Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- [H.A.S.C. No. 117-42] FISCAL YEAR 2022 BUDGET REQUEST FOR NUCLEAR FORCES AND ATOMIC ENERGY DEFENSE ACTIVITIES [House Hearing, 117 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 117-42] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2022 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED SEVENTEENTH CONGRESS FIRST SESSION __________ SUBCOMMITTEE ON STRATEGIC FORCES HEARING ON FISCAL YEAR 2022 BUDGET REQUEST FOR NUCLEAR FORCES AND ATOMIC ENERGY DEFENSE ACTIVITIES __________ HEARING HELD JUNE 10, 2021 [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] __________ U.S. GOVERNMENT PUBLISHING OFFICE 46-865 WASHINGTON : 2022 ----------------------------------------------------------------------------------- SUBCOMMITTEE ON STRATEGIC FORCES JIM COOPER, Tennessee, Chairman JAMES R. LANGEVIN, Rhode Island MICHAEL R. TURNER, Ohio JOHN GARAMENDI, California JOE WILSON, South Carolina SETH MOULTON, Massachusetts DOUG LAMBORN, Colorado SALUD O. CARBAJAL, California, Vice MO BROOKS, Alabama Chair ELISE M. STEFANIK, New York RO KHANNA, California SCOTT DesJARLAIS, Tennessee JOSEPH D. MORELLE, New York LIZ CHENEY, Wyoming JIMMY PANETTA, California MICHAEL WALTZ, Florida STEVEN HORSFORD, Nevada Grant Schneider, Professional Staff Member Ryan Tully, Professional Staff Member Zach Taylor, Clerk C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Cooper, Hon. Jim, a Representative from Tennessee, Chairman, Subcommittee on Strategic Forces............................... 1 Turner, Hon. Michael R., a Representative from Ohio, Ranking Member, Subcommittee on Strategic Forces....................... 1 WITNESSES Dalton, Melissa, Acting Secretary of Defense for Strategy, Plans, and Capabilities, U.S. Department of Defense................... 2 Dawkins, Lt Gen James C., Jr., USAF, Deputy Chief of Staff for Strategic Deterrence and Nuclear Integration, U.S. Air Force... 7 Verdon, Charles P., Acting Administrator, National Nuclear Security Administration........................................ 4 Wolfe, VADM Johnny R., Jr., USN, Director, Strategic Systems Programs, U.S. Navy............................................ 6 APPENDIX Prepared Statements: Cooper, Hon. Jim............................................. 33 Dalton, Melissa.............................................. 36 Dawkins, Lt Gen James C., Jr................................. 70 Turner, Hon. Michael R....................................... 34 Verdon, Charles P............................................ 46 Wolfe, VADM Johnny R., Jr.................................... 57 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: [The information was not available at the time of printing.] Questions Submitted by Members Post Hearing: Ms. Cheney................................................... 90 Mr. Langevin................................................. 83 Mr. Moulton.................................................. 88 Ms. Stefanik................................................. 89 Mr. Turner................................................... 84 FISCAL YEAR 2022 BUDGET REQUEST FOR NUCLEAR FORCES AND ATOMIC ENERGY DEFENSE ACTIVITIES ---------- House of Representatives, Committee on Armed Services, Subcommittee on Strategic Forces, Washington, DC, Thursday, June 10, 2021. The subcommittee met, pursuant to call, at 11:03 a.m., via Webex, Hon. Jim Cooper (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. JIM COOPER, A REPRESENTATIVE FROM TENNESSEE, CHAIRMAN, SUBCOMMITTEE ON STRATEGIC FORCES Mr. Cooper. The hearing will come to order. I would like to begin by thanking our distinguished panel of witnesses for testifying today. We look forward to hearing from each of you. First, Ms. Melissa Dalton, the Acting Assistant Secretary of Defense for Strategy, Plans, and Capabilities; Dr. Charlie Verdon, the Acting NNSA [National Nuclear Security Administration] Administrator; Vice Admiral Johnny Wolfe, Director of U.S. Navy Strategic Systems Programs; and Lieutenant General James Dawkins, U.S. Air Force Deputy Chief of Staff for Strategic Deterrence and Nuclear Integration. In reading through your testimonies, we are reminded that the work of this subcommittee is probably the most important, technical, and consequential of any committee in the House. I would also like to point out the astonishing continuity over recent years in funding and support of the triad and nuclear programs. Seldom do you see this level of bipartisanship in modern-day Washington, but I am glad that it is occurring in our number one defense priority. I ask unanimous consent that the remainder of my opening statement will be inserted in the record and I turn over the opening statement to my colleague, Ranking Member Mr. Turner. [The prepared statement of Mr. Cooper can be found in the Appendix on page 33.] STATEMENT OF HON. MICHAEL R. TURNER, A REPRESENTATIVE FROM OHIO, RANKING MEMBER, SUBCOMMITTEE ON STRATEGIC FORCES Mr. Turner. Thank you, Mr. Chairman. I appreciate your holding this hearing and I appreciate your bipartisan commitment to these topics. I too will ask that my statement be entered into the record, and I am going to summarize a few of the points. But, one, I know, obviously, we are under a great deal of pressure having gotten the budget so late, so I am very concerned about the effects of a CR [continuing resolution] and I am looking for the witnesses to discuss what that might be. Certainly, in the nuclear enterprise and the nuclear modernization, the effects of a CR are felt much more strongly. I also want to point out that Congress has the ability to change this, not just by getting our work done but because the fiscal year is statutory not constitutional. And we should probably change this. It could pick up at least 3 months a year for the Department of Defense if we made the fiscal year the calendar year. I am disappointed in the top line in the President's budget. It does not keep up with inflation as we look to those of our adversaries--China, Russia, North Korea, and Iran--that are modernizing. I think that there is a lot that we need to be focusing on and we are going to certainly be in a resources crunch. There has been a lot of bipartisan work as you have said, Mr. Chairman, on all the issues that fall under our committee. I am very concerned and I think we are all shocked to have heard the news of the Acting Secretary of the Navy appearing to take action to zero out the sea-launched cruise missile. This is something that is incredibly important. We just saw in the news also that the Secretary of Defense and the Chief of Staff, apparently, were not informed. We know that the Nuclear Posture Review isn't underway, and yet we have the first steps towards actions that would be unilateral disarmament. And, of course, even for those who wish to reduce nuclear forces, the best way to accomplish that is through arms control and you can't achieve arms control if you unilaterally give away assets that could be both beneficial to deterrence and/or beneficial to negotiations. I am looking forward to our witnesses today to discuss their thoughts on that breaking news. With that, Mr. Chairman, I yield back and the rest of my statement will be entered into the record. [The prepared statement of Mr. Turner can be found in the Appendix on page 34.] Mr. Cooper. I thank the gentleman. The first witness, Ms. Dalton. STATEMENT OF MELISSA DALTON, ACTING SECRETARY OF DEFENSE FOR STRATEGY, PLANS, AND CAPABILITIES, U.S. DEPARTMENT OF DEFENSE Ms. Dalton. Chairman Cooper, Ranking Member Turner, and distinguished members of the subcommittee, thank you for the opportunity to testify today. May I request permission to submit my written statement for the record and provide brief opening remarks? Mr. Cooper. Without objection, so ordered. Ms. Dalton. Thank you. As I described to the subcommittee in April, the United States today faces a complex global threat environment characterized by increasingly sophisticated and militarily capable strategic competitors, destabilizing regional dynamics, and accelerating technological changes that pose significant dangers. China is rapidly becoming more capable and assertive, and concerns regarding its nuclear modernization and expansion are increasing. Russia's comprehensive modernization of its nuclear capabilities, over 80 percent complete, includes the addition of new dual-capable systems that threaten the United States and its allies and partners. We are confronted with multifaceted deterrence challenges across domains from both competitors, which add increased escalation risks, all making deterrence more challenging. And strategic risks emanating from both North Korea and Iran add significant complications to the strategic threat picture. For these reasons, nuclear deterrence remains the Department's highest priority mission, but more is needed to confront these growing, multifaceted threats. That is why Secretary Austin has directed a National Defense Strategy focusing on integrated deterrence, an effort to address threats and opportunities across conventional, cyber, space, hybrid, information, and nuclear domains. With regard to nuclear deterrence, our nuclear forces remain essential to ensure no adversary believes it can ever employ nuclear weapons for any reason, under any circumstances, against the United States or our allies and partners without risking devastating consequences. That is why the nuclear triad remains the bedrock of our strategic deterrence, but we must modernize our aging capabilities to ensure a credible deterrent for the future. The President's fiscal year 2022 budget submission supports our efforts to modernize the nuclear triad. It funds all critical DOD [Department of Defense] nuclear modernization requirements, helping to ensure that modern replacements will be available before aging systems reach the end of their extended service lives. The fiscal year 2022 budget request for nuclear forces is $27.7 billion. This includes $15.6 billion to sustain and operate our current nuclear forces, and $12.1 billion for recapitalization programs. This modernization effort is at a critical juncture given our aging platforms. As Secretary Austin has stated, U.S. nuclear weapons have been extended far beyond their original service lives and the tipping point where we must simultaneously overhaul these forces is now here. Updating and overhauling our Nation's nuclear forces is a critical national security priority. Even as we continue with nuclear modernization, we will continually review ongoing programs to assess their performance, schedule, risks, and projected costs. The Department will always seek to balance the best capability with the most cost-effective solution. Our pending review of nuclear policy and posture, which will be nested under the National Defense Strategy, will ensure that we have the right capabilities to meet our priorities now and in the future. The review will allow us to examine our nuclear posture and policy with an eye towards acting on direction in the administration's Interim National Security Strategic Guidance that the United States takes steps to reduce the role of nuclear weapons in our National Security Strategy while ensuring our strategic deterrent remains safe, secure, and effective, and that our extended deterrence commitments to our allies remains strong and credible. In so doing, our review will focus on the vital interests of the United States and our allies and partners. It will be informed by current and projected global security environment, trends, threats posed by potential adversaries and the capabilities of the United States and our allies and partners to address those threats; the roles of nuclear weapons; a strategy to reduce those roles and the impacts of policy, posture, and capabilities on strategic stability; and the risks of miscalculation. Consultation with allies will be a core component of this review and we have begun engaging with allies to ensure that their views are heard and understood before reaching any conclusions. Unique to this review and consistent with the interim guidance, preserving strategic stability will be a significant area of analysis in the review. Steps in this respect have already started with the extension of the New START [Strategic Arms Reduction] Treaty, and further analysis based on the President's priorities will occur as our strategic reviews proceed. We look forward to keeping Congress informed as we conduct these reviews. Mr. Chairman, let me conclude by thanking this subcommittee for its previous support for nuclear deterrence and the opportunity to testify. I look forward to your questions. [The prepared statement of Ms. Dalton can be found in the Appendix on page 36.] Mr. Cooper. Thank you very much, Ms. Dalton. Every witness statement will be inserted for the record by unanimous consent, so I will ask you gentlemen to limit your remarks, as Ms. Dalton did excellently, to about 5 minutes. The next witness will be Dr. Verdon. STATEMENT OF CHARLES P. VERDON, ACTING ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION Dr. Verdon. Thank you. Chairman Cooper, Ranking Member Turner, and members of the subcommittee, thank you for the opportunity to testify today. On behalf of our entire national security enterprise workforce, I express our appreciation for this subcommittee's strong bipartisan support for NNSA's nuclear security missions as demonstrated most recently in fiscal year 2021 National Defense Authorization Act, and fiscal year 2021 budget for the Department of Energy. We meet today against the backdrop of a world marked by growing security challenges. China and Russia are modernizing their nuclear arsenal, investing significant resources in delivery platforms that have made clear that nuclear weapons will be a vital element to their statecraft. At the same time, the risk for proliferation of nuclear weapons and other weapons of mass destruction pose profound and existential dangers. Recognizing these global security challenges, the President's fiscal year 2022 budget request for $19.7 billion for NNSA reflects support for the three enduring missions for which Congress charged the NNSA in 2000: ensuring the safety, security, and effectiveness of the U.S. nuclear stockpile; reducing the threat of nuclear proliferation and nuclear terrorism around the world; and providing nuclear propulsion for the U.S. Navy's fleet of aircraft carriers and submarines that is critical to the U.S. national security and our allies. [Inaudible.] Dr. Verdon. [continuing]. Stockpile. Our alignment and synchronization---- [Inaudible.] Dr. Verdon. [continuing]. To improve. The fiscal year 2022 budget request enables NNSA to execute its nuclear warhead and infrastructure modernization efforts begun under the Obama/ Biden administration. The administration is beginning to undertake a formal review of efforts to modernize our nuclear deterrent to include DOD delivery platforms, the nuclear weapons required under those platforms, and the NNSA infrastructure needed to produce and maintain those weapons. Regardless of the review's specific findings, so long as we retain a nuclear arsenal we must have the infrastructure, science, technology, and engineering to produce and maintain the nuclear weapons stockpile. Unfortunately, the NNSA's production infrastructure has atrophied