- MODERNIZING VA: LESSONS LEARNED IN THE 118TH CONGRESS [House Hearing, 118 Congress] [From the U.S. Government Publishing Office] MODERNIZING VA: LESSONS LEARNED IN THE 118TH CONGRESS ======================================================================= HEARING BEFORE THE SUBCOMMITTEE ON TECHNOLOGY MODERNIZATION OF THE COMMITTEE ON VETERANS' AFFAIRS U.S. HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS SECOND SESSION __________ THURSDAY, DECEMBER 12, 2024 __________ Serial No. 118-92 __________ Printed for the use of the Committee on Veterans' Affairs [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] Available via http://govinfo.gov __________ U.S. GOVERNMENT PUBLISHING OFFICE 58-136 WASHINGTON : 2026 ======================================================================= COMMITTEE ON VETERANS' AFFAIRS MIKE BOST, Illinois, Chairman AUMUA AMATA COLEMAN RADEWAGEN, MARK TAKANO, California, Ranking American Samoa, Vice-Chairwoman Member JACK BERGMAN, Michigan JULIA BROWNLEY, California NANCY MACE, South Carolina MIKE LEVIN, California MATTHEW M. ROSENDALE, SR., Montana CHRIS PAPPAS, New Hampshire MARIANNETTE MILLER-MEEKS, Iowa FRANK J. MRVAN, Indiana GREGORY F. MURPHY, North Carolina SHEILA CHERFILUS-MCCORMICK, C. SCOTT FRANKLIN, Florida Florida DERRICK VAN ORDEN, Wisconsin CHRISTOPHER R. DELUZIO, MORGAN LUTTRELL, Texas Pennsylvania JUAN CISCOMANI, Arizona MORGAN MCGARVEY, Kentucky ELIJAH CRANE, Arizona DELIA C. RAMIREZ, Illinois KEITH SELF, Texas GREG LANDSMAN, Ohio JENNIFER A. KIGGANS, Virginia NIKKI BUDZINSKI, Illinois Jon Clark, Staff Director Matt Reel, Democratic Staff Director SUBCOMMITTEE ON TECHNOLOGY MODERNIZATION MATTHEW M. ROSENDALE, SR., Montana, Chairman NANCY MACE, South Carolina SHEILA CHERFILUS-MCCORMICK, KEITH SELF, Texas Florida, Ranking Member GREG LANDSMAN, Ohio Pursuant to clause 2(e)(4) of Rule XI of the Rules of the House, public hearing records of the Committee on Veterans' Affairs are also published in electronic form. The printed hearing record remains the official version. Because electronic submissions are used to prepare both printed and electronic versions of the hearing record, the process of converting between various electronic formats may introduce unintentional errors or omissions. Such occurrences are inherent in the current publication process and should diminish as the process is further refined. C O N T E N T S ---------- THURSDAY, DECEMBER 12, 2024 Page OPENING STATEMENTS The Honorable Matthew M. Rosendale, Sr., Chairman................ 1 The Honorable Sheila Cherfilus-McCormick, Ranking Member......... 3 WITNESSES Panel I Ms. Carol Harris, Director, Information Technology and Cybersecurity Issues, U.S. Government Accountability Office.... 4 Ms. Lynn Overmann, Executive Director, Beeck Center for Social Impact & Innovation, Georgetown University..................... 6 Mr. Reynold Schweickhardt, Non-Resident Senior Fellow for Congressional Modernization, Foundation for American Innovation 8 Panel II The Honorable Kurt DelBene, Assistant Secretary for Information and Technology and Chief Information Officer, U.S. Department of Veterans Affairs............................................ 18 Accompanied by: Mr. Robert Orifici, Executive Director, Benefits and Memorial Systems Portfolio, Office of Information and Technology, U.S. Department of Veterans Affairs Ms. Cherri Waters, Executive Director, Health Portfolio, Office of Information and Technology, U.S. Department of Veterans Affairs APPENDIX Prepared Statements Of Witnesses Ms. Carol Harris Prepared Statement.............................. 33 Ms. Lynn Overmann Prepared Statement............................. 55 Mr. Reynold Schweickhardt Prepared Statement..................... 63 The Honorable Kurt DelBene Prepared Statement.................... 69 MODERNIZING VA: LESSONS LEARNED IN THE 118TH CONGRESS ---------- THURSDAY, DECEMBER 12, 2024 Subcommittee on Technology Modernization, Committee on Veterans' Affairs, U.S. House of Representatives, Washington, DC. The subcommittee met, pursuant to notice, at 8:14 a.m., in room 360, Cannon House Office Building, Hon. Matt Rosendale (chairman of the subcommittee) presiding. Present: Representatives Rosendale, Cherfilus-McCormick, and Landsman. Also present: Representative Kennedy. OPENING STATEMENT OF MATTHEW M. ROSENDALE, CHAIRMAN Mr. Rosendale. Good morning. The subcommittee will come to order. I want to welcome our witnesses to discuss the lessons we can learn from the Department of Veterans Affairs' (VA) efforts to modernize its technology during the last 2 years. The VA is an organization of nearly half a million people that serves 9 million veterans and their family members using thousands of Information Technology (IT) systems and has a total budget of roughly $370 billion a year, making it second largest agency only surpassed by the Department of Defense (DOD). The scale of the IT systems are massive and presents a lot of challenges. The department has repeatedly attempted to address these challenges with mega projects that spanned years or even decades and cost billions of dollars. This strategy simply has not worked well. All six of the VA's multibillion dollar IT projects have either stumbled badly or collapsed altogether and this should come as no surprise. I challenge our witnesses to point to any IT project anywhere with a budget this large that has been successful. We have spent many hours in this subcommittee discussing VA's three mega projects that are currently racking up cost overruns and schedule delays. Electronic Health Record Modernization (EHRM) has spent nearly $10 billion already and would cost more than $37 billion to implement according to the Institute for Defense Analysis (IDA). The true cost across VA is even higher than that as it does not include the enormous additional staffing requirements or the loss of productivity. VA and Oracle are on the cusp of resuming the rollout and there is no end in sight. After 6 years Financial Management Business Transformation (FMBT) has only installed the Momentum system in a few small corners of the VA and its cost estimate has more than doubled to $5.8 billion according to the IDA. Finally, the digital GI bill has missed its original 2024 completion date and its final price tag will likely double as well. Not only have these systems blown past their schedules and budgets, they are also struggling to live up to the users' expectations. However, there are signs that the VA's leaders are learning to take different approaches. Secretary McDonough had the good sense to pull the plug on the Defense Medical Logistics Standard Support (DMLSS) system after its pilot at James A. Lovell went so poorly. The second supply chain effort has been on indefinite hold since the subcommittee exposed its poorly defined objectives and more than $9 billion lifecycle cost estimate. Finally, Secretary McDonough and Mr. DelBene and their teams came to their senses before moving forward with a nearly $1 billion human capital management modernization contract. I am glad to see some of the VA resist the contractors' expensive promises and the temptation to use major IT projects to build their bureaucratic empires. Megaprojects sound good in theory but in reality they are always overdue, over budget, and that is unacceptable for veterans and for the taxpayers. At a time when the VA has come to us with more than a $6 billion budget deficit, the department literally cannot afford to operate this way anymore. Megaprojects are also incompatible with the best practices that took hold in the software industry more than a decade ago. I am talking about agile, incremental development, small scale deployments, testing by real users, and component-based architecture. We are going to hear about successful use of these practices from our panel of independent experts and hopefully from our VA witnesses as well. We have also seen some encouraging examples when the VA succeeded in implementing or solving problems with smaller systems. VA.gov was riddled with bugs causing veterans' submissions to disappear and I still question how long it took for the department to tell us everything. Mr. DelBene and his office were able to get to the root of the cause, the problems fairly quickly. There is also the 18- month ordeal to get the program integrity tool to process claims data correctly. The system is small enough that Office of Information And Technology (OIT) was eventually able to figure it out. Mr. Orifici and his team recognized the limitations in the large, outdated veterans benefit management system and they have been proactively segmenting it and modernizing it in individual parts. As with most things in government, the larger project gets the harder it is to manage and the less likely it is to ever deliver useful capability. On the other hand, smaller efforts deliver early and often and they can survive the technical challenges along the way. As we close out this Congress and prepare to transition to a new administration with new VA leadership, I want to emphasize these lessons learned. We need to build a nimbler VA that is more responsive to the veterans' needs. I look forward to our witnesses' testimony today to help us do that. With that, I yield to Ranking Member Cherfilus-McCormick for her opening statement. OPENING STATEMENT OF SHEILA CHERFILUS-MCCORMICK, RANKING MEMBER Ms. Cherfilus-McCormick. Thank you, Mr. Chairman. Thank you so much for our witnesses for being here today. Over the course of the 118th Congress, this subcommittee held 20 hearings examining the IT modernization efforts of the Department of Veteran Affairs. It is clear to me that most of the programs that were reviewed suffer from the same issues, poor requirements development, poor contract management, and an over-reliance on contractors to determine what is possible versus what the department identifies as its needs. I am also concerned that the department is taking on too much. Instead of attempting to modernize everything all at once, they should be thinking strategically and delivering one or two successful projects before moving on to the other. I worry that business-led IT projects are part of the problem. It seems to me that OIT's role in many of these projects is not sufficient to keep the projects on track from the very beginning causing monumental downstream effects. This lack of involvement, whether intentional or otherwise, contributes to the poor requirements development which in turn leads to the significant contract overages we see in the projects like the digital GI Bill and the supply chain modernization, all for VA to realize that they are not getting what they need out of the product. I also have major issues with the way IT is budgeted at VA. IT is frequently the sacrificial lamb when it comes to needing funding for the mission. While this is not unique to VA, we cannot allow this to continue. As more and more veterans become eligible for care and benefits at VA, budget constraints require cuts in other places. It cannot continue to be one of those places. This is the reason that VA is operating on an IT infrastructure that is well past its service life in many places and much of the software that VA uses is obsolete. We hear a lot of talk about government inefficiency. Fixing those inefficiencies starts by ensuring that VA employees have the best tools to do their job, which starts with fully funding the Office of Information And Technology. Point blank, VA needs to do a better job of ensuring that its IT budget supports VA employees and veterans. I look forward today to hearing the witnesses' testimony. Before I yield, there is a few people that we unfortunately will be saying farewell to. This will be the last subcommittee hearing for Assistant Secretary DelBene, one of my favorite chairmen, Rosendale, and the Republican's subcommittee staff Bill Mallison, who has been excellent. Mr. Mallison has been with us with the subcommittee since its inception and has been a valuable partner in our efforts to ensure that VA and its employees have reliable and modern tools to provide world class care and benefits to our Nation's veterans. His insight and his thoroughness will be missed, and I wish him the best of luck in his next chapter. Also, as in this way, with a changing administration we will be losing Assistant Secretary DelBene. I know you and I have not always seen eye-to-eye, but I have appreciated your hard work over the last past 3 years. I would also like to save the best for last, which is wishing Chairman Rosendale well wishes as this will be his last hearing with the subcommittee. There are few places in this body as bipartisan as the subcommittee we have been on, and I thank the chairman for being one of