REVIEWING AND EXAMINING THE FRANCIS SCOTT KEY BRIDGE FEDERAL RESPONSE

House May 15, 2024

Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.

- REVIEWING AND EXAMINING THE FRANCIS SCOTT KEY BRIDGE FEDERAL RESPONSE

[House Hearing, 118 Congress]
[From the U.S. Government Publishing Office]

 REVIEWING AND EXAMINING THE FRANCIS SCOTT 
 KEY BRIDGE FEDERAL RESPONSE

=======================================================================

 (118-58)

 HEARING

 BEFORE THE

 COMMITTEE ON
 TRANSPORTATION AND INFRASTRUCTURE
 HOUSE OF REPRESENTATIVES

 ONE HUNDRED EIGHTEENTH CONGRESS

 SECOND SESSION

 __________

 MAY 15, 2024

 __________

 Printed for the use of the
 Committee on Transportation and Infrastructure
 
[GRAPHIC NOT AVAILABLE IN TIFF FORMAT] 

 Available online at: https://www.govinfo.gov/committee/house-
 transportation?path=/browsecommittee/chamber/house/committee/
 transportation
 
 __________

 U.S. GOVERNMENT PUBLISHING OFFICE 
59-460 PDF WASHINGTON : 2025 
 
----------------------------------------------------------------------------------- 

 COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

 Sam Graves, Missouri, Chairman
 Rick Larsen, Washington, Ranking Member
 
Eleanor Holmes Norton, Eric A. ``Rick'' Crawford, 
 District of Columbia Arkansas
Grace F. Napolitano, California Daniel Webster, Florida
Steve Cohen, Tennessee Thomas Massie, Kentucky
John Garamendi, California Scott Perry, Pennsylvania
Henry C. ``Hank'' Johnson, Jr., Georgiaian Babin, Texas
Andre Carson, Indiana Garret Graves, Louisiana
Dina Titus, Nevada David Rouzer, North Carolina
Jared Huffman, California Mike Bost, Illinois
Julia Brownley, California Doug LaMalfa, California
Frederica S. Wilson, Florida Bruce Westerman, Arkansas
Mark DeSaulnier, California Brian J. Mast, Florida
Salud O. Carbajal, California Jenniffer Gonzalez-Colon,
Greg Stanton, Arizona, Puerto Rico
 Vice Ranking Member Pete Stauber, Minnesota
Colin Z. Allred, Texas Tim Burchett, Tennessee
Sharice Davids, Kansas Dusty Johnson, South Dakota
Jesus G. ``Chuy'' Garcia, Illinois Jefferson Van Drew, New Jersey,
Chris Pappas, New Hampshire Vice Chairman
Seth Moulton, Massachusetts Troy E. Nehls, Texas
Jake Auchincloss, Massachusetts Tracey Mann, Kansas
Marilyn Strickland, Washington Burgess Owens, Utah
Troy A. Carter, Louisiana Rudy Yakym III, Indiana
Patrick Ryan, New York Lori Chavez-DeRemer, Oregon
Mary Sattler Peltola, Alaska Thomas H. Kean, Jr., New Jersey
Robert Menendez, New Jersey Anthony D'Esposito, New York
Val T. Hoyle, Oregon Eric Burlison, Missouri
Emilia Strong Sykes, Ohio Derrick Van Orden, Wisconsin
Hillary J. Scholten, Michigan Brandon Williams, New York
Valerie P. Foushee, North Carolina Marcus J. Molinaro, New York
Vacancy Mike Collins, Georgia
 Mike Ezell, Mississippi
 John S. Duarte, California
 Aaron Bean, Florida
 Celeste Maloy, Utah
 Kevin Kiley, California
 Vacancy

 CONTENTS

 Page

Summary of Subject Matter........................................ v

 STATEMENTS OF MEMBERS OF THE COMMITTEE

Hon. Sam Graves, a Representative in Congress from the State of 
 Missouri, and Chairman, Committee on Transportation and 
 Infrastructure, opening statement.............................. 1
 Prepared statement........................................... 3
Hon. Rick Larsen, a Representative in Congress from the State of 
 Washington, and Ranking Member, Committee on Transportation and 
 Infrastructure, opening statement.............................. 4
 Prepared statement........................................... 6

 WITNESSES

Vice Admiral Peter Gautier, Deputy Commandant for Operations, 
 U.S. Coast Guard, oral statement............................... 7
 Prepared statement........................................... 9
Major General William H. Graham, Deputy Chief of Engineers, 
 Deputy Commanding General, and Deputy Commanding General for 
 Civil and Emergency Operations, U.S. Army Corps of Engineers, 
 oral statement................................................. 12
 Prepared statement........................................... 14
Hon. Shailen Bhatt, Administrator, Federal Highway 
 Administration, U.S. Department of Transportation, oral 
 statement...................................................... 17
 Prepared statement........................................... 19
Hon. Jennifer Homendy, Chair, National Transportation Safety 
 Board, oral statement.......................................... 20
 Prepared statement........................................... 21

 SUBMISSIONS FOR THE RECORD

Submissions for the Record by Hon. Rick Larsen:
 Letter of May 15, 2024, to Hon. Sam Graves, Chairman, and 
 Hon. Rick Larsen, Ranking Member, Committee on 
 Transportation and Infrastructure, from Hon. Kweisi Mfume, 
 Member of Congress......................................... 83
 Report, ``The Impacts of Project Labor Agreements on 
 Competition, Costs, Apprenticeships, and Diversity: 
 Evidence from Port of Seattle Projects,'' Frank Manzo IV, 
 M.P.P. and Robert Bruno, Ph.D., May, 7, 2024............... 84
Statement of Rear Admiral Benjamin K. Evans, Director, Office of 
 Coast Survey, National Oceanic and Atmospheric Administration, 
 Submitted for the Record by Hon. Daniel Webster................ 84

 APPENDIX

Questions to Vice Admiral Peter Gautier, Deputy Commandant for 
 Operations, U.S. Coast Guard, from:
 Hon. Sam Graves.............................................. 87
 Hon. Bruce Westerman......................................... 87
 Hon. Patrick Ryan............................................ 87
Questions to Major General William H. Graham, Deputy Chief of 
 Engineers, Deputy Commanding General, and Deputy Commanding 
 General for Civil and Emergency Operations, U.S. Army Corps of 
 Engineers, from:
 Hon. Bruce Westerman......................................... 87
 Hon. Patrick Ryan............................................ 88
Questions to Hon. Shailen Bhatt, Administrator, Federal Highway 
 Administration, U.S. Department of Transportation, from:
 Hon. Eric A. ``Rick'' Crawford............................... 88
 Hon. Bruce Westerman......................................... 91
 Hon. Patrick Ryan............................................ 92
Questions to Hon. Jennifer Homendy, Chair, National 
 Transportation Safety Board, from Hon. Jefferson Van Drew...... 92

[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]

 May 10, 2024

 SUMMARY OF SUBJECT MATTER

 TO: LMembers, Committee on Transportation and 
Infrastructure
 FROM: LStaff, Committee on Transportation and 
Infrastructure
 RE: LFull Committee Hearing on ``Reviewing and 
Examining the Francis Scott Key Bridge Federal Response''
_______________________________________________________________________

 I. PURPOSE

 The Committee on Transportation and Infrastructure will 
meet on Wednesday, May 15, 2024, at 10:00 a.m. ET in 2167 of 
the Rayburn House Office Building to receive testimony at a 
hearing entitled, ``Reviewing and Examining the Francis Scott 
Key Bridge Federal Response.'' The hearing will discuss the 
ongoing investigation into the allision \1\ of the Motor Vessel 
DALI (MV DALI or DALI) with the Francis Scott Key Bridge (Key 
Bridge) and the Federal response to the incident. At the 
hearing Members will receive testimony from the United States 
Coast Guard (Coast Guard or USCG), the United States Army Corps 
of Engineers (Corps or USACE), the Federal Highway 
Administration (FHWA), and the National Transportation Safety 
Board (NTSB).
---------------------------------------------------------------------------
 \1\ An ``allision'' is a term of art defined as an event where a 
vessel strikes a stationary object.
---------------------------------------------------------------------------