considerably, both in terms of the physical infrastructure and the capabilities needed within those facilities. Continued recapitalization is imperative. The potential impacts to the U.S. deterrent if not addressed are no longer over the horizon. Of particular importance is reestablishing the capability to manufacture plutonium pits. This capability is needed to address risks due to plutonium aging, degrading warhead performance, improve warhead safety and security, and provide the ability to respond to evolving threats to the U.S. nuclear deterrent. We fully recognize that the potential impacts of plutonium aging on warhead performance are uncertain at this time. Plutonium didn't exist--at least we didn't know about it--until, you know, before 1940, and simply has not been in existence on the planet long enough to have concrete data on how our pits will behave when they are approaching a century old. Given this, it is an assessment of our best technical experts in the weapons program, the three NNSA laboratory directors, and independent experts like the JASONs, that the risk is just too high not to have the capability to manufacture plutonium pits at a rate sufficient to refresh the stockpile's pits before they exceed 80 to 100 years in age. In addition to our mission to ensure the continued effectiveness of the nuclear stockpile, nonproliferation also remains an important and growing priority. The NNSA's Defense Office of Nuclear Nonproliferation is critical to implementing the President's call to lock down fissile material and radiological materials around the world. The fiscal year 2022 budget request enables NNSA's Defense Office of Nuclear Nonproliferation to continue to work worldwide with our partners to prevent state and non-state actors from developing nuclear weapons or acquiring materials usable in nuclear weapons. With regards to our third mission of providing nuclear propulsion for the U.S. Navy, the Office of Naval Reactors remains at the forefront of technological developments in naval propulsion by advancing new technologies and improvements in naval reactor performance. This preeminence provides the U.S. Navy with a commanding edge in naval warfighting capabilities and the fiscal year 2022 budget request enables NNSA's Office of Naval Reactors to continue their programs which are so vital to the security of our Nation and the allies. In closing, despite the challenges posed by COVID [coronavirus] pandemic, I am pleased to report that the NNSA did not miss a single major milestone or DOD requirement. This achievement is a testament to the professionalism in NNSA's world-class workforce, the leadership of our sites, and their commitment to national security. In fact, I am happy to report that as we speak today, the system first production unit for the W88 Alt [Alteration] 370 is being assembled at Pantex. So I thank you again for the strong support of this committee and the opportunity to testify before you today and I stand ready to answer any questions you may have. [The prepared statement of Dr. Verdon can be found in the Appendix on page 46.] Mr. Cooper. Thank you very much, Dr. Verdon. Now we will hear from Vice Admiral Johnny Wolfe. STATEMENT OF VADM JOHNNY R. WOLFE, JR., USN, DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, U.S. NAVY Admiral Wolfe. Chairman Cooper, Ranking Member Turner, and distinguished members of the subcommittee, thank you for the opportunity to testify. I would like to thank this subcommittee for its continued support of the Navy's nuclear deterrent mission. As you heard from Admiral Richard, Commander, U.S. Strategic Command, nuclear deterrence underwrites every U.S. military operation and capability on the globe and serves as the backstop for both our national defense and the defense of our allies. The Nation's nuclear triad of intercontinental ballistic missiles, strategic bombers, and ballistic missile submarines serves as the bedrock of our ability to deter major power conflict, assure our allies and partners, achieve U.S. objectives should deterrence fail, and hedge against an uncertain future. The Navy has provided unwavering and singular mission-focused support to the sea-based leg of the triad for over six decades. We must sustain today's deterrent while modernizing for the future. This falls into four concurrent lines of effort. First, we must maintain the current D5LE [D5 Life Extension] missile inventory and provide the necessary operational support to sustain Ohio-class submarines through their service lives. This is being accomplished through an update to all of our subsystems. All of our life extension efforts remain on track and our current program will support the deployment of all existing warheads. We must also recapitalize our strategic weapons facilities to continue to support and sustain SSP [Strategic Systems Programs] and operations that enable our continuous at-sea presence. Second, we must continue to work with our partners at PEO [Program Executive Office] Columbia to ensure that the transition between Ohio-class and Columbia-class submarines stays on schedule. For SSP, this requires a seamless transition of the current D5LE weapons system and missile inventory onto the new Columbia class. During this time of transition, we will ensure that the Navy's portion of the nuclear triad remains credible by introducing the W93 Mark 7 to rebalance the stockpile of W76 and W88s and meet STRATCOM [United States Strategic Command] requirements. Third, it is imperative that we start the work on a future missile and corresponding weapons systems now. This next generation of the current D5LE missile, a missile in service since 1989 and boasting a remarkable history of 182 successful flight tests is called D5LE2. D5LE2 will yield multiple benefits in missile performance to include extending its service life. D5LE2 is required to completely outload our Columbia-class SSBNs and ensure that Trident remains credible in the face of a dynamic threat environment. A D5LE2 missile must be developed, tested, and produced with a lead time sufficient to deploy on Columbia-class Hull 9 in fiscal year 2039. It will then be backfitted for the first eight hulls of the class. Lastly, one of the greatest advantages the United States has is its alliances and partnerships. As the U.S. project officer for the Polaris Sales Agreement, I will continue to support the U.K.'s [United Kingdom's] sovereign deterrent for today's Vanguard-class submarines and their successor, the Dreadnought-class. For decades, U.S. policy has recognized that the independent British nuclear deterrent adds to global stability. Under the 1958 Mutual Defense Agreement and the 1962 Polaris Sales Agreement, the United States has provided assistance and material consistent with international law to the U.K. deterrent program. Without this assistance, the cost and schedule risk to maintain the U.K.'s independent deterrent would rise significantly, thus creating additional challenges for the U.K. in sustaining its nuclear contribution to NATO [North Atlantic Treaty Organization] alongside the U.S. None of these four lines of effort are possible without investment in our people, our infrastructure, and our industrial base. Military, civilian, government, and contractor, the men and women of SSP are working hard to deliver a safe, secure, and effective strategic weapons system today that will serve us well into the latter half of the century. They remain my number one priority in order to ensure continued program success. Nuclear modernization will take time to complete, so work towards these ends must start now and cannot be delayed. It is only through your continued support that the Department's top modernization priorities can be achieved. As the 14th director, it is my highest honor to represent the men and women of SSP comprising approximately of 1,700 sailors, 1,000 Marines, 300 coastguardsmen, and over 1,300 civilians and over 2,000 contractor personnel. It is my most critical goal to ensure they are poised to execute the mission with the same well of success, passion, and rigor both today and tomorrow as they have since our program inception in 1955. Thank you for the opportunity to testify today on behalf of the men and women who make deterrence of major power conflict their life's work. I look forward to your questions. [The prepared statement of Admiral Wolfe can be found in the Appendix on page 57.] Mr. Cooper. Thank you, Admiral Wolfe. And now we will hear from Lieutenant General James Dawkins. STATEMENT OF LT GEN JAMES C. DAWKINS, JR., USAF, DEPUTY CHIEF OF STAFF FOR STRATEGIC DETERRENCE AND NUCLEAR INTEGRATION, U.S. AIR FORCE General Dawkins. Chairman Cooper, Ranking Member Turner, and distinguished members of the subcommittee, thank you for inviting me to appear before you today to represent the dedicated men and women of the Air Force's nuclear enterprise. Along with my teammates here at the table, the airmen of the United States Air Force remain committed and work tirelessly to continuously provide the Nation a safe, secure, effective, and credible nuclear deterrent. This commitment has become even more significant given the age of our systems and the nature of the current security environment. The first time in our Nation's history we are on a trajectory to face two nuclear-capable, strategic peer adversaries. Russia has multiple types of nonstrategic nuclear weapons deployed or in research and development including short- and close-range ballistic missiles, cruise missiles, and anti-ship missiles. Three of Russia's novel strategic systems and its nonstrategic nuclear weapons are not subject to the New START treaty's limits or verification regime. The People's Republic of China [PRC], as our principal pacing threat, is nearing completion of its own nuclear triad and will likely at least double their nuclear stockpile this decade. The pace of the PRC's weapons development is very concerning. The U.S. nuclear triad remains the primary military means by which the Department of Defense provides deterrence against existential threats to our homeland and allies. The triad has remained the force posture of choice for each President and Congress since the 1960s. The flexible options it provides the President complicates an adversary's decision calculus should they wish to pursue aggression against the United States or our allies. However, the triad is showing its age as many of its weapon systems and infrastructure date back to the early 1960s. The President's fiscal year 2022 budget fully funds our modernization efforts to provide the necessary improvements to counter our potential adversaries' increasing capabilities. The Air Force continues to achieve significant progress in our modernization programs to include the Ground-Based Strategic Deterrent [GBSD], Long-Range Standoff Weapon [LRSO], and B-21 Raider. The GBSD is leveraging cutting-edge digital engineering and has met every major milestone of the past 5 years. The Long-Range Standoff cruise missile and the B-21 are also on schedule. The B-52 modernization efforts are on track ensuring the aircraft remains relevant through the 2050s. In partnership with the United States Space Force, our nuclear command, control, and communication system remains secure and effective as we modernize capabilities ensuring future connectivity for leadership and strategic forces in an increasingly challenging cyber environment. The Air Force is committed to providing stable requirements and delivering these modernized weapons system programs on time and on budget. However, we can't do this alone and we ask for the continued support of the Congress to give stable authorization and appropriation across both the Department of Defense and the National Nuclear Security Administration enterprise. We owe this not only to our Nation, but also to our airmen who are in some cases manning the same missile sites and flying the same aircraft as their grandparents did. Yet we demand and, in fact, depend on our success against threats that are far more lethal and sophisticated than their grandparents could have imagined to accomplish a mission that is vital to our Nation's security and survival. I thank the committee for your advocacy and I look forward to your questions. [The prepared statement of General Dawkins can be found in the Appendix on page 70.] Mr. Cooper. Thank you, General Dawkins. I appreciate the testimony of all the witnesses. I am grateful for your expertise and your patriotism. All members will be limited to 5 minutes in questioning to more evenly distribute the questioning, and if there is time perhaps, we can do a second round. I will start off and have a question or two for Ms. Dalton. You characterize in your testimony that Russia has already 80 percent recapitalized their nuclear forces. What percentage of completion or recapitalization would you put on our-- America? Ms. Dalton. Thank you so much, Mr. Chairman, again for having the opportunity to testify. On balance, I would have to get back to you in terms of relative percentage of the U.S. program, but I can tell you that as the Secretary has stated, we are at a critical point of being relatively behind and the need to modernize and recapitalize across all three legs of the triad. So the investments that are made in the fiscal year 2022 budget submission do seek to modernize for the GBSD or the Columbia-class and for LRSO, and these are critical capabilities to ensure that we can keep pace with the challenges before us, principally China. And your question pivoted directly off of Russia, but I think, you know, the intelligence records suggest that China's nuclear modernization is accelerating at a very concerning rate. So as we proceed with our Nuclear Posture Review, we are going to be closely looking at both of those threat factors to help inform upcoming programmatic decisions. Mr. Cooper. Thank you. I was about to turn to China, which seems to be, what, doubling or more their nuclear capabilities, plus they have road-mobile or underground or other advantages that we lack. And I believe they are not constrained by any treaty, right? We at least have the New START extension with Russia but that does not apply to China. General Dawkins, you mentioned that there are three novel Russian nuclear systems that are not covered by New START. Could you remind us what those are? General Dawkins. Yes, sir. There is the underwater--the submarine with a nuclear-armed torpedo, a very large system there meant as, I guess, a weapon of vengeance to come up on our coast and detonate. Very hard to defend against, of course. There is a nuclear-powered, nuclear-armed cruise missile that they have that again, not to have--they are under development on these systems, I am sorry. Under development on these systems that they would be able to use and, of course, they could certainly deliver, and then--and they are very difficult to defend against those cruise missiles. And the third one is--I am failing to remember. I can take that for the record. But I know they have got a host of other systems they are using and the small nuclear weapons that they have put on some of their air defenses and other things, sir. [The information referred to was not available at the time of printing.] Mr. Cooper. Thank you. Those are my questions. I will turn it over now to the ranking