those people and working with me so openly. I wish you the best on this. Thank you so much, and I yield back. Mr. Rosendale. Thank you very much for those kind words and appreciation from everybody, really. I will now introduce the witnesses on our first panel. Ms. Carol Harris is the director of Information Technology Acquisition Management at the Government Accountability Office (GAO). Ms. Lynn Overmann is the executive director of the Beeck Center at Georgetown University. Ms. Overmann has previously served in the U.S. Digital Service. Finally, Mr. Reynold Schweickhardt is the nonresident senior fellow for congressional Modernization with the Foundation for American Innovation. Mr. Schweickhardt previously served as senior technology advisor at General Services Administration (GSA) and in top technology roles in the House of Representatives. If you all could please rise and raise your right hands, please? Do you solemnly swear under penalty of perjury that the testimony you are about to provide is the truth, the whole truth, and nothing but the truth? Thank you and let the record reflect that all the witnesses have answered in the affirmative. [Witnesses sworn.] Mr. Rosendale. Ms. Harris, you are now recognized for 5 minutes to deliver your opening statement on behalf of GAO. STATEMENT OF CAROL HARRIS Ms. Harris. Thank you. Mr. Chairman, Ranking Member Cherfilus-McCormick, and members of the subcommittee thank you for inviting us to testify today on VA's IT modernization challenges and lessons learned. I also want to take a moment to thank your outstanding committee staff and also wish best wishes to Mr. Mallison as well. As requested, I will briefly summarize our prior work on the department's efforts to acquire and manage its IT, as well as our work on critical factors leading to successful IT outcomes. As you know, the use of IT is crucial to helping VA effectively serve our Nation's veterans and the department's investment in IT is substantial. Over the past 2 years VA has obligated over $21 billion for a range of IT products, systems, and services. Unfortunately, the department's management of its IT modernization efforts continues to be high risk. This morning I will highlight two key points. First, we have made a total of 20 recommendations in recent reports to improve VA's IT acquisitions and management and while VA has concurred, none have been implemented thus far. These recommendations address healthcare, financial management systems, IT governance, and IT procurement. For example, VA has faced longstanding challenges in its efforts to deploy modern IT solutions in two critical areas: its health information system as well as its financial and acquisition management systems. After three unsuccessful attempts between 2001 and 2017 to modernize its health information system, VA is now on its fourth attempt known as EHRM. However, in 2023, VA announced it was halting further deployments and instead prioritizing making improvements at the five sites using the system. At that time about 79 percent of users strongly disagreed that the system enabled quality care. In our 2023 report we made 10 recommendations to VA in areas such as user satisfaction, system trouble reports, and change management. Similarly, in 2016, VA established its FMBT initiative, its third attempt to replace aging financial and acquisition systems with one integrated system. In 2021, we reported that full implementation of the new system was not expected until 2027 at a 10-year lifecycle cost of nearly $3 billion. As of July 2024, full implementation was moved to 2030 and lifecycle costs escalated to $7.7 billion. Our two reports made a total of three recommendations to VA on cost and schedule estimating in its efforts to manage risks. If VA implements these 13 recommendations, along with the other seven we have made in the areas of IT governance, software licenses, and cloud computing, the department will be in a stronger position to course correct the major IT acquisitions it has under way. Now to my final point, VA should consider all available opportunities to ensure that its IT investments are acquired in the most effective manner possible. We have previously reported on nine critical factors that have led to successful IT acquisitions across the Federal Government. These factors include ensuring end users and stakeholders are involved in the development of requirements and in the testing of system functionality, that government and contractor staff are stable and consistent among other things. These factors are common sense, but they are also easier said than done. All too often, we have found the absence of these factors or the partial implementation of them to be the root causes of cost, schedule, and performance issues found on troubled or failed IT programs. Another set of leading practices applicable here is the use of iterative development for complex IT acquisitions. Leading companies use this approach to rapidly develop complex IT products that are relevant and responsive to their users' most critical needs. Iterative development essentially breaks large, monolithic IT projects into smaller more manageable pieces so that you are delivering system functionality within weeks or months versus years. The critical factors and leading practices I mentioned serve as the basis for many of our current recommendations to help improve Federal IT management. As such, VA can rely on them to help achieve successful IT acquisitions. Moving forward in the two areas I noted, it will be critical for VA to fully implement our recommendations as soon as possible. Doing so will position the department to more effectively deliver the systems and IT operations that meet mission needs. That concludes my statement, and I look forward to addressing your questions. [The Prepared Statement Of Carol Harris Appears In The Appendix] Mr. Rosendale. Thank you very much, Ms. Harris. The written statement of Ms. Harris will be entered into the hearing record. Ms. Overmann, you are now recognized for 5 minutes to deliver your opening statement on behalf of the Beeck Center. STATEMENT OF LYNN OVERMANN Ms. Overmann. Thank you, Chair Rosendale, Ranking Member Cherfilus-McCormick, and distinguished members of the committee for the opportunity to testify today. It is my honor to share insights from my perspective as the executive director of the Beeck Center for Social Impact at Georgetown University, as well as from my past experience in senior policy and delivery roles in the White House Office of Science and Technology Policy and the Domestic Policy Council. For more than a decade the Beeck Center has led projects that have positively impacted more than 262 million people across the United States, working alongside governments to build a future with more opportunity and economic mobility for all. Rooted in the values of our institutional home at Georgetown University, we are a network catalyst, a research hub, an advocate for policymaking in the modern age, and a training ground for tomorrow's innovators. Technology modernization is central to our work. The systems that veterans rely on to connect to benefits, parents use to access childcare, and seniors need to utilize healthcare must be robust, adaptive, and designed with user needs in mind. Yet Federal technology projects often fall short, plagued by rigid approaches that prioritize process over outcomes. These failures diminish public trust, waste taxpayer money, frustrate agency frontline workers, and prevent people from accessing services when they need them the most. When agencies attempt to modernize they often purchase static software treating it like any other commodity, like computers or cars, one-time purchases that simply work upon acquisition. Software must continuously evolve to keep up with the changing policies, security demands, and customer needs. Technology modernization is a continual process of addressing unmet needs, not a one-time effort with a defined start and end. Too often Federal modernization projects are built in silos, scoped too broadly, and outsourced to vendors who require high cost, multi-year contracts. Those contracts are then often overseen by agency project managers who may not be technologists themselves, making it even more challenging to test vendors' deliverables and identify technical fixes when projects go off track. The good news is that some agencies can and have shifted from this static project management model to what we call a product model that empowers internal agency digital services teams with full ownership of product development and avoids the one-size-fits-all solutions in favor of modular development that meets the needs of real people. The product model, championed by my friend and colleague, Jennifer Pahlka, starts with a small, nimble team conducting discovery sprints with the people who use the services to deeply understand their needs and the service delivery challenges the software aims to solve. By identifying high risk elements early, such as whether a data integration will actually function effectively, the product team can test and address critical components of the product before investing significant resources in a full-scale solution. A recent example of the product model in action is the development of the direct file tool for the Internal Revenue Service (IRS). The 2024 pilot ultimately served more than 140,000 people with 90 percent of users rating the tool as excellent or above average. To achieve this, the IRS empowered their internal team with the right expertise, started with a limited scope and eligibility, developed the tool with deep user research, and tested with a small number of users. In fact, the first test was with just one person. Then they fixed what did not work, tested again, user tested again, and then tested further. This process saved users time, money, and resulted in extremely high rates of satisfaction. What is more, the operational costs to the IRS to develop, test, and launch direct file, including customer service, cloud computing, and user authentication, were just $2.4 million, partly because the U.S. Digital Service team was deployed at no cost to the IRS. Simply put, agency product development teams are uniquely positioned to identify and address operational barriers. This streamlines processes, reduces administrative burdens, and paves the way for more successful product deployments. To ensure that Federal agencies, including the Department of Veterans Affairs, can fully realize the benefits of the product model for technology modernization, I propose four recommendations outlined in my written testimony that Congress can work on with agency and White House leaders. Perhaps the most important recommendation is to ensure that agencies streamline hiring processes to efficiently recruit and onboard digital service talent who can implement the product model backed by flexible multi-year investments that support a people-centered, iterative approach to delivering effective digital services. By adopting these recommendations, Congress can ensure that agencies like the VA are equipped with the tools, resources, and flexibility needed to deliver modern services that are focused on the end user, parents, veterans, seniors, and more that meet the evolving needs of the American people, ending the cycle of costly technology failures. [The Prepared Statement Of Lynn Overmann Appears In The Appendix] Mr. Rosendale. Thank you very much, Ms. Overmann. The written statement of Ms. Overmann will be entered into the hearing record. Mr. Schweickhardt, you are now recognized for 5 minutes to deliver your opening statement on behalf of the Foundation for American Innovation. STATEMENT OF REYNOLD SCHWEICKHARDT Mr. Schweickhardt. Thank you, Chairman Rosendale, Ranking Member Cherfilus-McCormick, and members of the subcommittee. Thank you for the opportunity to testify this morning. As mentioned, I am with the Foundation for American Innovation but previously spent considerable time here at the House beginning in 1995 to modernize a wide range of legacy and dysfunctional software. I have extensive experience in that technology modernization, but I am not a VA or IT health expert, so let me delineate that. When we think about technology at the VA, it should empower the staff to provide better care without limiting the ability of doctors and medical professionals to problem solve. I want to briefly focus on three issues that I think would improve the outcomes at VA: VA leadership challenges, improving the electronic health record modernization implementation, and identifying options to better address future challenges in financial management and supply chain. I think that the next secretary