Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR FISCAL YEAR 2023 [Senate Hearing 117-] [From the U.S. Government Publishing Office] ENERGY AND WATER DEVELOPMENT APPROPRIATIONS FOR FISCAL YEAR 2023 ---------- WEDNESDAY, APRIL 6, 2022 U.S. Senate, Subcommittee of the Committee on Appropriations, Washington, DC. The subcommittee met at 10:01 a.m. in room SD-192, Dirksen Senate Office Building, Hon. Dianne Feinstein (chairwoman) presiding. Present: Senators Feinstein, Shaheen, Heinrich, Kennedy, Murkowski, and Hyde-Smith. DEPARTMENT DEFENSE--CIVIL Department of the Army Corps of Engineers--Civil STATEMENT OF MR. MICHAEL CONNOR, ASSISTANT SECRETARY OF THE ARMY (CIVIL WORKS) opening statement of senator dianne feinstein Senator Feinstein. The Subcommittee on Energy and Water Development will come to order. Today's hearing will review the President's fiscal year 2023 Budget Request for the United States Corps of Engineering and the Bureau of Reclamation. Ranking Member Kennedy and I will each have an opening statement. We will then turn to our witnesses to present testimony on behalf of the Corps and the Bureau. Each witness will be allowed 5 minutes for opening remarks, and of course if you need more, I have never seen us not do that. At the conclusion of the witnesses' testimony, I will recognize Senators for 5 minutes of questions each. And I would like to welcome our witnesses. Thank them for being here today. They are: Mr. Michael Connor, the Assistant Secretary of the Army for Civil Works; Lieutenant General Scott Spellmon, the Chief of Engineers for the United States Army Corps of Engineers; and Mr. David Palumbo, Deputy Commissioner of Operations for the Bureau of Reclamation at the Department of Interior. I would like to speak for a moment about the Army Corps' budget request which cuts more than $1.7 billion from the enacted level for the Civil Works Program. That is a 21 percent cut. I am particularly disappointed that $1 billion of that is to the construction account. Last year we passed a Bipartisan Infrastructure Bill. It included $17 billion for the Corps of Engineers. The point of the bill was to address the backlog in infrastructure funding, not replace the regular funding program. The budget request undercuts the value of that investment by dramatically cutting the construction account. So in order to make tangible progress on our infrastructure backlog we have got to make some real investments this year. And in that regard I really hope that we would have some informal conversations among us on this subcommittee, and see what we might be able to do because I believe we are really going to set back our Nation if we can't have up-to-date infrastructure. So we will now begin with our witnesses, unless anyone else has an opening statement, please go ahead. statement of senator john kennedy Senator Kennedy. First, welcome. Thank you for being here. Thank you for your service to our country. I do have a few remarks that I wanted to make, and bear with me, I have got them written down here. I don't usually like to do it that way, but I wanted to choose my words carefully today. At last year's Budget Justification Hearing with respect to the Corps and the Bureau of Reclamation, I gave some opening remarks as ranking member of the subcommittee, and I showed you some images, they are behind me today. I wanted to emphasize them again. These are images of what we call HSDRRS, which as you know is an acronym for Hurricane and Storm Damage Risk Reduction System. HSDRRS was and is America's and Louisiana's response to Hurricane Katrina which struck New Orleans in--well, struck all of South Louisiana, and large parts of Mississippi in 2005. And I want to thank you, and I want to thank the American taxpayer, and the American people for HSDRRS. Today, I just wanted to comment briefly on why I think our country can take pride in what I think of as the ingenuity of the United States Army Corps of Engineers working on all of its projects, but especially with Louisiana's Coastal and Restoration Authority which is very important to my State. Hurricane Katrina, as we all know, was a cat (category) 5 hurricane. It hit New Orleans August 29, 2005, not just New Orleans it hit all of South Louisiana, it hit all of my friends in Mississippi, it caused unprecedented losses, we had 1,800 fatalities, $125 billion in damage, there was a 28-foot storm surge, 85-foot waves. The surge and waves caused, in my State, 50 major levee breaches of our previous protection system, compromised 169 of our systems, 350 miles of levee protection. Thirty-four; we have 71 pumping stations in New Orleans, which as you know is below sea level, without those pumping stations we would flood with every rain except for the French Quarter where our founders knew to build on high land; 34 of the 71 of our pumping stations were damaged. About 80 percent of the City of New Orleans was flooded to depths as deep as 15 feet in some areas. I die a little bit inside every time I remember the devastation. And I don't want to minimize the devastation in the rest of Louisiana as well, and in Mississippi. Hurricane Katrina left--because the levees broke in New Orleans, and it flooded 250 billion gallons of water. It took us 53 days to pump it out. In response to hurricane Katrina America sent numerous Federal agencies, thank you America, to help Louisiana recovery and rebuild. I want to focus on the essential role that the U.S. Army Corps of Engineers played in that, because we don't talk about it enough. In repairing and rebuilding the levees and the flood walls that encircle the New Orleans metropolitan area, not just New Orleans, the area surrounding as well, because I don't want to minimize the damage to anyone. The Corps incorporated lessons learned and recommendations from international experts. You talk to scientific organizations, you talk to other government agencies, you talk to the private sector, and we all studied the system failure. From this collaborative knowledge base, and its work with the Louisiana Coastal Protection and Restoration Authority in my State, we are trying to do our part, these engineering accomplishments include: The Corps strengthening the levees, the flood walls, the gated structures, the pump stations that form the 133-mile Greater New Orleans area perimeter system that encircles this part of my State. And you can see some of your good work here. The Corps improved approximately hundreds--I am sorry--70 miles of interior risk reduction structures within the levee that encircles the New Orleans Metropolitan region. Among the Corps' technically advanced engineering solutions, HSDRRS now includes a surge barrier wall that is 1.8 miles long. It is an engineering marvel. It is the largest design, built Civil Works project in your history one of the--maybe the largest in America's history. HSDRRS also includes the largest drainage pump station in the world, HSDRRS works, and has already spared lives and property, save taxpayers millions of dollars in my area from expensive storm recovery. Last year Hurricane Ida hit us, a category 4 storm. It hit Southeast Louisiana, its surge would have overtopped our levees before your good work, and additionally, there would have been overtopping along the inner navigation--Inner Harbor Navigation Canal Corridor if the HSDRRS surge barrier had not been in place. This would have flooded, gutted St. Bernard Parish, Orleans Parish, and I want, well, all of us to be mindful of that. I am almost done Madam Chair. I am sorry I talk slow. On May 26, the U.S. Army Corps of Engineers will be conducting an official ceremony at the surge barrier just outside of New Orleans. I am going to try to be there. The purpose will be turning over the HSDRRS system to Louisiana authorities who will--we will now operate it with your guidance. And I understand that Corps of Engineers' principals will be leading and participating in these ceremonies. We will have many State and local officials there. We will have many, many, many grateful Louisianans. And I intend to be present, and I would like to ask the members of this committee to join me. I want you to all come to New Orleans and see this engineering marvel that the Corps of Engineers constructed, and the American people, who are the most generous people in the history of the world, paid for. So I will be in touch. If you are interested in coming to Louisiana for May 26, we would love to have you. This project will take your breath away. Thank you, Madam Chair. Senator Feinstein. And I thank you Senator. Are there any other comments from the dais? If not, we will proceed with the witnesses. We will hear from Assistant Secretary Connor, followed by Lieutenant General Scott Spellmon, then Deputy Commissioner Palumbo. So Mr. Secretary, we are ready for you. summary statement of mr. michael l. connor Mr. Connor. Thank you Madam Chairman. Chair Feinstein Ranking Member Kennedy and distinguished members of the committee, thank you for the opportunity to discuss the President's Budget Request for the Army Civil Works Program. The fiscal year 2023 budget request includes $6.6 billion for the Civil Works program. It is focused on smart investments that are focused on yielding high economic and environmental returns, increasing resilience to climate change, and decreasing climate risk for communities and aquatic ecosystems based on the best available science, supporting a strong economy by facilitating safe, reliable, and sustainable commercial navigation, and promoting environmental justice, and investing in disadvantaged communities that have been too often left behind. Sorry about that. There we go. With this budget the Army will continue working with community partners to develop, manage, restore, and protect our Nation's precious water resources, particularly as it relates to the three main missions of the Army Civil Works Program: commercial navigation, flood protection and storm damage reduction, and aquatic ecosystem restoration. With respect to disadvantaged communities, the administration has set a goal that 40 percent of the overall benefits of Federal investments in climate and clean energy investments flow to disadvantaged communities, the Justice40 Initiative. Actions in this area include an examination of the activities of key programs to determine whether benefits have accrued to disadvantaged communities. There are also funds to one, improve access to Civil Works' technical assistance programs, and to develop projects that benefit disadvantaged communities. And two, ensure any updates to Civil Works policies and guidance will not result in a disproportionate negative impact on disadvantaged communities. The fiscal year 2023 budget also continues the process of addressing the climate crisis and evaluating the Civil Works programs to identify appropriate actions to support the administration's efforts to tackle the climate crisis at home and abroad. The budget includes well over $1 billion to support the Corps of Engineers' climate resiliency efforts and reduce the risk of damages from floods and storms, and restore the Nation's aquatic ecosystems. These efforts include incorporating natural and nature-based features--infrastructure solutions wherever possible. Investments include $974 million for construction of flood and storm damage reduction in aquatic ecosystem restoration projects, over $90 million to improve the resilience of Corps infrastructure to climate change, and $37.4 million for technical and planning assistance programs with an emphasis on work to help local communities identify and address their flood risks. The budget also includes funding to continue studies to investigate climate resilience in numerous areas such as the Great Lakes coast, as well as Central and Southern Florida. Let me highlight some specific allocations. In support of this administration's commitment to our Nation's coastal ports and inland waterways, critical links in the Nation's supply chains, the fiscal year 2023 budget includes over $3 billion for the study, construction, and operation, and maintenance of inland and coastal navigation projects. These funds will be used in conjunction with the $465 million provided in the Bipartisan Infrastructure Plan for the maintenance and repair of existing navigation harbors, channels, and navigation locks and dams on the Nation's ports and waterways. The budget proposes to drive over $1.7 billion from the Harbor Maintenance Trust Fund for eligible projects with an emphasis on O&M (operation and maintenance), including dredging, of completed projects. The budget also contains over $1.5 billion for flood and storm damage reduction, including an increase in funding for technical and planning assistance to local communities. The budget proposes to assist these local efforts with emphasis on non-structural approaches. The budget includes $624 million for aquatic ecosystem restoration, including $407 million for the South Florida Ecosystem Restoration Program, in addition to the $1.1 billion allocated to South Florida Ecosystem Restoration and the Bipartisan Infrastructure Spend Plan. Together, these investments will enable significant progress in restoring America's everglades. Significantly, the budget provides more than $1.2 billion in the construction account, the construction program uses objective, performance-based guidelines to allocate funding toward the highest performing economic environmental, and public safety investments. The fiscal year 2023 budget provides nearly $2.6 billion in O&M account. For O&M, the budget emphasizes maintaining and improving the performance of existing projects. The allocation of funding among projects for maintenance reflects a risk- informed approach that considers both project conditions and the potential consequences of a failure. Of note, the fiscal year 2023 budget includes $106 million in the investigations account which highlights the ongoing need in many communities to develop new projects. Finally, the fiscal year 2023 regulatory program is funded at $210 million to protect the Nation's water and wetlands, and provide efficiency in permit processing. I am honored to implement the President's priorities through the Army Civil Works programs. I look forward to your questions. Thank you. [The statement follows:] Prepared Statement of Mr. Michael L. Connor Chairwoman Feinstein, Ranking Member Kennedy and distinguished members of the committee, thank you for the opportunity to be here today to discuss the transformational investments of the President's Budget request for the Army Civil Works program. The fiscal year 2023 Budget request includes $6.6 billion for the Army Civil Works program. These investments continue to focus on yielding high economic and environmental returns; helping communities to reduce their risks and adapt to climate change, and restoring aquatic ecosystems in ways that will make them more sustainable and more resilient to climate change, based on the best available science; supporting a strong economy by facilitating safe, reliable and sustainable commercial navigation; and promoting environmental justice and investing in disadvantaged communities that have too often been left behind. The Army will continue working with