Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2024 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS FIRST SESSION [House Hearing, 118 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 118-8] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2024 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS FIRST SESSION __________ SUBCOMMITTEE ON READINESS HEARING ON ENERGY, INSTALLATIONS, AND ENVIRONMENT PROGRAM UPDATE __________ HEARING HELD FEBRUARY 28, 2023 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] __________ U.S. GOVERNMENT PUBLISHING OFFICE 52-230 WASHINGTON : 2024 SUBCOMMITTEE ON READINESS MICHAEL WALTZ, Florida, Chairman JOE WILSON, South Carolina JOHN GARAMENDI, California AUSTIN SCOTT, Georgia MIKIE SHERRILL, New Jersey MIKE JOHNSON, Louisiana VERONICA ESCOBAR, Texas CARLOS A. GIMENEZ, Florida MARILYN STRICKLAND, Washington BRAD FINSTAD, Minnesota GABE VASQUEZ, New Mexico DALE W. STRONG, Alabama JILL N. TOKUDA, Hawaii JENNIFER A. KIGGANS, Virginia DONALD G. DAVIS, North Carolina JAMES C. MOYLAN, Guam MARC VEASEY, Texas Patrick Nevins, Professional Staff Member Jeanine Womble, Professional Staff Member Ethan Pelissier, Research Assistant C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Garamendi, Hon. John, a Representative from California, Ranking Member, Subcommittee on Readiness.............................. 3 Waltz, Hon. Michael, a Representative from Florida, Chairman, Subcommittee on Readiness...................................... 1 WITNESSES Berger, Hon. Meredith A., Assistant Secretary of the Navy for Energy, Installations, and Environment......................... 7 Jacobson, Hon. Rachel, Assistant Secretary of the Army for Installations, Energy, and Environment......................... 9 Oshiba, Edwin H., Acting Assistant Secretary of the Air Force for Energy, Installations, and Environment......................... 10 Owens, Hon. Brendan, Assistant Secretary of Defense for Energy, Installations, and Environment................................. 5 APPENDIX Prepared Statements: Berger, Hon. Meredith A...................................... 61 Garamendi, Hon. John......................................... 39 Jacobson, Hon. Rachel........................................ 78 Oshiba, Edwin H.............................................. 99 Owens, Hon. Brendan.......................................... 41 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: Mr. Davis.................................................... 128 Mr. Garamendi................................................ 127 Mr. Moylan................................................... 128 Mr. Scott.................................................... 127 Ms. Sherrill................................................. 128 Mr. Vasquez.................................................. 128 Mr. Waltz.................................................... 127 Questions Submitted by Members Post Hearing: Ms. Escobar.................................................. 148 Mr. Moylan................................................... 149 Mr. Scott.................................................... 136 Ms. Sherrill................................................. 139 Mr. Waltz.................................................... 133 ENERGY, INSTALLATIONS, AND ENVIRONMENT PROGRAM UPDATE ---------- House of Representatives, Committee on Armed Services, Subcommittee on Readiness, Washington, DC, Tuesday, February 28, 2023. The subcommittee met, pursuant to call, at 2:31 p.m., in room 2212, Rayburn House Office Building, Hon. Michael Waltz (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. MICHAEL WALTZ, A REPRESENTATIVE FROM FLORIDA, CHAIRMAN, SUBCOMMITTEE ON READINESS Mr. Waltz. All right, ladies and gentlemen. Calling to order the first hearing of the Readiness Subcommittee on ``Energy, Installations, and Environment Program Update,'' first hearing of the 118th Congress. I would like to welcome the members of the Readiness Subcommittee for our first official hearing. I am deeply honored to serve as chairman of this impactful subcommittee and lead its crucial work. I am very pleased, again, to work with Mr. Garamendi as the subcommittee ranking member, and was honored to work with him as the ranking member as chairman to show the bipartisan--when he was chairman to show the bipartisanship of these issues and supporting our warfighters. I have thoroughly enjoyed working with him over the last year and appreciative of the great work conducted during his time as committee chairman. Thank you to our witnesses for your time and participation in today's hearing to discuss military construction, environmental programs, energy programs, as well as base and facility accounts. And, you know, I just want to say right out the gate, it has become a trend, and I wish we could be having this conversation after the release of the President's budget. There is no doubt plenty of issues we can discuss even without the budget figures. I welcome a continued dialogue on these matters as we do see the budget release and as we work through this year's NDAA [National Defense Authorization Act] process. The Armed Services Committee will deliberate a lot this Congress on the present and future capabilities needed for the great power competition that we face, in line with the national defense strategy, and a potential Taiwan contingency. As we discuss these capabilities, we must also recognize the need for investment in new infrastructure, as well as the maintenance for our existing infrastructure. Unfortunately, maintenance of existing facilities has been chronically neglected, often to pay for other priorities, and this lack of investment in aging and failing infrastructure has resulted in negative impacts to readiness and retention, as well as inefficient facilities that don't adequately support our intended missions. I think we can do better, and I think our warfighters deserve better. I look forward to discussing the path forward with new military construction and how the services prioritize sustaining existing infrastructure with the understanding that we must get this mix right to both support our platforms and our service members. Any MILCON [military construction] and facility sustainment effort must also prepare our military installations at home and abroad for future challenges with better planning that focuses on resilient infrastructure investments. We have made progress to this end by requiring master plans with previous committee work that we intend to continue, and these master plans consider these risks. The services have begun to submit these master plans for their two most at-risk installations after being required to do it in the fiscal year 2022 NDAA. However, we must do more to shape the best posture that we can for the future. Nowhere else is the issue of aging infrastructure more evident than our shipyards. The recent operational impacts to dry docks at the Puget Sound Naval Shipyard due to seismic resiliency issues is concerning. I am sure it concerns everyone here. I would like to hear from our witnesses today what is being done to remedy this problem, mitigate risk to readiness, and use this as an impetus to look across our shipyards and invest in critical updates to ensure their long-term viability. Our installations also remain largely dependent on commercial electrical grids--I know a lot of work has been done in this space, and I look forward to hearing it--that are vulnerable to any disruptions they suffer. To protect our mission capability, I believe we must continue to pursue solutions like islanding capabilities and generation from microreactors. On the operational side, I am very concerned the Department [of Defense] is not as far along as we should be given the threats on the horizon. Our ability to supply energy forward, to sustain operations forward in contested environments in a way that we have not had to do in recent decades it is just critical with today's threat environment. Contested and challenged environments are the new normal, and we need to posture ourselves accordingly. Furthermore, we must [ensure] our installations are free of dependency on energy supplied by our adversaries. It sounds like an obvious statement, but I think we are in a position where we need to do more work there. Recent NDAAs have highlighted the threat posed by our reliance on Russian energy at our European Command installations. The Department has begun this work. I look forward to hearing where we are with it, and it is paramount we develop and adhere to transition plans at every installation under EUCOM [U.S. European Command]. Taking care of our military members is the utmost responsibility of all of us here, and our Defense Department leaders continuously tout people-first strategies, ensuring our service members are the priority. But I remain skeptical, frankly, of this being put into practice when we look at the status of some of our housing and our barracks. We must provide safe barracks, housing, and infrastructure. I know Ranking Member Garamendi shares in this effort and has done a lot of work to that end. Recent NDAAs have authorized historic levels of spending for the cleanup of PFAS [per- and polyfluoroalkyl substances] contaminated military installations and surrounding areas. We hope to see that momentum continued. Furthermore, in last year's NDAA, we authorized $1 billion for the Red Hill Recovery Fund. I think you are seeing a theme here that we are going to continue the work and try not to reinvent the wheel of previous years despite a switch in the majority. We need to also prioritize making our strategic stockpiles whole, as well as reducing our reliance of adversarial nations for our critical minerals and for our supplies. The DLA has identified--the Defense Logistics Agency--has identified 14 critical defense materials that are 100 percent foreign- sourced. That is unacceptable in my view. We have insufficient national defense stockpile reserves to support essential defense requirements. Of those 14 materials, 11 are sourced from China. Again, unacceptable. This is an unacceptable threat to our national security. I look forward to working with the subcommittee on further solutions in addition to the critical mineral stockpile we have authorized in previous NDAAs. This administration's focus on climate, as a national security priority, oftentimes I find that concerning, just to be completely candid. I want to dig into the Department of the Army's strategy to electrify our tanks, fighting vehicles, and others given the supply chain concerns and other pieces involved. At the end of the day, I think our priority should be on developing and implementing the mostly lethal capabilities for deterrence and to counter China, and if that so happens to have green effects, I think that is completely appropriate. Finally, the ongoing war in Ukraine and ever-growing aggressive China are a constant reminder of the importance of this work. Smart investments must be made now. I thank you again, once again, for our witnesses for being here today. I look forward to your testimony. And with that, I turn it over to Ranking Member Garamendi. STATEMENT OF HON. JOHN GARAMENDI, A REPRESENTATIVE FROM CALIFORNIA, RANKING MEMBER, SUBCOMMITTEE ON READINESS Mr. Garamendi. Thank you very much, Mr. Waltz. I have got all of this written speech that I am going to give, but I like what you said. I like your priorities. I like what you have laid out. And whether we are going to put a hybrid Abrams tank out on the field or not remains to be seen. But everything that you have talked about, most of what you have talked about is what we have done over the last 4 years, and we did that in a bipartisan way; and we will continue to support you and the majority as you go about the agenda that you have laid out here. If I don't read this, you know, my staff is going to be really upset because they spent a lot of time writing this, but I am going to try to really shorten it. We have been with these witnesses before, as you said, Mr. Waltz, and we've talked about these issues. We haven't talked about them to the end of the process because the process doesn't end. There is always more to do, and so, we are going to be working diligently together on the Department's infrastructure, all of the bases, all of the shipyards, all of the dry docks, all of those things. They have to be dealt with, and they have to be brought up to modern standards and actually beyond modern standards. We have seen that the general attitude has been to accept risk. It turns out that the acceptance of risk is really risky and leads to a significant degradation of the readiness of the troops, the readiness of the ships, the readiness of the airplanes. Take, I don't know, take the shipyards. Take the F- 35. Lots of examples out there. So we need to really be very diligent, very diligent in pressing hard to make sure that the bright, shiny things that everybody would like to have and certainly the defense industrial base would love to make do not result in a degradation of the essential infrastructure upon which the entire military system relies. I can give examples here. We have accepted the risk of Tyndall Air Force Base being built in, I don't know, maybe a foot above sea level. Florida, I believe, Mr. Waltz. Mr. Waltz. Great State. Mr. Garamendi. It was wiped out, literally wiped out, but yet, we accepted the risk of rebuilding at the same location to the tune of several billion dollars. And I hope I am not around for the next earthquake that goes--the next hurricane that goes through that, but it may be the same result in the last earthquake--the last hurricane. My mind has shifted to China Lake and to earthquakes, which is California, and a few other places on the west coast. And you mentioned, Mr. Waltz, the question of the dry docks. Absolutely critical dry docks. They are not going to be able to be used for some time. How long have we accepted? How long have we known the risk, the earthquake risk there? And how long have we accepted it, until it got to the point where, oh, my goodness, it has to be dealt with now or else. And so, we can go on and on about those risks. Thank you for mentioning housing, barracks, and the like. This committee, even before I became chairman, had dealt with the housing issue, and I suspect four or five chairmanships beyond you and I will continue to deal with it because it has to be watched all the time. Backsliding is always there, and this is for the troops. And the barracks, you mentioned that. And absolutely true; we have to deal with that. There is an issue that we have not dealt with in the past, and I want to put it on the table for us to think about. We, this committee, had not really dealt with it, and that is the issue of encroachment. Who is buying land and putting up projects around our military bases? What is that and what is the threat of that encroachment? It may be a wind turbine that somehow screws up the radar at an Air Force base. Or in the case of Travis Air Force Base, what is this LLC that has literally purchased every piece of property around the base and 14,000 acres beyond that? Who are they? What are they? And it turns out that I think the base commanders had not been charged with the responsibility of watching carefully what is going on outside the base. We need to pay attention to that. We've had this issue in North Dakota, an issue that ultimately resulted in a Chinese company that wanted to buy the land saying, No, you can't, because of the potential security risks associated with it. I want us to pay more attention to it because it is down home, my district. And, perhaps, in other Members' districts also. We have got a lot of work to do. You talked about the energy issues. There is enormous potential for divisiveness on energy, but if we look at it in the way of cost savings, readiness, availability--your mention of microgrids, Mr. Chairman; that is a piece of that puzzle. There are--excuse me, small reactors and microgrids. All of these things are out there. Again, this comes back to resiliency. The great deep freeze in Texas. There are some Texas folks around here. What if we had a different strategy? We can go on and on. With your permission, I would like this wonderful speech that my staff put together to be in the record. Mr. Waltz. Without objection. [The prepared statement of Mr. Garamendi can be found in the Appendix on page 39.] Mr. Garamendi. I yield. Mr. Waltz. Thank you, Mr. Garamendi. Again, welcome to our witnesses. Brief introductions. The Honorable Brendan Owens, Assistant Secretary of Defense for Energy, Installations, and Environment. We have the Honorable Rachel Jacobson, Assistant Secretary of the Army--Go Army--Installations, Energy, and Environment. The Honorable Meredith Berger. Good to see you again. Assistant Secretary of the Navy for Energy, Installations, and Environment. And Mr. Edwin Oshiba, Assistant Secretary of the Air Force for Energy, Installations, and Environment. Over to you, Mr. Owens, for your opening statement. STATEMENT OF HON. BRENDAN OWENS, ASSISTANT SECRETARY OF DEFENSE FOR ENERGY, INSTALLATIONS, AND ENVIRONMENT Mr. Owens. Thank you, Chairman Waltz, Ranking Member Garamendi, distinguished members of the subcommittee. On behalf of myself and my military department colleagues, thank you for the opportunity to discuss the Department's energy, installation, and environment programs. This is my first time testifying before this subcommittee. I am 30 days into the job. And I look forward to working with you in the coming months to continue aligning our priorities and resources to support the National Defense Strategy [NDS]. The 2022 NDS is clear. We are operating in an increasingly complex global threat environment characterized by significant geopolitical, technological, economic, and environmental change. The People's Republic of China remains the Department's pacing challenge with its increasingly aggressive efforts to undermine U.S. alliances and security partnerships in the Indo- Pacific. We also face threats from actors like Russia, North Korea, Iran, as well as climate change and other transboundary challenges. Together, these threats not only pressure the joint force's power projection and maneuver capabilities but also put the safety and security of the homeland at risk. Countering these threats requires a resilient joint force and defense ecosystem that can operate in a contested environment at home and abroad. As such, we are ensuring that our installations and infrastructure are resilient to a wide range of challenges by implementing policy updates; innovation in how we plan, design, and build; and deployment of technology to counter the diversifying threats we face. In the Indo-Pacific specifically, there are two key priorities that will be critical to the success of this effort: retaining vital mission capabilities in the State of Hawaii, and ensuring the critical military construction efforts in Guam and the Commonwealth of the Northern Mariana Islands [CNMI] remain on track by extending the exemption from the H-2B visa temporary need requirement through 2029. We look forward to partnering with Congress, the State of Hawaii, Guam, the CNMI, and other Federal stakeholders in doing the work that is necessary to ensure that these priorities can be addressed. More broadly, we are making significant investments in both installation and operational energy to enhance resilience and reduce demand to improve joint lethality, support distributed operations, and reduce sustainment risks in contested environments. We are improving our approach to facility management to increase the efficacy of our sustainment, restoration and modernization investments, and to optimize the condition of our facilities. These efforts will enhance our facilities' direct mission support capabilities, and they will also enhance the health, well-being, and readiness of our service members and their families. Our installations, however, do not exist in a vacuum, and we recognize that the Department cannot achieve these goals on its own. Defense communities and host nations provide indispensable support to the mission. Acknowledging this interconnectedness, it is imperative that we be good stewards of the environment in addition to being conscientious and committed partners with the communities that support our installations, our service members, and their families. To that end, we remain committed to maintaining our robust environmental cleanup program, improving the safety and efficiency of our facilities, and improving the quality of life for our military personnel by ensuring access to safe, quality, and affordable housing. The Department is committed to working in close coordination with the U.S. interagency, State, local, Tribal, territorial and industry partners, as well as our international allies to achieve these goals. I would like to highlight specifically the progress we have made to develop and demonstrate PFAS-free alternatives for aqueous film forming foam. Congressional authorizations and appropriations made it possible for the Department to continue its ongoing work to evaluate flourine-free alternatives. Based on the hard work of numerous dedicated DOD employees and industry partners, the Navy published a new military spec for replacement foams in January. Several flourine-free foams are currently proceeding through the military specification qualification process, and the Department plans to begin the transition to the use of these products this summer. So while we implement new technology to avert future risk, we continue our cleanup efforts intended to safeguard the health and well-being of our people. Nothing is more important than our people: soldiers, sailors, airmen, Marines, guardians, and their families. The investments we make to improve the built and natural environments where they live and work are investments that pay off by improving their health and well- being. We appreciate Congress' and this subcommittee's continued support for these efforts, and we look forward to your questions. [The prepared statement of Mr. Owens can be found in the Appendix on page 41.] Mr. Waltz. Thank you, Mr. Owens. Ms. Berger. STATEMENT OF HON. MEREDITH A. BERGER, ASSISTANT SECRETARY OF THE NAVY FOR ENERGY, INSTALLATIONS, AND ENVIRONMENT Ms. Berger. Chairman Waltz, Ranking Member Garamendi, and distinguished members of the subcommittee, thank you for the opportunity to testify today. The Department of the Navy's Energy, Installation, and Environment portfolio is foundational to making sure that our sailors, Marines, and civilians are ready, able to do all that our Nation asks them to do. I started my last statement before this committee with an ask. Today I start with a thank you, for the inclusion of the Fallon Range Training Complex modernization in this year's NDAA. This is an example of the way things should be. We worked with Congress, Tribal, local, State, and Federal partners to ensure we protected culture, the environment, and the economy to guarantee the readiness for the fleet, making sure that they can train like they fight. At that time, we were also at the beginning of responding to a terrible event, the contamination of drinking water from the fuel spill at Red Hill. I am proud to report progress, and also to commit to the work that is still before us. Today, the water is safe to drink, and the Navy is conducting long-term monitoring to ensure there is no fuel contamination. Secretary of Defense Austin has directed Joint Task Force Red Hill to safely and expeditiously defuel Red Hill, and Navy to the permanent closure of Red Hill, and we are working on these monumental tasks together. With every action we take, we are prioritizing the health and safety of the people, environment, and communities in Oahu. We recognize that earning trust takes hard work and commitment and relies on all sides. We are working every day to keep up our end of the bargain, and we are grateful to the partnership of the people of Hawaii. Secretary Del Toro has identified three enduring principles that guide the work of the Department of the Navy: strengthen our maritime dominance, our people, and our partnerships. In my role, I implement Secretary Del Toro's guidance by focusing on three cross-cutting areas: communities, critical infrastructure, and climate action. Communities are where our people come together, the districts you represent, the towns where our installations are, and the environment and economies that surround them that enable our sailors and Marines to live, train, and operate. I am talking about communities like Southern California, where late last summer record-breaking temperatures above 100 degrees Fahrenheit caused record-breaking demands on the grid of more than 50,000 megawatts. Utility operators were ready to mandate