Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
[House Hearing, 118 Congress] [From the U.S. Government Publishing Office] . [H.A.S.C. No. 118-29] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2024 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS FIRST SESSION __________ SUBCOMMITTEE ON READINESS HEARING ON FISCAL YEAR 2024 BUDGET REQUEST FOR MILITARY READINESS __________ HEARING HELD APRIL 19, 2023 [GRAPHIC NOT AVAILABLE IN TIFF FORMAT] __________ U.S. GOVERNMENT PUBLISHING OFFICE 53-874 WASHINGTON : 2024 ----------------------------------------------------------------------------------- SUBCOMMITTEE ON READINESS MICHAEL WALTZ, Florida, Chairman JOE WILSON, South Carolina JOHN GARAMENDI, California AUSTIN SCOTT, Georgia MIKIE SHERRILL, New Jersey MIKE JOHNSON, Louisiana VERONICA ESCOBAR, Texas CARLOS A. GIMENEZ, Florida MARILYN STRICKLAND, Washington BRAD FINSTAD, Minnesota GABE VASQUEZ, New Mexico DALE W. STRONG, Alabama JILL N. TOKUDA, Hawaii JENNIFER A. KIGGANS, Virginia DONALD G. DAVIS, North Carolina JAMES C. MOYLAN, Guam MARC VEASEY, Texas Patrick Nevins, Professional Staff Member Jeanine Womble, Professional Staff Member Ethan Pelissier, Research Assistant C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Garamendi, Hon. John, a Representative from California, Ranking Member, Subcommittee on Readiness.............................. 3 Waltz, Hon. Michael, a Representative from Florida, Chairman, Subcommittee on Readiness...................................... 1 WITNESSES Allvin, Gen David. W., USAF, Vice Chief of Staff, United States Air Force...................................................... 8 Franchetti, ADM Lisa M., USN, Vice Chief of Naval Operations, United States Navy............................................. 6 George, GEN Randy A., USA, Vice Chief of Staff, United States Army........................................................... 4 Smith, Gen Eric M., USMC, Assistant Commandant, United States Marine Corps................................................... 7 Thompson, Gen David D., USSF, Vice Chief of Space Operations, United States Space Force...................................... 10 APPENDIX Prepared Statements: Allvin, Gen David. W......................................... 80 Franchetti, ADM Lisa M....................................... 42 Garamendi, Hon. John......................................... 28 George, GEN Randy A.......................................... 30 Smith, Gen Eric M............................................ 63 Thompson, Gen David D........................................ 94 Waltz, Hon. Michael.......................................... 27 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: Mr. Gimenez.................................................. 107 Questions Submitted by Members Post Hearing: Mr. Finstad.................................................. 120 Mr. Garamendi................................................ 119 Mr. Rogers................................................... 111 Mr. Strong................................................... 121 Mr. Waltz.................................................... 115 FISCAL YEAR 2024 BUDGET REQUEST FOR MILITARY READINESS ---------- House of Representatives, Committee on Armed Services, Subcommittee on Readiness, Washington, DC, Wednesday, April 19, 2023. The subcommittee met, pursuant to call, at 3:44 p.m., in room 2212, Rayburn House Office Building, Hon. Michael Waltz (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. MICHAEL WALTZ, A REPRESENTATIVE FROM FLORIDA, CHAIRMAN, SUBCOMMITTEE ON READINESS Mr. Waltz. Call to order this hearing of the Readiness Subcommittee of the fiscal year 2024 budget request for military readiness. I ask unanimous consent that the Chair be authorized to declare a recess at any time. Without objection, so ordered. We obviously have a lot to discuss today and you all have-- everyone has my apologies for running a few minutes behind. That is what happens when my team lets me disappear into a SCIF [secure compartmentalized information facility] with HPSCI [House Permanent Select Committee on Intelligence]. We have a lot to, obviously we have a lot to discuss as it pertains to readiness. I want to thank all of your for time in having our one-on-one meetings in the run-up to this hearing. Lots to talk about: pilot shortages, recruiting/retention, weapon system sustainment, infrastructure management and restoration, just to name a few. I would like to highlight the detriments of operating under a continuing resolution. I want to highlight that as much for my colleagues here, as all of our Vices well know. That without an on-time budget, the Department is unable-- and I think this is lost a lot of times in the conversation here--that the Department is unable to begin any new projects. I am convinced that there is an underlying belief here that the Department gets a lot money. And if it gets the same amount of money as last year, then everybody will be okay. But not having those new starts is just critical and devastating. I ask the witnesses to elaborate these, as you make your--on these effects as you make your comments. I do remain concerned with this administration's continuing priority on climate change. I want to be clear that we have to deal with climate change, that resiliency is absolutely an important issue. But as we had today with the Secretary of the Army, when we are outfitting our bases and our fleet with things that come from the--our greatest adversary, with panels, with turbines, with technology, with software that it literally comes from China, I have real concerns with our control of that supply chain as we move towards transitioning our fleet. In fact, you know, in addition to that, the Secretary of the Navy recently stated that climate change is a top priority of his. Yet we stand to have those same supply chain issues. I am supportive of efforts to increase resiliency, I want to be clear there. But these policies can't be an end to themselves. I am also concerned, just to be candid here, and we have had these conversations of what we are seeing within the Department of the Navy with regards to amphibs [amphibious assault ships]. And we want to talk about that today. And in fact, the Marine Corps' number one unfunded requirement is a ship for the Navy. And that is something that we have to resolve. We will help you resolve it here. But I think that is endemic of an ongoing issue. And years of delayed maintenance due to high OPTEMPO [operations tempo] frankly has gutted the readiness of our amphibs. This has led to delayed deployments for ARG-MEUs [amphibious ready group- Marine expeditionary units], and decreased capacity with our ships at sea. These are obviously critical capabilities to INDOPACOM [U.S. Indo-Pacific Command] and that combatant commander, and I remain somewhat baffled as to why these problems persist. I applaud force modernization taking place across the services. We support the Army's REARMM [Regionally Aligned Readiness and Modernization Model] and the Marine Corps' Force Design 2030. I am concerned, however, about the timeliness of these efforts, and you will continue, Ranking Member Garamendi and I think agree on this, that the timelines for the threats don't match the timelines to get our readiness in shape and to get our modernization in shape. And I am eager to hear how the services have revised and accelerated these timelines to counter China's ambitions. And finally, taking care of our soldiers, taking care of our service members across the board is the utmost responsibility of everybody here in this room. Service leadership continuously touts the rhetoric of people first. But when we look at some of our facilities, when we look at some of the living conditions for our service members, I still remain skeptical of this actually being put into practice. And so the condition of some of this housing truly is outstanding. It no doubt affects retention. We must provide safe barracks and housing to our service members and put their welfare first to match, have our budget match the priority. So I just look forward to hearing from everybody here today. And I hand over to you, Mr. Garamendi, for your opening comments. [The prepared statement of Mr. Waltz can be found in the Appendix on page 27.] STATEMENT OF HON. JOHN GARAMENDI, A REPRESENTATIVE FROM CALIFORNIA, RANKING MEMBER, SUBCOMMITTEE ON READINESS Mr. Garamendi. I thank you, Mr. Chairman. I am delighted to work with you. I am pleased to hear your interest and support for climate change issues. And you are quite right about addressing that issue using Chinese materials. That is why we wrote into almost--well, in all of the infrastructure and the energy issues of the future very strong buy-America requirements. And so we need to push the American industry into the manufacturing of these systems, from solar panels to turbines and the like. And we can do that, and that is also an issue for the military. Are they buying American-made equipment for their ships and planes, or are they buying others. And complex issue, but a very, very important one. So each year as we prepare for this hearing, I am struck by the vast jurisdiction of the Readiness Subcommittee. As I often say, other subcommittees get to buy the new, bright, shiny stuff, and it is left to us to maintain it and keep it operating. And so in this subcommittee, we need to pay particular attention to the facilities that support this equipment, that sustain the modernization of the weapon systems themselves, and in which the men and women of the military are trained. So we have an enormous task here. And over the years, both the minority and the majority as it has changed over time have paid attention to this issue, as you are Mr. Chairman, and I thank you for that. Now, we have also learned from Putin's immoral invasion of Ukraine that many of the issues that we have dealt with over the years here trying to make sure that the--that our military is ready in every way has brought to the attention and to the forefront many of our concerns. We have been forced to think about the organic industrial base, which was heretofore not with this committee, but with the--even the larger committee often ignored. And so in this budget request, I am finally seeing evidence that we are getting serious about the modernization of the depots, the shipyards, the infrastructure, the bases, the housing, and all of the rest. And we need to continue to push that. I know that you intend to do that, Mr. Chairman, and I hope that the members of this subcommittee will continue also with that effort. Through the media, we have also watched the cost of Russia's other readiness failures for the Russians. We have watched its equipment fail because it was poorly sustained and maintained. And we have witnessed the cost of poorly trained troops, Russian troops. We cannot let that happen, and it falls to this subcommittee to make sure that as we go forward, that we are fully prepared. There is another piece of this puzzle that falls within the jurisdiction beyond the training of the troops. And that is that we have to make sure that the access to sustain the fight is available. And so we will be working on that also. Now, the Comptroller General has analyzed that the readiness of our weapon systems over the course of years has not been good enough. When we analyze the aircraft type, the majority of the systems in our inventory fail to--by more than 10 percent below the Department's own mission capability rate goals. So we have to continue to work on this issue. Cannibalization seems to be the way in which we keep most of the fleet, whether that is an aircraft or it is a truck or a plane or a tank, or a ship, cannibalization seems to be the way in which we keep these things operating. That doesn't work for long. And so we need to pay attention to that as we have in the past, and we must continue to make sure that all of the equipment has the necessary parts and pieces on time when necessary. So I am looking forward to the hearing today, our witnesses as they discuss these issues, what they have learned or the lessons they have learned. And it will be displayed in this year's budget. And we are certainly seeing the lessons in Ukraine. More importantly, what we are doing to operationalize those lessons that have been learned from Ukraine and beyond. So, look forward to working with you, Mr. Chairman. Look forward to working with the members of the committee, the subcommittee, and we will push along. Thank you very much. Yield back. [The prepared statement of Mr. Garamendi can be found in the Appendix on page 28.] Mr. Waltz. Thank you, Mr. Garamendi. I'd like to again welcome our witnesses and thank them for their participation today. We are joined by General Randy George, the Vice Chief of the Army; Admiral Lisa Franchetti, the Vice Chief of Naval Operations; General Eric Smith, Assistant Commandant of the Marine Corps; and General David Allvin, Vice Chief Staff of the Air Force; General DT Thompson, Vice Chief of Space Operations. General George, over to you for your opening remarks. STATEMENT OF GEN RANDY A. GEORGE, USA, VICE CHIEF OF STAFF, UNITED STATES ARMY General George. Okay, thanks, Chairman. Chairman Waltz, Ranking Member Garamendi, distinguished members of this subcommittee, thank you for the opportunity to discuss the readiness posture of our Army. Eighty years ago, American troops were fully engaged in the allied war effort in Europe, in Africa, and in the Indo- Pacific. Among them was a company of soldiers holding a roadblock near a village at Sanananda in northern New Guinea. They were enduring malarial fevers, venomous snakes, torrential rains, and holding off a perpetual onslaught of competent enemy fighters. I reflect on this because it reminds me that our Army must be ready for anything. We must be ready to deter war, and if deterrence fails, to take the fight to the enemy anywhere around the globe, even in the most hostile environments, just as we have always done. It also reminds me that warfighting is a team effort. It takes teams on the ground, like at Sanananda, and teams at every echelon above providing a menu of lethal options to our combatant commanders. Our Army is focused on warfighting and training for battle in which all domains are contested. And we are focused on supporting our combatant commands with ready formations around the world. And right now we have 137,000 soldiers in over 140 countries. We are strengthening our partnership with defense industry and rapidly modernizing our organic industrial base to increase productivity and ensure that we have the stocks to fight when called upon. We are deterring the pacing challenge China by exercising and campaigning across the Indo-Pacific theater and holding the line in the European theater along our NATO [North Atlantic Treaty Organization]--alongside our NATO partners. All the while, adapting in real time to lessons learned from the war in Ukraine and rapidly incorporating new tactics into our doctrine and our training. But readiness for today is not enough. Our Army is also transforming, because honestly we don't have an option. Warfare is changing, and we must change because of it to ensure we stay ahead of our potential adversaries. So among many things, we are modernizing long-range precision fires, air and missile defense, ground