member. Mr. Turner. Thank you, Mr. Chairman. In my opening statement, I referenced the news making of the Acting Secretary of the Navy with respect to taking a step for the cancellation of the sea-launched cruise missile, a missile that both General Hyten and Admiral Richard have openly spoken as fans of. We know that Secretary of Defense and the Chief of Staff have both reported in the news that they were unaware of this action and were not consulted. Admiral Richard said that he heard about it on the news. Admiral Wolfe, can you tell me what you know of this action and if you could also then in your answer, in addition to what is happening over at the Pentagon with the sea-launched cruise missile that has had this subcommittee and committee's support, can you tell us about, you know, what Russia's programs are and what their sea-launched cruise missiles are capable of? Because certainly we need to take into consideration what our adversaries are doing whenever we take a step to review our own commitment to our own systems. Admiral. Admiral Wolfe. Yes, sir. Thank you for the question, sir. So I had read the SECNAV [Secretary of the Navy] memo. I had not--I was not privy to it before it was actually signed. But my understanding is for the SECNAV it was part of a deliberate process to start the dialogue for building the next POM [Program Objective Memorandum]. I would point out, however, sir, nuclear modernization for the program of record for D5LE2, for Columbia, for TACAMO [Take Charge and Move Out], for our portion of the air is solid and it will continue and should continue to be fully funded to all of the estimates. I would also point out that in starting that dialogue, he does point out that it is not a decision. It is meant to get the dialogue started. And, of course---- Mr. Turner. Well, I have got to tell you just to insert, it is a hell of a way to start a dialogue is to call for the canceling. But go ahead. You were going to talk about our adversaries, because I do have limited time. Admiral Wolfe. Yes, sir. Understand. Yes, and from an adversary perspective, I think what General Dawkins talked about and what we all know is as Russia continues to look at how they can build some of these what they call tactical nuclear capabilities, certainly cruise missiles are a big part of that. Because I believe that they look at that as an advantage that they can even in some of their dialogue on escalating to deescalating that provides a significant advantage to them. Mr. Turner. Thank you. Ms. Dalton, you know, this announcement in the news comes just on the precursor of the President sitting down with Putin. I believe that unilateral disarmament is certainly, you know, as a policy, idiotic because we don't have a support for our deterrence and certainly we have no bargaining chips when we meet with our adversaries. Doesn't this weaken President Biden as he goes to sit down with Putin and say, ``Hey, we should start more arms control negotiations,'' where his own staff are talking about unilaterally stopping programs that are both important to our deterrence and may be the subject of arms control negotiations? Ms. Dalton. Ms. Dalton. Representative Turner, in the President's budget request for fiscal year 2022 from a policy perspective, the Department had intended to provide a modest amount of funding for SLCM [sea-launched cruise missile] and plans to revalidate that requirement in the course of the Nuclear Posture Review [NPR]. That is still our intent to look closely at this program in the NPR. And I would say in terms of the administration's approach to our arms control negotiations we do not support unilateral disarmament, but we---- Mr. Turner. Well, this point that you made here, so the Nuclear Posture Review, has it commenced? Ms. Dalton. It is on the cusp of commencing, sir, so it is---- Mr. Turner. It hasn't even commenced, but yet you have people in the chain of the administration already targeting systems for canceling. Isn't that--I mean isn't the Nuclear Posture Review supposed to be like adversary risks-driven, capabilities-driven? How is it that one system could be singled out when you haven't even begun the Nuclear Posture Review? Ms. Dalton. Sir, it is our intent to look closely at the SLCM program within the context of the Nuclear Posture Review and make programmatic decisions for fiscal year 2023 based upon that objective analysis. Mr. Turner. Ms. Dalton, when you were before us before, the last time, we were talking about there were some proposals that people had tried to latch onto for Minuteman life extension programs that were--it was known as like the ``best 200.'' You said that you don't have an ongoing study, you are just updating previous studies. We don't have a copy of the previous best 200 study that was completed at the end of the Obama administration. Would you commit to providing that to the committee? Ms. Dalton. Happy to follow up with that, sir. Mr. Turner. Okay. If you could get that to us this week, we would appreciate it. We are coming back next week, as you know, and it would be very timely for us to be able to look at it. General Dawkins, you have indicated that the Ground-Based Strategic Deterrent is $38 billion less than the Minuteman III life extension program. Could you elaborate on that? It keeps coming up as a discussion item. Not only are we gaining with the Ground-Based Strategic Deterrent additional capabilities, but it is clear from your understanding that it is both the most cost-effective path, correct? General Dawkins. Yes, sir. Thank you for the question. And that is true, sir. The GBSD, from the minute that--or from the time we did the analysis of alternatives back in 2014, it was shown to be more cost effective than life-extending the Minuteman III over the course of the entire weapons system out to 2075. That $5 billion difference back then in 2014 has since grown to $38 billion now. So again, it is $38 billion more expensive to life-extend the Minuteman III. This is primarily-- yes, sir. Mr. Turner. No, I was going to jump to my last question to go to Dr. Verdon. Real quickly, you have given us in classified session the justification for ensuring that we needed both Los Alamos and Savannah River in order to be able to hit our 80 plutonium pits. What can you tell us in open session of the need for the Savannah River Plutonium Processing Facility? Dr. Verdon. So again, we would say all of our analysis still indicates that the two-site solution that we identified is the most susceptive in terms of both capacity, schedule, and cost way for us to implement and meet the 80 pits per year. When we look at the schedule, when we look at the cost, it still comes out to be the most effective way for us to implement and to achieve that requirement is to take advantage of both the existing facilities at Los Alamos and at Savannah River to implement pit production. Mr. Turner. And you are not able to just do it all at Los Alamos, correct? Dr. Verdon. Doing it, no. It would require building a whole new facility at Los Alamos to be able to do it. PF-4 is not large enough. Mr. Turner. Thank you. I yield back, Mr. Chairman. Thank you. Mr. Cooper. I thank the gentleman. The next questioner will be Mr. Langevin. Mr. Langevin. Thank you, Mr. Chairman. I want to thank our witnesses for their testimony today. Let me begin with this. The President's budget request included an additional $700 million for the Columbia above the expected fiscal year 2021 estimates due to an updated cost estimate assessment and a program evaluation review. Vice Admiral Wolfe, do you believe this assessment is accurate and that the funding in the budget is adequate? Admiral Wolfe. Yes, sir. Thanks for the question. So I did talk to Admiral Pappano from PEO Columbia and yes, sir, based on the CAPE [Director of Cost Assessment and Program Evaluation] estimate that was completed in August of 2020, which is what the new estimate and the reason for the increase in request for this fiscal year, it is consistent with everything that the Navy has seen that what the CAPE has done and we have funded to that CAPE estimate. So yes, sir. We believe it is accurate. Mr. Langevin. Very good. Thank you. Dr. Verdon, so I have been interested for some time now in developing low-enriched uranium fuel for submarine propulsion. In doing so would prevent us from having to restart production of weapons-grade uranium and it also can't be stolen for that purpose. I wanted to ask for the record, will NNSA continue to support effort to study the viability of this critical nonproliferation effort should additional funding be made available? Dr. Verdon. We are committed to this and continue to look at that. We are still working with the administration to balance the requirements of both the nonproliferation requirements and also the Navy's operational requirements. So that still continues to be a study but we are continuing to look at what are the technical feasibilities of doing it, but the broader administration is taking a hard look also at the balance of the nonproliferation goals against the Navy's operational requirements as well. Mr. Langevin. Thank you. Thank you. Vice Admiral Wolfe, in your testimony you mentioned that we can no longer wait to invest in critical workforce skills and in complex technologies. What types of programs should Congress be encouraging? Admiral Wolfe. Yes, sir. I think with what we do with our workforce, looking at the critical technologies, things like rad-hard [radiation hardening] and those that are very unique to what General Dawkins' organization and what we do, I think we very much put a premium on education and programs that encourage our folks to continue their education as well as to hone their skills for these critical programs. Mr. Langevin. Thank you. I--again, we need to focus heavily on a workforce development especially where we have significant gaps. It is in our national interest to address those gaps sooner rather than later. The final question I had for General Dawkins. Are your NC3 [nuclear command, control, and communication] modernization efforts meeting their scheduled performance and budget metrics? General Dawkins. Yes, sir. For the most part they are. We have got--I could go into an acronym soup here, but some of the new systems to replace our current systems that provide advanced high-frequency capability to our missile sites and several other upgrades are again on time and tracking well. There have been some systems that are producing the learning of the crew force, if you will, that we are getting our requirements correct and ensuring that those are going to be on track for the future. But for the most part, sir, we feel that we are in a good place but this will take renewed focus or a constant focus to ensure that we don't get behind. Mr. Langevin. Okay. Well, this is something that we are going to continue to track. We look forward to staying in touch with you on that topic. Those are the questions I had for this point. Mr. Chairman, I yield back the balance of my time. Mr. Cooper. Thank you, Mr. Langevin. Now, Mr. Wilson. Mr. Wilson. Thank you, Chairman Jim Cooper and Ranking Member Mike Turner, for the bipartisan cooperation on putting together this very important hearing and we appreciate each one of the witnesses. And Administrator Verdon, according to the President's budget, the Critical Decision 1 [CD1], the Savannah River Plutonium Processing Facility is expected to be released sometime this month of June. And is that timeline still accurate, and if so, will that create the first credible cost and schedule baseline and does the President's budget match what was revealed through the NNSA's initial review of the paperwork? Dr. Verdon. So yes, sir. We are still on track to accomplish the CD1 approval requests before the Deputy Secretary and by the middle of this month. And, indeed, the fiscal year 2022 budget request has the funding in there necessary that if we get the approval to do the work to progress towards Critical Decision 2 to continue to mature the design. Mr. Wilson. Well, thank you very much. And as you well know, NNSA is so well thought of at Savannah River Site. We wish you the best of success. Additionally, Administrator, I appreciate your opening comments. I appreciate the very pithy and positive statements by Congressman Mike Turner all the way from Dayton, Ohio. And the questioning and restating of the Department of Energy Secretary Jennifer Granholm; the NNSA nominee, Jill Hrugy; U.S. Strategic Command commander Admiral Charles Richard--all are on record supporting the two-sites solution. This shows clear bipartisan support from among the administrations. Moving forward, what do you see is the biggest risk to delay in achieving 80 pits per year by 2030? Is it the funding? Should this be addressed in future budget requests? Dr. Verdon. It will be--yes. It will be, what the funding that will be required will be, you know, one of the key factors, and then it is also how we manage the supply chain getting the critical equipment in, in a timely fashion. And we are beginning to work that issue as we speak to work with vendors to try to make sure we can optimize that between both the Savannah River requirements and the Los Alamos requirements. But certainly identifying the right funding profile that will--that can be, you know, afforded by the Nation will be one of the key factors. Mr. Wilson. Thank you very much. And, General Dawkins, numerous studies have shown a one- site pit production solution is cost prohibitive and does not provide the basic resiliency necessary for our nuclear infrastructure which is so crucial as we have discussed to have the deterrence to maintain peace through strength. From a defense perspective, what are the consequences to the credibility of our nuclear deterrence limiting pit production to one site production? General Dawkins. Sir, thank you for the question. And having served at NNSA several years ago, I know that they are challenged with the infrastructure that they have. We work very closely. We work also with the Nuclear Weapons Council within NNSA to ensure that the plans that we have are executable. I think we would--and across the Department, speaking for the Department--would be challenged to continue with all of our modernization programs out into the future. It would be difficult with a single site. Again, I am not the expert on that. Dr. Verdon, I could defer. I will defer to him, but I know that our Nation needs to be able to produce pits and having everything in one location might be, you know, it might be more strategically valuable to have a couple. Mr. Wilson. Well, we actually--Savannah River Site looks forward to working collaboratively with Los Alamos and to achieve pit production which is so critical since many of the pits are 60 years or older. And so we have got to modernize, and I want to back you up and work with Chairman Cooper and Ranking Member Turner. And, finally, a question for Secretary Dalton, and that is the Biden administration has expressed its intent to develop its own Nuclear Posture Review indicating a change in U.S. nuclear policy. What parts of the 2018 Nuclear Posture Review does the administration plan to change and what is the timeline for delivery? Ms. Dalton. Thank you for the question. So we are just beginning the Nuclear Posture Review and