rotating power outages, but instead, the Navy unplugged 20 ships from the grid, and the Marine Corps shifted from the commercial grid to its microgrid, ensuring that neither the naval force's mission nor the lives of the citizens were interrupted. The example above also demonstrates the second C, critical infrastructure. Energy security is critical to mission success. More broadly, critical infrastructure is the means to our ends. Our Navy and Marine Corps installations located in the United States and around the world are essential shore platforms from which we project our power. Currently, we see infrastructure that is weakened because of age, vulnerable to physical and cyber threats, and a changing climate. We recognize the need to drastically change our approach, and the Department of the Navy is beginning planning on a 30-year infrastructure plan that is proactive and anticipates the requirements of our future force and their mission. We protect our communities and critical infrastructure with a third C: climate action. No matter what we call it, extreme weather, temperatures, a rising sea, and depleting water sources, among other challenges, are threatening the naval service's installations and investments, the infrastructure that supports our critical missions, complicating logistics, and demanding more disaster and conflict response from the Navy and Marine Corps, while hampering their ability to respond. These factors are changing our operational environment, and, by default, changing the cost and calculus when it comes to mission success. We build resilience across the people and platforms of the fleet as a warfighting advantage, a tactical, operational, and strategic enabler. Ashore, we are making our structures, power grids, and fuel distribution systems and waterlines more survivable. Afloat, and forward-deployed, we are untethering from long and contested logistics tails to ensure we can stay on station longer, operate securely, independently, always keeping mission first. Climate change can be used as a tool and a weapon. We see that across the conflict continuum. And, Mr. Chairman, we talked about energy as a weapon last year. We will continue to build our resilience, reduce the threat, and promote innovation to ensure that the Navy and the Marine Corps remain the world's greatest maritime fighting force in every environment. Thank you. [The prepared statement of Ms. Berger can be found in the Appendix on page 61.] Mr. Waltz. Ms. Jacobson. STATEMENT OF HON. RACHEL JACOBSON, ASSISTANT SECRETARY OF THE ARMY FOR INSTALLATIONS, ENERGY, AND ENVIRONMENT Ms. Jacobson. Chairman Waltz, Ranking Member Garamendi, and distinguished members of the subcommittee, thank you for the opportunity to testify on the current state of Army's installations, and to answer any questions you may have. I am grateful to the committee for its continued support and for its commitment to Army's soldiers, families, civilians, and soldiers for life. I look forward to working with you to help build the force of 2030 and beyond. To realize the Army's 2030 goals, the future of installations must be now. Installations are the epicenter of everything we do in the Army. They are where we train, work, learn, and live. To strengthen Army readiness and build the force of the future, we must be laser-focused on providing state-of-the-art installations. I am pleased to report that with the help of Congress, we are making progress. We are continuing our investments in barracks, with over $11 billion planned between fiscal years 2024 and 2032. We are constructing new child development centers in multiple locations. We are building on congressional directives to deliver high-quality family housing and strengthen our oversight of the privatized housing providers. Each of these measures will help us to recruit and retain soldiers and families. A key component of creating installations of the future is improving our infrastructure and tackling our deferred maintenance backlog. These challenges will take focus and strategic spending to slow the progression of these deteriorating facilities. With timely, adequate, predictable, and sustained funding, we can continue to reduce our maintenance backlog. I thank the committee for your support in that regard. Resilient installations foster ready soldiers, beginning with reliable access to energy. We have all witnessed threats to the electric grid, whether from cyber attacks, physical attacks, or severe weather events. Installations can't afford to lose power when the commercial grid goes down. That is why we are developing onsite carbon-free power generation, battery storage, and a microgrid to support critical missions at all Army installations. Thanks to congressional authorities, we are collaborating with third parties to guarantee energy resilience without the need for upfront expenditures by the Army. An integral part of installation management is environmental stewardship and protection of natural, cultural, and archeological resources. Installations are home to 261 threatened and endangered species; 1.3 million acres of wetlands; and over 85,000 archeological sites. Our success as an environmental steward is due, in part, to the Army's Compatible Use Buffer Program, which is marking its 20th anniversary. The Army's exemplary stewardship of lands and resources reflects meaningful collaboration with State and local governments, Tribes, landowners, and other stakeholders. The Army also bears the responsibility for cleaning up pollution at current and former Army sites. We share concerns about PFAS chemicals, and we are taking our obligations to address PFAS seriously, in a transparent manner. Ensuring our soldiers and civilians are ready to support the Army mission requires prevention of accidents and injuries. The Army recently implemented the Army Safety and Occupational Health Management System. This modern safety-first program provides comprehensive oversight of each installation's safety and occupational health programs, and seamlessly integrates essential safety practices into daily operations. Installations provide the foundational support of our people. As we build the Army of the future, we must make strategic installations--investments in our installations today using the most cutting-edge technologies, innovative public- private partnerships, and streamlined processes to accelerate results. Although this work will not be completed overnight, the future of our installations is happening right now. Thank you for your continued support of our soldiers, families, civilians, and soldiers for life. I look forward to your questions. [The prepared statement of Ms. Jacobson can be found in the Appendix on page 78.] Mr. Waltz. Thank you. Mr. Oshiba. STATEMENT OF EDWIN H. OSHIBA, ACTING ASSISTANT SECRETARY OF THE AIR FORCE FOR ENERGY, INSTALLATIONS, AND ENVIRONMENT Mr. Oshiba. Thank you, Chairman Waltz, Ranking Member Garamendi, and distinguished members of the subcommittee. I am honored to join my colleagues this afternoon and equally honored to represent the nearly 700,000 airmen and guardians that defend our Nation each and every day. We are thankful for your consistent support over the years, specifically in the areas of energy, installations, and environment. In the December 1941 edition of the Society of American Military Engineers Journal, General Hap Arnold, in assessing the state of the Army Air Corps at the time, said the following: Air bases are a determining factor in the success of air operations. The two-legged stool of men and planes will topple over without this equally important third leg. He goes on to justify his words using the experiences of Germany and the United Kingdom in the European theater where the resiliency of airfields and, in some cases, the lack thereof, made the difference between victory and defeat. General Arnold didn't mention the Pacific, but I am sure General MacArthur would have made a very similar statement given the importance of airfields in his island-hopping campaign. Eighty-two years later, these words continue to ring true. They hold true for air and space operations; they hold true for airmen and guardians; they hold true for air and space weapon systems; and they hold true for air and space bases. We view that third leg, our bases, as foundational to enabling and projecting combat power in air, space, and cyberspace. Everything we do begins and ends at our Air and Space Force bases. The Department remains committed to ensuring they are ready by investing in the right capabilities at the right time and the right place and with a team of trained and equipped airmen and guardians. Resilient against the full range of natural and man-made threats, and optimized for effective and sustainable mission execution. Since 2019, the Department's infrastructure investment strategy has served as our roadmap to make our bases ready and resilient through decisions meant to optimize the balance between effectiveness and efficiency. The strategy informs policy investment decisions supporting weapon system modernization and combatant command priorities while balancing the need to recapitalize our aging infrastructure and facilities which improve the quality of work and life for our airmen, guardians, and their families. To that end, we recognize the crux of successful operations rests with our airmen and guardians. Our missions would be impossible to accomplish without them. This underscores the need to balance operational priorities with preserving the readiness and resilience of our most important resources: our airmen, guardians, and their families. We continue to emphasize continued quality-of-life investments in housing, dormitories, child development centers, and other support facilities. I want to thank Congress for your generous support in this area. Additionally, we remain committed to ensuring the safety and health of our service members and families who work and live on our installations and in our surrounding communities. We greatly appreciate Congress' substantial funding for environmental cleanup and research, including resources to tackle PFAS, which help us accomplish this important priority. Finally, we are pursuing policies, investments, and activities that increase our agility, energy diversification, and quote, unquote, ``lethality per gallon.'' This improves our ability to field and sustain a combat-credible force now and in the future. By reducing the energy demand of our aircraft, we are increasing the range and cargo-carrying capacity of these legacy platforms. And by broadening the aperture of financing opportunities, to include smart third-party investments matched to energy vulnerabilities identified through in-depth planning and realistic exercises, we improve mission assurance through energy assurance. In summary, your Department of the Air Force is committed to preserving ready and resilient installations. Our platform is to enable and project combat power using a strategy which optimizes operational effectiveness and resource efficiency as part of our focused and determined one team to win our one fight. Chairman Waltz and Ranking Member Garamendi, thank you again for the opportunity to testify today. We appreciate your continued support of our energy, installations, and environment enterprise. I look forward to your questions. [The prepared statement of Mr. Oshiba can be found in the Appendix on page 99.] Mr. Waltz. Thank you. At this time, we will go to questions. I will begin by just saying--the committee is going to get tired of hearing me say this--but we have a teachable moment right now with what is going on with the Russian military in terms of readiness and how much that matters. Along those lines, as I mentioned in my opening statement, recent NDAAs have sought to wean the Department and the services off their dependence on Russian energy, but we still have a problem. We are not there. Obviously, following the Russian invasion of Ukraine, this became even more pressing. In the 2023 NDAA, we established a DOD goal, or a goal for DOD, to eliminate use of Russian energy at all main operating bases in EUCOM within 5 years. The provision also required planning for energy security, resilience, mitigation to reduce reliance on Russian energy for any new military base in EUCOM. So, Mr. Owens, if you can start with what is--just update us on the status of eliminating reliance on Russian energy in EUCOM. How are we ensuring energy resilience for both main operating bases and/or smaller installations across EUCOM? I know the NDAA requires you to identify those, I believe by June, those bases, and then start implementing the plan. But if you can update us where you are on that process. Mr. Owens. Thank you for the question, and I think you are exactly right. As I have watched, from the outside, the energy markets deal with the pivot away from Russian energy in Europe, it has been apparent that the things that have already been pointed out, that energy as a weapon, the reality of energy as a weapon is here, and it doesn't seem to be going anywhere anytime soon. Relative to the specific things that are underway within DOD, there are people at this table who probably are better positioned to answer that, although I will take that question for the record. [The information referred to can be found in the Appendix on page 127.] Mr. Owens. Pulling back from that, one of the things that is apparent to me this early on is that all of the things that we are doing to maintain mission assurance within the United States are things that we need to be aggressively deploying in EUCOM, in Europe. So that is efficiency, reducing the amount of energy that we need, resilience, reliability, and working with our partners and allies in these places to make sure that we are advancing our ability to be independent from any risks associated with energy supply. Mr. Waltz. Mr. Oshiba, can you address that as well? My understanding is Ramstein was on--I mean, it is on the host nation grid, right? So, therefore, it is on Russian gas, Ramstein Air Force Base in Germany. At one point, my understanding was we exported domestic coal. We moved away from that about a decade ago, but I think we moved from one dependency to another. So can you address where we are going? Mr. Oshiba. Thank you for the question, sir. You are right. What we are doing and what we are focused on is completing our installation energy plans in the EUCOM theater. We finished the one at RAF Lakenheath in the U.K. earlier this year. Ramstein is actually days away from being completed. We got the draft back in, and that focus area is on both what are the sources of energy we have, as well as vulnerabilities that we need to mitigate moving forward. We have four more that we plan to accomplish this year: Aviano Air Base in Italy; RAF Menwith Hill, and Mildenhall back in the U.K.; and Spangdahlem Air Base in Germany. And that has been our focus area, and once we get those plans done, the idea is to then turn that into requirements that we can apply our resources to. Mr. Waltz. Great. Thank you. My other question and then I want to move on to Ranking Member Garamendi and the members. Again, along the lines of reducing dependency on our adversaries--I mean we just cannot continue along this path--I understand a number of installations are moving to solar. It is not only carbon- reducing, but it is energy-diversifying. Obviously, you need battery and storage for that. I can tell you, for example, Florida Power and Light is moving to 30 million panels by 2030; however, they source them from China. And we can point to the irony of one of the largest solar-producing plants in the world, in western China, on forced labor, and if you follow the transmission lines, they are being powered by coal. And China is opening more coal-fired plants than us and the rest of the world combined. So talk to me about the sourcing of your panels and the sourcing of your battery materials. Are they being sourced domestically, or are you also--even if you buy from domestic utilities who are ultimately buying from China? And what is the Department's plan to reduce that dependency? I will go with Mr. Owens, or anyone who wants to dive in. Because, obviously, that is a Department strategy, understanding your 30 days on the job. Mr. Owens. It is, sir, and I really appreciate that. I hope I don't have to use that get-out-of-jail-free card very much. Mr. Waltz. You only get one. Mr. Owens. All right. I think--I really like the way that you have drawn a complete picture of the energy ecosystem, because the irony of solar panels powered by coal is truly something that we are aware of. I think that the onshoring of these critical capabilities is something that we have as part of a larger industrial-based strategy that is going on within other parts of DOD, with other parts of the acquisition and sustainment team within DOD. So in terms of the work that is going to be undertaken under the battery mineral--sorry--the Battery Materials Initiative, under the IRA [Inflation Reduction Act], under the Bipartisan Infrastructure Law, under the CHIPS Act, I think all of those things are moving us in the right direction in terms of being able to divest ourselves from these vulnerabilities that you have correctly pointed out. Mr. Waltz. Ms. Jacobson, could you--I mean, you mentioned specifically--and I get it. It is carbon-reducing, but as I said in my opening remarks, that has secondary and tertiary effects when China controls the cobalt mines in the Congo and that is necessary for battery storage. That is an issue. Can you talk to me about that supply chain surety? Ms. Jacobson. Chairman Waltz, thank you very much for that question. It is absolutely essential that we address supply chain throughout our portfolio, but especially here where, as you say, China and other countries control the supply of those critical minerals. And because we are so intent on putting islanding power on every single installation through a microgrid along with battery technology, it is very, very important to us. We recognize that the challenges of relying on foreign sources of mined and processed minerals that we have to bring that domestically, and we are teaming with DOD and other Federal agencies in this effort to stimulate domestic mining and processing of these minerals so that we can produce batteries domestically. And so many partners in industry are already taking this on, as you know. There is huge investment in domestic battery manufacturing along with sourcing of those raw materials. DOD is using the Defense Production Act, as was set forth in a Presidential Executive order, and we are involved in the Federal Consortium for Advanced Batteries as part of DOD; but Army is committed to doing our part to make sure, again, that we have a robust and secure domestic industrial base for batteries. Mr. Waltz. I yield to Mr. Garamendi, but I will just say from my perspective, I understand we are charging headlong into our climate plans and executing those plans, but we cannot trade risk to climate to risk to force, right. And I will be looking at detail. I understand what we have to do, but I will be looking at details of how the Department is actually doing it, or do we need to tap the brakes on some of these plans until that onshoring can be complete? Over to you, Mr. Garamendi. Mr. Garamendi. Can I be your partner as you explore all of those issues? Very, very important. We have to do that. I would just add, and then a couple of questions, that the other pieces of legislation--you mentioned the Inflation Reduction Act, the Infrastructure and the CHIPS Act, and the Science and the CHIPS Act--are all intended to deal with the totality of the energy issue, and the military is a piece of that and certainly will be the beneficiary of those other Acts. With regard to onshoring the energy systems, if you want to take advantage of the tax credits in the legislation, and they are very, very significant, it has to be made in America. And so, that will bring a lot of that back home on the tax side of it. Mr. Scott. Will the gentleman yield for 1 second? Mr. Garamendi. Please. Mr. Scott. Ford Motor Company is partnering with CATL, which is a Chinese company, to get the tax credit. So that is where I think---- Mr. Garamendi. Well, there ought to be a law. Mr. Scott. I agree. Mr. Garamendi. And we have to watch that very carefully. There will be a lot of ways to escape and to take advantage inappropriately, and so, it is our task and the oversight to do that, and if we do, we will be able to resolve those particular problems. There are so many different pieces to this puzzle, and we need to make sure that the departments are looking at all of the opportunities and engaged in all of these areas. So, you know, there is information that all of us might have. We should bring it to the attention of our committee as it involves the installations, the energy systems, or the environmental pieces of it. And if we do, we will be making some very, very good progress. I don't know how much time I have to ask questions, but I am certainly opining here for a while. So forgive me for that. But there are some things that are going to be really important as we go forward, and I am going to go back to something that has been bothering me all of these many, many years, and that is the facilities themselves, the depots, the repair facilities, the shipyards. And in the testimony, all of you mentioned or at least touched on this, on the issues of the necessity of improving, upgrading, and, indeed, even making viable these critical facilities. And I would like you to quickly provide us with assurance that these are high priorities. We didn't bring up the arsenals and the making of 155 artillery shells, which I suppose we could spend time on, but that is included in this. So let's just go down the line. Let's start with the Navy. How many times do we have to talk about the SIOP [Shipyard Infrastructure Optimization Plan] program. Please don't tell us it is 30 years. Tell me what you are doing this year and the next 4 years and then we will go to the other bases, please. Ms. Berger. Yes, Congressman Garamendi. As we focus in the near term, we are taking steps on what we see as an historic opportunity--and thank you to Congress for the funding to do it--for our Shipyard Infrastructure Optimization Plan. This is a place where we have area development plans for two of our shipyards on the east coast, and we continue forward to make progress in all of those efforts, in incremental and in steps. This is a place where we can integrate some of what you were just talking about in terms of the IRA and the IIJA [Infrastructure Investment and Jobs Act]. There are tremendous opportunities to make sure that we are reaching that end state of resilient infrastructure that supports the mission that is critical that comes out of those shipyards. And in parallel, we have our organic industrial base, some of our fleet areas and our facilities that support some of our aviation depots and others where we are also investing in making sure that we are keeping those up to scruff so that way we can ensure that we are supporting the mission. Mr. Garamendi. Specifically, you have got four dry docks that are not being used now for earthquake. Specifically, what is the situation, if you can share it with us--if it is classified, we will take it up elsewhere, on the four dry docks in Washington State? Ms. Berger Yes, sir. Let me take the details for the record for you, but we moved swiftly to shut down when we saw that safety and readiness concern, and we have put forward the projects that will get us on track to be able to start to make those corrections already starting on two of the dry docks. And I will be glad to follow up with you in detail to provide exactly where everything is. [The information referred to can be found in the Appendix on page 127.] Mr. Garamendi. The 1st of March is nearby. How about by the end of March? Ms. Berger. Yes, Congressman. Mr. Garamendi. The details. Ms. Berger. Absolutely. Mr. Garamendi. I think I am out of time, Mr. Chairman, but I would go down the line and just let it go at that. Mr. Waltz. Mr. Wilson. Mr. Wilson. Thank you, Mr. Chairman. And, indeed, I agree with Chairman Mike Waltz that energy is so critical for our continuity at our installations and, additionally, a great opportunity, and that is small modular reactors. And I always enjoy working with Congressman Garamendi to fill in puzzle pieces, and a puzzle piece is small modular reactors. And I am really grateful that in meeting with our allies last week in the Czech Republic, they are making tremendous progress on small modular reactors, and they are in a contest, a good one, with Romania to see who can build the first. And we need to be there, too, and so I hope every effort