combat capabilities, and developing counter-UAS [unmanned aerial systems] capabilities and doctrine. Finally, we are building the team. And like I said, warfighting is a team effort. This includes providing commanders with the resources they need to support soldiers' mental and physical well-being, to maintain a healthy command climate, and to built cohesive teams. And it means investing in the quality of life of our soldiers and our families, ensuring that they have safe housing in barracks, adequate childcare, and spouse employment opportunities. I will end with recruitment, a critical readiness priority for us right now. We are challenged by the fact that a small number of young Americans, 23 percent, are qualified to serve. Fewer still, we are finding, are interested in serving. And that is something that we are working very hard to change. Our Army remains a great place to be, and I think our high retention rates speak to that. The trouble is, many Americans don't realize it or believe it. Military service to many people seems like a life setback. In reality, it is a life accelerator. That has certainly been my experience since I enlisted as a private right out of high school. It is a great team with an important mission and ample opportunity to learn, grow, and make an impact. And we have to get that story out, and we are pouring all of our energy into that effort. And we appreciate Congress' assistance in amplifying our call-to-service message. And Chairman, the last on--to answer your question on a continuing resolution, I will just give you an example from last year. Over 3 months, we had about 25 new starts that we were looking to get going and we couldn't because of the continuing resolution impacted about 1.9 billion. And you can imagine some of that in there, for example, was OIB [organic industrial base] modernization that we were trying to get started. So as you mentioned up front, it is the new starts that a continuing resolution would be a problem for us. Thank you. [The prepared statement of General George can be found in the Appendix on page 30.] Mr. Waltz. Thank you, General. Admiral Franchetti, your opening statement. STATEMENT OF ADM LISA M. FRANCHETTI, USN, VICE CHIEF OF NAVAL OPERATIONS, UNITED STATES NAVY Admiral Franchetti. Chairman Waltz, Ranking Member Garamendi, and distinguished members of the committee, good afternoon. On behalf of the Secretary of the Navy and the Chief of Naval Operations, thank you for the opportunity to discuss Navy readiness with you today. The United States is a maritime nation. Our security and prosperity depend on the seas. For the past 247 years, your Navy has stood the watch. We are America's away team, operating forward to deter war, protect our economic interests, uphold international law, ensure freedom of and access to the seas, and respond to crises and natural disasters. We provide our Nation's leaders with decision space and options and stand ready to fight and win when called to do so. Over the past year, we have safely executed 22,000 steaming days, almost 1 million flight hours, and participated in nearly 100 exercises. With operations spanning the globe, we have supported the allied response to Russia's illegal and unprovoked invasion of Ukraine, conducted freedom of navigation operations, interdicted illegal narcotics traffickers, and provided humanitarian assistance. As I speak, our sailors and Marine Corps counterparts are deployed on more than 100 ships and submarines around the world, ready to meet the security needs of our Nation. Our fiscal year 2024 budget request is consistent with CNO's [Chief of Naval Operations'] priorities of readiness in sailors, then capability, then capacity, with the Columbia SSBN [nuclear ballistic missile submarine] program as our number one procurement priority. We continue to prioritize readiness to sustain our forces through better maintenance performance, more training, improved parts availability, and increased weapons inventories. Navy readiness begins with our people, the sailors, civilians, and families who are the foundation of our true warfighting advantage. We are committed to improving their quality of service and personal resilience, investing in initiatives such as quality housing and childcare, access to the full continuum of mental healthcare, improved education, and an environment free of sexual harassment and sexual assault. In this 50th anniversary of the All-Volunteer Force, we continue to focus on recruiting, retention, and reducing gaps in our billets at sea. Navy readiness is also centered on the readiness of our platforms. Using data analytics, improving our planning processes, and procuring long lead time materials, we have decreased maintenance delays in public and private shipyards. But there is more work to be done. Our budget request fully funds public and private ship maintenance, aviation depot maintenance, increases parts and spares, and continues to grow our highly skilled public shipyard workforce. Finally, Navy readiness is also driven by the readiness of our bases. Shore infrastructure is critical, and we continue to fully fund the once-in-a-century recapitalization of our four public shipyards through the Shipyard Infrastructure Optimization Program. Our budget request supports increased sustainment of our shore infrastructure while prioritizing restoration and modernization for water, electrical, and safety systems. As our strategic competitors continue to improve and enhance their capabilities, maintaining a responsive, combat- ready, worldwide deployable Navy is our first line of defense and deterrence. Sustained readiness investments in today's Navy are a down payment on American's future security. I thank the committee for your leadership and partnership in keeping the world's greatest maritime force ready to fight and win at sea, and I look forward to your questions. [The prepared statement of Admiral Franchetti can be found in the Appendix on page 42.] Mr. Waltz. Thank you. General Smith, your opening statement. STATEMENT OF GEN ERIC M. SMITH, USMC, ASSISTANT COMMANDANT, UNITED STATES MARINE CORPS General Smith. Chairman Waltz, Ranking Member Garamendi, and distinguished members of this subcommittee, I am pleased to appear before you today to discuss Marine Corps readiness and the fiscal year 2024 budget. Your Marine Corps remains the Nation's force in readiness. We are ready to deter adversaries, and when that deterrence fails, we are ready to strike and enable others to strike. We also provide the crisis response forces that American citizens abroad and our allies have come to expect from their Marines. We provide this expeditionary combined arms force utilizing the minimum 31 amphibious warships that Congress has directed. Those ships provide the organic mobility required to bring all of our assets to bear at the critical time and place for our combatant commanders. The most important asset we bring to bear remains the individual Marine. Our modernization efforts, known as Force Design, ensure that we are manned, trained, and equipped to deter a peer adversary and to campaign to a position of advantage should deterrence fail and lethal force be needed. Our modernization efforts are required to fight and win on future battlefields. About that, we can make no mistake. Our aviation readiness has increased more than 10 percent in the past few years, thanks to the work of this subcommittee to provide us with the operations and maintenance funding we need, and due to our aviation modernization and reorganization efforts. When a Marine expeditionary unit deploys on a big-deck L- class amphibious warship today, they provide the combatant commander with 66 percent more fifth-generation aircraft than before we made Force Design changes. Our efforts to modernize our training and education are bearing fruit as we produce an even more lethal Marine. From our basic rifleman training to our service-level training exercises, we are becoming more lethal. Our new training integrates our joint and organic fires, improved communications, and updated ISR [intelligence, surveillance, and reconnaissance] to sense, make sense, track, and destroy targets at ranges and complexities never before seen by our Marine Corps. Our individual Marine remains the most lethal weapon on the battlefield. Our efforts to improve the quality of life for those warriors, to retain them once we train them, are vital and important. Your continued support matters to them and their families, so thank you. Finally, to your point, Mr. Chairman, I would note that of the past 10 years, approximately 4 have been spent in a continuing resolution status. During any CR, we are unable to improve as rapidly as we might have otherwise done. Our adversaries don't have that problem. Your help to deliver on-time and predictable funding to the 18- and 19-year-old lance corporals who do the fighting for our Nation is sincerely appreciated. As an example, in the past we had the opportunity to procure our Amphibious Combat Vehicle faster, but were unable to do so because of a CR. That leaves older equipment in the hands of the 18- and 19-year-olds who will fight for us. So the continuing resolution is absolutely detrimental. I look forward to answering your questions, and I am grateful to appear before you. [The prepared statement of General Smith can be found in the Appendix on page 63.] Mr. Waltz. Thank you, General Smith. General Allvin for your opening statement. STATEMENT OF GEN DAVID. W. ALLVIN, USAF, VICE CHIEF OF STAFF, UNITED STATES AIR FORCE General Allvin. Chairman Waltz, Ranking Member Garamendi, and distinguished committee members, on behalf of our Air Force Secretary and Chief of Staff, thank you for the opportunity to discuss the critically important topic of readiness. We greatly appreciate this body's continued partnership and support in delivering the resources necessary for the Air Force to respond to today's threats while preparing for tomorrow. The events of the past year remind us that global actors have the capability and intent to challenge peace and stability. In the case of the pacing challenge, the People's Republic of China, the speed at which they are developing advanced capability and capacity should serve as a warning for us to act with a greater sense of urgency. We must maintain the necessary advantage to deter them from violent pursuit of objectives at odds with our national interests. Your Air Force is laser-focused on this task. Readiness starts with our airmen, both uniformed and civilian, who consistently prove to be our greatest strength and competitive advantage. Since the beginning of the All- Volunteer Force 50 years ago, we have been fortunate enough to attract the best of America's youth in sufficient numbers. But recent realities have put this under pressure. As a result, we will likely not meet our recruiting goals this year. We are aggressively exploring multiple options while streamlining processes to attract a broader pool of those talented Americans into our formation. We also know that a ready airman is a focused and resilient airman. And we must demonstrate that we continue to value our service members and their families. We will continue to explore opportunities to expand or initiate programs that better support quality of life, and we greatly appreciate this committee's support for these efforts. The aircrew deficit persists due to several factors, but this shortage has not extended into the operational units or the pilot training bases. We are continuing on the path to transform our approach to pilot training to increase production while leveraging numerous monetary and non-monetary programs to retain the experience of those trained aviators. We look forward to working with the committee on these programs, as well as our pursuit of targeted relief from current legislation to enable the hiring of contract simulator instructors to maximize training and optimize our manpower to produce those pilots. While the proposed budget increase--increases weapon system sustainment funding by $1.1 billion over last year, this will only still resource 87 percent of the estimated requirement due to sustainment challenges of our ever-aging fleet, inflation, supply chain issues, and labor costs. We are pursuing improvements in reliability and maintainability, supporting initiatives that advance data- driven decisions. This drives efficiency in what we do today, and it enables responsiveness in dynamic wartime environments. Significant challenges and tough decisions still lie ahead. We must be thoughtful in adequately funding our readiness accounts while pursuing the right investments to develop advanced capabilities to meet future threats. This year we feel we have struck the right balance. In closing, I would offer this Congress can make the most positive impact on our readiness through a timely budget appropriation. An extended continuing resolution would result in the inability to start critical new programs and continue the momentum that we are building to meet the pacing challenge. It also creates instability in support to our airmen and families at a time when this has never been more important. A CR will essentially rob us of something both critical and irreversible as we face growing threats to our Nation, and that is time. So Mr. Garamendi, to your point as well, specifics, and Chairman Waltz, on a CR. We estimate that the CR will decrease our buying power for the United States Air Force by $5.4 billion, an extended CR. The key things that we are looking at that will directly be impacted by a continuing resolution are the initiation of a research and development in collaborative combat aircraft. This is integral to our design to have affordable mass against the People's Republic of China to be able to gain and maintain air superiority in a highly contested environment. These collaborative combat aircraft, we are working not only the platforms, but developing the autonomy to ensure we can leverage them with our crewed aircraft, as well as experimental operational units that we have funded in 2024 to be able to better integrate into our formations. And as I mentioned, with the uncertainty, we see this in every CR. Families that are getting ready to PCS [permanent change of station] and prepare their families for the schools they are going to go into, if we don't have the certainty of being able to do that on time, that just puts more tension into the families, and it doesn't show that we support them the way that we should. Thank you, and I look forward to your questions. [The prepared statement of General Allvin can be found in the Appendix on page 80.] Mr. Waltz. Thank you, General Allvin. And those specifics, General Smith, yours as well, are incredibly important for us as we go out to our respective caucuses as we try to get the-- as we try to get this done. General Thompson. STATEMENT OF GEN DAVID D. THOMPSON, USSF, VICE CHIEF OF SPACE OPERATIONS, UNITED STATES SPACE FORCE General Thompson. Chairman Waltz, Ranking Member Garamendi, and distinguished members of the subcommittee, on behalf of the Secretary of the Air Force and Chief of Space Operations, thank you for the opportunity to testify today regarding the readiness of the Space Force. In examining the readiness of the Space Force to accomplish its missions, the overriding consideration