircraft in Lot 15 in the summer of 2023. The ALIS to ODIN modernization effort continues addressing critical logistics information system software, hardware, data, and infrastructure requirements. We have successfully replaced the oldest ALIS hardware in the field and fielded 14 ODIN Base Kits to units around the world. These kits are 80 percent smaller and 30 percent cheaper than the units they replace, and they perform substantially better. We also recently deployed barcode scanners to warehouses and units around the world, simplifying the complex data entry task that accompanies the shipment inventory and installation of F-35 parts. We continue also to make strides in driving down sustainment costs, as mentioned by Mr. Stefany. Under the 2021 to 2023 annualized sustainment contract we signed last fall, the fiscal year 2023 cost per flying hour should be reduced by approximately 8 percent and cost per tail per year by 6 percent. This marks a step in the right direction but there's still work to be done. I look forward to discussing other actions taken by the government and industry to continue our fierce focus upon affordability today, as well as with your colleagues in the Readiness Subcommittee tomorrow. In the interest of ensuring our relevance well into the future, we remain laser focused on the evaluation of F-35 capabilities against existing and emergent high-end threats in an extremely high-fidelity simulation facility we call the Joint Simulation Environment, or JSE. Working closely with modeling and simulation experts at Naval Air Systems Command and other synthetic model providers across DOD and industry, we continue to make deliberate forward progress in the JSE's development and have delivered 90 percent of the required component verification and validation packages to date. Formal operational test activities in the JSE are scheduled to begin in January of 2023, and the final 64 runs of F-35 initial operational test and evaluation [IOT&E] are expected to occur there later that summer. I will note, however, that just because our final 64 runs for score have yet to be completed, that doesn't mean our air system is untested. In addition to the IOT&E events that we have to conduct in the JSE, we have already completed extensive operational testing to verify the capabilities that we are delivering to the fleet perform to their requirements and to verify that the suitability elements of the program meet sustainment requirements. This testing includes formal IOT&E open air trials executed from 2021--I'm sorry, 2018 to 2021, which consisted of 139 test missions, 16,436 flight hours, and 463 discrete test events using 23 F-35 aircraft and over 900 support personnel. Dedicated weapons events included 355 simulated air-to- surface attacks, 280 simulated AIM-120 [Air Intercept Missile 120] shots, and 207 live and inert weapons deliveries. Finally, we have made significant progress against our most critical sustainment degrader, the F135 power module availability. This progress is due to the combined efforts of a three-pronged enterprise recovery program. First, we increased the production at the Air Force Sustainment Center's Heavy Maintenance Center at Tinker Air Force Base; second, we increased capacity in the global power module repair network; and third, we matured our inspection procedures and damage tolerance limits to keep engines on wing longer. While we made real progress in all areas, Tinker really crushed its F135 power module production plan, reducing turnaround time from 240 days to 122, delivering 51 power modules against a target of 40. Tinker is on track to deliver 60 power modules this year. I thank you for your time today and look forward to your questions. [The prepared statement of General Fick can be found in the Appendix on page 96.] STATEMENT OF JON LUDWIGSON, DIRECTOR, CONTRACTING AND NATIONAL SECURITY ACQUISITIONS, U.S. GOVERNMENT ACCOUNTABILITY OFFICE Mr. Ludwigson. Chairman Norcross, Ranking Member Hartzler, and members of the subcommittee, thank you for the opportunity to discuss GAO's F-35 acquisition work. The F-35 was designed to replace multiple U.S. and allied aircraft and perform a wide range of missions from traditional airfields, austere forward locations, and carriers. The DOD and pilots report that the F-35 provides considerable improvements, giving warfighters advantages in many situations. Despite the broad needs and promise, the program continues to face challenges. The program has not completed testing because the government has not completed the needed simulator, which is more complex than expected. Without the simulator, the program cannot validate that the aircraft meets all requirements. Despite not completing testing, the program is already producing many aircraft. We estimate that over 1,100 aircraft will have been produced over 16 years during what is referred to as low-rate initial production and before the program is approved for full-rate production. This equates to about one-third of the total planned production, an approach out of the norm and inconsistent with leading practices. Our work of the past several years has identified challenges with the baseline program including production line immaturity, late parts deliveries, supply chain challenges, quality issues with engines, and hundreds of still open deficiencies. Addressing these should remain a focus. The over 700 aircraft already in service have not met reliability and maintainability [R&M] goals established for them. As a result, aircraft have been unavailable for missions more often, required more maintenance, and taken longer to repair than planned. There have been improvement in prior years but declines this year. The program has also struggled with the Block 4 modernization effort, already seeing schedule slips and cost increases. The Block 4 and related TR-3 efforts aim to enhance the F-35 to meet modern threats and provide new capabilities. Our work on Block 4, however, found, among other things, poor software quality, inadequate testing, fielding of defective software, and misestimates of the complexity of the work. These issues delayed deliveries and drove up costs, and we made related recommendations. The program has begun to address many of these but it's too soon to tell if they will address the core of our concerns. The program also has plans for less frequent software deliveries, a move away from modern software development practices. The new TR-3 processors and memory units are essential for some Block 4 capabilities but are also at risk of further delays. Unfortunately, we have been unable to include evaluations of cost and schedule estimates this year because formal updates have not been available. The cost estimate was last updated in 2019 and the schedule was last updated last year. Chairman Norcross, Ranking Member Hartzler, members of the subcommittee, this concludes my statement. I'd be happy to answer any questions you may have. [The prepared statement of Mr. Ludwigson can be found in the Appendix on page 116.] Mr. Norcross. Thank you to all of you for your statements, and our opening statements that we talked about a number of issues. Well, we met last year and I would be remiss in not thanking those who kept our planes flying, those who are building our planes during a pandemic. The workforce, particularly early on, who had no idea what was facing them, continued to work, and please, on behalf of the ranking member and myself, thank them for that. But here we are, and a chance to better understand many of the things that have changed and reflected in some of the statements. So, General Nahom, I talked about, in the opening remarks about the retirement of 650 aircraft over the next 5 years, buying 246--that operational deficit of close to 400. The numbers aren't that simple. An aircraft retiring and buying one aren't equal. But it is an indicator. But more importantly, what specifically caused the Air Force to accelerate this so significantly? It wasn't explained to us last year. What changed in those 12 months to make such a drastic shift? General Nahom. Sir, I'll say--and thank you for the question, sir. You know, first, if you look at it from our 2022 enacted to the 2023 PB [President's budget], we have invested $1.2 billion more in the fighter force over that period. So we continue to invest in the fighter force because it's critical to our Nation's defense. There is a balance between the capability that we need for a peer fight as well as the capacity that is needed worldwide for our airmen that are out on point every day, and it's a tough balance. There are some competing needs as we look at the--in the overall Air Force beyond the fighter portfolio, specifically the nuclear portfolio, which, as we recapitalize two-thirds of the nuclear arsenal and many of those articles now are in procurement, not just RDT&E [research, development, test, and evaluation] in this FYDP that did--that does crowd out some investment that we have to be cognizant of as we look forward to the fighter portfolio. Mr. Norcross. But that's nothing new to the last 12 months. We knew that was coming. General Nahom. Yes, sir, it is, but a lot of the procurement does enter into this FYDP, if you look at the latter part of the FYDP when you look at GBSD [Ground Based Strategic Deterrent] and B-21, and many of these things do start procuring now, which does tighten our budget a bit. Mr. Norcross. I understand, but we knew that was coming. General Nahom. Yes, sir. Mr. Norcross. Okay. General Nahom. Absolutely. But I'll tell you, as the threat changes--and the F-35 is a perfect example--you know, the F-35 that we initially bought 20-plus years ago as we envisioned it 20 years ago was for a threat that is much different right now. So we continue to evolve the F-35 and we do--and TR-3 and Block 4 and all the modernization is so critical. As well as you look at some of the modernization we're putting into F-22 and some of the advanced weapons that are going to be on these aircraft to make sure that we can meet the emerging threat because, as Ranking Woman Hartzler pointed out, the changing in the Chinese threat over the years is staggering and our capability has to advance to meet that, and you look at our investment in Next Generation Air Dominance, which will ultimately replace the F-22 matches that need. And so there, unfortunately, is a balance between how many aircraft we can procure and the capability that we need to invest in, moving forward. Mr. Norcross. So that's one-half the equation, the acquisition. How about the retirement accelerated at such a rate? General Nahom. When you accelerate the aircraft and you free up the investment, the money that it takes to maintain those aircraft is one thing, and as the Air Force's aircraft age--and I'll use the F-15C as an example--almost the entire fleet is beyond the original design service life. The maintenance costs--the WSS, the weapons system sustainment--is going up. Even in this increased inflation period we live in right now, those costs are still going up at greater than inflation. So when you retire them you free up that investment. But more importantly, you free up the airmen. You free up the personnel that we can bring onto modern systems and not just F-35 but other systems throughout the Air Force. So--and I'll tell you, if you look at the O&M, just the operations and maintenance on a legacy fighter, it's a little over 20 fighters that you would retire just to purchase one F- 35. So it takes, actually, a lot of divestment to actually invest in future systems. Mr. Norcross. I