is being made to develop. In particular, Mr. Oshiba, the Air Force. Is it on track with the guidance provided by the 2021 National Defense Authorization Act to identify suitable locations for development and operation of microreactors, small modular reactors for the year 2027? And I will tell you a beautiful location for energy independence, and it would be wonderful to spend a lot of time there, is the beautiful territory of Guam. And then after you do that, I want to invite you to South Carolina, the Savannah River Nuclear Laboratory. It is 310 square miles. It is probably the largest open area or secure area, and it is really close to Augusta National Golf Course. So it is a good place to visit. But, indeed, those are two locations that come to mind. Mr. Oshiba. Congressman Wilson, I think I feel like I have swung behind the ball and missed twice. But we do have a small modular reactor pilot project going on right now at Eielson Air Force Base in Alaska. It was chosen based upon the reliance of the power system there to a coal- fired power plant that we need to get rid of. So we have actually gone out with a request for proposals. We have received some very attractive proposals. We are in the process now of going through the licensing process with the Nuclear Regulatory Commission, and from what I can tell, from what I have heard so far, everything is going along very, very smoothly. We have gotten a lot of interest, a lot of community support. And I have taken note of the two other candidate locations you have mentioned. Mr. Wilson. And, indeed, we need to work with our NATO allies, Czech Republic and Romania. But, gosh, you can't have a better location than beautiful Guam. You get to go to the beach. And nothing is as good as the Savannah River Nuclear Laboratory with its proximity to Augusta National. Okay, along with that, Secretary Owens, the Department of Defense's Readiness Environmental Protection Integration program, known as REPI, is a vital tool for preserving the training missions and operations of military installations in South Carolina Midlands region, including Fort Jackson, which is the Army's largest and most active initial entry training center, by protecting more than 20,000 acres throughout the Midlands from incompatible development that would threaten military readiness. If the DOD continues the trend of increasing the budget for REPI, as DOD has done in recent years, what locations across the United States would be prioritized to ensure preserving training missions and operations at military installations? We will make the entire State of California an open space. Mr. Owens. There might be some arm wrestling up there if that is proposed. I think the REPI program is an excellent example of the type of capability that can be deployed when compatible use is something that we are focused around. My understanding of the way that that program operates is that we work with the military departments to understand what their needs are, and then prioritize projects according to how we can best serve the military departments from a readiness and mission assurance standpoint. Mr. Wilson. And additionally, I would like to ask in regard to the United States European Command area of operations, what additionally have we done to reduce our reliance on Putin's utilities into countries such as Bulgaria and Romania? Mr. Owens. We have continued to drive efficiency and essentially looking at all the things that our partners and allies were doing in Europe. We have taken steps that are similarly aggressive on the energy efficiency side of things at our installations. Mr. Wilson. And, indeed, with the pipelines through Ukraine, hopefully things are changing. So I yield back. Thank you. Mr. Owens. Thank you. Mr. Waltz. Ms. Sherrill. Ms. Sherrill. Thank you. It is wonderful to see all of you. Nice to see you, Secretary Jacobson. Thank you for joining me at the expo at the Pentagon, as we saw some of our future energy-saving technologies. Last year I had the opportunity to visit and tour Picatinny Arsenal in my district, and I was able to go through the software center, which really houses some of our most highly talented workforce winning awards as, quite frankly, the building is falling down around them. Highlights include peeling paint, leaks during rainstorms. It really is unfortunate given that we continue to face recruiting shortfalls, and here we are trying to recruit some of the most talented workforce and trying to do so with these aging labs and infrastructure. So it really makes it difficult to attract top talent. And I know the Pentagon has expressed concern regarding growing deficiencies in critical laboratory infrastructure across the Department. Heidi Shyu, Under Secretary of Defense for Research and Engineering, said during a May 2022 congressional hearing that her top priority is upgrading the Department's labs. So what progress and updates can you provide on how the DOD is prioritizing which labs to upgrade? And when can Picatinny Arsenal's two labs and four engineering facilities maybe expect to be upgraded? And I am sorry. That is for Secretary Jacobson. Ms. Jacobson. Thank you so much, Congresswoman Sherrill. It is very nice to see you again, and thank you so much for visiting our energy expo. It was a great day to have you there. We fully share your concern about the aging facilities that house our incredibly important labs, and we recognize that by not addressing these facilities and upgrading them to acceptable standards, we do lose talent. And we recognize that part of making sure our facilities are in good shape, that we have this sustainment funding, the MILCON funding, the restoration and modernization funding to accomplish necessary repairs, that that presents a recruiting challenge when we don't do that. We are prioritizing and prioritizing and prioritizing, using a lot of different tools and models to determine which infrastructure is at most risk, where does it fall in terms of the design, if it is a MILCON project. And we every year go through this, you know, facilities investment process to make sure that we are addressing the most important need. And with respect to the two labs at Picatinny Arsenal, I commit to getting back to you about specifics about status of modernization and upgrades at those labs, because I agree they are critically important, and we want to recruit the best talent available. Thank you. Ms. Sherrill. Well, thank you. I appreciate that. It was, as I met with the general, one of his top concerns as well. So thank you so much. I really do appreciate that and look forward to hearing from you. Last May, the Marine Corps Logistics Base [MCLB] Albany became the first DOD installation to achieve net zero electricity status, with the base producing 100 percent of the energy they use. They were able to do so through incorporating innovative energy technology, such as biomass steam turbines, landfill gas generators, and advanced microgrid controls into their installation. Other carbon pollution-free resources include wind and solar power alternatives, including new systems such as GAF Energy's integrated solar roofs that directly integrate solar technology into roof shingles. So Secretary Berger, congratulations on that success at reaching net zero. Can you elaborate on some of the challenge that MCLB Albany faced in achieving net zero, as well as lessons learned, recommendations, and takeaways from that process so other services can avoid those pitfalls as they work towards net zero installations. Ms. Berger. Congresswoman, thank you. We are very excited about this, and I had the honor of going down with the Commandant of the Marine Corps to be able to celebrate this milestone with him, and the first thing that he talked about was how this was warfighting, this was about mission success. This is a logistics base which is foundational to the Marine Corps, and so as we talk about a contested logistics environment and how we are facilitating the way that we support the fight, it is just a wonderful example in a number of ways. This is a testament to the Marines who were committed year after year, commanding officer after commanding officer, to work with the community that surrounded them through trial and error and continuity of commitment---- Mr. Waltz. Ms. Berger, I hate to interrupt you. If you could submit the rest for the record. The member's time has expired. [The information referred to can be found in the Appendix on page 128.] Ms. Sherrill. I'll take that for the record. Thank you, Mr. Chairman. I yield back. Mr. Waltz. Thank you. Mr. Scott. Mr. Scott. Thank you, Mr. Chairman. The chair, Congressman Waltz, hit on this a little bit with regard to solar panels, battery technology. I will tell you that, Secretary Owens, I do think that the DOD should make it very clear that the DOD, the United States Department of Defense, is not going to purchase any vehicle that utilizes CATL or any other Chinese battery technology. I refuse to believe that with all of the great companies in this country and with all of the great minds at Georgia Tech, MIT [Massachusetts Institute of Technology], and everywhere else in this country, that we in this country cannot develop better technology than the Chinese have. And if it takes us 12, 18, 24 months to do it, then that is better than sending people who don't share our interests or our values U.S. tax dollars. And so, I think that corporate America is going to have to understand that if they are going to partner with China, then they are not going to sell their vehicles to the Department of Defense. That said, I realize part of that manufacturing is not going to come back to the U.S. It doesn't all have to come back to the U.S. It is just we shouldn't be buying it from people who don't share our interests or our values. Secretary Oshiba, can you briefly explain what materials the Air Force considered for its facility to be built under the pilot program on the increased use of sustainable buildings? Mr. Oshiba. Congressman Scott, I apologize. I may have to take that one for the record as far as the details go. [The information referred to can be found in the Appendix on page 127.] Mr. Scott. My understanding is that you only considered concrete. Is that correct? Mr. Oshiba. For the pilot project that we are undertaking, I think it is at Patrick Air Force Base, that was the one material that we focused on for that one project, yes, sir. Mr. Scott. And so the whole purpose of the project is innovative concepts, new materials. Why didn't you consider a cross-laminated timber? Mr. Oshiba. Sir, I would have to take that one for the record. I am not sure exactly why we didn't look at a broader range of materials. I do know the focus was specifically on concrete. And then we also looked at what other kinds of resilient design techniques that we could incorporate as part of the design for that specific area. [The information referred to can be found in the Appendix on page 127.] Mr. Scott. There has also been language that is specific to--not telling you that you have to use it, but that you have to consider cross-laminated timber. And the use of cross- laminated timber is certainly a much more renewable resource than concrete is. I mean, when you take concrete down you create a pile of rubble that nothing can be--nothing can be done with. And so, I just want to make sure that cross- laminated timber is part of the discussion as we look to---- Mr. Oshiba. Sir, we can certainly take a look at that specifically. And if it is not there, then I don't see why we couldn't consider it. Mr. Scott. I would appreciate that. And then Secretary Jacobson, the Army somewhat did the same thing. But in your testimony you say: While lower emission building materials are in development, these materials are not currently at the appropriate technology readiness level for direct implementation of the project. But other countries and the private sector are using cross-laminated timber now. Can you explain those comments further? Ms. Jacobson. Congressman Scott, thank you for the question. And I want to start by saying that we have two projects underway at Joint Base Lewis-McChord using sustainable material. They are both barracks projects. The first one, as you mentioned, is using sustainable low-carbon concrete. But the second one is going to use cross-laminated timber. Really, it was just a planning issue with the Army Corps of Engineers. They were a certain way along in the planning for that first barracks, and to change the material so substantially would have affected the timing of the construction and so forth. But the second barracks project for fiscal year 2025 will be made of cross-laminated timber. We are committed to that. Mr. Scott. Well, as somebody from the private sector, I think that you will find that the more options you have with the way you construct buildings---- Ms. Jacobson. Yeah. Mr. Scott [continuing]. Not only are you going to get a better building, but you are going to get it at a better cost. And so I would hope that you would consider cross-laminated timber where it can be used. I realize there is some situations where it is probably not appropriate; but where it is appropriate, I hope that you will consider it. And, again, Secretary Owens, I know you are new to the job, but I will tell you, we are not going to spend DOD dollars on Chinese technology for batteries. And if it slows us down, 12, 18, 24 months---- Mr. Strong [presiding]. The gentleman's time has expired. Thank you, Mr. Scott. The Chair recognizes Mr. Davis from North Carolina. Mr. Davis. Thank you so much, Mr. Chair, and to the ranking member as well. Fort Bragg, North Carolina, is an installation that is home of some of the most elite military units, as we understand. Also, have understanding that the North Carolina Department of Transportation has offered to take over maintenance of roads at Fort Bragg as soon as the Army brings the roads up to the DOT standards. Letting NCDOT take over maintenance would save the Army nearly $400,000 we estimate, in maintenance per mile at Fort Bragg, which we understand have over 1,500 miles of road total. There are many examples of public-private partnerships and third-party financing that have led to vast improvements in conditions in sustaining infrastructure. Yet, the Army here remains resistant to this program. At this time, when the Army's faced with multimillion dollars of maintenance backlog, and facing hard choices about how they use dollars, the Army should be using all tools at its disposal to improve infrastructure, especially when the continued decline of these roads are present. So does the Army have any alternative plan to correct these conditions and invest in installations such as Fort Bragg? Ms. Jacobson. Congressman Davis, thank you very much for that question. Because the programs, of course, that you are talking about, intergovernmental service agreements, Army is the biggest user across the Department of those programs. And we recognize that they save enormous amount of costs to the taxpayer, because of making these agreements with State and local agencies who have the expertise to supplement the expertise that Army simply doesn't have. We recently entered into such an agreement for road maintenance with the State of Texas where the State of Texas Department of Transportation will provide road maintenance--this was actually with all the other services, for all services in Texas. I am not familiar with why there is any progress not being made on any intergovernmental services agreement at Bragg with respect to road maintenance and working with the DOT, but I will find out and make sure we get back with you. Mr. Davis. Thank you so much. Unfortunately, Camp Lejeune has a long history of service members that has been harmed by environmental contaminations, specifically dealing with the water. In recent years we have learned that service members have been exposed to another contaminant, PFAS, that exposes them to additional health risk. In the fiscal year 2021 NDAA, you were asked to provide a timeline and cost estimate for cleanup of all sites that have been contaminated by the PFAS. The response to that requirement indicated that while the Navy has begun the cleanup process, phase 2 of the process of the remedial investigation and feasibility study will not be completed until the last quarter of fiscal year 2029, which means we are probably looking at 2030 before the meaningful cleanup. My question is, with a timeline like that, explain how you believe that the Department is fulfilling its commitment to clean up the responsibility--this responsibility here of cleanup at Camp Lejeune in particular? And why is it taking so long? Why will it take so long? Ms. Berger. Congressman, we share your concern for people who are harmed by contaminates in water and take that very seriously. And anybody who has had exposure should get the medical care to which they are entitled to from all the different places that it is provided. I will need to take, for the record, what the time is that will take us out to 2029 and be happy to follow up with you on that answer so that you get the details that you are looking for. [The information referred to can be found in the Appendix on page 128.] Mr. Davis. Thank you. I yield back. Mr. Strong. Thank you, Mr. Davis. The chairman recognizes himself for 5 minutes. Thank you each for being here today. During my time as chairman of the Madison County Commission in Huntsville, Alabama, I saw firsthand the impact a strong community can make on an Army installation. To name a few instances at Red Stone Arsenal, the region pulled together to move the most popular entrance back three quarters of a mile to comply with new regulations and growth of the installation. We built new officers and base leadership housing, contributed over a half a billion dollars to improve infrastructure. Started new partnerships with some of the best research universities in the Nation. And my personal favorite, we built a $55 million minor league baseball stadium, the Rocket City Trash Pandas, which sits right outside of Red Stone Arsenal, along with a $50 million amphitheater at no cost to the Department of Defense. Because it was the right thing to do to support our warfighters, their families, and our contractors. Quality of life makes a difference. With the DOD facing a maintenance backlog of around $130 billion, my question is, what can the communities do to better serve their installations? Mr. Owens. Thank you for the specific examples of what I believe to be very true relative to the interdependency of defense communities and installations. The Office of Local Defense Community Collaboration [OLDCC] is a program that is run as a defense field agency that is resourcing communities to be able to look at that question, specifically. So to try to find out what needs the Department has in communities; what OLDCC can provide to make it possible for those communities to come to the table as partners, as collaborators to identify the places that we should be partnering together to improve quality of life for all of the people in the community. Seventy percent of our service members and their families don't live on installations, they live in the community. So specific to any ideas right now, I would be happy to take that for the record. But I think you have pointed out some specific examples of quality-of-life improvements that could be used other places to be replicated to improve the conditions for our service members. And Trash Pandas is an outstanding name. That is really commendable. Mr. Strong. It has been great for our community. No doubt. Mr. Owens. I'll bet, yeah. Mr. Strong. The next question is what benefit has the Defense Community Infrastructure Pilot program provided for installations? Mr. Owens. I have a list in the binder. I would be happy to share that with the committee for what specific things that have happened. But DCIP is another example of a program that is, again, organized and operated by OLDCC to be able to provide the resources to stitch together the infrastructure that exists on the other side of the fence line that our military service members and our communities rely on. Mr. Strong. Thank you. Ms. Jacobson, the Ukraine conflict has highlighted shortfalls within the U.S. defense production capacity and supply chain. I think we can all agree it is better that these issues be fixed before we find ourselves in the middle of our own conflict. In Alabama, we have Army Materiel Command at Red Stone Arsenal, and the ``combat vehicle center of the free world'' and one of the largest storage and distribution centers of ammunition and missiles at Anniston's Army Depot. My question is what lessons has the Army learned regarding the ability of our arsenals and ammunition facilities to meet future wartime demands? Ms. Jacobson. Thank you very much. And thank you for your support of Red Stone Arsenal. We really appreciate it. It is, obviously, as you say, home to Army Materiel Command and so many other important functions across DOD, actually, across the Federal Government even. What we recognize is that as we start to build new operation systems and new platforms, we have to have the facility to house those platforms. So not only do we need to make sure our organic industrial base is modernized enough to be able to keep pace with the new platforms that we have to replenish, but also, to make sure that we have the facilities, the maintenance facilities and so forth to house those new equipment, and to make sure that we are giving it state-of-the- art maintenance facilities and so forth and manufacturing facilities. And this is, obviously, a huge priority and part of our facilities investment planning. Mr. Strong. Thank you, Ms. Jacobson. I yield back. The Chair recognizes Ms. Tokuda of Hawaii. Ms. Tokuda. Thank you, Chair. First of all, thank you, everyone, for your testimony and for coming before our committee. I have some questions, as you can guess, on the Red Hill tragedy that took place in Hawaii. I appreciate the conversations we have had as well. Appreciate for all the testimony, including what you are doing and planning to do. But as we have discussed before, what is at the core of this is rebuilding a broken trust that exists right now. That takes more than words, it takes actions, and it takes giving people confidence that the injustice that has happened is recognized and will not happen again. And so, you know, when I take a look at what is still being required in terms of questions about important information that they would like shared, even the fact that video that was released by independent sources of the fuel leaking out and spewing out, quite frankly, of the Red Hill pipeline in November 2021, has still not officially been released right now. What efforts do we--you know, what assurance do we have, I guess, Ms. Berger, that, you know, the information that people are demanding, the transparency and disclosure that people expect after something like this, will actually take place, including a lot of the relevant FOIA [Freedom of Information Act] requests that have been put forward so that the people of Hawaii can really know what happened and what will happen and can have confidence that the relationship going forward will be one of openness and of trust? Ms. Berger. Congresswoman, thank you, too, for the time and recent conversations. And I am grateful to have had the opportunity to engage across the Hawaii delegation with both on- and off-island leadership and citizens and constituents to understand. I think that part of building trust is building understanding as well. And it comes from all sides who are involved. And so every day, we at the Department of the Navy and the Department of Defense need to make sure that we are being responsive, being transparent, providing that information. You note that there are some FOIA requests that have come. FOIA is a process that does take some time, but we will make---- Ms. Tokuda. If I could just interject here since I am limited in time. Do you feel that you folks have been, in fact, responsive? And I understand that FOIA is a process, but given the extreme urgency of having 20,000 gallons of jet fuel pumped into your water and people poisoned, your families worried about if they are getting sick because of what they are exposed to, do you feel that it has been responsive? Do you feel the timelines are fair, given the information people are demanding right now over Red Hill? Ms. Berger. Congresswoman, if there are specific pieces of information that I can help you to find out, I would be glad to. Ms. Tokuda. I think we are taking a look at what people have been asking. It has been in the paper. It has been well documented. Again, and I know I am running short of time. I don't