community partners to develop, manage, restore, and protect our Nation's precious water resources. We believe in smart investments that improve the durability of our water management resources; and moving to a more sustainable posture for our water resources all across America. The Administration has also set a goal that 40 percent of the overall benefits of Federal investments in climate, flow to disadvantaged communities--the Justice40 Initiative. The Justice40 Initiative is a critical part of the Administration's whole-of- government approach to advancing environmental justice. The Budget focuses on the highest performing work within the three main missions of the Army Civil Works program: --commercial navigation, --flood and storm damage reduction, and --aquatic ecosystem restoration. In developing the Budget, we gave consideration to advancing two key objectives including: (1) increasing infrastructure and ecosystem resilience to climate change and decreasing climate risk for communities based on the best available science; and (2) promoting environmental justice in disadvantaged communities in line with Justice40 and creating good paying jobs that provide the free and fair chance to join a union and collectively bargain. The fiscal year 2023 Budget continues the process of addressing the climate crisis and evaluating the Civil Works program to identify appropriate actions to support the Administration in tackling the climate crisis at home and abroad. The Budget includes over $1 billion to support U.S. Army Corps of Engineers (Corps) climate resiliency efforts and reduce the risk of damages from floods and storms and restore the Nation's aquatic ecosystems. Investments include $974 million for construction of flood and storm damage reduction and aquatic ecosystem restoration projects, over $90 million to contribute to climate resilience efforts such as improving the resilience of Corps infrastructure to climate change, and $37.4 million for technical and planning assistance programs with emphasis on work to help local communities identify, understand, and address their flood risks including work that would directly benefit disadvantaged communities by improving their resilience to climate change. The Budget also includes funding to continue studies intended to investigate climate resilience along the Great Lakes coast as well as in Central and Southern Florida. The Army is also committed to securing environmental justice and spurring economic opportunity for disadvantaged communities that have been historically marginalized and overburdened by pollution and experience underinvestment in essential services. The Army is actively working, along with other Federal agencies, towards ensuring 40 percent of the benefits of climate and clean energy investments are directed to disadvantaged communities. These actions include an examination of the activities of key programs to determine whether those programs' benefits have accrued to disadvantaged communities. The fiscal year 2023 Budget includes funds to--(1) improve outreach and access to Civil Works information and resources; (2) improve access to Civil Works technical assistance programs (e.g., Planning Assistance to States and Floodplain Management Services) and maximize the reach of Civil Works projects to benefit disadvantaged communities, in particular as it relates to climate resiliency; and, (3) ensure any updates to Civil Works policies and guidance will not result in a disproportionate negative impact on disadvantaged communities. The Administration's America the Beautiful initiative sets a goal of conserving at least 30 percent of America's lands and waters by 2030. The fiscal year 2023 Budget includes funds to advance this goal at Army Corps-owned projects by creating safe outdoor opportunities in nature-deprived communities, supporting Tribally led conservation and restoration priorities, expanding collaborative conservation of fish and wildlife habitats and corridors, and increasing access for outdoor recreation. In support of this Administration's commitment to our Nation's coastal ports and inland waterways, the fiscal year 2023 Budget includes over $3 billion for the study, design, construction, operation and maintenance (O&M) of inland and coastal navigation projects. These funds will be used in conjunction with the $465 million provided in the Bipartisan Infrastructure Deal Spend Plan for fiscal year 2023 for the maintenance and repair of existing navigation harbors, channels, and navigation locks and dams on the Nation's ports and waterways that support commercial navigation.The Budget proposes to derive over $1.7 billion from the Harbor Maintenance Trust Fund for eligible projects with an emphasis on operation and maintenance, including dredging, of completed projects. The Budget contains over $1.5 billion for flood and storm damage reduction, including an increase in funding for technical and planning assistance to local communities to enable them to understand and to better manage their flood risks. The Budget proposes to assist these local efforts, with emphasis on non-structural approaches. The Budget includes $624 million for aquatic ecosystem restoration, including $407 million for the South Florida Ecosystem Restoration (SFER) program, in addition to the $1.1 billion allocated to the SFER program in the Bipartisan Infrastructure Deal Spend Plan, which together will enable significant progress in restoring this valuable ecosystem. The Budget supports a Civil Works program that has a diverse set of tools and approaches to working with local communities, whether this means funding projects with our cost-sharing partners, providing planning assistance and technical expertise to help communities make better risk-informed decisions, or participating in the national and international conversations on how to best address our water resources challenges. The Budget also focuses on maintaining the vast water resources infrastructure that the Corps owns and manages, and on finding innovative ways to rehabilitate it or divest it to others. The fiscal year 2023 Budget provides more than $1.2 billion in the construction account. The construction program uses objective, performance-based guidelines to allocate funding toward the highest performing economic, environmental, and public safety investments. The fiscal year 2023 Budget includes $50 million in Construction funds for the Innovative Funding Partnership program, which supports Corps efforts to accelerate and improve the delivery of water resources projects through greater non-Federal participation, and by removing barriers that prevent State, local, and private parties from moving forward with investments that they deem priorities. The fiscal year 2023 Budget provides nearly $2.6 billion in the O&M account. For O&M, the Budget emphasizes maintaining and improving the performance of existing projects. The allocation of funding among projects for maintenance reflects a risk-informed approach that considers both project and project component conditions and the potential consequences of a failure. The Budget gives priority to the maintenance of coastal ports and inland waterways with the highest commercial traffic. The Budget also includes $60 million for operation and maintenance work to mitigate for adverse impacts from the operation of existing Army Corps-owned projects and $20 million to install the necessary refueling infrastructure to support zero-emission vehicles at existing Army Corps-owned projects. The fiscal year 2023 Budget includes $106 million in the Investigations account. The fiscal year 2023 Regulatory Program is funded at $210 million to protect the nation's waters and wetlands and provide efficiency in permit processing. I am very honored to implement the President's priorities for the Army Civil Works program. I'm excited to be a part of a great team-- serving our Nation. Thank you for inviting me here today. I look forward to your questions. STATEMENT OF LIEUTENANT GENERAL SCOTT A. SPELLMON, CHIEF OF ENGINEERS AND COMMANDING GENERAL U.S. ARMY CORPS OF ENGINEERS General Spellmon. Chairwoman Feinstein, Ranking Member Kennedy, and distinguished members of the subcommittee, I am also honored to testify before you today. And thank you for the opportunity to discuss the fiscal year 2023 budget of the U.S. Army Corps of Engineers, another record investment in our Civil Works Program. And Senator Kennedy I should just thank you up front for your very kind words about the Corps. I think we all know that we did not do this alone, a lot of talented engineers and scientists in the State of Louisiana helped us deliver that system, and looking forward to 26 May, where we can finally cut the ribbon. But today I look forward to discussing the status of important Corps projects and programs, as well as answering any questions the committee may have regarding the 2023 budget. Most importantly I look forward to continuing to work with this committee, all of Congress, and the administration to address the Nation's water resource infrastructure needs. We greatly appreciate the committee's continued support of the Corps' program. With recent supplemental appropriations, including the Hurricane Ida Disaster Relief Supplemental, the Infrastructure Investment and Jobs Act, and continued record- high annual appropriations, the Corps Civil Works Program has experienced significant growth over the past several years. This substantial level of investment enables critical water resource infrastructure to be studied, and constructed, and also helps with developing innovating approaches to address some of our most pressing needs through a focused research and development program. The fiscal year 2023 budget reflects a targeted approach to continue investing in our water resources programs to promote climate resiliency, which will benefit the Nation's economy, environment and public safety now and well into the future. The budget also supports the Secretary's priorities for the Corps by upgrading our Nation's waterways, protecting communities and ecosystems, better serving disadvantaged communities, investing in science and research and development, and finally, sustaining and improving our communications and our relationships with partners and communities. The 2023 budget, taken with other recent funding, provides the Corps with what the Secretary calls, a transformational opportunity to deliver water resource infrastructure projects that will positively impact communities across our great Nation. So we are also taking advantage of this opportunity to transform our organization and our decisionmaking processes to safely deliver quality projects on time, and within budget. We are also taking deliberate steps to proactively identify risk to the execution of our program, then developing measures to reduce, resolve, or eliminate those risks. By evolving our policies, programs, and operations, and placing increased focus on research and development, we are working to overcome impacts of sea level rise, changes to precipitation patterns, and hydrology, and other effects of climate change, including improvement to the resilience of our own Corps operated infrastructure. I will conclude by saying the Corps does not accomplish anything on its own, we draw upon our engineering expertise, and build upon our partnerships with our non-Federal partners, project stakeholders, and Congress to enable us to succeed. I look forward to continuing our great collaboration, as we continue to take on the challenges that face us today, and those of tomorrow. And thank you again Chairwoman Feinstein, Ranking Member Kennedy, and members of the subcommittee. I look forward to answering any questions you may have. [The statement follows:] Prepared Statement of Lieutenant General Scott A. Spellmon Chairwoman Feinstein, Ranking Member Kennedy, and Members of the Subcommittee, I am honored to testify before your committee today, along with the Honorable Michael Connor, Assistant Secretary of the Army for Civil Works, regarding the President's Fiscal Year 2023 (FY 2023) Budget (Budget) for the Army Civil Works Program. Through the Civil Works program, the United States Army Corps of Engineers (Corps) works with other Federal agencies, and with State, Tribal, and local agencies, as well as others, to develop, manage, restore, and protect water resources, primarily through the study, construction, and operation and maintenance of water-related infrastructure projects. The Corps focuses on work that provides the highest economic, environmental, and public safety returns to the Nation. The Corps also regulates development in waters of the United States and works with other Federal agencies to help communities respond to, and recover from, floods and other natural disasters. The Fiscal Year 2023 Budget invests in improving the Nation's water infrastructure, including at U.S. coastal ports, while incorporating climate resilience efforts into the Corps' commercial navigation, flood and storm damage reduction, and aquatic ecosystem restoration work. The Corps uses its engineering expertise and its relationships with project sponsors and stakeholders to develop innovative approaches to address some of the most pressing water resources challenges facing the Nation. I am committed to the Secretary's priorities for the Army Civil Works program, including investing in the Nation's coastal ports and inland waterways to facilitate waterborne transportation and strengthen economic growth; helping communities to reduce their risks and adapt to climate change; restoring aquatic ecosystems in ways that will make them more sustainable and more resilient to climate change; modernizing the Civil Works program to better serve the needs of disadvantaged communities; investing in science, research, and development to deliver enduring water-resource solutions; and strengthening communications and relationships to solve water resource challenges. I am absolutely focused on ensuring that we deliver studies and finish quality projects safely, on time, and within budget. These priorities will ensure a better return on taxpayer investment and improve the lives of all Americans. Under my oversight and direction, and with the leadership of Assistant Secretary Connor and his team, the Corps is committed to efficiently and effectively executing the Civil Works program. The Corps' Military program also continues our work across the globe with a presence in more than 110 countries supporting national security and our Combatant Commanders. summary of fiscal year 2023 budget The Civil Works program is performance-based. It uses a targeted approach to invest in our water resources and promote climate resiliency, which will benefit the Nation's economy, environment, and public safety--now and in the future. With the requested funds, the Corps will emphasize investments in high return projects; increasing resiliency to climate change; facilitating safe, reliable, and sustainable commercial navigation; and accelerating and improving delivery of water resource projects. The Corps focuses on high-performing projects and programs within its three main water resources missions: commercial navigation, flood and storm damage reduction, and