 II. BACKGROUND

THE FRANCIS SCOTT KEY BRIDGE INCIDENT

 On March 26, 2024, the DALI, a Singapore-flagged cargo 
vessel, allided with the Key Bridge in Baltimore, Maryland, 
resulting in the collapse of center spans of the Key Bridge 
into the Patapsco River and significant damage to the 
vessel.\2\ Prior to the allision, the pilot aboard the vessel 
issued a radio call that the DALI had lost power as it 
approached the Key Bridge.\3\ In response, a Maryland 
Transportation Authority (MDTA) police officer radioed two 
police officers on either side of the Key Bridge, resulting in 
the closure of all lanes with access to the Key Bridge and the 
cessation of bridge traffic, saving countless lives.\4\ 
However, a construction crew consisting of eight individuals 
were repairing potholes on the Key Bridge at the time of the 
allision.\5\ Two of the workers were rescued from the water due 
to the efforts of first responders.\6\ Unfortunately, six 
individuals died in the collapse and as of May 7, 2024, the 
bodies of all six victims have been recovered.\7\
---------------------------------------------------------------------------
 \2\ NTSB, Contact of Cargo Vessel Dali with Francis Scott Key 
Bridge and Subsequent Bridge Collapse, (last visited May 2, 2024), 
available at https://www.ntsb.gov/investigations/Pages/DCA24MM031.aspx 
[hereinafter NTSB Investigation Announcement].
 \3\ @NTSB--Newsroom, Twitter, (Mar. 27, 2024, 9:14 PM), available 
at https://twitter.com/NTSB_Newsroom/status/1773156557045276972/photo/
1.
 \4\ Id.
 \5\ Key Bridge Response 2024, UPDATE 16 Multimedia Release: Unified 
Command Reflects on Month's Progress During Joint Recovery and Salvage 
Operations, (April 16, 2024), available at https://
www.keybridgeresponse2024.com/post/update-16-multimedia-release-
unified-command-reflects-on-month-s-progress-during-joint-recovery-and.
 \6\ NBC News, Francis Scott Key Bridge: Two Victims Recovered; NTSB 
Recovers Ship's Voyage Recorder Data, (Mar. 28, 2024), available at 
https://www.nbcnews.com/news/us-news/live-blog/francis-scott-key-
bridge-collapse-live-updates-recovery-mission-starts-rcna145224.
 \7\ Key Bridge Response 2024, UPDATE 20: Authorities Identify Sixth 
Victim Recovered in the Collapse of the Francis Scott Key Bridge, (May 
7, 2024), available at https://www.keybridgeresponse2024.com/post/
update-20-authorities-identify-sixth-victim-recovered-in-the-collapse-
of-the-francis-scott-key-brid.
---------------------------------------------------------------------------
 A Unified Command and Joint Information Center was 
established in Baltimore, Maryland, providing a coordinated 
response and the distribution of information related to the Key 
Bridge collapse.\8\ The Unified Command includes the Coast 
Guard, the Corps, Maryland Department of the Environment, MDTA, 
Maryland State Police, and Witt O'Brien's, on behalf of Synergy 
Marine.\9\ Maryland Governor Wes Moore declared a State of 
Emergency for the State of Maryland on March 26, 2024, allowing 
Maryland to coordinate and request emergency resources and 
support.\10\ President Biden visited the site on April 5, 2024, 
and restated his intention for the Federal Government to cover 
the entire cost of reconstructing the Key Bridge while 
committing to the use of union labor and American steel.\11\ 
The President also signaled the Administration's commitment to 
ensuring that the responsible party pays ``to repair the damage 
and be held accountable to the fullest extent of the law.'' 
\12\ On the same day, Office of Management and Budget (OMB) 
Director Shalanda Young requested that Congress authorize a 100 
percent Federal cost share to rebuild the Key Bridge.\13\
---------------------------------------------------------------------------
 \8\ Key Bridge Response 2024, Unified Command, Joint Information 
Center Established for Key Bridge Response 2024, (Mar. 30, 2024), 
available at https://www.keybridgeresponse2024.com/post/baltimore-s-
francis-scott-key-bridge-collapses-after-mv-dali-allided-with-bridge-
column.
 \9\ Key Bridge Response 2024, Unified Command Response 
Organizations, (last visited May 2, 2024), available at https://
www.keybridgeresponse2024.com/about.
 \10\ The Office of Governor Wes Moore, Governor Moore's Statement 
on the Collapse of the Francis Scott Key Bridge, (Mar. 26, 2024), 
available at https://governor.maryland.gov/news/press/pages/governor-
moore-statement-on-the-collapse-of-the-francis-scott-key-bridge.aspx 
[hereinafter Maryland State of Emergency Declaration].
 \11\ The White House, Remarks by President Biden on Rebuilding the 
Francis Scott Key Bridge and Reopening the Port of Baltimore, (Apr. 5, 
2024), available at https://www.whitehouse.gov/briefing-room/speeches-
remarks/2024/04/05/remarks-by-president-biden-on-rebuilding-the-
francis-scott-key-bridge-and-reopening-the-port-of-baltimore-baltimore-
md/.
 \12\ Id.
 \13\ Letter from the Honorable Shalanda Young, Director, Office of 
Management and Budget, to Rep. Sam Graves et. al., Chairman, H. Comm. 
on Transp. and Infrastructure, (Apr. 5, 2024), available at https://
www.whitehouse.gov/wp-content/uploads/2024/04/Letter-Regarding-
Authorizing-Language-for-Rebuilding-Francis-Scott-Key-Bridge.pdf 
[hereinafter OMB Director Shalanda Young Letter].
---------------------------------------------------------------------------

HISTORY OF THE FRANCIS SCOTT KEY BRIDGE

 The Key Bridge opened on March 23, 1977, and was the second 
longest main span continuous truss bridge in the world at the 
time, measuring 1,200 feet between adjacent towers and 
supporting pillars.\14\ It remained the third longest 
continuous truss bridge in the world at the time of 
collapse.\15\ Constructed to relieve congestion in the area, 
the Key Bridge provided a second crossing over the Baltimore 
Harbor, especially for vehicles transporting hazardous 
materials that are otherwise prohibited from traveling through 
the Baltimore Harbor and McHenry tunnels.\16\ The Key Bridge 
carried four toll lanes of Interstate 695 over the Patapsco 
River, generating 12.4 million toll transactions totaling $56.1 
million in revenue during Maryland's last fiscal year.\17\ An 
estimated 30,000 vehicles crossed the bridge each day.\18\ As a 
toll bridge on an Interstate that at the time of the incident 
was not subject to Title 23, United States Code, the Key Bridge 
had never received Federal-aid funding.\19\
---------------------------------------------------------------------------
 \14\ Jennifer Hassan, The History of Key Bridge, Baltimore's 
Engineering Marvel of the 1970s, The Washington Post, (last updated 
Mar. 27, 2024), available at https://www.washingtonpost.com/local/2024/
03/26/francis-scott-key-bridge-history-baltimore; see also Wayne Perry, 
Named for `Star-Spangled Banner' Author, Francis Scott Key Bridge Was 
Part of Baltimore's Identity, The Associated Press, (Mar. 26, 2024), 
available at https://apnews.com/article/key-bridge-collapse-baltimore-
national-anthem-d22abe7910d7d4ece6c8437997b6d5a5.
 \15\ Id.
 \16\ MDTA, Francis Scott Key Bridge History, (last visited May 2, 
2024), available at https://mdta.maryland.gov/keybridgenews.
 \17\ MDTA, Annual Comprehensive Financial Report of the Maryland 
Transportation Authority--An Enterprise Fund of the State of Maryland, 
(Dec. 31, 2023), available at https://mdta.maryland.gov/sites/default/
files/Files/ACFR/2023_Annual_Comprehensive_Financial_
Report.pdf.
 \18\ The White House, FACT SHEET: Biden-Harris Administration 
Actions Following the Francis Scott Key Bridge Collapse, (Apr. 5, 
2024), available at https://www.whitehouse.gov/briefing-room/
statements-releases/2024/04/05/fact-sheet-biden-harris-administration-
actions-following-the-francis-scott-key-bridge-collapse/.
 \19\ Email from FHWA to Staff, H. Comm. on Transp. and 
Infrastructure, (Mar. 26, 2024, 3:49 p.m.), (on file with Comm.) 
[hereinafter FHWA March 26 Email].
---------------------------------------------------------------------------