agree with this. This is the conversation you and I have had over the last 2 years. But what changed over the last 12 months? Because much of this was discussed earlier. We know Refresh 3, Block 4 is coming. It reflects the change in China. But what changed in the last 12 months that we didn't know when we were here last year? Why didn't we do this last year if it's the same? General Nahom. Sir, I'll have to take that for record and make sure I compare the right [inaudible]. I don't want to give you an answer off the cuff. That's such a critical--a critical answer. [The information referred to was not available at the time of printing.] Mr. Norcross. Because that's the question I'm going to get through the committee is we're here with you. We want [inaudible] here. So what changed in the last 12 months that we are now shifting? Mrs. Hartzler. Mrs. Hartzler. Thank you. We're thinking similarly. Out of all your testimony, the thing that stood out the most to me was what Major General Adams said--talking about last summer you did these scenarios that showed, you know, a need for different things and whatever. But last summer, we had just passed the NDAA in the House-- in the committee here. It hadn't come up to the floor yet. We didn't pass that till December. We didn't pass the budget until just in March. Yet, we heard nothing about any of these changes, and this is a radical change that you proposed to us a couple of days ago. Four hundred less aircraft, divest all of the A-10s, divest F-18 electronic planes. Did you say anything to any Member of Congress about your findings when we were in processing last year? How come we didn't hear about it until a couple of weeks ago? General Adams. Ma'am, thank you for the question. The studies that we did didn't define specific actions that the services ended up taking. They defined what is the right mix of fourth-, fifth-, and sixth-gen platforms that are required to meet the changing--the rapidly changing and evolving threat from China. And there was thought that, you know, if we continued on and leveraged and didn't change in an accelerated fashion and used the standard process, which, essentially, delivers small changes with each cycle, it will continue to increase the gap between the capabilities that the Chinese were delivering and the capabilities that we needed to field. Mrs. Hartzler. How come you didn't say something sooner, though? General Adams. The---- Mrs. Hartzler. I mean, if this is the case, if China is making--you're discovering something new, I'm concerned that we're waiting a whole almost year before it's brought to us. General Adams. Ma'am, I'll take that for the record. I know for a fact that the CAPE study delivered probably the earliest of them and that was in October of last year, and then following that were the deliveries of the other studies. But I'll take that for the record as to exactly what was delivered and when. [The information referred to can be found in the Appendix on page 153.] Mrs. Hartzler. Okay. Okay. Thank you. Now to my written questions. So the first one, General Nahom, and it's kind of a long intro but you'll kind of see. Bottom line, I'm concerned about a capability gap in between. So we're going to make this big change. We're going to divest. What are we going to do in the meantime? So early this month in an interview with Air Force Magazine, you noted that the Air Force requirements have never been more in demand, needed to support combatant commanders around the world. During that interview, you also noted that the Air Force fighter fleet age continues to rise and that the Air Force has failed to recapitalize several of these aircraft and new airframes in a timely manner. To get to this readiness problem you agree with former Air Force Chief of Staff General Goldfein's assessment the Air Force must seek 72 new fighters per year. However, in this budget, the Air Force is only requesting procurement funding for 57 tactical aircraft between both the F-35A and the F-15EX. Even with the additional 7 F-35As on the Air Force's unfunded priority list, tactical aircraft procurement will fall 6 short of the necessary annual procurement minimum of 72. Additionally, the Air Force FYDP for 2023 through 2027 provides a plan to divest--well, I'll just summarize, it's what the chairman just said--basically, leaving 400 divested aircraft without new fleet replacements. News to this committee since we were not provided with the FYDP last year. The Air Force now plans to divest of its F-15C and D fleets by 2026, the entire A-10 fleet of 281 aircraft by--well, 6 years, and has cut its planned F-15EX acquisition objective from 144 to now only 80 new aircraft, all while shifting expected timelines for the NGAD program significantly later than originally planned. So, equally concerning, you've indicated over the last few weeks that the majority of these budgetary decisions were budget driven rather than requirement driven. In fact, you've acknowledged that you would like to see the Air Force buy more new fighters. So with an aging fleet, divestments of entire tactical aircraft fleets, decreased procurement, and further slipping timelines within the Next Generation Air Dominance program, this committee has significant concerns regarding not only how the Air Force plans to maintain minimum total fighter aircraft and combat-coded inventories as required by law, but also operational and safety risk the Air Force is accepting both in the near and long term. So as the Air Force forces its resources--focuses its resources on the nuclear recapitalization, which you talked about, what is the Air Force plan to mitigate further near- and long-term capability and capacity gaps within the tactical aircraft fleet to ensure that it's ready when our country needs it? And does the fiscal year 2023 proposed budget and FYDP adequately resource this mitigation effort? Thank you for your patience with that long---- General Nahom. Ma'am, thank you for the question. I guess, first, I'll start with what I think is the good in terms of the--in the capability piece. The Next Generation Air Dominance family of systems and the focus that Secretary Kendall has on it as part of his operational imperative, I think is on a very good track and we--and I would like to sit down and talk at a classified level to show where we are, and I don't--the timelines have not changed appreciably from last year on the---- Mrs. Hartzler. That's not what I saw. I was in a classified briefing a couple of weeks ago. That's not what I was told. General Nahom. Okay, ma'am. Again, I would love--I would look forward to the opportunity to meet, discuss, and make sure we're all looking at the same things. But I do actually like where Next Generation Air Dominance is going because I think it's the right--the right thing to do for our Nation. Also, until we get there, we have invested in the F-22 advancements to make sure that we have that air superiority hedge between now and Next Generation Air Dominance fielding, and those advances are going very well. Although delayed, we're happy with the current progress on TR-3 and Block 4. We look forward to getting that capability into the F-35 as well as some of our advanced weapon systems that we're invested in. In terms of the fighter numbers, I am concerned, as you are--as you are, too, we do have an aging fleet. The Air Force's fighter force is sitting at nearly 30 years old, and if you look at the conditions of some of the fighters in the field, I not only worry about the capability that they would be asked to counter and, specifically I look at the F-15C. The aircraft that I grew up in were A-10s or other things. We do owe our airmen better, more modern technology and that's what we're trying to get after. That said, there are limitations to the resources and we had to strike that balance between the capabilities that we need to invest in and, certainly, the numbers of aircraft to make sure that we can field the proper-sized fighter squadrons moving forward, ma'am. But we are focused, like I said in my opening. We have invested more money this year than we did last year in our fighter force and we hope we struck the right balance, and that's why, as we sit here talking to you and your colleagues, we want to make sure that we did strike that right balance with the given resources that we have. Mrs. Hartzler. Thank you. Mr. Norcross. Ms. Sherrill, you are recognized. Ms. Sherrill. Thank you. Secretary Kendall, over 10 years ago, the Department and the Congress determined that a second engine for the F-35 was costly and unnecessary. Yet, your budget includes almost $300 million to recreate the second engine program at the expense of F-35 aircraft quantities, funds for F-35 modernization, and NGAD propulsion, and you've been publicly quoted as saying you prioritize integrating the second engine into the F-35 at the expense of those existing programs. So can you just describe what has changed? Why are you prioritizing investment in a costly second engine, for which we don't have a defined requirement, at the expense of the existing F-35 program of record or the current propulsion system? Mr. Hunter. Ma'am, this is Andrew Hunter. I'm going to address that question. On the engine question, we do have funds invested in our AETP [Adaptive Engine Transition Program] program, which is-- has not been a second engine program. It is a technology development program to develop advanced engine technologies for things such as greater fuel efficiency and better thermal management, which give us operational benefits such as increased range and better ability to support advanced mission systems. That is a program that has been ongoing for some time and it has built a couple of demonstrators, which industry is currently--is going--doing testing on and evaluating that technology. Within the fiscal year 2023 budget there are funds allocated towards a propulsion solution for the F-35 but no decision has yet been made on what that solution will be. So we have postured funding in order to enable a solution. But the decision on what that solution will be is still pending. But the AET program is one of the possibilities that's under consideration for that. Ms. Sherrill. Well, I guess that AETP--from what I understand it would only work for a small subset of the F-35s-- the F-35A fleet of the Air Force--and it's estimated to cost as much as $40 billion over the program's life cycle. So modernizing the existing engine could save as much as $40 billion in lifecycle sustainment cost across the fleet, benefitting all of the services and our allied partners. So why aren't we investing in those engine enhancements to field the modernized capabilities across the entire F-35 fleet? Mr. Hunter. Ma'am, there is work underway. There are others who could probably speak to it on--you know, maybe let General Fick speak to the work that's being done to analyze those questions. General Fick. Yes, sir. Happy to contribute. So the F-35 Joint Program Office, working in concert with the Air Force, the Navy, the Marine Corps, the Air Force Life Cycle Management Center, and Naval Air Systems Command, is conducting a business case assessment to explore the combinations of engine solutions and power and thermal management solutions available or proposed to be available to help solve the F-35's cooling- related propulsion issues. We have begun working our way through the engine decks and PTMS, power thermal management system, decks to assess the performance implications. At the same time, we're looking at the cost and the schedule implications