aquatic ecosystem restoration. The Budget includes $6.601 billion in discretionary funding for Civil Works activities throughout the Nation. investigations For the Corps Investigations program, the Fiscal Year 2023 Budget includes $105.9 million in the Investigations account and $9.75 million in the Mississippi River and Tributaries account. The Corps uses these funds to evaluate water resources problems and opportunities, design projects within the three main Civil Works mission areas, and support related work. The Budget also supports planning assistance and technical assistance programs, where the Corps shares its expertise with local communities to help them identify and understand their water resources problems and helps them to develop options including ways that they can increase their resilience to and preparedness for flood risks. construction For the Corps Construction program, the Budget includes $1.221 billion in the Construction account and $66.7 million in the Mississippi River and Tributaries account. The goal of the Civil Works program is to produce as much value as possible for the Nation from the available funds. Projects are primarily funded based on their economic, environmental and safety returns. The selection process includes giving priority to investments, on a risk-informed basis, in dam safety assurance, seepage control, and static instability correction work at dams that the Corps owns and operates, and work to address significant risk to human safety, as well as construction of dredged material disposal facilities for high and moderate use segments of commercial deep-draft, shallow-draft, and inland waterways projects. In developing the Fiscal Year 2023 Budget, we also gave consideration to projects that provide climate change benefits to disadvantaged communities. The Budget provides $407 million for the South Florida Everglades Restoration (SFER) program, which includes the Everglades. This amount, as well as the $1.1 billion included in the Infrastructure Investment and Jobs Act Spend Plan, will enable significant progress on restoration of this unique ecosystem. The Budget funds four projects to completion: (1) Chickamauga Lock, Tennessee River, TN; (2) Corpus Christi Ship Channel, TX (Main Channel and Barge Lanes); (3) American River Common Features, Natomas Basin, CA; and (4) Pipestem Lake, ND. operation and maintenance (o&m) All structures age and can deteriorate over time, causing a potential decline in reliability. As stewards of a large portfolio of water resources projects, the Corps is working to sustain the benefits that the key features of this infrastructure provide. The Corps continues to improve the efficiency and effectiveness of the operation and maintenance of its large portfolio of water resources projects. The Corps does so by targeting its investments in infrastructure maintenance, repair, and rehabilitation on a risk- informed basis. It invests in the highest priority needs with emphasis on the key features of the infrastructure that the Corps owns and operates, and in work that will reduce long-term O&M costs in real terms. Generally, the O&M program supports completed works owned or operated by the Corps, including operation and maintenance of locks and dams along the inland waterways; maintenance dredging of inland and coastal Federal channels; operation and maintenance of multi-purpose dams and reservoirs for flood risk reduction and related purposes such as hydropower; monitoring of completed navigation and flood damage reduction projects; and management of Corps facilities and associated lands, including serving as a responsible steward of the natural resources on Corps lands. For the Corps O&M program, the Budget includes $2.599 billion in the Operation and Maintenance account, $1.704 billion in the Harbor Maintenance Trust Fund, and $148.5 million in the Mississippi River and Tributaries account. These funds will be used in conjunction with the $1 billion provided in the Infrastructure Investment and Jobs Act for fiscal year 2023 for operation and maintenance work, including $465 million for the maintenance and repair of existing navigation harbors, channels, and navigation locks and dams on the Nation's ports and waterways that support commercial navigation. regulatory program Through the Regulatory program, the Corps protects the Nation's waters including wetlands, and regulates development that could impede navigation, while allowing reasonable development to proceed. The Budget proposes the necessary level of funding for the Regulatory program to enable the Corps to protect and preserve these water resources. The Fiscal Year 2023 Budget provides $210 million for this program. reimbursable program Through the Interagency and International Services (IIS) Reimbursable program, the Corps assists other Federal agencies, State, local, Tribal governments, and those of other countries with timely, cost-effective solutions where these partners do not have the capability to act as their own design and construction agent. The work is principally technical oversight and management of engineering, environmental, and construction projects is financed by the partners we service. We only accept agency requests that are consistent with our core technical expertise, in the national interest, and that can be executed without impacting our primary mission areas. emergency management The Fiscal Year 2023 Budget includes $35 million in funding for the Flood Control and Coastal Emergencies account to enable the Corps to prepare for emergency operations in response to natural disasters. The Budget for the emergency management program also includes $5.5 million for the National Emergency Preparedness Program. conclusion The Fiscal Year 2023 President's Budget for the Army Civil Works Program represents a continuing, fiscally prudent investment in the Nation's water resources infrastructure and restoration of aquatic ecosystems. The Army is committed to a performance-based Civil Works program, based on innovative, resilient, and sustainable risk-informed solutions. Thank you, Madam Chairwoman and Members of Subcommittee. This concludes my statement. I look forward to answering any questions you and other Members of the Subcommittee may have. DEPARTMENT OF THE INTERIOR Bureau of Reclamation STATEMENT OF MR. DAVID PALUMBO, DEPUTY COMMISSIONER Mr. Palumbo. Thank you Chair Feinstein, Ranking Member Kennedy, and members of the subcommittee, for the opportunity to discuss the President's budget for the Bureau of Reclamation. I am David Palumbo, Acting Commissioner. The Bureau of Reclamation is the largest supplier and manager of water in the Nation, and the second-largest producer of hydropower. Reclamation's working relationship with the subcommittee has helped us address both long-standing and emerging challenges in the West. Addressing drought resilience, water security, climate change adaptation, ecosystem health, and issues of equity are essential, as are the continuing needs of securing, maintaining, and modernizing our Nation's water infrastructure. We have a generational opportunity to couple our fiscal year 2023 $1.4 billion budget with that of the Bipartisan Infrastructure Law, to put money to work on the ground to advance these vital needs for the American people. At the outset I would like to acknowledge the significant, expansive, and persistent drought. In most western watersheds there have been successive and compounding years of drought, exacerbating the dire conditions on the ground, increasing temperatures, increased evapotranspiration which decreases soil moisture, and ultimately decreases runoff which negatively impacts available renewable, freshwater resources. These hydrologic conditions have resulted in the need to make difficult decisions. Many water users, power contractors, Tribes, and related communities have had to make significant sacrifices. In the Colorado River Basin we are in the 23rd year of drought. Last month we dropped less than 35 feet above minimum power pool at Glen Canyon Dam, with minimum power pool being the lowest point where we can generate hydropower at this critical facility, which provides carbon-free energy, electrical grid stability, and support for other renewables, like wind and solar. We have not been at this elevation since Lake Powell was being initially filled nearly 6 decades ago. In California's Central Valley we are in our third consecutive, critically dry year. We have had to issue a 0 percent allocation to irrigation water service contractors, and last Friday we had to reduce water allocations to municipal and industrial contractors from 25 percent to minimum health and safety levels. These types of situations highlight the need for immediate actions as well as thoughtful planning and on-the-ground work to make both our infrastructure and operational decisions more resilient to withstand future water resource scarcity and variability. Reclamation's budget priorities reflect a commitment to drought planning and response activities to promote water security. Appropriately, this budget request acknowledges the need to continue to develop and deploy science-based drought and climate change adaptation strategies. Reclamation's WaterSMART and science and technology programs directly contribute to these administration priorities. Reclamation must also plan for the future of its infrastructure. Reclamation's dams and reservoirs, water conveyance systems, and power generating facilities serve as a water and power infrastructure backbone of the American West. However, as with all infrastructures, these features are aging and are in need of critical maintenance. For example, in California we are about to embark on our largest dam safety construction project ever, at B.F. Sisk Dam. Our fiscal year 2023 dam safety request of $210 million not only addresses this project in California, but also projects in Wyoming, Oregon, New Mexico, Washington and other locations. We were able to leverage this funding to address more west- wide needs in an accelerated manner due to the $500 million in Bipartisan Infrastructure Bill (BIL) funding, and $100 million of which was allocated for B.F. Sisk Dam in fiscal year 2022. However, it is not sufficient to address infrastructure needs without also considering economic inequities, the needs of underserved communities, and environmental justice. Reclamation is establishing and rebuilding water infrastructure for underserved populations by ensuring that clean drinking water is reliably provided to communities. Our budget includes funding for Reclamation's Native American Affairs Program to enhance our technical assistance to Tribes, and includes funding for Reclamation's Rural Water Program. As with our Dam Safety Program, our Rural Water Program leverages $1 billion in BIL funding to accelerate completion of these long-needed projects. The Bureau of Reclamation remains committed to working with Congress, and our operating partners and stakeholders in carrying out our mission and responsibly planning for the future. The challenge of drought and climate change demands such action and the need for broader economic development and more equitable outcomes do as well. I again thank the subcommittee. And I am happy to answer any questions. [The statement follows:] Prepared Statement of David Palumbo Thank you, Chairwoman Feinstein, Ranking Member Kennedy, and members of the Subcommittee for the opportunity to discuss with you the President's Fiscal Year (FY) 2023 Budget for the Bureau of Reclamation. I am David Palumbo, Acting Commissioner for the Bureau of Reclamation. The Bureau of Reclamation is the largest supplier and manager of water and the second largest producer of hydroelectric power in the Nation. Reclamation manages water for agriculture, municipal and industrial use, the environment, and provides flood control and recreation for millions of people. Reclamation's activities, including recreation benefits, support economic activity valued at $66.6 billion, and support approximately 472,000 jobs. Reclamation delivers 10 trillion gallons of water to more than 31 million people each year and provides water for irrigation of 10 million farmland acres, which yields approximately 25 percent of the Nation's fruit and nut crops, and 60 percent of the vegetable harvest. Reclamation's fundamental mission and programs--modernizing and maintaining infrastructure, conserving natural resources, using science and research to inform decisionmaking, serving underserved populations, and staying as nimble as possible in response to the requirements of drought and a changing climate--position it as an exemplar for the Biden-Harris Administration's core tenets. The Bureau of Reclamation's fiscal year 2023 budget provides the foundation to meet our mission, and to manage, develop, and protect water resources, consistent with applicable State and Federal law, and in a cost-effective and environmentally responsible manner in the interest of the American public. Reclamation remains committed to working with a wide range of stakeholders, including water and power customers, Tribes, State and local officials, and non-governmental organizations, to meet its mission. Reclamation is requesting a total of $1,414,225,000 in Federal gross discretionary appropriations. Of the discretionary total, $1,270,376,000 is for the Water and Related Resources account, which is Reclamation's largest account, $65,079,000 is for the Policy and Administration account, and $33,000,000 is for the California Bay Delta account. A total of $45,770,000 is budgeted for the Central Valley Project Restoration Fund, to be offset by expected discretionary receipts in the amounts collected during the fiscal year. These appropriations will complement the funding Reclamation received from the Bipartisan Infrastructure Law, which is allocated pursuant to statute in the amount of $1.66 billion in fiscal year 2023. Following are some focus areas and highlights of Reclamation's Fiscal Year 2023 Budget request. Racial and Economic Equity: Activities to Support Underserved Communities, Tribal Programs & Tribal Water Rights Settlements: Reclamation advances racial equity and assistance to underserved communities through investments in Tribal water rights settlements, continuation of the Native American Affairs technical assistance program, rural water projects, and investments in specific projects for underserved communities. The Bipartisan Infrastructure Law also invests very substantial portions of its funding to underserved populations and Tribal communities as described later in my testimony. The fiscal year 2023 discretionary request includes $20.0 million for the Native American Affairs program to work with and support Tribes in the resolution of their water rights claims and to develop sustainable water sharing agreements and build Tribal technical capacity. This funding will also strengthen Department-wide capabilities to achieve an integrated and systematic approach to Indian water rights negotiations to consider the full range of economic, legal, and technical attributes of proposed settlements. Finally, funding also supports Reclamation efforts for Tribal nations by supporting many activities across the