remains the dramatic shift to the space domain from a comparatively benign military environment to one that is undeniably contested. Given that the capabilities and benefits provided from space are essential to our way of life and crucial to effective military operations in every other domain, this shift was the compelling reason for the creation of the Space Force 3\1/2\ years ago. Since then, with the tremendous support of Congress, the Space Force, Department of the Air Force, and broader Department of Defense have moved out aggressively to address the challenges the Nation faces in space. We have begun to pivot to more resilient and defendable space architectures that ensure soldiers, sailors, airmen, and Marines can count on space forces across the spectrum of conflict. We have begun designing and developing satellite constellations that address the migration of missions to space, including moving target indication, domain awareness on the land, at sea, and in the air. Key elements of command and control and the movement of the data and information enables the joint force in the way it expects to fight in the future. Finally, the Space Force has begun to shift to a new training and readiness approach that I described last year as the Space Force Generation Model. We achieved initial capability for this approach on October 1 of last year. Once complete, it will ensure space forces are combat-ready against the pacing challenge. While much remains to be done in each of these areas, the main challenges of Space Force readiness today are twofold. The first is creating a combat-ready force that--the first to creating a combat-ready Space Force is an advanced full- spectrum test and training infrastructure. This infrastructure will be a system of systems that provides test and training opportunities with high-fidelity mission simulators and threats, a professional aggressor force, and a suitable range. It will allow us to validate tactics, test system limitations, and train operators in a live and synthetic environment against a thinking adversary. Without this infrastructure, Guardians would not have defendable systems, proven tactics, or the confidence and competence they need should it come to conflict in space. The operational test and training infrastructure will be a force multiplier, allowing Guardians to maintain and improve our strategic advantage in space. The second primary challenge of Space Force readiness lies in whether budgetary resources will be available in a timely manner to execute all we are planning to do. As I stated previously, Congress has been a tremendous partner in defining and building the Space Force. In each year since its existence, the Space Force has seen 12-15 percent increases in its budget year over year. The 2024 request is nearly $4 billion more than it was in 2023, a 15 percent increase. In the event of a continuing resolution, that increased budget authority would not be available to meet our needs. This budget request includes at least 17 new initiatives, many of which are focused on this operational test and training infrastructure. Beyond that, new initiatives that were begun in 2023, already delayed because of the continuing resolution this year, are programmed for increases in 2024. As a specific example, the missile warning system that will track advanced hypersonic threats was begun in 2023. The budget for this vital capability doubles in 2024, allowing us to deliver real global capability by 2027. None of that additional authority and none of the new starts required for the test and training infrastructure can be begun during a CR. The President's fiscal year 2024 budget request affirms the DOD and Space Force's commitment to a bold, threat-informed shift. It acknowledges the need for a more robust proliferated architecture, intelligence-driven space domain awareness, aggressive cybersecurity, measured investment in space superiority, and combat-credible forces anchored in a full- spectrum training enterprise. The most important thing Congress can do to help us in this endeavor is pass an on-time budget. Thank you all for your steadfast partnership and support. I look forward to your questions. [The prepared statement of General Thompson can be found in the Appendix on page 94.] Mr. Waltz. Thank you, General. I'm just going to dive right in. I just have one question, I want to get to other members that we--since we have votes looming. Can we just go down the line. I'll start with you, General George. What are your current projections for your recruiting shortfalls this year? General George. Chairman, right now we are doing better than we were doing. I would say right now we are probably projecting to be about 55,000. We had set our goal up to be 65,000 this year, which is higher than what we did last year. So that is where I expect we will---- Mr. Waltz. About 10,000 short. General George. Yes, sir. Mr. Waltz. Admiral. Admiral Franchetti. Chairman, we expect to be about 6,000 short. Also doing better than we started, but about 6,000 short is our projection. Mr. Waltz. General. General Smith. Chairman, the Marine Corps will meet its recruiting mission this year, as we did last year. Mr. Waltz. Roger that. Semper fi. General Allvin. The total force Air Force will be coming in approximately on this path 10,000 short. That is about 3,400 in the Active Duty, 3,100 in the Guard, and a little over 4--in the Reserves, and a little over 4,000 in the Guard. Mr. Waltz. Thank you. General. General Thompson. Chairman, we have a little different challenge than the other services. We need about 700 new recruits off the street, but we still need and will for the next several years need about 700 interservice transfers from the other services. And while we are doing very well in recruiting off the street, as the other services have challenges in their recruiting, it becomes more difficult for them to release folks for interservice transfer. Mr. Waltz. So will you fall--are you projecting to fall short in those transfers? General Thompson. Don't know yet. We will meet our off-the- street needs. The question will be working with services, how much can they afford to give us. And we just don't know that yet. We will need to wait and negotiate later this year. Mr. Waltz. Thank you. And minus the Army, because you are already doing it, in terms of polling and collecting data on why we are in this crisis that we are in, will all of you commit to the committee to begin collecting data, look at programs, initiate programs to start understanding why this shortfall is happening? So I am looking at Navy, Air Force. Admiral Franchetti. Yes. General Allvin. Absolutely, Chairman. That is underway and will continue. Mr. Waltz. Great, thank you. Mr. Garamendi. Mr. Garamendi. Thank you, Mr. Chairman. I have had the privilege of meeting with each of the presenters today ahead of this meeting, and I am going to turn over my time to Ms. Sherrill. Ms. Sherrill. Thank you. And thank you all for your service and for your support to our troops across the globe. It is important that we build and procure clean energy sources appropriately without influence and ties to our strategic competitors, who use forced labor, conduct intellectual property theft, and forced technology transfers. It can be done. GAF, a national roofing company headquartered in my district, has been able to successfully transition from Chinese suppliers to manufacturing and producing solar panels in domestic facilities in Texas and California, as well as in Southeast Asian nations including Vietnam, Cambodia, and Taiwan. As we work on increasing our energy resiliency, we need to ensure our Armed Forces are looking at all energy options available. And General Smith, we had a discussion yesterday about how this impacts logistics. Can you talk a little bit about that discussion and how energy options can improve your logistics challenges? General Smith. Yes, ma'am. Logistics is the pacing function against the pacing threat in the expanse of the Pacific. As a warfighter, I don't want to move 1 pound that I don't have to move. I want to reserve every poundage of movement for lethality. So if I am, for example, if I don't need to bring diesel to operate a reverse osmosis water purification unit to produce water in the middle of the South China Sea, which doesn't seem to make sense to me to ship water, I want to produce it there, and I can do that via some other means? It is about, for me it is about lethality. Because that 8 pounds give or take per gallon, that is 8 pounds of a warhead that I can bring. This is about lethality for us. And anything we can do to move less, and polymer ammo means I could bring more bullets instead of more casings, that is what we want to do because it is about warfighting and lethality. Ms. Sherrill. Thank you for that plug for polymer ammo. We are working on that in my district. And with that, I will turn it back in the interest of time. Thank you. Mr. Waltz. Thank you, Ms. Sherrill. Mr. Wilson Mr. Wilson. Thank you, Mr. Chairman, and thank each of you. I particularly appreciate your service as a 31-year veteran myself. And, but I am really grateful to be a Army dad of three sons who served in Iraq, Egypt, and Afghanistan. I also can claim the Navy, a son that served in Baghdad. And so I am really grateful as a doctor. And then I have a nephew in the Air Force. And one day I will have somebody in the family smart enough to be in Space Force. So, but I thank you all for what you do. And General George, I am so grateful to represent Fort Jackson. It trains over 50 percent of all soldiers in the basic combat training facility. And I am also grateful that what you are doing is providing, all of you--are providing opportunity for young people to achieve to their highest level and to be so meaningful. And that is why I appreciate what you are doing. And General, there is the Future Soldier prep course. And can you explain what that is, and how successful it has been? General George. Yes, sir. It has been very successful for us. We have come into this, we did not want to lower our standards. And so the idea of the Future Soldier prep course is actually to get people to meet our standards. So they basically come there on average, I would say they are there 4 or 5 weeks. We have some that need help with the ASVAB [Armed Services Vocational Aptitude Battery] testing. Some that need help with the body fat. And we have seen about a 97 percent success rate, 96, 97 percent on both of those accounts getting to basic training. So we are really proud of that program down there at Fort Jackson. Mr. Wilson. And in lieu of a question because of time, I just want to commend all of you for the placement of troops in Eastern Europe to provide for peace through strength with deterrence. I have met with the military personnel in Poland. President Donald Trump was ahead of the curve to put troops there. I have met with our American troops working at Novo Selo in Bulgaria with young Bulgarians to be at MK Air Base in Romania to see success there. And Larissa and Greece. And so over and over again, to me it is just so important that we have sufficient military effectiveness backing up our NATO allies to back up the very courageous people of Ukraine. So thank you for what you have done. And any other enterprising maneuvers you can do to back up the people of Ukraine, I know the chairman and I would appreciate it. Thank you. I yield back. Mr. Waltz. Thank you, Mr. Wilson. Ms. Tokuda. Ms. Tokuda. Thank you very much, Mr. Chair. In the interest of time, I am just going to go over a few questions. Admiral Franchetti, in February the Navy closed three dry docks at Puget Sound Naval Shipyard, and another at the Trident Refit Facility in Bangor due to seismic concerns, I believe. This means that at least right now, of 18 dry docks in our 4 public shipyards, almost a quarter of them are offline at a time when over one-third of the Navy's attack submarine fleet desperately needs maintenance and repair. Admiral Franchetti, given our already limited shipyard capacity and the growing demand for ship maintenance, what is the Navy doing to address the challenges posed by these closures and continue to meet our shipyard needs? Admiral Franchetti. We are very focused on our shipyards in general, the focus through SIOP [Shipyard Infrastructure Optimization Program], but specifically to the shipyards in Puget Sound. So there are three dry docks that are being repaired right now. One of them is already complete and in testing. The other one should be complete by the beginning of June, and the other one by late June. So right now we don't see any impact to the closures of those dry docks. Separately from that, we are continuing to work through all of our public shipyards to improve their performance through project management, fundamentals, workforce development, and taking a big effort to buy long lead time supply materials in advance that will help us get our shipyards out--our submarines out on time. Ms. Tokuda. Thank you, that is very good to hear. Related to the SIOP and shipbuilding industry industrial base, recently you may have heard the Hawaii Department of Land and Natural Resources issued a letter to Navy Region Hawaii about the discovery of an invasive octocoral, or soft coral species, in Pearl Harbor. What was initially 10 acres when discovered back in August 2020 has now grown to be at least 20 acres and is estimated to be potentially impacting 90 acres. Unmitigated, the spread of this invasive species has potential risks to operations at Joint Base Pearl Harbor- Hickam, including the new Dry Dock 5 at Pearl Harbor Navy Shipyard. And obviously poses serious threat to our native corals, but more importantly just the operation of this area. Can I get your commitment that the Navy is going to work quickly with us to address and mitigate this invasive soft- tissue coral so that we can continue operation, and of course the new dry dock at Pearl Harbor? Admiral Franchetti. Yes, as part of the SIOP program, the Navy has been working with the National Marine Fisheries, all of the interagency, to better understand the problem and develop that mitigation plan originally for the 9 acres of this invasive coral. And the cost for that removal effort was included in the MILCON [military construction]. We are also looking at how do we adopt biosecurity protocols to mitigate any risk of spreading of the coral for any work we do there. Right now, we don't anticipate that there will be impacts to Dry Dock No. 5, but we are continuing again to work, and you have my commitment, to work with your team and with everyone to make sure that that does not spread any further. Ms. Tokuda. Thank you very much. As you can see, it is exponentially increasing, and we want to get this addressed before it impacts. Thank you. I yield back, Chair. Mr. Waltz. Thank you. Mr. Scott. Mr. Scott. Thank you, Mr. Chairman. Ladies and gentlemen, thank you for being here. I want to piggyback a little bit on what Ms. Sherrill said just a second ago. Less than 15 days after China flew a spy balloon across the United States of America, Ford Motor Company announced a partnership with Communist China and CATL battery technology. I want to just make sure that none of our DOD funds are going to purchase Chinese battery technology or any other technology