Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.
- [H.A.S.C. No. 118-26] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2024 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS FIRST SESSION [House Hearing, 118 Congress] [From the U.S. Government Publishing Office] [H.A.S.C. No. 118-26] HEARING ON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2024 AND OVERSIGHT OF PREVIOUSLY AUTHORIZED PROGRAMS BEFORE THE COMMITTEE ON ARMED SERVICES HOUSE OF REPRESENTATIVES ONE HUNDRED EIGHTEENTH CONGRESS FIRST SESSION __________ SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES HEARING ON AIR FORCE PROJECTION FORCES AVIATION PROGRAMS AND CAPABILITIES RELATED TO THE PRESIDENT'S 2024 BUDGET REQUEST __________ HEARING HELD APRIL 18, 2023 [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ______ U.S. GOVERNMENT PUBLISHING OFFICE 52-789 WASHINGTON : 2024 SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES TRENT KELLY, Mississippi, Chairman ROBERT J. WITTMAN, Virginia JOE COURTNEY, Connecticut SCOTT DesJARLAIS, Tennessee JOHN GARAMENDI, California MIKE GALLAGHER, Wisconsin DONALD NORCROSS, New Jersey JACK BERGMAN, Michigan JARED F. GOLDEN, Maine MIKE JOHNSON, Louisiana SARA JACOBS, California RONNY JACKSON, Texas CHRISTOPHER R. DELUZIO, NANCY MACE, South Carolina Pennsylvania JENNIFER A. KIGGANS, Virginia JENNIFER L. McCLELLAN, Virginia MARK ALFORD, Missouri JIMMY PANETTA, California Kelly Goggin, Professional Staff Member Phil MacNaughton, Professional Staff Member Ethan Pelissier, Research Assistant C O N T E N T S ---------- Page STATEMENTS PRESENTED BY MEMBERS OF CONGRESS Courtney, Hon. Joe, a Representative from Connecticut, Ranking Member, Subcommittee on Seapower and Projection Forces......... 0 Kelly, Hon. Trent, a Representative from Mississippi, Chairman, Subcommittee on Seapower and Projection Forces................. 1 WITNESSES Hunter, Andrew P., Assistant Secretary of the Air Force for Acquisition, Technology, and Logistics......................... 0 Moore Jr., Lt Gen Richard G., USAF, Deputy Chief of Staff for Plans and Programs............................................. 0 APPENDIX Prepared Statements: Mr. Courtney................................................. 00 Mr. Kelly.................................................... 00 Mr. Hunter and Lt Gen Moore.................................. 00 Documents Submitted for the Record: [There were no Documents submitted.] Witness Responses to Questions Asked During the Hearing: Mr. Courtney................................................. 00 Mrs. Kiggans................................................. 00 Questions Submitted by Members Post Hearing: Mr. Bergman.................................................. 00 Mr. Wittman.................................................. 00 AIR FORCE PROJECTION FORCES AVIATION PROGRAMS AND CAPABILITIES RELATED TO THE PRESIDENT'S 2024 BUDGET REQUEST ---------- House of Representatives, Committee on Armed Services, Subcommittee on Seapower and Projection Forces, Washington, DC, Tuesday, April 18, 2023. The subcommittee met, pursuant to call, at 3:30 p.m., in room 2212, Rayburn House Office Building, Hon. Trent Kelly (chairman of the subcommittee) presiding. OPENING STATEMENT OF HON. TRENT KELLY, A REPRESENTATIVE FROM MISSISSIPPI, CHAIRMAN, SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES Mr. Kelly. The subcommittee will come to order. I ask unanimous consent that the chair be authorized to declare a recess at any time. Without objection, so ordered. Good afternoon. This subcommittee covers seapower and projection forces. Today, we will hear about the projection part of this portfolio. Our witnesses this afternoon have been in front of this committee a few times, and I would like to thank you for meeting with me last week via phone. Thank you for your service, and welcome to the subcommittee. Projection forces plays an important role in the military's ability to be anywhere at any time. Airlift bombers and tankers are critical. Mr. Alford and I had a great visit to Palmdale, California last week and are very impressed with the progress of the B-21. As you know, the challenge from China is growing and the Air Force must have the right aircraft systems and capabilities to carry out any mission anywhere. And I think the B-21 will perform admirably. I would like to hear from our witnesses discussing the urgency we have to have enough refueling capacity and capability for a possible China fight across a very large INDOPACOM [Indo-Pacific Command] AOR [area of responsibility]. Finally, I would like to hear from our witnesses today on how our projection forces are being modernized to meet the future threats. Before we introduce the witnesses, I would like to turn it over to Mr. Courtney, our ranking member, for his opening remarks. [The prepared statement of Mr. Kelly can be found in the Appendix on page 23.] STATEMENT OF HON. JOE COURTNEY, A REPRESENTATIVE FROM CONNECTICUT, RANKING MEMBER, SUBCOMMITTEE ON SEAPOWER AND PROJECTION FORCES Mr. Courtney. Thank you, Chairman Kelly. And thank you to both witnesses for joining us here today. And I am going to be very brief and ask that my written remarks be entered into the record. Again, I just want to agree with the chairman that the projection forces mission of our subcommittee is one that we take very seriously. We have got great staff that do such a good job in terms of analyzing the President's budget when it comes over. And we are not a rubber stamp. I mean, historically, if you look at some of the changes and I think improvements that the subcommittee has made, whether it is the tanker program, Air Force One, or the C-130s, it has really made a positive difference for the Air Force and for Air Force projection and Airlift. And, again, I look forward to the witnesses' testimony. Again, Mr. Chairman, if there isn't any objection, just ask my written remarks be entered---- Mr. Kelly. Without objection. Mr. Courtney. Thank you. I yield back. [The prepared statement of Mr. Courtney can be found in the Appendix on page 24.] Mr. Kelly. Thank you, Mr. Courtney. He is always correct. I mean, he was a chairman longer than I have been. So he is gently reminding me to do certain things. So I always appreciate my ranking member and his partnership in this, much like you guys are partners. You can't do this without a strong team. Our briefers today are Mr. Andrew Hunter, who is the Assistant Secretary of the Air Force for Acquisition. And Lieutenant General Rick Moore is the Deputy Chief of Staff for the Plans and Programs. I understand, Mr. Hunter, that you are going to give an opening statement. So the floor is yours. STATEMENT OF MR. ANDREW P. HUNTER, ASSISTANT SECRETARY FOR ACQUISITION, TECHNOLOGY, AND LOGISTICS, DEPARTMENT OF THE AIR FORCE; AND LT GEN RICHARD G. MOORE, USAF, DEPUTY CHIEF OF STAFF FOR PLANS AND PROGRAMS Mr. Hunter. Well, thank you very much, Mr. Chairman. And thanks to you and Ranking Member Courtney and all the members of the subcommittee for the support that you provided to the Department of the Air Force over a number of years. And we absolutely greatly appreciate the fact that you have taken the time to visit our installations, visit our facilities, visit our airmen and guardians and to understand how we perform the mission, how they perform the mission, and how the programs that you oversee are supporting that mission. So that is really vital, and we greatly appreciate it. And I am very happy to be here today with my colleague, Lieutenant General Moore, to provide testimony on the Air Force's fiscal year 2024 budget request for projection forces aviation programs. The Department of the Air Force's fiscal year 2024 President's budget request reflects our commitment to developing a threat informed future Air Force equipped to win a high-end fight. Last year, Secretary Kendall and General Brown outlined the seven operational imperatives we must meet to success in this mission. The operational imperatives were the combined work of the entire Air and Space Force teams combining the best insights of operators, analysts, and the acquisition enterprise. As a result of this analysis and work, we have over 25 billion dollars requested in the fiscal year 2024 budget for OI [operational imperative]-related investments, a significant portion of which is new funds applied to programs that are new compared to our previous President's budget request. Our fiscal year 2024 request balances this investment of critically needed new capability with recapitalization and modernization of our existing platforms. In my oral remarks, I am going to highlight just a few of these key investments and the written statement that the general and I submitted goes through them in some detail. I want to start with the B-21. The B-21 Raider will form the backbone of our future bomber force and it is the centerpiece of the Secretary of the Air Force's six operational imperative. The B-21 underscores our national security as the most flexible leg of the nuclear triad and supports combatant commanders across a range of military objectives as both a nuclear and conventional bomber. The fiscal year 2024 President's budget request fully funds engineering and manufacturing development and initial production for the B-21. Additionally, the fiscal year 2024 President's budget request includes modernization activities focused on nuclear certification, integration of the long-range standoff weapon, and