Bureau, including rural water projects, the Yakima River Basin Water Enhancement Project, activities of the Klamath Project, and the Lahontan Basin project, among others. Conservation and Climate Resilience: Reclamation's projects address the Administration's priorities for conservation and climate resilience through funding for the WaterSMART program, funding to secure water supplies to wildlife refuges, and funding for proactive efforts through providing sound climate science, research and development, water security, drought resilience, and clean energy. The WaterSMART Program serves as the primary contributor to Reclamation's/Interior's Water Conservation Priority Goal. Since 2010, projects funded under the Water Conversation Program, including WaterSMART Grants, Title XVI (Water Recycling and Reuse Program), California Bay-Delta Program, Yakima River Basin Water Enhancement Project, and the Desalination construction program are expected to achieve more than 1.4 million acre-feet of water savings each year once completed. Through WaterSMART, Reclamation works cooperatively with States, Tribes, and local entities as they plan for and implement actions to address current and future water shortages, including drought; degraded water quality; increased demands for water and energy from growing populations; environmental water requirements; and the potential for decreased water supply availability due to climate change, drought, population growth, and necessary water requirements for environmental values. This includes cost-shared grants for water management improvement projects; watershed resilience projects; the Basin Study Program; and drought planning and implementation actions to proactively address water shortages. The fiscal year 2023 request includes $62.4 million for the WaterSMART Program. Climate Science: Reclamation's fiscal year 2023 budget for Research and Development (R&D) programs includes $25.3 million for both Science and Technology, and Desalination and Water Purification Research--both of which focus on Reclamation's mission of water and power deliveries. Climate change adaptation is a focus of Reclamation's R&D programs, which produce climate change science, information and tools that benefit adaptation, and by yielding climate-resilient solutions to benefit management of water infrastructure, hydropower, environmental compliance, and water management. The Desalination and Water Purification Research program addresses drought and water scarcity impacts caused by climate change by investing in desalination and water treatment technology development and demonstrations for the purpose of more effectively converting unusable waters to useable water supplies. The Science and Technology program invests in innovation to address the full range of technical issues confronting Reclamation water and hydropower managers, including the Snow Water Supply Forecasting Program that aims to improve water supply forecasts through enhanced snow monitoring and water management to address the impacts of drought and a changing climate. Modernizing and Maintaining Infrastructure: Reclamation's water and power projects throughout the western United States provide water supplies for agricultural, municipal, and industrial purposes. Reclamation's projects also produce hydropower and maintain ecosystems that support fish and wildlife, hunting, fishing, and other recreation, and strengthen rural economies. Dam Safety: Reclamation manages 487 dams throughout the 17 Western States. Reclamation's Dam Safety Program has identified 360 high and significant hazard dams. Through constant monitoring and assessment, Reclamation strives to achieve the best use of its limited resources to ensure dam safety and maintain our ability to store and divert water and to generate hydropower. Although some pending infrastructure priorities will be addressed through the Bipartisan Infrastructure Law, additional priorities exist and the fiscal year 2023 budget request includes $210.2 million for the Dam Safety Program. The Dam Safety Program helps ensure the safety and reliability of Reclamation dams to protect the downstream public. Approximately 50 percent of Reclamation's dams were built between 1900 and 1950, and approximately 90 percent of the dams were built before adoption of currently used, state-of-the-art design and construction practices. Reclamation continuously evaluates dams and monitors performance to ensure that risks do not exceed the Federal Guidelines for Dam Safety Risk Management and the Public Protection Guidelines. The Dam Safety Program represents a major funding need over the next 10 years, driven largely by necessary repairs at B.F. Sisk Dam in California. The B.F. Sisk Dam is a key component of the Central Valley Project and California's State Water Project, providing 2 million acre-feet of State and Federal water storage south of the California Sacramento-San Joaquin River Delta. Reclamation is modifying the dam to reduce the risk of potential failure resulting from potential overtopping in response to a seismic event, using the most current science and technology to develop an adaptive and resilient infrastructure. In addition to B.F. Sisk, Reclamation has identified 19 additional projects with anticipated modification needs through 2030. The budget also requests $96 million for specific Extraordinary Maintenance (XM) activities across Reclamation in fiscal year 2023. This request is central to mission objectives of operating and maintaining projects to ensure delivery of water and power benefits. Reclamation's XM request relies on condition assessments, condition/ performance metrics, technological research and deployment, and strategic collaboration to better inform and improve the management of its assets and deal with its infrastructure maintenance challenges. Renewable Energy: Reclamation owns 78 hydroelectric power plants. Reclamation operates 53 of those plants to generate approximately 15 percent of the hydroelectric power produced in the United States. Each year on average, Reclamation generates about 40 million megawatt hours of electricity and collects over $1.0 billion in gross power revenues for the Federal Government. Reclamation's fiscal year 2023 budget request includes $5 million to increase Reclamation's hydropower capabilities and revenue from existing public infrastructure and reduce project operating costs (e.g., water and power delivery costs). Revenues derived from hydropower production are invested in the underlying public infrastructure to ensure continued, reliable operations and benefits. Section 70101 of the Bipartisan Infrastructure Law established the Indian Water Rights Settlement Completion Fund (Completion Fund), making $2.5 billion available to the Secretary of the Interior to satisfy Tribal settlement obligations as authorized by Congress prior to enactment of the Bipartisan Infrastructure Law. The Department allocated $1.7 billion of those funds in fiscal year 2022, $355 million of which supported Reclamation's Tribal settlement implementation actions, and additional funding will be allocated in fiscal year 2023. In addition to the Completion Fund, fiscal year 2023 represents the fourth year of Reclamation Water Settlements Fund allocations, which provide $120 million in annual mandatory authority for Reclamation Indian water rights settlements. Funding made available by previous mandatory authorities, such as that authorized in the Claims Resolution Act, remain available for settlement implementation, while the ongoing operations and maintenance requirements of the Arizona Water Settlement Act are expected to continue to be supported within the Lower Colorado River Basin Development Fund. In fiscal year 2023, the Department of the Interior is requesting $34 million for ongoing operational requirements for existing settlements to be added in the Completion Fund and the Administration is interested in working with Congress on an approach to provide a mandatory funding source for future settlements. Additional information can be found in the Permanents chapter of the Reclamation request. The investments described in Reclamation's fiscal year 2023 budget, in combination with the Bipartisan Infrastructure Law implementation and prior year efforts, will ensure that Reclamation can continue to provide reliable water and power to the American West. Water management, improving and modernizing infrastructure, using sound science to support critical decisionmaking, finding opportunities to expand capacity, reducing conflict, and meeting environmental responsibilities were all addressed in the formulation of the fiscal year 2023 budget. Reclamation continues to look at ways to plan more efficiently for future challenges faced in water resources management and to improve the way it does business. Thank you for the opportunity to summarize the President's Fiscal Year 2023 Budget Request for the Bureau of Reclamation. central utah project completion act (cupca) The Department's fiscal year 2023 CUPCA Program budget of $20 million reflects the Administration's commitment to strengthening our climate resiliency and supporting conservation partnerships, and continues the progress of prior appropriations including $50 million included for the CUPCA Program in the Bipartisan Infrastructure Law. As authorized, the completion of the Central Utah Project Utah Lake System pipelines will deliver 60,000 acre-feet of municipal and industrial water to Salt Lake and Utah Counties. The completed project will provide increased water security, helping communities adapt to and increase their resiliency under changing climate conditions. The request provides funding to continue construction of the system; to support the recovery of endangered species; and implements fish, wildlife, and recreation mitigation and water conservation projects. One of the goals of the project is the recovery of the June sucker fish, a critical element of listed species recovery efforts. Senator Feinstein. Thank you very much. Deputy Commissioner Palumbo, 94 percent of California is now in severe drought, or worse, as the most severe drought in the West in recorded history deepens. This is an emergency which many of us feel that really requires our action, and I believe we have secured $210 million in emergency funding last year. So here is the question. What actions are being taken now to address these issues as the drought continues to deepen? Mr. Palumbo. Thank you very much Chair. The Bureau of Reclamation is taking a variety of actions. In the State of California we are using the funding of the $210 million provided, which we very much appreciate from this subcommittee, to deploy actions on the ground to address drought. For example, we are installing salinity barriers to deal with water inflow restrictions into the Delta. We are looking at fish hatchery operations, looking at laboratories for Delta Smelt, installing curtains at Shasta Dam to control temperature. We are putting together a variety of drought mitigation activities and programs to deal with impacted farmers and communities throughout the West. That funding, the $210 million, plus additional funding from this subcommittee has come at the right time, and is being deployed responsibly. Senator Feinstein. Well, I am a bit confused. If I understand it correctly, the Congress passed a Disaster Supplemental in February of 2018 that included $15 billion in construction funding for critical flood and storm damage reduction projects. Four years later, as I understand it, construction continues to stall due to Corps policy guidance requiring full funding upfront. So Assistant Secretary Connor, I appreciate your willingness to discuss this issue with me in the past, but I also appreciate the Corps' recent attention to fully resolving the long-standing obstacles in the South San Francisco Bay Shoreline Project. As directed, in the fiscal year 2022 Energy and Water report language, will you commit to revise the Corps policy guidance so these projects can continue to move ahead? Mr. Connor. Chair Feinstein, I commit to working with you and your staff on exercising any and all discretion I have to moving those projects, and work with General Spellmon to move those projects forward as quickly as possible. We may have some legal authority issues that we have to raise with you and your team, and we are working through that right now. We have had some good discussions lately. Our goal is to ensure that all the projects in BBA 2018 are moving forward. And we have got good construction on some activity, and we have got some projects, particularly South San Francisco held up. But I am committed to working with you and your team on moving those projects forward. Senator Feinstein. Thank you. Senator Kennedy. Senator Kennedy. Thank you, Madam Chair. I want to take a little different approach today, gentlemen. I am going to ask you a few quick questions, feel free to give me a yes or no; there is a method here to my madness. Like everybody else in the Western Hemisphere, and a few in the Eastern, I have some specific projects I would like to talk to you about, but I am not going to talk to you about them today. I want to talk about a larger issue. And that has to do with the integrity of the Corps, and some of this loose talk about earmarks. So let me ask you a couple questions, with the exception of a really small number of projects, less than 1 percent, is it not true that Congress doesn't authorize construction of proposed Corps projects without a comprehensive study that can take up to years to complete to determine if the project is economically justified? Is that accurate? General Spellmon. Yes, sir. Senator Kennedy. That study has also got to show that the project is environmentally sound, right? General Spellmon. Yes, sir, that is correct. Senator Kennedy. Technically feasible; is that correct? General Spellmon. Yes, Senator. Senator Kennedy. So somebody just can't call you folks up at the Corps and say, I have got a project, and I want it done and you better get it done. It doesn't work that way; does it? General Spellmon. That is correct, Senator, it does not. Senator Kennedy. All right. And in your years at the Corps, what percentage of all Corps projects have been authorized by Congress for construction without meeting this three-part test? General Spellmon. Sir, I have been with the Corps, six-and- a-half years, I am not aware of any. Senator Kennedy. Any? Every project has had to be economically justified, environmentally sound, and technically feasible based on an objective study. General Spellmon. Sir, that is correct. Senator Kennedy. Not by politicians. General Spellmon. That is correct. Senator Kennedy. All right. What does a favorable chief's report mean? General Spellmon. Sir, it means that the project, as you said, is technically feasible, it is economically justified, and it will achieve its desired effect in one of our Corps mission areas. Senator Kennedy. Okay. And in your years with the Corps, what is your best estimate of all the construction authorizations that have been enacted without a favorable chief's report? General Spellmon. Sir, I am not aware of any that have been authorized without a favorable report. Senator