should define several organizational objectives for technology modernization and place those objectives in each executive performance plan to help create a more unified focus from VA leadership agency- wide. The second issue that they should address is the tenure of the Chief Information Officer (CIO). I think Mr. DelBene had the best possible tenure given transitioning from an important private sector career with conflicts of interest to manage, et cetera. His 3-year term is about as long as that is going to be. The next administration should take steps to ensure that the CIO has a tenure of at least 5 years, be it a term appointment or some other process to accomplish that. When you look at the record of the electronic health record modernization project, it would appear to me as an outside observer that the process is very stepwise. The sixth implementation in Chicago was apparently the first one with a community care center and that process of moving patients from the care center to clinical care and back again had been worked out in the legacy software but was an issue in the implementation. To avoid, sort of, repeated discovery as this project is implemented across VA, I would recommend that the deployment plan look at how to operationalize all of the functionality to discover what it is across all the centers. I think the fact there is 130 instances of the legacy system reflects a broad divergence across the facilities and you cannot discover that one at a time. The methods previously discussed, you know, are appropriate to do that, but a key milestone, I think, is reaching a point where all of that functionality is running successfully in at least one facility so it is not a hypothetical and it is not pretty PowerPoint slides. You know, looking at the supply chain issue briefly, it sounds like in these repeated failures these are these monolithic projects. One thing I would note is that the problem of failing to deliver creates a negative feedback loop and it causes a last train leaving the station phenomena where everyone loads every capability and every complexity as this is their one chance in 10 or 20 years to get their requirements into the system. That has to be fought with a more agile and incremental approach. To the degree that the supply chain initiative is going to be broken down into seven to 10 pieces, I think that is a good progress but the committee should ensure that each of those pieces--that the first piece is actually implemented and that it is not another way to describe a monolithic approach. With that, I would conclude my remarks and look forward to your questions. [The Prepared Statement Of Reynold Schweickhardt Appears In The Appendix] Mr. Rosendale. Very good. Thank you so much, Mr. Schweickhardt. The written statement of Mr. Schweickhardt will be entered into the hearing record so that we have the full statement. We are now going to proceed to questioning and I will recognize myself for 5 minutes. Okay. Ms. Overmann, good morning again. Thank you again for being here. Can you think of a multibillion dollar IT project that a Federal agency has ever completed on time and on budget or completed it at all? Ms. Overmann. Heads up, but this is going to be a question and I will not say that I did comprehensive research across every single IT implementation in the Federal agencies. I did actually find a successful project or two and it is interesting because I actually think it reinforces the points that you made in your opening remarks and that I have heard from my fellow testimony given here today. It was a cloud migration that the Department of Defense managed. It is called the defense, like, Defense Enterprise Office Solution (DEOS). It is an $8.9 billion 10-year timeframe contracts to migrate securely to the cloud. I think the reason that this actually reinforces what we are talking about is twofold. One is cloud infrastructure is really functionally infrastructure. It is something that you can acquire and deploy. It is not something that is aimed at meeting specific end user needs. That has been a successful implementation and it was interesting because the way that they rolled that out initially starting in May 2023 was to roll it out to 11,000 users to start. Now, for some agencies that might feel like a large amount, but for DoD who has, I think, the ultimate goal of the system is to serve 3.2 million people, that was a small starting point so they did follow that model of testing with a small group of users and then rolling it out slowly over time. Outside of those type of cloud migrations, which again I believe just provide things like secure data storage, access to different development tools, and different, kind of, Customer Relationship Management (CRM), I was unable to find a single large-scale IT projects along the lines of what you are describing with the VA that has been successful on time or on budget. Mr. Rosendale. On budget, okay. Thank you. Mr. Schweickhardt, can you think of one? Mr. Schweickhardt. I cannot, Mr. Chairman. Mr. Rosendale. Thank you very much. Ms. Harris, what is it about the IT megaprojects that makes them so risky and prone to failure? Ms. Harris. When you take that waterfall approach, which is that monolithic approach, you are developing all your requirements in the beginning and then you are designing and developing the system and then once you deploy 5 to 7 years out that is when you realize it is not going to meet your mission need. You have already sunk in at that point, you know, hundreds of millions possibly billions of dollars and you are just set up to fail. It is just too much risk for these agencies to take on to go with that kind of approach. Mr. Rosendale. Very good. Ms. Overmann, you have been an advocate for a product model approach that makes government agencies accountable for outcomes rather than a project model. You touched on it on your opening statement that lets agencies pass the buck to contractors. What are some examples of the product model and the project models so that the general public can understand the difference of what we are talking about? Ms. Overmann. Yes, absolutely. I do think the examples that you provided of some of these six VA systems are very good examples of the project model and what the challenges are with that approach. I believe Ms. Harris also just highlighted that. I am going to give a couple of positive examples of the product model. I mentioned the IRS direct file, which was---- Mr. Rosendale. First time we have heard them mentioned in a favorable manner, okay? Ms. Overmann. Purely from a software development and deployment standpoint it was actually quite effective. I do want to point to another project that I think actually is another component of why this type of an approach can be quite useful, which was the COVIDtest.org website that was launched in the midst of the COVID pandemic. If as you all recall, COVID tests were extremely difficult to find at the time. COVIDtest.org was developed jointly by U.S. Digital Service, Department of Health and Human Services (HHS), and the U.S. Postal Service. They developed this tool in 3 weeks and they used existing infrastructure and there were a few key components that went into why this program was so successful. First of all, they designed with users in mind and made the application online as lightweight as possible. They did not try to pile on data collection. They did not try to do identity proofing. They basically made a very simple form that took less than a minute to fill out. Mr. Rosendale. Okay. Ms. Overmann. That did not actually--on the back end what they did was they worked with vendors who had demonstrated success in handling high load input. While the front end was very simple the back end was intentionally designed to handle high volumes of applications. Indeed, on the first day a million people applied and the system was able to bear that load. I think that combination of thoughtful design, working successfully with vendors, and having a product vision that was owned by the implementers was what made that project so useful. Mr. Rosendale. Very good, very good. I am going to yield back now and recognize Representative Kennedy for 5 minutes of questioning. Mr. Kennedy. Thank you, Chairman. Mr. Rosendale. Thanks for joining us. Mr. Kennedy. Yes, thank you. Thank you, Chairman and thank you all for your testimony. Thanks for your service to our country. Ms. Harris, in your testimony you talked a bit about the VA's IT budget. Do you feel the budget is sufficient to support the VA's IT needs and ultimately the modernization efforts? Ms. Harris. Well, I have not scrubbed the full IT budget to give you that full response, but what I can say is that when we take a look at these critical success factors for these large- scale IT acquisitions, one of these factors that they have in common are having programs receiving sufficient funding. It is very important for these programs to have that. I do think that, you know, that in combination with other tools, like having a working capital fund with money that the CIO can use over multiple years at his or her discretion is very important to give them that flexibility. At the same time, accountability is also critically important because the last thing we want is for agencies to have these slush funds. We have open recommendations to VA to improve their cost and schedule estimating capabilities so when they come out with these programs like EHRM or FMBT, for example, we want those cost estimates to be reliable and comprehensive and credible. That is critically important. We have those open recommendations for VA to improve that so that when they do come out with a budget request the underlying programs have reliable estimates behind them. Mr. Kennedy. All right, thank you. As far as the VA IT acquisition efforts go, what are the biggest steps that the VA could take to improve? Ms. Harris. Again, breaking down these large programs into these smaller more manageable pieces is a huge thing. That will definitely set them up for success. Also, I also agree with my panelists that having end users involved in that process early and often, especially for testing, is vital. We have seen success cases where agencies have literally built test labs. They bring in the users and they are, you know, working on prototypes and they are testing on, like, in real time early and often. That is also a great predictor of success. Mr. Kennedy. Thank you. To your knowledge is there a single office or official responsible for tracking open recommendation from GAO or Office of Inspector General (OIG) related to VA's IT modernization efforts? Ms. Harris. I am not aware of that. I am not sure. Mr. Kennedy. Do you think it would be beneficial---- Ms. Harris. I do think so. Mr. Kennedy [continuing]. to have a single entity? Ms. Harris. I do think so. I think a single point of accountability would greatly improve VA's track record in closing out our recommendations, as well as the Inspector General's (IG). Mr. Kennedy. Where should that entity fall within the department would you say? Ms. Harris. I would have to take that back for the record. I am not quite sure where it would fall, but certainly someone that has direct reporting lines to the secretary or the deputy secretary so that they have that substantial backing behind them to ensure that these recommendations get implemented effectively and efficiently. I think that that would be a good thing. Mr. Kennedy. Thank you. In regard to the indicated risks associated with the lack of Federal Information Technology Acquisition Reform Act (FITARA) compliance, what do you think the VA's biggest weaknesses are with the lack of compliance? Ms. Harris. Well, with regards to FITARA, I mean, one of the main things is for the CIO to review and approve all IT contracts, you know, going through the department. Based on our most recent work in that area it looked like roughly 39 percent of those IT contracts were going under the radar so Mr. DelBene was not in a position to even be aware of those contracts coming through. Having automated processes that ensure that those contracts hit his desk first so that, you know, he can review it and make a determination whether or not they are merited to move forward I think that would be a good thing. We have an open recommendation relative to that. Mr. Kennedy. As far as the VA addressing these concerns and compliance, what is your suggestion? Ms. Harris. Again, we have 20 open recommendations. They should expeditiously implement those 20. Mr. Kennedy. In regard to--I will yield. I will come back. Mr. Rosendale. Thank you very much. Ms. Overmann, why are the VA's megaprojects stuck in the project model and what problems