other modernization activities. There are today B-21 test aircraft in flow on the manufacturing line. They are being built using the same tooling processes and technicians who will build the production aircraft. And that is a substantial--goes a substantial way to improving the maturity of that platform and its readiness for production. The B-21 had a successful rollout last December and is working towards first flight. Support for the fiscal year 2024 budget request for the B-21 is critical to recapitalizing our bomber force and being prepared to deter future conflicts. The other element of our long-term plan for the bomber force is the B-52. While the last B-52 Stratofortress entered service in the Air Force in 1962, we expect to continue operating the B-52 beyond 2050. To get there, we have work to do. The Air Force's number one priority for the B-52 is to ensure the platform viability through 2050 with the Commercial Engine Replacement Program [CERP] that enables us to achieve this goal. It is important to note that CERP is more complex than just replacing today's engine with a commercial engine from commercial use. The CERP program includes the new engines but also flight systems, cockpit throttles, and displays as a combined system to provide power and propulsion to the jet. In September 2023, the CERP program will seek a Milestone B decision which will authorize the program to enter into engineering and manufacturing development, transitioning from the middle tier of acquisition rapid prototyping effort that we have had to date. It will formally initiate the program and set the acquisition program baseline. Let me talk about our mobility fleet. Due to an updated threat environment, we have modified our tanker recapitalization approach from what we have discussed in prior years, setting aside the three three-phase approach originally envisioned in the early 2000s in favor of prioritizing and accelerating the right capabilities to deliver fuel to the joint force and to the fight. The next generation air refueling system will be an accelerated advanced air refueling system that meets the future needs of the joint force in contested battle space. We will actively consider clean sheet purpose built designs for NGAS [Next Generation Air- Refueling System] with aircraft delivered in increments as part of the family of systems that allows the Department of Air Force to remain flexible and responsive to the evolving and ever changing threat. The program is being designed to leverage continuous competition and will be competitive from the first day. We have begun work on the NGAS analysis of alternatives. That will be completed in fiscal year 2024 and is going to inform NGAS requirements and development timelines in cooperation with industry, the information that they provide. Initial deliveries are expected to begin in the mid to late 2030s. Our work with the operational imperatives has been extensive. And you see the outcome of that in our fiscal year 2024 budget request. But in significant ways, the work for operational imperatives has really just begun. As we begin to implement the recommendations born out of our initial work, we are continuing to examine areas such as cross cutting operational enablers that are critical to success. And this includes mobility. This work will leverage and complement our work on NGAS and the next generation air mobility study to identify priorities to enable our future operations. Lastly, let me speak to the importance of delivering this budget on time. More than ever, it is critical the Department avoid the delays driven by extended continuing resolutions. The OIs include multiple new start programs that must begin as soon as possible. We cannot cede anymore time during a critical moment in the Air Force's transition to being prepared for the future fight. I also want to close by asking for your support for a legislative proposal recently transmitted by OMB to Congress creating a new authority for the military services to respond to emergent technology advances and threats. This authority will accelerate our ability to respond to a rapidly changing security environment with effective congressional oversight. We look forward to working with this subcommittee and thank you again for your continued support. And General Moore and I stand ready to address your questions. [The prepared statement of Mr. Hunter and Lt Gen Moore can be found in the Appendix on page 25.] Mr. Kelly. Thank you, Mr. Hunter. It has been a bit troubling to watch the KC-46's problems with the remote vision system and now we are hearing there is another delay to fill the program. Can you explain why there have been so many delays and how it benefits the taxpayers to even think about purchasing more? Mr. Hunter. So with the remote vision system, one thing that is important to know is this is a deficiency to the specification the Air Force provided to Boeing. Therefore, they are correcting that deficiency at their expense. So they are paying the bill to develop the fix for the RVS [Remote Vision System] 2.0, and they will pay to install and retrofit the previously purchased aircraft and to cut in the fix into the new production aircraft. So on the cost side of the RVS 2.0, the taxpayer is protected there. As to the timing of its delivery, we did run into issues with the supply chain there in getting the necessary equipment, both in terms of displays but also some of the boxes that end up transmitting and processing the signal there that have pushed back the program schedule. So we are now looking to fielding that system in calendar year '25 but fiscal year 2026 to begin fielding it. And that is later than we would prefer. Having said that, the Air Mobility Command has set the parameters under which the platform is able to operate today. And they are successfully refueling aircraft with the system that they are currently using. Mr. Kelly. Okay. Because I just think the sense of urgency we need to have, we need to be capable of fighting tonight. And so I am glad that we are not talking about divesting in future and all that stuff. But thank you very much. Mr. Hunter, I was in Palmdale last week, and we are happy with what we saw. And knock on wood, the program seems to be on track. Can you confirm to us that the Air Force will maintain continuous oversight of the program and not go down the path of the B-2 when the program was truncated? Mr. Hunter. I can absolutely assure you that we are paying very close attention to this program and that is true at my level. That is true with my close partner, the Commander of Global Strike Command who is the major command that provides the resources and establishes requirements for the B-21 program. We are tightly synced. We meet regularly to discuss the program and everything that is happening on it. So we are in close touch. And sort of the management philosophy for the B-21 program is something we call active management. So it is continuous engagement between the government, the program office, the program manager, and the contractor, Northrop Grumman in this case, to identify any unexpected eventualities or risks that are emerging on the program. And because of the way the program has been managed by the Air Force and set up by my predecessors, we have the resources in place usually when a risk does arise or when something does get off track to apply resources and to identify a fix and make a fix relatively quickly. And that active management approach has really served the program well. Mr. Kelly. And Mr. Hunter, if there is a CR [continuing resolution], which programs in this portfolio that we own will suffer the most? Mr. Hunter. So it depends a little bit at what level the funding is established at under the CR. Sometimes CRs go a prior year funding. Sometimes they are at less. I don't know that I have seen one that was more. And so the funding level is important. The programs that are most effected are those that are new starts in fiscal year 2024 because they simply can't begin under our standard operating procedures usually specified in the continuing resolution. The legislative proposal I mentioned I think would give us some ability on critical priorities to do some early work, even under a continuing resolution approach. And that is one reason why we are so eager to work with you on potentially providing that authority. The second is programs that have a significant change in funding or that are transitioning from one stage to another. So a program moving from development into production and where the initial production funds would come in the '24 budget, they would not have access to production money during the span of a continuing resolution. So there are programs that are making this transition in fiscal year 2024 that could be greatly impacted by an extended CR. Mr. Kelly. Thank you. And, General Moore, final question. The KC-135 is considered the backbone of the air refueling fleet and will be in service for many decades to come. How will the Air Force support the modernization throughout the rest of the life cycle of the KC-135s? General Moore. Sir, the 135 will be in service for something like another two-and-a-half or three decades. And we are mindful of what it takes to get an airplane that far out. So, two separate things. First of all, airframe and airworthiness modifications and enhancements, the sister program office in Oklahoma City runs a program called CORAL REACH