we will be conducting that as I noted nested within the National Defense Strategy. Statutorily, we are required to deliver to Congress the NDS in January of 2022, so we are aiming for a similar timeline for the completion of the NPR. But as noted in my last honor to testify before you all, I am happy to come up and brief you on some of our emergent findings of the NPR as we proceed this summer. And in terms of the review of declaratory policy, that is obviously a Presidential-level decision. And so even as the Department progresses in its work on specific DOD aspects of nuclear posture, we will also be engaged in an interagency process to review the nuclear policy implications. But our North Star, to begin with, is the Interim National Security Strategic Guidance which indicates that this administration will take steps to reduce the role of nuclear weapons in our National Security Strategy while upholding our extended deterrence commitments to allies and partners and ensuring a safe, effective, and secure nuclear deterrent. Mr. Wilson. Well, we look forward to working with you. I am confident about our Savannah. I now yield back. Mr. Cooper. I thank the gentleman. Now Mr. Moulton is recognized. Mr. Moulton. Thank you, Mr. Chairman. I want to thank everybody for coming here today and participating in this discussion and my colleagues on the committee because this couldn't be a more important topic. Secretary Dalton, I would like to start with you. Hypersonic weapons, we have talked a lot about them recently, and they have the potential to be highly destabilizing, particularly if we pursue them blindly in a tit-for-tat with PRC or Russian development without carefully developing the operational concepts for their use. On the other hand, conventional hypersonic missiles could certainly change our adversaries' calculus in a way that reduces our reliance on nuclear weapons for strategic stability. So, Ms. Dalton, do you believe we have a clear vision for how we integrate hypersonic capabilities into the U.S. arsenal in a way that deters rather than potentially increases the risk of a nuclear response? Ms. Dalton. Thank you, Representative Moulton. It is a great question and I think this is why the Secretary has encouraged us in the course of the NDS to look at, holistically, at an integrated deterrence so we are not looking at any one domain or system in a silo. So, you know, to take the specific mention of hypersonic missiles, this administration is proceeding with investments in that capability because we think it is important to be able to keep pace with key challengers such as China and Russia to be able to respond with speed and at distance. But as we are developing these capabilities, as you mentioned the importance of concepts of operations, we are doing a lot of leg work behind the scenes in classified channels to ensure that as we are developing out this capability we are doing so responsibly, and at present are only making investments in a conventional capability when it comes to hypersonic missiles. But this will be among the capabilities that we are looking at through this frame of integrated deterrence so that we can account for potential escalation risks as we look across different scenarios involving, particularly, China and Russia. Mr. Moulton. Madam Secretary, if I may say, integrated deterrence and some other things you have said are music to my ears and hopefully to the ears of others on the committee. But in a lot of ways you have succeeded in saying a lot of good things without answering the question. It seems pretty clear that we don't have a strategy. And while it must be developed in classified terms, I understand that, it also needs to be clearly communicated to our adversaries which can't be entirely classified. So I look forward to hearing more about how you develop this. We have to have these operational concepts made clear before we spend billions of dollars on taxpayer money to develop weapons that we may not need or could actually make our strategic situation worse. Let me move, if I may, to General Dawkins and Admiral Wolfe. Thank you both very much for your calls. We discussed on the phone in our extended conversations the importance of not only developing a highly technically qualified workforce, but retaining them. And I am anxious to hear how you measure your progress. What we are doing today is clearly not adequate. We are losing too much talent and it is going out the door quicker than we can count. How are you actually measuring your progress in better training, retaining, attracting, and retaining personnel? General Dawkins. Representative, thank you for that question. And that is something that is foremost on our mind particularly as we get, or going into the bow wave of modernization where all of these programs are ramping up. Whether it is finding workforce inside the Air Force itself or out in the industrial complex, that is something that OSD [Office of the Secretary of Defense] tracks closely that we track in the Nuclear Weapons Council and the Air Force is focused on that as well. The way we track that is we do keep track of where--of our ability to hire. That is, you know, at times challenging because of the nature of the work we do and security clearances, but we do work with local universities. For instance, out with the Ground-Based Strategic Deterrence out at Utah, they work with local universities and other places to recruit these folks and bring them in and then offer the incentives that they can to actually retain them. And the broader Air Force---- Mr. Moulton. I am afraid I am just about out of time and Chairman Cooper is quite strict with us as he should be. But if you could just take this for the record and share with us some of the statistics, the ways that you actually track this so we can see measurable progress on these fronts that would be very helpful. Thank you, Mr. Chairman. Mr. Cooper. I thank the gentleman. Mr. Lamborn. Mr. Lamborn. Thank you, Mr. Chairman. Can you hear me okay? Mr. Cooper. Yes. Mr. Lamborn. Okay, thank you. Admiral Wolfe, I have a question for you, a background question about the sea-launched cruise missile, but first I just want to make a comment about the Acting Secretary's unilateral decision. It appears to me that he has gone rogue and I don't say that lightly. It appears to me that he has gone rogue because the people above him and the people below him are denying any knowledge of this decision and seem to be disavowing the decision. And, secondly, it comes at a horrible time. It really does damage to President Biden's position vis- a-vis Mr. Putin and these upcoming discussions, so the timing could not be any worse. But back to you, Admiral Wolfe. For background, what kind of capability does it give the United States and our strategic posture to be able to have the capability and flexibility that a sea-launched cruise missile provides? Admiral Wolfe. Sir, at a very high level I can answer that. I really believe that Admiral Richard could really give you in a classified setting what the real capabilities. But what I would tell you is, it gives--if you think about deterrence, it gives you another decision tool for the President and for STRATCOM. And what it really does is it causes yet another calculus thought that the adversary has to have before they think that we would have to use something bigger than a sea- launched cruise missile. So it does provide many options to continue this deterrent thought process. Mr. Lamborn. Thank you so much. General Dawkins, I have a couple of questions for you. I am going to focus in on the MILCON [military construction] projects that are intended to be accomplished out at Vandenberg Air Force Base and for software at Hill Air Force Base in support of GBSD. If those MILCON projects were not funded in this year's NDAA [National Defense Authorization Act] and appropriation bills, how much would that set back the GBSD program and how detrimental would that be? General Dawkins. Sir, thank you for the question. And as you are aware, the Vandenberg Space Base, Space Force Base is where we do our testing. We typically do four, what we call a ``Glory Trip,'' ICBM [intercontinental ballistic missile] launch testings each year. As we transition to GBSD, our first test, our first flight for the GBSD missile will be 1 December of 2023. I know that they need to get to start that work out there at Vandenberg in order to facilitate this test. I would like to take it for the record though to get you the exact impacts if we do not get the full funding in the MILCON or it slips. But I do know there will be impacts, sir. Mr. Lamborn. And those would be negative impacts. General Dawkins. Yes, sir. Mr. Lamborn. Okay, thank you. Changing gears, General Dawkins, I would like to hear you respond to something that Admiral Richard pointed out. He said that if we ever reduce the number of ICBMs or, God forbid, remove the leg of that triad completely that that would, ``solve a critical problem for China.'' So could you elaborate on what he was referring to about China's calculus if we degrade the ability of our land-based leg of the triad? General Dawkins. Yes, sir. So without ICBMs, we quickly will turn China into a peer adversary. And so when we look at how the ICBM force is a ready and responsive force and most responsive of the legs of the triad, it provides a pretty--it enhances strategic stability by providing a great deterrent against an adversary, because they know that if they were to do us, mean to do us harm as a nation, it would have to be a fairly large attack for them to do that. And, in fact, they would be attacking the homeland and that would--that in and of itself enhances deterrence and will make them or any central adversary perhaps take a step back and go, ``do we really want to commit to a large-scale attack against the United States homeland?'' Mr. Lamborn. Thank you. And how serious of a problem is it for us to not have any kind of treaty or any kind of verification or knowledge of what China is doing with its tunnel system, with its ability combined with mobile launchers to hide the existence of and the number of ICBMs that they might have? General Dawkins. So, sir, I am a big believer in arms control treaties that are verifiable and executable or enforceable. You know, a lot of our treaties are based on simply numbers and I think it is important also to look to capabilities as an important part of that as well. Mr. Lamborn. Okay. Thank you, Mr. Chairman. I yield back. Mr. Cooper. I thank the gentleman. Mr. Panetta. Mr. Panetta. Thank you, Mr. Chairman. I appreciate your understanding in getting me in to ask questions. Just real quick, Ms. Dalton, obviously, thanks. Thanks to all the witnesses for being here and thank you for your service. But, Ms. Dalton, when does the administration plan to complete its Nuclear Posture Review and when will it begin and what exactly will it entail going forward? Ms. Dalton. Thank you, Representative Panetta, for the question. So as I mentioned in my opening remarks, the NPR will be nested within the National Defense Strategy and we are just commencing the NPR leg, if you will, of the strategic reviews. We plan to structure it in such a way that there will be decision off-ramps as we get into the end of the POM build and into the PBR [President's budget request] season such that, you know, the objective analysis that we do in the NPR can feed into programmatic decisions that are relevant for the fiscal year 2023-27 FYDP [Future Years Defense Program]. In terms of what we plan to cover in the NPR, as noted earlier there will be a look at declaratory policy which we will do in concert with the interagency. There will be a thorough assessment of the security environment. Many things have changed since the last time there was a Democratic administration in power that we will need to be cognizant of and we will look to define based on the integrated deterrence frame, which I know is still in development and, you know, we will be able to say more on as we move forward how that relates to thinking about the use of strategic forces like nuclear weapons in that deterrence construct. And then as I noted, the specific implications then for programs and modernization. So in brief, those are the areas for examination. Mr. Panetta. Okay. In regards to that and in regards to the nuclear command and control modernization, do you believe that there will be a review in regards to the sole launch authority of the President? Ms. Dalton. So I know that that is a question that has come up in some of the early consultations that we have had with outside groups and we are committed to taking input from all stakeholders across the nuclear committee to help inform our review. Mr. Panetta. And that will include this subcommittee right here? Ms. Dalton. Yes, absolutely. Mr. Panetta. Outstanding. Great. Thank you. I appreciate that and look forward to working with you. Mr. Chairman, thank you. I yield back. Mr. Cooper. I thank the gentleman. Mr. Waltz. Mr. Waltz. Mr. Waltz. Thank you. Yes, thank you, Mr. Chairman. And thank you. Thank you to all of our witnesses. General Dawkins, yes, I think there is kind of a common criticism or belief out there that ICBMs are on a ``hair trigger alert.'' Can you tell us about the redundancies built into the launch system as well as how they are actually targeted out in the open ocean and how those are built in to assuage some of those concerns? General Dawkins. Yes, Representative, thank you for the question. So that is a misnomer. While the ICBMs are ready and responsive and we do have crew members, two crew members down there in the launch control centers awaiting a Presidential order, it requires an order from the President to be transmitted through our NC3 systems down to the crew members and for them to decode any of those orders they get, ensure that they are verifiably from the President and otherwise. As far as the process goes, the President, if necessary, if we are under attack of some sort, the President has--we have a means to bring the President into a conference, the Department of Defense does, and Joint Staff, to ensure, and he can also bring all of his senior advisors across the national security complex, and any ones that he wants into this conference to discuss how to respond. It is a very measured process. And then the President can decide whether he wants to respond with nuclear weapons or choose something else. The great thing about the triad is the President does not have to use the ICBMs because we have a survivable leg in the submarine-launched ballistic missile capability. So that is an example of the great attributes that the triad brings. So the President does not have to launch on attack or launch on warning, he can wait and gather more information before he has to make a decision, because he has a submarine force. Mr. Waltz. Great, thank you. And that leads me to my next question. This committee heard testimony from Admiral Richard that if the ICBM leg of the triad was allowed to atrophy further that he would need to put bombers and refuelers back on alert. Do you have a sense--and this is for any of the witnesses--of how much that would cost? And is it safe to assume that this cost was not factored into the $38 billion in savings by choosing the GBSD over Minuteman III life