THE DALI

 The DALI, a then Marshall Island-flagged vessel, was 
constructed in 2015 by Hyundai Heavy Industries in South Korea 
and is owned by Grace Ocean Private Ltd. and managed by Synergy 
Marine Group, both based in Singapore.\20\ The now Singapore-
flagged vessel was leaving Baltimore for Sri Lanka and was 
time-chartered to MAERSK, a Danish shipping firm, to carry 
cargo under contract to MAERSK. Under time charters, the 
charterer uses the vessel owner or operator's crew, meaning no 
MAERSK employees were operating the 985-foot container ship. 
The vessel includes 20 crew members from India and one from Sri 
Lanka.\21\ The vessel has a 10,000 Twenty-foot Equivalent Unit 
(TEU) capacity and was carrying 4,679 TEUs (roughly 2,340 40-
foot containers).\22\ The vessel is classed by Nippon Kaiji 
Kyokai,\23\ was last inspected by the Coast Guard on September 
13, 2023, at the Port of New York and New Jersey, and made nine 
calls to United States ports over the last two years.\24\
---------------------------------------------------------------------------
 \20\ John Frittelli et al., Cong. Rsch. Serv., R48028, Baltimore 
Bridge Collapse: Frequently Asked Questions (FAQs), (Apr. 12, 2024), 
available at https://www.crs.gov/reports/pdf/R48028/R48028.pdf, 
[hereinafter Baltimore Bridge Collapse FAQs].
 \21\ Emily Davies and Rachel Weiner, The Dali Ship Crew is Still on 
Board After Hitting the Baltimore Bridge, The Washington Post, (Apr. 4, 
2024), available at https://www.washingtonpost.com/local/2024/03/29/
dali-ship-crew-baltimore-bridge-collapse/.
 \22\ Baltimore Bridge Collapse FAQs, supra note 20.
 \23\ Nippon Kaiji Kyokai is a classification society, which 
establishes and maintains technical standards for vessels, and they 
conduct inspections to ensure the vessel maintains those standards.
 \24\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure, (May 1, 2024, 11:57 a.m.), (on file with Comm.).
---------------------------------------------------------------------------
 The largest container vessel in 1977 when the Key Bridge 
was completed was an SL7.\25\ SL7s were owned by Sea-Land, 
operated by Sea-Land, and carried cargo under contract with 
Sea-Land.\26\ They were built in Europe, but United States-
owned, -flagged, and crewed.\27\ SL7s were 24,471 gross tons 
and had a beam of 105 feet.\28\ By comparison, the DALI, a 
Neopanamax vessel, is 95,128 gross tons and has a beam of 157 
feet.\29\
---------------------------------------------------------------------------
 \25\ MARAD, Vessel History: SS Pollux (T-AK-290/T-AKR-290), (last 
visited May 2, 2024), available at https://vesselhistory.marad.dot.gov/
documents/34baeea1-6161-4a9d-9ce0-fba137bbbc88.pdf.
 \26\ Id.
 \27\ Id.
 \28\ Id.
 \29\ BalticShipping.com, DALI, IMO 9697428, (last visited May 2, 
2024), available at https://www.balticshipping.com/vessel/imo/9697428.
---------------------------------------------------------------------------
 All vessels making call at United States ports are required 
to maintain a vessel response plan and hold insurance for the 
vessel. Following the allision, the Coast Guard activated the 
DALI's vessel response plan, which brought contracted salvagers 
at the vessel owner's expense to assist the response 
operations.\30\
---------------------------------------------------------------------------
 \30\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure, (Mar. 26, 2024, 8:43 a.m.), (on file with Comm.).
---------------------------------------------------------------------------

 III. FEDERAL AGENCY RESPONSE

UNITED STATES COAST GUARD

 Following the collapse of the Key Bridge, the Coast Guard 
deployed numerous assets to begin search and rescue efforts and 
to establish a security perimeter around the impacted area. The 
Coast Guard Cutter Mako, an 87-foot Marine Protector-class 
patrol boat, was deployed to serve as the On-Scene Coordinator, 
responsible for coordinating the multiagency search and rescue 
effort.\31\ As the situation progresses, the Coast Guard 
continues to surge assets to assist with various elements of 
the response. This includes multiple assets ranging from a 225-
foot buoy tender, 154-foot fast response cutters, 87-foot 
patrol boats, and numerous smallboats, as well as more than 200 
Coast Guard members including members from stations outside of 
the immediate area to support the unified command.\32\
---------------------------------------------------------------------------
 \31\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure, (Mar. 27, 2024, 8:28 p.m.), (on file with Comm.) 
[hereinafter USCG March 27 Email].
 \32\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure, (Apr. 2, 2024, 8:39 a.m.), (on file with Comm.).
---------------------------------------------------------------------------
 Following the allision, the Coast Guard issued an urgent 
marine broadcast and set up a 2,000-yard safety zone for 
surrounding waters.\33\ They continue to monitor and enforce 
the safety zone. The Coast Guard deployed vessels and staff to 
verify aids to navigation, finding one buoy off station and 
relocated other aids to navigation to reroute vessel 
traffic.\34\ The USCG National Strike Force, which provides 
technical experts and specialized equipment, oversaw all 
salvage dive operations, provided on site aerial assessment 
with unmanned aerial systems, and supervised Salvage 
Engineering Response Teams (SERT), which provided initial 
assessments on stabilization of the bridge and the DALI. The 
National Strike Force also worked to develop a salvage plan and 
provided a phased removal approach involving the removal of 14 
damaged containers carrying hazardous materials from the 
vessel.\35\ The Unified Command determined that these damaged 
containers largely contained soap and perfume products and 
noted that no volatile organic compounds or flammable vapors 
were observed.\36\ There were a total of 56 containers on the 
DALI containing hazardous materials.\37\ The Marine Spill 
Response Corporation deployed 1400 feet of boom around the 
vessel and 41 bales of sorbent bill and has subcontracted 
Miller Environmental in case of any unforeseen pollution 
remediation needs.\38\ Most recently, 182 containers were 
removed from the vessel to allow for salvage crews to remove 
the portion of the Key Bridge lying on top of the DALI.\39\
---------------------------------------------------------------------------
 \33\ USCG, Coast Guard, Multiple Partner Agencies, Responding to 
Francis Scott Key Bridge Collapse in Baltimore, (Mar. 26, 2024), 
available at https://www.news.uscg.mil/Press-Releases/Article/3718320/
coast-guard-multiple-partner-agencies-responding-to-francis-scott-key-
bridge-co/.
 \34\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure, (Mar. 26, 2024, 4:44 p.m.), (on file with Comm.) 
[hereinafter USCG March 26 Email].
 \35\ Key Bridge Response 2024, CORRECTION: United Command Continues 
Key Bridge Response 2024, (Mar. 28, 2024), available at https://
www.keybridgeresponse2024.com/post/correction-unified-command-
continues-key-bridge-response-2024.
 \36\ Id.
 \37\ Id.
 \38\ USCG March 26 Email, supra note 34.
 \39\ Key Bridge Response 2024, UPDATE 18 Multimedia Release: Key 
Bridge Unified Command Prepares for Removal of Bridge Piece on Top of 
M/V DALI, (May 3, 2024), available at https://
www.keybridgeresponse2024.com/post/update-18-multimedia-release-key-
bridge-unified-command-prepares-for-removal-of-bridge-piece-on-top.
---------------------------------------------------------------------------
 While the NTSB is leading the investigation pursuant to a 
Memorandum of Understanding between the NTSB and the Coast 
Guard, on March 26, 2024, the Coast Guard convened a formal 
Marine Board of Investigation to investigate and issue a report 
on the allision.\40\ The Commandant may designate a Marine 
Board of Investigation to promote safety of life and property 
at sea or in the public interest.\41\ On April 15, 2024, the 
Coast Guard's Marine Board of Investigation paused evidence 
collection efforts to avoid interfering with an ongoing 
criminal investigation being conducted by the United States 
Attorney's Office for Maryland and the Federal Bureau of 
Investigation.\42\ Special agents from the Coast Guard 
Investigative Service (CGIS) are assisting the Department of 
Justice with the ongoing criminal investigation.\43\
---------------------------------------------------------------------------
 \40\ USCG March 26 Email, supra note 34.
 \41\ 46 C.F.R. Sec. 4.09-1.
 \42\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure, (Apr. 15, 2024, 5:38 p.m.), (on file with Comm.).
 \43\ Id.
---------------------------------------------------------------------------
 The Coast Guard response is primarily funded through their 
Operations and Support (O&S) budget. Under current statute, the 
Coast Guard cannot recoup operating expenses unless there is 
discharge or the substantial threat of discharge of oil and the 
Oil Spill Liability Trust Fund (OSLTF) is activated.\44\ When 
the OSLTF is activated, the Coast Guard can recoup costs from 
the Fund which is then replenished by the responsible party. 
While the OSLTF has been activated, the amounts used from the 
Fund have been for limited response actions to mitigate the 
threat of a discharge of oil from the DALI.\45\ Once the DALI 
is refloated and moved, the Coast Guard will cease use of the 
OSLTF. Outside of the OSLTF, no other mechanism exists to 
recoup costs occurred to their O&S account.\46\ While the Coast 
Guard maintains enough funding to continue the response, the 
incident has put a strain on the Coast Guard's overextended 
budget and impacts their ability to perform other missions.\47\
---------------------------------------------------------------------------
 \44\ USCG, The Oil Spill Liability Trust Fund (OSLTF), (last 
visited May 9, 2024), available at https://www.uscg.mil/Mariners/
National-Pollution-Funds-Center/About_NPFC/osltf/.
 \45\ Email from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure (May 8, 2024, 5:29 p.m.) (on file with Comm.)
 \46\ Id.
 \47\ Briefing from the USCG to Staff, H. Comm. on Transp. and 
Infrastructure (April 15, 2024).
---------------------------------------------------------------------------