that looks at how to keep the airframe itself viable. And over the years as the airplanes have aged, it has done a great job of making sure that we don't have any airworthiness problems. That will continue for the life of the airframe. And then certainly the avionics become a part of this as well. And some of the avionics right now, particularly the fuel system panel and some of the other items in the navigation display area, they are beginning to show their age. And in fact, they are reaching the end of their life. And so you will see in this budget a request to replace the avionics in the center pedestal to make sure that the aircraft is viable into the future. Mr. Kelly. Thank you. And, with that, I now yield to Mr. Courtney, the ranking member. Mr. Courtney. Thank you, Mr. Chairman. And just a follow-up again on Chairman Kelly's question regarding the KC-46. Again, in prior years, we have had these hearings where General Moore's predecessor, General Nahom, would come in and we were sort of getting updates in terms of the percentage of interim operability which the last time we met, I think it was in the 50 to 70 percent range or whatever. But my understanding is it has continued to improve. And just wondering just for the purposes of an update where does that stand? Mr. Hunter. Yeah, I think we can get you an exact figure for the record. But in terms of the ability to refuel, right now the only Air Force platform in operations that is not refuelable by the KC-46 is essentially the A-10. And we do have the capacity with the rest of our fleet to be able to service the refueling needs of that platform. [The information referred to can be found in the Appendix on page ?.] So we are able to meet the overwhelming number of air refueling missions required using the KC-46 as it is operating today. And if your question, though, was on mission capability rates, I can get you that answer for the record too. Mr. Courtney. Okay. General Moore. Yes, sir. I will add at the beginning of the Ukraine crisis about a year ago, we deployed four airplanes to Moron, Spain. They performed very, very well in a deployed environment. And one of the things that we worked on while they were there was certification with European refueling platforms. Lots of progress there as well. So there are some things about the KC-46 that need to be made right. As Mr. Hunter mentioned, Boeing is on contract to do that, and we will hold them to that. But the airplane is preforming very, very well. And it is performing well in an operational environment. And it is on the road every single day now. Mr. Courtney. Great, thank you. And I just would sort of reiterate your comment that this is not on the taxpayer's dime. Again, Mr. Wittman and I had many painful hearings and made sure that was actually not going to be the outcome here. And I think the Air Force has kind of held its ground as well on that. In your testimony going to another program that we have had multiple hearings in the past on Air Force One, there is a request for 490 million dollars to continue engineering and manufacturing development. Again, initially those plans should have been up in the air flying by now. And obviously, they are not. And I wonder, again, if you could give us an update in terms of particularly that vendor problem with the interior of the plane as well as just an explanation of what the 490 million dollars is for. Mr. Hunter. Yes, sir. Rick may want to speak specifically to the exact usage of the dollars. But in terms of the status of the program, the interior subcontractor that Boeing had originally hired as part of their proposal for the program was not performing in terms of the work that they were tasked to do. And also, I think they had real significant financial issues that even if they had been capable of doing the work would have potentially been a barrier to them being successful. So Boeing made the decision to terminate that subcontractor and bring another subcontractor aboard to do that work. When you hear the term, interior, it sounds like seat cushions and, like, sort of trimmings and surface level stuff. But in fact what you are talking about is the non-747 commercial aircraft parts of the aircraft, anything inside the fuselage. So it is actually a tremendous scope of work. It requires significant engineering expertise to carry out the work that subcontractor is expected to perform. So there was a delay. A lot of work had to be redone during the transition from one supplier to another. But they are now up on step. They have progressed well beyond where the previous subcontractor had gotten with the design. I particularly would highlight the work put in on the engineering for the wiring. There is quite a bit of miles and miles of wire on this aircraft as you would expect for an aircraft of this size and complexity. And a lot of engineering being done to get that engineering work done right and making sure that we won't have to do rework as has happened on other similar aircraft where we have had to do some of this engineering work on the front end. So I think they have really gotten back into the right place programmatically. It is delayed as I know you are aware. But they are now performing to our expectations at this stage of the effort. Mr. Courtney. And the budget request? General Moore. Sir, both airplanes are undergoing modification right now. There is, as Mr. Hunter mentioned, a lot of work going on in the interior as well as installation of wiring and modification in the places where the airframe itself needs to be modified, for example, the height of the lower lobe door. Some of those modifications are in progress as well. So it is what it takes to produce an aircraft of Presidential quality times two. And they both are undergoing modification as we speak. Mr. Courtney. Well, thank you. Again, it is something that we have been tracking and will continue to track. My last question is just simply--again, we have historically done plus- ups to have propeller replacements for the C-130s. And maybe you could just--and we talked about this a little bit before the hearing in terms of just sort of where that all stands because it is really a safety issue and where we are with schedule. Mr. Hunter. Yeah, and as we discussed, the availability of that propeller production line was very valuable to us this year because we had the issue with the center barrel on the older model of the propeller. We had some cracking there. We had to take a number of those items out of service. And having an operating production capacity for the new propeller design where all the engineering work had already been done and were into production has really been invaluable helping us recover the fleet back to operational capability. And in fact, we worked with the contractor to increase that production rate so that we can get to a get well date for the C-130 fleet well ahead of our original projections. We are now projecting that we will be fully get well in this year. And we were able to accelerate that by about ten months from the original plan through working with the propeller contractor and also working with a lot of our partners and allies who operate these aircraft to find some additional supplies. Mr. Courtney. Ten months ahead of schedule. I will end on that positive note. Mr. Kelly. All right. I now recognize General Bergman. Mr. Bergman. Thank you, Mr. Chairman, and thank you all for being here. Quick question just out of curiosity. What I heard you say was the only aircraft that the tanker can't refuel is the A-10? Got that right? General Moore. Yes, sir. Mr. Bergman. So what can refuel an A-10? General Moore. Sir, we still have a large fleet of KC-135s. Even at the completion of the KC-46 program, we will still have nearly 300 KC-135s. And they can all refuel A-10s. Mr. Bergman. Okay. So we still have the capability? General Moore. Yes, sir. Mr. Bergman. All right. We were talking before we sat down here about the longest running production lines in aviation history in those aircraft. The current long-term bomber structure, you have 145 B-21s, 75 B-52s. The new upgrades to the B-52 is going to extend its service life out to the 2050s. Does the Air Force truly believe that a 100-year-old airplane will compete in a contested environment against China in 2050? General Moore. So the aircraft that will go into the contested environment specifically in a Chinese--fight against Chinese aggression into the highly contested environment will be the B-21. The B-52 has a much higher volume of weapons delivery as you are well familiar. But it will be from standoff range. The B-52 is not envisioned to go into the highly contested environment. It will deliver large payloads from range. Mr. Bergman. So as we look at prosecuting the fight in 2030 as opposed to prosecuting the fight in 2015, I mean, that is asking you to put your Jedi mindset on and look way out there. Is the Air Force considering, for lack of a better term, a clean sheet purpose built design to replace the B-52 that would address those future necessary capabilities that we would have? Or do you think that will the B-21 take care of it all? Or are we going to add another--by the way, there is no it is what it is. We need the capabilities necessary to prosecute a fight, whether it is today, 2030, or 2050, but just the long-term Skunk Works kind of thinking. General Moore. Yes, sir. I absolutely agree. So I think that could certainly be