Kennedy. Okay. And not to put too fine a point on it, but one of the things that the Corps looks at in this study which can take years, is whether the taxpayers are getting a return on their investment. In other words, the benefits have to substantially outweigh the costs; is that right? General Spellmon. Yes, sir, that is correct. Senator Kennedy. Now, earlier I talked about HSDRRS, and the levee protection system in Southeast Louisiana which protects Louisiana from the South. But like a lot of States, we are not only endangered by the South, water from the South, we are endangered by water from the North. Louisiana, you can see from the map, drains 41 percent of the Continental United States, and parts of two Canadian provinces, so we have a threat from the North, from water. The Great Flood of 1927, we remember it. I don't remember how many tens of thousands of acres flooded, millions dollars' worth of damage, this is 1927 now. As usual America turned to the Corps of Engineers, and we said help us fix it. And you did. And you built levees from just South of the Canadian border all the way down to the Gulf of Mexico, it costs $13 billion. Man that was a lot of money then. It saved this country trillions of dollars. And the point I am trying to make, look, earmarks are now back, and I am not making a critical or laudable statement about them, it is up to the Senate whether they want to do earmarks, but I don't want there to be any confusion. I don't know the technical definition of an earmark, I don't know how many lawyers can dance on the head of a pin either, but I don't want these Corps projects to be considered earmarks. This isn't politics, these projects have to be studied, they have to we have a substantial return on investment, and I want this country to know that, and be proud of that, and I don't want, as we have this discussion about earmarks, the sterling reputation of the Corps of Engineers to be tarnished. Thank you Madam Chair. Senator Feinstein. Thank you, Senator. Senator Heinrich. Senator Heinrich. Thank you, Madam Chair. Madam Chair, first, I want to ask unanimous consent to enter an article into the record. This is from E&E Daily, and the headline is, ``Army Corps cuts would put boating camping sites at risk'', White House fiscal 2023 budget would cut more than $50 million from Army Corps recreation spending without--I just ask unanimous consent to put that in the record. Senator Feinstein. So ordered. [The information follows:] Senator Heinrich. Assistant Secretary Connor, I bring this up because in the last 2 years we have seen this incredible surge in visitation to public lands, writ large, everything from Army Corps, to Forest Service, to our National Parks. Army Corps actually experienced an additional 20 million visits just last year. So I just want to ask, are these cuts a good idea? It seems to be a particularly unfortunate time to do that. Mr. Connor. Senator Heinrich, thank you for raising the issue. I think myself and General Spellmon, we have had discussions about that. We certainly understand the value, increasing value of recreation, as you point out. So we have got some work to do with this budget, we are trying to fit in a lot of priorities, but we need to go through and analyze the full range of impacts, with respect to potential, you know, reduction of services to the general public, and we don't want that. So with that budget we are going to try and manage it so that we don't have those impacts. The good news is, through IIJA (Infrastructure Investment and Jobs Act), the Bipartisan Infrastructure Law, and other mechanisms, we have made some investments in the maintenance of facilities, but we need to operate those facilities. And so we are going to look at the 2022 spend plan, we are going to look at other ways that we can ensure we are not reducing services. But it is a concern, and I appreciate you raising it. Senator Heinrich. No. I look forward to working with you on this, on this issue. I think if anything we have really seen, this is a part of our economy that has grown dramatically as a result of people's desire to be outside in the midst of COVID. I think that is going to carry forward for a number of years, and we certainly want to keep those facilities open. Mr. Palumbo, historical and projected climate changes have translated to pretty significant water supply, reductions, and habitat degradation in the Rio Grande Basin, warmer conditions, decreased runoff into the Rio Grande resulting, frankly, in a drier river every single year. The existing low flow conveyance channel that runs alongside the Rio between San Acacia, New Mexico, and Elephant Butte Reservoir has been identified as a key source of water inefficiency in the Middle Rio Grande. What can we do about addressing existing river inefficiencies such as the low flow conveyance channel, so that we can keep more water in the main stem, and protect the habitats that rely on that water? Mr. Palumbo. Thank you very much, Senator, for bringing up this issue. This is an important issue for the Bureau of Reclamation. We are currently implementing several projects with the low flow conveyance channel to remove sediment, remove plugs, and improve connectivity to the Rio Grande at large. So, we are focusing on this, it is important, and we have folks doing work on the ground in this area. Senator Heinrich. So it didn't take long for that entire conveyance channel to sediment up. Should we be looking at whether it was a good idea in the first place? Mr. Palumbo. Yes, absolutely. The Bureau of Reclamation prides itself on adaptive management. If something doesn't work, let us not do it again, let us figure out a way to do it better. That is also part of this program, to ensure that there are other ways in which to provide the habitat, provide the flows, and get them in the right areas at the right time. Senator Heinrich. Assistant Secretary Connor, in the face of continued aridification of the West, and I use that word rather than drought because it is now a permanent dynamic. How can we better manage the Rio Grande as an interconnected system rather than a series of separate reservoirs each with separate purposes? Mr. Connor. It is a great question. It is the question, du jour of the day, because we have got to holistically use all of our infrastructure. The Bureau of Reclamations Facility, particularly the Rio Grande Basin. The facilities that we have under the Corps of Engineers to control Abiquiu, use that in tandem with El Vado, and ensure that we can add to water supply, and you help put that provision in place through the last word that we can expand the use of Abiquiu, and that is a necessary part of the process. We have got to look also how we do flood risk reduction, and how we make releases, and see if we can't coordinate with the water suppliers, so that our releases aren't solely focused on flood control, that we do our job, that we operate in a way that we can help maximize water supply for other entities. And that means not just coordinating with the Bureau, but the Rio Grande Conservancy District, with Tribes. There is a lot to do, there is a lot of capability, and it requires even better coordination than in the past. Senator Heinrich. I am out of time, but would the Corps and BOR (Bureau of Reclamation) be willing to work with the National Academy of Sciences to study the Upper Rio Grande as a whole, and come up with some management practices to keep the river wet. Mr. Connor. Yes we had a discussion with NAS just this week. Senator Feinstein. Thank you very much. Senator Hyde-Smith. Senator Hyde-Smith. Thank you, Chairwoman Feinstein, Ranking Member Kennedy, and I certainly want to thank our witnesses today. We truly appreciate you being here, and as we discussed the 2023 budget for the Corps and the Bureau of Reclamation. Secretary Connor, I just really appreciate the time that you spent in traveling to Vicksburg, Mississippi, in February for a briefing on the Yazoo Area Pump Project. That is a really important project to me, it is one of my very top priorities because I have seen the suffering that has happened in Mississippi. But today I would like to discuss environmental justice, a topic this administration says is a top priority as well. As you know the comprehensive Yazoo Backwater Area Project is a congressionally authorized Corps project designed to provide flood protection to thousands of residents in the South Mississippi Delta, most of whom are African-Americans. I have visited this place many, many times, and I don't live far from it. The Yazoo Backwater Area comprises of 1,446 square miles, six Mississippi counties, these are some of the most rural underserved counties in the entire United States. This project consists of three components designed to be used in tandem including levees to keep Mississippi and Yazoo River flood waters out, floodgates to let accumulated interior flood water out, and pumping stations to remove flood waters trapped on the protected side of the levee system when the floodgates have to be closed because the Mississippi River is high, and excess rainfall occurs. All of these features have been completed except for the pumps. Unfortunately, the EPA (Environmental Protection Agency) in 2008 stopped the Corps from completing the pumps, the project's last remaining feature. Since that EPA veto in 2008 the area has experienced catastrophic flooding nearly every year, causing billions, with a B, in damages, and destroying lives, home, property, wildlife habitat, and the environment. In 2019 the Yazoo Backwater Area, which is more than 11 times the size of Washington, D.C., remained flooded for well over 6 months it was underwater. It was disastrous on the quality of life for the people who live and work there, many who are already impoverished. Two people lost their lives. During the onset of the COVID-19 pandemic in 2020 there was another terrible flood. It again displaced residents and forced them into crowded shelters, or to move in with family, neither option ideal during an unprecedented pandemic. Recognizing that this perpetual flooding was simply not sustainable for the people or the environment, and armed with the new scientific information, the Corps issued a new proposed plan for the pumps in December of 2020. Unfortunately, the EPA, last November, put the brakes on the Corps from moving forward yet again. It simply dismissed years of new Corps environmental studies, and thousands of pages of scientific information that fully justifies the pumps. We often hear, we need to listen to the science. Well, what does the science say? The science says the Corps' new proposed plan would not convert any wetlands to non-wetlands. The science says the project would benefit all sections of the economy and contribute to the wellbeing of all area residents. The science says the project would benefit wetlands, aquatic species, wildlife, and wildlife life, habitat, and every important resource that flooding has been destroying for decades. But here is the real irony, the current administration has placed environmental justice at the top of its priority list, the Yazoo Backwater Area population is nearly 70 percent minority, with roughly 30 percent living in poverty. The Corps Environmental Justice Appendix indicates that the pumps would significantly benefit low-income and minority populations, and it shows that more than 90 percent of the homes would be devastated from a 100-year flood event, are minority occupied. Secretary Connor, please, there are two things, and I want you to thoroughly answer both of these for me, if you would. Please share your thoughts on the environmental justice benefits associated with the Yazoo Backwater Project? And do you consider the Corps' new proposed plan to be consistent with this administration's emphasis on promoting environmental justice? Mr. Connor. Senator Hyde-Smith, I wish I would have started with your statement when I got into Yazoo, because it took me a while to get up to speed the way you just articulated it. It is a very complex system. And I will get exactly to your points, because I don't think it is ironic that this administration focuses on environmental justice. And how we have dealt with the Yazoo Basin, or how we are going to deal--let me put it that way--because, yes, we cannot move forward with the project that the Corps most recently proposed, because of the reinstitution of the veto, that is correct, and that is concerning, because we have got to get to some project to address the uncompleted project as you mentioned. And we are getting the attention that we need at a very high level to move forward in the interagency group, chaired by CEQ (Council on Environmental Quality) Chair Brenda Mallory, she has convened us together, and when I went down to Yazoo in February, it was with Chair Mallory, to get a first-hand account, and you cannot understand the system without that first-hand account because of the complexity of it. So we need to address the intended project as it was originally conceived. And you are right, it is missing that last phase of the project, so we have got to deal with that backwater flooding, we have got to figure out the mix of structural and non-structural. And when I say structural, I think pumps are still in the mix for the discussion that we are going to have in this interagency group. There are questions about the science from some of the other agencies, the Corps feels very strongly that it has got peer-reviewed science, but we need to have that dialogue about what exactly are the impacts to wetlands, are we reducing the wetland function. Those are going to be some detailed conversation. But I can assure you this is part of the environmental justice agenda to get to a project, to get to a solution, because of the factors that you mentioned with respect to minority residents in that area, as well as the poverty level that exists in that area. So that is why it is getting this attention, and I just wanted to note, I appreciate the fact, being part of this group, that there is a sense of urgency that we need to get to a reconfigured project. So I share your views, the importance, and I will keep you posted as that interagency group continues to work on that reconfigured project. Senator Hyde-Smith. Please do so. And General Spellmon, give me your knowledge of civil engineering. Please share your thoughts on how practical, if even possible, it would be to provide meaningful flood protection in the Yazoo Backwater Area without a pumping station? How would that be possible? General Spellmon. So Senator, as you know this pump station was part of the project since it was initially authorized in the 1941 Flood Control Act. We have looked at 34 options to how to evacuate water from that basin, and our recommendation--we are certainly open to any other ideas that may be out there, but we are confident in our science, we are confident in our engineering that the pump station can be operated in a manner that protects these communities that you mentioned, but also protects the 38,000 acres of wetland that are in that area. So we are confident of that. The other 34 options, we looked at everything, from looking at rain levees around every home, we just could