does that create? Ms. Overmann. Certainly, based on my experience at the White House working on delivery and implementation and the work we do at the Beeck Center, I do think the key problem is what has been indicated by my fellow panelists, which is this model of starting by trying to project over very extensive timelines what the ultimate end product is, all its functionality, gathering those requirements, handing them off to a vendor, and then hoping that, you know, 5 to 10 years down the line what is implemented or provided back, if it is, in fact, provided back actually works. I think there is a couple of fundamental challenges with that. One, I mean, if you think 10 years back, like, cellphones for example, how much have cellphones changed in just 10 years? How much of user needs changed over time? The, kind of, fundamental approach of this waterfall megaprojects is just destined to failure. Even if a vendor perfectly implements all of the requirements listed and it is deployed 10 years later, it is almost certainly not going to be fit for purpose. I do want to emphasize I appreciate Ms. Harris' obviously extensive expertise in this space. I do think a key component of this making the VA successful is, obviously, the more technical pieces of this. Having this internal capacity, these product development teams to oversee these projects so that there is a single owner or a team that is well-versed in agency mission and goals in these modern agile processes that own the product vision and then manage vendors on a much faster and more modular timeline is really a key to success to trying to solve these problems. Mr. Rosendale. Very good, thank you, Ms. Overmann. Ms. Harris, are the megaprojects inherently incompatible with some of your best practices? What I am trying to find out is where do we have these conflicts coming in? It is, like, with your recommended best practices and the megaprojects the way that they are developing them? Ms. Harris. Yes. They are entirely in conflict with best practice and what we have seen, both in the public space and the private sector. We want these large projects to be broken down into these smaller pieces, and I think a large part of that is the lack of having the end users involved in that process early and often so that when they are generating requirements, prioritizing those requirements, that the end users are involved in that. But also being able to prioritize is critically important, too, because again, the last thing we want is to have, you know, everyone, you know, throwing on their wish list of items. As long as it is prioritized and they have gotten buy-in from the end users then that is when agencies are able to break them out, these large projects into smaller pieces and deliver---- Mr. Rosendale. Into components. Ms. Harris [continuing]. yes, exactly, and deliver quickly. Mr. Rosendale. Very good. Mr. Schweickhardt, the VA knows how to design IT systems in an agile, modular way. We have seen that. It is not a technical problem anymore. What are the cultural and managerial obstacles preventing them from doing it more often? Mr. Schweickhardt. I think there are the two things, Mr. Chairman, one, the legacy projects that have been running the approach has not gone back and taken lessons learned to approve legacy project to update how they deal with legacy projects. I think there is a, if you will, a trust issue from my outside impression because projects have not delivered in a timely fashion there is that tendency to load everything in. I think that one of the things that---- Mr. Rosendale. When you say the trust issue, break that down a little bit for me. From the people that are responsible for developing the---- Mr. Schweickhardt. From the end users, from the employee-- -- Mr. Rosendale. Okay. Mr. Schweickhardt [continuing]. right, that, oh, we are---- Mr. Rosendale. We are not going to get another. We are not going to get another delivery for an extended period of time so let us go ahead and add everything, all our requests on right now? Mr. Schweickhardt. That is right and it is there a little bit of burnout on it? Oh, no, now we are on the fourth try and nothing happens so why should I really participate because I am busy because this try is probably going to fail as well. Why do I need to get involved? That is a management and a culture challenge. I think the other challenge is the build once use many to say, okay, we are going to build this and there has to obviously be user input, but everyone needs to take it. Second, the phrase from my CIO colleague at GSA, minimum viable product is a shorthand way of saying build just enough for it to be useful, get it into people's hands, and iterate. They need to do that enough so people believe it is going to work. You have to build that trust. Mr. Rosendale. Very good. Thank you very much, Mr. Schweickhardt. I now yield back to Representative Kennedy. Mr. Kennedy. Thank you, Chairman. Ms. Harris, back to you. Thank you. As Ranking Member Cherfilus-McCormick indicated in her opening, we are concerned about the business-led modernization efforts. Has GAO done any evaluation or do you have an opinion on how effective business- led modernization is versus OIT-led? Ms. Harris. Well, I can tell you across the Federal Government I have seen a mix of arrangements where it is business-led or it is, you know, it is CIO-led. I have seen, you know, moderate success in in both areas. I think the critical key is for both to work in partnership together in close collaboration. That is again, those requirements are being fleshed out appropriately and that there is adequate engagement with stakeholders and end users. That is really the key rather than who is leading the effort. Mr. Kennedy. Do you think that OIT should have a bigger or a different role in the modernization efforts at the VA? Mr. Harris. I think that OIT should be involved as early as possible in an effort that is led, you know, under Veterans Health Administration (VHA) or Veterans Benefits Administration (VBA), for example, that they are involved in the acquisition phases so that they understand and that they get end users even involved in that in, like, before we are even talking about contracts so that requirements are adequately defined. I think OIT understands or has a better understanding of what best practices in IT acquisition are so they should be involved in that process to be able to lead those discussions effectively. Mr. Kennedy. Thank you. Ms. Overmann, in your testimony you identified failing to conduct deep user research as a risk to successful technology modernization. I associate this with VA's struggles to do comprehensive requirements development. How do you think an agency like VA could or should improve upon this? Ms. Overmann. I think you are hearing a lot of agreement here on this need for user research, and I think it has to be in combination with small starts. Start small, build a minimum viable product, test it with those users, iterate. There is a hidden benefit to this as well or one that has not been emphasized yet is this will make for more successful longer term development. It also very early surfaces if something is not viable so you can actually stop projects that are not going to work before they get several years in and multibillion dollars in. I think there it is also important to emphasize there is really two users that we need to test for, the end users of the product, the people who are receiving the services, but also the agency staff. Because the agency staff, I believe as Mr. Schweickhardt mentioned, how insanely frustrating it must be for people who are trying to serve veterans to have to deal with this clunky software over and over and over again, repeated trainings, unsuccessful implementations that are getting in the way of the services that they are trying to provide. There is, kind of, I cannot imagine that everyone is not frustrated by the current status. The other value of starting small is that the implications of being unsuccessful are much less impactful on these end users as well. Mr. Kennedy. Thank you. You also indicated that you had thoughts on the budgeting and appropriations process and how they should be changed. Can you expand on that? Ms. Overmann. Sure. I think, honestly, the thing that you are going to hear from me repeatedly is how important it is to have digital service expertise in the government, and I think for two key reasons. Ms. Harris has mentioned how valuable it would be to have OIT involved. If they do not have sufficient staff capacity with this digital service delivery expertise it is going to be very difficult for them to be actively involved in the number of contracts, excuse me, that the VA manages and should be working on. I think the other thing that has also been mentioned is this, kind of, flexible multi-year funding to ensure that as these projects and products are developed over time they are not altered or slowed down by your, kind of, year-to-year money challenges. I think those are really the two key things. I do think the other benefit of the modular development again is that you are going to have a much more consistent spend over time as opposed to getting these, kind of, huge spikes around these large development projects where you think you are making a one-time investment but, as we have seen there is, you know, a big dump of money to start. It does not work. There is another dump of money, et cetera. Over time we genuinely believe that this product model approach is more cost effective for the agencies as well. Mr. Kennedy. Thank you. I yield back. Mr. Rosendale. Very good, very good, thank you. Ms. Overmann, you have worked with a lot of Federal agencies. Which ones do this well and what kind of cultures and management structures do they have? Ms. Overmann. You know, it is interesting. As you mentioned, I worked with the U.S. Digital Service (USDS). I think USDS is probably the best example I can think of, and I think the reason for that is a lot of agencies, again, do not have the internal capacity. Oftentimes what we would see at USDS is the teams would get called in when a crisis point had hit. I think a lot of agencies really struggle with this. We are seeing a growing number of digital services teams evolve across agencies. I think, as mentioned, I believe DoD is further along. I think Department of Homeland Security (DHS) is further along in having enough digital service capacity to do these things on their own without having to rely on that external support. I think the interesting thing about DHS is not only do they have a lot of very good and deep internal technology expertise, they also have a very large customer experience office. We have seen those two things in combination, the digital service engineering product development expertise plus customer engagement experience to be a pretty potent model. It is---- Mr. Rosendale. More like the private sector does? Ms. Overmann. Exactly, exactly. Mr. Rosendale. They focus on customer service. Ms. Overmann. Yes. Mr. Rosendale. Very good, very good. Thank you. Ms. Overmann, how do agencies get in trouble when they buy commercial Off-the-Shelf (COTS) software as the VA has done with the Cerner Electronic Health Record (EHR) and the CGI Momentum financial systems? Ms. Overmann. You know, it is interesting. I think, again, I feel like a little bit of a broken record here. If you start with end users from the beginning it is entirely possible that a commercial off-the-shelf system could work but you have to be very careful in understanding exactly what those COTS systems are offering and does it fit with what you are trying to solve for? There are some downsides to COTS regardless of the fit. One, it really only works if the agency is capable of adjusting its process and workflow to meet the COTS system, and two, in a lot of these systems you end up paying for functionality that you do not actually need because you are buying the whole package as opposed to having a customized response. I do think, you know, generally speaking, what I have seen is you do not want to be absolute about anything. There are certainly use cases where having a COTS system might actually be the fastest and easiest way to solve for problems. If there are, however, if you are dealing with what a lot of agencies deal with, which is a user base that is not common in the private sector or is not fully met by private sector technology and you need customization, that is where the product model becomes very helpful because you have the internal experts who can guide a number of different vendors toward meeting the actual end needs. If there is any customization at all you really do not want to go with COTS. The