want to continue this discussion. This really is a disrespect that happened to the people of Hawaii. What we are looking for is transparency and urgency. And regardless of the processes and the timelines that exist for things like FOIA, I think if we are going to rebuild what is a broken, a sadly, badly broken trust, it is about going above and beyond to make sure people have the timely answers to the questions that they deserve answers to and exposure to. So if I could go on--and, you know, I know we had a conversation, both Mr. Owens and yourself, about the post-closure plans. Even during my tour of Red Hill last week, I had mentioned that whatever the contractor Nakapuna was doing that it had to be done right and well. Or it would not only be a distraction, but it would be further mistrust, it would further degradation of the relationship. So, I was sad to see an article yesterday talking about the fact that this contract was an enigma because they couldn't get basic information about what the contract would do and how would they even engage. Would it be one on one? Would it be a website? They were actually told, the newspaper, to go FOIA your request. That is not the response that we want. Is this acceptable that your contractors and subcontractors can operate in the dark, while, again, people are asking for light and answers in this case. Ms. Berger. Congresswoman, thank you for noting that. I saw the same article yesterday, and it is something that I have asked my team to help me to understand what happened there. I saw it yesterday for the first time and will provide a response to your office. Ms. Tokuda. Okay. Do you think that is acceptable of an answer? The company that you have hired to basically engage with the community, saying they will not explain how to the taxpayers of Hawaii they will be doing this? Ms. Berger. Congresswoman, what is acceptable is a clear answer and a transparent process. And that is what I owe to you, and I will get to you. Ms. Tokuda. Thank you. And you owe to the people of Hawaii, as well, given what we have experienced. My last just comment here, because I know I don't have time for an answer. Infrastructure is a problem. Sadly, we were not surprised about Red Hill. We haven't been surprised about the Maui Space Facility, Schofield Barracks---- Mr. Strong. The gentlewoman's time has expired. Ms. Tokuda. Thank you very much. Infrastructure is a concern. We need to keep up on this. Mr. Strong. Thank you, Ms. Tokuda of Hawaii. Thank you. The Chair now recognizes Mr. Gimenez of Florida for 5 minutes. Mr. Gimenez. Thank you, Mr. Chairman. Mr. Owens, what is the greatest existential threat to America today? Mr. Owens. The pacing challenge for the Department of Defense is the People's Republic of China. Mr. Gimenez. Okay. Ms. Jacobson, same question. Ms. Jacobson. I agree with Mr. Owens' answer. Mr. Gimenez. Okay. Ms. Berger. Ms. Berger. The same, sir. Mr. Gimenez. And Mr. Oshiba, the same thing? Mr. Oshiba. The same thing, sir. Mr. Gimenez. Okay. Thank you. I appreciate that. I am 100 percent in support of Mr. Scott's assertion that any material that goes into our combat vehicles, none of it should be manufactured by the People's Republic of China. It would be insanity to have our greatest adversary supplying us with the materials needed for us to defend ourselves. Would you--would anybody disagree with that, any of you? I guess not. Okay. I am concerned--and I also am agreeing with our Ranking Member Garamendi about nuclear and small nuclear reactors to be able to power our military bases and essential infrastructure, military infrastructure. I am really concerned about solar panels. Not only because the materials come from China, and they are manufactured from China, but also from a security perspective. How do you defend them? Anybody have an answer for that? How do you defend solar panels? If you start putting out solar panels to power our bases, how do you defend that? How do you secure them? Mr. Owens. Representative, I will take a stab. I think that the strategy for DOD is not dependent on any one technology. What we are trying to do is diversify our energy ecosystem in a way that allows us to be able to take advantage of multiple different sources of energy to be able to harden and make resilient all of the various aspects of how we procure and use energy. So that is electricity from wind, from solar, from nuclear, from gas, from diesel. All of those sources, when you try--when you deploy a distributed energy platform, disruption of any one of those things is not catastrophically problematic for the entire system. All right. So mission assurance is guaranteed by diversity. Mr. Gimenez. Now are we talking about military bases now? Especially in Europe, right? I mean, we are talking about trying to get away from Russian energy, et cetera, et cetera. And so, when I started thinking about it, wouldn't solar panels be the most difficult thing to defend in a military base? You can't harden it. They have to be outside. So how do you defend solar panels? How do you defend wind power? That has to be outside, too. So how do you do that in a military base? Mr. Owens. Thank you for the question. I am realizing that I am way over my---- Mr. Gimenez. Omahoma. Have you all figured that one out? Have you figured that out yet, that you are now going to put in our military bases two sources of energy that are probably the most difficult things to defend against attack? Mr. Owens. The solution is in much broader diversity than we currently have, and that makes for resilient and reliable. Mr. Gimenez. Well, I would argue that it would be much more resilient and reliable to go with two nuclear, you know, small nuclear plants than putting some solar, some wind, and one nuclear plant. I would argue that because A, nuclear plants are much more reliable. They don't need wind. They don't need sun to power them. And you could probably, probably fortify them much, much easier than solar and wind. This is talking from a purely military perspective. So with that, I will yield the rest of my time back. Thank you. Mr. Strong. Thank you. The Chair now recognizes Mr. Vasquez of New Mexico. Mr. Vasquez. Thank you, Mr. Chairman. I am very pleased to see the Readiness Subcommittee's prioritization of MILCON projects, base infrastructure, environmental protection, and energy resiliency. I would also like to thank the honorable witnesses here today for taking the time to speak with us this afternoon, for your public service to strengthen the defense of our Nation. The military installations in New Mexico's Second District play some of the most critical roles in our national defense. But if you saw the condition of the infrastructure at some of these bases, you wouldn't believe it. For example, the service members at White Sands Missile Range and Holloman Air Force Base who are testing groundbreaking technologies are still living in communities with buildings built just after World War II. At a time when our military is struggling with recruitment and retention, we should prioritize improving the quality of life of facilities, like housing and child development centers for our service members and their families. We ask them to do a dangerous job, and they deserve better. To make matters worse, the Air Force recently notified the New Mexico Environment Department in 2018 that PFAS is prevalent in surface and groundwater throughout the State, particularly in Albuquerque right outside of Kirtland Air Force Base. And samples collected at Holloman Air Force Base also showed PFAS levels as high as 1.29 million parts per trillion. Experts state that the lifetime of drinking water exposure to these toxic chemicals is 70 parts per trillion. That is over 18,000 times the lifetime level of exposure, and we should do more to protect the health and well-being of our service members. I think the time to act is now, and I look forward to discussing these important issues with you all. As a former city councilor in the city of Las Cruces, New Mexico, where the National Guard was found liable for contaminants of PCE [perchloroethylene] in a Superfund site that cost the city of Las Cruces $6 million, we, as a city with limited resources, had to go to court with the Department of Defense in order to clean up those contaminants because they were found by the EPA to be in the drinking water of our residents. That to me, as a local elected official, was an unacceptable response from the Department of Defense not to accept the liability that it later took a local government to be able to find at fault. Now my first question is for Mr. Owens. Mr. Owens, could you provide just a quick status update on the Department's efforts to completely phase out all firefighting agents containing PFAS by 2024. Mr. Owens. I would be happy to, and thank you for your commitment to this issue. It is vitally important that the full Department takes its responsibility to deal with the legacies of the decisions that we have made. In January of this year, the Department of Navy certified a military spec for a PFAS-free firefighting foam. The military departments are--we are in the process now of certifying that that is--that those formulations do, in fact, work. And after that, the military departments will be implementing their phaseout plans according to the plans that they have developed. Mr. Vasquez. Thank you, Mr. Owens. And can you provide any insight on specific steps that the Department has taken to ensure that aging legacy infrastructure, like family housing, child development centers on installations are being properly modernized as mandated in previous NDAAs? Mr. Owens. My first job out of college was working as an energy manager at Fort Belvoir which is just south of here. And I have sort of lived both ends of this now in terms of the infrastructure challenges from an installation level, and from a department level. I think that there are--the FSRM [facilities sustainment, restoration, and modernization] backlog, the challenges that we have facing a chronic underfunding of the infrastructure maintenance and the deferred maintenance and repair, is a very big problem and something that I am going to be focused on going forward. And I look forward to partnering with the military departments to make sure that we are bringing the resources that are needed to modernize and repair these pieces of infrastructure, particularly on the housing side. Mr. Vasquez. Thank you, Mr. Owens. And that is something that I believe myself and other members of this subcommittee, in a bipartisan way, are willing to work on to make sure there is accountability. And that, I can tell you, it is very hard to attract not just service members but families to the missions at Holloman Air Force Base when there is a danger that they will be ingesting toxic chemicals from buildings that have asbestos and other chemicals that have yet to be remediated. Despite the record investments that we have made in our defense budget year after year, I think this is a critical readiness component, especially where we are handling such critical missions in places like White Sands Missile Range and Holloman Air Force Base that are so critically important to the defense of our Nation. Lastly, just one more quick question with these 15 seconds I have. Ms. Jacobson, are there any plans to nominate White Sands for any additional ERCIP, Energy Resilience and Conservation Investment Projects, as far as you are aware? Ms. Jacobson. May I take that for the record and let you know? [The information referred to can be found in the Appendix on page 128.] Mr. Vasquez. Yes, thank you, Ms. Jacobson. I yield back. Ms. Strong. Thank you, Mr. Vasquez. The Chair recognizes Mr. Moylan of Guam for 5 minutes. Mr. Moylan. Thank you, Mr. Chairman. Ms. Berger, were you in Guam recently? I thought I saw you. Were we sitting next to each other at the commencement there of the Camp ``Ben'' Blaz? Well, thank you for coming to Guam. Ms. Berger. It is nice to see you again. Mr. Moylan. I appreciate that. So I do have a question for you. So in 2005, the USS San Francisco ran aground in the Western Pacific and was successfully repaired on Guam. By contrast, when the USS Connecticut ran aground in 2021, it proceeded to Guam. It languished in the harbor and was unable to be repaired. So Ms. Berger, can you please speak to the dangers posed by America's backslide in ship repair capacity in the Western Pacific, and the importance of facilities such as Guam now closed dry dock? Ms. Berger. It is very nice to see you again, and it was a good thing to spend time at Camp Blaz which emphasized the importance of Guam, and as we build out some of the geostrategic importance of our focus there. As far as the ship repair, I would like to take the detailed question for the record to make sure that I provide for you the perspective of some of my partners who work in that section of the Department of the Navy. But certainly, it is why we are focused on capitalizing right now our shipyards to make sure that we are able to provide that infrastructure. And as you noted it is critically important to supporting our warfighting mission. So let me get back to you with more, but I would be glad to follow up. [The information referred to can be found in the Appendix on page 128.] Mr. Moylan. It has been shown successful when we did have it. And with this current threat, I think it is very important that we bring this back. So thank you. And then for Mr. Owens, in your testimony, you stated that a long-term extension of H-2B visas is needed to meet Department of Defense construction requirements. Do you believe that the failure of the extended H-2B and therefore have construction projects fall behind deadlines or to be left uncompleted would leave the United States in a disadvantaged position in the Indo-Pacific? Mr. Owens. Absolutely, I do. Mr. Moylan. You gave a really good statement in your report here, which I read through. Do us a favor, just highlight this a little bit for me just about a minute or two. Mr. Owens. I would be happy to. And I really appreciate you enabling us to talk about this a little bit more, because it is a critical--a critical aspect. The construction workforce to do all of the work, the MILCON work that needs to happen on Guam to support the posture that we need in the Indo-Pacific does not exist. And try as we have over the course of the last several years to bring U.S. workforce to Guam to satisfy that construction need, we have been unable to meet that need. So as we increase the amount of MILCON that needs to happen, we are at risk for construction contracts being--labor, particularly, aspects of construction contracts not being available to keep on schedule and on budget. So the extension that would--that we are asking for in our legislative proposition would solve that problem for Guam and for the Indo- Pacific. And I would say that we are going to continue all the efforts that we have been doing to encourage U.S. workforce to get to Guam and do this work. But absent that, we need certainty so that we can be able to deliver these projects on time and on budget. Mr. Moylan. All right. Thank you, sir. And that has been-- -- Mr. Owens. Thank you for letting me speechify. Thank you. Mr. Moylan. So all our efforts there and all our communications with INDOPACOM [U.S. Indo-Pacific Command] generals is basically this needs to be done. And that it can be done with the continued extension of the H-2B. So I appreciate your support in continuing to push that. That is about just it for me. But Mr. Oshiba, I am looking forward to visiting you-- your visit to Guam again. So I appreciate it. Thank you. Mr. Oshiba. Thank you, sir. Mr. Strong. Ms. Escobar of Texas is recognized for 5 minutes. Ms. Escobar. Thank you, Mr. Chairman. And many thanks to our witnesses today. I really appreciate your service to our country and your time with our subcommittee. I have the privilege of representing Fort Bliss. Actually, I share Fort Bliss with my colleague, Gabe Vasquez, which is the second largest installation in our country as well as the largest joint mobilization force generation installation. And I recently had the opportunity to see the 3D printed barracks on Fort Bliss and was very impressed with what is happening there. And so, Ms. Jacobson, I have a question for you about that. I am wondering if you can give us an overview of what kind of facility construction this technology could potentially be used for going forward to meet the Army's infrastructure needs? And what are some creative ways we can transport this technology on deployments for our service members stationed abroad? Ms. Jacobson. Congresswoman Escobar, it is very nice to see you again. So and---- Ms. Escobar. Likewise. Ms. Jacobson. Thank you so much for all of your support of Fort Bliss. It is greatly appreciated. The 3D barracks is an interesting and a novel approach to construction. I know General Daley is a big fan of it and talks about it all the time. And we are looking at ways, especially in contingency basing, where we can use this type of construction, which is very fast and very efficient. And I promise to get with the Corps of Engineers and talk about how they can come up with sort of a proposal for how we can increase our use of 3D printing both at installations, at contingency bases as well. Ms. Escobar. Wonderful. Thank you. I look forward to that. I have a couple more questions about Fort Bliss. In your testimony, you mentioned that the Army is administering an Installation Climate Resilience Plan [ICRP] assessment for Fort Bliss. Can you give me some detail on when you expect that assessment to be completed? How can we on the Armed Services Readiness Subcommittee help complement the Department of the Army's efforts to shore up the state of our installations, based on the findings of these assessments? Ms. Jacobson. Well, thank you so much for that question. These assessments called these ICRP, two of them have been completed so far at Fort Carson, and at Anniston. And they are really comprehensive and directed specifically to bases based on regional environmental conditions. They are ecosystem driven. And so the notion is to put together those bases that are essentially the same ecosystem, so we can very specifically target what are the climate-associated risks based on that ecosystem. So in the next group of these assessments that we are doing will be Fort Bliss and Fort Hood. And part of what comes out of these recommendation are suites of projects where we can enhance base resilience based on what we learn comprehensively about the risks associated with changing weather and other environmental conditions in that region. So Bliss and Hood are in the next group. And if there is specific recommendations for projects, we would be happy to report back to you about that. Ms. Escobar. I appreciate that. And do you have any idea of the timeline for that, when that next group might--the assessment might begin for that next group? Ms. Jacobson. I can find out specifically the timeline and get back with you about that. Ms. Escobar. Okay. That would be great. Thank you. And, also, I am wondering if the Army EI&E [Energy, Installations, and Environment] office is tracking a couple of priorities for Fort Bliss that have been on our radar. The need for more barracks, but also the rail spur. And are there plans to request MILCON funding for these projects? Ms. Jacobson. Well, I am happy to report for the Fort Bliss barracks projects, we have five modernization projects programmed for fiscal years 2024 to 2028. That will be an investment of over $187 million. With respect to the railhead, we appreciate the extreme importance of the railhead to mission readiness and power projection. And I visited the railhead. I know that it needs improvement, substantial improvement. The railhead design wasn't enough--at an efficient-enough stage to make it into the last round of proposed military construction projects, but it is a very top priority. And the Corps knows that the design of 35 percent must be complete, and we will make sure it is for the next round. Ms. Escobar. Perfect. And I will be sure to keep on everyone about that as well. Thank you so much. I yield back. Ms. Jacobson. Thank you. Mr. Waltz [presiding]. Thank you, Ms. Escobar. Mrs. Kiggans. Mrs. Kiggans. Thank you, Mr. Chair. I just want to take a few minutes to talk about privatized or unaccompanied soldier, sailor housing. So I represent Virginia's Second Congressional District down in the Hampton Roads area. And although we lost Norfolk Naval Base with redistricting, it is still very close. And we are home to the largest fleet on the Atlantic Coast. And I have the master jet base Oceana in my district. So, housing there is atrocious. As a Navy veteran, I was a Navy wife for 20 years, you know, I go on base all the time. I shop at the commissary. I see where those guys live. And the quality-of-life aspect, we talk about that, and I know recruitment and retention is down. And, I mean, not only is housing a social determinant of health for people, but if we don't offer and at least get that quality-of-life piece back, we are never going to improve our numbers. And we talked to the leadership over at Oceana, specifically. Those guys are--there is three condemned enlisted barracks. There is no privatized housing on base; or there is only one at Norfolk. We are charging our enlisted sailors for WiFi usage. I could not believe the WiFi plans range from $50 to $200. The first weekend that I held office here, I brought my DC staff down to Virginia Beach, and I put them in my minivan, and we drove to Norfolk, and we drove to Oceana. And I said look at where we are asking our single sailors to live. Here is the barracks. Here is the galley. Now, think of any 4-year college or university you have been to lately, and think about how beautiful those places are. And think about what we are asking those kids in the same age ranges to do. I have been to college. I know what those guys are doing every night of the week. And think about what we are asking those 19- and 20- and 21-year-olds to do. So if we don't prioritize that--so I hear you about all these other--and the energy project thing, specifically, if we are sacrificing quality of life like housing and barracks issues for things like energy projects, that is not the right place to prioritize. We are not going to have people to prioritize energy projects for if we don't focus on that first. For me, as a nurse practitioner as well, suicide issues have been real in my district. Quality of life is absolutely impacted by where these guys and girls live. So we have got to do a better job for them. So I know there is alternatives out there. And listening to the discussion, thank you so much for your testimonies and briefs, but I am very interested in privatized housing. I know there is probably pros and cons. I think I know the pros. So I would be interested to hear some of the cons. And then also, is there a way that we are prioritizing amongst the services? It seems like Army has made some progress. I think Navy, especially in my district, I feel like we are really behind the power curve down there for utilizing some of these public-private partnerships. But can you explain just kind of the order of how we are prioritizing who is getting these privatized barracks, and then also, if there are any major cons we should consider? Mr. Owens. I can tee this off. As part of the ASD(EI&E) [Assistant Secretary of Defense for Energy, Installations, and Environment] job, I am also the Department's chief housing officer. So I am responsible for working with and ensuring that the military departments exercise their oversights authority with respect to MHPI [Military Housing Privatization Initiative] projects. And I think that there is progress that has been made. So the tenant bill of rights a couple of years ago, the fact that we have hired several hundred housing oversight personnel to be in installations and work. But there definitely is, as you have noted, work left to do. So the commitment that we have to ensuring that our service members and their families have places to live that are-- respect the dignity of the work that they are doing is something that we are all committed to. It is a critical readiness issue because of the health. And if I wrote this down right, your reference to the social determinant of health is something that is right up my alley. I would love to talk more about that with you if we get a chance, because there are aspects of this that we can focus on. In terms of prioritization, I will turn to my colleagues to let that be something they can speak to. Ms. Berger. And, Congresswoman, it is nice to see you. And thank you for your focus on quality of life in a place that it is very important to our