a possibility. I don't think we have reached that decision point yet. I think the things that we are working on in the near term are NGAD [next generation air dominance] and NGAS with NGAL [next generation aiming laser] to follow directly on. In the meantime, I think the decision point that we will come to sooner is what the actual production run of the B-21 will be. And that will depend on its performance. And we will know that here in the next couple of years as well as how the threat changes. As you have seen with the next gen air refueling system, we have pulled that 15 years or so to the left because of the change in threat. Certainly the same thing could happen in the bomber portfolio. If we find out there is an emerging threat that the B-21 is not capable of handling, we would look to replace or add to the bomber fleet with something that could handle that threat. We are not to that decision point yet. For right now, everything that we see can be managed by the B-21. And the near term decision point on that will be what will the production run be. And I think probably a place where we would look to make a change in this portfolio if we were going to would be weapons and not necessarily the airframes. What we see from the Chinese is rapid spiraling of weapons capability. And I think that might be a more likely place where we would attempt to counter the threat rather than a clean sheet design. But I certainly wouldn't rule that out. And it may be that we don't have a choice. Mr. Bergman. Okay. Well, to switch subjects--well, switch gears here, we are not going to talk about airframes here. We are going to talk about people for a second. Roughly 250 Boeing workers with expired security credentials worked aboard the new Air Force One on a highly classified system, so I have been told. What has the Air Force done to ensure that this was a one-time event and cannot be repeated? I mean, things happen. But how are we going to prevent it from happening again? Mr. Hunter. Yeah, so we have worked closely with Boeing to correct the errors on their system. My understanding is they actually replaced the corporate official who is responsible corporately overall for the procedures that they were supposed to be following there and failed to follow. So there has been accountability in that case. And we are working closely with Boeing to make sure that the individuals who needed to have their clearance processes updated are in that process. And we have identified who those folks are, understand for the most part these were people who actually had valid clearances. But the specific clearance that they needed to have, the paperwork had not been submitted. Mr. Bergman. Do we know of any other programs potentially that we found the same scenario with contractors? Or was this an isolated incident? Mr. Hunter. There are very limited number of programs that participate in this particular security process. My understanding is that it is we are up to speed on the very limited number of other programs, essentially that participates. Mr. Bergman. Okay. And I guess as we have seen recently in the news, compromising of sensitive classified information into a public domain, I believe really it is not only an opportunity but it is essentially that Air Force and every other military service makes sure that those folks who have access to anything classified are vetted. And if they do something bad, they are appropriately disciplined. And with that, Mr. Chairman, I yield back. Mr. Kelly. The gentleman's time has expired. Now I will recognize Mr. Norcross. Mr. Norcross. Thank you, Chairman. I would just like to remind my colleagues just because it is old doesn't make it bad. There are some nice things that are a little bit more aged that work real well. And we happen to be part of that. Going on, Mr. Hunter, love to discuss NGAS. In this committee over the last few years, we have had a lot of discussions with the Pegasus program, the RVS. And we all know how frustrating it is. And our colleagues have mentioned it is on Boeing's dime, but the time is on us, the U.S. But the one thing I do want to point out is when the is KC-46 was first to be delivered, if that system on the RVS had been approved, we would have a system that is over ten years old now. We have the newest and by any accounts the best system in the world. Would you agree with that statement? Mr. Hunter. Sir, that is accurate. So the system that is being designed as for 2.0, the technology for that did not exist when the original design for KC-46 was made. Mr. Norcross. Yeah, certainly not the way we want to go about it. But there is the good side of what is going on here. But I want to talk a little bit more. Originally, you had mentioned the three-phase approach we are going to take for tankers including a bridge program which is now put to the side because we want to go to the NGAS, a stealth refueling capacity. Stealth is relative to what we are talking about, where it can be seen, how far in. Can you, to the point we can in open session, give us the scenarios that you would see this new tanker envision where it would be able to operate under a contested environment? Mr. Hunter. Yeah, and let me preface my comments by saying the exact mix, the exact potential ways in which we would employ the platform, these are things that the analysis of alternatives will be looking at. So there is analysis to be done here, operational analysis about what is the most beneficial way to carry this out. But the key issue is not that hard to understand. So we have air refueling capability in order to air refuel the aircraft that are engaging in missions. So our combat aircraft that are engaged in the high end fight will have to be refueled by a system that they can reach and that can get close enough to them to be operationally relevant and to enable the operations I have to carry out. So it is that distance, right? It is that distance that it takes the tactical aircraft to have to go back and forth from the tanker while being able to perform its mission that is governing how close the tanker fleet has to get to a potential fight. And the threats that we see in that area are what is driving us to need the technologies and the NGAS will deliver. Mr. Norcross. So as we understand, the KC-46 Pegasus has a hardened frame and also would be useable as a communication device as many other things. Would you envision NGAS being part of that communications network? Mr. Hunter. I think it is very much the case that we think situational awareness and effective comms will be critical to NGAS to the requirements that we will have for the NGAS system. And we have some of those things on the KC-46 today. Mr. Norcross. Thank you. No other questions. I yield back. Mr. Kelly. I now recognize the former chairman of this subcommittee, Mr. Wittman. Mr. Wittman. Thank you, Mr. Chairman. So Secretary Hunter, Lieutenant General Moore, thank you so much for joining us. Assistant Secretary Hunter, I wanted to start with you. The 2020 report that the Air Force gave to Congress talked about the deficit in the availability of tanker hours at about 6,000. We know that the floor for the number of aircraft, the minimum number of tankers in the fleet is at 466. We know that we are 467 today, so precipitously close to where the floor is. The President's budget continues to capitalize the KC-46As with 179 aircraft. You had spoken, though, previously to say that you envisioned over the lifetime of the near term acquisition of cutting that acquisition in half, essentially from 150 aircraft down to 75 aircraft to, for the most part, be able to resource NGAS into the 230s. With that in mind, does the Air Force currently have the capacity for surge tanking? So if the balloon were to go up to 90, we need surge tanking to be able to prosecute operations in the INDOPACOM, do we have the surge capacity with the current tanker fleet across all the different years of variations of aircraft? And where do you see that capacity five years or ten years from now which is going to intersect with where the pathway is for new KC-46A coming into the fleet? And does the decision that you put in place to essentially curb the KC-46Y competition, does that affect that. And you heard Mr. Norcross ask a little bit about NGAS and the other capabilities going in the future without modernizing that aircraft to have some sort of protect provisions there. I think that is certainly the situation that we want to know about. And then as I spoke about earlier, your report from 2020 points out the 6,000-hour gap per year of tanker hours and availability. Tell us where that leaves the Air Force with any future considerations. And are you considering augmenting this with commercial tanker availabilities within that realm? Mr. Hunter. Let me work through as many of those questions---- Mr. Wittman. Sure, yes, yes. Mr. Hunter. --as I can in the time allotted, sir. So I think the big picture that is important to focus on first is we are going to be maintaining the tanker levels that we have projected forward across the FYDP. That is our plan. It is why we have taken the approach that we have of going back to industry with a revised requirement. So not the KC-Y requirement which was beyond what today's tanker fleet is capable of doing and which we learned in conversation with industry was likely to lead to a gap, a time post-KC-46 179 but prior to anything else coming on board that was