that is coming from China. I think that you will see language to that effect coming in the NDAA [National Defense Authorization Act]. We are not going to spend U.S. tax dollars to support Communist China or CATL battery technology. I don't need you to comment on it, I just need you to be prepared for it. And if Ford Motor Company decides that is who is going to develop their batteries, this is America, they have got the right to decide who is going to develop their batteries. But we are not going to buy them. General Allvin, I am going to focus on the Air Force if I could. Seven months ago, General Kelly, commander of Air Combat Command, said that he has 48 fighter squadrons, 9 attack squadrons doing the work of 60 squadrons, 3 squadrons short of what he needs. He said he needs 28 fighter squadrons to project power in the Indo-Pacific region, Europe, and the Middle East; 8 squadrons to respond to an unfolding crisis; 16 squadrons for homeland defense; 8 squadrons for modernization and training. We are in pretty much peacetime right now as we speak. Do you agree with his assessment? General Allvin. I do, Congressman. And I think the point that General Kelly was trying to point out is not only that we can't just count the numbers, but the missions that those were--are tasked to do. So those 9 attack squadrons are primarily the A-10 squadrons that aren't as survivable and they aren't multi-role. So that is why we are aggressively, in the fiscal year 2024 budget, we are asking for 72 fighters, front-line fighters, to include 48 F-35s and 24 F-15 EXs, which will enable us to be able to do those missions and be able to compete and succeed in the Indo-Pacific theater. Mr. Scott. But the A-10s are deployed right now, correct? General Allvin. I'm sorry, sir? Mr. Scott. A-10s are deployed right now, correct? General Allvin. They are right now on their--I don't think they are in CENTCOM [U.S. Central Command], but they are set to go to CENTCOM in a single-role mission, and they are adapting to that as we speak. Mr. Scott. Quantity to me is a quality in and of itself in some cases, and I do worry about standing down fighter squadrons when we have an acknowledged need for more squadrons. But I understand the A-10 is an old platform and it is not going to be the platform of the future. You did say over the past two decades that we have offered forces to the joint force in an unsustainable manner, and the readiness impact is becoming more apparent in the face of our pacing challenge. I assume that means it is safe to say the Air Force needs more resources to maintain current levels of readiness, and that our current levels of readiness are not what they have been in the past? General Allvin. Congressman, I would say for sure to the latter, that our readiness is not what it has been in the past. That is a reference to my written statement. Primarily the point we are making is in addition to additional capacity and more modernized capacity, what we do need is also to reimagine ourselves and understand to be ready for what? To optimize our training, to make sure we are generating and presenting the forces in the best way. In the past, we had just been all in without really looking at how to focus on the high-end readiness. And so our new Air Force Generation Model is enabling us to see that and really hone in on our new mission-essential tasks and get the very best readiness out of every flying hour that we can get. Mr. Scott. So when we talk about the best readiness, one of the concerns I have is when I look at the readiness rate, it is significantly below where any of us in this room want it to be. And yet there are two different definitions of readiness. One of them is able to perform one of the primary missions. And the other one is able to perform all of the primary missions. My understanding is that we are using the definition when we talk about readiness that they are able to perform one of the primary missions, not all of the primary missions. Is that correct? General Allvin. That is correct in some cases. The readiness is really talking about the mission-essential tasks, which as I mentioned, we are rewriting specifically to go against the China threat. So there is both a shortage of being able to do the full spectrum of missions---- Mr. Scott. So if I could, again, it is written specifically for the China threat. General Allvin. We are adapting it to make the primary mission the China threat. Mr. Scott. Okay. And I, again, Mr. Chairman, if I may, in the--the primary mission being the China threat, and yet less than 15 days after China flies a spy balloon across the United States of America, we have one of America's most iconic brands announcing a multibillion dollar partnership to buy Chinese battery technology, which they intend and think that they are actually going to sell to the DOD in some cases. And I would just encourage you to make sure that you are not preparing to buy any CATL batteries. Thank you. Mr. Waltz. I think your sentiment is shared across multiple supply chains. Mrs. Kiggans. Mrs. Kiggans. Thank you, Mr. Chair. And briefly, I know that votes are happening, but just to echo Mr. Scott about having the corporate buy-in for, I mean, you guys are doing a great job on the ground and with people and weapons and lethality. But getting that corporate buy-in. We are not, this is not a, just a military fight with China. We have got to get the corporate buy-in as well. So I fully support everything he just mentioned. And also to echo the previous comments about ship repair and shipyards. In my district, I am Hampton Road, so Virginia Beach, Norfolk. And I hear from those guys all the time about challenges. And I know it is, that is multifaceted too, from workforce to supply chain. But scheduling, gosh, and it is like this, they want to blame the Navy and the Navy wants to blame them. So if we could get it together on that front. And I don't know if that is doing a better job at repairs out at sea internally what we are doing. But then when they come to port, making sure that we are staying on schedule. Because we can't keep this old fleet of ships that is already fewer numbers that I wish we had at sea if we don't get our ship repair industry behind. It is not just the shiny new ships and toys, but we have got to keep those old ones out there too. So that is important in my district, whatever you can do to help that. I just specifically and real quick want to ask about pilot training. I have asked about this before, but we know that all of those new toys and wonderful things that we can purchase go nowhere without the people behind, specifically the pilots, which I know Army, Navy, and Air Force and Marine Corps, you know, all of us. So how long does it take, and if you guys could answer just in order, how long does it take to train a pilot from commissioning time 'til the time they touch a gray, combat- ready aircraft? General George. Ma'am, that does depend a little bit on the aircraft. But I would say on average a year to 15 months, you know, for helicopter pilots that are down at Fort Rucker after they do their other initial training. Mrs. Kiggans. And do those commissioned pilots start right away, or is there a lag time before they actually start flight training? General George. No, they go down to, like for us, they go down to Fort Rucker and go to their basic course for aviation, and then get started, you know, soon thereafter. Mrs. Kiggans. How about the Navy? Admiral Franchetti. I will get back to you with the exact number. It is roughly 2 years. And of course, we have a pilot delay right now in training, backlog, which we are working through as rapidly as possible. Mrs. Kiggans. So actually closer to four. We were in Kingsville about 2 weeks ago, and they will tell me 4 years from the time that they get commissioned from the Naval Academy or ROTC [Reserve Officers' Training Corps] 'til the time that they are actually flying a fleet-ready F-18. That is 4 years--that is too long. We are not going to be able to, God forbid, replace or have the pilots that we need if we continue to have a 4-year lag time. I think the Army is a little bit better. How about the Marine Corps? Well, you guys run with the Navy, so. General Smith. What is different for us is every Marine lieutenant goes to The Basic School for 6 months---- Mrs. Kiggans. Right. General Smith [continuing]. To learn to be an infantry platoon commander. Then we begin flight school or any other MOS [military occupational specialty]. So it is in excess of 2 years, depending on the airframe. Mrs. Kiggans. Right. General Smith. And those delays from everything from weather to aircraft availability all contribute to that. Which is why those 6- and 8-year commitments post-wings are so vital to us. And we are not having any problems with those who wish, we just need the additional bonuses and help because the airline industries can hire them faster than I can. Mrs. Kiggans. Yes, yes. Air Force. General Allvin. Ma'am, to your point, from when they enter pilot training to when they are flying a gray tail, if it is mobility, it is about 18 months. If it is a fighter/bomber, it is closer to beyond 24 months. But to your point about from the time they are commissioned, because of the challenges we are having with T-6 and T-38, we have a little bit of a backup. And it can be as many as 4 years. So almost an 18-month to 24-month wait just to get into pilot training. So that is why we are trying to accelerate, and our budget asks for more help with the T-38 engines and the T- 6, to move those through. Mrs. Kiggans. Yes, you guys have had kind of comparable challenges with the Navy, and I am a little bit more familiar with the Navy side, but with the T-45 and some of those OBOGS [On-Board Oxygen Generating System] issues, the blade issues. I mean, we are--and COVID [coronavirus disease] issues. But we are seeing those challenges now become where instructor pilot shortage, you know, we are short instructor pilots. So now we can't train the naval aviators and all the other aviators that we do need because we don't have the teachers. So now we are robbing the fleet to get those teachers. And you talk about retention and competing with airlines and whatnot, we have got to do a better job at this. And I think part of it is the onus is on us. And I echo and agree with everything you said about continuing resolutions and how detrimental that would be. But having the right training equipment in place, and you guys tweaking the syllabuses too. But so that we can tighten it up. I just, I want to do it faster. We need more, we need faster. So I think every service branch has its challenges. I am mindful of it, but it is something that I just want to prioritize. So thank you very much. Mr. Waltz. Thank you. Mr. Gimenez. Mr. Gimenez. Thank you, Mr. Chairman. And thank you to everybody here. If you really want to scratch your head, it has come under--somebody gave me information that the VA [U.S. Department of Veterans Affairs] just bought $430 million worth of computers from Lenovo. Lenovo is a Chinese computer company. So I will ask an overhead question. Are any of the services looking at buying large purchases of computers in the near future? And if you are or if you have bought some, have anybody--has anybody bought Lenovos, Chinese computers? General George. I am going to have to take that one. I don't know right off. I mean, we do buy tech and computers, but I can't answer that one, sir. I will take that for---- [The information referred to can be found in the Appendix on page 107.] Mr. Gimenez. I would certainly hope that whatever technology you buy, any computers you buy, any printers you buy, etc., are American-made and not made in China. Every taxpayer dollar that goes to China is just funding more equipment, more military capability against ourselves, which is ludicrous. So I will be looking into this VA thing. And I hope that I am wrong, but that is the information I am getting. On the question of pilots, is it fair to say we have more airframes than pilots, or do we have more pilots than airframes? General Allvin. By broad numbers, we have many more pilots than airplanes. Mr. Gimenez. Okay, so but you do have a pilot shortage, is yes or no? General Allvin. Well, we have a pilot shortage in the pilots that we want throughout our entire Air Force. We do not have empty cockpits. So in order to have a healthy pilot--a professional force, you need first and foremost the combat cockpits filled, then you need the trainer cockpits filled, then you need the test cockpits filled. And after you fill all the cockpits, then you go to those that our next priority is the leadership, you want the leadership positions filled. And then after you have all those filled, then you go to the staff positions. That is where we are currently absorbing our shortage, is in the staffs. So where you would traditionally want pilot experience, rated experience, we are manning those are somewhat less than 70 percent. So we are not sacrificing our front-line units. But if this sustains over time, then we will have a sort of misshapen force where you won't be able to have professionally developed enough of the rated membership to provide that expertise in the leadership at the higher level. But for right now, we have not had any of our combat training or test cockpits go empty. Mr. Gimenez. What about Reserve units? Have you looked at the expanding Reserve units or adding Reserve pilots to the force? General Allvin. Frankly, the Reserves are having about the same issue that we are having with respect to shortage overall. Now, I believe as--we are, in the Active Duty, we are advantaged by retention. But in our total force we are disadvantaged because as the retention in the Active Duty goes, a large part of their sort of business model in the Guard and Reserves is those who want to continue to affiliate with the military will go from the Active Duty to the Guard and Reserves. And so oftentimes when the retention becomes poor, people still want to stay affiliated with the Air Force, the Guard and Reserves will get a little bit healthier. But as of right now, they are feeling about the same pain as we are. Mr. Gimenez. Your Reserve bases, are they based in large urban areas where you would have a good, I guess a pool of folks that may be wanting to be, are interested in serving in the Reserves? I mean, if you have a Reserve base somewhere in the middle of nowhere, it is hard to find I guess reservists that actually live around the area. So how do you make your bases on Reserve bases versus Active bases? General Allvin. For the most part, we take advantage of being able to leverage both historical old fields which used to be Active Duty. So some of them are just, they are sort of godfathered from--or grandfathered from being existing old Active Duty air bases and take advantage of infrastructure there. Those are the ones that have been around 30, 40 years. Oftentimes what we have now is the associations that the-- we have Reserve members flying on what are sort of owned and maintained, these classic associations, by the Active Duty. So it really is a mix of those that are just on Active Duty bases. I am trying to go through my head and see if there are any remote, very remote and isolated Reserve-only bases, and none come to mind, frankly. Mr. Gimenez. Fair enough. Okay, I guess most of my time is up. I yield back. Mr. Waltz. Thank you, Mr. Gimenez. Thank you again to our witnesses. Obviously the vote schedule is getting in the way of a more fulsome conversation here. But I think if you hear a theme, obviously it is a real concern about the recruiting crisis that we are in. And I know you share those concerns, are getting after it. And secondly, though, I am just not sure the Department as an institution and all the way down through the services and through our contracting officers are really looking at the supply chain issue. And I think you are hearing bipartisan concern across the board in having that supply chain surety. One, having visibility on it, but then two, driving our practices along those lines in a systematic way. I know I think the committee, and I share Mr.