UNITED STATES ARMY CORPS OF ENGINEERS (CORPS)

 The Corps is tasked with ensuring the navigability of the 
Nation's waterways by providing for the safe and reliable 
movement of commerce.\48\ The Corps is leading bridge debris 
removal efforts within the Baltimore 50-foot navigation 
channel. The Corps is working to reopen the permanent, 700-
foot-wide by 50-foot-deep Federal navigation channel by the end 
of May 2024, restoring port access to normal capacity.\49\ 
Corps activities include use of dive safety experts, underwater 
analysis and assessment with remotely operated vehicles and 
sonar, use of certified bridge safety inspectors and urban 
search and rescue structural technical specialists, and the 
deployment of vessels for waterway debris management and 
hydrographic and topographic surveying.\50\ The Corps has 
employed contractors as part of its process for clearing the 
damage and debris.\51\ The Corps has an ongoing relationship 
with the Navy Supervisor of Salvage and Diving, who has 
existing contracts with companies experienced in heavy salvage. 
These companies repositioned two heavy salvage cranes from 
Newark, New Jersey to Baltimore to begin the salvage work, 
including the largest heavy salvage crane on the East Coast. 
The existing contract allowed the debris removal work to begin 
quickly after the incident.\52\
---------------------------------------------------------------------------
 \48\ USACE, Navigation, (last visited May 2, 2024), available at 
https://www.usace.army.mil/Missions/Civil-Works/Navigation/.
 \49\ Email from the USACE to Staff, H. Comm. on Transp. and 
Infrastructure (Apr. 29, 2024, 2:42 p.m.) (on file with Comm.) 
[hereinafter USACE April 29 Email].
 \50\ USACE, U.S. Army Corps of Engineers Leading Effort to Clear 
Fort McHenry Channel Following Key Bridge Collapse, (Mar. 26, 2024), 
available at https://www.nab.usace.army.mil/Media/News-Releases/
Article/3719448/us-army-corps-of-engineers-leading-effort-to-clear-
fort-mchenry-channel-followi/.
 \51\ Id.
 \52\ Briefing from the USACE to Staff, H. Comm. on Transp. and 
Infrastructure (Mar. 27, 2024).
---------------------------------------------------------------------------
 The Coast Guard Captain of the Port established three 
temporary alternate channels (TACs) on either side of the 
collapsed span.\53\ The northern channel (Sollers Point TAC) 
supporting 11 feet of depth opened on April 1, 2024, the 
northeastern channel (Fort Carroll TAC) supporting up to 20 
feet opened on April 19, 2024, and the southern channel 
(Hawkins Point TAC) supporting up to 14 feet opened on April 2, 
2024.\54\ These temporary alternate channels are located in the 
portion of the Patapsco river outside the Federal channel. A 
Limited Access Channel (LAC), partially located along the 
northern alignment of the closed 50-foot Federal navigation 
channel, opened on April 25, 2024, a week and a half ahead of 
schedule.\55\ This 280 feet wide by 35 feet deep LAC will allow 
approximately 40 percent of port capacity to return.\56\ The 
Corps announced temporary closure of the LAC from April 30, 
2024, through May 10, 2024, to allow for removal of a steel 
truss from the Key Bridge laying across the DALI.\57\ These 
efforts are necessary to complete before removing additional 
containers from the DALI and floating the vessel to allow it to 
be relocated before the planned channel reopening at the end of 
May 2024.\58\
---------------------------------------------------------------------------
 \53\ Key Bridge Response 2024, Update 5 Multimedia Release: First 
Vessel Passes Through Temporary Alternate Channel Around Key Bridge 
Wreckage, (Apr. 1, 2024), available at https://
www.keybridgeresponse2024.com/post/update-5-multimedia-release-first-
vessel-passes-through-temporary-alternate-channel-around-key-brid; see 
also Key Bridge Response 2024, Update 6 Multimedia Release: Unified 
Command Opens Second Temporary Alternate Channel Around Key Bridge 
Wreckage, (Apr. 2, 2024), available at https://
www.keybridgeresponse2024.com/post/update-6-multimedia-release-unified-
command-opens-second-temporary-alternate-channel-around-key-bri; see 
also Key Bridge Response 2024, UPDATE 14 Multimedia Release: Unified 
Command Opens Third Temporary Alternate Channel, (Apr. 19, 2024), 
available at https://www.keybridgeresponse2024.com/post/update-14-
multimedia-release-unified-command-opens-third-temporary-alternate-
channel.
 \54\ Id.
 \55\ Key Bridge Response 2024, UPDATE 15: United Command Opens 
Limited Access Deep Draft Channel, (Apr. 25, 2024), available at 
https://www.keybridgeresponse2024.com/post/update-15-unified-command-
opens-limited-access-deep-draft-channel.
 \56\ USACE April 29 Email, supra note 49.
 \57\ Id.
 \58\ Id.
---------------------------------------------------------------------------
 The Corps recently conveyed it has sufficient authorization 
and available operation and maintenance (O&M) funding to 
complete the debris removal work in response to the Key Bridge 
collapse.\59\ However, the Corps is using fiscal year (FY) 2024 
funds appropriated for operation and maintenance of the 
Baltimore Harbor and Channels not initially intended to be used 
for the salvage work, among other funds.\60\ While a formal 
funding request has not yet been made, the Corps has indicated 
an anticipated need for additional appropriations to replenish 
diverted funding intended for other projects, including planned 
maintenance of the Baltimore Harbor.\61\ This work is being 
completed without a non-Federal cost share and therefore is 
covered entirely by Federal funds.\62\
---------------------------------------------------------------------------
 \59\ Briefing from Vice Admiral Peter Gautier, Deputy Commandant 
for Operations, USCG, Lt. Gen. Scott Spellmon, Chief of Engineers and 
Commanding General, USACE, Allison Dane Camden, Deputy Asst. Sec., 
Office of Multimodal Freight Infrastructure and Policy, DOT, to H. 
Comm. on Transp. and Infrastructure, (Apr.10, 2024, 3:00 p.m.), 
(remarks from Lt. Gen. Scott Spellmon) [hereinafter Briefing].
 \60\ Email from USACE to Staff, H. Comm. On Transp. & 
Infrastructure, (May 7, 2024, 2:34 p.m.), (on file with Comm.).
 \61\ Briefing, supra note 59.
 \62\ Id.
---------------------------------------------------------------------------

FEDERAL HIGHWAY ADMINISTRATION (FHWA)