sailors. As you note, there are barracks in disrepair. There is an example, though, of what is a great authority that we have been excited to have which is the privatized barracks. I will get back to you on how we prioritize those. But that is something that we are looking to do more of within those authorities. And your district is one of those places. And on your note on wireless, I recently learned that, too, and it is top of my list to fix because I understand the connectivity and the mental health that can come from making a simple change. Mrs. Kiggans. Thank you very much. Thank you. And real quick, any cons to privatized housing that we should be considering when we are requesting, or is it as good as it sounds and seems. Ms. Berger. From our perspective, it has been a very good experience. And we would love to see more of the opportunity to use the authority. Mrs. Kiggans. Great. Thank you so much. Mr. Waltz. Mrs. Kiggans, I am going to extend your time a minute because I want to give the Army an opportunity--not from an Army-Navy standpoint--but the Army has been moving out on this issue, particularly when it comes to the BOQs [bachelor officers' quarters], the apartment-type complexes. And I would like to give Ms. Jacobson a minute. Mrs. Kiggans. Yeah, and if I could [inaudible] in, too--I would concur. It is painful for me to say, but yes, I think the Army is really blowing some of the other branches out of the water, especially on some of those privatized lodging. So good job. Mr. Waltz. We have that on the record, Mrs. Kiggans. Ms. Jacobson. Feel free to elaborate, Congresswoman. Thank you. We really appreciate that. Obviously, this is very important to us, as you say, for quality-of-life purposes. On the privatized housing side, we have been very vigilant. We have had some issues, but we are exercising controls now, and a lot of oversight. And we have done investigations. We are doing audits. We are on top of it in terms of oversight of housing providers, where there are negatives associated with that. With respect to privatized barracks, we are considering this very, very carefully. We have commissioned a RAND study to give us some of the pros and cons and do a deep dive. And at the same time, we are right now looking at two proposals from our housing providers about how they would address privatized barracks. We have a great situation at Meade--I think it is at Meade, I am sorry--and where it is working. But, of course, it is for more senior single soldiers. The question is, how do you ensure continuity of leadership and unit continuity? How do you make sure that leaders have access to the barracks? How do you basically--unit cohesion is critical there and making sure that leaders have access to those barracks for a whole suite of reasons. So we are examining it very carefully and expect to make some decisions this year. Mrs. Kiggans. Good. And that should be a priority as well. Thank you for that. I know on Norfolk Naval Base, with the ship deployment schedules, they were housing those guys just in empty barracks rooms. So there was no unit cohesion. It was very difficult for our enlisted leadership to be checking in on those guys. They were scattered amongst--if you have ever been to Norfolk Naval Base--a lot of acres. So being able to house them together, yes, for unit cohesion, to be able to provide just some positive activities and things for them to do would be so meaningful for quality of life. So thank you. Mr. Waltz. Thank you. And to that end, Mrs. Kiggans, we are going to request the Department come back for a more detailed briefing and really diving into where the services are going, what the commonalities are from OSD's [Office of the Secretary of Defense's] perspective, where you are prioritizing. And, hopefully, what we will get out of that is some cross-service lessons learned and areas to sustain and areas to improve, and really what the trajectory is going forward. You know, a colleague of Mr. Garamendi's from--a well-known colleague of Mr. Garamendi's from California once said: Show me your budget, and you'd show her your priorities. And it seems year after year, FYDP [Future Years Defense Program] after FYDP, installations management and these quality-of-life issues seem to somehow fall to the bottom of a very competitive budget process. So if I am wrong in that, I look forward to you disabusing me, and if--otherwise, then, we look forward--I know on this subcommittee it is a priority for all of us to figure out how to help you on that. Because we can throw millions and millions at retention bonuses and specialty pays and what have you, but having a decent, safe, quality-of-life place for our soldiers, sailors, airmen, Marines, and guardians to live is of the utmost importance. I think with that--anything else from our ranking member? Mr. Garamendi. Well, you have done well first time out, Mr. Chairman. Thank you. Mr. Waltz. You know, in the Special Forces, that is I owe you a case of beer. Well, thank you. The hearing's adjourned. [Whereupon, at 4:18 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X February 28, 2023 ======================================================================= ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD February 28, 2023 ======================================================================= [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ======================================================================= WITNESS RESPONSES TO QUESTIONS ASKED DURING THE HEARING February 28, 2023 ======================================================================= RESPONSE TO QUESTION SUBMITTED BY MR. WALTZ Mr. Owens. Ensuring the energy resilience of installations in Europe, in part by eliminating reliance on Russian energy, remains a priority for the Department. Building upon our previous work to understand our reliance in Russian energy at our main operating bases in the region, we have taken strategic next steps to further address any gaps our resilience posture. First, we are conducting an analysis of the main operating bases in Europe, their criticality, and their dependence on Russian energy. Second, we continue to ensure that the Military Departments complete Installation Energy Plans (IEPs) for main operating bases and other installations in Europe, with 13 plans completed thus far. Once complete, we will share the results of the previously mentioned study with the Military Departments to update existing IEPs as appropriate, and to guide development of future IEPs as required by the NDAA. Lastly, my Office has scheduled separate, focused briefings with each of the Military Departments and the Office of the Joint Chiefs of Staff on their energy resilience postures in Europe to better enable implementation of resilience in the region, with a goal of eliminating reliance on Russian energy. [See page 12.] ______ RESPONSE TO QUESTION SUBMITTED BY MR. GARAMENDI Ms. Berger. I look forward to providing your office a detailed briefing on this topic. To summarize the situation in this setting, the Navy temporarily suspended submarine docking in Dry Docks (DD) 4, 5, and 6 at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) and the dry dock at delta pier located at Trident Refit Facility (TRF) Bangor due to the results of a recent seismic vulnerability study and expert analysis in late January 2023. On February 15, 2023, the Navy mobilized construction to mitigate seismic vulnerabilities at TRF-Bangor and PSNS DD 4 & 5 to restore availability for submarine use. There are no immediate plans to mitigate at DD6, which can still safely support aircraft carrier dockings. The estimated completion dates for DD 4 and TRF is mid-April, with work at DD 5 to follow. [See page 16.] ______ RESPONSES TO QUESTIONS SUBMITTED BY MR. SCOTT Mr. Oshiba. The DAF is incorporating lower emission concrete into the Patrick Space Force Base (SFB) Consolidated Communications Center as part of the pilot program. We first identified the project best suited for this pilot project then determined the right sustainable material to incorporate. This project met the pilot project criteria in Section 2861 of the Fiscal Year 2022 NDAA. Patrick SFB is vulnerable to extreme whether events based on our assessment with the Defense Climate Assessment Tool and we could prepare the project for execution quickly while incorporating sustainable materials. The structure of the Consolidated Communications Center primarily consists of concrete for the foundation, floors, columns and roof, and walls. Our approach to incorporate sustainable materials was to modify the concrete specification with a target to reduce emissions associated with concrete by 30-40% compared with conventional concrete baselines. Modification of the concrete specification during the design was not expected to significantly impact the design or contract execution timeline, cost, or resiliency of the facility. [See page 19.] Mr. Oshiba. Incorporating cross laminated timber as a primary construction material when it was not included from the beginning of the design would have significantly impacted the project timeline and cost. Re-design would have been required. This project was already between 35% and 65% design when selected. We focused on more sustainable concrete because modification of the concrete specification would not have an adverse impact on timeline, enabling us to meet the intent of the pilot program to execute the project as quickly as possible. The DAF is looking to incorporate cross-laminated timber into future MILCON projects where design has not yet begun. [See page 20.] ______ RESPONSE TO QUESTION SUBMITTED BY MS. SHERRILL Ms. Berger. Each installation has unique opportunities and challenges regarding its energy and water needs, and the Department of the Navy is developing a guidebook for installation commanding officers to understand the tools, authorities and resources available to them. MCLB Albany's success can be attributed to innovative and diverse financing mechanisms, partnerships, and long-term commitment. First, MCLB successfully leveraged energy financing mechanisms and multiple funding sources to achieve net zero electricity outcomes and expand resilience capabilities with limited appropriations. Second, MCLB Albany partnered with local entities to make use of other resources normally unavailable to military installations and create business case opportunities for net zero electricity achievement. Third, MCLB Albany demonstrated that achievement of net zero requires commitment over many years to plan, design, and implement multiple projects and initiatives. The installation committed to pursuing net zero over 15 years ago, including development of a net zero plan in 2011. The net zero vision was embraced by commanding officer after commanding officer, providing continuity of commitment from leadership levels. MCLB Albany's energy team provided the dedication, stability, consistency, and passion required to advance net zero. [See page 19.] ______ RESPONSE TO QUESTION SUBMITTED BY MR. MOYLAN Ms. Berger. The Navy remains committed to maintaining a robust pier-side ship repair capability on Guam, including funding infrastructure repairs to Lima, Mike, and November Wharves in Guam to support additional maintenance capability. Plans for future projects include repairs to Glass Breakwater; Oscar, Papa, and Quebec wharves; dredging to support Roll On Roll Off (RORO) operations at Lima wharf, additional energy resilience, construction of a new pier on Polaris Point to support Virginia Class Block V submarines, and improvement to Kilo and Lima wharves. Currently, forward-based submarine tenders EMORY S LAND (AS 39) and FRANK CABLE (AS 40) provide repair, supply, weapons handing, and tending for submarines homeported and visiting Guam. The Navy added 154 Full Time Equivalents in FY24 to support the Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility-Guam Detachment. [See page 28.] ______ RESPONSE TO QUESTION SUBMITTED BY MR. VASQUEZ Ms. Jacobson. There is currently an ongoing FY20 ERCIP project for Installing a Microgrid, Solar Array and Battery Storage under construction. The groundbreaking ceremony was held 27 January 2023 and the project is expected to be complete and operational within 24 months. Additionally, all installations are currently developing their five-year plans for future ERCIP projects, which we expect will include additional projects for White Sands Missile Range. [See page 28.] ______ RESPONSE TO QUESTION SUBMITTED BY MR. DAVIS Ms. Berger. The Department of the Navy (DON) continues to monitor and adapt to emerging regulatory requirements and evolving scientific understandings of PFAS while working closely with regulators and the community. Our response actions and schedules are developed in consultation with--and approval by--regulatory agencies, and with public input. The DON took early actions to ensure that Navy and Marine Corps installations and facilities have drinking water without perfluorooctane sulfonate (PFOS) and perfluorooctanoic acid (PFOA) above the U.S. Environmental Protection Agency (EPA)'s then health advisory levels of 70 part per trillion and proactively identified locations where PFAS may have migrated to off-installation drinking water sources. Near MCB Camp Lejeune, the DON has sampled 12 private drinking water wells downgradient from the installation for PFAS, and all sampling results were below 70 parts per trillion for PFOS and/or PFOA. The DON supports EPA's recent actions to propose a regulatory drinking water standard for PFAS that, once finalized, will apply to all drinking water suppliers, including DON. The DON will continue to amend sampling and testing of PFAS as appropriate, in the event additional drinking water regulations (such as EPA's proposed rule) are promulgated. On base, the DON's deliberate response at MCB Camp Lejeune has been to complete the Preliminary Assessment and Site Inspection for all areas of interest on the installation in accordance with Comprehensive Environmental Response, Compensation and Liability Act. The Preliminary Assessment was completed in December 2019 and the Site Inspection was completed in January 2022. Both documents can be found on-line at https://administrative-records.navfac.navy. mil/?PK7PTGQ656246GPKLO. The Site Inspection evaluated 59 areas of interest (AOIs) and recommended that 51 of the AOIs should advance to the next step, which is Remedial Investigation/Feasibility Study. One AOI is being further evaluated. All RI/FSs for MCB Camp Lejeune were originally planned to complete by 2029. However, the DON has identified additional new sites as a result of the EPA's lower Regional Screening Levels, and this additional work shifts the completion date to 2034. Remedial Investigations/Feasibility Studies will be developed and completed for individual sites or groupings of sites with the highest risk sites generally being addressed first. [See page 22.] ? ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING February 28, 2023 ======================================================================= QUESTIONS SUBMITTED BY MR. WALTZ Mr. Waltz. Located in the center of the Indian Ocean, Naval Support Facility Diego Garcia serves as a facility for U.S. military aircraft and ships transiting from the Philippines to the Middle East and gives our strategic bombers and ISR assets the capability to reach CENTOM and maritime chokepoints and Chinese installations in the region. The U.K owns this installation and leases portions of it to U.S. forces. There are ongoing negotiations between the U.K. and Mauritius over the return of control the island chain Diego Garcia is located in to Mauritius. After the abandonment of Bagram Air Base in Afghanistan, OSD assured that this capability loss could be mitigated by assets operating with similar effect from Diego Garcia. oWhat is DOD doing to ensure the U.S. military retains access to this critical installation? Mr. Owens. The United States recognizes United Kingdom (UK) sovereignty over the British Indian Ocean Territory (BIOT) and regards the sovereignty dispute as a bilateral matter between the UK and Mauritius. We support UK-Mauritius engagement to resolve the issue. As you note, the joint U.S.-UK military facility on the island of Diego Garcia plays a vital role in the security of the United States and the Indo-Pacific region. The specific arrangement and agreement with the UK involving the facilities on Diego Garcia is grounded in the uniquely close and active defense and security partnership between the United States and the UK. We are working closely with the UK on this issue and are confident that the UK is aware of U.S. priorities and the importance of continued access to Diego Garcia. We trust that the UK will accurately represent those priorities in its bilateral talks with Mauritius on BIOT. Mr. Waltz. According to DOD's own reporting, many facilities on military installations are in poor or failing condition. With more than half a million facilities worldwide and a growing deferred maintenance backlog of at least $130 billion for all facilities, this is a particularly acute problem with our Shipyards, as highlighted by the recent operational impacts at Puget Sound Naval Shipyard. In order to appropriately posture for global threats, naval fleet maintenance must improve. In order to do so, we must have functioning Shipyards. What is the current status of the dry docks at Puget? And how will the Shipyard Infrastructure Optimization Program (SIOP) get after lagging fleet readiness? Mr. Owens. Due to the results of a seismic vulnerability assessment, I understand the Navy suspended submarine docking earlier this year in some of their dry docks at Naval Base Kitsap to ensure safe conditions for submarine operations. We support the Navy in their efforts to implement mitigations to address these seismic vulnerabilities. The Navy's Shipyard Infrastructure Optimization Program (SIOP) is focused on enabling increased submarine and carrier maintenance throughput by recapitalizing the shipyard infrastructure and equipment required to conduct scheduled depot maintenance, as well as reconfiguring infrastructure layouts to deliver reductions in availability durations. My office continues to work with the Navy to ensure infrastructure is appropriately addressed. Mr. Waltz. Many military and civilian personnel have been working remotely for almost three years because of COVID-19 restrictions. What opportunities are available for the military departments and fourth estate to reduce installation infrastructure and leased space, particularly within the national capital region, when assessing their post-pandemic work needs? How do you monitor occupancy rates to ensure proper space usage? Mr. Owens. The Military Departments have processes in place to continuously review and adjust facilities to ensure optimalization of available space. For example, Department of the Air Force policies that require net-zero growth in facilities square footage are driving space use optimization by requiring installation and combatant commanders to identify facilities that will be demolished or put into closed status to offset any new construction. With regard to the National Capitol Region, Washington Headquarters Service (WHS) is on a 5-year effort to assist the Office of the Secretary of Defense, Military Departments and Defense Agency and Field Activity realign space within the National Capital Region (NCR). The purpose is to analyze Pentagon, Mark Center, and leased space in the NCR and identify opportunities for reducing DOD lease facilities, apply lessons learned from COVID-19 telework experiences, better optimizing underutilized space, eliminate vacant space, and where possible, establishing shared hoteling workspaces to better utilize office space. As part of this analysis, WHS continues to closely monitor and review facility entry data to identify space opportunities taking into account organizational health and performance impacts, including any customer- facing missions. Mr. Waltz. According to DOD's own reporting, many facilities on military installations are in poor or failing condition. With more than half a million facilities worldwide and a growing deferred maintenance backlog of at least $130 billion for all facilities, this is a particularly acute problem with our Shipyards, as highlighted by the recent operational impacts at Puget Sound Naval Shipyard. In order to appropriately posture for global threats, naval fleet maintenance must improve. In order to do so, we must have functioning Shipyards. What is the current status of the dry docks at Puget? And how will the Shipyard Infrastructure Optimization Program (SIOP) get after lagging fleet readiness? Ms. Berger. The Navy temporarily suspended submarine docking in Dry Docks (DD) 4, 5, and 6 at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) and the dry dock at delta pier located at Trident Refit Facility (TRF) Bangor due to the results of a recent seismic vulnerability study and expert analysis in late January 2023. On February 15, 2023, the Navy mobilized construction to mitigate seismic vulnerabilities at TRF-Bangor and PSNS DD 4 & 5 to restore availability for submarine use. There are no immediate plans to mitigate at DD6, since the current restrictions in place are specifically applicable to submarine use and DD6 can still safely support aircraft carrier dockings. The results from the ongoing seismic risk study, due to complete in June 2023, may drive the need for further mitigations. The estimated completion dates for DD 4 and TRF is mid-April, with work at DD 5 to follow. To apply lessons learned at Puget Sound, the Navy accelerated a rapid assessment at Pearl Harbor Naval Shipyard to identify and evaluate potential seismic vulnerabilities. The Shipyard Infrastructure Optimization Program (SIOP) is focused on enabling increased submarine and carrier maintenance throughput by recapitalizing the shipyard infrastructure and equipment required to conduct scheduled depot maintenance, as well as reconfiguring infrastructure layouts to deliver reductions in availability durations. The Navy completed its first increment of SIOP industrial modeling and simulation in 2022, and this modeling indicates that infrastructure improvement and reconfiguration will--in addition to improving shipyard condition--result in tangible reductions in ship maintenance durations. The extent of reductions in maintenance durations are dependent on ongoing analyses of alternatives at each shipyard. These modeled reductions are dependent upon the ship class being maintained and assume investments that provide for the full range of facility optimization. Mr. Waltz. Many military and civilian personnel have been working remotely for almost three years because of COVID-19 restrictions. What opportunities are available for the military departments and fourth estate to reduce installation infrastructure and leased space, particularly within the national capital region, when assessing their post-pandemic work needs? How do you monitor occupancy rates to ensure proper space usage? Ms. Berger. The Department of the Navy continuously assesses the utilization of our infrastructure for efficiency and effectiveness. The Navy and Marine Corps have reduced facility footprint through the facility demolition and by reducing leased facilities where possible consistent with mission needs. These efforts support a more distributed workforce and enable the Department to better use our existing space and make the most of facility investments taking into account organizational health and performance impacts, including any customer- facing missions. Specifically in response to a changed, post-pandemic workforce, the Navy is conducting pilot at the Washington Navy Yard to undertake consolidation efforts at Commander, Navy Installations Command (CNIC) Headquarters. This effort is still in progress, and we expect to award a contract to physically renovate spaces late this calendar year. Information gained from this pilot consolidation project will be used to determine the cost and effort required to do this at scale, and potential space and cost savings that could be realized by expanding this effort. Mr. Waltz. According to DOD's own reporting, many facilities on military installations are in poor or failing condition. With more than half a million facilities worldwide and a growing deferred maintenance backlog of at least $130 billion for all facilities, this is a particularly acute problem with our Shipyards, as highlighted by the recent operational impacts at Puget Sound Naval Shipyard. In order to appropriately posture for global threats, naval fleet maintenance must improve. In order to do so, we must have functioning Shipyards. What is the current status of the dry docks at Puget? And how will