other challenge with a COTS system, frankly, is a lot of the contracts mean that you do not necessarily have access to the code so you cannot modernize it yourself. Even if it is fit for purpose at the time of acquisition 3 to 5 years down the road you are now stuck with a system that you cannot change. Mr. Rosendale. Very good, thank you. Mr. Schweickhardt, do you think that the electronic health record modernization program reflects an agile, incremental or modular approach? Mr. Schweickhardt. I am not sure it reflects any of those. I think that the challenge is how to create an incremental or modular approach. If I could touch back on one of your comments in your opening statement, Mr. Chairman, about underinvestment in infrastructure, we talked about a modular approach but we need the plumbing or the architecture so that these different pieces can be installed easily. You know, that the door frames are a standard size so you can buy another door or a different door. You know, with where they are with this system, with the electronic health records modernization system, can they fully validate the requirements with small groups of users? You know, a test lab would be helpful, but in my mind the key milestone is they have actually gotten all of the functionality implemented once, which means that the other centers can come and look at it and say, so this is what we are going to go do. Mr. Rosendale. Right. Mr. Schweickhardt. We are not going to mess around every time we come to another center and say, oh, we need to change this because I like, you know, vanilla instead of chocolate ice cream. That they have actually done enough exploration and enough validation and a demonstration, really, you know, in the real world this really works and we can roll it out rapidly to the to the remaining centers. Mr. Rosendale. It makes sense. As a matter of fact, I am sure that you all can go back to the statements that I made going back as long as 3 years ago. We want to have a fully functional system at one facility before we start rolling it out another. I have used my time and I think that we are all finished with this panel? Okay. This panel is excused from the witness table. I want to thank you all so much for coming in today and taking the time to answer questions for the committee. We are going to go ahead and switch out the next panel. I am going to go ahead and introduce the next panel as everybody is switching up so that we can utilize this time as efficiently as possible. I would like to now welcome the witnesses on our second panel to the witness table as we are doing the changes. First from the Department of Veterans Affairs, we have the assistant secretary for Information and Technology and chief information officer Mr. Kurt DelBene. Good to see you again with us, Mr. DelBene. We also have Mr. Robert, excuse me, Orifici, the Benefits and Memorials Portfolio director, and Mrs. Cherri Waters, the health portfolio director at the Office of Information and Technology. Once we are all situated, just like every meeting we have had you seated, now we are going to ask you to stand back up again and please raise your right hand. Do you solemnly swear under penalty of perjury that the testimony you are about to provide is the truth, the whole truth, and nothing but the truth? [Witnesses sworn.] Mr. Rosendale. Thank you and let the record reflect that all witnesses have answered in the affirmative. Mr. DelBene, you are now recognized for 5 minutes to deliver your opening statement. I understand that we have a little bit of extra time? STATEMENT OF KURT DELBENE Mr. DelBene. Chairman Rosendale, Ranking Member Cherfilus- McCormick, and distinguished members of the subcommittee, thank you for the opportunity to testify on our critical mission to build a world-class IT organization and support the critical work of the Department of Veterans Affairs. I am accompanied by two of my executive directors in OIT, Ms. Cherri Waters, Health Portfolio and Mr. Robert Orifici, Benefits and Memorials Services Portfolio. Over the past 3 years, OIT has transitioned from a traditional IT approach into a modern organization patterned after high tech product development practices. This model aligns with our responsibility in delivering a broad range of products and services to stakeholders and veterans. While we have made much progress, much work remains to be done and the ongoing support of Congress will be essential in advancing this transformation. Driven by our vision-led approach and clear execution roadmaps, OIT sets a reliability standard of at least 99.9 percent uptime across all critical systems and services. We have also made significant steps toward creating a flatter organization structure empowering teams to take ownership of their work. This transformation fosters a more agile environment, allows for more efficient resource allocation, and improves our responsiveness to the needs of stakeholders thereby enhancing the overall veteran experience. Additionally, OIT has enhanced focus and transparency in spending, developing a clear 1-to-N list of prioritization of IT investments. This aligns with FITARA to improve management and oversight of IT resources. These efforts ensure that every dollar spent benefits the veterans through improved services and support systems. In the past 3 years, we have made significant technical strides in our major IT programs and projects, greatly enhancing the services we provide to veterans through focused efforts in cybersecurity, claims processing, digital experience, electronic health records, financial management, and education benefits. The most critical technical priority is cybersecurity. We have refocused the team from merely executing cyber as a policy and compliance exercise to a risk-based approach. We have embraced zero trust strategy achieving over 95 percent enforcement of multi-factor authentication, encryption at rest, and encryption in transit. Veterans Benefits Management System (VBMS) has been a cornerstone of our efforts in supporting streamlined claims processing for veterans. In 2024 alone, VBMS supported processing 90 percent of the claims within the established timelines showcasing our commitment to creating a user-centered platform that empowers veteran. To our efforts to improve the veterans' digital experience, OIT has successfully launched the VA health and benefits mobile application and it is been downloaded 2.8 million times. It is actively used by 1.2 million veterans each month. We have also supported millions of monthly visits to va.gov, ensuring veterans and customers receive the same information regardless of how and where they interact with VA. The EHRM initiative has undergone a thorough reset since early 2023 focusing on integrating user feedback into the system's design. We are planning a restart of deployment efforts in 2025 ensuring that our electronic health record system meets the needs of our veterans and VA staff. The rollout of Integrated Financial and Acquisition Management System (iFAMS) within FMBT has modernized financial management processes across VA, enhancing our ability to manage our resources effectively. As of November 2024, we have successfully completed multiple phases of the initiative resulting in a more agile financial management system. Our work on digital GI Bill has resulted in technical advancements that ensure timely and accurate delivery of payments and benefits information for enrolled veterans. This initiative exemplifies our commitment to innovation and reliability in delivering essential services. While we celebrate these successes, challenges also lie ahead as we continue our modernization efforts. Enhancing the technical skills of our workforce is vital in adapting to evolving cybersecurity threats. OIT must also navigate the complexities of modernizing supply chain and Human Resources (HR) systems. Our efforts in modernizing VA supply chain management systems have made slow progress, and we are committed to leveraging a more deliberate incremental approach. Likewise, HR modernization needs sustained investment beyond the current implementation. The enterprise human capital management modernization efforts aim to enhance the employee and user experience while ensuring information transparency. Continued investment in OIT's major initiatives is essential to building progress we have made over the past 3 years. These initiatives are crucial to fulfilling our mission to provide secure and effective IT services to support veteran care. Above all, we in IT must continue to hone our craft focusing on a clear vision, developing comprehensive roadmaps, and being relentlessly focused on operational excellence. Investing in our people, our greatest asset, is key. We have made great strides but the work must continue into and beyond the next administration. Chairman Rosendale, Ranking Member Cherfilus-McCormick, and members of the subcommittee, thank you for the opportunity to present this testimony. Our journey to become the best IT organization in the Federal Government continues, and I extend my deepest appreciation to the subcommittee for your oversight, your attention, and your unwavering support of our Nation's veterans. I look forward to your questions. [The Prepared Statement Of Kurt DelBene Appears In The Appendix] Mr. Rosendale. Thank you very much, Mr. DelBene. The written statement of Mr. DelBene will be entered into the hearing record. We will now proceed with questioning. I will recognize Representative Kennedy for 5 minutes. Mr. Kennedy. Thank you, Chairman. Mr. DelBene and other panelists, thank you for being here, thank you for your testimony and service to the country. Mr. DelBene, I have serious concerns about the size of the VA's Fiscal Year 2025 IT budget, and I understand you do as well. It is clear to me that the budget is not just going to keep the lights on. It is going to severely curtail many of the department's modernization efforts. Do you believe that the funding for next year's levels are sufficient? Mr. DelBene. Thank you for the question. I do not. As I have talked about in the past, the budget is down in a significant way from the previous budget of 2024, but even a flat budget in this environment of growing cybersecurity threat and the need for modernization you talked about, that would not be sufficient. We have some of the key highlights I would probably flag is development is down 99.2 percent in funding there. Staffing and administration services are up 5 percent but much of that is covered by a increase so that the actual net increase in head count is zero, essentially. Modernization effort is down 66.5 percent over 2024. One critical area is infrastructure readiness program, which is off 65 percent in the current budget and that is the rollout on a sustained basis of new Personal Computers (PC), new network infrastructure, et cetera. That will take a significant hit as well. FMBT, that program is down 63 percent. Enhancements down 87.7 percent. Across the board what you find with this budget is we are focused on sustaining what we have in place and not being able to move forward critical program so it is a very challenging budget. Mr. Kennedy. It is a maintenance budget. Mr. DelBene. That is probably the right characterization. Mr. Kennedy. What are the short-term and long-term impacts of this so-called maintenance budget? Mr. DelBene. Well, on a positive front we are, as I talked about with our one-to-N prioritization and really focusing on execution, is we are figuring out how to make it work. There is a few things that I would call out. One, while we have it at a 20 percent increase in cybersecurity investment, the transformation to a zero trust architecture, which I firmly believe in, is an expensive operation. The Office of Management and Budget (OMB) put out a pretty comprehensive roadmap that they asked us to follow in terms of our implementation. We will not be able to do that entire deployment. We will also have to make very difficult decisions about which programs to invest in modernization of. I would also say that because of the good work that is been going on in the Sergeant First Class Heath Robinson Honoring our Promise to Address Comprehensive Toxics (PACT) Act and serving more veterans the headcount levels have increased in the administration so that means we have to pay for more PCs. We have to do more customer support. As a result, we are short in the field on the number of people that we need to actually support folks. We are actually coming from a legacy of very good customer support. Our users' satisfaction in the field is very, very good. I worry that those numbers will come down as we are spread more thin. Mr. Kennedy. Thank you. If you