 On March 28, 2024, FHWA received and approved an 
application from the Maryland Department of Transportation for 
$60 million in Emergency Relief (ER) funding.\63\ These ``quick 
release'' funds are intended to help with initial emergency 
response and repair costs and may be released prior to 
completion of detailed damage inspections and cost 
estimates.\64\ According to FHWA, the $60 million represents 
approximately five percent of the preliminary estimated project 
cost of $1.2 billion.\65\ The Maryland Transportation Authority 
has reportedly said the rebuild will cost between $1.7 billion 
and $1.9 billion, and the target for completion is fall 
2028.\66\
---------------------------------------------------------------------------
 \63\ FHWA, Biden-Harris Administration Announces $60 million for 
Emergency Work in Wake of the Collapse of theFrancis Scott Key Bridge 
in Baltimore, (Mar. 28, 2024), available at https://highways.dot.gov/
newsroom/biden-harris-administration-announces-60-million-emergency-
work-wake-collapse-francis.
 \64\ Id.
 \65\ Email from FHWA to Staff, H. Comm. on Transp. and 
Infrastructure, (March 28, 2024, 4:32 p.m.), (on file with Comm.) 
[hereinafter FHWA March 28 Email].
 \66\ Michael Laris and Erin Cox, ``Rebuilding Baltimore's Key 
Bridge expected to cost up to $1.9 billion'' The Washington Post, (May 
2, 2024) available at https://www.washingtonpost.com/dc-md-va/2024/05/
02/baltimore-key-bridge-rebuilding-cost/.
---------------------------------------------------------------------------
 ER is a special program within the Highway Trust Fund (HTF) 
for the repair or reconstruction of Federal-aid highways and 
roads on Federal lands which have suffered serious damage as a 
result of natural disasters or catastrophic failures from an 
external cause.\67\ Individual states are responsible for 
requesting ER funds.\68\ Eligibility is dependent on a 
presidential or gubernatorial disaster declaration.\69\ 
Maryland Governor Wes Moore declared a State of Emergency on 
March 26, 2024, making repairs to the Francis Scott Key Bridge 
eligible.\70\ States are required to submit an application for 
ER funding to FHWA within two calendar years of the date of the 
disaster.\71\ The application must include a comprehensive list 
of all eligible project sites and repair costs.\72\
---------------------------------------------------------------------------
 \67\ FHWA, Emergency Relief Program, (last updated Jan. 23, 2024), 
available at https://www.fhwa.dot.gov/programadmin/erelief.cfm 
[hereinafter ER Program].
 \68\ Id.
 \69\ Id.
 \70\ Maryland State of Emergency Declaration, supra note 10.
 \71\ ER Program, supra note 67.
 \72\ Id.
---------------------------------------------------------------------------
 The ER program receives funding from a permanent annual 
authorization of $100 million in contract authority from the 
Highway Trust Fund (HTF) and periodic supplemental 
appropriations from the General Fund.\73\ From FY 1990 to FY 
2023, Congress provided nearly $23 billion in supplemental 
appropriations from the General Fund and HTF for the ER program 
in addition to the $100 million annual authorization from the 
HTF.\74\ All supplemental appropriations have been derived from 
the General Fund since FY 2005.\75\ The Infrastructure 
Investment and Jobs Act (IIJA) (P.L. 117-58) amended the period 
from 180 to 270 days after a disaster during which the Federal 
cost share would be provided at 100 percent for ``eligible 
emergency repairs to minimize damage, protect facilities, or 
restore essential traffic.'' \76\ After that, the Federal cost 
share payable is 90 percent or 80 percent, depending on the 
classification of the project.\77\
---------------------------------------------------------------------------
 \73\ See 23 U.S.C. Sec. 125; see also ER Program, supra note 67.
 \74\ FHWA March 28 Email, supra note 65.
 \75\ Id.
 \76\ IIJA, Pub. L. No. 117-58, 135 Stat. 429; see also 23 U.S.C. 
Sec. 120(e).
 \77\ Id.
---------------------------------------------------------------------------
 Despite being located on Interstate 695, the Key Bridge was 
not part of the Interstate Highway System. While the bridge was 
shielded as I-695, it was part of a larger segment that 
comprises Maryland State Route 695, which includes sections not 
on the Interstate Highway system, including the Key Bridge.\78\ 
According to FHWA, prior to its collapse, the facility never 
received any Federal funding.\79\ The Key Bridge was 
historically a toll facility, but because it did not receive 
Federal funds, it was never required to comply with Federal 
requirements, including tolling requirements. However, upon the 
Maryland Department of Transportation's receipt of ER funding, 
the facility was considered ``Federalized,'' and became subject 
to all Title 23, United States Code, requirements going 
forward.\80\
---------------------------------------------------------------------------
 \78\ John Lloyd, Maryland.gov, MDOT SHA Roadway National Highway 
System, (see segments), available at https://data-
maryland.opendata.arcgis.com/datasets/maryland::mdot-sha-roadway-
national-highway-system-nhs/explore?location=39.209822%2C-
76.584433%2C12.00.
 \79\ FHWA March 26 Email, supra note 19.
 \80\ Id.
---------------------------------------------------------------------------
 Generally, the Federal share for ER program-funded 
permanent repairs is 90 percent for interstate highways and 80 
percent for all other Federal-aid highways, unless a project 
meets the conditions for an exception.\81\ In 2012, Congress 
enacted changes to the ER program to allow that ``eligible 
repairs to restore damaged facilities to predisaster condition 
may amount to 90 percent of the cost of the repairs if the 
eligible expenses incurred by the State due to natural 
disasters or catastrophic failures in a Federal fiscal year 
exceeds the annual apportionment of the State.'' \82\ 
Maryland's Federal-aid highway program apportionment for FY 
2024 is approximately $828.3 million.\83\ If the costs of 
repairing the bridge and other eligible activities, such as 
emergency traffic services and debris removal, exceed 
Maryland's FY 2024 highway apportionment, Maryland will be 
eligible for a Federal share up to 90 percent for repair of the 
Key Bridge.
---------------------------------------------------------------------------
 \81\ FHWA, Federal-aid Programs and Special Funding, (last updated 
Jan. 23, 2024), available at https://www.fhwa.dot.gov/programadmin/
erelief.cfm.
 \82\ MAP-21, Pub. L. No. 112-141, 126 Stat. 566.
 \83\ FHWA, Apportionment of Federal-aid Highway Program Funds for 
Fiscal Year 2024, (Oct. 2, 2023), available at https://
www.fhwa.dot.gov/legsregs/directives/notices/n4510880.cfm.
---------------------------------------------------------------------------
 Immediately following the collapse, President Biden said, 
``It's my intention that [the] Federal government will pay for 
the entire cost of reconstructing that bridge.'' \84\ The Biden 
Administration has since requested Congress authorize a Federal 
cost share of 100 percent to cover the entire cost of 
rebuilding the Key Bridge.\85\
---------------------------------------------------------------------------
 \84\ The White House, Remarks by President Biden on the Collapse of 
the Francis Scott Key Bridge, (March 26, 2024), available at https://
www.whitehouse.gov/briefing-room/speeches-remarks/2024/03/26/remarks-
by-president-biden-on-the-collapse-of-the-francis-scott-key-bridge/.
 \85\ OMB Director Shalanda Young Letter, supra note 13.
---------------------------------------------------------------------------
 Because ER is a reimbursable program the Federal Government 
does not provide a state with lump sum payment, but rather a 
state receives payment after making repairs and submitting 
vouchers to FHWA for reimbursement of the Federal share.\86\ 
Once the state's eligibility for ER funds has been confirmed by 
FHWA, Maryland can incur obligations knowing that FHWA will 
reimburse the state. Prior to the collapse, the Key Bridge was 
a toll facility.\87\ ER funds cannot be used to pay for lost 
toll revenue.\88\
---------------------------------------------------------------------------
 \86\ FHWA, Emergency Relief (ER) and Program Administration: Steps 
for Receiving Reimbursement of ER Expenses, (last visited May 2, 2024), 
available at https://highways.dot.gov/fed-aid-essentials/videos/other-
programs/emergency-relief-er-and-program-administration-steps.
 \87\ FHWA March 26 Email, supra note 19.
 \88\ 23 C.F.R. Sec. 668.109(c)(9).
---------------------------------------------------------------------------
 FHWA issues periodic reports on the total unmet needs for 
emergency relief for both Federal-aid highways and Federally-
owned roads, which represents the total amounts eligible to be 
reimbursed by the Federal government under the ER program.\89\ 
As of March 26, 2024, there is $2.05 billion in total unmet 
needs and an ER fund balance of approximately $951 million, 
resulting in a backlog of nearly $1.1 billion.\90\ These 
figures do not reflect the projected cost to rebuild the Key 
Bridge. When recently testifying before Congress, Department of 
Transportation (DOT) Secretary Pete Buttigieg acknowledged that 
DOT has not yet proposed a specific supplemental funding 
request to cover the cost of rebuilding the Key Bridge and 
address the existing unmet needs of the ER program.\91\
---------------------------------------------------------------------------
 \89\ FHWA March 26 Email, supra note 19.
 \90\ Id.
 \91\ Budget Hearing--Fiscal Year 2025 Request for the Department of 
Transportation: Hearing Before the Subcomm. on Transportation, Housing 
and Urban Development, and Related Agencies of the H. Comm. on 
Appropriations, 118th Cong. (2024) (Testimony of Sec. Pete Buttigieg).
---------------------------------------------------------------------------
 IIJA makes significant investments in bridges through 
existing and new programs, including the Bridge Investment 
Program (BIP) and the Bridge Replacement, Rehabilitation, 
Preservation, Protection, and Construction Program (BFP).\92\ 
The BIP is a competitive, discretionary grant program that 
supports funding for states, localities, and other entities to 
invest in existing bridges and reduce the number of bridges in 
poor condition.\93\ The BFP funding is largely distributed by 
formula and is generally intended for States to replace bridges 
in poor condition and rehabilitate bridges in fair 
condition.\94\ From FY 2022 through FY 2026, IIJA provides 
$36.7 billion in advance appropriations for these two programs, 
authorizes nearly $3.3 billion from the HTF, and authorizes an 
additional $3.3 billion in spending subject to 
appropriation.\95\ IIJA also authorized and appropriated tens 
of billions of dollars for other grant programs where bridge 
projects are eligible, including for the Nationally Significant 
Multimodal Freight & Highway Projects (INFRA) program, 
Rebuilding American Infrastructure with Sustainability and 
Equity (RAISE) discretionary grant program, and the National 
Infrastructure Project Assistance (Mega) program.\96\ 
Additionally, IIJA reauthorized formula programs for which 
bridge projects are eligible, such as the National Highway 
Performance Program and the Surface Transportation Block Grant 
Program.\97\
---------------------------------------------------------------------------
 \92\ IIJA, Pub. L. No. 117-58, 135 Stat. 429 [hereinafter IIJA].
 \93\ FHWA, Bridge Investment Program, (last updated Mar. 5, 2024), 
available at https://www.fhwa.dot.gov/bridge/bip/.
 \94\ FHWA, Bridge Formula Program (BFP) Questions and Answers, 
(last updated Dec. 23, 2022), available at https://www.fhwa.dot.gov/
bridge/bfp/qanda.cfm.
 \95\ IIJA, supra note 92.
 \96\ Id.
 \97\ Id.
---------------------------------------------------------------------------