not economically justify that, we have looked at elevating homes, we have looked at buyouts, we looked at elevating roads, and again not all of that--after we got through that analysis was consistent with our longstanding environmental operating principles. And some of it, frankly, we just could not get to economic justification. We stand by our recommendation but again we are open to any other ideas that may be out there. Senator Hyde-Smith. I appreciate your answer very much, both of you. And I know I am over time. Thank you. Senator Feinstein. Thank you. Senator Shaheen. Senator Shaheen. Thank you Madam Chair, and thank you to each of our panelists for the work that you do, and for being here today. I want to especially thank the Army Corps. In the last 6 years or so we have had two of our harbors dredged in New Hampshire, and right now the turning basin in the Piscataquis River is being dredged, and for a State with only 18 miles of coastline that is pretty good. And I really appreciate that effort. But because of the challenges we had trying to get in the queue to get those projects done, I recognized just how challenging the funding is for the work that you are doing, and was very pleased to see that the Army Corps received $9 billion from the Bipartisan Infrastructure Law, and of that the Corps has already announced $4 million in projects in New Hampshire for 2022 and 2023, fiscal years 2022 and 2023, which has been really important. But it raises a couple of questions that I hear from people about how project selection is doing? How are those projects determined? And so can you speak to the type of projects that you are looking at, as you are looking at this funding? General Spellmon. Yes ma'am, I will start. When I formulate my recommendations when I take them to the Secretary, I look at five criteria. To the top of that list is always life safety. So for example, a dam safety project that we know that has a population at risk downstream, those always go to the top of the list. Second priority, I have legal mandates across the country, some of that, Endangered Species Act, for example. Some of our projects have a national security component to them. I would use the example of the Soo Lock and the steel industry; we have made that argument before. And then finally-- I am sorry--number four is economic and environmental returns, I think there is a narrative, an incorrect narrative that the Corps only looks at benefit-to-cost ratios, that is not the case that is part of the justification. And then finally, and maybe most importantly, we want to finish what we start. If we have a project that is under construction, we never want to demobilize a contractor because of lack of funding. We want to make sure we can keep our contractors at work and finish work that we have initiated. Senator Shaheen. Thank you. I certainly share that, and I think that is really helpful to know. One of the things both you and Mr. Palumbo talked about in your opening testimony was the importance of science and research and development in determining how to respond to particular areas. And I was really dismayed to see that the President's budget reduces the Coastal Inlets Research Program from over $12 million in fiscal year 2022 to only $100,000. And I wonder if you could speak to why that is, and how can we do what we need to do if we are not able to have the research to allow us to address climate change, and the other critical projects we have. General Spellmon. Senator I know, I know the Secretary shares the same. We are absolutely committed to elevating our investment in research and development. And I think folks like me have to do a better job of communicating the importance of research and development. Today, in the Civil Works Program we invest about 0.02 of 1 percent of our overall program into R&D, where folks like Apple are investing 4.5 percent, or my counterparts in the Netherlands, the Rijkswaterstaat, are investing 4 percent. In fact, many of my senior leaders are down in Vicksburg, Mississippi, this week going through our top ten research and development priorities, and we are framing up the argument, and what we would like to include in the 2024 budget, for these top ten initiatives in the Civil Works Program. So we want to get more aggressive on that front. Senator Shaheen. Good, I really appreciate that. Mr. Connor. Senator, can I? Senator Shaheen. Yes, please. Mr. Connor. Can I just add, real quick, that General Spellmon will have a very strong partner in this effort. We are completely in sync with the importance of R&D, and how we want to put it out in the 2024 budget. Senator Shaheen. That is great. And, you know, listening to everybody raise the concerns about the projects that we have in our home States, and the challenges that we face with climate change, it seems to me that as we did in the '20s, and '30s, and '40s, and we looked at projects like the Tennessee Valley Authority, the effort to electrify the country, and all of the projects the Army Corps was involved in, in doing that. But this may be another time when we need to really relook at the kind of regulations that you are talking about with respect to your Yazoo River Project, the kind of things that were done with respect to the project in New Orleans, where we know we have got all this water draining in, we have got a drought in the West, and yet this water is flowing into the Gulf and we are not able to divert it to places that we need. It seems to me that we are in a position where we need to totally reexamine some of the assumptions that we have made for the last three or four decades, and think about how we better position ourselves to address the challenges of the 21st century. And I think that requires the kind of overhaul you are talking about, General, as you think about research, what else do we need to do in terms of regulation, and other areas to address the challenges that we face? Thank you, Madam Chair. Senator Feinstein. Thank you, Senators. Senator Murkowski. Senator Murkowski. Thank you, Madam Chairman. And Senator Shaheen know that I agree with what you have just concluded there. In many parts of Alaska, particularly on our coast, we are seeing levels of erosion that are threatening communities. Those communities don't have a lot of alternatives, there is no road out, and they are kind of very, very isolated. So we have got a list of those threatened communities, communities that we know need to be relocated, we are in the process of relocating one out of dozens, and yet we know that every year there are more communities that are further threatened. And now it is not just looking at the coastal communities, it is the river communities where we are seeing river erosion at pretty remarkable rates there. So know that I would join you in that. Secretary Connor, thank you for working with us. General Spellmon, thank you as well for all that the Corps has done in trying to address many of the backlogged projects that we have seen in my State. I think we made some good progress with the Infrastructure Bill. I had a chance yesterday to meet with Colonel Delarosa to talk about the Alaska-specific projects. I can tell you right now there is an urgency from the communities, whether it be the community of Nome, up in the Interior, the Moose Creek Project, specifically the lower point. That is truly a safety issue for that community. And so they are wondering how quickly they can expect to see the funding move out. We got a little bit of a top line on that yesterday, but I guess what I would like to hear you say this morning is that there is a level of priority with these projects, again that have been on the list for a long, long time and we are finally starting to see going? Secretary Connor. Mr. Connor. The Corps very effectively got the guidance document for the Bipartisan Infrastructure Law, as well as the Disaster Supplemental to my office this week, so we will process and get it out by the end of next week. Senator Murkowski. Okay, good. Well, we will be working closely with you just so we can give good guidance to people on the ground in terms of what to expect. I want to ask you about the Port of Alaska, and Anchorage, as you know, a pretty significant port there, handles one-half of all Alaska inbound fuel and freight, it is distributed Statewide, consumed by 90 percent of Alaska's population, everything funnels in to this port. It supports more than 14 billion in commercial activity in our State, it is the main inbound, containerized freight and fuel distribution center. It additionally is the strategic seaport that supports DoD (Department of Defense) missions in Alaska, the Pacific and the Arctic. This port is absolutely critical to Alaska, to the community--to the country really, and the problem that we are facing is that it is in severe disrepair. So I know that this has been brought to your attention, but I have had no fewer than a half dozen meetings in the past couple weeks just on this particular project. So I would ask for a commitment to work with us to get the New START funding in, in 2023 if we can, but just need to know that this is on your radar here. Mr. Connor. Senator, it is definitely on my radar. I know as part of the modernization effort there is a range of permitting as well as some infrastructure needs. So I think, quite frankly, General Spellmon may have more knowledge, but I am a little unclear about the infrastructure investments needed to be made. So we need to get up to speed with respect to that, and the authorizations presently available, but absolutely get the need for coordinated permitting to take those actions, and move them forward as quickly as possible. General? General Spellmon. Senator, I have been to the port, I would certainly acknowledge all of your comments. We recognize its importance, and we are committed to do our regulatory work, or other work, and we will continue to work to make our best technical argument for the New START Authority. Senator Murkowski. Good. Well, we know again that this is not just a local priority, it is truly a State-wide priority. Last question; and this relates to some of our small harbors. And I appreciate what you have said in terms of your analysis, and the review, General, in terms of how you determine priorities for projects. But I have always been concerned that our smaller ports, our smaller harbors, they are get kind of overlooked. And we have had this conversation in the past, that is why we have our small and subsistence harbors category, But, you know, when you think about cost benefit any economic analysis is going to show that large ports are favored, because they have big, economic impacts, and so everything that we can do to find a way to help the small communities for these coastal communities, that port, that harbor, that is their economy that will allow for them to really exist. So I am looking at Craig, which I was really disappointed didn't make the list, and I would like to understand why, but also Dutch Harbor. For communities like Craig, communities like Dutch, if the barge doesn't make it in with the groceries, it is not like you can just drive somewhere else to go get the materials that you need. These communities need their harbors, there is no other option. So I guess I would like a quick understanding as to how and why communities like Craig and Dutch Harbor didn't make that list and whether--what we need to do to ensure that, for instance, Craig gets the $30 million for preconstruction engineering and design. How do we help these communities? General Spellmon. So Senator, I will start. First, I would tell you that I am responsible across the Nation for maintaining 577 Federal navigation channels, and so we do, we recognize there are many of those channels that don't get touched on a routine basis. I acknowledge your comments about Craig Harbor, and Dutch Harbor. I hope I am wrong. The Jobs Act, we are seeing nearly a billion-dollar investment in Alaska, and we are working down the priorities we think that you have shared with us. And you mentioned it is Nome, it is Barrow, it is Kenai, it is Moose Creek, and it is Slough Creek. Again, I hope I am wrong. I think we are really going to stress our contracting partners in the State of Alaska. And when I took these recommendations to the Secretary I have got 963 construction projects underway today in the Civil Works Program, I did not want to put us in a position where we were going to have money sitting in a bank where we couldn't get after the work. So as I made these recommendations we wanted to get--give the Secretary projects that we knew we could get after right away. We are not forgetting about the projects that you mentioned Craig and Dutch, we are going to get after these, it might just be in next year's appropriation that we can make that argument. Senator Murkowski. I am hearing next year's appropriations. Okay. Mr. Connor. Can I just quickly add? Senator Murkowski. Okay, Secretary Connor. Mr. Connor. A lot of discussion about Craig, and Dutch Harbor as part of the allocation process. And I think we have got an issue that we need to discuss with you with respect to the $250 million limit that was in the IIJA for small ports. And of course we allocated that to Port of Nome, which is also a very important port. So we get to work through that issue, but they definitely are on the radar screen. And I wanted to just get quickly because I absolutely agree with your assessment that we need to look at a wider range of benefits. And my predecessor, Mr. James, issued a comprehensive benefits memo. I want to build upon that. I think that was a very good piece of work, we want to give that guidance to the Corps to look at a wider array of benefits, including regional benefits which are very important. And then we want to institutionalize not just looking at those benefits, but being able to make decisions based on that wider view of the benefits. And we have got a directive to move forward to the rule making, on principle, requirements, and guidelines, our agency specific procedures that will allow us to make decisions on a broader basis that is a high priority as part of our agenda. Senator Murkowski. Great. That is really good to hear. I appreciate that because I think we recognize. Again, it is not just the number of individuals served, but truly a much wider range of benefits that can accrue to your region. Thank you, Madam Chairwoman. I apologize for going over my time. Senator Feinstein. And thank, you Senator. I have a bit of a beef, and so I am going to raise it now. Assistant Secretary Connor, over the last 2 years we have provided $82 million for the Army Corps WIFIA (Water Infrastructure Finance and Innovation Act) Program, to provide low-interest loans for local dam safety projects. The implementation for this program has been stalled. We have been clear, and I think to ignore congressional intent in this manner, regarding how taxpayer dollars shall be spent is really not acceptable. My State, California, has 89 dams which are in less than satisfactory condition, and would cause loss of life or significant economic damage if they were to fail. Damn safety has been a priority of mine as an appropriator since I have come to the