had the ability what would you do to restructure the OIT budget? Mr. DelBene. Well, I think it just needs to be at a higher level. I think there is an opportunity to have money that goes over multiple years, however, I should point out at this point that the common theme in this hearing of incremental instead of, well, what I call Big Bang development and a lot of folks do, I fully agree with that. What it means is not if the budget were larger we would have super large expenditures in any of the programs. It would mean we would have an adequate investment across modernizations, a broad set of modernizations that we would do in an incremental approach. That, kind of, sustained a budget at that kind of, like, the whole notion of an MVP followed by an investment on a yearly basis getting us to a point where all the systems are what we call evergreen, which means you are always doing an incremental amount of improvement every year. That is how I would like to see the budget follow that structure as well. Mr. Kennedy. I will come back for more questioning. I yield back. Thank you. Mr. Rosendale. Thank you very much. Mr. DelBene, good to see you again. Thanks for coming before us. Mr. DelBene. Thanks for having us. Mr. Rosendale. The VA started developing the veterans benefits management system in 2013 to digitize the paper-based claims process. The system was a disappointment for many years, but in 2022 you changed your strategy and the VBMS has notably improved. Could you explain how and why the VA changed its strategy with the VBMS? Mr. DelBene. Thank you for the question. I am very proud of the work that is been done there. I will pass it to Rob Orifici, who leads that program, but there is a couple of things I think in my perspective that I want to highlight first. The first thing is when I came onboard, but not as a result of my effort, certainly, but, kind of, a focus around operational excellence, we looked at the uptime of the system and made changes in terms of our scalability to make sure it would just not fall over as the demand was continuing to increase. We have gotten VBMS to the point where it has a highly reliable high uptime system which is, I think, the first key. Then the second key is just going to this notion of creating a target platform for the modernization where you want to go and then incrementally getting us there. We have this new platform called Benefits Integration Platform (BIP) and we want to move everything to BIP, but you do not do it all at one time. You do it incrementally. Rob, do you want to take it from there? Mr. Orifici. Sure. Thank you for that question. Really, back in 2022 and earlier, we could only release a version of VBMS about once a quarter because VBMS is so large. There is so many pieces of it that need to be tested and gone through and then fixed as bugs were found and it did not make sense to continue in this model in which we had to wait so long to get a release of VBMS out. We looked at the various strategies that we could take for being able to release VBMS faster and get the capability into the field, be able to test individual parts without having to rework the whole entire system whenever you found an issue, and that led to the modular approach we are now taking with VBMS today where we are able to work on it in very smaller modules that the parts make up the whole and we are able to deploy. Right now we are deploying. Every 2 weeks we are deploying functionality to VBMS and we have a very ready agile release with VBMS working hand-in-hand with VBA to make sure they have the functionality they need. Mr. Rosendale. Very good, thank you so much. Mr. DelBene, in 2023 the VA was soliciting proposals for a $900 million project to replace its human capital management systems. You recently abandoned this idea and now you are considering a modernize in place strategy. Why did you decide against the megaproject and what is your strategy now? Mr. DelBene. Well, I think there is two aspects to that. The first is that of the austerity environment that we find ourselves in. We are not going to be able to go out for a very large bid to move the entire HR system to a new platform. I do think moving to a new platform is important. The current system is an on-premise system and all of the major vendors are moving to a cloud-based platform. I should note that the contract if you look at it actually had the notion of a minimum viable product in it so it basically said you will create a pilot that will do just the atomic functions necessary and we would only pay for that first milestone before we went more broadly. With fiscal austerity as it is, we are moving to a model that says we want to find, kind of, similar to how we are doing it with VBMS, find that new platform we want to move to, figure out, and it will be a cloud-based platform, figure out how we would take a small modicum of functionality from the HR. I think of it as a process flow from you are recruited to you are offboarded at the end of your career. We will take a slice of that. We will figure out how we would move that to a modern platform and then we will figure out how to move the other pieces over time. That will change the notion of funding as well to be a very incremental thing over time. We will come to you in the future once we have figured out the strategy of, like, this is how much we will need in each year to do that continuous modernization. Mr. Rosendale. Very good, thank you, Mr. DelBene. Earlier this year the VA was planning another megaproject to consolidate 63 supply chain systems at a cost of over $9 billion. Why did you decide not to move forward with this project? How is the current strategy better? Tell us the improvements on that? Mr. DelBene. Yes. Early on DMLSS, as you mentioned, I believe, was the target environment there because it was being used by the DoD and also felt that sharing a catalog of inventory elements would be a good, kind of, synergy across those two organizations. I think we lacked a clear understanding of what the gaps in the systems are today from an end user perspective and what an incremental approach might look like to improving our supply chains approach. I think we are stepping back and looking at that now. Let me pass it to Cherri Waters, who has been involved in that project. Thank you. Ms. Waters. Thank you very much for that question. I am actually really excited to tell you about what we are doing in the supply chain initiative. Very much like what we heard about from our first panel, we are having a very end user-focused approach and we are doing an iterative strategy. We recently brought a group together and we looked at what are the most challenging problems that we want to resolve with this system? Then we had teams take them back and evaluate all of those top 24 that were identified from a people, process, and technology perspective. By looking at it in that way, it helps us begin to prioritize how we get quick wins so that we can deliver a minimally viable product, improve on products that we already have in place, and work with our partners to improve processes at the same time. Mr. Rosendale. Very good, thank you. I yield back. I will now recognize Representative Kennedy again. Mr. Kennedy. Thank you, Chairman. Mr. DelBene, I am concerned that the VA has a shadow IT or an IT modernization happening outside of the Office of Information and Technology. What authority do you as the CIO have over these business-led IT efforts? Mr. DelBene. I share the concern there and we have worked closely with the administrations to come into a better partnership there. The authority I have and the leverage points that we have really tried to drive have been around the authority to operate process which says if you are going to be on the network we have to review specifically from a cybersecurity perspective but we can broaden that approach as well. Then FITARA review as well, and I think the points that were made around whether everything goes through the FITARA process is a really good one. I think the GAO work there was very good to survey particular projects and see how many do and do not. We have been working within our office of strategic sourcing in OIT to put processes in place to make sure more and more goes through the FITARA process. I am a big fan of the FITARA process because it gives us the ability to review everything is it comes about. At the same time, the capabilities to do the technical review of these projects is not strong within the administrations and I think they would recognize that as well. We have reached out to those groups and said, look, we want to play a bigger role in doing the technical oversight of those projects. In most cases there is a receptivity there. I think the work in particular in digital GI Bill has been good where we said, hey, let us get more involved. Let us review the release plans, the delivery plans, and make sure that they make sense and that we do that iteratively as we move along that. There is more for us to do there, right? Shadow IT and/or we call it business-led IT is a big concern. Mr. Kennedy. How would you restructure these efforts going forward and how do you think it would improve the VA's success? Mr. DelBene. One of the things we are doing, my biggest concern over all bar none is cybersecurity so, you know, the sacredness of the data that we hold is held in trust and we have to make sure that we do not get a breach. The first thing we are pushing for is our policy 6500 requires that people purchase software that is cybersecure and we are holding people accountable to that. That means that you have to have technical resources on your program even if it is a business-led IT program to actually assure the cybersecurity of it. That is not necessarily--it is our goal to review that. It is not our responsibility to assure that the development that you went through is a secure one. The second thing we are doing is we are, and we are doing this really, I would say, at a pilot level right now is we are engaging in drafting an operational agreement with the administrations that says not just in cybersecurity but in operations as well, we will do this, you will do that, and we will work together in these areas and in this way. We did a lot of this in the commercial sector when we had, for instance, the Windows team working with the office team delivering things together. You basically have to come to a common operating model that says these are your responsibilities, these are ours, and this is how we will work together. My first approach there, which has been very iterative, has been just to clarify by virtue of a memo and a policy what the responsibilities are, but we quickly found that it is much more complicated in the back and forth thing. This operating agreement principle, I think, will work better. Mr. Kennedy. Thank you. I yield back. Mr. Rosendale. Thank you very much. Mr. DelBene, in your testimony and I sense that even in the question, you described taking an incremental approach instead of pursuing a Big Bang solution. Why should Big Bang solutions be avoided? Mr. DelBene. Well, it is the whole notion that you can determine exactly the cost of a program, the precise requirements for a program of a large size from the beginning is just very fraught. Once we get involved in a project things evolve in terms of the requirements. New requirements find themselves or emerge and the technical complexity of the project invariably increases. This notion of building a minimum viable product that you can build upon and build success upon success it basically allows you to hone what you think you are going to deliver more broadly, but it also builds on success from people's minds as well. They see it roll out. They see the initial difficulties. They see it getting better, and they start getting excited about the project as well. I completely agree with the sentiment of the first panel that there are very few successes where the Big Bang approach has been successful. This is true in the commercial sector as well. Mr. Rosendale. You have had the unique experience of being able to operate on both sides so it is---- Mr. DelBene. Yes, we have had our share of Big Bangs in the commercial side as well, yes. Mr. Rosendale. Thank you. Mr. DelBene, you have clearly learned some lessons in VBMS, HR, and the supply chain project to move toward more agile, less risky approaches. Where else are you are doing that? Where else are you implementing this? Mr. DelBene. Well, ironically, I think where we are ending up in the EHRM program is an incremental approach. If you look retrospectively, we have established six locations where it is today. With the pause we are resetting to getting it right. In