NATIONAL TRANSPORTATION SAFETY BOARD (NTSB)

 The NTSB is an independent Federal agency responsible for 
investigating transportation accidents in the United States and 
issuing safety recommendations.\98\ The NTSB is leading the 
investigation into the contact of the DALI with the Key Bridge 
and the subsequent collapse of the bridge.\99\ The NTSB's 
general investigative process includes the initial notification 
and decision to investigate, on-site fact gathering, analysis 
of facts and determination of probable cause, acceptance of a 
final report, and advocacy for the acceptance of safety 
recommendations resulting from the investigation.\100\ The 
NTSB's role while on scene of the Key Bridge collapse is 
limited to the collection of the perishable evidence, including 
the documentation and photographs of the scene and confiscation 
of electronics and other components.\101\
---------------------------------------------------------------------------
 \98\ NTSB, Who We Are and What We Do, (last visited May 2, 2024), 
available at https://www.ntsb.gov/Pages/home.aspx.
 \99\ NTSB Investigation Announcement, supra note 2.
 \100\ NTSB, The Investigative Process, (last visited May 2, 2024), 
available at https://www.ntsb.gov/investigations/process/Pages/
default.aspx.
 \101\ NTSB, NTSB Media Briefing 2--Francis Scott Key Bridge Struck 
by Cargo Ship Dali, (Mar. 27, 2024), (Remarks by Chair Jennifer 
Homendy).
---------------------------------------------------------------------------
 The NTSB and Coast Guard are required by statute and 
Federal regulations to investigate marine casualties.\102\ The 
Coast Guard is required to conduct a preliminary investigation 
of marine casualties, including a determination of whether the 
casualty is deemed a ``major marine casualty,'' and to 
subsequently notify the NSTB of its determination.\103\ The 
NTSB investigates and establishes probable cause for any 
``major marine casualty'' defined as the loss of six or more 
lives, the loss of a vessel 100 or more gross tons, property 
damage initially estimated in excess of $500,000, or a serious 
threat posed by hazardous materials.\104\ The Coast Guard 
classified the Key Bridge incident as a ``major marine 
casualty,'' and the NTSB reported the initial estimate of 
damage to the DALI and the Key Bridge exceeded $500,000.\105\
---------------------------------------------------------------------------
 \102\ Baltimore Bridge Collapse FAQs, supra note 20.
 \103\ 49 C.F.R. Sec. 850.
 \104\ 49 U.S.C. Sec. 1131; see also 49 C.F.R. Sec. 850.
 \105\ NTSB Investigation Announcement, supra note 2.
---------------------------------------------------------------------------
 On March 27, 2024, NTSB Chair Jennifer Homendy announced in 
a media briefing that the NTSB investigation could take an 
estimated 12 to 24 months to complete and that a preliminary 
report would be released several weeks following the Key Bridge 
collapse.\106\ As of the date of this SSM, the NTSB has not yet 
released its preliminary report.
---------------------------------------------------------------------------
 \106\ Supra note 101.
---------------------------------------------------------------------------

 IV. OTHER CONSIDERATIONS

FEDERAL REQUIREMENTS

 Accepting ER funding has made the repair and replacement of 
the Key Bridge, and the future operation of the facility, 
subject to all Title 23, United States Code, requirements. 
These include environmental review requirements, transportation 
planning requirements, domestic content requirements for bridge 
materials, prevailing wage requirements, Federal procurement 
rules, and other requirements.\107\ In general, the Council on 
Environmental Quality (CEQ), charged with overseeing the 
National Environmental Policy Act (NEPA) implementation, 
maintains categorical exclusions (CEs) across Federal 
agencies.\108\ CEs are allowed for actions that ``do not 
individually or cumulatively have a significant effect on the 
human environment and for which, therefore, neither an 
environmental assessment nor an environmental impact statement 
is normally required.'' \109\
---------------------------------------------------------------------------
 \107\ FHWA March 26 Email, supra note 19.
 \108\ CEQ, Categorical Exclusions, (last visited May 2, 2024), 
available at https://ceq.doe.gov/nepa-practice/categorical-
exclusions.html.
 \109\ Id.
---------------------------------------------------------------------------
 There is a FHWA CE that could apply for actions following 
an emergency declaration by a Governor of a state, including 
for the ``repair, reconstruction, restoration, retrofitting, or 
replacement of any road, highway, bridge, tunnel, or transit 
facility.'' \110\ Specifically, the CE stipulates that this 
work ``occurs within the existing right-of-way and in a manner 
that substantially conforms to the preexisting design, 
function, and location as the original (which may include 
upgrades to meet existing codes and standards as well as 
upgrades warranted to address conditions that have changed 
since the original construction).'' \111\ For reconstruction to 
qualify for this CE, reconstruction efforts must begin within 
two years of the Governor of Maryland's emergency 
declaration.\112\ Other Federal requirements to be met could 
include Endangered Species Act Section 7 consultation and 
compliance with the requirements of the Clean Water Act 
associated with construction of the bridge.
---------------------------------------------------------------------------
 \110\ See 23 C.F.R. Sec. 771.117.
 \111\ Id.
 \112\ Id.; see also ER Program, supra note 67.
---------------------------------------------------------------------------

LIABILITY

 On April 1, 2024, the vessel's owner and operator filed for 
exoneration from or limitation of liability, arguing that the 
vessel owner's liability should be capped at $43.67 million, 
which is the value of the vessel plus pending freight fees, 
less repair and salvage costs.\113\ The petitioners filed in 
Federal district court under the Limitation of Liability Act of 
1851, which generally allows a shipowner to limit its total 
liability to the diminished value of the vessel and pending 
freight if the owner lacked privity or knowledge.\114\ In 
response to the vessel owner's liability limitation action, the 
City of Baltimore filed a lawsuit on April 22, 2024, 
challenging the limitation assertion, claiming negligence on 
the part of the vessel owner and crew, and seeking to lift the 
liability cap.\115\
---------------------------------------------------------------------------
 \113\ Brinley Hineman, Dali Owner, Manager Seek to Cap Liability in 
Baltimore Bridge Collapse, Yahoo Finance, (Apr. 2, 2024), available at 
https://finance.yahoo.com/news/dali-owner-manager-seek-cap-
191833847.html.; see also Petition for Exoneration from or Limitation 
of Liability, (Apr. 1, 2024), available at https://
storage.courtlistener.com/recap/gov.uscourts.mdd.556480/
gov.uscourts.mdd.556480.1.0.pdf.
 \114\ See 46 U.S.C. Sec. 30523.
 \115\ Sareen Habeshian, Baltimore Accuses Dali Cargo Ship Owner, 
Operator of Negligence, Axios, available at https://www.axios.com/2024/
04/23/baltimore-ship-negligence-claim-bridge-collapse.
---------------------------------------------------------------------------