the Shipyard Infrastructure Optimization Program (SIOP) get after lagging fleet readiness? Ms. Jacobson. [No answer was available at the time of printing.] Mr. Waltz. Many military and civilian personnel have been working remotely for almost three years because of COVID-19 restrictions. What opportunities are available for the military departments and fourth estate to reduce installation infrastructure and leased space, particularly within the national capital region, when assessing their post-pandemic work needs? How do you monitor occupancy rates to ensure proper space usage? Ms. Jacobson. There is currently an ongoing FY20 ERCIP project for Installing a Microgrid, Solar Array and Battery Storage under construction. The groundbreaking ceremony was held 27 January 2023 and the project is expected to be complete and operational within 24 months. Additionally, all installations are currently developing their five-year plans for future ERCIP projects, which we expect will include additional projects for White Sands Missile Range. Mr. Waltz. According to DOD's own reporting, many facilities on military installations are in poor or failing condition. With more than half a million facilities worldwide and a growing deferred maintenance backlog of at least $130 billion for all facilities, this is a particularly acute problem with our Shipyards, as highlighted by the recent operational impacts at Puget Sound Naval Shipyard. In order to appropriately posture for global threats, naval fleet maintenance must improve. In order to do so, we must have functioning Shipyards. What is the current status of the dry docks at Puget? And how will the Shipyard Infrastructure Optimization Program (SIOP) get after lagging fleet readiness? Mr. Oshiba. [No answer was available at the time of printing.] Mr. Waltz. Many military and civilian personnel have been working remotely for almost three years because of COVID-19 restrictions. What opportunities are available for the military departments and fourth estate to reduce installation infrastructure and leased space, particularly within the national capital region, when assessing their post-pandemic work needs? How do you monitor occupancy rates to ensure proper space usage? Mr. Oshiba. Lease space assignments within the national capital region are managed and overseen by the Washington Headquarters Service. The Department of the Air Force manages assigned national capital region space using Pentagon space standards and conducts space utilization surveys to identify footprint reduction or consolidation opportunities. The Department of the Air Force does not mandate the use of telework or remote work authorizations; each organization identifies the percentage of personnel authorized and willing to telework or remote work in addition to the space-type requirements (administrative, SCIF, etc). We continue to review all policies authorizing teleworking or alternative work agreements and consider these policies in the review of real estate acquisitions and lease requests/renewals to ensure all requests are appropriately sized for the mission purpose. In the November 2020 DOD Report on Infrastructure Capability, the Department of the Air Force reported significant surplus infrastructure capacity for all operations and training facility categories assessed, and we continue to assess solutions within existing authorities to consolidate and reduce our excess infrastructure. Utilization of operations and training facility categories is unlikely to be impacted by telework and remote work opportunities. Outside the national capital region, the Department of the Air Force is working to establish an Enterprise Utilization Initiative (ECD FY25) to conduct space utilization on an annual basis with accurate space utilization data and utilization rates populated and available in official databases. The Department of the Air Force will continue to evaluate where telework and remote work will help reduce installation infrastructure and leased space, consistent with unique mission requirements of each organization. Mr. Waltz. With respect to the effects of Hurricane Michael at Tyndall Air Force Base, what is the current status of rebuilding efforts? What are the lessons learned with respect to installation resiliency; what procedures should be sustained or improved? Mr. Oshiba. The rebuild of Tyndall AFB is progressing well. 89% (33 of 37) of the projects have been awarded with an additional two expected to be awarded in 2023. An additional $252M is required to award the final two projects and is included on the FY24 Air Force Unfunded Priority List. Construction is nearly complete on the first MILCON awarded after the storm, the Child Development Center. We expect eight more facilities to finish construction in 2023 and the majority to reach completion by the end of 2026. One lesson we learned is that newer facilities, built to more current building codes survived the storm well. We have applied that to the rebuild by implementing new construction standards, specifically: the minimum design wind speed is 165 mph, and 170 mph for mission critical facilities; all exterior materials (glass, roofing, siding, etc) must be manufactured and installed according to building codes for the Miami-Dade County hurricane zone; and we established design elevations that take into account projected sea level rise scenarios through the year 2100. Furthermore, DAF is studying nature based coastal resiliency strategies such as shoreline stabilization using oyster reefs and dune restoration, and have used digital technology to test our designs under adverse conditions. ______ QUESTIONS SUBMITTED BY MR. SCOTT Mr. Scott. Is the MILCON planning process prepared for large-scale combat operations against an enemy peer nation? If not, why not and what changes should be made to the planning process? Mr. Owens. Yes, the planning process for construction is grounded in the identification of mission requirements and capabilities and developing construction related and non-construction alternatives that can meet those needs. When construction is deemed the appropriate solution, skilled facility planners will need to have access agreements with friendly nations and site information to develop project scopes. Improvements can always be made and OSD will continue to work with Military Departments to identify and implement efficiencies. Mr. Scott. Do you support or oppose legislation that would raise the cap on minor military construction above the temporary cap of $9 million? If you support raising the cap, what is your recommended amount? Mr. Owens. The Department would like to see this temporary increase made permanent, with the ability to increase the project cost threshold worldwide based upon the area construction cost index for each location. The Department appreciates Congress's temporary increase in the minor military construction threshold as our buying power for construction continues to diminish. Currently, the ACF can only be applied to a limited set of locations including the United States. This application worldwide would normalize the Department's buying power by accounting for geographic economic differences. Mr. Scott. Do you support or oppose legislation that would make permanent the authorization of depot working capital funds for unspecified minor military construction projects? As you know, the FY 23 NDAA temporarily extended this program from September 30, 2023 to September 30, 2025. Mr. Owens. The Department supports making this legislation permanent, which would eliminate the uncertainty associated with a temporary authority. Mr. Scott. Is legislation required to ensure that the Department of Defense meets the target of 80% of its sustainment needs? Mr. Owens. The Department does not believe legislation required. The Department is looking to modify the process for identifying an appropriate level of funding for facilities. Legislation that only addresses one aspect of facility investment limits the Department's ability to holistically develop a facility investment strategy that accounts for all aspects of facility maintenance and repair and could stifle innovation in this area. Mr. Scott. What should be the recapitalization rate of DOD buildings and facilities? How would it compare to private industry standards? Mr. Owens. The DOD mission and availability of funding drives the recapitalization rate for our buildings and facilities. Private industry invests in their facilities based on the extent their facilities drive business development, workforce retention, and overall profit margins. Mr. Scott. Have you ever visited JIATF-South Headquarters at NAS Key West, Florida? It is a 1950s era headquarters building in need of replacement. If not, can you make plans to visit the headquarters soon to see it for yourself firsthand? What impact does the fact that it is an Army MILCON for a joint command on a naval installation have when it comes to funding priorities for Army Milcon? How can this be fixed and the Headquarters be made a priority for the nation? Mr. Owens. I have not visited JIATF-South Headquarters and will plan a visit. This project is an example of key stakeholders that will need to be effectively engaged to ensure success. The Army is the assigned Service for administrative and logistical support of SOUTHCOM and therefore is responsible for funding this project. Like all other command proponents for Army projects, SOUTHCOM, as a Combatant Command (CCMD), is responsible to ensure the Army is aware of their requirements. If the Army does not include CCMD priority projects in their submission to OSD, the Department has established processes for the CCMD to engage with OSD to appropriately consider their requirement. Because this project is on a Navy installation, the Navy through Naval Facilities Engineering Systems Command will be responsible for executing the project in coordination with the installation, the Army, and SOUTHCOM. Mr. Scott. What impact does DOD's $137 billion deferred maintenance backlog have on the ability of the United States to wage large scale combat operations against an enemy peer nation? Mr. Owens. Due to the size of the Department's facility inventory, the deferred maintenance backlog has a minimal effect on our ability for combat operations. The Department's focus on mission assurance ensures our facility investments include those that would allow us to perform our mission. However, the Department also recognizes that there may be longer-term challenges without investment in other foundational enablers, including quality-of-life facilities, and is committed to working with Congress on these investments. Mr. Scott. Is the MILCON planning process prepared for large-scale combat operations against an enemy peer nation? If not, why not and what changes should be made to the planning process? Ms. Berger. The Department of the Navy appreciates the continual dialog with Congress on the effectiveness and applicability of our authorities. The DON has existing authorities for advanced planning for Military Construction (MILCON) projects as well as ``planning and design'' for MILCON projects. The planning processes for both of these areas is sufficient, albeit contingent upon the availability of appropriated funding. Once planning and design is complete, the execution of MILCON projects requires both specific authorization and appropriation. Although emergency reprogramming for urgent, new MILCONs is possible, that process may not be sufficient in the event of large- scale combat operations against a peer. Greater flexibility, such as lump sum authority and appropriations with post-execution reporting requirements may be needed. Mr. Scott. How many Navy-certified drydocks in public and private shipyards are there across the United States? How many are needed for large scale combat operations against an enemy peer nation? Ms. Berger. There are 72 dry docks in public and private shipyards in the United States and territories that are certified or certifiable by the Naval Sea Systems Command. To understand how many Navy-certified dry docks are needed for large-scale combat operations against an enemy peer nation, the Navy is leveraging the Naval Contested Logistics wargame series with the Naval War College to better understand both the repair and the reconstitution of maritime forces and to provide data in support of wartime requirements development. Mr. Scott. Can the United States Navy win a protracted war without a way to fix ships quickly and send them back to the fight? If not, what is your office doing to find ways to repair damaged ships faster during large scale combat operations against an enemy peer nation? Ms. Berger. Ongoing wargames will better refine requirements for locations of both fixed and expeditionary repair assets/facilities. The Navy has built an Analytic Master Plan that drives wargame subjects and other analysis designed to identify what is needed to execute the Navy's mission of decisively fighting and winning. Battle Damage Repair is one part of a broader set of capabilities needed to fight and win, and Naval Contested Logistics efforts look at what is needed to Repair, Rearm, Refuel, Resupply, and Revive. All five efforts are needed to provide warfighting capability to the Combatant Commanders. Mr. Scott. What is the recapitalization rate of U.S. Navy drydocks and how does it compare to private industry? What is the recapitalization rate of U.S. Navy buildings and facilities? Ms. Berger. The service life of Navy dry docks is expected to be 150 years, however, due to mission changes, inadequate sustainment, and other factors, restoration and modernization work can be required prior to the end of a dry dock's service life. For example, the Navy recently awarded a task order to replace Dry Dock 3 at Pearl Harbor Naval Shipyard due to changed mission. This dock was constructed in 1942 and is currently 81 years old. The Navy does not have the necessary historical data to calculate an actual recapitalization rate of Navy dry docks, but it is expected to be more frequent than 150 years. The Navy also does not have actual dry dock recapitalization rates for private industry to make comparisons. For Navy buildings and other facilities, each type of facility has a unique service life when recapitalization would be required to extend its service life. This assumes no change in mission and no restoration work is required over the service life. Across facility types, the Navy uses a 67-year average recapitalization rate, but restoration, modernization or replacement is typically required earlier than a facility's expected service life due to changing mission and/or restoration due to premature failure or inadequate. Mr. Scott. It has been widely reported that the Air Force is shutting down 10 on-base hotels because of financial problems and I have heard that the Navy's hotels aren't in much better financial shape. The Army has partnered with a private hotel company to run its hotels and they are doing well financially. Are you considering a similar partnership? Ms. Berger. The Navy's lodging program is financially strong. Thanks to several business reforms, consolidations and other process improvements over the past several years, the Navy has an aggressive recapitalization program to use non-appropriated funding to not only build new--but also to renovate--our inventory. We remain committed to continuously assessing all pathways to improve our lodging program-- including privatization, third-party management and franchising, and all other reforms and approaches--to best support our Sailors, Marines, Civilians and their families. Mr. Scott. Is the MILCON planning process prepared for large-scale combat operations against a enemy peer nation? If not, why not and what changes should be made to the planning process? Ms. Jacobson. Yes, our current construction planning process is driven by the need to improve our facilities to be prepared for large- scale combat operations and the imperative to improve or maintain our readiness. The Army planning process for construction is grounded in the identification of mission capability requirements and developing construction and non-construction alternatives that can meet those needs. Combatant Commands have detailed operational plans that identify facility requirements and potential gaps where facilities are deemed inadequate to the task. OSD hosts quarterly updates with each combatant command to review planned and programmed infrastructure requirements that supports operations. An example of this process is the planning for facilities build-out on Guam. This planning includes coordination and collaboration among Navy, Missile Defense Agency, and Army to determine lead agencies for construction requirements to support the mission. Mr. Scott. What is the recapitalization rate of active duty Army buildings and facilities? What is the recapitalization rate of Army Reserve buildings and facilities? What is the recapitalization rate of Army National Guard buildings and facilities? Ms. Jacobson. Recapitalization rate can be expressed by number of years to replace existing inventory, which is calculated as current replacement value (Plant Replacement Value) divided by annual facilities investment. Army facilities Investment includes a portion of multiple appropriations including AFH; MILCON (MCA, MCNG, MCAR); O&M (OMA, OMNG, OMAR) and SRM (100% Restoration and Modernization and 20% of Sustainment).\1\ The recapitalization rate for the Army's asset inventory are provided by COMPO below using the investment in the FY24 President's Budget Request: --------------------------------------------------------------------------- \1\ For Kwajalein SRM expenditures are funded as RDTE. [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Mr. Scott. Have you ever visited JIATF-South Headquarters at NAS Key West, Florida? It is a 1950s era headquarters building in need of replacement. If not, can you make plans to visit the headquarters soon to see it for yourself firsthand? What impact does the fact that it is an Army MILCON for a joint command on a naval installation have when it comes to funding priorities for Army Milcon? How can this be fixed and the Headquarters be made a priority for the nation? Ms. Jacobson. I have not yet had the opportunity to visit the JIATF-South Headquarters, but I understand the need to recapitalize this facility for improved efficiency and resiliency supporting the JIATF-South mission. The fact that the facility is sited on a Naval Base has no impact on its prioritization within the Army program, as the Army routinely constructs projects on Air Force and Navy installations as dictated by mission needs. I would also like to thank you for the $8M for planning and design funds used to design the facility. The MILCON project, with a current cost of $378M, will compete with other high priority projects supporting Soldier quality of life, readiness and modernization for scarce MILCON funding. The Army will work with the Navy to complete the project design and will consider it for funding in future programming and budgeting cycles. Mr. Scott. Is the MILCON planning process prepared for large-scale combat operations against an enemy peer nation? If not, why not and what changes should be made to the planning process? Mr. Oshiba. Yes, the MILCON planning process is prepared for large- scale combat operations against near peer and acute threats. The DAF MILCON planning process evaluates operational needs and ensures MILCON projects support the National Defense Strategy objectives. Our corporate structure includes prioritization of Combatant Command (CCMD) requirements through the annual Global Posture Executive Council (GPEC). Approximately one third of our annual MILCON budget supports CCMD priorities. This includes the European Deterrence Initiative (EDI) focused on pre-positioning of material and equipment (runway repair, munitions, deployable air base systems) and the Pacific Deterrence Initiative (PDI) focused on Agile Combat Employment (ACE) concepts to support the distributed hub and spoke model. These projects, along with projects supporting new weapon systems, improve the DAF strategic posture and ensure we are prepared to provide the necessary combat capabilities in any future conflict.Mr. Scott. Is the United States Air Force still committed to a Three Depot Strategy? Mr. Oshiba. Yes, The Air Force is committed to three viable depots. The depot workforce is appropriately sized and maintains the requisite technical competencies to support our weapon systems. The Air Force depots provide support for the warfighter but also provide needed competition in the sustainment of our weapons systems. Additionally, the Air Force has developed a 5-yr funded depot improvement plan and identified key investments for FY24-28. The plan includes investments in facilities/infrastructure through the Military Construction (MILCON), and Facilities Sustainment, Restoration, and Modernization (FSRM) programs, equipment through the Capital Investment Program (CIP), and Digital Depot (IT) program. Mr. Scott. What is the recapitalization rate of active duty Air Force buildings and facilities? What is the recapitalization rate of Air Force Reserve buildings and facilities? What is the recapitalization rate of Air National Guard buildings and facilities? Mr. Oshiba. Based on current funding projections and the size of our physical plant, the DAF recapitalization rate for active duty, Air Force Reserve and Air National Guard facilities is approximately 123 years. This is significantly longer than the typical design life of a facility. The DAF uses Facility Sustainment, Restoration, and Modernization funds to maximize and extend the useful life of facilities as much as possible. However, we currently carry a $28 billion backlog of deferred maintenance and repair requirements. QMr. Scott. It has been widely reported that the Air Force is shutting down 10 on-base hotels because of financial problems and I have heard that the Navy's hotels aren't in much better financial shape. The Army has partnered with a private hotel company to run its hotels and they are doing well financially. Are you considering a similar partnership? Mr. Oshiba. The Department of the Air Force is considering various options to sustain the long-term viability of the lodging portfolio. We have met with the Army's Privatized Lodging office to better understand their operating model and will continue to explore this and other options to sustain and improve our lodging portfolio to meet mission requirements. The closures mentioned were not related to financial performance. The DAF has spent the last year right sizing the lodging room inventory based on demand, these closures were based on low occupancy rates, and underutilization. ______ QUESTIONS SUBMITTED BY MS. SHERRILL Ms. Sherrill. Last May, Marine Corps Logistics Base Albany became the first DOD installation to achieve net zero electricity status, with the base producing 100% of the energy they use. MCLB Albany was able to achieve their net zero climate and energy resilience goals through incorporating innovative energy technologies, such as a biomass steam turbine, landfill gas generators and advanced microgrid controls into their installation. Other carbon pollution-free resources include wind and solar power alternatives, including new systems such as GAF Energy's integrated solar roofs that directly integrates solar technology into roof shingles. Secretary Berger, congratulations on the success of MCLB Albany on reaching net zero status. Can you elaborate on some of the challenges that MCLB Albany faced in achieving net zero as well as lessons learned, recommendations, and take-aways from that process so that the other services can avoid those pitfalls as they work towards net zero installations? Secretary Owens, Secretary Jacobson, Secretary Berger, and Mr. Oshiba, can you each highlight what your organization is doing to ensure your services' installations are on track to meet the administration's 2021 federal mandate of 100% carbon pollution-free electricity by 2030 and a 65% emissions reduction from federal operations by 2030? What resources do you need to achieve the federal mandate, and what are you currently lacking? Mr. Owens. As will be elaborated more fully in the DOD Greenhouse Gas (GHG) reduction plan required by Section 323 of the FY22 National Defense Authorization Act (NDAA), the Department takes a broad-based approach to reducing GHG. This approach recognizes that we must meet emissions reductions goals in a manner that enhances or preserves operational effectiveness and ensures installation energy resilience. The pathways that we are taking to reduces GHG emissions can be placed into two broad categories: reducing demand and substituting clean energy and