Senate, and it is critical to millions of Americans who live near these dams. When will you finalize--apparently we have 14 million a- year-and-a-half-ago there. So the question is, when will you finalize the program rules and get out these funds so we can start repairing dangerously deficient, non-Federal dams? Mr. Connor. Madam Chair, thank you for your leadership in this area. It is a legitimate beef that you have, absolutely. So we have a proposed rulemaking that we are in the final throes. I expect that within the next month or so, hopefully, no more than 6 weeks, we will be in the Federal Register with that proposed rulemaking, which is the first step to setting up the program. The WIFIA Program, and enlisting the ability for private dam owners to repair and modify their dams, it is part of the resilience agenda that we need in this era of climate change. So it is another important tool we are moving forward. And lastly, I would just note, we have lit a fire under ourselves, because WIFIA is now in the President's budget for 2023, so we acknowledge the importance of the program, we have got to move forward and get it stood up to address all the reasons you just mentioned. Senator Feinstein. So I want to understand this. I have your word here that it is going to move? Mr. Connor. You have my word I am going to do everything possible to move it through, and get it in the Federal Register in the next one to 2 months. Senator Feinstein. Well, I accept that with thanks. So thank you. Senator Kennedy, you are next. Senator Kennedy. Madam Chair I just wanted to point out that Senator Hoeven just called me, he is on his way. I would like, you know, if we could indulge him for a few minutes because I know John has some questions he wants to ask. I wanted to ask one of my colleagues a question. Senator Hyde- Smith, I listened with interest about your situation in Mississippi. And I appreciate it. The Corps wants to go forward, and the EPA won't? Senator Hyde-Smith. Pretty much correct, that that is what has happened. The EPA is one that put the brakes on, and we had signed the MOUs, we had done everything, and the science was very, very strong. And the amazing thing is the two different sets of scientists with EPA, and with the Corps have not sat down. And I think that is critical. Am I correct, Daniel? They have not sat down together, and I don't know why that has not happened. But I really, really would like to see that happen. And thank you for the discussion because, literally, a lady who was pregnant died because of this flooding. And, you know, we talk about wetlands, we talk about everything else, 6 months these houses were under water--this property was under water, 6 months. And you know, I talked to so many people who were living in hotel rooms, who were living with relatives in the back of businesses, that people allowed them to live, these people cannot afford hotel rooms, and other areas like that. Senator Kennedy. Well, can I ask? Why haven't the two sets of scientists talked? Or they have these things called telephones at a minimum? General Spellmon. Sir, our team from Vicksburg and the scientists have sat down and compared data. What may be happening is---- Senator Hyde-Smith. With EPA and with the Corps, the two sets. General Spellmon. Yes. Yes, ma'am. What may be happening is new staff that have come in within the past several months of the past year, but we will pack up this afternoon to go meet the---- Senator Feinstein. Could you speak directly in the mic? Sorry to interrupt you. General Spellmon. Yes, ma'am. So my parting comment is, we will pack up this afternoon and meet with any scientist from any Federal agency or State agency that would like to compare notes on our data. Senator Hyde-Smith. Yes. The Corps is very willing, EPA is the one that we can't get--to seem to get as interested as---- Mr. Connor. Senator, can I just add very quickly? Senator Kennedy. Yes. But let me put a finer point on. Here is what I am missing. The Corps spent a lot of time and money doing this project, on this project, did its studies, decided there is no damage to wetlands. The leadership of the EPA changed; one of the leadership's priorities is environmental justice. And the EPA is saying, in the name of environmental justice we are going to hold up on this project, even though this project will help people who happen to be 70 percent African- Americans. Am I missing something here? Mr. Connor. I would just add, I don't speak for EPA, but I have spoken to Administrator Regan, and Assistant Administrator Fox. They are strongly committed to getting their team with our team as part of this interagency group, I think the administrator was particularly moved by his visit down to the Yazoo Basin. So frustrating, yes, but we are going to get together---- Senator Kennedy. Sir, when is your administrator going to make a decision? Mr. Connor. Well, we have got to get the teams together, and not just have a meet and explain the differences, we as leaders have to reconcile those differences so we can make a decision about the project that can move forward. Senator Kennedy. Well, how about next week? Mr. Connor. We are getting together our, interagency group tomorrow at the leadership level, and having yet another meeting. And the goal is to then focus the issues so that we can get our teams to get into those details so we can---- Senator Kennedy. Right. Again, I am just trying to get a timeline. The Corps spent a lot of time and money, and says, we are ready to go. It has passed all the studies, the scientists say go, you all have it--because of the change in leadership, have said, no, we are holding up. And we have got to make a decision. I am just asking a simple question. When are you going to make a decision? Mr. Connor. As soon as we can. Senator Kennedy. Yes, when is that? Mr. Connor. That is hopeful we are going to be working on this all year. Senator Kennedy. It is going to take a year? Mr. Connor. Well, it is going to take some time to reconcile the differences between the agencies. Senator Kennedy. Why? Mr. Connor. Because there are disagreements about the science, we as leaders can convene folks, we can focus the issues, but we have got to have that dialogue, and that is going to take a little bit of a time, Senator Kennedy. I don't understand why. I don't get it. I don't understand why you can't put the two scientists together, lock them in a room, give them some coffee, give them a few honey buns, and say, okay, over the next 8 hours, work this out. I don't get it. That is the way the real world works. Why can't you do that? Mr. Connor. Well, we are going to do that. Senator Kennedy. When? Mr. Connor. Whether the 8 hours is what it is going to take. Senator Kennedy. Or maybe it will take a couple of days. Mr. Connor. Or whether it is going to take 24, or 48 of intense dialogue, I don't know the answer to the question. I just know that we are committed to forcing that process to happen and coming up with the project. Senator Kennedy. Do you understand why people get frustrated about that? Mr. Connor. Absolutely. Senator Kennedy. Okay. I can't even--I mean, I am just asking for a decision. I am not telling you what decision to make. I just don't see why you can't do it within 6 weeks. Mr. Connor. I understand the frustration. I am part of a committed team that is going to get to a decision, Senator. Senator Kennedy. Okay. Thank Okay. Thanks again, for all your good work, gentlemen, and ladies. Senator Hyde-Smith. Six weeks would be great. Senator Feinstein. Senator Hyde-Smith, any questions? Senator Hyde-Smith. Sure. Senator Kennedy. I will let you go. Senator Hyde-Smith. Hey, you are my honey bun. Senator Kennedy. Okay. Good. I like that. Senator Hyde-Smith. Shifting gears from flood control to innovation, Congress is asking the Corps to do a lot of things with the record high funding the Corps has received in recent years. I want to make sure you have the tools you will need to be successful. Part of what you will need is innovation, and to be able to access the innovation taking place in the private sector, sometimes the rigid structure of the Federal acquisition process doesn't make that very easy for you. To address that very problem Congress gave NASA (National Aeronautics and Space Administration)-- I am sorry--NASA, DoD, and a number of other agencies, Other Transaction Authority, OTA, has been used to great effects by the Department of Defense, including the Corps of Engineers to access innovation--innovative solutions, and cutting-edge technologies from entities that aren't traditional Federal contractors. Unfortunately the Department of Defense reads the law as providing OTA only for the Corps' Military Mission, and not the Civil Works Mission. Given all that we are asking you to do, you need these important tools would be what most people would conclude. But Secretary Connor, and General Spellmon, don't you think having the ability to use Other Transaction Authority in your Civil Works Mission would be a useful tool for you to have? General Spellmon. Senator we do. As you suggested we have used this on several projects in our Military Construction Program, I would argue, to great effect. And we also think there is value in bringing this over to the Civil Works Program. I have just not had the opportunity yet to sit down with Mr. Connor to talk about this particular tool, but you have our commitment, we will have that conversation, ma'am. Senator Hyde-Smith. And as Congress works on the next Water Resources Development Act, will you work with me to help put that tool in your hands? General Spellmon. Yes, Senator. Senator Hyde-Smith. Thank you very much. Senator Feinstein. I would like to bring up a subject that is of real concern to me. The Bureau and several States have already severely reduced water allocations in many cases to zero. And I am a westerner, and I am from a big State, it is 40 million people, it is a huge commercial State, it is a big AG State, but there is no way the West can survive extreme droughts, plus climate change, without more investment in infrastructure to move water from the wet years to the dry ones. WIIN (Water Infrastructure Improvements for the Nation) Act funding, I think, and I wrote the bill, is key to developing long-term solutions to these challenges, and last year we provided an additional $155 million to WIIN Act funding for water storage, desal, and water recycling and reuse projects. So I have continued to work with my colleagues to appropriate funding for good projects, but the President's budget recommends no funding for any of these projects. And I am curious as to why? Mr. Palumbo. Senator, thank you very much for that question. The way the Bureau of Reclamation is looking at the WIIN Act projects, we were able to make a lot of progress on getting projects determined feasible, getting projects started with funding, and we are now utilizing the BIL funding, the Bipartisan Infrastructure Law funding in large storage to put towards some of those WIIN projects. We are going to be making an announcement later this fiscal year, in 2022, using that BIL funding to advance those WIIN-related projects. And we also have queued up money for 2023 out of the BIL funding for those WIIN Act projects. So, we absolutely thank the subcommittee on supporting those projects, getting them moving, and we are going to keep them moving, because the WIIN Act authority expired, but we are going to keep them moving with BIL funding. Senator Feinstein. Well, thank you very much for that. We will follow closely and see if it happens. Please know that this is a big problem out West, and one of the things that I have seen is how big this country is when you fly back and forth over it. And I am really concerned. So this is a top priority for me, and I believe for California. So I thank you for that answer, and my expectation will be that the administration will respond. So thank you very much. Mr. Palumbo. Absolutely. Senator Kennedy. Can I say one more thing, Madam Chair? Senator Feinstein. Yes, okay. Senator Kennedy. First, I am going to just repeat what I have said before, what a delight it is to work with you Madam Chair, and your very able staff. I am going to be calling you gentlemen, I need to get updates on three projects that I know you are working on, that are really important in my State, and have become more important recently. The Calcasieu River and Pass, you know, we need some dredging done there, it is a major LNG (Liquefied natural gas) export hub, and we need to get it to what 42 feet deep and about 800 feet wide, our Atchafalaya--I know you know the projects I am talking about--Atchafalaya river dredging, we have got to maintain that the authorized depth of 20 feet deep, and a bottom width of 400 feet. And finally, last but certainly not least, I don't mention these in any particular order, our New Orleans to Venice Hurricane Protection Project. So I will just be calling you, and to try to get an update. And again, I wanted to thank you for giving so much to our country. Senator Feinstein. That was nice, very nice, Senator. Thank you very much. Senator Kennedy. Thank you. You are welcome, Senator. ADDITIONAL COMMITTEE QUESTIONS [The following questions were submitted to the Department, but the questions were not answered by press time.] Questions Submitted to Mr. Michael Connor Questions Submitted by Senator Dianne Feinstein Recreation Program Question. The Corps was the second leading provider of recreation on public lands and waters in 2021, yet the President's budget requested a significant cut to the Corps recreation budget. How can the Corps continue to support increasing demand for recreation and sustain the significant economic footprint of Corps managed lakes in local communities across the country if they don't have enough funding for basic operations and maintenance? Can you please explain the rationale for this funding reduction at a time when the American public's interest in outdoor recreation is surging? ______ Questions Submitted by Senator John Hoeven Question. I have supported the development of a WIFIA program within the Corps of Engineers that would match the WIFIA program established at the Environmental Protection Agency. The Red River Valley Flood Protection project received an EPA WIFIA loan, which provides tremendous cost savings for the local share of that large public-private partnership or P3 project. Last year, the Corps WIFIA program supported loans for projects at non-Federal dams. Would you support the expansion of the Corps WIFIA program to include the construction of levees in cases where those levees would be entirely constructed, owned, and operated by a non-Federal entity? Question. The Dakota Access Pipeline (DAPL) is vital energy infrastructure, transporting well over half a million barrels of oil per day from North Dakota to energy consumers throughout the Midwest. DAPL has additional delivery capacity, up to 1.1 million barrels per day, which sits unused while the EIS process remains delayed, a process which has now gone on for over 2 years. Families are paying record high gasoline prices, and consumers need long-term certainty. Will you promptly complete and release the draft