associated with the creation of a program to move one or more of those solutions forward. This BCA [business case assessment] is then going to be complemented by an analysis that the Air Force is doing that looks at the operational implications of those different solutions. So if a solution yields additional range or endurance or payload, the question is what does that actually mean in a warfight--what does that actually mean in the Asia-Pacific when it comes to actually employing the system in combat. So the BCA that we're doing at the bottom level really forms the business case. Above that, the Air Force is looking at an operational assessment to be provided to the Secretary later this spring. Our full BCA we'll complete later in the summer. Ms. Sherrill. Well, I guess I would also hope that the BCA looked at what that actually meant to our supply chain, what that actually meant to the other forces, and what that actually meant to the cost of this program, which we have already seen severe overruns throughout the life cycle. So thank you, and I yield back. Mr. Norcross. Mr. Wittman, you are now recognized. Mr. Wittman. Thank you, Mr. Chairman. I'd like to thank our witnesses for joining us today. Rear Admiral Loiselle, I want to start with you and I want to speak specifically to the choice suite that had been given to us by the Navy. The choices go from bad to worse, and one of those is the strike fighter shortfall. As you know, the minimum requirement under the law is to have 10 carrier strike air wings by 2025, and the Navy has always paced the carrier strike air wings with the number of carriers available. Even though we have been through all kinds of machinations with [USS] Ford, she's going to be going on deployment or predeployment right now as we speak and we will be at 12 carriers by 2025. From that particular point, it now sounds like the Navy is seeking legislative relief from the 10 carrier air wing requirement by 2025. I believe firmly that it was the understanding of this committee and the full committee that there was only temporal relief for that 10 carrier air wing requirement. So my question to you is what are the consequences of us going below 10 air wings for the carriers and why does the Navy no longer intend to field those 10 carrier air wings when there was a commitment, I believe, made by the Navy to Congress that they would, indeed, do that, based upon the number of carriers that will be in the fleet by 2025? And what is the operational risk that the Navy is taking on by requesting to go below 10 carrier air wings? Admiral Loiselle. Sir, thank you very much for that question. So there were several questions in there so I'll stick with where you ended up first and then we can redirect after that if you'd like. But the primary reason why we asked for legislative relief to go back to nine air wings--to remain at nine air wings, spoken correctly--is that when you look at our overall master aviation plan that delineates where all of our aircraft carriers are going to be at any given time, that goes out for a 10-year period. And so as we look at that, there are very few periods of time--brief time--where we have more than nine aircraft carriers available, predominantly due to one--at least one carrier in our COH [complex overhaul] and right now we have two--and then one other--at least one other aircraft carrier in a docked planned maintenance period that lasts, generally, you know, anywhere from 12 to 16 months depending on the workload of that aircraft carrier, and those are stacked east and west coast as we go through. So as we look through that entire timeframe, there were very brief periods of time where we had more than 9 aircraft carriers available, and so all of our analysis indicated that 9 carrier air wings was adequate to be able to staff and man the aircraft carriers that we were going to have available to use at any time in the next 10 years. And so given the funding constraints on the overall top line in the Navy and the investments required, as you've mentioned in your statement, there were higher priority things to put that money against, which is why we asked for legislative relief. Mr. Wittman. Well, as I see it, the problem with that is during those times when you will need more than nine carrier air wings you're going to be really pushing those jets on a lot of hours to be able to bridge those gaps. We have seen what's happened with F-18 and putting a lot of hours on those aircraft and deep dive depot maintenance level work that's needed. We have seen the cost and the time that goes along with that. So I think there is some risk as you're pushing the envelope on those. It sounds great conceptually, but when you push those aircraft that hard, we know what happens to the life span of aircraft and then what it costs in deep level maintenance elements. Lieutenant General Wise, I want to get a question in real quickly and that is related to Force Design 2030. In the Force Design 2030, the Corps' intent is to reduce squadron size from 16 to 10 primary aircraft, and General Berger previously explained that the Corps is going to finalize their F-35 request. This year we see three F-35Bs, three F-35Cs. The question then becomes does the Corps anticipate updating their request based on the Commandant's comments, based on the current request in the PB [President's budget], and what factors is the Corps considering in making decisions require--or regarding the size of F-35 squadrons? General Wise. Sir, I appreciate the question. And the initial decision to take it down to 10 planes per squadron was based on a couple of things. Sorry, there we go. The decision to take it down to 10 aircraft per squadron was based primarily on the fact that the F-35 deploys as a division at any given time, so having two divisions. But what also happened at the same time is that was kind of the placeholder. So we have been doing, as you are aware, a lot of the studies, war games, experimentation, to make sure we got it right because part of--the other part of the question the Commandant is trying to answer is, okay, if we start with that we have to exercise it on the amphibs to ensure that the rest of the air wing, the flight deck can be managed appropriately, all the things to readiness of the aircraft. All those things actually equal 10. So that's where a lot of the study is going right now. As far as adjusting the--I think it would be premature to adjust the actual program of record right now, and the other factor, I would say, in there is the initial decision to go to 420, there was a cost constraint piece of it, because if you look at the attrition models that was used, it was truncated to make it more affordable for a program. If you expand out back to what the original attrition model would have been, we'd still be pretty close to 420. Mr. Wittman. Okay. Very good. Thank you, Mr. Chairman. I appreciate your indulgence. Thank you. Mr. Norcross. I'm trying to get everybody in. Mr. Horsford, you are now recognized. Mr. Horsford. Thank you, Mr. Chairman. General Fick, I've got some questions about initial production F-35s and capability differences between earlier versions of the aircraft and the Block 4 versions currently being fielded. The fiscal year 2023 budget indicates that the Air Force currently plans to modify production Lots 8 through 16 of the F-35A fleet and that it would cost the Air Force roughly $16 million per aircraft to upgrade a Lot 2 to 8 aircraft to the Block 4 configuration. I do understand the importance of the technical refresh and that these aircraft will represent a significantly improved capability. But can you describe the capability differences of a Block 4 F-35A and an initial production F-35A from Lots 7 or earlier? General Fick. Sir, thank you very much for your questions. I'll try to address them in the context of what we add in Block 4 and in TR-3. So, first, Block 4 brings with it in its initial instantiation 66 unique capabilities, including about 16 weapons that the initial tranche of F-35s did not, could not, would not carry. So we're bringing those 66 capabilities in addition to those 16 weapons. In the time that's transpired since the program began, since the Block 4 or post-SDD [system development and demonstration] phase of the program began, we have actually also altered the content of what is included in what a lot of people refer to as Block 4. So Block 4 started off as 66 unique capabilities. Then there were a number of capabilities added by the U.S. services and by the F-35 governance groups and in three different phases. One was kind of an initial phase that added a couple of capabilities. Then we added what we call a capability Increment 2 which was, I believe, an additional 6 or additional 10 capabilities. Then capability Increment 3, which is another six capabilities. So all in all, that 66 capability set has grown to about 88 capabilities now being added to the baseline F-35s as we work our way through Block 4, which is now to include capability Increment 1, which is the baseline, capability Increment 2, and capability Increment 3. So it's the extent of all of those added capabilities that will not be resident if you don't upgrade to the Block 4 configuration. Now, I'm aware that some of our customers are going to upgrade their aircraft to the TR-3 configuration but, perhaps, stop the modification there and not add some of the later electronic warfare capabilities. Now, that number stopping after TR-3 is about 180 or so aircraft across the fleet will be upgraded to TR-3 but not to full Block 4. Additionally, there's about another---- Mr. Horsford. I have a couple of other areas I want to get to. So---- General Fick. So, primarily, weapons and additional electronic warfare systems, COMNAV [communications-navigation] and info systems, radar modes, and the like. And I can provide a full list if you need it. [The information referred to was not available at the time of printing.] Mr. Horsford. A written response is fine. Thank you. General Nahom, it's my understanding that some of the top priorities in the Pacific theater are the accelerated building of the F-15EX, procurement of an E-3 replacement, and fielding improved air-to-air missiles, and I was pleased to see the accelerated F-15EX buy included in the fiscal year 2023 budget and also to hear yesterday that the Air Force had selected the E-7 to fill the gap left by the retirement of the E-3. Can you update the committee on the progress being made on next-generation air-to-air missiles and any challenges you're facing in fielding these capabilities? General Nahom. Thank you for the question. It's good to see you again, sir. On the earlier missile piece, I think--I want to be careful and most, I think, I am going to have to take to a classified session with you. What I will say is we are--right now, our follow-on missile, the JADM [Joint Direct Attack Munition], the progress alongside our Navy partners is going quite well. I would say I don't want to say much more about that until we get to a classified session. You know, as we field these advanced fifth-generation aircraft, we're very cognizant that we have to have fifth-generation-level weapons to go aboard these aircraft, and right now our investments are quite well placed and the development is going very well. But I want to leave it at that. Mr. Hunter, unless you want to add anything to that. Mr. Hunter. No, I agree with that assessment. We have several critical investments in munitions in the budget request that we certainly request your support for and that is an area