likely to be a gap there based on what we were seeing and our responses from industry. That is part of why we revised our plan, to simplify that requirement, have it be very similar to today's tanker requirement so that we could maximize our ability to have continuous tanker production through the FYDP and throughout the 2020s and into the 2030s until we can get to NGAS. So that is a core part of our plan is to sustain the force and ensure we continue to have that capability. I have talked quite a bit. I mentioned when it comes to B- 21, we work very closely with Global Strike Command. In this case, we work very closely with Air Mobility Command to understand what operating the fleet looks like from their perspective and how our acquisition programs support their ability to do that. My understanding from General Minihan is he has high confidence in the ability of today's fleet to carry out the missions that they are assigned that they would need to engage in a fight. It is not a simple matter as we know. He is very focused on this, works this problem every day. And so on the issue of competition, we will have to go back to industry. We are going back to industry with a revised requirement based on our KC-135 recapitalization plan. And based on the number of aircraft that we would see being procured through that effort until we got to NGAS to find out what industry can deliver to us and when they can deliver it. And then we will evaluate that and make a decision on the acquisition strategy for KC-135 recapitalization. Mr. Wittman. Very good. Thank you, Mr. Chair. I yield back. Mr. Kelly. The gentleman yields back. I now recognize Dr. Jackson. I now recognize Mr. Alford. Mr. Alford. Thank you, Mr. Chairman. And thank you for the witnesses being here today. Thank you, Ranking Member Courtney. I am honored to represent the home of the B-2 stealth bomber in Whiteman Air Force Base in the great state of Missouri. And I recently along with Chairman Kelly visited Palmdale. And that B-21 is impressive as you know. And I am just so glad that we got to see it and touch and see what this great thing is going to do for our nation. It is a critical piece as you know of our effort to deter China and modernize or smaller and aging bomber fleet and force. This program has stayed on target and within budget, and we are committed to working with our colleagues on this committee and both of you to make sure it stays that way and that I am also planning to make sure that it does end up in Missouri. Considering China's rapid military build-up, we cannot afford delays to programs like the B-21. We need the B-21, as you know, to counter the threat from China and bolster our bomber force. So Lieutenant General Moore, considering the status of the B-2 and the transition of the B-21, can you talk a little bit about the modernization efforts made to the B-2? Are we making the necessary investments such as ACS to keep the B-2 program lethal and capable until B-21--basically, are we ready today to have a conflict with China? General Moore. Sir, we are doing that with the B-2. The most notable example I can give is a replacement of all the displays in the cockpit because they are reaching the end of their life and we are proceeding with that program. I am pleased to tell you as well that the Secretary announced the preferred alternative for the second location for B-21 and it is Whiteman. The environmental study is going on now and should be complete by sometime next summer. So we look forward to operationalizing the B-21 at Whiteman. And we also as a key milestone in that, the nuclear certification of the B-21 is also on track. And that is the major milestone that we have to hit before we start to retire the B-2s. So I think all of this looks like we have a solid approach to this that will play out over the rest of the '20s. Mr. Hunter. Just two other, if I could, modernization programs to highlight there with the B-2 is continuing weapons integration including the extend range version, variant of the JASSM [Joint Air-to-Surface Standoff Missile]. And there is some comm upgrade programs that have been going on the B-2 for some time that we are continuing to finish to make sure that it is integrated, especially in terms of NC3. Mr. Alford. I would like to hear more about that in another setting, please. Lieutenant General Moore, I want to follow up a little bit about the safety stand down of the B-2. Are you familiar with the statement that General Bussiere released on what is going on? General Moore. I may not be familiar with that statement, but I am familiar with the issue. Mr. Alford. Of course, we all know that there was an incident on the 10th of December, an in-flight malfunction. General Bussiere has said that the safety investigation board for this incident is currently set for the 28th of April, ten days from now. And of course, the outcomes will determine the necessary corrective actions. When we were out in Palmdale, I asked the same question. I want to ask it to you just to make sure we have this on record for the public. The problems that we have seen on the B-2, those are being corrected and not going to be present in the B-21, correct? General Moore. So I can't speak to the engineering level. What I can tell you is the B-21 is not an updated version of a B-2. It is a newly designed airplane. And I will also tell you although the B-2 fleet has stood down, it is able to fly with General Bussiere's approval. And he is comfortable putting it in the air in the event that a mission need would arise. Mr. Alford. He did make that quite clear. And I would let you follow up, sir. Mr. Hunter. Yeah, so in the engineering level, obviously we are willing to have the final processes out of the safety process. But my judgment is that we are narrowing in on an engineering fix to the issues that led us to where we are today. And we will be able to carry out that fix in the near term. I do not anticipate that we would see the same kind of issue on the B-21. Mr. Alford. I got 40 seconds left, and I want to follow up with you, Mr. Hunter. The Air Force has repeatedly called for divestment of legacy aircraft to modernize the force for the China fight. Can you explain which capabilities the divestment will be used for, sir? Mr. Hunter. So there are the ones that we proposed on the budget. A-10 is a big one of that. The other one that I highlight quite a bit although I know it is another subcommittee but it is the transition from E-3 to E-7. And one of the primary enablers of us bringing E-7 on board as quickly as possible is being able to take crews from the E-3 fleet, train them with our Australian partners who are flying E-7 today. And when we get that aircraft on the ramp, we will be able to get it into operations as soon as possible. So those are the kinds of things that we are referring to. In terms of the aircraft we are talking about today, there are no near term retirements in this fleet. But in future years as we get towards fielding of B-21, that would become more relevant in that area. Mr. Alford. Thank you, sir. Thank you, General. I yield back. Mr. Kelly. Gentleman's time has expired. Now I will recognize Mrs. Kiggans. Mrs. Kiggans. Thank you, Mr. Chair, and thank you to our witnesses here today. I represent Hampton Roads area, so I have got the Navy master jet base. So it is always interesting to get some insight into how our other partners in the sky are doing business. But a couple questions. How long does it take to train an Air Force F-35 pilot from commission till the time they touch a gray aircraft? General Moore. So typically, we have a year of pilot training, another three to four months of introduction to fighter fundamentals, and then another four to five months of F-35 training before they are able to go to an operational unit. Mrs. Kiggans. And are these kids getting--they are getting commissioned and going right to flight school? Or what is that wait time like before they start? General Moore. In some cases, there is a wait before they go to pilot training. Right now, that wait is almost a year. It is actually fairly long. And on occasion, there is--actually, normally there is a wait in between each of those phases. Mrs. Kiggans. So in total, what is the total length of time? General Moore. I would have to take that question for the record and we can come back and tell you what it averages. [The information referred to can be found in the Appendix on page 43.] Mrs. Kiggans. For example, the Navy takes about four years roughly the time these kids are commissioned till the time they actually touch a gray aircraft which is too long in my opinion. So I know there is not a lot of appetite for--I think we tried some combination training with the Navy. At least on the Navy side, there didn't seem to be much appetite for going back to joint training. But I just want to know--I have heard from the Navy side. What is the Air Force side about challenges to pilot training? What can we do to improve this? I know that we are competing with retention for our more senior pilots. We are always competing with the airline industry. I mean, it cost 10 million dollars approximately to train a fighter pilot these days. I am worried that we are going to need these fighter pilots quickly, a lot quicker than four years. So what can we do to expedite that process and eliminate some of these wait times? It is not just Air Force specific, but I want to hear from