extension? General Dawkins. Representative, that was not a factor in the cost of any of the studies in analysis. We don't have an analysis right now that says how much extra that cost will be. I call it a transfer cost. If you do something with one leg of the triad, you may have transfer costs associated with it if you transfer other missions to the remaining two legs. With the bomber force, because we have not been on alert since the early 1990s when we were pulled off of alert and we had hundreds and hundreds of bombers, actually, you know, able to be on alert, we would have to do a couple of things. We would have to buy more bombers, we believe, buy more tankers. We would have to get more infrastructure and, of course, bring in more people to be able to sustain that capability, the alert capability. Just as concerning is how we would--if we didn't have that extra capability, we would detract from our ability to do our conventional missions with these dual-role bombers, the B-1 and the B-52 and soon to be the B-21 and the B-52. So again, it would be a drain on resources that we would also use, or we also use today for other combatant commanders. Mr. Waltz. Thank you. And I don't know, does anyone else have anything to add on that if we allowed the ICBM to atrophy, the burden that that puts on the other two legs, cost and impact on readiness? Admiral Wolfe. Yes, sir. This is Admiral Wolfe. So I would tell you from a Navy perspective, as Admiral Richard looks at what he needs to achieve in support of the President, there is a possibility that that could call on the Navy to pick up more of that mission. And I would tell you today, with the platforms that we have got and the assets we have got, that would be almost impossible. In the future, that would potentially require you to build more Columbia-class submarines. That would potentially cause us to build more assets and look at how we could work with our partners at NNSA to then provide the adequate number of warheads that would go on there. So I would say there would be a huge downstream impact even to the United States Navy. Mr. Waltz. So less ICBMs, more bombers, more subs. Is that just--not to oversimplify, but that is essentially what we would be facing to keep the same capability, the same deterrent capability. Admiral Wolfe. I would just add the word ``potentially,'' sir. Potentially that could be the outcome. Mr. Waltz. Thank you, Mr. Chairman. I yield my time. Mr. Cooper. I thank the gentleman. Mr. Khanna. Mr. Khanna. Thank you, Mr. Chairman, and thank you to everyone here for your service and testifying. On April 3rd, 2019, Lieutenant General Richard Clark, who I know you know, then the Air Force Deputy Chief of Staff for Strategic Deterrence, noted that we have one more opportunity to extend Minuteman III. I would like to understand why that option of extending it one more time is not a good option and why that hasn't been explored. General Dawkins. Thank you, Representative Khanna, and thank you for the question. So I am familiar with the statement from 2 years ago. I think it is important whenever we discuss life-extending the system or GBSD, we understand that we are talking about a total system replacement. General Clark was talking about a subcomponent of just the missile itself, and the missile itself has several key subcomponents. There is 330- plus parts in it, but there are about 4 subcomponents that actually have to be modernized or life-extended as well, and we needed to have made those decisions on some of those key ones several years ago back in 2015. Now what he was talking about was just a single-stage booster and it has three, and he said there would be--that we might be able to repour the propellant one more time. What we have found whenever we have repoured the propellant, and basically you take the booster and you ream the propeller out, bring it out, you extend the wall of the booster--result in a 50 percent rate. So just doing that we would not have enough boosters to even contribute to the other stages of the missile that would have to be replaced at great expense. One example is the propulsion system rocket engine. We needed to have started that program back in 2016. That was roughly almost a $7 billion project back then, and I don't know what it is grown to now. Mr. Khanna. I respect that as your service and your expertise. I guess my question is, has there been a comprehensive study on how much it would cost and what it would require to extend Minuteman in a cost-benefit analysis between that choice and the GBSD system? General Dawkins. Yes, sir. There have been several studies and the foundation of one is the analysis of alternatives from 2014. It looked at life-extending Minuteman III versus GBSD and a few other options as well, and it was determined that at the time, the Obama administration, that we would forego life extension because it was more expensive. At the time, $5 billion more expensive over the lifetime of a system to do a Minuteman III life extension versus going with a system replacement. Mr. Khanna. Now that was premised, I know there was something that you submitted premised on 400 deployed ICBMs by 2075. President Reagan would probably roll over in his grave if he thought we would have that many ICBMs by then when his vision was to end the nuclear arms race. How was 400 chosen? General Dawkins. 400 was again decided under the New START treaty. When we signed up to the New START treaty back in 2010, the Obama administration, at the time, determined the best way to meet the requirements of the treaty was to reduce from 450 to 400 ICBMs and then---- Mr. Khanna. I understood that, but how do we know that we are going to need that many? And I guess, getting to Representative Waltz's question, isn't it true just strategically that the ICBMs are a much easier target for an adversary to take out than the submarine for the Air Force, and so has there been an analysis whether strategically--we may be better off, actually, having more submarine than Air Force capacity going in the future. Ms. Dalton. Representative Khanna, thank you so much for all of these excellent questions. In the course of the NPR, we are going to be taking a hard look at what is required to maintain a safe, effective, and secure nuclear deterrent while also attempting to be fiscally responsible given the cost of these programs. So based on the analysis that General Dawkins has referenced, we will be interrogating that analysis with the types of questions that you are asking to ensure that we have the right balance across the triad. Mr. Khanna. Well, I think it just is very important. And also, you know, I know you have talked about the capacity being improved by the GBSD as opposed to Minuteman, but it is not clear. What is the vulnerability of the Minuteman? Are there things that we couldn't do right now? Are we vulnerable in ways that would be improved by the GBSD or, because they say it gives us better targeting? The other question and, frankly, being from Silicon Valley with cyberattacks is whether we would be better off being in an analog system than going to a digital system. I mean couldn't the digital system make us more at risk to an adversary in an age of cyber warfare? You know, I obviously have deep admiration and respect for all of your patriotism. I know you are trying to do what is right for our country. I would just ask that, you know, if we could have more of an analysis on some of these questions as alternatives it will help better understand and help us make more informed decisions. Mr. Cooper. The gentleman's time has expired. Mr. DesJarlais. Dr. DesJarlais. Thank you, Mr. Chairman. I want to talk about infrastructure for just a minute. Mr. Verdon, Y-12 National Security Complex is one of the most important national security assets not only in Chairman Cooper and my home State of Tennessee, but in the entire country. However, if you were to look at the state of disrepair at some of the facilities, you wouldn't know it. We cannot modernize our nuclear arsenal without having the necessary infrastructure in place to undertake those programs. In the fiscal year 2018 NDAA, my colleagues and I worked in this committee to help address this issue by creating the Infrastructure Modernization Initiative as well as broader minor construction authorities to help remedy these problems at NNSA. While both appear to have been successful in making some progress, it is abundantly clear that more work still needs to be done not only at Y-12 but across the nuclear security enterprise. So my question for you, is the $20 million minor construction threshold that you are all operating with adequate to accomplish desired modernization efforts or does that number deserve a second look in light of the inflation and increased construction costs? Dr. Verdon. So I would say that based on those last points you brought up that we should take a look at it again, because certainly when you did give us an increase it was beneficial, but because of all those things you just cited that benefit is being eroded relatively quickly. So looking at increasing that would certainly be a benefit for us. Dr. DesJarlais. All right. Any idea on what kind of number? Dr. Verdon. So we were looking at something on the order of even going up to 30 or up to 40, for that would be for the types of projects that we would like to be able to move out and address quickly, based on what we are seeing for costs of increased labor and concrete and lumber and steel would be the kind of the range we would be looking at. Dr. DesJarlais. Okay, thank you. For General Dawkins and perhaps Ms. Dalton, if we have time for both of you both to answer on this next question. Many on this committee, myself included, have concerns about the Biden administration's Nuclear Posture Review and what it may look like particularly as it pertains to a sole purpose policy. In the past, President Biden has expressed support for a sole purpose doctrine and I am concerned that he may turn his personal stance into U.S. policy. Those concerns are also shared by many of our allies like Poland, Japan, the Republic of Korea who rely heavily on our extended deterrence and assurance. Admiral Richards, commander of our strategic forces, has stated that the sole purpose doctrine would be detrimental to our alliances and our goal of nuclear nonproliferation. So, first, will this administration consult with our allies before making such consequential change to U.S. policy? And second, in your discussions with the decision makers on this issue, do you believe that they are fully aware of the consequences the adoption of a sole purpose policy would have on our alliances and our nuclear nonproliferation? Ms. Dalton. Thank you for the question. We are absolutely committed to robust, early and often, consultations with our allies and partners as we embark on these strategic reviews. In fact, we have already begun those consultations. I will say that with the release of the Interim National Security Strategic Guidance that also prompted a number of questions from allies and partners in terms of the line on reducing the role, or taking steps to reduce the role of nuclear weapons. But, of course, the next part of that is while upholding our extended deterrence commitments to our allies and partners. It is one of the top priorities of this administration to revitalize our alliances and partnerships. So as we move forward, we will be working in lockstep with our allies and partners to understand their threat perceptions, their asymmetry of interests when it comes to China and Russia, what their comparative advantages are when looking more broadly at deterrence to include where they may also be making nuclear contributions, but also as that relates to conventional means as well in cyber and space. And so we are absolutely committed to working this in lockstep and that will be a key priority in determining the way forward on our declaratory policy. Dr. DesJarlais. Okay. General Dawkins, about 40 seconds left to chime in. General Dawkins. Sir, I defer to what Ms. Dalton said that I believe that all this will be looked at in the NPR, and I know that the allies want to be involved in the process as well and that what we provide for extended deterrence is the reason. And so again, I think the review will address all of those things. Thank you. Dr. DesJarlais. Okay. Well, I thank all of our witnesses today. And, Mr. Chairman, I yield back. Mr. Cooper. I thank the gentleman. Let's see. Now we will hear from--who is next? Mr. Morelle. Thank you. Mr. Morelle. Thank you, Mr. Chairman, for the opportunity to be here and thank you to all our witnesses. In particular it's been good to have conversations with both Admiral Wilson and General Dawkins and I appreciate that. But I also hope that, Dr. Verdon, that you still have many friends in the Rochester area. I want to just talk a little bit about my district which is home, in Rochester, New York, which is home to the Laboratory for Laser Energetics at the University of Rochester. It is a key part of NNSA's inertial confinement fusion [ICF] program, which is a critical component of the Stockpile Stewardship Program, to maintain a safe, secure and effective nuclear deterrent. And I am glad to have the opportunity right now to just discuss the fiscal year 2022 budget and, Dr. Verdon, maybe I can start with you. For nearly two decades, we have not seen major infrastructure investment in any of the three complementary ICF facilities. Meanwhile, China and Russia are building modern facilities intended to rival or exceed U.S. capabilities. So can you share, does NNSA have a plan to address research infrastructure using the ICF sites? Dr. Verdon. So we are indeed beginning to--we have just started to look at that. And part of the reviews we had for 2020 in the JASON's review was to begin to lay the foundation of how we should move forward into the future in the area, the very important area of inertial confinement fusion, and part of that was with the focus on helping us identify what potential future facilities in those areas might look like or what they should be. So that is certainly, you know, it is in our process. We are starting that process now and, but the goal will be to identify what are the future capabilities or upgrades that would be needed in those areas. Mr. Morelle. That is encouraging. Do you have a sense of what the timeline will be for that, Doctor? Dr. Verdon. So the reports, we are just digesting some of the conclusions of the reports now so it would probably be--it is probably going to still be, you know, a few years before we kind of go through it in quite a bit of detail, but we are beginning to gather information, as I say, about what people are thinking. But we are also trying to push the system to make sure we are not just thinking near term but as you say looking for the future--what do we really need for the long term? Mr. Morelle. Right. Aside from the facilities question, the ICF research is a critical component to the Stockpile Stewardship Program. So both the NNSA's ICF 2020 report and the review by the JASON Defense Advisory Panel provide specific recommendations to strengthen the capability. Are the current requested funding levels by the administration sufficient to fully implement these recommendations? Dr. Verdon. We assess