where funding is a significant enabler of our efforts. Mr. Horsford. Thank you, Mr. Chairman. I'll take my other questions offline. Mr. Norcross. You got it. Dr. DesJarlais. Dr. DesJarlais. Thank you, Chairman, and thank you for being here today. Can you all hear me? Okay. General Fick, let's start with you. The GAO recently reported that the F-35 TR-3 development costs are increasing and the program office is also tracking additional schedule risk. What is the program doing to ensure smooth integration of the TR-3? General Fick. Sir, thank you for your question. We're watching TR-3 development very, very closely. As you know, TR-3 is not just a capability enhancement, it's also a diminishing manufacturing source solution. So it's absolutely critical that we cut it into production in Lot 15 this coming summer. We work very hard with L3Harris, the prime contractor for the integrated core processor, which is really the long pole in the TR-3 tent, to progress them through a safety of flight qualification testing, which is ongoing today, to move us towards a first flight in the mid- to late-July timeframe this summer. That first flight will be the leading edge of a flight test program that will take us all the way through the delivery of the first aircraft with TR-3 hardware in the summer of 2023. We're also able to protect the production line by procuring a number of TR-2 kits that we can use to move aircraft through the production line and then cut in TR-3 hardware at the very end so that we DD-250 every tail with TR-3 hardware. Dr. DesJarlais. Okay. Can you articulate the relationship between TR-3 and Block 4 capabilities? In other words, how dependent are Block 4 capabilities on TR-3 development and how will the TR-3 delays and cost increases affect the overall Block 4 plan? General Fick. Yes, sir. So think of TR-3 as the architecture, the computational architecture, that supports the software-enabled capabilities that really are the broader Block 4 capability set. So the iPhone and the apps, if you will. TR-3 is actually what we call an integrated core processor. So it's like your CPU [central processing unit]. It's a aircraft memory unit, so like your RAM [random access memory], and it's a display unit just like your monitor. So it is, effectively, the computer at the heart of the F- 35. The Block 4 capabilities ride on that computational architecture. Interestingly, before we suffered the developmental delays on TR-3 the broad Block 4 effort from a earned value perspective, from a developmental perspective, was actually proceeding very well. But because we had to preserve, we had to work the hardware cut-in because that's the hardest thing to cut in to a production line, we prioritized that when we ran into our cost overruns and our budgetary reductions in fiscal year 2021. So that we had to delay some of that Block 4 software-based capabilities to get TR-3 into the aircraft. Since the 2022 budget arrived we have restarted all of the critical elements of that broader Block 4 capability set and we're working to deliver those currently. Dr. DesJarlais. Okay, and this will also be for you, General Fick, and Mr. Ludwigson, feel free to chime in. The GAO reported that F-35 production has continued to experience delays in 2021, largely due to the lingering effects of COVID- 19, including the disruption of the labor force and supply chain. Can you expand on these challenges and their impact on production and costs and do these issues show any signs of abating in the near future? General Fick. Sure. So while Lockheed did not request any equitable adjustment relative to the impacts or implications of COVID as we worked our way through calendar year 2020 or 2021, I will tell you that the impacts of COVID are being felt in our ongoing negotiations for Lot 15 through 17. And while I won't talk about the details of that negotiation, I will tell you it is being challenged by supplier and prime contractor posture relative to the uncertainty in the economic environment, uncertainty with COVID, inflation, among other things. Dr. DesJarlais. Okay. Mr. Ludwigson, you can touch on that, too. But I also wanted to just, while we have time left, you know, you come before this committee every year and your reports essentially say the same thing, that the F-35 program is experiencing more schedule delays and more cost overruns. What are some constructive advice that you could offer or suggest to us on what the F-35 program could do differently, going forward, to change the narrative? Mr. Ludwigson. Thank you very much for the question. On production, I would mention that in our recent reports we have identified that COVID was a partial culprit. But we have identified concerns with the production line for a couple of years, dating back to immaturity in the production processes that were in place. I know that they've continued to work on those things with the introduction of new equipment and, in some cases, new parts suppliers, I think, compound some of those challenges. I also believe that the supply chain issues that COVID exacerbated, of course, but there were supply chain issues with deliveries getting there late, not just engines, which all were--well, almost all were late this year, but considerable late to dock sort of situations with parts for the airframe. Those issues were there before COVID. COVID made them worse. With respect to what can be done, I really think when you think about the baseline aircraft there are a few things that you can do that, I think, have material and lasting effects and really focusing on trying to achieve the R&M metrics. Those are the metrics that are going to define how this aircraft is going to perform in the field, and that's first and foremost. I know the program has put money on the table with respect to the R&M improvement program. Those efforts may well bear fruit but they will take time, and I think it's worth giving that a little bit of time but focusing on what parts are going bad, what are the issues with respect to the service intervals for the engine or other parts. Those are important things. With respect to Block 4, from my perspective, I think you've really got to get back to the basics of good software. You know, write good code, write tests while you're writing good code, test stuff before it gets to the field, do a good job on estimating, and I would say lean into more frequent software deliveries. Don't back away from the basic principles of agile. Sorry, that was a big answer. A lot of questions. Mr. Norcross. Good answers. Mr. Gallego is recognized. Mr. Gallego. Thank you, Mr. Chairman. Secretary Hunter and General Nahom, thank you both for your testimony today. Could you share any details of those--details about the findings of A-10/F-35 flyoff and does the Air Force plan to release an unclassified version of the report? And if not, do you have any plans to brief Congress on the results in a classified session? General Nahom. Congressman, thank you for the question. On the flyoff, I know the report was made available. I'm not sure what I can share here so I want to make sure I take that for the record, just so I'm careful here. But we were pleased this year that we were able to provide the report because the test has been done for some amount of time and we're pleased that we could share the results. But if I could take that for the record to make sure I don't share anything I shouldn't in open session. [The information referred to was not available at the time of printing.] Mr. Gallego. Mr. Hunter. Secretary Hunter. Mr. Hunter. I concur with that assessment, sir. Mr. Gallego. Well, we're happy to hear that the report is finally out. I think we have been asking for it for quite a while. General Nahom, thank you for your responses so far. Regarding the F-35, I'd like to ask you about an ongoing program next door to my district, at Luke Air Force Base. On any given day, you will see American, Dutch, Danish, Norwegian, and Singaporean flights flying the same aircraft, rehearsing the same tactics, and learning to operate advanced technology as a unit. Is this the template for the future and are there additional opportunities to expand this integrated tactical- level training with allies and partners? General Nahom. Yes, sir. I'll tell you, you know, when you look at some of the real--you know, we've talked about a lot of the challenges with the F-35 today, but there's some really good opportunities with so many of our allies and partners flying that airplane and it seems to expand every month with a different partner now flying the airplane. And when you look at the integration, especially as--one of the best examples of what's going on in Europe with not only with our aircraft now stationed there at RAF [Royal Air Force] Lakenheath but with all our partners flying alongside of us, and then now we're starting to see the opportunities in the Pacific as well. I think this--if you look at a way allies and partners integrate the F-35 is going to give us an incredible opportunity once we completely fully realize the capabilities of that aircraft, moving forward, sir. Mr. Gallego. General Wise and Rear Admiral Loiselle, in 2021, the F-35 fleet saw two deployments at sea, the F-35Cs aboard the USS Carl Vinson in the South Pacific and the F-35Bs aboard the HMS Queen Elizabeth in the Mediterranean. Each ship lost one aircraft while underway, and it was noted the sea conditions, at least in the Pacific, were causing extensive corrosion to the jets' low observable [LO] coating. What are some lessons learned each of your services is gathering from these early at-sea deployments regarding the F- 35 and its usage? General Wise, let's start with you. General Wise. Congressman, I very much appreciate the question. The investigations, obviously, are just in their final stages, and from a safety perspective, we don't want to impede the investigative process. But I would say that what we have learned we don't know at this point that anything was aircraft malfunction related. That, of course, was one of our colleagues in the U.K. [United Kingdom] as far as the aircraft. But it's imperative on us to make sure that the training, the preparation for the operations, are done appropriately to ensure that we minimize that risk to the crews on board. And I'll defer for the other question. Admiral Loiselle. Yes, sir. And so same answer. The investigation is ongoing on the loss of the aircraft so I can't comment on that until it's complete. General Wise and I are tomorrow going down to Lockheed Martin. In fact, that's our next stop after we leave here is to the airport, and we are attending the post-cruise debrief from the first deployment with VFA-147, where we're going to discuss exactly the things that you are asking about, some of which are classified in nature. So I'm happy to take that as a lookup and get you the performance of corrosion in LO coatings during deployment. Mr. Gallego. I think it would concern us a lot after all this investments on these platforms, especially considering how we intend to use them vis-a-vis China if our biggest hindrance is going to end up being nature versus a Sidewinder. Thank you. Appreciate it. Mr. Norcross. Mr. Bacon, you are now recognized. Mr. Bacon. Thank you. Appreciate all of our leaders being here and the great job you're doing. Sorry, I missed out. I was doing some interviews here. So, hopefully, I won't be duplicating questions. If I--I'd like to just say for the record up front, the President's budget, you know, calls for a 4 percent increase in defense spending and a 12 percent increase for