--I think I can speak for Mr. Garamendi here, looks forward to working with you on that. I hope that is something that the services and the Department can get ahead of, rather than really it being driven by this side of the foxhole. Because I certainly look forward to hearing what you are doing in that regard as we move forward through the defense bill. With that, the hearing is adjourned. And thank you, genuinely, thank you again. [Whereupon, at 4:43 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X April 19, 2023 ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD April 19, 2023 ======================================================================= [GRAPHICS NOT AVAILABLE IN TIFF FORMAT] ======================================================================= WITNESS RESPONSES TO QUESTIONS ASKED DURING THE HEARING April 19, 2023 ======================================================================= RESPONSE TO QUESTION SUBMITTED BY MR. GIMENEZ General George. The Army is not actively pursuing a large contract purchase of Lenovo computers. As of April 24, 2023, Army Cyber Command reported 1,840 out of 735,105 systems on the unclassified system were Lenovo, and 316 systems out of 35,448 on the secret network were Lenovo. Under current authorities, policies, and regulations, Lenovo is not a prohibited source. Army Cyber Command is providing direction to commands and organizations to provide a holistic understanding of security risks and operational impact regarding the Lenovo systems currently on Army networks. The Army understands the importance of the potential security threat and will ensure a comprehensive review. [See page 19.] ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING April 19, 2023 ======================================================================= QUESTIONS SUBMITTED BY MR. ROGERS Mr. Rogers. According to the Department, DOD is the third largest city in the United States with 3.2 million people--placing it behind Los Angeles and New York City and ahead of Chicago. From an emergency services perspective, DOD manages 150,000 first responders, 220 public safety answering points (PSAPs), and 1500 operators across 4200 installations. As you may be aware, states and communities are rapidly transitioning from outdated, analog 9-1-1 systems to Next Generation 9- 1-1 (NG911) which will ``enhance emergency number services to create a faster, more resilient system that allows voice, photos, videos and text messages to flow seamlessly from the public to the 911 network while also improving public safety answering points' ability to help manage call overload, natural disasters and transfer of 911 calls based on caller location data.'' According to the 2020 National 911 Progress Report, 12 states have fully implemented NG911 while 9 are rapidly approaching that threshold. However, DOD, whose installations are connected to the surrounding communities, is not transitioning to NG911 at the same rate. As a recent Institute for Defense Analyses report highlighted, ``NG911 is both an operational requirement and a strategic capability supporting multiple missions.'' Migrating to NG911 will enhance ``capabilities to save lives and protect property'' and will have a ``direct, positive impact on several mission areas including Public Safety, Emergency Management, Force Protection, Anti-Terrorism, Mission Assurance, and Critical Infrastructure Protection.'' Failure to migrate to NG911 in a timely manner will turn installations into islands unable to coordinate with local partners and leverage modern technology. As IDA concluded, ``This situation is likely to result in higher risk to life and property, and degraded capabilities to fulfill safety obligations to their military personnel and under the numerous mutual aid agreements in place today.'' Questions: 1. Does DOD have a detailed NG911 rollout plan? If so, please provide. 2. Specifically, what is the timeline associated with the plan? 3. Does it include individual installations? 4. What budgetary resources are needed to fulfill the plan? 5. What budgetary resources are needed to implement NG911 at all DOD installations? When will this be completed? 6. Are any installations currently fully NG911 operational? If so, which ones? General George. Answer 1: In order to comply with federal laws (e.g. the Ray Baum Act) and national standards, the Army has a fiscal year (FY) 2025 plan to roll out Next Generation 911 (NG 911) as one of the five interoperable Public Safety Communications (PSC) capabilities that make up the Base Emergency Communications System (BECS). BECS will modernize the Army's PSC and will increase interoperability between first responders and mutual aid partners. It will provide them with the ability to send, receive, and exchange information, data, imagery, and video, thus enhancing the protection of life, health, and safety on Army installations. Background: On September 30, 2022, the Army approved the BECS Capabilities Development Document, codifying BECS as an Army Program of Record. Subsequently, on February 16, 2023, the Army identified the Program Executive Office Enterprise Information Systems to lead the BECS acquisition program for the Army. Answer 2: The Army has already initiated its NG 911 incremental implementation with the voice modernization project which improves networks, voice, and data capabilities across our installations. Concurrently, the geographic information system upgrades incorporate residential addressing and mapping on Army installations. The FY 2025 comprehensive BECS acquisition strategy will begin with NG 911 implementation at a rate of five to ten installations per year. Ultimately, the pace at which the Army can transition to NG 911 is contingent upon its ability to: 1) fully resource the requirement; and 2) maintain synchronicity between the Department of Defense (DOD), states, and our installation migration plans. Answer 3: The BECS Capabilities Development Document estimates 93 Army installations will require NG 911. Answer 4/5: The Army NG 911 implementation and sustainment plan spans 12 years (FY 2025-FY 2036) and estimates a cost of $18 million annually across 93 installations, totaling approximately $216 million. Answer 6: No Army installations are NG 911 fully operational at this time. Mr. Rogers. According to the Department, DOD is the third largest city in the United States with 3.2 million people--placing it behind Los Angeles and New York City and ahead of Chicago. From an emergency services perspective, DOD manages 150,000 first responders, 220 public safety answering points (PSAPs), and 1500 operators across 4200 installations. As you may be aware, states and communities are rapidly transitioning from outdated, analog 9-1-1 systems to Next Generation 9- 1-1 (NG911) which will ``enhance emergency number services to create a faster, more resilient system that allows voice, photos, videos and text messages to flow seamlessly from the public to the 911 network while also improving public safety answering points' ability to help manage call overload, natural disasters and transfer of 911 calls based on caller location data.'' According to the 2020 National 911 Progress Report, 12 states have fully implemented NG911 while 9 are rapidly approaching that threshold. However, DOD, whose installations are connected to the surrounding communities, is not transitioning to NG911 at the same rate. As a recent Institute for Defense Analyses report highlighted, ``NG911 is both an operational requirement and a strategic capability supporting multiple missions.'' Migrating to NG911 will enhance ``capabilities to save lives and protect property'' and will have a ``direct, positive impact on several mission areas including Public Safety, Emergency Management, Force Protection, Anti-Terrorism, Mission Assurance, and Critical Infrastructure Protection.'' Failure to migrate to NG911 in a timely manner will turn installations into islands unable to coordinate with local partners and leverage modern technology. As IDA concluded, ``This situation is likely to result in higher risk to life and property, and degraded capabilities to fulfill safety obligations to their military personnel and under the numerous mutual aid agreements in place today.'' Questions: 1. Does DOD have a detailed NG911 rollout plan? If so, please provide. 2. Specifically, what is the timeline associated with the plan? 3. Does it include individual installations? 4. What budgetary resources are needed to fulfill the plan? 5. What budgetary resources are needed to implement NG911 at all DOD installations? When will this be completed? 6. Are any installations currently fully NG911 operational? If so, which ones? Admiral Franchetti. 1. The Navy is in the process of modernizing information systems to include transition to internet protocol services (IP). In 2015, the Navy awarded a contract to AT&T Government Services to establish private IP networks to be used to route 911 calls originating from existing Navy End Office TDM telephone switches, to deliver them to one of seven regional 911 dispatch centers in the United States and Guam. The Navy is working closely with the Defense Information Systems Agency (DISA), the lead DOD agent, in implementing modernized solutions that take advantage of the latest technologies while ensuring the solutions maintain the integrity and security of the networks employed by DOD. 2. The Navy is working closely with the Defense Information Systems Agency (DISA) on the modernizations solutions and strategy to achieve a cohesive 911 operating system, while maintaining the integrity and security of Navy networks. 3. Should the Navy invest in upgrading its installation telephony and switching infrastructure, we will make a phased investment that includes individual installations. 4. All of the Navy's Public Safety Answering Points (PSAP), public safety networks, and telephone infrastructure will require significant investment to attain compliance with applicable laws. This improvement will eliminate dependency on the third-party commercial service providers which are not providing compliant NG911 solutions and carry cybersecurity non-compliance risk if used for NG911 in its current configuration. Naval Information Warfare Center (NIWC) Atlantic has completed the design and cost estimates for implementing Location Information Servers (LIS) with the Navy Voice-Over-IP (VoIP) upgrades. The final plan from N2N6 will inform resource requirements. 5. Budgetary resources are required to upgrade the telephony and switching infrastructure. There is no estimated completion date. Navy seeks to balance the requirements for facility investment with the requirements for continued investment in quality of life/quality of service and operational readiness of the fleet. 6. No Navy installations are fully NG911 operational. Mr. Rogers. According to the Department, DOD is the third largest city in the United States with 3.2 million people--placing it behind Los Angeles and New York City and ahead of Chicago. From an emergency services perspective, DOD manages 150,000 first responders, 220 public safety answering points (PSAPs), and 1500 operators across 4200 installations. As you may be aware, states and communities are rapidly transitioning from outdated, analog 9-1-1 systems to Next Generation 9- 1-1 (NG911) which will ``enhance emergency number services to create a faster, more resilient system that allows voice, photos, videos and text messages to flow seamlessly from the public to the 911 network while also improving public safety answering points' ability to help manage call overload, natural disasters and transfer of 911 calls based on caller location data.'' According to the 2020 National 911 Progress Report, 12 states have fully implemented NG911 while 9 are rapidly approaching that threshold. However, DOD, whose installations are connected to the surrounding communities, is not transitioning to NG911 at the same rate. As a recent Institute for Defense Analyses report highlighted, ``NG911 is both an operational requirement and a strategic capability supporting multiple missions.'' Migrating to NG911 will enhance ``capabilities to save lives and protect property'' and will have a ``direct, positive impact on several mission areas including Public Safety, Emergency Management, Force Protection, Anti-Terrorism, Mission Assurance, and Critical Infrastructure Protection.'' Failure to migrate to NG911 in a timely manner will turn installations into islands unable to coordinate with local partners and leverage modern technology. As IDA concluded, ``This situation is likely to result in higher risk to life and property, and degraded capabilities to fulfill safety obligations to their military personnel and under the numerous mutual aid agreements in place today.'' Questions: 1. Does DOD have a detailed NG911 rollout plan? If so, please provide. 2. Specifically, what is the timeline associated with the plan? 3. Does it include individual installations? 4. What budgetary resources are needed to fulfill the plan? 5. What budgetary resources are needed to implement NG911 at all DOD installations? When will this be completed? 