that they are, you know, that we are supporting the program that we need to conduct in this area. And so we believe that particularly the 2022 budget does support what we need to do in this area. Mr. Morelle. Well, recent budgets have focused on a NNSA production complex, yet I think it is NNSA science and technology and engineering capabilities and the associated expert workforce that underpin our confidence in the safety, security, and reliability of the nuclear deterrence. So do you agree that NNSA needs to maintain world lead in scientific capabilities and workforce, and again does the budget request, which contains significant cuts to several ST&E [science, technology, and engineering] areas from fiscal year 2021 levels, sufficiently prioritize those needs? Dr. Verdon. It is always a risk-benefit, you know, calculus that we are constantly doing, but we believe that the funding that we put forward for 2022 supports the highest priority programs in that area. And, you know, we are even upgrading some additional capabilities in the science area to include exascale computing and enhanced capabilities of some critical experiments in Nevada. So we are doing--adding new capabilities to address existing gaps. So again, we are trying to make sure we balance, you know, all the requirements across the entire Stewardship Program, but we certainly support that the science area remains key. It underpins just about every decision we make. Mr. Morelle. Well, I appreciate that. I am obviously going to be a fierce advocate for this in our conversations over the next several weeks. And, Mr. Chairman, I appreciate very much the time and the opportunity to have this conversation and I yield back the balance of my time. Mr. Cooper. Thank you so much, Mr. Morelle. I appreciate that. Mr. Garamendi. We seem to be having technical difficulties. Mr. Garamendi. To say the least. Mr. Cooper. Now we can hear you. Now we can hear you. Mr. Garamendi. Okay. I am late to the meeting. I am having trouble with AT&T with whom I seem to be carrying on a long, long in duration fight. But thank you very much. I want to follow up on questions that Mr. Khanna had posed to General Dawkins. Specifically, what I want to get into is the Minuteman III, the life extension of it. General Dawkins, under the present plan, it appears as though the Minuteman III will remain as one of the two ICBM systems for the next minimum of 15 years, probably closer to 20 years. Is that true that there will be actually two types of missiles being used over the next 20 years? General Dawkins. Congressman, thank you for the question. And I am not tracking two missiles, I am only tracking the single Minuteman III missile. There are two warheads though that go on top of the missile, the W87-0, right now, for the Minuteman III, as well as the 78. Mr. Garamendi. That is a good piece of information, but I was actually talking about your present plan is to have the Minuteman III in the silos, operative, as well as the GBSD as the transition takes place. If that is correct then the Minuteman III is good for at least the next 15, probably closer to 20 years, as the GBSD comes on line. Therefore, the argument that the Minuteman III cannot be extended seems to be, to be incorrect. Also with regard to the cost, the cost differential that you spoke to a few moments ago is really based on the next 75 years and extending the Minuteman III over and over again during that period of time, while the GBSD would be--the Minuteman III would be in place, as I just suggested, with the GBSD during the transition period, and then the GBSD would go forward and it too would have to be life-extended over that 75- year period of time. Is that correct? General Dawkins. Congressman, we have to keep the Minuteman III going until the last GBSD is put in place. So the plan right now is in 2027 to field the first GBSD. As that first one goes in, a Minuteman III system comes out and we will harvest the parts from that Minuteman III as well as all the infrastructure that supports it to feed back into the supply system to continue the remaining missiles to keep them on line until 2036 when we will have the final GBSD in place. So it is a just-in-time--go ahead, sir. Mr. Garamendi. Well, so the fact is that the Minuteman III is being life-extended. You are using the harvesting technique, which is one way of doing it; the other is to acquire the necessary parts and pieces to keep the Minuteman III in place. My second series of questions go to the cost. The current estimate of the cost of the GBSD system over the next decade, that is the decade of the 2020s, is somewhere north of $80 billion. What is the anticipated cost in the next decade, that is the decade of the 2030s? General Dawkins. Sir, I don't have that broken down by decade. I do know that over the life of the GBSD program, it is right now that is out from 2026, if you will, out to 2075, that was the timeframe that we were using, out to 2075, that it is somewhere in the number of $264 billion for the total lifetime cost, that is, of GBSD. Mr. Garamendi. I think it is very interesting and questionable of whether you use a 55-year time horizon here to estimate cost in the system. I will let that go at that point. I want to turn very quickly to--well, we don't have time for that. The issue of command and control and the analog versus digital needs very, very careful attention. I will be out of time here. I am going to pursue this issue more completely to completely understand this phase-in, phase-out just-in-time and the fact that the Minuteman III is actually going to be life-extended for at least the next, probably the next 15, more likely the next 20 years. So with that, I yield back. Mr. Cooper. I thank the gentleman. I want to thank all the members for participating. These remote hearings are not always easy, but I appreciate your participation especially when there are technical issues. I would like to close the hearing with this final question for Dr. Verdon. Dr. Verdon, based on current estimates and planning, will the NNSA be able to meet the 80 pit requirement by 2030 as required by law? Dr. Verdon. So based on our latest information, we assess that meeting the 2030, particularly at Savannah River, is not going to be achievable. It will be, right now, our estimate will be between 2032 and 2035 based on our current conceptual-- our Critical Decision 1 information. Mr. Cooper. So that is even using Los Alamos and Savannah River? Dr. Verdon. Los Alamos we still have high confidence of achieving 30 pits a year by 2026. It is what we learned in putting the, you know, 30 percent design complete on Savannah River and being able to work closely with the vendors and starting to engage them on the details of the design that we identified that the Savannah River, getting Savannah River to produce more reserve pits by 2030 just doesn't look achievable at this time. Mr. Cooper. Is there any other way to do it faster? Dr. Verdon. Not that we have identified, because again a lot of what we are starting to see is the long poles in the tent is just ordering the long-lead equipment through the vendors and then also just the amount of dollars that you can execute in any given year is also limited. That you could, you know, you could postulate you could do it, but the amount of dollars would be a difficult program. So that is why we are thinking we are trying to work out both technically and just what we can execute at. Mr. Cooper. Thank you. Does the ranking member have a final question at all? Mr. Turner. Thank you, Mr. Chairman. No. I think we have covered it all and I appreciate the information we have received today. It is certainly very helpful. Mr. Cooper. I thank our distinguished witnesses. The hearing is now adjourned. [Whereupon, at 12:29 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X June 10, 2021 ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD June 10, 2021 ======================================================================= [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING June 10, 2021 ======================================================================= QUESTIONS SUBMITTED BY MR. LANGEVIN Mr. Langevin. In your testimony regarding LEU research, you indicated that the NNSA is continuing to look at the viability of LEU. However, you also said that one of the main hurdles will be balancing non-proliferation requirements with the Navy's operational requirements while you work with the administration on this issue. If in the end, the R&D program does not validate acceptable LEU fuel density and higher assay fuel must be substituted to achieve a life-of-ship core, what is the technical and performance risk of designing next-generation vessels to accept a core sized for an aggressive LEU design? Dr. Verdon. The technical and performance risk of designing next- generation vessels to accept a core sized for an aggressive low- enriched uranium (LEU) design is high. As discussed in DOE/NNSA's 2016 report to Congress, Conceptual Research and Development Plan for Low- Enriched Uranium Naval Fuel, naval reactor plants must be compact to be cost-effective. The size of a submarine directly affects the power required to propel the ship. The reactor core must fit within the space and weight constraints of a warship, leaving room for weapons and crew, while still being powerful enough to drive the ship at tactical speeds for engagement or rapid transit to an operating area while carrying sufficient fuel to last for decades. Decades of technological advancements with highly enriched uranium (HEU) have enabled life-of- ship cores for Navy submarines, including the COLUMBIA-Class, each of which will serve in excess of 40 years without the need for refueling. The replacement of HEU with LEU reduces the energy in the uranium fuel by more than a factor of four. Implementation of LEU is a major technical challenge, and is expected to result in ships that are less capable militarily, more expensive, and that require at least one refueling over the life of the first ship class to use LEU fuel, regardless of reactor size. If refueling were reintroduced, force structure requirements and costs would increase. An example of the costs associated with refueling impacts on force structure requirements can be shown with the COLUMBIA Class SSBN. This submarine will not require a mid-life refueling because it is designed with a 40-year life-of-ship core. Introducing such a need for mid-life refueling in the COLUMBIA Class would require the strategic deterrent mission to be accomplished with more ships (14 versus 12), significantly increasing acquisition and lifecycle costs by over $40 billion dollars. We do not deem it practical to work on designs of naval vessels around an unproven advanced LEU fuel concept, nor to accurately project the effects of an advanced LEU fuel, because neither the ship performance requirements nor the fuel technology needed are established. However, even without working on a design, we assess that attempting to design a ship to accommodate sufficient LEU for potential life-of-ship operation would lead to a larger submarine diameter and/or length. Developing a new ship capable of later acceptance of an LEU reactor core would involve insertion of substantial margin--resulting in increased hull size--that would be difficult to estimate and costly to implement. Mr. Langevin. For both the carrier and submarine applications, what is the estimated impact on the vessel performance and dimensions of using LEU fuel, assuming a full power core sized for life-of-ship, under range of plausible LEU fuel densities that might be validated by an aggressive R&D program? At what point in the Navy's planning process must these decisions be made? Dr. Verdon. As discussed in DOE/NNSA's 2016 report to Congress, Conceptual Research and Development Plan for Low-Enriched Uranium Naval Fuel, an advanced LEU fuel system concept might satisfy performance requirements for an aircraft carrier without affecting the number of refuelings (current NIMITZ and FORD class carriers require one mid-life refueling), though at higher acquisition cost. The conceptual plan for an advanced LEU fuel design would include manufacturing and testing that would span 15 years and, based on cost estimates in the 2016 Report to Congress, require at least $1 billion in fiscal year (FY) 2016 dollars to establish whether the fuel is viable for use in a naval reactor design. Subsequent funding would be needed to mature this conceptual plan and bring it to reality. Assuming successful fuel system validation and aggressive parallel engineering and manufacturing development, the estimated cost to deploy an advanced LEU fuel system in submarines and aircraft carriers is in excess of $20 billion. Not included in this estimate are additional significant costs associated with (1) additional operating and support costs at shipyard facilities, (2) increases in manufacturing costs of advanced fuel, and (3) the increase in force structure that may be required to offset the loss in operational availability of submarines undergoing refueling overhauls. For submarines, the reactor plant must be very compact to be militarily effective. The reactor core must fit within the space and weight constraints of a warship, leave room for weapons and crew, be powerful enough to drive the ship at tactical speeds for engagement or rapid transit, and carry sufficient fuel to last for decades. An LEU-based fuel capable of meeting modern U.S. Navy submarine requirements has not been established, and, therefore we do not deem it practical to work on designs of naval vessels around an unproven advanced LEU fuel concept. The Navy would not consider a newly-designed reactor core using LEU until a new fuel system could be developed and shown to be effective in a prototypical environment. Decades of technological advancements with HEU have enabled life-of-ship cores for Navy submarines, including the COLUMBIA-Class, each of which will serve in excess of 40 years. The replacement of HEU with LEU reduces the energy in the uranium fuel by more than a factor of four. Implementation of LEU is a major technical challenge, and is expected to result in ships that are less capable militarily, more expensive, and that require at least one refueling over the life of the first ship class to use LEU fuel, regardless of reactor size. If refueling were reintroduced, force structure requirements and costs would increase. For example, introducing such a need for mid-life refueling in the COLUMBIA Class would require the strategic deterrent mission to be accomplished with more ships (14 versus 12), significantly increasing acquisition and lifecycle costs by over $40 billion dollars. ______ QUESTIONS SUBMITTED BY MR. TURNER Mr. Turner. When can we expect to see the SLCM-N AOA? Despite the Acting SECNAV memo on the FY2023 PRB the committee requests to be briefed on the AOA at the earliest possible date. Ms. Dalton. The Analysis of Alternatives (AOA) was conducted by the U.S. Navy and is now complete. I will refer you to our Navy colleagues who I understand are prepared to brief the Committee on the classified results of the AOA in the near future. While we are aware of the Acting Secretary of the Navy memo you reference, the submarine-launched cruise missile--nuclear (SLCM-N) program will be examined