 V. WITNESSES

 LVice Admiral Peter Gautier, Deputy Commandant for 
Operations, United States Coast Guard
 LMajor General William (Butch) H. Graham, Deputy 
Commanding General, Civil and Emergency Operations, United 
States Army Corps of Engineers
 LHon. Shailen Bhatt, Administrator, Federal 
Highway Administration, United States Department of 
Transportation
 LHon. Jennifer Homendy, Chair, National 
Transportation Safety Board

 
 REVIEWING AND EXAMINING THE FRANCIS SCOTT KEY BRIDGE FEDERAL RESPONSE

 ---------- 

 WEDNESDAY, MAY 15, 2024

 House of Representatives,
 Committee on Transportation and Infrastructure,
 Washington, DC.
 The committee met, pursuant to call, at 10:02 a.m. in room 
2167 Rayburn House Office Building, Hon. Sam Graves (Chairman 
of the committee) presiding.
 Mr. Graves of Missouri. We will call the committee to 
order.
 I would ask unanimous consent that the chairman be 
authorized to declare a recess at any time during today's 
hearing.
 And without objection, that is so ordered.
 And as a reminder, if Members insert a document into the 
record, please also email it to [email protected].
 At this point, I will just recognize myself for the 
purposes of an opening statement.

 OPENING STATEMENT OF HON. SAM GRAVES OF MISSOURI, CHAIRMAN, 
 COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

 Mr. Graves of Missouri. So, we are here today to discuss 
the initial Federal response to the March 26, 2024, early 
morning incident involving the cargo vessel Dali and the 
Francis Scott Key Bridge in Baltimore, Maryland, which resulted 
in the subsequent collapse of the bridge.
 And I first want to acknowledge the six workers who, sadly, 
perished that morning. And on behalf of the entire committee, I 
want to express our condolences and offer our prayers to their 
families and their loved ones.
 I also want to express the committee's appreciation to the 
harbor pilot and the Maryland Transportation Authority police 
officers who saved countless lives by closing the Key Bridge 
prior to the incident, and to all the first responders who are, 
obviously, involved in that process.
 And finally, I want to commend the Federal, State, and 
local officials working that night to clear the wreckage and 
debris and, obviously, continuing that effort, and to reopen 
the shipping channel that supports the Port of Baltimore.
 This committee continues to receive updates from the 
Federal agencies who are responding and investigating the 
incident, including those testifying here today.
 So, hours after the collapse, President Biden announced his 
intention for the Federal Government to pay for the entire cost 
of reconstructing the Key Bridge, and the committee has 
received a letter from the administration officially requesting 
that Congress authorize a 100-percent Federal cost share to 
rebuild the bridge, and I have personally spoken to Governor 
Moore about the request on a couple of occasions.
 On March 28, the State of Maryland applied for funding from 
the Federal Highway Administration's Emergency Relief Program, 
commonly called ER. Within hours of receiving the Maryland 
Department of Transportation's application, the Federal Highway 
Administration approved $60 million in quick release funding, 
which it said represented roughly 5 percent or so of the 
initial total project cost of $1.2 billion. This funding is 
intended to assist with eligible repair work, which includes 
emergency repairs needed to restore essential travel, to 
minimize damage, or protect the remaining facilities, as well 
as permanent repairs necessary to restore the highway to its 
pre-disaster condition.
 Under the ER Program, the Federal Government will reimburse 
the State for qualifying work at 100 percent Federal cost for 
the first 270 days. After that initial 270 days, States get 
reimbursed at an 80- to 90-percent rate, depending on the 
classification, and the program also provides flexibility to 
allow for reimbursement up to 90 percent in some cases. So, 
this past Friday, May 10, the Federal Highway Administration 
informed the committee that they had designated the portion of 
I-695 that includes the bridge as part of the interstate system 
effective April 29, meaning that Maryland's reimbursement rate 
is now going to be guaranteed up to 90 percent.
 All that is to say that while the President's request has 
been received and it is under consideration, Congress still has 
roughly 6 months to act before any cost share changes might 
occur. So, despite initial estimates of $1.2 billion to rebuild 
the bridge, media reports now indicate that the State of 
Maryland estimates that the bridge may cost somewhere between 
$1.7 and $1.9 billion. So, it is important that we have a very 
firm estimate before we take any further action on the cost 
share.
 In addition, if the company that owned and operated the 
ship is found to be liable, we must make sure that the 
Government actively works to recover any money that it is owed. 
That could help offset the bridge funding or be used to make 
the people and companies who obviously rely on and work at the 
Baltimore Harbor whole.
 So, several members of this committee have visited the site 
with our Federal partners, and for those who wish to go up 
there and see it for themselves, the committee will continue to 
facilitate visits on a regular basis.
 So, at this stage we need to make sure that we are not 
getting ahead of the facts, and let the NTSB and other agencies 
complete their investigations. But as we continue to learn 
more, we will ensure that Members of Congress have all the 
information that is available to them.
 And I do want to thank all of our witnesses for being here 
today, and I look forward to the testimony. I did talk to the 
Governor just this morning about the hearing coming up, and he 
is pretty optimistic about the litigation, too, moving forward. 
I mentioned that just briefly in my opening statement, but it 
sounded very interesting and very, very promising.
 [Mr. Graves of Missouri's prepared statement follows:]

 
 Prepared Statement of Hon. Sam Graves, a Representative in Congress 
 from the State of Missouri, and Chairman, Committee on Transportation 
 and Infrastructure
 We are here today to discuss the initial federal response to the 
March 26, 2024, early morning incident involving the cargo vessel Dali 
and the Francis Scott Key Bridge in Baltimore, Maryland, that resulted 
in the subsequent collapse of the bridge.
 I first want to acknowledge the six workers who sadly perished that 
morning. On behalf of the entire Committee, I want to express our 
condolences and offer our prayers to their families and loved ones.
 I also want to express the Committee's appreciation to the harbor 
pilot and Maryland Transportation Authority police officers who saved 
countless lives by closing the Key Bridge prior to the incident, and to 
all first responders involved.
 Finally, I want to commend the federal, state, and local officials 
working day and night to clear the wreckage and debris and to reopen 
the shipping channel that supports the Port of Baltimore. This 
committee continues to receive updates from federal agencies that are 
responding to and investigating the incident, including those 
testifying here today.
 Hours after the collapse, President Biden announced his intention 
for the federal government to pay for the entire cost of reconstructing 
the Key Bridge. This committee has received a letter from the 
Administration officially requesting that Congress authorize a 100 
percent federal cost share to rebuild the bridge, and I have personally 
spoken to Governor Moore about this request.
 On March 28, the State of Maryland applied for funding from the 
Federal Highway Administration's Emergency Relief Program, commonly 
called ER. Within hours of receiving the Maryland Department of 
Transportation's application, the Federal Highway Administration 
approved $60 million in ``quick release'' funding, which it said 
represented roughly five percent of the initial estimated total project 
cost of $1.2 billion.
 This funding is intended to assist with eligible repair work, which 
includes emergency repairs needed to restore essential travel, minimize 
damage, or protect the remaining facilities, as well as permanent 
repairs necessary to restore the highway to its pre-disaster condition.
 Under the ER program, the federal government will reimburse the 
state for qualifying work at 100 percent federal cost for the first 270 
days. After the initial 270 days, states get reimbursed at 80 or 90 
percent rate, depending on classification, and the program also 
provides flexibility to allow for reimbursement of up to 90 percent in 
some cases. This past Friday, May 10th, the Federal Highway 
Administration informed the Committee that they had designated the 
portion of I-695 that includes the bridge as part of the Interstate 
System effective April 29th, meaning that Maryland's reimbursement rate 
is now guaranteed to be at 90 percent.
 All that is to say, while the President's request has been received 
and is under consideration, Congress still has roughly six months to 
act before any cost share changes would occur. Despite initial 
estimates of $1.2 billion to rebuild the bridge, media reports now 
indicate that the State of Maryland estimates that the bridge rebuild 
may cost between $1.7 billion and $1.9 billion.
 It is important that we have a firmer estimate before we take any 
further actions on the cost share. In addition, if the company that 
owned and operated the ship is found to be liable, we must make sure 
that the government actively works to recover any money it is owed. 
That could help offset the bridge funding or be used to make the people 
and companies who rely on and work at the Baltimore Harbor whole.
 Several Members of this committee have visited the site with our 
federal partners, and for those who wish to go up there and see it for 
themselves, the Committee will continue to facilitate visits on a 
regular basis.
 At this stage, we need to make sure we are not getting ahead of the 
facts, and let the NTSB and other agencies complete their 
investigations. But as we continue to learn more, we will ensure that 
Members of Congress have all available information.
 I thank all four witnesses for being here today, and I look forward 
to your testimonies.