a sense, hindsight is 20/20 but you probably should have done that from the beginning. The scope of the project from the beginning should have been this first pod and then you would broaden it beyond that. I think it is the model that we are using everywhere though. I think even if FMBT, in a sense, I mean, it has been talked about as Big Bang, it is not really. It is get the blueprint of the financial transformation right, start with some of the core offices and add VBA, and now the thing that we are going to have to do in the future, which we are just doing with the central office in this first VHA central office first, is the rollout to the Veterans Integrated Service Network (VISN). That will be complex, but I do not think it is completely accurate to say it was a Big Bang project. The other thing I would say is the nature of Enterprise Resource Planning (ERP) projects in general, which is what that program is, it is a big commitment. There is no way to absorb half an ERP transformation. You know, I did part of our transformation at Microsoft in my previous role and there we were consolidating 34 different ERP systems into a single global system, but the target was one, single, large global system. We just need to do it in an incremental fashion. Mr. Rosendale. Very good. Mr. DelBene, 6 years into the FMBT and EHRM systems is it too late to change them wholesale to make them more agile? Is it? Mr. DelBene. As I said with FMBT, I actually think it is pretty agile. I think the problem or the challenge there is it is going to be an expensive program. It is an essential program. Every successful organization has a strong financial management system. It is been noted that ours is 30 years old. It is time to do FMBT but it is going to be an arduous process to get it done. I think it is important to go in the approach we have taken. I think the next thing they are going to do is to take a particular VISN and use a willing VISN that is excited about the project and getting that one right. They are focusing on process transformation that has to happen in concert with the actual rollout. That one, I think, is going to work but it is going to take time. On EHRM as I said, we just need to get the criteria right. We need to get the situation right where we are, which is what we have been working on. Then at that appropriate time we will do the planning to move to another set of VISNs and locations, and again, pause, get that right. I think there are good signs there, too. I think the Lovell deployment that we did has actually been quite good and received well and that is a good sign as well. That is going to be hard work, too. Mr. Rosendale. Lovell had the additional staff available to them to give that support, which again, when we start looking at the total cost that really has been a big part of the problem. We do not have just the overrun in the program itself but the incredible additional staffing requirements that have been necessary to try and even implement the system. When will we start seeing the results of some of these changes? Mr. DelBene. Well, I think we are already seeing some of those. For instance in FMBT, the success of the project so far has been good and the uptime of that system has been strong as well. I think in many ways FMBT, although a very large project which is not an easy project to do, has been fairly successful. We are seeing on the EHRM side greater stability and uptime of the Oracle system. They are meeting the requirements around uptime, on incident-free time, on end user responsiveness as well, so those are good signs. I think the harder work there and this is ironic to say technology is so hard are the process aspects of that, getting the system to meet the processes. There is, and I think this was spoken to before, there is a lot of diversity in the processes even across the VISNs. Another thing that is going to lead to success is that process standardization, that role standardization with the EHRM, and that has been a big part of the work as well. I think as the secretary said, you should expect to hear from us about a restart within the Fiscal Year 2025. Mr. Rosendale. Mr. DelBene, why is it so difficult for large government agencies and the VA in particular to implement these megaprojects successfully? Mr. DelBene. That is a very good question. I think megaprojects are difficult to do any time. I think it is probably the industry minimizes the complexities involved when they, you know, we go out and ask for a new system which probably we should say we will only want the MVP. People on the industry says side says this. We have got the solution for you. It will solve all of your problems and that probably sets the expectations of folks too high in terms of the simplicity of doing it. I think cost estimates are probably part of the problem, that they tend to underestimate the cost. I, you know, to your earlier question about have you ever seen a program that did not overrun cost, part of that may be as you get into the complexity things get harder and more expensive. Part of it is the underestimate of the cost estimate in the beginning. It is independent lifecycle cost estimates almost invariably increase over a period of time as more is known. I think it is tempting to say, oh, this seems easier than it is, and you just have to be very wary. These are very, very complex projects that have deep infusion into how the organization works and that is not always thought about. Mr. Rosendale. Again---- Mr. DelBene. If I may, the final thing I would say is we need deeper technical expertise within our IT organizations so that, you know, people--like, I have seen a lot of bad programs in my life and so I am constantly wary. Great leaders like I am with today are constantly wary of these challenges as they come up, and we need more of that. Mr. Rosendale. From my view it seems just like, quite frankly, bad legislation. You take a piece of legislation and you continue to pile everything on it because everybody thinks it is the last opportunity to get a bill passed, and what you end up with is a really big, ugly, unworkable piece of legislation. That is the problem with this city, quite frankly. Using that in relation to software, if people think this is the opportunity that we have to fix and everybody starts trying to throw their piece into there as well and it becomes just an unmanageable, great big mess instead of listening to the experts saying we will take a component of this. We will get this. We will make sure we have that right and then we will take the next piece and buildupon that. Mr. DelBene, you inherited EHRM, FMBT, and all the other megaprojects along with the decisions that were made before you arrived which stinks, but again, that is the nature of the beast. If you could go back in time and start over with one of them, how many of those would you have designed or started differently? Mr. DelBene. Well, the critical question on EHRM, as we have discussed in the subcommittee, is modernization of this to versus building up a new system. There are real values to building from a commercial system but it is a very difficult debate that you could have debates on both sides of it. There have been failed attempts to modernize Veterans Health Information Systems and Technology Architecture (VISTA). This whole notion of getting VISTA into an incremental modernization where it is evergreen is, kind of, what I would have had I gone back that would have been, kind of, like, the leading candidate on the improving VISTA side. I was not involved in the evaluation. There is only a few commercial vendors that the VA could have gone with on the COTS side of things but so I do not have that much visibility into how that selection was made. There are real merits to going to a commercial product as we have done. I think we are over the hump now and those merits outweigh the whole relooking at or, you know, relitigating this question of modernizing VISTA. We do need to continue to modernize VISTA because it is going to be with us for quite some time still, but I would have probably, given where we are at, I would have. Certainly now I would continue with the rollout of Oracle. FMBT, again, it is by nature an incremental effort and so I think they actually probably took the right approach. The one thing that is interesting there is the choice of a system that is very Federal Government-specific which is what CGI system is. That even makes sense because they do have a very large market share in the very unique aspects of what needs to be within the ERP system for Federal Government, so those, kind of, make sense. The supply chain one and the HR one I think we should have been incremental from the beginning. I definitely would have taken that approach. Mr. Rosendale. Very good. Well, I am glad to see that we are starting to get our arms wrapped around some of these and taking smaller portions of them and trying to get them functioning or taking facilities, individual facilities, and get it to work. As I say, if you talk to a vendor, a contractor, an engineer, we can build a bridge from here to Europe. Is it possible? Absolutely, but how much time and how much money is it going to cost? Any of these things, sure. As far as a megaproject the engineer, the developers, they will tell you sure we can do that and they can eventually, but how many challenges and what is the cost of it going to be along the way? I would urge your successor to be skeptical of the contractors' promises and hopefully stay on the same path that we have all worked together here to get us going down because it has started making some incremental improvements. Okay. This one? Everybody is done? I have no ranking member to give me closing remarks, so I thank the witnesses for joining us today in both panels. The potential benefits of modernizing VA's IT systems are undeniable. With the right IT strategies the VA will deliver health care and benefits to veterans faster and better. There is no doubt about it. If the VA's leaders keep repeating the failed ways of the past, they will burn through billions of dollars of taxpayers' money only to be left with dysfunctional systems that do nothing to improve services for veterans. Today, the ranking member and I laid out the subcommittee's position based on all the evidence we have gathered during the past 2 years for how the VA should be approaching the IT modernization. The VA should not be doing IT megaprojects. They just do not work and they always turn into black holes sucking billions of dollars of taxpayers' money into the contractors' pockets. Put together, EHRM, FMBT, and the digital GI Bill are conservatively going to cost the VA at least $27 billion more than what they were initially planned. No organization, and that includes the Federal Government, should be allowed to operate that way. This is just not our opinion. Our expert witnesses explained the pitfalls of buying or developing software without a clear understanding of the organization and its requirements. They know that once a faulty project is set in motion it is very difficult and expensive to restructure it. I appreciate them pointing out that sometimes the best course of action with a project is just simply to cancel it. We have seen that and I appreciate it. Our VA witnesses also understand this. We have discussed some examples like supply chain and human capital where Secretary McDonough and Mr. DelBene have wisely stepped back and reassessed the requirements and restructured the efforts in small or less expensive, less risky pieces. We have also seen the VA begin to convert VBMS into a modern modular system. This is encouraging, but as long as the VA leaders continue to answer the siren song of megaprojects I am afraid that we will see more poor results, overspending, and budget problems. No project should be too big to fail, especially when it is failing because it is too big. Finally, I would like to thank Bill Mallison, his staff, Sam. I understand he is going to be stepping up. LeeAnn, everyone who is behind us that has helped us do this work. Representative Cherfilus-McCormick, the GAO for all the information that they have helped us with. Secretary McDonough I have truly enjoyed working with him and the VA and all of us working together to identify the problems that we are facing and to make some incremental steps toward resolving several of the big issues which have plagued the VA for years, have plagued the VA for years. I will tell you that it has been my honor to work with you and to serve on this committee. With that, I ask unanimous consent that all members have 5 legislative days to revise and extend their remarks and include extraneous material. Without objection, so ordered. This hearing is concluded. [Whereupon, at 9:42 a.