nondefense spending and domestic spending. So that seems to be where the priorities are at. Inflation is at 8.5 percent. So if we stick to this budget, we're going to see a 4.5 percent cut to the military. And I think because of that we have been able to still maybe procure or have an acquisition program for our nuclear triad. But we're going to have to cut the Air Force to do so. We're going to have to cut the Navy. So I don't like where we're going, especially after Ukraine and a rising China. So it's my hope that we can get the budget to the right spot so that we don't have to cut the Air Force, Navy, Marines, and the Army for--and while still doing the nuclear triad recapitalization. So I wanted to say that up front. I want to thank Mr. Hunter and General Nahom for working with me on the EC-37. We have a commitment to try to get to 10 aircraft, maybe not in the timing that we would like. I'm grateful that you put four of them on the unfunded requirements list. So we will do that, and I would like to say for the committee I hope we get one or two funded through the unfunded because you can't operate a combat unit with six aircraft and also do the training required. And so that would maybe take me to take my first question. General Nahom, you've worked with small fleets in the past. Could you explain to us the impact if you only have, like, a six-aircraft weapon system and how you would use it in war trying to sustain your training? General Nahom. First of all, I'm having trouble with the button here. Yeah, small fleet dynamics are very difficult, sir, and you and I have talked about this before and you and I--you in your career and me in my career have experienced this. When you only have a couple airplanes and a couple of them are broken it's very challenging. And it's also, like you said, challenging when you do deploy to operations to have some fleet left at home to absorb new aircrew and new maintenance crew as they come into the unit. So we're going to watch the EC-7 very closely--EC-37 very closely. Six--the reason the Chief did put those on the UPL [unfunded priority list] is because we would like to get to 10 because we understand that 6 is not enough to ensure we have that deployable capability and a healthy environment for the crews and the maintainers, sir. Mr. Bacon. Well, that's why I hope that this committee will band together and try to make that happen. For Mr. Hunter, could you explain a little bit, too, if you have a 2-year gap in trying to modify EC-37 aircraft from a Lear jet, how difficult is it to maintain that expertise when you decide to finish those four? In other words, I think it's important to try to put this through incrementally. Otherwise, you're going to lose this expertise. But I'd love to have your thoughts on that. Mr. Hunter. You're correct, sir. There are industrial base implications of our production profile. So, currently, the aircraft that were previously funded by the Congress, for which we thank you for providing those resources, those are going through that rehosting process of bringing the equipment over from the prior aircraft onto the current aircraft. And so they are continuing that work, notwithstanding that there was not an aircraft procured formally last year and in 2023, but the point will come where they will finish the work that they have doing and if we are to procure additional aircraft they would need to induct the next set. I did want to highlight one of the items on the unfunded list was engines. In the case of the engines, the production line there is also winding down. On that one in particular, if the Congress were so moved as to provide something off the unfunded list the engines would be particularly significant from being able to get those engines in before the production line finishes. Mr. Bacon. Thank you. A followup question for General Nahom on pilot training. I understand that you'd like to divest some of the T-1A fleet. That could impact some of the heavy and mobility pilot training. Will this move some of the training onto the squadrons when they do basic training or MQ or is that not an issue? General Nahom. We don't believe it's an issue, sir. I think what you're looking at is in pilot training 2.5, as we train our mobility crews, in the future what we would like to do is use the T-6 where a pilot--a young pilot would show up and do 6 months of T-6, and then instead of going to a T-1 at that business jet training they go to an enhanced simulator program for a few months, and then from that point go on to their major weapon system. So it actually trains a pilot in a shorter period of time and we believe we're going to--you're going to see that we can train the pilots as well without needing that business jet fleet, moving forward. So it will not change that at all, sir. Mr. Bacon. Thank you. And one last question in my short time left, when do you think we'll have our first operational NGAD fighter? What timeline are we looking at? General Nahom. Sir, and I don't want to jump in front of Mr. Hunter here, but I think we--I really want to get you offline because many of the dates and the specifics of the NGAD family of systems program are classified for all the right reasons, sir. Mr. Bacon. Thank you. Mr. Norcross. And I'm sorry, he's out of time. [Laughter.] Mr. Kahele, you are now recognized. Mr. Kahele. Thank you so much, Mr. Chairman, and mahalo. To all of our witnesses, aloha for being here today. Earlier today the full committee heard from the Air Force Secretary and the Chief of Staff and their intent to transition to a four-plus-one fighter fleet, which includes NGAD, F-35, F- 15EX, F-15 or it's--F-16 or its successor, plus the A-10. It's my understanding that the Air Force plans on divesting 21 A-10s from Fort Wayne's Air National Guard Base, Indiana, and replace this capability with 21 post-Block F-16s from a location still to be determined. First question for Assistant Secretary Hunter--has the Air Force identified the location of these F-16s, where they'll be coming from and when are these 21 A-10s expected to be divested? Mr. Hunter. Sir, I'm going to defer to General Nahom on the shift in the basing of the aircraft. That's more in his line. General Nahom. Sir. And it is planned on being--first of all, it's planned on being an fiscal year 2023 move. So that's actually in the beginning of the FYDP, and we think it's actually a good-news story. You know, the Indiana Guard at Fort Wayne, they're excited about the move. They're ready to go. The, specifically, aircraft tails, let me just take that for the record and make sure I get you the correct answer on that. But those are post- Block F-16s that will be coming into the Indiana Guard. [The information referred to was not available at the time of printing.] Mr. Kahele. Okay. Well, let's jump over to Hawaii then. General Nahom, you know Hawaii is a unique and strategically important location and its F-22 Raptors not only provide homeland defense for the Hawaiian Islands but also the ability to project fifth-generation combat airpower throughout the Indo-Pacific. There have been discussions about new Air Force aircraft for Hawaii, including NGAD, EX, and F-35s, and in addition, what and where those combat Air Force structures would look like throughout INDOPACOM. So my questions are or my question is, are there any plans, General Nahom, to divest any combat aircraft in Hawaii and replace them with a different platform that the committee is not aware of? General Nahom. Sir, right now, as you look in the near future with Hawaii with the F-22s, we see F-22s there for a while and, actually, frankly, we see F-22s in the Air Force for a while, probably the next decade or so, as we continue to develop the Next Generation Air Dominance systems. What follows on in Hawaii is yet to be determined for the F-22 and I think that that's actually okay. There's, obviously, commitment to Hawaii. We're always going to have fighter aircraft on the islands for all the right reasons--its location in the Indo-Pacific, the defense of the Hawaiian Islands. What follows the F-22 will be a question because when--as we develop the Next Generation Air Dominance family of systems--and, again, without getting into specifics--where those are postured is still an open question as well. And so right now, we're much more worried about the posture inside of the FYDP and just outside the FYDP--let's say, in the next 10 years, with the weapon systems that are going to expire between now and then--your A-10s, your pre-Block F-16s, your F- 15Cs, and some of those older systems. That's more of the concern right now. Right now, with Hawaii with the F-22 we know that's going to be flying for a number of years and we will replace it. We just don't know with what yet. Mr. Kahele. So do you think--is it fair to say that the F- 22 would remain in Hawaii at least for the next decade? General Nahom. Sir, without getting into the details of the dates because of the nature of the Next Generation Air Dominance system, I'd like to take that for the record for a classified conversation. Mr. Kahele. Okay. Thank you. A question for Mr. Ludwigson. It feels like every year, and you've heard the chair and many other members talk about the F- 35 program, but every year, the GAO office reports the same thing--more schedule delays, cost overruns. For example, out of 150 F135 engine deliveries only 22 were delivered on time. In 2020, 159 engines were delivered but only 44 of them were delivered on time. Last year alone, out of 152 engines delivered only 6 were delivered on time. I'm worried that this trend will continue for the life of the program. So what could be done in the F-35 program to do something differently, going forward, to change that narrative. And I know you maybe have already discussed it previously and I'm sorry that I wasn't here to hear your response. Mr. Ludwigson. No, I appreciate the opportunity to answer the question. I wish it was more upbeat this year than last. But I do think that my answer that I provided previously, that one of the things that, I think, on the baseline program you can focus on is the reliability and maintainability efforts, make sure that the aircraft is going to be funded to meet those needs because in the long term that's one of the things that matters. I'd mention that we have a recommendation that if the--that the program office should take a look at the R&M metrics and figure out whether or not some of them are unachievable and make changes to them if that's needed and appropriate, but do that in a public way to say this is somehow the way we can look at it now and have a conversation with this committee and others in Congress about that and what it means for sustainability costs and those issues which are critically important as you look down range, given challenges with sustaining this aircraft in the field. But from my standpoint, on the Block 4, I'll say again that getting back to basics of writing good code and building test scripts, using automated testing to get that out, making sure that you're not fielding flawed code, and doing estimates of work that makes it likely that you're going to be able to complete the work in a timeframe that's allowed, I think is critically important to making Block 4 get on the right footing rather than repeating what we have seen with the baseline program for the past 20-plus years. Mr. Kahele. Alright. Thank you. Mahalo, Mr. Chair. Mr. Norcross. Thank you. Dr. Jackson, you're now recognized. Dr. Jackson. Thank you, Mr. Chairman. I appreciate it. Thank you to the witnesses for being here