you guys. General Moore. Yes, ma'am. Fair question. So we have redesigned pilot training over the last couple of years to bring it forward from the kind of 1950s and '60s industrial era pilot training program. We were calling it undergraduate pilot training, UPT 2.5. We have stopped calling it that now because it is finished. It is just pilot training, and it is the way we train all of our pilots now. And there is lot more integration of augmented reality training. We have allowed them to graduate on their own pace. They don't have to wait for an entire class until they can graduate. We have done everything we can to maximize their ability to perform and advance and make it through pilot training. We also were looking at the capacity of the flying training units which is where they go next. And to minimize one of those gaps between pilot training and introduction to fighter fundamentals, we have actually combined those so that they are part of a single syllabus. So there is no gap in between. They start at the beginning. And when they finish, they have done both parts of that. No break in training. No gap. No retraining. No recurrency. None of that. So we are working through this as best we can. And we share your concern that folks are not flying quickly enough and they are not flying enough. That certainly is on the forefront of the Secretary and the Chief's mind as well. Mr. Hunter. Yeah, I do hear from the Chief regularly on the topic of pilot production. We don't do that in AQ [Acquisitions Directorate]. But the platforms that enable the production pipeline are obviously platforms that we either sustain or are working to acquire in the case of the T-7. So it is always on the Chief's radar screen. And General Robinson who is their education training command, we work closely with his team. There are some issues with the legacy platform of the T-38 in terms of its availability and that has been a limiter on their ability to accelerate and increase the flow through the pilot production pipeline. And then with some of the delays on the delivery of the T- 7, that is also something that we are going to have to work through and extend the T-38 to go even longer to make that transition. So we focus on that on a weekly basis on both ends of that to try and enable more pilot production to the extent that we can. Mrs. Kiggans. Good. Thank you. Thanks for keeping that priority. And can you just talk to me briefly, I have got about one more minute left, just about how you are integrated unmanned aircraft into your squadrons or what that looks like going forward. Mr. Hunter. Well, so one of our really premier initiatives in the '24 budget is to really accelerate the CCA program, the Collaborative Combat Aircraft program, which is designed from the get-go to be fully integrated and a partner to crude fighter aircraft and other crude aircraft in operations. We have established or having funding in the '24 budget to do an operational experimentation unit to really test out how is this going to work. What are the CONOPS [Concept of Operations] for this kind of coordination and this kind of collaboration between a manned platform and a manned unit and an uncrewed platform, uncrewed squadron. Mr. Kelly. The gentlelady yields back. I now recognize Mr. Johnson. Mr. Johnson. Thank you, Mr. Chairman and Mr. Hunter and General Moore. Thank you so much for your time and your testimony today. I represent Barksdale Air Force Base and Global Strike, and so I am keenly interested in the topics we are talking about today. I will just say real quickly on the important issue of pilot training, just a week ago, I was on base. And they let me try out the new cutting edge virtual reality simulator for the B-52. I crashed the plane immediately. I am terrible. But they had these young pilots there that are aces on this virtual reality. And it is so similar. And obviously the cost savings and the time efficiencies, it is remarkable what they are doing it. I commend everybody for their work on that. I am obviously very interested in the health and readiness of our bomber force given who I represent. And in that vein, you mentioned in your written statement the number one priority for the B-52 is to ensure that it remains viable through 2050. It would be a 100-year aircraft. It is an engineering marvel. And you have talked about how CERP [Commercial Engines Replacement Program] is integral to achieving that goal. So we know the TF33 engine is not going to be supportable for much longer. And I hear from my folks all the time about problems with parts availability and how the current engines are constantly having to be taken off the plane for maintenance and then put back on and on and on. Can one or both of you talk us through some of the issues you are experiencing with that engine and describe how CERP will alleviate these problems? Mr. Hunter. Well, you know, CERP fully replaces the TF33. And when you consider an individual engine and how often when they break as frequently as the TF33s do and of course the B-52 has eight of them. So that is eight opportunities to have something that interrupts an operation or causes you not to be able to take off. So it is a huge impact on the operation of the platform. The CERP program will replace all of the TF33s with the F130. So a commercial derivative but brand-new engineer with a supply chain that is consistent with what is out there today in the commercial sector. So I think it will really address and solve the issues that we are seeing today with the TF33. And the critical thing for us is how quickly we can do the engineering work and procure the kits in order to get those installations begun and then completed across the B-52 fleet. Mr. Johnson. I really appreciate how you said in your testimony it is more than just slapping new engines on an old airplane. It is really kind of a game changer redesign in so many ways. And I don't know. Some of my colleagues may not realize it, but you step into the cockpit of a B-52, it is like stepping back in the 1960s. I mean it is just antiquated. It is hard for me to believe that we are still using some of this equipment. And I mean, the dash is analog dials. It has got tons of info being thrown at the pilots and copilots from all over the place. Can you talk to us about what these upgrades are, the things associated with CERP, how that is going to improve the crew's situational awareness and their ability to successfully conduct their mission? Mr. Hunter. Yeah, and we do have--in addition to the CERP program, there is the radar modernization which will dramatically improve the organic sensing that the platform has and can convey to the pilot for situational awareness and for being able to strike targets, being able to ensure the accuracy that we expect, and delivers the effectiveness that we need for the strike capabilities of the platform and the comms [Communications] upgrades. So having more pipes for more data to then be able to provide situational awareness from off board the aircraft to improve the pilot's ability to engage in collaboration with the rest of the Air Force to strike the targets they need to strike. So it is all three programs working together. And when you look at it, this is an almost complete overhaul of the mission capabilities mission systems of the B-52. And that is what will enable it to operate well into the future. Mr. Johnson. And not a moment too soon. I understand the testing is underway. It is Stennis for the new F130 engine and that the Air Force is going to seek a Milestone B decision a little bit later this year, I think. Can you elaborate on how the testing process is going and what are some of the things you are hoping to accomplish before that Milestone B decision is made? Mr. Hunter. Yes, sir. We are transitioning the program. So it was a middle tier acquisition rapid prototyping. The rapid prototyping effort is delivering a digital prototype and has done quite a bit of risk reduction on the program. When we get to Milestone B, it will become what we call a formal acquisition program of record, major capability acquisition program. That allows us to do the full 30-year-plus life cycle sustainment planning that we would do for a platform that we are going to operate and sustain over decades period of time. In terms of risk reduction that has been done, they have been able to take the F130 engines, put them in a pod, that is essentially the B-52 compatible pod that goes on that pylon, and operate--they have the two-engine pods. So you have two engines in close proximity to one another one and some unique vibrations. And so they have been able to do testing and really understand the performance of the engine in that environment and reduce a lot of risk on that. And as far as what we are looking for when we get to Milestone B, it is the readiness of the program to go into full bore engineering manufacturing development. And I have a fairly high degree of confidence we will be ready in the fall. Mr. Johnson. Thank you. Mr. Chairman, I just want to add you would all been proud. We had our Defenders of Liberty Air Show at Barksdale a couple weeks ago, and we had 160,000 civilians on base to check that out. It was awesome. I yield back. Mr. Kelly. Your time has expired, Mr. Johnson. And if we are going to infomercials, I can talk about Columbus Air Force Base or the great 172nd or the 185th in Mississippi. I now recognize Mr. Bergman for a