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X ======================================================================= Prepared Statements of Witnesses ---------- Prepared Statement of Carol Harris [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Prepared Statement of Lynn Overmann [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Prepared Statement of Reynold Schweickhardt [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] Prepared Statement of Kurt DelBene Chairman Rosendale, Ranking Member Cherfilus-McCormick, and Distinguished Members of the Subcommittee, thank you for the opportunity to testify on the critical role the VA Office of Information and Technology (OIT) plays and share the strides we have made in our mission to build a world-class information technology (IT) organization to support the critical work of the Department of Veterans Affairs. I am accompanied by two of my executive directors from OIT: Ms. Cherri Waters, Health Portfolio, and Mr. Rob Orifici, Benefits and Memorial Services Portfolio. Over the past 3 years, OIT has been driving a significant transition from a traditional IT approach to a modern one patterned after high-tech product development practices. This approach aligns with our responsibilities in delivering a broad range of products and services to our stakeholders and Veterans. While we have made much progress, much work remains to be done, and the ongoing support of Congress will be essential for advancing this transformation. Improving Strategic Alignment Driven by our vision-led approach and clear execution roadmaps, OIT sets a reliability standard of at least 99.9 percent uptime across all critical systems and services, ensuring operational excellence through rigorous coding and change management practices and by designing resilient systems. We have also made significant steps toward creating a flatter organizational structure. By eliminating excess management layers, OIT has empowered teams to take ownership of their work, ensuring that responsibilities are clear and aligned with mission priorities. This transformation not only fosters a more agile environment but also allows for more efficient and effective resource allocation and improves our responsiveness to the needs of stakeholders, thereby improving the overall Veteran experience. Additionally, OIT has enhanced focus and transparency in its spending by developing a clear ``1-N'' list of prioritized IT investments, which details spending at a granular level. This aligns with the objective of the Federal Information Technology Acquisition Reform Act (FITARA) to improve the management and oversight of IT resources. These efforts enhance the overall effectiveness of IT investments across VA, eliminating unnecessary spending and ensuring that every dollar spent is ultimately benefiting Veterans through improved services and support systems. Technical Accomplishments In the past 3 years, we have made significant technical strides in our major IT programs and projects, greatly enhancing the services we provide to Veterans through focused efforts in cybersecurity, claims processing, digital experiences, electronic health records, financial management, and educational benefits. The most critical technical priority is cybersecurity. Threat actors' approaches are constantly evolving in sophistication. This increases the need to assess and work to reduce the overall cyber risks for VA. We have refocused the team from an organization that merely executes cybersecurity as a policy and compliance exercise to one that is risk-based, assessing and developing plans to mitigate the greatest technical risks. We have embraced a Zero Trust strategy, a security framework that assumes no user or system is inherently trustworthy and requires strict verification for access to resources. This strategy enables OIT to prioritize and focus our efforts on the places of greatest vulnerability. Through this focus, we have made significant progress on key Zero Trust initiatives, achieving over 95 percent enforcement of multi-factor authentication, encryption at rest, and encryption in-transit. The Veterans Benefits Management System (VBMS) has been a cornerstone of our efforts supporting streamlined claims processing for Veterans. In the past 3 years, VA achieved a remarkable reduction in claim processing times through the use of automated decision support tools. Both automation and targeted capability improvements in VBMS have made it easier and more efficient for claims processors to do their jobs. In 2024 alone, VBMS supported VA staff in processing 90 percent of claims within established timelines, showcasing our commitment to creating a user-centric platform that empowers Veterans. We have also made significant progress in our modernization of VBMS, incrementally migrating functionality to a new platform, while still regularly accomplishing our 99.9 percent uptime goal. In our efforts to improve the Veteran digital experience, OIT has successfully launched the VA health and benefits mobile app, which has been downloaded 2.4 million times and is actively used by 1 million Veterans each month. We also support millions of monthly visits to VA.gov, our modern, seamless, and user-friendly experience. With that platform in place, we have been actively consolidating, integrating, and sharing data across VA to improve interoperability and accessibility, ensuring Veterans and customers receive the same information regardless of how or where they interact with VA. The Electronic Health Record Modernization (EHRM) initiative has undergone a thorough reset since early 2023, focusing on integrating user feedback into system design. VA's efforts have led to improved functionality, system stability, and user satisfaction among health care providers, and we are planning to restart deployment efforts in 2025. The reset period has allowed us to refine VA's incremental approach, ensuring that our electronic health record system is not only reliable but also innovatively meets the needs of our Veterans and VA staff. The rollout of the Integrated Financial and Acquisition Management System (iFAMS) under Financial Management Business Transformation (FMBT) has been a significant achievement for OIT during this administration. This initiative has modernized financial management processes across VA, enhancing our ability to manage resources effectively. iFAMS streamlines operations and improves financial reporting capabilities, allowing us to allocate resources more efficiently and effectively to serve Veterans. iFAMS demonstrates high system reliability, accomplishing high uptime, so that financial operations are not impacted. As of November 2024, we successfully completed multiple phases of this initiative, resulting in a more agile financial management system that supports timely decision-making. Our work on the Digital GI Bill has resulted in technical advancements that ensure timely and accurate delivery of payments and benefits information for enrolled Veterans. By modernizing this platform throughout 2022 and into 2024, we are enabling more efficient delivery of education benefits, providing near real-time eligibility and benefit information, and allowing for first contact resolution. We also successfully completed another major deployment of DGIB capabilities in late November 2024 and have two additional major deployments scheduled during this fiscal year, which will culminate in enabling VA to retire one of its two remaining mainframes. This initiative exemplifies our commitment to innovation and reliability in delivering essential services. In addition to these large programs which have received a great deal of attention, there are other successes across the organization too numerous to list, including the delivery of a new patient scheduling system, a new call center customer engagement system, a new identity management system, enhancements to our networking and telecommunications capability, and improvements in the resiliency of all our 100 most-critical IT systems. At the same time, we have improved our already high end-user satisfaction across over the 650,000 end-user workstations. For the fourth year in a row, the Office of Management and Budget and General Services Administration ranked VA #1 for overall IT Customer Satisfaction within its employee-size peer group. All this is made possible through a rigorous engineering approach that we have embraced over the past several years. Challenges and Opportunities While we celebrate these successes, challenges lie ahead as we continue our modernization efforts. Much remains to be done as we continue our journey toward a Zero Trust security framework. One of the primary hurdles in our Zero Trust framework is enhancing the technical skills of our workforce, which is vital for adapting to evolving cybersecurity threats and ensuring effective implementation of new technologies. Doing so depends on our ability to enhance the value proposition of a cybersecurity career at VA. VA must be a place where people can become experts in cybersecurity and be paid commensurately for this industry-valued expertise. OIT must also navigate the complexities of modernizing two critical systems: supply chain modernization and Human Resources (HR) modernization. Supply chain modernization is an important effort as it directly impacts our ability to provide quality care to Veterans by ensuring that medical facilities are adequately stocked with necessary supplies. Our efforts in modernizing VA's Supply Chain Management system have made slow progress, and direction changes have necessitated adjustments in strategy. With these changes, we are committed to leveraging a more deliberate, incremental approach to improve supply chain operations and its underlying technology rather than a ``big bang'' solution. OIT is in full alignment with VA's supply chain governance board who set standardizing the Department's current supply chain ecosystem as a key priority. Likewise, we recognize that HR modernization needs sustained investment beyond what is being achieved through the current Human Resources Information System (HR SMART) implementation alone. The Enterprise Human Capital Management (ECHM) modernization effort represents an opportunity for VA to streamline enterprise-wide HR operations and business processes. By standardizing HR service delivery through advanced information technology, ECHM modernization aims to enhance the employee and user experience while ensuring information transparency. This effort will transform VA's HR ecosystem into a modern, intuitive, and integrated user experience. Some of ECHM's goals are to enable back-end process automation, integration, and interoperability, allowing VA to better forecast future staffing requirements and more accurately report data to key stakeholders. Additionally, the new HR solution aims to improve our response to customer needs without requiring intensive developer support, ultimately leading to a more efficient and effective HR system. Continued investment in OIT's major initiatives is essential for building on the progress we have made of the past 3 years. In my testimonies throughout 2024, I have highlighted how strategic investments will enable us to enhance our technological capabilities and support ongoing modernization efforts at VA. These initiatives are essential to ensuring that we deliver reliable services to Veterans, while mitigating risks associated with abrupt system overhauls. Addressing these challenges is crucial for fulfilling our mission to provide secure and effective IT services that support Veteran care. Above all, we in OIT must continue to hone our craft, focusing on the art of being driven by a clear vision, developing comprehensive roadmaps to deliver on that vision, being relentlessly focused on operational excellence, and being invested in our people - our greatest asset. We have made great strides, but the work must continue into, and beyond, the next administration. Conclusion Chairman Rosendale, Ranking Member Cherfilus-McCormick, and Members of the Subcommittee, thank you for the opportunity to present this testimony. As we look ahead to 2025, OIT remains dedicated to its mission and looks forward to our continued work with you to support our Nation's Veterans. Our journey to become the best IT organization in the Federal Government continues, and I would like to extend my deepest appreciation to this subcommittee for your oversight, attention, and unwavering support. Your commitment ensures that we can continue innovating and improving the services that our Veterans so rightfully deserve. I look forward to your questions. [all]