today. This morning at the Air Force posture hearing, my question focused on the new T-7 advanced trainer that's being fielded to train future Air Force fighter pilots and replace the legacy T- 38. General Nahom, when a young fighter pilot is training, how large a gap is there between the current T-38 and the fifth- generation aircraft and how will the T-7 help bridge that gap when a new fighter pilot is training? And, additionally, Mr. Hunter, I would like to ask you, if additional funds were to be provided by Congress over the President's budget request, would we be able to begin procuring the T-7 sooner and faster? General Nahom. On your first part of your question, I'll start. We can't get the T-7 fast enough. There is a huge gap. You know, the T-38 is--you know, if you if you look at the tail on most T38s it'll have a 60 on there--60 something on there when it was produced. We have got to get these aircrew training in a much more modern aircraft that will help bridge them into these fifth- generation aircraft that they're moving into. So the answer is we do need the T-7 as quickly as possible. Dr. Jackson. Yes, sir, I agree, and that's why I brought it up because I'm going to be pushing hard to make sure that we get them as fast as we possibly can and, in particular, I want to get them to Sheppard Air Force Base as fast as we possibly can as well because I know there's a plan to push them out in a certain order. Mr. Hunter. Sir, and on the procurement of the aircraft, we are just about to take delivery of the test aircraft--the EMD [engineering and manufacturing development] aircraft--to allow us to begin doing flight tests. So I would say it would be premature to accelerate procurement of the production aircraft in fiscal year 2023. I can get back to you on the record on whether there might be any long lead items that could be useful. [The information referred to was not available at the time of printing.] Mr. Hunter. But right now, my assessment would be accelerating production to 2023 would be a challenge. But there may be--I want to keep a close eye on the test program and see what we learn from that and there may be issues that arise there that we could address. Dr. Jackson. Thank you, sir. I appreciate it. Shifting gears just a little bit, the Navy's first fleet logistics multi-mission squadron recently completed its first operational deployment on the USS Carl Vinson. The maiden deployment was a success with a very impressive 98 percent mission completion rate and a mission capable rate of 75 percent. A big part of this, I believe, was the success of the CMV- 22 [tilt-rotor aircraft]. The Navy's program of record for the CMV-22 is 48 aircraft, yet funding has only been provided for 44 aircraft. Despite being included in last year's unfunded priorities list, the final four aircraft have yet to be funded. Admiral Loiselle, have you been pleased with the capability of the--that the platform brings to the carrier air wing and do you envision the mission set for the CMV-22 potentially increasing in the future? Admiral Loiselle. Sir, thank you for that question. So as you know, we designed that as a three-ship system in order to account for some of the longer phase inspections associated with tilt-rotor aircraft. So a 30-day phase as opposed to more of an 8-day phase. And so given that you've quoted the correct statistics for first deployment, our second deployment is ongoing now. We're learning a lot of lessons. So I agree that the program numbers in our program of record as purchased are there. We had them on the UPL last year in 2022. Did not get them, and so we didn't want to ask the same question twice and so that's why we didn't put it on for this year. And then due to reduction in F-35 numbers, specifically in 2023, that's where the CNO [Chief of Naval Operations] put the priority for the UPL this year with a request for six. But we are pleased with what we have done. We're looking at specifically the cargo-loading mechanisms that we use and whether or not we can make those more efficient. But we'll be looking forward to the lessons learned out of that deployment soon as well. Dr. Jackson. Well, I'm sure, as you may know, Bell Helicopter is in my district so I'm interested in helping you get the aircraft that you need as quickly as possible. My last question--I've seen plans stating that the Marine Corps expects to operate the V-22 [tilt-rotor aircraft] well beyond 2050, and I'm not aware of a plan to develop its replacement at this point. General Wise, I am pleased to see that the Marine Corps recognizes the need to begin the nacelle improvement project on the MV-22s beginning in fiscal year 2023. Air Force is already doing that now. I think this is something they need to do as well. We here on the committee know that we need to get that funded or we'll experience a very costly break in the production line in the next few years. General Wise, could you speak to the importance of maintaining the readiness of the MV-22 fleet, and in what ways could you see the MV-22 mission potentially expanding in the future? General Wise. Congressman, thank you for the question and it's a very good one. Of course, the MV-22 for us has been a game changer, really. I know that can be an overused phrase. But when you start to look at battlefield tempo and what it can achieve, none of our adversaries can come close. So readiness of that platform is essential for us and, really, one of the reasons, especially as we look at the Indo-Pacific, the best kind of sustainment you have to do is the kind you don't have to do, right--the tail you don't have to bring out there. So in answer to your question, we're very committed to nacelle improvement and being right on the tail of our Air Force brothers and sisters as they go through and finish their CV-22s. So we're very committed to that. We have also got other programs in order to increase readiness and make sure that platform is viable well into the future. Dr. Jackson. Thank you, sir. I think my time is up. It's good to hear, and I yield back, Mr. Chairman. Thank you. Mr. Norcross. You got it. And the bell just rang. So Mrs. Hartzler or myself are going to try to get in a quick question. And, Mr. Hunter, let's have a question here, and I'm not trying to put people on the spot. I'm trying to better understand what's changed and why are we doing it. So the F-15EX we talked about. It was original goal was 144. So it was fifth generation. We all heard that was the only thing we were going to buy and then the EX came into it for reasons that were later explained. And we're in agreement. We need 144, because not only for its capabilities working with the F-35, it was also about replacing, to some degree, the F-15C and E models. Now, what new requirements have changed that we're going to pretty much cut in half those EXes? Mr. Hunter. Yeah. There's sort of two parts to the F-15EX story, sir. The one that is of greatest focus for me is the actual increase in the production rate, which we are executing with the fiscal year 2023 budget, doubling it from 12 to 24. So from my seat, in the near term we're ramping up production and we're doing that to meet the fact that with the aircraft that the F-15EX is replacing in the near term, as General Nahom articulated earlier--and I'll give him a chance to speak to it again--those aircraft, you know, very much need to be replaced and they're just--both from a threat perspective and just a sustainability and--perspective that we need to do that. And so in the near term, we have accelerated F-15EX to do that. Over the longer term, you know, the challenge of the FYDP is, is all of the different priorities that we're trying to address, and I'll let General Nahom speak to that. General Nahom. On the EX, there is a fleet size of the F-15 platform we need to keep in the Air Force. The F-15 platform offers us the ability to carry some outsized weapons, do some point defense, sensor package on it. It does offer some things that the F-35 doesn't offer. We can talk more about that offline. Mr. Norcross. We're on board with that. General Nahom. Yeah. The size of the fleet, though, what we're looking at--again, this is probably a conversation for offline, too--we're not changing that, roughly. We're going to keep about the same size fleet. Right now, based on resources and based on tradeoffs we're making, we're going to have to keep more F-15Es than we initially would have thought we would have kept. We're going to have to have a certain size F-15 fleet. In a resource unconstrained world those would all be EXes with a lot newer airplanes, better sustainability, more time on them, et cetera. Right now as we look at the budgets, moving forward, we're likely to keep more of the F-15Es to be part of that F-15 fleet. Mr. Norcross. That explains it, certainly. If you're told you're going to have a great 2 years but your life ends, it's still a tough thing to swallow. Mrs. Hartzler, you are on board. Mrs. Hartzler. Thank you. F-18. So under your tactical aircraft procurement plan, after 2025 the Navy will have just one manufacturer of tactical aviation aircraft for a number of years until NGAD reaches IOC. If the United States is drawn into a conflict with China in the 2027-28 timeframe, what will the inventory look like then? And Admiral Loiselle. Sorry. Admiral Loiselle. Yes, ma'am. So we are at a total fleet right now. When I talk about Super Hornets, I divide them into Block Is and Block IIs with Block IIIs coming off the line as new production now through the first quarter of 2026, based on the 12 additional that we got last year. And so right now our SLM plan is our rheostat that we're using to control availability in the out-years, depending on schedules and future budgets that are unknowns at this point in time. So, right now, I do not plan to do SLM on the entirety of my Block II force and I do not plan to do it on my Block I force. And so if there are changes in the future that require additional capabilities, i.e., more Block III aircraft, then I have the ability to dial up that rheostat on SLM and it'd be able to do that for a longer period of time and to, potentially, use the FRCs [Fleet Readiness Centers] to increase capacity for SLM beyond the currently planned 35 per year. If necessary, we can also go further in. We have done an experiment with one Block I--actually, two Block I aircraft in our initial 7,500-hour SLM and, based on the results of that, decided not to go on at this point in time with Block I SLM unless there's some requirement in the future to do so. Mrs. Hartzler. So what will the inventory look like? Did I get the answer? I heard a lot about SLM and this or that. Can you give me a number. Admiral Loiselle. No, I can't, ma'am. So I can give you the strike fighter shortfall numbers per year. And so---- Mrs. Hartzler. How many short will we be in---- [Simultaneous speaking] Admiral Loiselle. In 25 last year--as quoted by the chairman, we were at zero and 25 last year. This year we're at 13. We redo those numbers every month, and in the calculation of those numbers we have alloted a turnaround time for an SLM jet of 15 months. Despite Boeing saying they can do it in 12, we just added a conservative factor to that. No, our fixed numbers of F-18s will not change in the future, going forward. What will change is the number of aircraft that we do SLM on, which will give each of those remaining aircraft an additional 4,000 hours and about 13 years of service life. Mrs. Hartzler. Okay. Great. Yeah. Last year, you shared that the Navy can only resolve its strike fighter