question--General Bergman. Mr. Bergman. Yeah, no, no. Mr. Bergman on HASC. To be taken for the record because when Congresswoman Kiggans talked about pilot training and time, for the record, by the way, I think it is important we ask the Department of the Navy because they control the Marine Corps and the naval aviation training pipeline. I would like to just see a timeline from the point where that second lieutenant is commissioned to the point where they report for flight training to the point where they are going to get their wings, go through transition training to their type model series that they are going to be operationally capable and to the point where they are full up round in the squadron, deployable. And the end date is the first date then that their initial contract is up. Okay? So the day they are commissioned till the date that they can leave active duty and move on. That would be very helpful for us in a lot of different things. So just take it for the record and if you can get it us. We are going to ask the same thing to the Department of the Navy as well. Thank you. General Moore. Happy to do it, sir. Mr. Kelly. Did anyone else have a question? If not, this hearing is adjourned. [Whereupon, at 4:26 p.m., the subcommittee was adjourned.] ======================================================================= A P P E N D I X April 18, 2023 ======================================================================= ======================================================================= PREPARED STATEMENTS SUBMITTED FOR THE RECORD April 18, 2023 ======================================================================= [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] ======================================================================= WITNESS RESPONSES TO QUESTIONS ASKED DURING THE HEARING April 18, 2023 ======================================================================= RESPONSE TO QUESTION SUBMITTED BY MR. COURTNEY Mr. Courtney. And just a follow-up again on Chairman Kelly's question regarding the KC-46. Again, in prior years, we have had these hearings where General Moore's predecessor, General Nahom, would come in and we were sort of getting updates in terms of the percentage of interim operability which the last time we met, I think it was in the 50 to 70 percent range or whatever. But my understanding is it has continued to improve. And just wondering just for the purposes of an update where does that stand? [See page 7.] Mr. Hunter. Starting in Summer of 2021, through its Interim Capability Release (ICR) Process, Air Mobility Command (AMC) progressively made KC-46As available for employment and taskings as operations with receiver aircraft were adequately tested and evaluated. Through this effort, AMC has cleared KC-46As to carry out operational refueling on nearly all required aircraft, except for the A-10 and other receiver aircraft without an approved technical compatibility assessment. In September 2022, the AMC commander approved KC-46A for worldwide use in support of combatant command taskings, including combat operations. Thus, the ICR Process can be considered 100 percent complete. In addition to resolving the known performance deficiencies, the Air Force continues to examine and refine this weapon system on the road to full operational capability. ______ RESPONSE TO QUESTION SUBMITTED BY MRS. KIGGANS Mrs. Kiggans And are these kids getting--they are getting commissioned and going right to flight school? Or what is that wait time like before they start? [See page 15.] Lt Gen Moore. The following response was drafted by the Air Staff for Operations (AF/A3). Air Force pilot training programs fall under the purview of the AF/A3. Air Force pilot candidates are accessed primarily through three Sources of Commissioning, the United States Air Force Academy (USAFA), Reserve Officers' Training Corp (ROTC), and Officer Training School (OTS), with each program having a different timeline from commissioning as a Second Lieutenant to starting Undergraduate Pilot Training (UPT). On average, USAFA graduates will wait approximately 476 calendar days between commissioning and starting UPT. ROTC graduates, on average, will spend 245 calendar days in the Individual Ready Reserve, followed by an approximate 221 calendar day period following entry on active duty before starting UPT. OTS graduates, on average, will wait approximately 298 calendar days before starting UPT. Air Force pilot candidates attending UPT can expect, on average, approximately 175 calendar days for the fixed-wing pilot track, 190 calendar days for the Euro-NATO Joint Jet Pilot Training track, and 174 calendar days for the helicopter pilot track. At the completion of UPT, fixed-wing pilot trainees will be winged, and track selected for Air Mobility Fundamentals for crewed aircraft and Fighter/Bomber Fundamentals for Fighter and Bomber aircraft. The breakdown of training timelines by track selection, weapon system formal training through combat mission ready, and end of initial service commitment are below: Mobility, Special Operations, Command Control Intelligence Surveillance Reconnaissance and Electronic Warfare, and Rescue pilots attend Air Mobility Fundamentals (approx. 75 calendar days), survival training (approx. 12 calendar days), then weapons system formal training (approx. 86 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 911 calendar days (2.5 years). Pilots in this community will have 9.2 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. Bomber pilots attend Fighter/Bomber Fundamentals (approx. 159 calendar days), survival training (approx. 19 calendar days), then weapons system formal training (approx. 226 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 1138 calendar days (3.1 years). Pilots in the Bomber community will have 8.7 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. Fighter pilots attend Fighter/Bomber Fundamentals (approx. 159 calendar days), Introduction to Fighter Fundamentals (approx. 59 calendar days), centrifuge and survival training (approx. 20 calendar days), then weapons system formal training (approx. 236 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 1315 calendar days (3.6 years). Pilots in the Fighter community will have 8.1 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. At the completion of UPT for rotary-wing, pilot trainees will be winged, then attend survival training (approx. 18 calendar days) then move to their weapons system formal training (approx. 143 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 878 calendar days (2.4 years). Pilots in the helicopter community will have 9.3 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. During the 10-year pilot training Active Duty Service Commitment (starting at graduation from UPT), we expect two or three assignments depending on weapons system--one or two operational and one training (as an Undergraduate Pilot Training or Major Weapons System Formal Training Unit Instructor Pilot) from each pilot. During this period, some pilots will get the opportunity to attend the U.S. Air Force Weapons School or Test Pilot School. ======================================================================= QUESTIONS SUBMITTED BY MEMBERS POST HEARING April 18, 2023 ======================================================================= QUESTIONS SUBMITTED BY MR. WITTMAN Mr. Wittman. After the KC-10's are fully retired, will the Air Force have a tanker surge capacity in the event of a conflict in the Pacific? What will the Air Force's tanker surge capacity be over the course of the next 5- and 10-year timeframes? Mr. Hunter. Tanker capacity and operational priority is accounted for in stacked demand and mobility capabilities and requirements planning documents. Tanker surge capacity is sufficient with the fleet of 466 total air refueling aircraft inventory. In the near-term, each retired tanker will be replaced with a new tanker and the overall tanker fleet quantity will not change. The FY24 PB position is that the Air Force plans to maintain a tanker fleet at or above 466 total aircraft inventory. Mr. Wittman. The Navy has used commercial aerial refueling tankers for over 20 years to supplement their refueling needs for Navy and Marine Corps training exercises that cannot met by the Air Force. Given the recent gaps in Air Force aerial refueling capacity, wouldn't it be prudent to augment refueling needs for Air Force training exercises with commercial aerial refueling? If not, why not? Mr. Hunter. The Air Force is currently meeting aerial refueling demand and projects that it will continue to do so in the future. Should the need for additional aerial refueling arise in the future, the Air Force may consider alternatives to augment capacity. Mr. Wittman. Will the Air Force consider making some retired KC-10's available to industry to ensure a surge capacity is available as a gap filler if needed, particularly since KC-Y has been cancelled and the new near-term follow-on KC-46 tanker acquisition plan has been cut from 150 to 75 aircraft? Mr. Hunter. The Air Force remains engaged with industry and pursues opportunities that have cost benefit for the Government. Currently, industry has not expressed interest in purchasing an Air Force KC-10 for commercial use based on a January 2023 Request for Information released by the KC-10 System Program Office. Some companies are interested in parts and have worked through the General Services