6. Are any installations currently fully NG911 operational? If so, which ones? General Smith. The DOD Chief Information Office C3, supported by Defense Information Systems Agency's (DISA) Global Public Safety Communications Office is the executive agent for DOD Public Safety Communications. They have established four overarching levels of efforts to modernize DOD's Public Safety Communications, which includes Next Generation 9-1-1 (NG911), Next Generation Wireless, Public Safety Internet of Things (IoT), and Enterprise Mass Warning and Notification (EMWN). The Marine Corps is collaborating with DOD stakeholders to conduct technical reviews between Emergency Communications, Public Safety and its Title 10 Command and Control Communications to seek alignment each of these independently regulated communications capabilities into a single communications solution. The Marine Corps timeline is aligned with the DOD governance and funding timeline and will initiate planning actions in FY24 and across the FYDP. DOD's guidance includes development of Public Safety Communications policies and supporting technical requirements with State and local-level 9-1-1 authorities, identifying Memorandum of Understanding/Agreement requirements and aligning NG911 transition efforts. DOD's Guidance for FY24-28 proposes a number of installations be modernized by fiscal year for each Component. The Marine Corps tentatively plans to transition 13 installations as follows: four in FY24 (MCLB Albany, MCAS Beaufort, MCAS Yuma, MCRD Parris Island), two in FY26 (MCB Camp Butler, MCAS Iwakuni) and seven in FY28 (MCAGCC Twentynine Palms, MCLB Barstow, MCB Camp Lejeune, MCB Camp Pendleton, MCAS Cherry Point, MCAS Miramar, MCB Quantico). Complex challenges, including the fast pace of State and local level transition plans, resourcing levels and DOD information technology architectures, impact the Marine Corps' timely to transition to NG911. The Marine Corps' overseas installations requirement to connect to Host Nation emergency and public safety communications infrastructure faces additional technical and political challenges. The Marine Corps identified NG911 funding requirement investment costs of $212M across the FYDP for procurement, operations and maintenance to support the material solution, system sustainment, and labor. Additional requirements (and costs) are being analyzed now to support Military Construction and Installation Communication infrastructure, which are necessary at several installations to eliminate legacy technologies and to implement an Internet Protocol (IP) technical solution that is fully interoperable and resilient with State/local and industry mission partners. The Marine Corps' current estimate is $212 million, comprised of $81.3M in labor and $130.7M for procurement of materiel. We currently expect deployment to occur over a seven-year period. The Marine Corps currently does not have any installations that are fully NG911 operational. Mr. Rogers. According to the Department, DOD is the third largest city in the United States with 3.2 million people--placing it behind Los Angeles and New York City and ahead of Chicago. From an emergency services perspective, DOD manages 150,000 first responders, 220 public safety answering points (PSAPs), and 1500 operators across 4200 installations. As you may be aware, states and communities are rapidly transitioning from outdated, analog 9-1-1 systems to Next Generation 9- 1-1 (NG911) which will ``enhance emergency number services to create a faster, more resilient system that allows voice, photos, videos and text messages to flow seamlessly from the public to the 911 network while also improving public safety answering points' ability to help manage call overload, natural disasters and transfer of 911 calls based on caller location data.'' According to the 2020 National 911 Progress Report, 12 states have fully implemented NG911 while 9 are rapidly approaching that threshold. However, DOD, whose installations are connected to the surrounding communities, is not transitioning to NG911 at the same rate. As a recent Institute for Defense Analyses report highlighted, ``NG911 is both an operational requirement and a strategic capability supporting multiple missions.'' Migrating to NG911 will enhance ``capabilities to save lives and protect property'' and will have a ``direct, positive impact on several mission areas including Public Safety, Emergency Management, Force Protection, Anti-Terrorism, Mission Assurance, and Critical Infrastructure Protection.'' Failure to migrate to NG911 in a timely manner will turn installations into islands unable to coordinate with local partners and leverage modern technology. As IDA concluded, ``This situation is likely to result in higher risk to life and property, and degraded capabilities to fulfill safety obligations to their military personnel and under the numerous mutual aid agreements in place today.'' Questions: 1. Does DOD have a detailed NG911 rollout plan? If so, please provide. 2. Specifically, what is the timeline associated with the plan? 3. Does it include individual installations? 4. What budgetary resources are needed to fulfill the plan? 5. What budgetary resources are needed to implement NG911 at all DOD installations? When will this be completed? 6. Are any installations currently fully NG911 operational? If so, which ones? General Allvin DOD CIO is the lead for the DOD and DAF CIO is in close coordination with them for the rollout of NG911. All questions regarding the roll out of NG911 should be directed to the office of DOD CIO. Mr. Rogers. According to the Department, DOD is the third largest city in the United States with 3.2 million people--placing it behind Los Angeles and New York City and ahead of Chicago. From an emergency services perspective, DOD manages 150,000 first responders, 220 public safety answering points (PSAPs), and 1500 operators across 4200 installations. As you may be aware, states and communities are rapidly transitioning from outdated, analog 9-1-1 systems to Next Generation 9- 1-1 (NG911) which will ``enhance emergency number services to create a faster, more resilient system that allows voice, photos, videos and text messages to flow seamlessly from the public to the 911 network while also improving public safety answering points' ability to help manage call overload, natural disasters and transfer of 911 calls based on caller location data.'' According to the 2020 National 911 Progress Report, 12 states have fully implemented NG911 while 9 are rapidly approaching that threshold. However, DOD, whose installations are connected to the surrounding communities, is not transitioning to NG911 at the same rate. As a recent Institute for Defense Analyses report highlighted, ``NG911 is both an operational requirement and a strategic capability supporting multiple missions.'' Migrating to NG911 will enhance ``capabilities to save lives and protect property'' and will have a ``direct, positive impact on several mission areas including Public Safety, Emergency Management, Force Protection, Anti-Terrorism, Mission Assurance, and Critical Infrastructure Protection.'' Failure to migrate to NG911 in a timely manner will turn installations into islands unable to coordinate with local partners and leverage modern technology. As IDA concluded, ``This situation is likely to result in higher risk to life and property, and degraded capabilities to fulfill safety obligations to their military personnel and under the numerous mutual aid agreements in place today.'' Questions: 1. Does DOD have a detailed NG911 rollout plan? If so, please provide. 2. Specifically, what is the timeline associated with the plan? 3. Does it include individual installations? 4. What budgetary resources are needed to fulfill the plan? 5. What budgetary resources are needed to implement NG911 at all DOD installations? When will this be completed? 6. Are any installations currently fully NG911 operational? If so, which ones? General Thompson. DOD CIO is the lead for the DOD. The Department of the Air Force CIO is in close coordination with them for the rollout of NG911. We have forwarded this question to the office of DOD CIO. ______ QUESTIONS SUBMITTED BY MR. WALTZ Mr. Waltz. Do you see benefits with the JROTC program and its ability to help with recruiting? General George. The mission of Junior Reserve Officers' Training Corps (JROTC) is to assist high schools in motivating students to be better citizens. The Army's JROTC program is an overwhelmingly positive youth citizenship program supporting more than 272,000 cadets at more than 1,700 high schools across the nation. JROTC's presence in high schools in areas that lack a military presence helps connect those communities with our Armed Forces. Across all programs, JROTC cadets have higher attendance, graduation rates, and grade point averages than their peers, who do not participate in the program. While JROTC is not a recruiting program, approximately 44% of Army enlistees came from a high school with a DOD JROTC program. Mr. Waltz. An ongoing GAO study details the current disrepair of barracks across the services. Some of the photos show rooms that are similar to condemned buildings, rather than barracks for our service members. What are you doing to ensure safe and sanitary places for service members to live? How are these problems allowed to persist? General George. The Army is investing over $1 billion per year in barracks for construction, facilities sustainment, restoration, and modernization across the 5-year Future Years Defense Program. This investment will help to improve conditions for unaccompanied soldiers across all types of barracks-permanent party, training, and transient. Issues such as facility condition, functionality and deficit are the main factors that are weighed when identifying barracks projects for investment. Earlier this year, senior Army leadership directed all components to inspect all barracks for life, health, and safety conditions. We have also implemented an Army-wide inspection program for all barracks to identify and prioritize deficiencies. As concerns are observed or identified for remediation or correction, we are taking immediate action. Mr. Waltz. Do you see benefits with the JROTC program and its ability to help with recruiting? Admiral Franchetti. The Junior Reserve Officers' Training Corps (JROTC) program has historically had a positive impact on the Navy's recruiting efforts. JROTC instills a sense of patriotism and a desire for younger individuals to serve their country. This early exposure significantly increases the likelihood of students to consider a career in the Navy. JROTC emphasizes leadership skills by fostering personal growth and self-discipline in its participants. These qualities are highly valued in the Navy. By nurturing leadership abilities, JROTC prepares students for future naval service, making them more attractive candidates to recruiters. Most importantly however, the program's strong presence in high schools facilitates recruiter access to the student population by developing relationships with school administrators and their faculty. These relationships provide Navy recruiters with an easier path to engage with school officials, thereby gaining access to the student population. This access allows recruiters to provide firsthand information about Navy opportunities, career paths, and benefits to students who may be curious about the service and those who may already be interested in serving. Mr. Waltz. The Commandant of the Marine Corps cites amphib availability at about 32 percent. Our ability to project power, on a persistent basis, is critical to our ability to successfully operate from competition to conflict. What is the Navy doing to improve Navy surface vessel maintenance and increase readiness for ARG-MEUs? Why is the Navy requesting to decommission amphibious ships to a level below the requirement set by the FY23 NDAA? Admiral Franchetti. The Navy continues to emphasize its focus on achieving measurable performance improvement to improve surface vessel maintenance. The Navy is accomplishing this by improving schedule adherence, reducing new and growth work during availabilities and identifying and improving Maintenance Figures of Merit. The Navy is investing in maintenance and readiness in PB-24, fully funding all executable ship maintenance. The Navy is committed to working closely with private shipyard partners to improve surface ship maintenance and modernization outcomes. In particular, Performance-to- Plan-driven improvements--such as the goal of awarding contracts 120 days before the start of a maintenance availability, level loading ports through better prediction of workload, better availability planning, and improved long-lead-time material acquisition have provided effective solutions for readiness and reduced maintenance delays. As part of the joint force, the Navy has met every global force demand for naval amphibious forces. Navy Amphibious Forces provided over 100% of the SECDEF Global Force Management Allocation Plan base order in FY22, and is on course to do so again for FY23. Further, the Navy supports the 31 amphibious ship requirement, but it needs to be the right 31 ships with a capable, sustainable mix of ship classes to ensure we meet the nation's need for ARG/MEUs for decades to come. The Navy recently delivered the Battle Force Ship Assessment and Requirements report which continues to validate the need for 31 amphibious ships. We prioritize readiness and modernization over maintaining force structure. In doing so, we maintain a combat-credible Navy now and in the future. Mr. Waltz. An ongoing GAO study details the current disrepair of barracks across the services. Some of the photos show rooms that are similar to condemned buildings, rather than barracks for our service members. What are you doing to ensure safe and sanitary places for service members to live? How are these problems allowed to persist? Admiral Franchetti. As directed in Section 2814 of the Fiscal Year 2022 NDAA, Navy is developing a sustainable path to eliminate poor and failing Unaccompanied Housing (UH). The Secretary of the Navy and the Chief of Naval Operations' joint memo, ``Setting a New Course for Navy Quality of Service,'' states that every Sailor deserves the opportunity to live off the ship. This intent is a line of effort under the Quality of Service (QoS) Cross Functional Team, which is developing a comprehensive and integrated approach to improve UH; the Navy is targeting investments to improve the condition of inadequate UH and identifying sustainable, optimized UH policies to ensure safe, reliable housing for all Sailors. The Navy is focusing on several efforts to increase ownership, advocacy and visibility of UH issues to improve living conditions. To that end, on 2 May, Navy released NAVADMIN 102/23, Navy Unaccompanied Housing Resident Bill of Rights and Responsibilities. This bill of rights and responsibilities outlines what residents should expect while residing in Navy-controlled UH. It also highlights their individual responsibilities while residing in UH. Last fall, Commander Navy Installations Command (CNIC), the Navy Housing program manager, standardized the inspections program that includes semi-annual preventive medicine unit to ensure the health and safety of residents, and the installation UH management staff conducts monthly inspections for adequacy and habitability of facilities. The standardized inspections conducted by UH staff identify issues requiring correction to ensure safe, reliable housing for Sailors. In addition, as part of our UH improvement efforts, we have reinvigorated the Command inspection program to better monitor daily living standards. This intrusive leadership provides UH management and unit command leadership the ability to proactively identify any relevant maintenance, health or safety issues in UH. To help Sailors self-advocate, in 2022, CNIC rolled out a maintenance request QR code program across the enterprise to improve the maintenance request process. The QR code initiative allows residents to report routine maintenance issues at any time of the day or night using their cellular phones. Since the rollout, there has been an increase in the volume of service calls, while completion times have remained steady. As there has not been an increase in staff within UH or Public Works, CNIC is monitoring operational metrics closely to determine optimal staffing requirements. The Navy has requested $165M in PB24 ($400M FYDP) to renovate and replace poor and failing UH. We appreciate Congress' support for these investments in Navy UH. Mr. Waltz. Do you see benefits with the JROTC program and its ability to help