shortfall by repurposing a number of F/A-18s currently assigned to Navy Reserve adversary air aggressor squadrons. And so it follows that these squadrons will no longer be deployable to meet warfighting contingency requirement and that's concerning. So, additionally, those F/A-18s will now be backfilled with less capable aircraft such as F-5, pre-Block F-16s. Do you have any concerns about whether this strategy will enable our pilots to meet future training requirements? Admiral Loiselle. Well, ma'am, we actually utilize our Reserves to conduct those training requirements and so those F- 5s and those pre-Block F-16s are what conduct a large portion of our adversary requirements for our training. And so our FRS [Fleet Replacement Squadron] students don't require a high-end adversary in their initial thing. So that's why we have them utilizing F-5s as the lowest cost solution for that. With your--with regard to the Reserve question, our predominant response should Reserves be required are to take one--a squadron or an aircraft from an off-cycle air wing that is outside of their sustainment window and utilize those aircraft as necessary to support frontline air wings; they all go through their maintenance cycle. Mrs. Hartzler. So if they're using F-5s and F-16s now, does that really represent a near-peer threat-based scenarios? Admiral Loiselle. We are using the entirety of our systems to include live, virtual, and constructive to get through all of that. So another thing that we are using with our adversary force is a program called Red Net that allows them to simulate advanced adversary capabilities. But you are correct. There are only so many things that are going to go at the speed of a top line foreign fighter, and so for the speed aspect we use the F-16. But trying to get something that does that signature in a live environment is not affordable and so we rely on virtual, constructive to do that. Mrs. Hartzler. Thank you. I have some additional questions. Maybe I can submit it for the record. Mr. Norcross. Absolutely. Mrs. Hartzler. Thank you. Mr. Norcross. We are pushing down 7 minutes and 36 seconds to get there. Mrs. Hartzler. Yes. Yes. Mr. Norcross. First of all, I'd like to thank everybody for coming today. We understand things change. But as Mrs. Hartzler said, you know, you had a year, and to get surprised on so many things--we want to be with you. These are great platforms. We understand there's always a budget issue. But it's risk and we have to do our job as oversight. So we appreciate your time and, certainly, there's a number of followups for both Vicky and myself that we are looking forward to getting with you. And with that, we are adjourned. [Whereupon, at 3:55 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X April 27, 2022 ======================================================================= ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD April 27, 2022 ======================================================================= [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ======================================================================= DOCUMENTS SUBMITTED FOR THE RECORD April 27, 2022 ======================================================================= [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ======================================================================= WITNESS RESPONSES TO QUESTIONS ASKED DURING THE HEARING April 27, 2022 ======================================================================= RESPONSE TO QUESTION SUBMITTED BY MRS. HARTZLER General Adams. There were several internal Service and Joint Staff Tactical Aircraft analytical efforts conducted in 2021-2022, specifically, by the US Navy, by the US Air Force, and one by the Joint Staff J-8. These efforts informed DOD Cost Assessment and Program Evaluation's (CAPE) review of TACAIR Modernization plans and USN and USAF Next Generation Air Dominance efforts, which was directed in the FY21 NDAA. These directed studies were submitted to Congress per the NDAA guidance. [See page 19.] ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING April 27, 2022 ======================================================================= QUESTIONS SUBMITTED BY MRS. HARTZLER Mrs. Hartzler. With regard to the F-15EX fleet, in FY22, the Air Force informed this committee that 144 aircraft was the minimum required aircraft within the F-15EX fleet. We have also heard a strong pull from combatant commanders in INDOPACOM and EUCOM to have the F- 15EX based in their theaters. But now in FY23, the Air Force plans to cut the planned F-15EX fleet size from 144 aircraft to only 80 total aircraft. Can you help this committee to better understand the rationale behind this decreased fleet size from 144 total aircraft to only 80 aircraft? Specifically, what operational requirement has changed to lessen the requirement so significantly? How will a smaller fleet of F- 15EX aircraft affect the Air Force's ability to support the combatant command's operational and tactical requirements? How will the reduced procurement number affect the unit cost per aircraft moving forward? What impact will the unexpected decision to buy less on an accelerated timeline have on the current production line and industrial supply chain? Mr. Hunter. [No answer was available at the time of printing.] Mrs. Hartzler. The committee understands that the T-7 program has delayed its Low-Rate Initial Production Decision by 18 months because the program has run into flight control software development challenges and is also struggling to establish the global supply chain for critical parts. Can you describe the challenges the program currently has and what cost growth you might expect from the program going forward with these new challenges? How does the Air Force plan to mitigate these challenges? Do plans remain on track for delivery of the first EMD aircraft in FY23? Mr. Hunter. [No answer was available at the time of printing.] Mrs. Hartzler. In its 2019 Justification and Approval for the program, the Air Force stated that replacing the existing F-15 inventory with anything other than the F-15EX would be ``cost- prohibitive.'' According to the Air Force, converting these units from legacy F-15s to F-15EX rather than F-35s offered not only the necessary complementary mix of capabilities, but also saves billions in transition costs and dramatically reduces disruption to ``the mission ready status of current F-15 units.'' If the Air Force now plans to buy only 80 F-15EXs, it seems safe to assume that some of the current F-15C units are not going to have flying missions in the future. Is that an accurate assumption? What is the rationale behind the Air Force's additional FYDP proposal to divest all F-15E aircraft that are powered by the Pratt & Whitney -220 engine, which currently totals 105 aircraft. How will that further impact the future mission of current F-15C units? General Nahom. [No answer was available at the time of printing.] Mrs. Hartzler. In the FY22 budget cycle when the Air Force presented it's A-10 divestment request and ATTACK Wing Replacement Program plans, the story was that the Air Force planned to keep a fleet of 218 A-10 aircraft within its tactical aircraft inventory through the mid- to late-2030 timeframe. But now, the Air Force plan has changed to one of full A-10 fleet divestment by 2028. What has caused this abrupt change? What will this new divestment plan mean for the missions of the current A-10 squadrons? General Nahom. [No answer was available at the time of printing.] ______ QUESTIONS SUBMITTED BY MR. BROWN Mr. Brown. We have heard that one of the limitations of the F-35 today is the number of weapons that it can carry internal and external on the aircraft. What is the USAF doing concerning integration of advanced weapons on the platform, and what can Congress do to help in this regard? General Nahom. [No answer was available at the time of printing.] ______ QUESTIONS SUBMITTED BY MR. HORSFORD Mr. Horsford. Secretary Hunter, I'm concerned that this budget does not accelerate procurement of long-range standoff weapons that will be critical in a future high-end fight. While the Air Force has proposed procurement of 550 Joint Air to Surface Standoff Missiles, they only requested 28 Long Range Anti-Ship Missiles Given the rapid consumption of smaller precision munitions that we've seen in our Ukraine, and the importance of these long-range standoff weapons in a high-end fight, are you confident that these procurement levels will meet the needs of the Air Force in a near-term conflict? Is there an issue with production line capacity or are low ``L-RASM'' procurement levels due to fiscal constraints? Mr. Hunter. [No answer was available at the time of printing.] Mr. Horsford. I understand the Navy has begun fielding of the Joint Precision Approach and Landing System, intended to improve the safety and efficiency of carrier landings. Can you speak to the importance of this system in improving safety for carrier landings? What percentage of carrier air wings have received this system and when do you anticipate fielding will be complete? Admiral Loiselle. The AN/USN-3 Joint Precision Approach and Landing System (JPALS) achieved Initial Operational Capability (IOC) May 4, 2021 and is being installed aboard Aircraft Carriers (CVNs) and Amphibious Assault ships (LHD/LHAs). Currently, there are six (6) JPALS units installed onboard CVN ships (54.5%) and five (5) JPALS units installed onboard Amphibious Assault ships (45.5%). Full Operational Capability (FOC) for shipboard installed systems is FY25. JPALS provides precision guidance in support of coupled flight to 200 feet Height Above Touchdown (HAT) for the F-35B to LHD/LHA type ships and precision guidance in support of auto-land for the F-35C, MQ- 25A, CMV-22 and future platforms to CVNs. JPALS meets or exceeds capability requirements to support Precision Approach and Landing Capability (PALC) of all JPALS-capable aircraft during operations at sea in virtually any weather condition (within aircraft limitations). Additionally, JPALS is required for future MQ-25A CVN Operations. The feedback from the first CVN JPALS deployment on the USS Carl Vinson was resoundingly positive. Over the course of deployment, 450 JPALS approaches were attempted by F-35C aircraft with a 99.6% boarding rate. Additionally, USS Abraham Lincoln recently completed an overseas deployment executing 599 JPALS Approaches with a 99.5% boarding rate. The enhanced all weather capability has improved carrier landing safety and efficiency while the redundant system design has led to a 99% operational availability. Mr. Horsford. It's my understanding that initial production F-35s have some unique differences given how early in the program they were fielded, to include differences between individual aircraft as opposed to lots. Can you describe some of the unique characteristics of the earliest F-35As and any maintenance challenges associated with these specific aircraft? General Fick. Most legacy aircraft are configuration controlled at the block/lot level with each aircraft in that block/lot identical in design. However, the F-35 has each aircraft individually configuration controlled, which allows design break in production changes anywhere in a block/lot. This has the advantage of allowing for faster break in of improved parts, allows for use of previous parts until exhaustion, and does not require design changes to wait for a break in at the start of a new block/lot. As with any new production design, changes are desired and required, both to