during the upcoming review of U.S. nuclear posture and policy. Mr. Turner. When you provided testimony before the SASC last month, it was stated that GBSD will be $38 billion less than a Minuteman III LEP. Could you please specifically outline what went into those numbers and what was excluded, so that the committee can have confidence it was an apples-to-apples comparison? General Dawkins. The Department of the Air Force estimated the cost of a Minuteman III (MM III) Service Life Extension Program (SLEP) to 2075 as $302B. The Office of the Secretary of Defense, Cost Assessment and Program Evaluation estimated in their Milestone B Independent Cost Assessment for the Ground Based Strategic Deterrent (GBSD) that GBSD will cost $264B to 2075, $38B less than the MM III SLEP estimate. The MM III SLEP estimate includes replacement efforts for booster, guidance, post-boost, ground system, and command and control elements. Both estimates include required Research, Development, Test and Evaluation; Procurement; Military Construction; Military Personnel; and Operation and Sustainment costs. Neither estimate includes any fuze or warhead modernization; including this cost would add $24B to each estimate. Finally, neither the MM III SLEP estimate nor the GBSD estimate include costs for the deactivation, demilitarization, and disposal of the MM III. Mr. Turner. Earlier this year this committee heard testimony from Admiral Richard that if the ICBM leg of the triad is allowed to atrophy further, he'll need to put bombers and refuelers back on alert. How much would this cost? General Dawkins. Cost estimates to put bombers and tankers back on alert are not fully mature at this time, as this course of action is not necessary given the current nuclear triad construct. However, United States Strategic Command provided a rough cost estimate of returning bombers to alert in its April 2021 ``Potential Delays to Nuclear Modernization'' Report to Congress, to which the Air Force contributed. While this document is classified and cannot be quoted in this unclassified response, returning bombers to a continuous alert posture would require major infrastructure improvements, as well as increased security and manning requirements. Additionally, returning bombers and tankers to alert status would negatively impact conventional readiness by reducing the availability for Bomber Task Force missions, which are currently in high demand by Combatant Commanders. Finally, returning bombers to alert would likely drive requirements for additional new tanker and bomber aircraft and associated manning in order to support Strategic Command's deterrent mission requirements as well as other day-to-day conventional requirements. Mr. Turner. GBSD will not only be a cost saver but will also provide an upgraded capability over the MMIII. Can you please explain this upgraded capability and how it will better allow you to address the Russian and Chinese threat? General Dawkins. Our potential adversaries are rapidly advancing both their offensive and defensive capabilities. The currently fielded Minuteman III ICBM was designed in an era when the cyber-domain did not exist and anti-ballistic missile capabilities were in their infancy. The Ground Based Strategic Deterrent (GBSD) will not only provide an increase in survivability and accuracy, but will be safer, more secure, more reliable, and offer enhanced operational flexibility. GBSD utilizes model-based systems engineering, a Modular Open Systems Architecture and a modular system interface allowing technology insertions at a lower cost and implementation at the speed of relevance. These methodologies will enable the weapon system to quickly adapt to and counter new, emerging, and currently unforeseen threats while reducing operations and sustainment costs throughout its lifecycle. As a full system recapitalization effort, GBSD will address the complete spectrum of current and future threats in the realms of electronic, electromagnetic pulse, antiballistic missile, cyber, and nuclear pre/trans/post attack environments. The Air Force welcomes the opportunity to provide the Committee further details in a classified setting. Mr. Turner. Isn't it true that GBSD will have safety upgrades? Can you please explain what these are and why they're important? General Dawkins. Like the currently fielded Minuteman III (MM III), Ground Based Strategic Deterrent (GBSD) will contain positive control measures to prevent the deliberate pre-arming, arming, launching, or release of nuclear weapons, except upon execution of the President's orders. Compared to MM III, GBSD will drastically reduce human proximity to the weapon by limiting the need to access and/or transport the missile for routine maintenance. GBSD missile components are being designed for greater time spans between routine maintenance, reducing exposure while increasing physical security, weapon surety, and safety. Additionally, GBSD will include positive physical measures against unauthorized access through a combination of enhanced entry and access measures, as well as administrative, technical, and cyber security provisions to protect access to sensitive areas and materials. Mr. Turner. The FY22 request included a modest increase in the request for LRSO. Can you please explain how this increase was arrived at and how it will be spent? General Dawkins. The FY22 increase in LRSO Research, Development, Test, and Evaluation from the FY21 President's Budget is primarily due to an accelerated Engineering and Manufacturing (EMD) contract award in July 2021 instead of February 2022. Pivoting to a sole source vendor enabled EMD acceleration based on Raytheon's maturity of design. The FY22 increase accounts for maintaining manning levels constant across all of FY22 in order to smooth the transition between the Technology Maturation and Risk Reduction phase and EMD ($30M/month x 5 months = $150M). Additionally, the increase accounts for procuring hardware for testing not originally planned in FY22, such as radiation hardening testing ($42M), and inclusion of performance incentive fees ($21.5M) as identified in the Acquisition Strategy (AS). Other prime contract cost drivers include updated costs for conducting flight tests ($5M) to begin clearing the B-52 envelope with a design of experiments approach, and an increase due to Digital Engineering efforts ($3M), which will provide greater insight into the design as required with the AS. Government costs include warhead hardware purchases ($18M) through the National Nuclear Security Administration, which are required to maintain the synchronization with the warhead development effort. Government costs also include range costs and survivability ground tests ($10.8M). Mr. Turner. Can you please articulate for the committee the capability LRSO will provide over the current ALCM? General Dawkins. The AGM-86B Air Launched Cruise Missile (ALCM) was first fielded in 1982 and was designed for a 10-year service life against air defenses of that era. Now 29 years past its designed service life, the LRSO is needed to replace the ALCM. The need for LRSO is partially driven by ALCM's over-extended service life, however, the true driver for LRSO is to ensure that a penetrating nuclear cruise missile capability is retained given the rapidly advancing adversary integrated air defense system capabilities. The LRSO will impose higher costs on adversaries' air defenses, requiring large investments and advances in detection, tracking, command-and-control, and area defenses to challenge each LRSO. The Air Force welcomes the opportunity to provide the Committee further details in a classified setting. Mr. Turner. Is there potential for the USN to leverage the USAF LRSO program for SLCM-N? General Dawkins. Yes, there is potential for the Navy to leverage the Air Force's Long Range Standoff Weapon (LRSO) program for the Sea- Launched Cruise Missile-Nuclear (SLCM-N). LRSO and its associated warhead are part of the Navy's SLCM-N Analysis of Alternatives (AoA). The Navy's TRIDENT II Life Extension 2 (D5LE2) and the Air Force's Ground Based Strategic Deterrent (GBSD) programs have forged a strong relationship, using an Under Secretary of Defense for Acquisition & Sustainment Memorandum of Understanding (MOU), and information is shared between the programs regularly. If SLCM-N becomes a program of record, the MOU construct developed for D5LE2 and GBSD could be utilized as a model to create a similar relationship for LRSO and SLCM- N. Mr. Turner. I'd like to express my appreciation that full funding was included to achieve the military requirement of producing 80 plutonium pits per year by 2030. This is specifically $475 million for the Savannah River Plutonium Processing Facility (SRPPF) and $350 million for Los Alamos Plutonium Facility 4 (LAPF-4). Can you please describe in detail just how much more expensive it would be to do all 80 pits per year at LANL? Dr. Verdon. Producing all 80 pits per year at Los Alamos National Laboratory (LANL) would involve greater risks than NNSA's current two site strategy for plutonium pit production and would have higher acquisition costs. The additional acquisition expense of producing all pits at LANL is driven by the need to construct a new nuclear facility at Los Alamos, rather than repurposing a nuclear facility that already exists at the Savannah River Site. In terms of mission risk, a Congressionally-mandated independent study conducted by the Institute for Defense Analysis (IDA) concluded that producing 80 pits per year at LANL was a ``very high risk'' approach. Section 3120(c) of the Fiscal Year (FY) 2019 National Defense Authorization Act (NDAA) directed NNSA to provide a detailed plan for designing and carrying out the entire 80 pit per year (ppy) production mission at LANL. As part of the 2018 Plutonium Pit Production Engineering Assessment (EA), a team of subject matter experts and Enterprise Construction Management Services contractors evaluated pre-conceptual design drawings for an option to achieve 80 ppy in LANL's Plutonium Facility 4 (PF-4) in tandem with new production module construction. The Department of Energy (DOE) and the Department of Defense (DOD) affirmed the EA conclusion that a strategy to produce 80 ppy at LANL in PF-4 or newly constructed production modules had the highest risk of all options examined, and installation of additional equipment in PF-4 to achieve 80 ppy could disrupt ongoing operations to achieve 30 ppy. DOE/NNSA concurs with the risks identified by the EA and IDA studies regarding the use of PF-4 to achieve 80 ppy. In addition, PF-4 is currently the only U.S. facility capable of pit production and other missions, and the facility will reach its assumed 50-year design life before 2030. Although DOE/NNSA continues to invest in facility sustainment projects to extend the life of the facility and reduce public, safety, and operational risks, any long-term commitment to achieve and sustain 80 ppy at LANL would require additional production capacity in a new nuclear facility. Beyond the additional acquisition cost and risk associated with an investment to produce more than 30 ppy at LANL, there is a potential production risk associated with concentrating all pit production in a single location. Two geographically separated plutonium pit production facilities bolsters resilience from external threats and hazards and enables flexibility to mitigate impacts of shutdowns, incidents, or other factors that may suspend operations at a single site. Mr. Turner. Can you please outline NNSA's track record for meeting CD-1 cost estimates since 2012 with specific examples of projects that have come in both under and over budget from CD-1 to CD-4. Dr. Verdon. Since the beginning of Fiscal Year 2012, NNSA has approved Critical Decision (CD)-1 for and completed six (6) projects or subprojects. All projects were completed under budget (i.e. below their CD-2 baseline cost estimates). Comparing the CD-2 Total Project Cost (TPC) to the estimated cost at CD-4 (or final closeout cost where available), the 6 projects had a collective underrun of $159 million (27%). The table below includes information about the six projects, including the top end of the cost range approved at CD-1. It should be noted that the two projects that finished above the top end of their CD-1 range started as general plant projects (GPP) and as such were managed outside of the DOE O 413.3B process. They reached CD-1 and established their cost range before nearly all of the reforms in place today were initiated. Mr. Turner. Do you have everything you need in this budget to bring the W88, W80-4, W87-1, and the W93 in on-time and on-budget. Dr. Verdon. Yes, the FY 2022 President's Budget Request provides NNSA the necessary resources to meet the timelines and requirements associated with these programs. Mr. Turner. Some have argued that there are too many single points of failure in the NNSA complex. What are some single points of failure that give the you most concern? Dr. Verdon. While DOE/NNSA's priorities are modernizing the weapons complex and executing all programs of record, there are sub-tasks critical to meeting these requirements that are single points of failure. These sub-tasks are Canned Subassemblies and plutonium pit production; if we fail to manufacture or assemble these critical components we will be forced to implement mitigation strategies which challenge our ability to maintain the nation's nuclear deterrent while enhancing the safety, security, and effectiveness of the U.S. nuclear weapons stockpile. Single-point infrastructure failures create undue mission risk. DOE/NNSA's aged, fragile production and testing facilities are reliant on safety systems and utilities that require increased maintenance and upgrades to avoid shutdowns. DOE/NNSA is in the process of replacing the Y-12 National Security Complex's obsolete Criticality Accident Alarm Systems and is preparing to install a secondary electrical feed at the Pantex Plant to provide backup power to the site's data nerve center. Sufficient manufacturing space at the Kansas City National Security Campus is a significant risk which we are addressing through short-term leases and longer-term real property acquisition. Investment is needed in PF-4's fire suppression water loop, which is a major safety system for pits, to eliminate a high- risk, single-point failure. Additionally, failing building systems must be replaced at Sandia National Laboratories' Building 894, which is the sole producer of power components for the enterprise, until the Power Sources Capability is operational. Fully funded maintenance and extended life programs help mitigate the risk of single-point failures, but even the best maintained systems require major replacement decisions every 15-20 years. For timely and unexpected infrastructure failures, minor construction projects are vital for a quick response. Additionally, aged, high-risk facilities carry significant risks to sites and surrounding populations. Aggressive risk reduction programs to prepare these facilities for demolition as soon as possible is extremely important to addressing some of our most concerning infrastructure challenges. Mr. Turner. Where in the NNSA FY2022 budget are we accepting the greatest risk. Dr. Verdon. By letter dated August 16, 2021, the Administrator certified that