with recruiting? General Smith. JROTC is among the largest youth development programs in the United States. These programs instill the value of citizenship and civic responsibility, service to our country (including opportunities within the military, national, and public service sectors), personal responsibility, and a sense of accomplishment in participating students. Over the last decade, Marine Corps JROTC (MCJROTC), serving over 27,000 students in 254 high schools, has provided opportunities through our co-curricular and extra-curricular activities \1\ to introduce students to means for improving career readiness skills and knowledge of emerging workforce careers in science, technology, engineering, math, computer science, and cybersecurity. Although recruiting is not the purpose of JROTC, the MCJROTC historical data continues to demonstrate a benefit of MCJROTC to service. The data from the last three graduation reports \2\ show the following: --------------------------------------------------------------------------- \1\ Co-curricular activities--drill, marksmanship, enrichment trips, and physical training. These are taught in conjunction with academic curriculum. Extracurricular activities--competition teams in drill and exhibition drill, marksmanship, and precision marksmanship, Cyber, Academic Bowl, and PT/Raider. These are conducted outside of the academic curriculum. \2\ The graduation report is information submitted by graduating cadet. ------------------------------------------------------------------------ Graduation Year 2020 2021 2022 ------------------------------------------------------------------------ Graduating Seniors 4,849 4,683 4,442 ------------------------------------------------------------------------ Service Academy Appointments 35 29 40 ------------------------------------------------------------------------ ROTC Scholarships 88 75 143 ------------------------------------------------------------------------ Service Enlistments 1,011 853 1,119 ------------------------------------------------------------------------ Total Military Service 1,134 957 1,302 ------------------------------------------------------------------------ Percentage Military Service 23.4% 20.4% 29.3% ------------------------------------------------------------------------ Mr. Waltz. The Commandant of the Marine Corps cites amphib availability at about 32 percent. Our ability to project power, on a persistent basis, is critical to our ability to successfully operate from competition to conflict. Has the requirement for 31 amphibious vessels changed? How does lagging amphibious availability hurt your readiness? General Smith. Our requirement remains no less than 31 amphibious warfare ships. The increased time that our Amphibs spend in the maintenance phase consumes approximately half our Marines training and certification time. Per the Navy OFRP, our ships should average about eight months of their notional 36 month cycles in maintenance. Over the past ten years that number is slightly over twelve months since 71% of maintenance periods were extended. On top of that, when factoring in all other emergent maintenance requirements, our AWS average closer to 15 of 36 months in maintenance. We prioritize shipboard operations and training for our deploying ARG/MEUs, so the maintenance does not impact them quite as heavily, however across the Service we've seen over 82 incidents in the past two years where training or deployments were negatively impacted by lack of available ships. In summary, Marines cannot become proficient at operating in an amphibious environment, as required by Title 10 Sec 8063, unless they are provided time aboard amphibious warfare ships. Mr. Waltz. An ongoing GAO study details the current disrepair of barracks across the services. Some of the photos show rooms that are similar to condemned buildings, rather than barracks for our service members. What are you doing to ensure safe and sanitary places for service members to live? How are these problems allowed to persist? General Smith. The Marine Corps inventory of unaccompanied housing (UH) is comprised of 672 facilities, of which 16% (108) are below an acceptable condition level (rated as Q3 or Q4 facility condition index). We want every Marine living in facilities that meet high standards. Accordingly, we have embarked upon a path to improve overall quality of UH to Q2 or higher by 2030, prioritizing barracks facility renovations. For example: In FY22, the Marine Corps renovated 14 barracks, totaling $117.8M, to improve the quality of life of an estimated 3,353 Marines. In FY23, the Marine Corps is on track to execute the renovation of an additional 16 barracks, totaling $262.2M, to improve the quality of life of an estimated 4,763 Marines. In FY24, the Marine Corps plans to renovate 13 barracks, totaling $116M, to improve the quality of life of an estimated 4,339 Marines. We are also focusing on oversight procedures to improve the condition of inadequate UH and more broadly provide for high quality facilities in a predicable, sustainable manner. For example, we are testing QR codes on the doors of our barracks rooms at Marine Corps Air Station Miramar and Camp Pendleton for Marines to scan and report maintenance concerns. Additionally, on the laundry rooms doors of these test barracks, we have placed QR codes there to enable Marines to report which washers and dryers require maintenance. The goal of QR codes access to maintenance reporting is to ensure a more responsive, accurate, and connected reporting and remedy system. We are also making targeted investments using MILCON projects like P158, which in the FY24 base budget for a $131M Bachelor Enlisted Quarter and Support Facility aboard Marine Barracks Washington, Of course, the Marine Corps can accelerate the pace at which we get all barracks assets to Q2 or higher, should the President or Congress decide to make additional funding be available. The Marine Corps has 12 additional ``shovel- ready'' barracks renovations projects totaling $155M to improve the quality of life for an additional 4,178 Marines. In the end, care for our Marines is a leadership issue. Management tools are needed but cannot replace on scene leadership. Mr. Waltz. Do you see benefits with the JROTC program and its ability to help with recruiting? General Allvin. Yes, we see the value of JROTC. One of the challenges we face in recruiting is an unfamiliarity with what the Air Force is and does. Having the presence of AFJROTC in schools offers the opportunity for youth and their influencers (teachers) to be educated on the value proposition of service, and for our potential future Airmen to ``see themselves'' as part of this institution, to include all the opportunities for growth/experience/education/leadership that will serve them throughout their lives. Mr. Waltz. An ongoing GAO study details the current disrepair of barracks across the services. Some of the photos show rooms that are similar to condemned buildings, rather than barracks for our service members. What are you doing to ensure safe and sanitary places for service members to live? How are these problems allowed to persist? General Allvin. The Department of the Air Force (to include Space Force) recognizes that the environment in which our Airmen and Guardians live impacts their quality of life, their ability to do their job, and our ability to recruit and retain the force. Taking care of unaccompanied Airmen and Guardians living in dormitories is a fundamental responsibility of leadership, installation commanders, and senior enlisted leaders. In keeping with this commitment, the DAF has numerous projects underway or planned between FY2023 and FY2026 to modernize and ensure safe, quality unaccompanied housing that supports mission requirements and provides improved privacy and greater amenities for junior personnel. DAF housing offices work to keep our families and single Airmen and Guardians safe every day. These housing offices conduct dormitory inspections on a routine basis and they brief our members upon move-in about maintenance and safety precautions. Additionally, during resident change over, dormitory rooms undergo maintenance and are again inspected. If problems are discovered, teams make corrections before assigning the unit. Overall, our dorms are in satisfactory condition--with 99% of dorms above the OSD standard--but we continue working hard to increase investment to improve facility conditions. The long-range investment plan is captured in the Dormitory Master Plan that integrates data and commander assessments. In response to Section 2814 of the FY22 NDAA, the DAF made a concerted effort to increase investment in dormitory facility conditions. Section 2814 requires the DAF to invest approximately $1.1B in permanent party dorms across FYs22-26--the DAF is exceeding this requirement, targeting $1.7B. In FY23, the DAF authorized $342M in O&M funding for dorm maintenance & repair projects. DAF's ongoing unaccompanied housing projects include construction of a dormitory at Clear Space Force Station, Alaska, and a follow-on increment for a Basic Military Training dormitory at Joint Base San Antonio, Texas. For FY24, the DAF budget request includes $50 million in MILCON for a Surety Dormitory at Royal Air Force Lakenheath, UK. Additionally, we are planning to spend $251M in O&M funding on 38 projects to maintain, repair, and improve dormitory facilities. Mr. Waltz. Do you see benefits with the JROTC program and its ability to help with recruiting? General Thompson. JROTC programs are citizenship programs, not military recruiting programs. Our ROTC units teach character, leadership skills, the importance of fitness, and a commitment to national service. As a result, they familiarize youth with Air Force and Space Force core values and increase the propensity to serve. JROTC programs can help create positive relationships with educators and provide an avenue for recruiters to engage with student cadets. There are ten Space Force JROTC detachments managed by the Air Force. Arlington Career Center, Arlington, Va. Del Norte High School, Albuquerque, N.M. Durango High School, Las Vegas, Nev. Falcon High School, Peyton, Colo. Huntsville High School, Huntsville, Ala. Klein High School, Spring, Texas Shadow Mountain High School, Phoenix, AZ Space Coast Junior/Senior High School, Cocoa, Fla. The Academy for Academic Excellence, Apple Valley, Calif. Warren County High School, Warrenton, N.C. Mr. Waltz. An ongoing GAO study details the current disrepair of barracks across the services. Some of the photos show rooms that are similar to condemned buildings, rather than barracks for our service members. What are you doing to ensure safe and sanitary places for service members to live? How are these problems allowed to persist? General Thompson. The Department of the Air Force (to include Space Force) recognizes that the environment in which our Airmen and Guardians live impacts their quality of life, their ability to do their job, and our ability to recruit and retain the force. Taking care of unaccompanied Airmen and Guardians living in dormitories is a fundamental responsibility of leadership, installation commanders, and senior enlisted leaders. In keeping with this commitment, the DAF has numerous projects underway or planned between FY2023 and FY2026 to modernize and ensure safe, quality unaccompanied housing that supports mission requirements and provides improved privacy and greater amenities for junior personnel. DAF housing offices work to keep our families and single Airmen and Guardians safe every day. These housing offices conduct dormitory inspections on a routine basis and they brief our members upon move-in about maintenance and safety precautions. Additionally, during resident change over, dormitory rooms undergo maintenance and are again inspected. If problems are discovered, teams make corrections before assigning the unit. Overall, our dorms are in satisfactory condition--with 99% of dorms above the OSD standard--but we continue working hard to increase investment to improve facility conditions. The long-range investment plan is captured in the Dormitory Master Plan that integrates data and commander assessments. In response to Section 2814 of the FY22 NDAA, the DAF made a concerted effort to increase investment in dormitory facility conditions. Section 2814 requires the DAF to invest approximately $1.1B in permanent party dorms across FYs22-26--the DAF is exceeding this requirement, targeting $1.7B. In FY23, the DAF authorized $342M in O&M funding for dorm maintenance & repair projects. DAF's ongoing unaccompanied housing projects include construction of a dormitory at Clear Space Force Station, Alaska, and a follow-on increment for a Basic Military Training dormitory at Joint Base San Antonio, Texas. For FY24, the DAF budget request includes $50 million in MILCON for a Surety Dormitory at Royal Air Force Lakenheath, UK. Additionally, we are planning to spend $251M in O&M funding on 38 projects to maintain, repair, and improve dormitory facilities. ______ QUESTIONS SUBMITTED BY MR. GARAMENDI Mr. Garamendi. The AIR and SEA Card programs are critical to national security and military readiness across the world. The Air Card fuel program contract process administered by DLA has previously had issues. What effect would the degradation of this program have on your service's readiness should aircraft and marine fuel suppliers in the network be limited or lost? Are you concerned about the loss of competitive prices or disruption of this long-standing network? General George. The cost of fuel, efficient contracting, and general fuel management are all essential to Army readiness. The Army, like the other armed services, relies on the Defense Logistics Agency (DLA) to effectively manage fuel contracts. DLA currently uses the Aviation Into-plane Reimbursement (AIR) and Ships' bunkers Easy Acquisition (SEA) Card programs to manage fuel contracts between vendors and purchasing customers; the Army relies on DLA to mitigate any readiness concerns or disruptions in the supply network. The Army is always concerned with the Standard Fuel Price, though the Stand Fuel Price is set by the Office of the Under Secretary of Defense (Comptroller) for each FY. Mr. Garamendi. The AIR and SEA Card programs are critical to national security and military readiness across the world. The Air Card fuel program contract process administered by DLA has previously had issues. What effect would the degradation of this program have on your service's readiness should aircraft and marine fuel suppliers in the network be limited or lost? Are you concerned about the loss of competitive prices or disruption of this long-standing network? Admiral Franchetti. 1. The SEA and AIR Card programs are critical enablers for procuring commercially available Marine Gas Oil and Aviation Fuel from nearly any commercial port and air station/airport around the world. In the absence of Combat Logistics Force assets, Defense Fuel Service Points, and Fuel Exchange Agreement locations, there is no other quick and organic contracting mechanism for U.S. Navy ships and aircraft to acquire fuel. Loss, or degradation to the program would create significant gaps in logistics support for units deployed across the world. Additionally, it would exacerbate the complexity of logistics support for distributed maritime operations, which would eliminate or weaken our ability to project power. 