Administration to obtain them. While we recently updated our tanker recapitalization approach, our goal is to continue replacing 15 KC-135s per year as they retire, and the tanker fleet will not drop below 466 tanker total aircraft inventory. The Air Force is currently meeting aerial refueling demand and projects that it will continue to do so in the future. ------ QUESTIONS SUBMITTED BY MR. BERGMAN Mr. Bergman. I would like information on the length of time a pilot spends in the various stages of his or her first contract with the service. The timeline would start with the point the 2nd Lieutenant is commissioned and end when the pilot's initial contract is up and they are able to leave active service. Please include pertinent milestones in the timeline such as the point he or she reports to flight training, the point he or she receive their wings, the point they go through transition training to their type model series that they'll be operational capable, to the point they are deployable, etc. Include any other milestones you feel are relevant. The end state would be to identify the length of time for each major milestone to include how long this pilot fully trained and ready to fight until the first contract is up. If the data is there to provide timelines by platform-- helo/fighter/transport; that would be helpful! Mr. Hunter. Air Force pilot candidates are accessed primarily through three Sources of Commissioning, the United States Air Force Academy (USAFA), Reserve Officers' Training Corp (ROTC), and Officer Training School (OTS), with each program having a different timeline from commissioning as a Second Lieutenant to starting Undergraduate Pilot Training (UPT). On average, USAFA graduates will wait approximately 476 calendar days between commissioning and starting UPT. ROTC graduates, on average, will spend 245 calendar days in the Individual Ready Reserve, followed by an approximate 221 calendar day period following entry on active duty before starting UPT. OTS graduates, on average, will wait approximately 298 calendar days before starting UPT. Air Force pilot candidates attending UPT can expect, on average, approximately 175 calendar days for the fixed-wing pilot track, 190 calendar days for the Euro-NATO Joint Jet Pilot Training track, and 174 calendar days for the helicopter pilot track. At the completion of UPT, fixed-wing pilot trainees will be winged, and track selected for Air Mobility Fundamentals for crewed aircraft and Fighter/Bomber Fundamentals for Fighter and Bomber aircraft. The breakdown of training timelines by track selection, weapon system formal training through combat mission ready, and end of initial service commitment are below: Mobility, Special Operations, Command Control Intelligence Surveillance Reconnaissance and Electronic Warfare, and Rescue pilots attend Air Mobility Fundamentals (approx. 75 calendar days), survival training (approx. 12 calendar days), then weapons system formal training (approx. 86 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 911 calendar days (2.5 years). Pilots in this community will have 9.2 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. Bomber pilots attend Fighter/Bomber Fundamentals (approx. 159 calendar days), survival training (approx. 19 calendar days), then weapons system formal training (approx. 226 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 1138 calendar days (3.1 years). Pilots in the Bomber community will have 8.7 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. Fighter pilots attend Fighter/Bomber Fundamentals (approx. 159 calendar days), Introduction to Fighter Fundamentals (approx. 59 calendar days), centrifuge and survival training (approx. 20 calendar days), then weapons system formal training (approx. 236 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 1315 calendar days (3.6 years). Pilots in the Fighter community will have 8.1 years of utilization from weapons system for-mal training until the end of their initial 10-year pilot commitment. At the completion of UPT for rotary-wing, pilot trainees will be winged, then attend survival training (approx. 18 calendar days) then move to their weapons system formal training (approx. 143 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 878 calendar days (2.4 years). Pilots in the helicopter community will have 9.3 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. During the 10-year pilot training Active Duty Service Commitment (starting at graduation from UPT), we expect two or three assignments depending on weapons system--one or two operational and one training (as an Undergraduate Pilot Training or Major Weapons System Formal Training Unit Instructor Pilot) from each pilot. During this period, some pilots will get the opportunity to attend the U.S. Air Force Weapons School or Test Pilot School. Mr. Bergman. I would like information on the length of time a pilot spends in the various stages of his or her first contract with the service. The timeline would start with the point the 2nd Lieutenant is commissioned and end when the pilot's initial contract is up and they are able to leave active service. Please include pertinent milestones in the timeline such as the point he or she reports to flight training, the point he or she receive their wings, the point they go through transition training to their type model series that they'll be operational capable, to the point they are deployable, etc. Include any other milestones you feel are relevant. The end state would be to identify the length of time for each major milestone to include how long this pilot fully trained and ready to fight until the first contract is up. If the data is there to provide timelines by platform-- helo/fighter/transport; that would be helpful! Lt Gen Moore. The following response was drafted by the Air Staff for Operations (AF/A3). Air Force pilot training programs fall under the purview of the AF/A3. Air Force pilot candidates are accessed primarily through three Sources of Commissioning, the United States Air Force Academy (USAFA), Reserve Officers' Training Corp (ROTC), and Officer Training School (OTS), with each program having a different timeline from commissioning as a Second Lieutenant to starting Undergraduate Pilot Training (UPT). On average, USAFA graduates will wait approximately 476 calendar days between commissioning and starting UPT. ROTC graduates, on average, will spend 245 calendar days in the Individual Ready Reserve, followed by an approximate 221 calendar day period following entry on active duty before starting UPT. OTS graduates, on average, will wait approximately 298 calendar days before starting UPT. Air Force pilot candidates attending UPT can expect, on average, approximately 175 calendar days for the fixed-wing pilot track, 190 calendar days for the Euro-NATO Joint Jet Pilot Training track, and 174 calendar days for the helicopter pilot track. At the completion of UPT, fixed-wing pilot trainees will be winged, and track selected for Air Mobility Fundamentals for crewed aircraft and Fighter/Bomber Fundamentals for Fighter and Bomber aircraft. The breakdown of training timelines by track selection, weapon system formal training through combat mission ready, and end of initial service commitment are below: Mobility, Special Operations, Command Control Intelligence Surveillance Reconnaissance and Electronic Warfare, and Rescue pilots attend Air Mobility Fundamentals (approx. 75 calendar days), survival training (approx. 12 calendar days), then weapons system formal training (approx. 86 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 911 calendar days (2.5 years). Pilots in this community will have 9.2 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. Bomber pilots attend Fighter/Bomber Fundamentals (approx. 159 calendar days), survival training (approx. 19 calendar days), then weapons system formal training (approx. 226 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 1138 calendar days (3.1 years). Pilots in the Bomber community will have 8.7 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. Fighter pilots attend Fighter/Bomber Fundamentals (approx. 159 calendar days), Introduction to Fighter Fundamentals (approx. 59 calendar days), centrifuge and survival training (approx. 20 calendar days), then weapons system formal training (approx. 236 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 1315 calendar days (3.6 years). Pilots in the Fighter community will have 8.1 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. At the completion of UPT for rotary-wing, pilot trainees will be winged, then attend survival training (approx. 18 calendar days) then move to their weapons system formal training (approx. 143 calendar days). On average, from commissioning to combat mission ready (deployable) takes approximately 878 calendar days (2.4 years). Pilots in the helicopter community will have 9.3 years of utilization from weapons system formal training until the end of their initial 10-year pilot commitment. During the 10-year pilot training Active Duty Service Commitment (starting at graduation from UPT), we expect two or three assignments depending on weapons system--one or two operational and one training (as an Undergraduate Pilot Training or Major Weapons System Formal Training Unit Instructor Pilot) from each pilot. During this period, some pilots will get the opportunity to attend the U.S. Air Force Weapons School or Test Pilot School.