the FY 2022 President's Budget Request for NNSA of $19.7 billion is sufficient, and there are no unfunded priorities that would preclude NNSA from meeting FY 2022 Department of Defense requirements or FY 2022 internal NNSA deliverables. Mr. Turner. We've heard Secretary Granholm and Dr. Hruby state that they fully support the two-site solution for pit production. Can you please articulate the importance of resiliency in the system? Has COVID played into your resiliency calculation? Dr. Verdon. The need for a capability to produce 80 pits per year was identified by the Secretaries of Defense and Energy in 2008 and has been echoed through multiple administrations. Our Nation is at a point where we can no longer accept the risk of a single-point failure in the ability to produce pits needed to meet the military requirements. Having two geographically separated plutonium pit production facilities supports resilience from external threats and hazards and enables flexibility to mitigate impacts of shutdowns, incidents, or other factors that may suspend operations at a single site. These conclusions were supported by a Congressionally-mandated independent study conducted by the Institute for Defense Analysis (IDA), which found that using Los Alamos National Laboratory as the sole production site for the full 80 pits per year was a ``very high risk'' approach. Disruptions to global supply chains caused by the COVID pandemic both illustrated and underscored the need for robust and resilient manufacturing capabilities in vital production sectors. Plutonium pit production is a vital manufacturing sector for national security missions. Mr. Turner. How will LANL and SRS work together to ensure lessons learned at one site are shared at the other? Dr. Verdon. The Los Alamos National Laboratory (LANL) and the Savannah River Site (SRS) have been actively sharing lessons learned since the Nuclear Weapons Council endorsed DOE/NNSA's two-site strategy for pit production in 2018. The Preliminary Project Execution Plans (PPEPs) for both the Los Alamos Pit Production Project (LAP4) and the Savannah River Plutonium Processing Facility (SRPPF) state that DOE/ NNSA and DOE field offices--including the Los Alamos Field Office (NA- LA), Savannah River Field Office (NA-SR), Lawrence Livermore Field Office (NA-LL), and the Carlsbad Site Office--will provide inputs to the overall requirements and project execution activities. The SRPPF PPEP specifically states that: ``During conceptual design and CD-1 development, the SRPPF team sought out and used all available lessons learned for similar nuclear projects, to ensure that decisions are made using knowledge gained from past projects and innovative approaches and good work practices can be incorporated into the SRPPF Project.'' This process will continue with the preliminary and final design and the CD- 2 development, especially coordination with the LAP4. In addition, Senior Management Teams (SMTs) are led by NNSA's Office of Production Modernization and are comprised of Senior Executive Service members from NNSA's Office of Acquisition and Project Management, NA-LA, NA-SR, and support offices, including but not limited to nuclear safety, security, and the Chief Information Officer for both projects. The SMTs for both the LAP4 and SRPPF projects provide another opportunity to ensure lessons learned at one site are shared at the other. LANL, the Lawrence Livermore National Laboratory, and Sandia National Laboratories are collaborating to support SRPPF, with Integrated Project Teams (IPTs) that maintain a high level of awareness of the project to ensure integration between the work at each site. LANL has established a single associate lab director organization responsible for plutonium delivery which allows for a single point of coordination and integration. DOE/NNSA has also provided incentives in the Corporate Performance and Evaluation Plan for contractors at these sites to coordinate, integrate, and execute both projects at LANL and SRS in the most advantageous manner in support of the overall mission. In addition to routine collaboration on activities involving manufacturing process design, equipment selection, technology readiness assessments, nuclear and criticality safety strategies, and pit production workforce development initiatives, LANL and SRS have established a formal Knowledge Transfer Program. Under the auspices of the Knowledge Transfer Program, personnel from SRS relocate temporarily to work and train in LANL's Plutonium Facility-4, performing actual pit production operations. Continued expansion of the Knowledge Transfer Program is vital to the success of NNSA's two site strategy for plutonium pit production. Mr. Turner. Can you please sum up your understanding of Russian nuclear-capable SLCMs. Admiral Wolfe. Congressman, thanks very much for your interest in this area. I can't adequately answer your question in this venue, but I will work with your staff to provide you a more comprehensive response via classified channels. Mr. Turner. Is there potential for the USN to leverage the USAF LRSO program for SLCM-N? Admiral Wolfe. Yes, there is certainly potential for the USN to leverage the USAF LRSO program for SLCM-N. The USAF LRSO and its associated warhead are part of the SLCM-N Analysis of Alternatives (AoA). The USN's TRIDENT II Life Extension 2 (D5LE2) and the USAF's Ground Based Strategic Deterrent (GBSD) programs have forged a strong relationship and we share information between the programs (technical exchanges, hardware, testing, etc) regularly. ______ QUESTIONS SUBMITTED BY MR. MOULTON Mr. Moulton. On the importance of recruiting, developing, and retaining a highly technical workforce, how do you measure your progress in recruiting and retention? We are losing too much talent today. Can you please share some of the statistics and the ways you track this so we can see measurable progress? General Dawkins. The Air Force carefully monitors recruiting goals and retention metrics to ensure we have a sufficient force of highly skilled and experienced Airmen to support the National Defense Strategy. Additionally, some of the additional authorities granted to my position as one of the six cross-functional authorities in the Air Force enable me to gain additional insight into all career fields supporting the Air Force nuclear enterprise and the ability to provide feedback into the overall Air Force process. Furthermore, the Air Force is developing a continuous assessment capability of the nuclear enterprise as part of the Nuclear Mission Assessment (NMA), which was established by the Fiscal Year 2016 National Defense Authorization Act. The overall vision of the NMA is a continuous, comprehensive, data- driven assessment capability to provide insights and trend analysis of underlying issues within the nuclear enterprise to senior leaders and decision makers. The analysis model being developed with our partnership with Johns Hopkins University's Applied Physics Laboratory will incorporate human capital metrics such as retention rates to better address the health of those career fields within the nuclear enterprise. The Air Force as a whole achieved its FY20 recruiting goals of 26,398 regular component Enlisted (100% of goal) and regular Officers of 4,553 (100% of goal). We also met our Air National Guard combined officer and enlisted goal by recruiting 11,620 members (108% of goal), and our Reserve combined officer and enlisted goal of 7,000 (100% of goal). Additionally, the Air Force is on target to reach our FY21 recruiting goals. While we are doing well in recruiting, we understand there is a growing competition for talent and expect the recruiting environment to become more challenging. As important as recruiting is, retention within our high-tech force is equally important. While the Air Force is experiencing unprecedented high retention rates in both the enlisted and officer corps, the aggregate success may hide areas with retention challenges. To help improve these retention challenges, the Air Force continues to offer targeted monetary incentives as well as non-monetary incentives focused on quality of life and quality of service programs. Mr. Moulton. On the importance of recruiting, developing, and retaining a highly technical workforce, how do you measure your progress in recruiting and retention? We are losing too much talent today. Can you please share some of the statistics and the ways you track this so we can see measurable progress? Admiral Wolfe. [No answer was available at the time of printing.] ______ QUESTION SUBMITTED BY MS. STEFANIK Ms. Stefanik. The FY2022 President's Budget requests $640,684,000 for Naval Reactors Development (NRD), which focuses on research and development to ensure the current and future fleet is the most advanced, well-maintained, and capable nuclear fleet in the world. Which technologies are NRD working on to maintain our nuclear force's capability overmatch over our great power adversaries in China and Russia? Dr. Verdon. Naval Reactors Development (NRD) funds the development of advances in the unique nuclear propulsion technical capability that the Navy relies on to operate, build, and maintain nuclear-powered ships. Included in this line is funding that enables the Naval Nuclear Propulsion Program to manage operations of the current fleet, perform analysis of current reactor performance, and support construction of nuclear-powered warships. The FY 2022 budget request also increases investment in the research and development of new technologies, including those intended to support the Navy timeline for SSN(X). Investment in mid- to long-term advanced research and development has been deferred over the past decade to support major recapitalization efforts across the Program. The increase in NRD in FY 2022 will support the following efforts: Performing cutting-edge research to develop new technologies and manufacturing methods that significantly improve the capability, effectiveness, performance, and cost of future naval nuclear propulsion plants to maintain our strategic maritime superiority. Examples include added focus on: Advanced instrumentation and control technology and equipment: Current digital control and power management equipment is becoming obsolete and will need to be replaced. Naval Reactors is working with commercial industry on replacements that take up less space, run cooler and with less power, enable more effective use of electrical power in the ship, are more secure against cyber-attack, costs less and can efficiently acquire and process a broad range of plant data. Plant Data and Automation: Advanced sensors, artificial intelligence, and data analytics are being pursued to automate current manual data collection, and process that data into information that gives the operator a clearer picture of plant status, with goals to simplify operation, enable confident condition-based maintenance, increase ship operational availability and ease the burden on our sailors. Core manufacturing development: Naval Reactors has started an effort to change how we manufacture reactor cores, with technology that promises to provide a more capable reactor for the next ship, while also allowing that reactor to be smaller and cost less. The new approach employs advanced, high precision robotics and machine learning methods for automated in-process inspection that can quickly find and correct potential production process issues much earlier than is possible today, reducing our fabrication costs and risks. Component manufacturing technologies: Naval Reactors sees practical potential for using certain advanced manufacturing approaches in building major plant components. These advanced capabilities include hot-isostatic pressing and metal additive manufacturing, and based on industry experience, promise to delivery propulsion plant components at reduced cost and schedule, in addition to enabling performance-enhancing designs with unique or complex geometries. These advanced manufacturing approaches can supplement, or in some cases replace, traditional forging and casting methods, some of which have changed little since World War II. Developing technology for reactor plant components that will provide substantial improvements in quieting capability and performance for future submarines. There is real potential to make a meaningful improvement to submarine stealth. Achieving an improvement involves work in reactor technology areas using existing specialized laboratory test facilities and state of the art flow and heat transfer computer methods, as well as targeted improvements to key reactor plant components. Recapitalizing facilities and equipment for inspecting and characterizing naval spent nuclear fuel; efforts that have the potential to provide increased operating capability of nuclear submarines and aircraft carriers. ______ QUESTIONS SUBMITTED BY MS. CHENEY Ms. Cheney. The nominee for NNSA Administrator recently testified in her confirmation hearing that it was longstanding U.S. policy that any enriched uranium used for national security applications, such as for NNSA's tritium program, must be fully ``unobligated''--that is, mined, converted, and enriched in the United States, using U.S. technologies. Do you agree with that position? Dr. Verdon. Yes. Under longstanding U.S. policy and international agreements, peaceful use obligations are imparted on uranium processed by certain foreign technologies or transferred under a 123 Agreement. DOE/NNSA maintains that these peaceful use obligations restrict the material from being used for tritium production and therefore unobligated material must be used for this mission. Ms. Cheney. While not a national security mission, the Office of Nuclear Energy is under a congressional mandate from Section 2001 of the Energy Act of 2020 to be able to provide a new type of nuclear fuel--high assay, low enriched uranium (HALEU)--to the commercial advanced reactor industry no later than 2026. Currently the only commercial producer of this specialty material is Russia. Shouldn't NNSA be working to support the Office of Nuclear Energy in meeting their commercial HALEU needs, so as to use American-produced HALEU rather than material imported from a strategic adversary? Dr. Verdon. Yes. DOE/NNSA's Office of Defense Nuclear Nonproliferation is working closely with the Office of Nuclear Energy to identify HALEU within the DOE complex that can be used to support near-term commercial advanced reactor industry needs. Some of these inventories will require processing into a form that can meet industry's needs. While there is not enough HALEU available within the DOE/NNSA complex to meet all of industry's anticipated near-term needs, NNSA is committed to making available as much HALEU as possible for advanced reactors without negatively impacting existing national security and nonproliferation programs. Ms. Cheney. Why did NNSA not include funding for the uranium reserve in its FY22 request? Dr. Verdon. NNSA did not request funding in FY 2022 for two reasons. First, the Uranium Reserve program was originally proposed as a program to support civilian nuclear industry and not defense needs. DOE/NNSA has sufficient quantities of unobligated uranium to sustain defense missions through the early 2040s. Second, funds appropriated in FY 2021 will be executed in FY 2022. [all]