materials. These approaches apply to GHG emissions reductions both for operational and installation energy. For our installations, reducing energy demand is critical to enhancing resilience and reducing emissions. Planned efforts related to demand reduction include improving data availability, reducing gross facility footprint and introducing efficiency upgrades. Scaling the Department's use of clean energy includes transitioning to a zero emissions non-tactical vehicle (NTV) fleet and achieving net-zero emissions installations. Consistent with EO 14057, the Department intends to transition its electricity use to 100% CFE on an annual basis by 2030. The Department has begun evaluating how to revise its purchasing methods, with initial solicitations in progress in Texas, North Carolina, and South Carolina. The Department anticipates close coordination with other government agencies, especially GSA and DOE, to achieve a ``whole-of-government'' approach to leverage the purchasing power of the U.S. Government. The Department is also pursuing on-site clean energy generation technologies including advanced nuclear power and next-generation geothermal. Other actions include expanding consultations with CFE suppliers and creating a center of excellence at Defense Logistics Agency-Energy Office. For GHG emissions related to Operational Energy, the Department is reducing demand by increasing platform efficiency, exploring new operating concepts; and fielding new, more capable equipment. In addition, we are substituting current fuels with sustainable liquid fuels, preferably produced in a distributed manner, and pursuing alternative power generation technologies. The Department is also exploring ways in which construction techniques and materials can sequester carbon. For example, the Department was an early adopter of cross-laminated timber (CLT) construction techniques that have lower embodied GHG emissions. DOD is also seeking to expand this approach to include steel, concrete, and other advanced materials. Regarding the need for resources to achieve federal mandates, the Department appreciates the support it has received from Congress to meet resilience and sustainability requirements and so doing strengthen our lethality, resilience, and efficiency posture. Presently, the Department's GHG reduction plan, as well as specific strategies for CFE, efficient buildings and ZEV, are being integrated into our installation and energy master-planning processes to create holistic solution pathways. This iterative process will inform any additional resource requirements that may need to be addressed through the Department's Planning, Programming, Budgeting and Execution (PPBE) process. Ms. Sherrill. Secretary Owens, DOD's Climate Adaption Plan 2022 Progress Report released last October highlights how the Department is incorporating climate and energy resilience requirements into key strategy and planning documents. What is the current status of DOD's comprehensive installation assessments? How does the DOD plan to prioritize installation improvements to increase energy redundancy and strengthen energy resiliency? Can you elaborate on the current status of the DOD Climate Assessment Tool (DCAT)? How successful has DCAT been in helping the DOD prioritize installation vulnerability to climate related hazards and making changes to reduce those vulnerabilities? Mr. Owens. The Department is developing a policy for integrated installation resilience against current and future extreme weather, climate change, facility-related control systems (FRCS) cyber threats, and other human-induced hazards. This policy will guide integrated planning and is expected to be released in Calendar Year (CY) 2023. The DOD Climate Assessment Tool (DCAT) currently contains Extreme Weather and Climate Change Hazard Reports for 1932 locations in the Continental U.S., Alaska, Hawaii, and 336 locations internationally. By the end of April 2023, all major installations will be included plus an additional 71 international locations. Analogues of DCAT have been produced for six partner nations: Australia, Germany, Italy, Japan, the Republic of Korea, and the United Kingdom. DCAT output has been incorporated in a variety of resilience investment programs. This includes the Readiness Environmental Protection Integration Program (REPI), the Defense Health Agency capital investment program, and the All-Hazards Threat Assessments (AHTA). DCAT output is also included in climate wargaming. The Department prioritizes energy resilience investments for critical installation missions, according to our list of Mission Assurance Priority Installations, and for critical missions at other installations based on the Services' priorities, as reflected in our annual guidance for ERCIP. ERCIP guidance includes the use of DCAT in identifying climate exposure and appropriate adaptation for energy resilience investments. Ms. Sherrill. Alternative fuels can be more cost effective, reliable, and cleaner than fossil fuels. As we have seen over the past year, U.S. dependence on foreign nations for oil can create issues of both cost and availability. It also significantly increases the amount of carbon released into the atmosphere. Private companies, such as Maersk, which has its U.S. headquarters in my district, have been working to advance technology utilizing these fuels, such as biofuels and e-fuels. The Army Climate Strategy addresses the importance of more effective power solutions that reduce GHG emissions. In both the FY23 Omnibus and NDAA, funds were allocated to the Department of Defense to invest in these types of fuels. I'd like to hear from each witness about any unique challenges in the integration of these alternative fuels into operations and whether there are places where its integration is not feasible. Mr. Owens. The Department is making investments to ensure we can use drop-in compatible Sustainable Aviation Fuel (SAF) and naval marine fuels in our platforms and infrastructure. Beginning in FY22, the Department initiated the certification and testing of additional alternative fuels already approved in the commercial market, as well as additional pathways in the approval pipeline, to ensure DOD is ready to use alternative fuels available on the global market. DOD testing will ensure that these alternative fuels are compatible with DOD equipment and infrastructure, and builds on previous DOD approvals of four alternative fuels for use in tactical platforms. Similar to the private sector, the primary challenge to the adoption of drop-in compatible alternative fuels is cost and limited availability. In operational terms, the production of alternative fuels closer to the point of use could reduce the risks facing the storage and distribution of liquid fuels in a contested logistics environment. To this end, the Department is supporting a pilot demonstration to better understand the technological and operational implications of on- site refining of alternative fuels. Ms. Sherrill. Secretary Owens, the GAO recently released a report earlier this month on Military Child Care and DOD efforts to provide affordable quality care for families. The report detailed steps the DOD is taking to address child development center staffing shortages and long wait times for new enrollees due to limited child care spaces. What is the DOD planning to do or currently doing to address these issues to improve sustainability and access to affordable child care for service members? What is the projected building timeline for the seven new CDCs that were included in FY2022 appropriations? Given that the GAO report highlights how this issue is particularly impactful for junior service members, are there any efforts planned or currently underway to alleviate those issues? Mr. Owens. The Department recognizes the importance of providing military families and civilians with access to quality, affordable Child Development Programs (CDP), and is committed to addressing the increased demand and challenges to sufficiently meet the needs for quality and affordable childcare. On September 22, 2022, SECDEF released the Taking Care of Our Service Members and Families memorandum highlighting efforts to meet the childcare need. The expansion of Military Child Care in Your Neighborhood PLUS (MCCYN-PLUS) provides increased opportunities for childcare fee assistance in Arkansas, Colorado, Kentucky, Maryland, Nevada, North Carolina, Texas, Virginia, Washington, and Miami-Dade County, Florida. The Department also expanded the Child Care in Your Home pilot to a total of 11 locations: the National Capital Region; Norfolk, Virginia; San Diego, California; Hawaii; San Antonio, Texas; Colorado Springs, Colorado; Seattle/Tacoma, Washington; Jacksonville and Fort Walton Beach, Florida; Fayetteville, North Carolina; and Las Vegas, Nevada. Finally, to assist with military child development program (CDP) staff recruitment and retention, the Department standardized a minimum 50 percent employee discount for the first child of CDP direct-care workers to improve staff recruitment and retention. The Department continues to develop additional strategies to increase access to quality, affordable childcare in coordination with the Military Services. The CDC projects funded in FY 2022 are in various stages of execution. The Army projects are progressing through design and the Air Force projects are in acquisition. Ms. Sherrill. Last May, Marine Corps Logistics Base Albany became the first DOD installation to achieve net zero electricity status, with the base producing 100% of the energy they use. MCLB Albany was able to achieve their net zero climate and energy resilience goals through incorporating innovative energy technologies, such as a biomass steam turbine, landfill gas generators and advanced microgrid controls into their installation. Other carbon pollution-free resources include wind and solar power alternatives, including new systems such as GAF Energy's integrated solar roofs that directly integrates solar technology into roof shingles. Secretary Berger, congratulations on the success of MCLB Albany on reaching net zero status. Can you elaborate on some of the challenges that MCLB Albany faced in achieving net zero as well as lessons learned, recommendations, and take-aways from that process so that the other services can avoid those pitfalls as they work towards net zero installations? Ms. Berger. Each installation has unique opportunities and challenges regarding its energy and water needs, and DON is developing a guidebook for installation commanding officers to understand the tools, authorities, and resources available to them. MCLB Albany's success can be attributed to innovative and diverse financing mechanisms, partnerships, and long-term commitment. First, MCLB successfully leveraged energy financing mechanisms and multiple funding sources to achieve net zero electricity outcomes and expand resilience capabilities with limited appropriations. The Department of the Navy awarded three Energy Savings Performance Contracts at MCLB Albany--between 2003 and 2009 to Chevron, and in 2016 to Constellation New Energy (CNE). Each initiative built additional capability to reduce energy demand and increase generation capability: lighting upgrades, HVAC controls, efficient transformers, landfill gas cogeneration, smart grid controls, and a steam turbine that uses waste steam from the neighboring 50-megawatt industrial biomass steam plant. MCLB also has an Enhanced Use Lease agreement with Georgia Power Company for 150 acres and 44 megawatts direct current/31 megawatts alternating current, of on-site solar power generation, which is delivered directly to the utility grid while MCLB Albany gained a new 12-megawatt substation and express feeder. Finally, MCLB Albany leveraged the Energy Resilience and Conservation Investment Program to construct a landfill gas generator and geothermal heat pumps and identified and tracked multiple funding opportunities to implement energy projects, including four borehole thermal energy storage systems and base-wide HVAC upgrades. Second, MCLB Albany partnered with local entities to make use of other resources normally unavailable to military installations and create business case opportunities for net zero electricity achievement. MCLB Albany partnered with Proctor & Gamble (P&G), Albany Green Energy (AGE), GPC, and CNE to structure a deal around a biomass steam generator and steam turbine generator. The installation also partnered with Chevron and Dougherty County to construct the landfill gas generator. Dougherty County owns and operates the landfill gas source, and MCLB Albany funded and constructed the landfill gas generators and partnered with Chevron to construct the gas piping. The installation then partnered with Dougherty County to connect the piping to the landfill gas source. Once complete, all three parties conducted joint commissioning of the system before placing it into operation. Third, MCLB Albany demonstrated that achievement of net zero requires commitment over many years to plan, design, and implement multiple projects and initiatives. The installation committed to pursuing net zero over 15 years ago, including development of a net zero plan in 2011. The net zero vision was embraced by commanding officer after commanding officer, providing continuity of commitment from leadership levels. MCLB Albany's energy team provided the dedication, stability, consistency, and passion required to advance net zero. Advanced clean energy technologies play an important role in both the approach to net zero for installations but also--such as in the case of advanced nuclear technology--can also provide clean and resilient energy in light of current and emerging threats. Ms. Sherrill. Secretary Owens, Secretary Jacobson, Secretary Berger, and Mr. Oshiba, can you each highlight what your organization is doing to ensure your services' installations are on track to meet the administration's 2021 federal mandate of 100% carbon pollution-free electricity by 2030 and a 65% emissions reduction from federal operations by 2030? What resources do you need to achieve the federal mandate, and what are you currently lacking? Ms. Berger. The DON takes a broad-based approach to reducing Greenhouse Gas (GHG), which recognizes that we must meet emissions reductions goals in a manner that preserves operational effectiveness and ensures installation energy resilience. Specifically, the DON is focused on GHG emissions reductions both for operational and installation energy. For our installations, reducing overall energy demand and increasing efficiencies is critical to enhancing resilience and reducing emissions. To reduce demand, the DON is working across multiple fronts, to include: improving data availability to better target opportunities for improvement, reducing gross facility footprint, introducing efficiency upgrades to existing mechanical and electrical systems, partnering with utility providers, electrifying building systems, and increasing sustainable and low-carbon design elements in all new construction projects and planned renovation work. Scaling the Department's use of clean energy includes transitioning to a zero emissions non-tactical vehicle (NTV) fleet and achieving net- zero emissions installations. For GHG emissions related to Operational Energy, the Department is reducing demand by increasing platform efficiency, exploring new operating concepts, and fielding new, more capable equipment. In addition, we are substituting current fuels with sustainable liquid fuels, preferably produced in a distributed manner, and pursuing alternative power generation technologies to address contested logistics. The DON is leveraging Third Party Financing and DOD ERCIP funding to deploy, microgrids, onsite renewable generation, and long duration battery storage. Further, the DON is deploying these capabilities in conjunction with Interagency, state and local community partnership to enable mutually beneficial GHG reductions and increased energy and water resilience. Examples include ongoing partnerships in California, Hawaii, Virginia, and Georgia. The Department appreciates the support it has received from congress in leveraging 10 U.S.C 2912, 10 U.S.C 2913, 10 U.S.C. 2916, Third Party Financing and ERCIP funding that are enabling investments in resilience and sustainability. The DON Chief Sustainability Officer is engaged in the Planning Programing Budgeting and Execution process through POM guidance and policies that strengthen lethality, resilience, and efficiency posture. Ms. Sherrill. Alternative fuels can be more cost effective, reliable, and cleaner than fossil fuels. As we have seen over the past year, U.S. dependence on foreign nations for oil can create issues of both cost and availability. It also significantly increases the amount of carbon released into the atmosphere. Private companies, such as Maersk, which has its U.S. headquarters in my district, have been working to advance technology utilizing these fuels, such as biofuels and e-fuels. The Army Climate Strategy addresses the importance of more effective power solutions that reduce GHG emissions. In both the FY23 Omnibus and NDAA, funds were allocated to the Department of Defense to invest in these types of fuels. I'd like to hear from each witness about any unique challenges in the integration of these alternative fuels into operations and whether there are places where its integration is not feasible. Ms. Berger. Similar to the private sector, the primary challenge to the adoption of drop-in compatible alternative fuels is high cost and limited availability. In operational terms, the production of alternative fuels closer to the point of use could reduce the risks facing the storage and distribution of liquid fuels in a contested logistics environment. To this end, the Department of Defense (DOD) is supporting a pilot demonstration to better understand the technological and operational implications of on-site refining of alternative fuels. The DOD is making investments to ensure we can use drop-in compatible Sustainable Aviation Fuel and naval marine fuels in our platforms and infrastructure. Beginning in FY22, the Department initiated the certification and testing of additional alternative fuels already approved in the commercial market, as well as additional pathways in the approval pipeline, to ensure DOD is ready to use alternative fuels on the global market. Testing will ensure that these alternative fuels are compatible with equipment and infrastructure. Ms. Sherrill. Last February, the Army released its Climate Strategy with concrete goals and objectives that will allow the Army to become more energy resilient and increase energy redundancy while faced with extreme weather challenges impacting readiness, increasing the overall effectiveness of the force. And last October, the Army released its Climate Strategy Implementation Plan detailing their plan to respond to threats, increasing installation sustainability and readiness. Secretary Berger, the Navy recently released its Climate Action 2030 plan in May of last year. Could you expand on the progress made during the 90 day implementation planning process guide, the status of the Executive Steering Committee stand-up, and any critical initiatives your stakeholders identified during the planning process? Ms. Berger. During the 90-day implementation planning process, the Department of the Navy conducted several Executive Steering Committee meetings and working groups with dozens of subject matter experts to identify detailed initiatives to further the goals established in Climate Action 2030. I am releasing those initiatives in a series of memorandums through my role as the DON's Chief Sustainability Officer (CSO). To date, the DON published CSO Serial 1 on Infrastructure (3 January 2023), CSO Serial 2 on Water Security (21 March 2023), and Nature-Based Solutions (28 April 2023). Our next one will cover Acquisition. Follow-on CSO memorandums will guide the DON's actions forward. Earlier this year, the Marine Corps published Installation and Logistics 2030, which looks at sustaining the Force in the 21st century while recognizing that the operating environment is contested across all domains and at global scale every day. For the Navy, Global Strategy Ashore seeks to enable and improve Fleet readiness, transform logistics to better sustain the Fleet, and to sustain the momentum for evolving wartime support across the sustainment kill-chain. Both the Navy and the Marine Corps are making installations ready for the contested environment with a focus on energy, utility, and climate resiliency, and the ability to recover rapidly after an attack. Ms. Sherrill. Last year I had the opportunity to visit and tour Picatinny Arsenal, where I was able to see both our new state-of-the- art EOD facilities and as well as the much older and worn down software center, which still houses a highly talented workforce that are winning awards while rain leaks in their building. The Pentagon has expressed concern regarding growing deficiencies in critical laboratory infrastructure across the department. Heidi Shyu, undersecretary of defense for research and engineering, said during a May 12, 2022 congressional hearing before our CITI subcommittee that her top priority is upgrading the department's labs. Secretary Jacobson, what progress and updates can you provide on how the DOD is prioritizing which labs to upgrade and when can Picatinny Arsenal's labs and engineering facilities be expected to be upgraded? Ms. Jacobson. The Army recognizes the importance of its laboratory and test facility infrastructure. These facilities are critical for the efficient and effective development of new combat systems to provide Soldiers with materiel for a decisive advantage in conflict. The Army also recognizes that many of its RDT&E activities reside in aged, failing and marginally functional facilities. The Army prioritizes lab and test facility projects in consideration of all Army facility requirements as constrained by available funding. The Army's FY24 Budget Request features a Ground Transport Equipment Building at Detroit Arsenal for $72 million to assess the durability and reliability of current and future tactical vehicle fleets. Additionally, the Army's FY 24-28 Future Years Defense Program includes an Ammunition, Explosives and Toxics Research Building at Picatinny Arsenal for $77 million, programmed for FY 27. Within the unspecified minor military construction program, an Ammunition Storage Igloo is currently under construction at Picatinny Arsenal for $5.3 million. Ms. Sherrill. Last May, Marine Corps Logistics Base Albany became the first DOD installation to achieve net zero electricity status, with the base producing 100% of the energy they use. MCLB Albany was able to achieve their net zero climate and energy resilience goals through incorporating innovative energy technologies, such as a biomass steam turbine, landfill gas generators and advanced microgrid controls into their installation. Other carbon pollution-free resources include wind and solar power alternatives, including new systems such as GAF Energy's integrated solar roofs that directly integrates solar technology into roof shingles. Secretary Berger, congratulations on the success of MCLB Albany on reaching net zero status. Can you elaborate on some of the challenges that MCLB Albany faced in achieving net zero as well as lessons learned, recommendations, and take-aways from that process so that the other services can avoid those pitfalls as they work towards net zero installations? Secretary Owens, Secretary Jacobson, Secretary Berger, and Mr. Oshiba, can you each highlight what your organization is doing to ensure your services' installations are on track to meet the administration's 2021 federal mandate of 100% carbon pollution-free electricity by 2030 and a 65% emissions reduction from federal operations by 2030? What resources do you need to achieve the federal mandate, and what are you currently lacking? Ms. Jacobson. The Army Climate Strategy (ACS) and Implementation Plan (ACS-IP) synchronize climate-related efforts across the force to increase capability; enhance installation resilience; prepare for new threats and operating environments; and modernize processes, standards, and infrastructure while cutting operational energy demand and greenhouse gas emissions. The ACS outlined Army goals consistent with EO 14057 requirements for carbon-free electricity (CFE) and greenhouse gas (GHG) emissions reduction, and the ACS-IP sets interim targets to ensure the Army is making quick progress on these goals. In FY22, the Army estimated that almost 45% of its installations' electricity came from CFE sources: 4.1% from onsite CFE and 40.6% from purchased CFE through their utility commodity