2. Inability to meet operational requirements is a greater concern than the loss of competitive prices, even in a fiscally constrained environment. The greater concern would be if this program were disrupted with no functional alternative. From the end-user side, AIR and SEA Card provides an effective contracting mechanism to rapidly acquire commercially available fuel with minimal lead time. If the AIR and SEA Card programs were not available, the Navy would require an immediate solution from Defense Logistics Agency in order to meet its commercial, bulk fuel requirements for ship port visits to commercial ports and aircraft refueling stops at commercial airports. It should be noted that fuel and fuel-related services are outside the scope of the Husbanding Service Provider Program. Mr. Garamendi. The AIR and SEA Card programs are critical to national security and military readiness across the world. The Air Card fuel program contract process administered by DLA has previously had issues. What effect would the degradation of this program have on your service's readiness should aircraft and marine fuel suppliers in the network be limited or lost? Are you concerned about the loss of competitive prices or disruption of this long-standing network? General Smith. The proper and effective use of the Defense Logistics Agency (DLA) managed, Aviation Into-plane Reimbursement (AIR) Card program provides Marine Aviation with the flexibility needed to sortie and operate across our Air Stations and commercial aviation infrastructure. The Marine Aviation Logistics Squadrons across our force continue to execute DLA directed control measures to increase program management proficiency at the tactical level and ensure accountability. Any degradation, disruption, or serious loss of the associated network of aircraft fuel suppliers would immediately compel a reassessment of a key planning consideration shaping the execution of Sortie Based Training Plans (SBTP) and operational missions. Disruptions or loss of competitive pricing will ultimately impact the fiscal balance the Service looks to maintain as multiple appropriations are brought to bear in resourcing the operation and maintenance of our aircraft and units. This would almost surely lead to a degradation in readiness of our aviation community. Mr. Garamendi. The AIR and SEA Card programs are critical to national security and military readiness across the world. The Air Card fuel program contract process administered by DLA has previously had issues. What effect would the degradation of this program have on your service's readiness should aircraft and marine fuel suppliers in the network be limited or lost? Are you concerned about the loss of competitive prices or disruption of this long-standing network? General Allvin. AIR cards are administered by DLA-Energy and the AF/A3 community in accordance with DLA Energy Publication P-8: ``Fuel Card Program'' and Air Force Instruction (AFI) 11-253, ``Managing Purchases of Aviation Fuel and Ground Services.'' The loss or degradation of the AIR Card, as a purchase media--without a suitable replacement for Mission Planners and Aircrews to utilize at commercial airports to purchase fuel and ground services--would have a detrimental impact on the Air Force's ability to execute its mission. It is the Air Force's understanding that DLA-Energy is in the process of awarding the next AIR Card contract and has extended the current contract to ensure there is no lapse or disruption to the network. In FY22, the Air Force purchased fuel at over 1,200 commercial airports, using the cards provided by the AIR Card program. The Air Force purchased over 80 million gallons at DLA contract/Canadian Bulletin locations and 23 million gallons at non-contract locations, accounting for 67 thousand refuel operations, or 7% of the total gallons of aviation fuel purchased. ______ QUESTION SUBMITTED BY MR. FINSTAD Mr. Finstad. Can you speak to the critical need to modernize the Air National Guard C-130 fleet to C-130J aircraft and the importance of continuing to modernize the fleet by simultaneously upgrading some C- 130H aircraft with modern technology? General Allvin. C-130Js are gradually replacing the C-130H fleet through yearly Congressionally added funding which will establish a common interoperable MDS fleet. At the current rate of 16 C-130J models per year, full recapitalization of the remaining 120 C-130Hs will occur in 2033. However, selective C-130H model modernization efforts are still required to ensure the remaining aircraft remain effective and operationally compatible. Further, continued C-130H model propulsion system modernization are needed to improve reliability, fuel efficiency, and performance. ______ QUESTIONS SUBMITTED BY MR. STRONG Mr. Strong. 1. It is my understanding that the Army has taken up its own approach to develop a variant of robotic targets. What is the current status of the Trackless Moving Target-Infantry? Is it true that it is five years late in development? General George. The Army has successfully matured its Trackless Moving Targets (TMT) program to meet the Army's requirements for trackless targets, including both vehicle (TMT-V) and infantry (TMT-I) variants, to operate on live-fire ranges. The program is executing on schedule and in accordance with the Army's plan. In 2020, the Army awarded a Small Business Innovative Research (SBIR) Phase III production contract to a Michigan-based small business, Pratt Miller Engineering, which is a wholly owned subsidiary of Wisconsin-based Oshkosh Defense. The Army produced and deployed 25 TMT-Is and 3 TMT-Vs at two Army Installations. These systems have commonality for ease of maintenance and sustainability and operation. The Army plans to award its Full Rate Production SBIR Phase III contract in 2nd Quarter FY 2024 (2QFY24) for the continued production of both TMT variants to meet the Army's training requirements. Mr. Strong. 2. The Maneuver Center of Excellence at Fort Benning has shared that the Army's solution dangerously lacks collision avoidance, doesn't accurately register hits, doesn't provide a thermal signature for nighttime operation, can't replicate human behaviors and has barely been used by soldiers. It is my understanding that the Army is still planning on going to Full Rate Production for TMT, is this true? If so, why--how does this enhance soldier lethality? General George. Yes, the Army plans to award its Full Rate Production SBIR Phase III contract for TMT in 2QFY24 to meet the Army's training requirements for trackless targets. The Army is confident these systems will improve soldier lethality with the additional realism that trackless targets provide. The Army is currently unaware of any documented concerns with the TMT program from the Maneuver Center of Excellence. TMT platforms implement collision avoidance and human behavior replication via pre-planned path following and positive control of the platforms through the Army's live-fire range control software and PME's robotic software. Although the initial systems deployed to Fort Moore (formerly Fort Benning) had issues with registering hits, those issues were addressed and corrected during development. With respect to nighttime capabilities, TMTs have power ports for the connection of devices including thermal blankets, which are required for day and nighttime operations. Although the initial TMT systems deployed to Fort Moore had limited soldier use due to the installation's operational requirements and an early-on technical issue, the TMTs are now being relocated to Fort Liberty (formerly Fort Bragg) to gain more utilization. The TMTs sent to the Joint Readiness Training Center have been utilized in every training rotation since their deployment in October 2022 and more systems are being requested for additional realistic training scenarios. Mr. Strong. 1. As you know, the Army has led the way with mass timber adoption through five privatized hotels. Since the first hotel that was built at Redstone Arsenal in 2015, DOD saw mass timber buildings consistently go up almost 40 percent faster, with 44 percent less personnel hours, and a 90 percent reduction in on-site construction traffic. Not only that, but mass timber far exceeds installation resilience standards related to anti-terrorism force protection, lateral winds, seismic activity, and fire performance. Despite these benefits, the DOD has yet to design and build its own facility using the innovative wood products from mass timber despite that speed, strength, and efficiency. What is the Department doing to ensure equal competition in the early MILCON process, particularly to ensure mass timber is considered? General George. The Army relies on the design and construction agent to ensure equitable competition for all building materials within our current planning and design process. Life-cycle cost effectiveness is required per the Energy Policy Act of 2005 (Public Law 109-58). As a result, project delivery teams are required to consider multiple alternatives for the various components of each design including, but not limited to, project location, building type, and material availability. Policies currently being written by the Army that prioritize sustainability attributes may have the effect of expanding the use of cross-laminated timber (CLT) for military construction. The Army plans to construct a CLT barracks in FY 2025 at Joint Base Lewis- McChord, Washington, and will use data from that process to inform future decisions regarding building materials. Mr. Strong. 2. Considering the lessons learned from the Redstone Arsenal hotel, how did USACE ensure education across the MILCON workforce, particularly those responsible for designing the buildings and soliciting for construction bids? General George. Multiple presentations/webinars have been facilitated documenting the successes and lessons learned from the Candlewood Suites hotel at Redstone Arsenal, Alabama, with an audience consisting of a cross-section of groups and disciplines within the US Army Corps of Engineers (USACE). USACE also published and circulated technical notes for both CLT in January 2016 and nail-laminated timber in April 2019 to promulgate knowledge about these materials and the most advantageous building types and geographic regions for their utilization. Mr. Strong. 3. Specifically, what has the Army done to ensure the USACE workforce is aware of mass timber construction benefits to get after the MILCON problems we face today? General George. While the Army typically does not direct the design and construction agent on what materials and methods to use for military construction, USACE developed a tri-service Uniform Facilities Guide Specification on CLT, which has been approved for use by all U.S. military services. The ready availability of this template helps to facilitate the use of CLT in military construction. In 2016, the International Code Council Tall Wood Building Ad Hoc Committee began formulating building code recommendations for tall wood buildings. In 2018, the Committee's proposals were approved for inclusion in the 2021 International Building Code (IBC). USACE, with its tri-service counterparts, modified and published the Unified Facilities Criteria 1- 200-01 DOD Building Code in September 2022, incorporating the 2021 IBC to enable more effective use of CLT and nail-laminated timber in military construction. Multiple presentations and webinars have been facilitated to discuss the above documents and other recent developments. These events equip USACE project delivery teams with the understanding and confidence to integrate mass timber and other newer technologies. The USACE Construction Engineering Research Laboratory (CERL) is currently exploring how buildings constructed with mass timber respond to blast conditions. CERL is also partnering with the American Wood Council to provide expertise for the upcoming Army military construction barracks project at Joint Base Lewis-McChord, Washington, which will promote decarbonization and electrification. To date, there are five Army hotels constructed by Lendlease, the Privatized Army Lodging program partner and construction firm. These CLT structures include: the Candlewood Suites hotel at Redstone Arsenal, Alabama (92 rooms); Fort Drum, New York (99 rooms); Joint Base Lewis-McChord, Washington (127 rooms); and Fort Jackson, South Carolina (West Building--171 rooms; East Building--146 rooms). Mr. Strong. 1. I understand that the Marine Corps is planning a $250 million, 5-year IDIQ to support Marine lethality and autonomous robotic targets. I'd like to commend the Corps for doing this, and for using an innovative ``Technology as a Service'' model that saves the government time, money, and logistics. Do you believe realistic training tools like this are critical to preparing warfighters for combat operations? General Smith. The Marine Corps' training resources play a critical role in the Service's ability to prepare to meet the demands of current and future operating environments. The provision of modern capable training and range resources remains a Service priority to realize the Naval Expeditionary Force required in Force Design 2030 and Training and Education 2030 to deter current and future real-world pacing threats. The Marine Corps is committed to continued research, integration, and use of the latest technological advances in evolving our training to prepare Marines to counter a peer adversary. These efforts are indicated through the Service's establishment of the Trackless Mobile Infantry Target (TMIT) (e.g., autonomous robotic target) capability. Based upon a Business Case Analysis, the capability is being provided using a Knowledge Based Training Service (KBTS) type contract (e.g., ``Training as a Service''). In addition to the TMIT system, the contract includes field service support at each location for the operations and maintenance, and logistical equipment, spare parts, and software/hardware upgrades. The KBTS solution was identified as the most advantageous in terms of performance, benefits, and risks. TMITs significantly enhance standards-based training events, promote enhanced weapons proficiency, and provide the ability to create a more challenging training environment. TMITs contribute to the overarching missions and activities of the Marine Corps by providing human-like behavior in a live-fire training environment to better simulate the actions of adversaries resulting in increased lethality and more effective warfighters. The capabilities that these targets provide allow Marines to conduct a live-fire assault on a realistic enemy, chase that enemy from the objective, pursue them by fire, and prepare for and repel a counterattack in ways not previously achievable. Realistic training tools like this are critical to preparing warfighters for combat operations. In summary, the Marine Corps will be required to support training of Marines and Marine Corps units in an expanding array of mission essential tasks that require ever-increasing amounts of training space and increasingly sophisticated training and range resources. With the help of Congress we will meet that challenge, enabling Marines to serve as the Nation's Force-in-Readiness. [all]