EIS? Question. You said previously that your office would not reopen standalone jurisdictional determinations (JDs) under the Navigable Waters Protection Rule (NWPR). However, it is our understanding that Army Corps offices around the country are calling into question the validity of negative JDs issued under the NWPR, despite such JDs being valid for 5 years. Have you given a policy direction from headquarters questioning the validity of JDs completed under the NWPR? If permittees cannot rely on a lawful negative JD letter issued by the Corps, what are they supposed to rely on? Will you confirm that the Army Corps will not pursue enforcement actions against permitted entities complying with a lawful negative JD? ______ Questions Submitted by Senator Bill Hagerty Question. I was able to visit the Chickamauga Lock construction project in May 2021 and see first- hand the size, scope, and importance of this project to the region and our country. For fiscal year 22, the project did not require any funding thanks to the years of support and leadership of the Appropriations Subcommittee on Energy and Water Development. However, for this coming fiscal year, local leaders tell me they will need about $39 million to finish construction of the Chickamauga Lock projects. Assistant Secretary Connor, does the President's budget request any funding to finish the construction of Chickamauga Lock? If so, will that funding be sufficient to complete construction of this project? Assistant Secretary Connor, can you discuss the importance to the region and our nation's broader inland waterway system of completing this project on schedule? Assistant Secretary Connor, will you be able to discuss delays or contracting issues with the construction project? And can you provide me with a detailed timeline of the project's completion? Question. I was able to visit the Chickamauga Lock construction project in May 2021 and see first- hand the size, scope, and importance of this project to the region and our country. For fiscal year 22, the project did not require any funding thanks to the years of support and leadership of the Appropriations Subcommittee on Energy and Water Development. However, for this coming fiscal year, local leaders tell me they will need about $39 million to finish construction of the Chickamauga Lock projects. Assistant Secretary Connor, does the President's budget request any funding to finish the construction of Chickamauga Lock? If so, will that funding be sufficient to complete construction of this project? Assistant Secretary Connor, can you discuss the importance to the region and our nation's broader inland waterway system of completing this project on schedule? Assistant Secretary Connor, will you be able to discuss delays or contracting issues with the construction project? And can you provide me with a detailed timeline of the project's completion? Question. Outdoor recreation is a critical economic driver in my State of Tennessee and it is estimated that it generates nearly $700 billion in gross economic output in the U.S. Now more than ever, Americans are looking to get outdoors and spend time in our national parks and lakes. The U.S. Army Corps of Engineers plays an integral role in maintaining and ensuring our Nation's waterways are safe and navigable. To that effect, in fiscal year 2022, Congress provided $295 million for the Corps' recreation programs. However, industry tells me your fiscal year 2023 budget request only includes $240 million for these activities, which represents a $55 million reduction. Assistant Secretary Connor, at a time when the USACE is need of increased resources to manage a surge in outdoor recreation participation by millions of Americans in the wake of a pandemic, please explain the rationale for the Administration's proposal to cut this funding. Question. Constituents from construction materials producing industries tell me that the USACE and EPA are not acting to approve water permits that they rely on to supply materials to build infrastructure projects and communities. The current permit criteria should be based on longstanding practice, however, the recent spate of rulemaking has caused the USACE and EPA to slow walk permit approvals. These approvals are needed to deliver the infrastructure investments Americans need. Assistant Secretary Connor, how many 404B permits and JDs have been approved in the last 6 months and how many are outstanding in your backlog, applied for yet waiting approval? Assistant Secretary Connor, what action are you taking to ensure permits are being processed even as simultaneous rulemakings and judicial reviews by the SCOTUS move forward? Assistant Secretary Connor, further what is your plan to ensure material producers and other key industries can receive approvals in order to effectively supply building materials to markets that are suffering significantly from shortages and operational disruptions in their supply chain? ______ Questions Submitted to Lieutenant General Scott A. Spellmon Questions Submitted by Senator Jon Tester Question. I am pleased that the New York District of the Corps has undertaken several projects under the authority of section 542 of the Water Resources Development Act of 2000 (Public Law 106-541) and sections 3158, 3159, and 3160 of the Water Resources Development Act of 2007 (Public Law 110-114). Among these projects is phase 1 of a feasibility study of constructing an invasive species barrier in the Champlain canal. The importance of this work has been driven home recently by evidence that the round goby, a highly invasive fish, is now making its way to the canal which will allow it to access Lake Champlain, where it is expected to have devastating ecological impacts. Progress on the Corps feasibility work has been painfully slow, however, due in large part to the need, under section 542, for the Corps to work with a local sponsor, requiring cost share contributions, agreements and coordination that take months, even years, to get in place. This feasibility work, as well as design and ultimately construction of this much needed measure is specifically authorized section 5146 of WRDA 2007 as a 100 percent Federal project. Working under this authority the Corps could accelerate progress and provide a solution to invasive species transfer at a much earlier date. When will the Corps allocate the needed funds within its work plan and undertake the Champlain Canal invasive species barrier project under the authority of section 5146 of WRDA 2007 and thereby accelerate this important and highly time sensitive project? ______ Questions Submitted by Senator Mitch McConnell Question. Kentucky Lock and Dam is a gateway to more than 700 miles of navigable waters, with $10 billion of products passing through it annually. Its current average delay is one of the longest delay times of any lock in the inland waterway system. Congress authorized the Kentucky Lock and Dam addition project in 1996 and has appropriated over $1 billion since then. Yet, this project is still ongoing and, as we recently learned, is facing even more extension, pushing the estimated completion timeline from 2025 to as late as 2030. What are the reasons for such a major delay? Based on the latest official assessment in 2020 which stated a 2025 completion, why has the project doubled in remaining length to 2030? Construction of the original lock began in 1935 and took just 6 years to complete. With vast advancements in modern technology, why has this addition project taken over 26 years and counting? What are concrete, hard and fast ways to accelerate the timeline without compromising the integrity of the project? What is an updated timeline for completion, and do you expect additional funding needs? ______ Questions Submitted by Senator John Hoeven Question. I recently wrote to you about how drought conditions in the upper Missouri River basin create challenges around Lake Sakakawea. Persistently low water levels create problems for lake access, on top of a backlog of deferred maintenance at various recreation areas around the lake. We have a history of State and local officials working with the Corps to meet these challenges during drought conditions and I hope we can do so again. Will you support basic investments in things like boat ramps and Corps-owned infrastructure at Lake Sakakawea as part of a coordinated effort to preserve lake access during drought conditions in the upper Missouri basin? Question. Last fall, the Corps of Engineers announced that it would conduct a special release of water from Fort Peck on the Missouri River to support the spawning of the pallid sturgeon. The Corps eventually cancelled this plan due to persistent drought conditions that made it unworkable, but it raised concerns that conducting this release would result in problems downstream. I have heard from many farmers in northwest North Dakota who have concerns about negative impacts on cropland and processing facilities. It is also my understanding that a surge of water could hurt the operation of several municipal water intakes. Can you ensure that the Corps of Engineers will not conduct such a pulse in the future if such a pulse would harm local interests along the Missouri River? ______ Questions Submitted by Senator Bill Hagerty Question. I recently became aware of a permit application under consideration by the Corps of Engineers involving expansion of an existing dock structure located in Port Allen, Louisiana. My constituents and industry leaders have voice concerns that his project could have long-lasting negative consequences for upstream users. Over the last several weeks I have had conversations with the various USACE Commanders and U.S. Coast Guard leadership. The permit application, if approved would permit Panamax-sized vessels at this already dangerously constrained point of the Mississippi River and would create a hazard to navigation that would limit full utilization of the Mississippi and could obstruct free navigation on that river. The U.S. Coast Guard, which is responsible for ensuring the Mississippi River is safe an navigable, has evaluated this location on prior occasions and found it unfeasible because of the increased probability of major marine incidents. As I understand it, the final decision whether to approve or deny the permit will be made by the New Orleans District Commander. Lt. Col. Spellmon, will the effects on the entire Mississippi River system be considered as part of this decision? Lt. Col. Spellmon, since this decision will have major impacts across the entire length of the Mississippi River system, would it be more appropriate for this decision to come from Division or Headquarter leadership? If not, could you explain the rational? Question. I recently became aware of a permit application under consideration by the Corps of Engineers involving expansion of an existing dock structure located in Port Allen, Louisiana. My constituents and industry leaders have voice concerns that his project could have long-lasting negative consequences for upstream users. Over the last several weeks I have had conversations with the various USACE Commanders and U.S. Coast Guard leadership. The permit application, if approved would permit Panamax-sized vessels at this already dangerously constrained point of the Mississippi River and would create a hazard to navigation that would limit full utilization of the Mississippi and could obstruct free navigation on that river. The U.S. Coast Guard, which is responsible for ensuring the Mississippi River is safe an navigable, has evaluated this location on prior occasions and found it unfeasible because of the increased probability of major marine incidents. As I understand it, the final decision whether to approve or deny the permit will be made by the New Orleans District Commander. Lt. Col. Spellmon, will the effects on the entire Mississippi River system be considered as part of this decision? Lt. Col. Spellmon, since this decision will have major impacts across the entire length of the Mississippi River system, would it be more appropriate for this decision to come from Division or Headquarter leadership? If not, could you explain the rational? ______ Questions Submitted to Mr. David Palumbo Questions Submitted by Senator Dianne Feinstein Klamath Basin Drought Response Agency Question. The Klamath Basin has suffered back to back drought years which is causing considerable hardship to farmers and also harmed endangered species and migratory birds. The fiscal year 2023 budget request recommends $21 million for endangered species. How do you plan to use these funds to meet the needs of fish, tribes and farmers in the Basin? Last year I worked to provide an additional $9.9 million under the Disaster Response Program for the Klamath Drought Response Agency to help farmers impacted by the significant lack of irrigation water delivered from the Project. We hear from Klamath water users that there is a shortfall in the $27 million in funding needed for the Klamath drought response agency. What is Reclamation doing to address this shortfall? The Department has held a series of meetings with the stakeholders in the Basin. Are there more meetings scheduled in the future? Will you provide more information on these engagements, specifically what are your long term goals for this effort? ______ Questions Submitted by Senator Jon Tester Question. The Dry-Redwater Regional Water Authority System in Montana has been in progress for nearly two decades, and while they've made substantial progress, they still need Federal funding to build out the project. In 2020, we passed, with bipartisan support, legislation to authorize Bureau of Reclamation to conduct a $5 million feasibility study for the project, to clear the way for a formal authorization. How is Reclamation planning to fund that study, and what timeline can we expect to see for completing it? ______ Questions Submitted by Senator John Hoeven Question. The Garrison Diversion Unit was initially designed and intended to serve irrigation purposes. Since the project was first authorized in 1965, the focus and mission of the project has changed multiple times, most recently under the Dakota Water Resources Act of 2000. Garrison Diversion and the Bureau of Reclamation are currently conducting a basis of negotiation for the cost of water to make good use of the McClusky Canal for the Eastern North Dakota Alternate Water Supply Project (ENDAWS), which will help secure an affordable and reliable water supply for half of North Dakota's population. As part of this process, Reclamation is determining repayment costs for use of Federal facilities that currently remain under-utilized. Do you think Reclamation should be able to share actual proof of costs prior to claiming they are legitimate costs? Will you work with my office and our state to approve a cost of water for ENDAWS that is fair to water users, for what would otherwise be a stranded Federal asset providing no benefit U.S. taxpayers? ______ SUBCOMMITTEE RECESS Senator Feinstein. If there is no further business before this committee, we will stand adjourned. [Whereupon, at 11:21 a.m., Wednesday, April 6, the subcommittee was recessed, to reconvene subject to the call of the Chair.]