correct deficiencies and to reduce production costs as the design matures during production and fielding. Early Low- Rate Initial Production (LRIP) aircraft are naturally less mature, have more unknown deficiencies, and require additional maintenance and modification support until the aircraft receive modifications to correct or remove those deficiencies. From a maintenance perspective, the earliest F-35A aircraft required additional flightline inspections and unscheduled maintenance tasks. Examples include: 1) earlier aircraft experience accelerated wear and seam interference damage with the original tape/seam designs leading to more inspections and higher repair time; 2) hoist point corrosion and Outer Mold Line (OML) corrosion seen on earlier LRIP due to water pooling and coating issues; 3) landing gear hydraulic control valves on earlier LRIP aircraft life limitations due to internal design flaws, requiring unscheduled maintenance for failures or scheduled downtime to implement the modification to the newer valve design. Mr. Horsford. The FY23 budget indicates that the Air Force currently plans to modify production lots 8 through 16 of the F-35A fleet and that it would cost the Air Force roughly $16 million per aircraft to upgrade a Lot 2 through 8 aircraft to the Block 4 configuration. I understand the importance of the Technical Refresh 3 and Block 4 modifications, and that these aircraft will represent a significantly improved capability over initial production aircraft. Can you describe the capability differences of a Block 4 F-35A and an initial production F-35A from lots 7 or earlier? In what ways are Block 4 F-35As uniquely superior to initial production F-35As? General Fick. The F-35's Block 4 capabilities, as defined in the F- 35 Block 4 Capability Development Document (CDD) and supplemental program directives, are being delivered via an incremental approach known as Continuous Capability Development and Delivery (C2D2). Using this approach, individual capabilities are delivered incrementally when the required hardware and software modifications are complete, rather than all at once at the end of an extended development program associated with a more traditional ``big bang'' approach. The fielded F-35 fleet has benefitted from is process since 2018, when the first C2D2-based software load was delivered in a software release identified as 30P00. Lot 7 F-35A--and prior--aircraft have benefitted from this approach and have already been upgraded with the Block 4 capabilities that have been completed to date. These early production lot aircraft will continue to be upgraded with Block 4 capabilities to the extent their legacy avionics architecture and hardware supports the capabilities, or as long as the US Services are able to fund the required hardware retrofits. The current avionics architecture, known as Technology Refresh 2 (TR2), is the limiting factor for future Block 4 capability insertion; as such, the last planned TR2 software load with new capabilities is 30P08, which will be delivered to the fielded fleet in Oct 2023. At this point, the majority of the remaining Block 4 capabilities will require the Technical Refresh 3 (TR3) hardware suite. This upgrade will establish the architecture--specifically the computational power, memory, and throughput--to support increased data processing required achieve the performance associated with future sensor and communications hardware upgrades. The tables below contain the full list of approved F-35 Block 4 capabilities. Green indicates already delivered capabilities and yellow indicates capabilities that will be delivered for TR2 aircraft by 2024. The remaining capabilities in white will only be available on aircraft with TR3 hardware. An acronym list is provided below the table for reference as needed. [The tables referred to can be found in the Appendix on page 147.] ______ QUESTIONS SUBMITTED BY MR. TURNER Mr. Turner. Your testimony before this committee states a Cost Per Tail Per Year (CPTPY) of $6.3M for an F-35A at the end of 2023. I understand from JPO documents that you project a $7.7M CPTPY in 2033 when the program reaches steady state. What is causing the JPO to project a $1.4M increase in CPTPY when over 800 new aircraft will be added to the fleet over the next 10 years? As you know, the air vehicle portion of F-35 O&S costs has been coming down and you testified that it is continuing to decrease in the FY21-23 contract. Please provide a detailed explanation for the increase in O&S costs over the next ten years, a period when these costs should be naturally declining due to the scaling of the fleet. General Fick. The JPO team remains laser-focused on Enterprise affordability, and the PEO remains committed to cost reduction across the acquisition lifecycle. The JPO's 2021 Annual Cost Estimate (ACE) shows $6.6M Cost Per Tail Per Year (CPTPY) for USAF F-35A in FY23 in Constant Year 2012$ (CY12$). The program now predicts a range of $6.1M to $6.6M CPTPY in FY23 (CY12$), informed by outcomes for air vehicle, propulsion, JPO, and Services initiatives post the finalization of the 2021 ACE. The USAF defines their Steady State (SS) period as occurring in FY36-41 for F-35A. The USMC defines SS as FY33-37 for F- 35B and F-35C. USN defines SS as FY36-43 for F-35C. For the USAF F-35A, the ACE estimates a CPTPY of $7.0M in FY33 and $7.5M across the USAF SS period of FY36-41. Based on the latest data noted above, the program now predicts a range of $6.5M to $7.0M in FY33 and $7.0M to $7.5M across SS FY36-41. Maintaining CPTPY within the Services' targets for the NDAA Sec 141 in FY27 and their SS affordability constraints get pressurized by inclusion of sustainment related air vehicle modifications and engine overhauls and due to projections for labor and material outpacing inflation in future years. These pressures drive CPTPY increases as the program enters the SS phase. Alongside these pressures, the JPO tracks opportunities that may help drive down costs and offset the cost pressures noted above. These opportunities include organic repair/support, air vehicle repair cost improvements, air vehicle reliability improvements, and propulsion improvements as repair capabilities come online, life limits expansion occurs, and MVRs complete, allowing overhaul cost reductions. The program's ability to take advantage of opportunities like these depend on Services' investments in sustainment infrastructure. The ACE can reflect these opportunities as the program obtains more data around their definition and impacts. ______ QUESTIONS SUBMITTED BY DR. JACKSON Dr. Jackson. Why is the Navy investing in the TCTS II Program of Record without a requirement for blended live, virtual and constructive training, particularly given that the Air Force and Navy already developed the Secure LVC Air Training Environment (SLATE) advanced technology program that provides LVC capability? Admiral Loiselle. The Navy's requirement for a tactical combat training system includes blended live, virtual, and constructive (LVC) training capability in addition to baseline encrypted air combat maneuvering instrumentation (ACMI). Several key components to that requirement include: NSA Type 1 encryption Multi-Level security Tethered and untethered operations Multi-platform interfaces LVC supportable data link Weapon simulations Enhanced constructive threat environment Open system architecture to support future competitive upgradability The TCTS II contract was awarded in 2017 following a full and open competition. TCTS II is the joint selected program of record (PoR) for the USN, USMC, and USAF, enabling interoperability across the Services' training and test ranges. TCTS II Initial Operating Capability (IOC) in Q1FY23, will meet these requirements through National Security Agency (NSA) Type 1 encryption, 4-channel multilevel security, an LVC capable waveform, real-time kill notification, weapons simulation, and constructive threat scenario generation. The Navy has validated the TCTS II program baseline to meet the above requirements. Dr. Jackson. What is the Navy's strategy and timeline to competitively procure a live, virtual and constructive aviation training solution which will be joint, interoperable, and open to coalition partners? Has an independent Government Cost Estimate been conducted to verify TCTS II Baseline estimates to deliver SITL LVC capability? Admiral Loiselle. The Chief of Naval Operations (CNO) has identified Live, Virtual, Constructive (LVC) training as a critical warfighting enabler. Naval aviation is supporting the CNO's LVC NAVPLAN Implementation Framework through multiple efforts, to include Naval Aviation Distributed Mission Training, the Integrated Training Facility (ITF), Navy Continuous Training Environment (NCTE), and training range investments. A key portion of the Navy's broader LVC environment includes the Tactical Combat Training System Increment II (TCTS II). The TCTS II contract awarded in 2017 following a full and open competition. TCTS II is the joint selected program of record (PoR) for the USN, USMC, and USAF, enabling interoperability across the Services' training and test ranges. TCTS II provides critical LVC technologies, such as a National Security Agency (NSA) Type 1 encryptor, 4-channel multilevel security, an LVC capable waveform, and initial Synthetic Inject to Live (SITL) capabilities, and will achieve Initial Operational Capability (IOC) in 2022. Independent government estimates were conducted in support of TCTS II Initial Operational Capability (IOC) capabilities at Milestone C in 2020. TCTS II's open systems architecture enables affordable incorporation of additional LVC capabilities. Government estimates on additional LVC and SITL technologies developed by the joint test community and advanced technology demonstrations were completed to support Navy budget plans. The TCTS II program will incorporate additional LVC and SITL technologies developed by the joint test community and advanced technology demonstrations, with projected fielding updates to TCTS II systems in FY25. The program office has received interest from coalition partners and is diligently working with Navy Security Programs Office and Office of the Under Secretary of Defense for Acquisitions and Sustainment (OUSD (A&S)) Office of International Cooperation on exportability requirements for TCTS II. Dr. Jackson. When will the TCTS II program receive its NSA accreditation for its encrypter and Cross Domain solution? Does TCTS II have the capability to connect live aircraft to fleet simulators or the Next Generation Threat System? Admiral Loiselle. The NSA certified the KOV-74 encryptor used by TCTS II in 2014. The program is updating the KOV-74 to the KOV-74A to allow Over-the-Network Keying capability, and updated NSA certification is on track to complete July 2022. Cross Domain Solution (CDS) certification will be issued in July 2022 after completion of the Site Based Security Assessment. The Navy Cross Domain Solution Office is the CDS certification agency. TCTS II utilizes the Next Generation Threat System (NGTS) and can connect live aircraft to fleet simulators. Last year TCTS II, demonstrated its capability to connect to the Navy Continuous Training Environment (NCTE), the USS Bainbridge (in training mode), and the Joint Semi Automated Forces (JSAF) system. In 2022, TCTS II demonstrated ability to connect to an E-2D fleet simulator, an F/A-18 fleet simulator, an F-35 effects-based simulator, the Link Inject to Live (LITL) system including NGTS, and Naval Aviation Distributed Training Center (NADTC) Atlantic. [all]