providers. Additionally, the Army has a robust pipeline of 40+ new CFE projects in FY23-27 that, once operational, will add over 130 MW of new CFE generation to our existing nearly 750 MW of CFE generation capacity. Many of these projects are coupled with battery storage and integrated into microgrids to support both the Army's CFE and resilience objectives. Through 2022, the Army had reduced GHG emissions by 41.3% from the 2008 baseline. In addition to driving GHG reductions through energy efficiency projects, the Army is working to innovate construction and planning efforts to reduce GHG emissions associated with building construction and operations. The Army will continue to leverage all available authorities and resources, especially performance contracting and 3rd party financing, to meet the federal mandates and Army goals in these areas. The Army is committed to accomplishing the objectives of EO 14057 and the Army climate strategy to ensure our installation meet the mandates of 100% CFE by 2030 and 65% emissions reduction from federal operations by 2030. Ms. Sherrill. Alternative fuels can be more cost effective, reliable, and cleaner than fossil fuels. As we have seen over the past year, U.S. dependence on foreign nations for oil can create issues of both cost and availability. It also significantly increases the amount of carbon released into the atmosphere. Private companies, such as Maersk, which has its U.S. headquarters in my district, have been working to advance technology utilizing these fuels, such as biofuels and e-fuels. The Army Climate Strategy addresses the importance of more effective power solutions that reduce GHG emissions. In both the FY23 Omnibus and NDAA, funds were allocated to the Department of Defense to invest in these types of fuels. I'd like to hear from each witness about any unique challenges in the integration of these alternative fuels into operations and whether there are places where its integration is not feasible. Ms. Jacobson. The Army is working with the other Services and the Defense Logistics Agency to qualify and certify jet fuel made from alternative production pathways as drop-in replacements for use in Army equipment. To date, the Army has qualified jet fuel manufactured through two alternative pathways when blended with conventional petroleum for use in all Army equipment, and certified Army aircraft to use alternative jet fuel from two additional pathways. Currently, the Army has completed testing fuels from four additional pathways which are awaiting final approval for use. The greatest challenge to adopting these alternative fuels is their higher cost and limited availability. Because these alternative fuels are intended to replace traditional petroleum-based jet fuels, technical feasibility should not be a challenge. However, integration of replacement fuels could be stymied by limited production or higher cost. The Department is prohibited legally from paying a premium for alternative fuels. Title 10 U.S.C. 2922h prohibits purchase of drop-in fuels for operational purposes unless the fully burdened cost of the drop-in fuel is cost-competitive with the fully burdened cost of a traditional fuel available for the same purpose. Ms. Sherrill. Last February, the Army released its Climate Strategy with concrete goals and objectives that will allow the Army to become more energy resilient and increase energy redundancy while faced with extreme weather challenges impacting readiness, increasing the overall effectiveness of the force. And last October, the Army released its Climate Strategy Implementation Plan detailing their plan to respond to threats, increasing installation sustainability and readiness. Secretary Jacobson, it's great to see you again. I enjoyed your guided tour at the Pentagon Energy Expo last year that showcased emerging energy-related capabilities. What updates do you have on the current status and execution of the Army's Climate Strategy and the Army's Climate Strategy Implementation Plan as well as the progress on feasibility studies? Ms. Jacobson. The Army has made much progress towards achieving the tasks outlined in its Army Climate Strategy (ACS) Implementation Plan in line with the goals of (1) achieving 40% reduction in Army net greenhouse gas (GHG) emissions by 2030 (compared to 2008 levels), (2) attaining net-zero Army GHG emissions by 2050, and (3) proactively considering the security implications of climate change in strategy, planning, acquisition, supply chain, and programming. . The Army is making progress as set forth below, based on the lines of effort (LOE) in the ACS. First, the Army continued to enhance resilience and sustainability at its installations (LOE 1: Installations) by: Increasing the number of microgrids (28 operational, 9 under construction, and 26 in design as of May 2023) to ensure installations have continued power and can operate their critical missions during a climate-induced event. Awarding 13 new carbon-free electricity (CFE) projects in FY22. Once operational, these projects will generate 53 megawatts of new CFE. In FY22, the Army consumed 34.5% of electricity from CFE sources (5.2% from onsite CFE and 29.3% from purchased CFE). Starting planning actions to identify emissions profile and feasible/suitable alternatives for replacing building systems emissions. The Army has reduced GHG emissions from the Army real property portfolio by at least 38%, from a 2008 baseline. Producing guidance on implementation of ASA IE&E Building Automation Systems (BAS) Policy and beginning additional coordination with Commands to identify gaps in current guidance and where updates are needed. Converting its non-tactical vehicles (NTV) into electric vehicles (EVs) with 2,583 ordered for FY22, although, due to lack of supply, only half that number was delivered. For FY23, Army ordered 2,291 EVs. Completing pilot Installation Climate Resilience Plans (ICRPs) at Fort Carson, Anniston Army Depot, USAG Alaska (Fort Wainwright and Fort Greely) and Fort Bliss. Three additional pilot ICRPs are underway (at Fort Cavazos, Fort Stewart, and Fort Liberty). The ICRPs provide a path for installations to address the threats of climate change holistically in the Real Property Master Plans by identifying climate-related risks and steps to address those risks. Second, the Army is making strides in tactical vehicle electrification and contingency basing energy efficiency (LOE 2: Acquisition and Logistics). These programs will provide a battlefield advantage to the force, reduce supply chain vulnerability, and decrease Soldier risk. Specifically, the Army is taking the following actions: Developed anti-idle retrofit kits for Joint Light Tactical Vehicles (JLTVs) and Family of Medium Tactical Vehicles (FMTVs) to enable silent watch, with procurement planned for 2025. Initiated testing of two Bradley Hybrid-Electric Vehicle Prototypes at Aberdeen Proving Grounds to assess the operational benefits of integrating a hybrid electric drive into a combat platform. Awarded a Small Business Innovation Research contract in September 2022 through the Army Applications Laboratory to demonstrate additional configurations and more ruggedized tactical battlefield recharge. Initiated the electric Light Reconnaissance vehicle (eLRV), a new start program for 2023, which will provide a substantial competitive advantage through reduction in acoustic, thermal signature, silent mobility, increased dash speed, extended range, and increased reliability. Third, the Army is preparing the force to be ready to operate in a climate altered world (ACS LOE 3: Training) by: Continuing to build awareness in future leaders about resilience, operational energy, and climate change through a partnership with the United States Military Academy at West Point by establishing the Sustainable Infrastructure, Resilience, and Climate Consortium (SIRCC). Issuing task orders by Army Training and Doctrine Command (TRADOC) in March 2023 directing the following actions: Collect and publish climate and weather-related adaption and mitigation best practices and climate change related lessons learned every two years beginning in FY24. Produce a digital handbook of potential individual training modifications that could reduce Army GHG emissions beginning in FY26. Incorporate climate literacy in Professional Military Education (PME) and Civilian Education System (CES) programs. Ms. Sherrill. Last May, Marine Corps Logistics Base Albany became the first DOD installation to achieve net zero electricity status, with the base producing 100% of the energy they use. MCLB Albany was able to achieve their net zero climate and energy resilience goals through incorporating innovative energy technologies, such as a biomass steam turbine, landfill gas generators and advanced microgrid controls into their installation. Other carbon pollution-free resources include wind and solar power alternatives, including new systems such as GAF Energy's integrated solar roofs that directly integrates solar technology into roof shingles. Secretary Berger, congratulations on the success of MCLB Albany on reaching net zero status. Can you elaborate on some of the challenges that MCLB Albany faced in achieving net zero as well as lessons learned, recommendations, and take-aways from that process so that the other services can avoid those pitfalls as they work towards net zero installations? Secretary Owens, Secretary Jacobson, Secretary Berger, and Mr. Oshiba, can you each highlight what your organization is doing to ensure your services' installations are on track to meet the administration's 2021 federal mandate of 100% carbon pollution-free electricity by 2030 and a 65% emissions reduction from federal operations by 2030? What resources do you need to achieve the federal mandate, and what are you currently lacking? Mr. Oshiba. The department's current budget submission includes sufficient resources to achieve the Administration's mandates and timelines. DAF is seeking novel approaches and technology to deliver carbon pollution-free electricity (CFE) to installations, supporting infrastructure, and vehicle fleets, and provide continuous and reliable power to maintain mission continuity. There are several CFE projects underway through a variety of execution vehicles--power purchase agreement (PPA), Enhanced Use Lease, Utility Energy Service Contract, and Energy Resilience and Conservation Investment Program. Examples include: Partnering with the Defense Logistics Agency Energy to execute a PPA with a third-party developer, who will license, own, and operate a micro-reactor, to deliver electricity on Eielson AFB property in exchange for DAF's long-term purchase of the energy it generates. Working with the Defense Innovation Unit (DIU) to leverage geothermal technological innovation from industry to meet installation electricity needs at Mountain Home AFB, Idaho and Joint Base San Antonio, Texas. The prototype will utilize onsite, behind-the- meter, geothermal technology that can produce resilient electricity on a 24/7 basis to meet critical loads by relying on underground heat resources without directly relying on above ground water resources or impacting underground drinking water resources. Supporting several CFE pilot projects to inform future decisions about the procurement of CFE for domestic installations. This includes working with the Electric Reliability Council of Texas (deregulated market) and South Carolina Duke Energy Territory (regulated market) on pilot efforts. An additional CFE pilot is currently in early planning stages for Colorado. Ms. Sherrill. Alternative fuels can be more cost effective, reliable, and cleaner than fossil fuels. As we have seen over the past year, U.S. dependence on foreign nations for oil can create issues of both cost and availability. It also significantly increases the amount of carbon released into the atmosphere. Private companies, such as Maersk, which has its U.S. headquarters in my district, have been working to advance technology utilizing these fuels, such as biofuels and e-fuels. The Army Climate Strategy addresses the importance of more effective power solutions that reduce GHG emissions. In both the FY23 Omnibus and NDAA, funds were allocated to the Department of Defense to invest in these types of fuels. I'd like to hear from each witness about any unique challenges in the integration of these alternative fuels into operations and whether there are places where its integration is not feasible. Mr. Oshiba. The Department of the Air Force (DAF) has a goal to reduce greenhouse gas emissions and is collaborating with industry to lead innovative pilots, delivering combat power to the warfighter with less fuel. The increased demand for zero-carbon-based energy sources can be seen across the commercial market, including zero-emission vehicles (ZEVs). To keep pace with this transition, DAF is building and communicating requirements to streamline acquisition pathways in order to meet ZEV acquisition goals of 45% in 2025; 77% in 2030; and 100% in 2035 and beyond. Due to current supply chain challenges, DAF has a near-term focus on General Services Administration (GSA) leased ZEVs while preparing ``Make-Ready'' infrastructure for future incoming vehicles. DAF is developing a streamlined process to identify concentrations of ZEV candidates and Electric Vehicle Supply Equipment (EVSE) through the DAF Fleet Electrification Pilot Program. This pilot program, which is just underway, will inform training and facility needs for future DAF-owned ZEV and EVSE operations and management. To reduce demand for fuel in our aircraft we have funded a series of initiatives that reduce drag on our aircraft and increase the efficiency of our engines and our mission planning processes. However, the DAF will continue to consume large quantities of liquid fuels for the foreseeable future and as outlined in our climate action plan, as Sustainable Aviation Fuel (SAF) becomes more prevalent in the market, we must be prepared to leverage SAF to build resiliency, flexibility, and security into the energy logistics supply chain for storage, distribution, and transportation to the end user. The DAF maintains close coordination with the Commercial Aviation Alternative Fuels Initiative (CAAFI), the International Air Transport Association (IATA), DOE, and other users to ensure that as SAF becomes more prevalent on the commercial market, it is drop-in compatible with our aircraft. Ms. Sherrill. Last February, the Army released its Climate Strategy with concrete goals and objectives that will allow the Army to become more energy resilient and increase energy redundancy while faced with extreme weather challenges impacting readiness, increasing the overall effectiveness of the force. And last October, the Army released its Climate Strategy Implementation Plan detailing their plan to respond to threats, increasing installation sustainability and readiness. Mr. Oshiba, the Air Force also published its Climate Action Plan this past October. Can you provide an update on the current implementation status as well as your plan for modernizing infrastructure and facilities? Mr. Oshiba. We released our Climate Action Plan in Oct 22, which defines how we will preserve operational capability and increase resilience through specific and measurable objectives and key results. We will soon publish our Climate Campaign Plan, which identifies the specific actions we must accomplish to produce the key results. Each action includes stakeholders, performance metrics, drivers and requirements, baseline, and outcomes. Our priorities are to: Invest in resilient installations to operate unimpeded in all threat environments Leverage data and data analytics to make informed decisions Optimize aircraft energy use to increase readiness and operational capability Diversify energy sources to increase mission assurance Collaboration with allies and partners, national laboratories, innovation units, academia, industry, and multiple sectors at the federal, state, and local level enables and empowers us to leverage transformative approaches and technology. We use our Military Construction and Facilities Sustainment, Restoration and Modernization funding to accomplish key mission and quality of life requirements and incorporate attributes to increase resiliency against the effects of climate change. Every project accounts for future climate change and the possibility of increased severe weather events through application of Unified Facilities Criteria (UFCs) in design, as well as thoughtfully siting projects using authoritative flood data. Adapting to future changes in climate also includes using nature-base solutions which can be less costly, self-maintaining, and providing multiple lines of defense against storms. As part of its rebuild from Hurricane Michael, Tyndall AFB is investing in up to 1,000 feet of living shorelines, 3,500 feet of submerged shoreline, and 1,500 feet of new oyster reef habitat. ______ QUESTIONS SUBMITTED BY MS. ESCOBAR Ms. Escobar. Mr. Owens, my district is home to the University of Texas at El-Paso, or UTEP, which is renowned for being a powerhouse in additive manufacturing innovation. How closely are you tracking the applicability of these technologies to milcon projects, and what are some opportunities you can identify for academic institutions to partner with the Department on innovative testing of new construction materials and designs? Mr. Owens. To address the effects of extreme conditions on mission critical building infrastructure and reduce embodied emissions, the Department has begun looking at additive manufacturing in part through our Research and Engineering Defense Innovation Unit. While we have updated our Unified Facilities Criteria to allow limited implementation such as additive concrete construction, pilot efforts are still underway to determine where it is applicable. Regarding academic partnership, the Department's Environmental Security Technology Certification Program (ESTCP) funds academic, industry, and federal innovation projects. ESTCP recently established the Climate Resilience program area with the objective of developing climate resilience construction metrics and technologies. Ms. Escobar. Castner Range, in northeast El Paso, Texas was acquired by Fort Bliss in 1926 for ordnance and munitions training. The U.S. Army ceased all operations at Castner Range in the early 1970s. Although the area is safe, there is still a risk of potential munitions debris that may become exposed through erosion or encountered in the ground during construction activities. How does the Department prioritize funding for the cleaned up of formerly used defense sites (FUDS) such as Castner Range? Ms. Jacobson. Because Castner Range is still under the control of the Army, it is not a Formerly Used Defense Site, however, cleanup is underway under the Army's active sites cleanup program and is still several years from completion. Although not currently safe for public access, the property has been restricted and limited to authorized Army personnel since the range closed in the 1960s to ensure safety. In general, cleanup sites are prioritized across the Army based on risk to human health and the environment, with highest risk sites sequenced for action before lower risk sites. Because of its long history of live-fire training, Castner Range is a higher priority site than many others. The recent Presidential Proclamation designating Castner Range a National Monument includes language that will ensure that the cleanup at Castner Range remains a priority for the Army. The Army appreciates the continued funding provided by Congress, which is necessary to support and sustain the Army's cleanup progress at Castner Range and other sites across the Army. Ms. Escobar. Ms. Jacobson, in your testimony you mentioned that the Army is administering an Installation Climate Resilience Plan assessment for Fort Bliss. Can you provide a timeline as to when you expect that assessment to be completed? Ms. Jacobson. The Fort Bliss Installation Climate Resilience Plan is scheduled for completion in June 2023. Ms. Escobar. Ms. Jacobson, what milcon and infrastructure priorities are being tracked by your office as they pertain to milcon requirements of Fort Bliss? Ms. Jacobson. My office is tracking, as Fort Bliss's number one installation infrastructure project, the Fort Bliss Rail Yard, which will improve our ability to rapidly project armored combat formations in support of combatant commanders. The Army is requesting $74M for this project in our Fiscal Year FY24 Budget Request. Additionally, the Army's FY24-28 Future Years Defense Program, includes construction of two Collective Training Barracks and one Shipping and Receiving Building in FYs 26 and 27, respectively. Other Fort Bliss priorities include vehicle maintenance shops, company operations facilities, secure operations facilities and road improvements. The Army will continue to assess these projects for funding in future budget cycles in consideration of all other Army priorities and available MILCON top line. For FY23-24, the planned R&M investment at Fort Bliss is $79M, to make improvements at one Permanent Party Barracks, eleven Enlisted Training Barracks and one Fire Protection System. ______ QUESTIONS SUBMITTED BY MR. MOYLAN Mr. Moylan. Assistant Secretary Owens, in your testimony you state that a ``long term'' extension of H-2B visas is needed to meet DOD's construction requirements. Would a failure to extend H-2B create a risk that critical DOD construction projects fall behind schedule or go uncompleted? Additionally, would this inability to proceed with DOD construction disadvantage the United States in the Indo-Pacific? Mr. Owens. Without extended relief through at least Dec 31, 2029 in both Guam and the CNMI from the H-2B visa requirement to demonstrate temporary need, DOD will face significant cost increases and extreme schedule delays in all major construction programs on Guam and the CNMI, significantly degrading the Department's readiness posture and ability to deter PRC aggression and respond to crisis or conflict within the Indo-Pacific area of operations. The Department has several ongoing and upcoming key posture actions in Guam and the CNMI that will require historic levels of military construction. Guam's construction workforce is already overextended, and ongoing and planned projects require a workforce more than three times as large as the local construction workforce. It is difficult to find workers willing and able to work in construction in Guam's harsh climate and given the limited housing on Guam it requires workers willing to live in barracks. Without extended relief from the H-2B visa requirement to demonstrate temporary need, costs will increase, and construction timelines are expected to at least double. Even if additional funding is provided, this will render the DOD unable to implement key posture actions within expected timelines (Missile Defense Agency Defense of Guam, Polaris Point expansion, Marine Corps relocation, Tinian Divert) and other planned Guam and CNMI Pacific Deterrence Initiative projects would likely be delayed by more than a decade. Ultimately, reliance solely on local and domestic workforce capacity would delay final completion of critical DOD infrastructure by 10 to 20 years due to both cost and timeline overruns. Mr. Moylan. Ms. Berger, in 2005 the USS San Francisco ran aground in the western pacific and was successfully repaired on Guam. By contrast, when the USS Connecticut ran aground in 2021 and proceeded to Guam, it languished in harbor unable to be repaired. Can you please speak to the dangers posed by America's backslide in ship repair capacity in the western pacific and the importance of facilities such as Guam's now closed dry dock? Additionally, what are some specific ship repair assets/facilities that you would like to see return to Guam, or be placed there for the first time? Ms. Berger. The Navy remains committed to maintaining a robust pier-side ship repair capability on Guam, including funding infrastructure repairs to Lima, Mike, and November wharves in Guam to support additional maintenance capability. Plans for future projects include: repairs to Glass Breakwater; Oscar, Papa, and Quebec wharves; dredging to support Roll On Roll Off (RORO) operations at Lima wharf, additional energy resilience, construction of a new pier on Polaris Point to support Virginia Class Block V submarines; and improvement to Kilo and Lima wharves. Currently, forward-based submarine tenders EMORY S LAND (AS 39) and FRANK CABLE (AS 40) provide repair, supply, weapons handing, and tending for submarines homeported and visiting Guam. The Navy added 154 Full Time Equivalents in FY24 to support the Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility-Guam Detachment. [all]