 Mr. Graves of Missouri. So, with that, I will turn to 
Ranking Member Larsen for his statement.

 OPENING STATEMENT OF HON. RICK LARSEN OF WASHINGTON, RANKING 
 MEMBER, COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

 Mr. Larsen of Washington. Thank you, Chair Graves, for 
holding this hearing, and I want to thank each of the 
administration officials for joining us to discuss the Francis 
Scott Key Bridge recovery effort.
 First, like the chair, I want to express my sympathies with 
the families of the six transportation workers who lost their 
lives while on the job, maintaining this important piece of 
infrastructure. This incident is a reminder of why safety 
always has to be the top priority in transportation: safety of 
workers, the traveling public, and the residents of communities 
adjacent to that infrastructure.
 This emergency left in its wake an incredibly complex 
debris removal challenge, a closed channel and a shuttered 
port, significant regional economic and global shipping 
ramifications, and the loss of a bridge essential to freight 
movement and roadway mobility in the mid-Atlantic region.
 Vice Admiral Gautier and General Graham, I want to commend 
you and your team and your leadership and the tireless efforts 
of the women and men under your command for their incredible 
work to safely remove debris and return the channel to the 
operations that currently exist under extremely challenging 
circumstances.
 The degree of difficulty became clear when I visited the 
site of the collapse last month. I want to thank the Coast 
Guard, the Corps, your State partners on the Unified Command, 
especially the Maryland State Police, for guiding many Members 
of Congress in our various trips to witness the damage. I look 
forward to hearing the latest updates from you today on the 
status of the cleanup and the estimated timeline for the full 
reopening of the Channel and Port of Baltimore operations.
 I am also eager to learn what resources and authorities the 
Coast Guard and the Corps will need from Congress as the full 
costs and impacts of the response become more concrete.
 The Coast Guard has expended significant fiscal year 2024 
operations and support funds to respond to this emergency, and 
we are grateful the Coast Guard always does what it needs to 
get the job done. Yet, it is unreasonable to expect the Service 
to absorb these response costs, which were obviously not 
budgeted for in advance, without impacting the Coast Guard's 
ability to perform other missions. So, the Service must be made 
whole.
 Similarly, the Corps, in responding to the emergency, has 
used fiscal year 2024 operations and maintenance funds 
appropriated for the Baltimore Harbor and channels. If not 
replenished, the diverted funding will impact planned 
maintenance for the Baltimore Harbor once response is complete 
and in future years.
 These amounts were not, however, sufficient to fund the 
response, and last week, the Corps announced the reprogramming 
of $20 million in unused funds to continue the channel clearing 
work. This level of reprogramming is unprecedented, and 
demonstrates--in the absence of supplemental funds provided by 
Congress for this cleanup--the budgetary juggling the Corps has 
to do to get the bridge out of the water and off the vessel so 
the Port of Baltimore can reopen. That juggling will continue.
 I urge the Corps and the Coast Guard to communicate to 
Congress early and often on what your needs are in this 
process, on your plans to ensure this work can finish 
uninterrupted, and to do so in partnership with the legislative 
branch.
 Beyond the immediate response, I look forward to hearing 
from Federal Highway Administrator Bhatt about the timeline to 
replace the bridge and the role the Federal Government is 
playing in aiding that process.
 Congress established the Emergency Relief Program in 1958, 
as part of the Federal highway program, to provide for the 
reconstruction of highways and bridges in the event of a 
disaster. Congress understood that the State could not be 
expected to cover the costs of an unforeseen emergency loss of 
infrastructure out of its annual road budget.
 That is still true today. Maryland transportation officials 
estimate it will cost up to $1.9 billion to replace the bridge. 
Frankly, there are a lot of estimates out there, and it is a 
broad range, so, I really wouldn't call them estimates at this 
point, frankly. So, while U.S. DOT has provided $60 million in 
ER funds to date, we do know that is a fraction of the total 
need.
 Prior to the collapse, the Key Bridge carried 34,000 
vehicles a day. Traffic diversion is increasing vehicle 
crossings in the Fort McHenry and Harbor Tunnels by 18 percent, 
and truckdrivers carrying hazardous materials currently must 
add 25 miles to get through Baltimore via alternate routes, 
including communities that did not expect hazmat trucks to be 
going through them.
 This committee has a role to help rebuild this critical 
economic artery quickly and efficiently, including ensuring the 
project can advance without a cost share from Maryland.
 Finally, I want to welcome back Chair Homendy, and 
congratulations on your reconfirmation last night. The NTSB's 
thorough investigation of this catastrophe will help answer 
questions about how to prevent future allisions, shore up 
bridges, save lives, and protect our critical infrastructure. I 
look forward to what Chair Homendy is able to share about this 
incident based on the NTSB's preliminary findings, which were 
released yesterday afternoon, I believe.
 So, thank you to each of our witnesses, and I thank the 
chair for calling this hearing today, and I look forward to 
what you all have to say.
 With that, I yield back.
 [Mr. Larsen of Washington's prepared statement follows:]

 
 Prepared Statement of Hon. Rick Larsen of Washington, Ranking Member, 
 Committee on Transportation and Infrastructure
 Thank you, Chairman Graves, for holding this hearing, and thank you 
to each of the Administration officials for joining us to discuss the 
Francis Scott Key Bridge recovery effort.
 First, like the Chairman, I want to express my deepest sympathies 
with the families of the six transportation workers who lost their 
lives while on the job, maintaining this important piece of 
infrastructure.
 This incident is a reminder of why safety must always be our top 
priority in transportation--safety of workers, the traveling public and 
the residents of communities adjacent to that infrastructure.
 This emergency left in its wake an incredibly complex debris 
removal challenge, a closed channel and shuttered port, significant 
regional economic and global shipping ramifications and the loss of a 
bridge essential to freight movement and roadway mobility in the mid-
Atlantic region.
 Vice Admiral Gautier and General Graham, I want to commend your 
leadership and the tireless efforts of the women and men under your 
command for the incredible work to safely remove debris and return the 
channel to operation in extremely challenging circumstances.
 The degree of difficulty became clear when I visited the site of 
the collapse last month. Thank you to the Coast Guard, the Corps and 
your state partners on the Unified Command, especially the Maryland 
state police, for guiding many members of Congress to witness the 
damage.
 I look forward to hearing the latest updates from you today on the 
status of the cleanup and the estimated timeline for the full reopening 
of the channel and Port of Baltimore operations.
 I am also eager to learn what resources and authorities the Coast 
Guard and the Corps will need from Congress as the full costs and 
impacts of the response become more concrete.
 The Coast Guard has expended significant Fiscal Year 2024 
Operations and Support funds to respond to this emergency. We are 
grateful that the Coast Guard always does what it needs to get the job 
done.
 Yet, it is unreasonable to expect the Service to absorb these 
response costs, which were obviously not budgeted for in advance, 
without impacting the Coast Guard's ability to perform other critical 
missions. The Service must be made whole.
 Similarly, the Corps, in responding to the emergency, has used up 
Fiscal Year 2024 Operation and Maintenance funds appropriated for the 
Baltimore Harbor and Channels. If not replenished, the diverted funding 
will impact planned maintenance for the Baltimore Harbor once the 
response is complete and in future years.
 These amounts were not, however, sufficient to fund the response. 
Last week, the Corps announced the reprogramming of $20 million in 
unused funds to continue channel clearing work.
 This level of reprogramming is unprecedented and demonstrates--in 
the absence of supplemental funds provided by Congress for this clean 
up--the budgetary juggling the Corps has to do to get the bridge out of 
the water and off the vessel so the Port of Baltimore can reopen. That 
juggling will continue.
 I urge the Corps and the Coast Guard to communicate with Congress 
early and often on your needs in this process, on your plans to ensure 
this work can finish uninterrupted and to do so in partnership with the 
legislative branch.
 Beyond the immediate response, I look forward to hearing from 
Federal Highway Administrator Bhatt about the timeline to replace the 
bridge and the role the federal government is playing in aiding that 
process.
 Congress established the Emergency Relief (ER) program in 1958, as 
part of the federal highway program, to provide for the reconstruction 
of highways and bridges in the event of a disaster.
 Congress understood, then, that a state could not be expected to 
cover the costs of an unforeseen, emergency loss of an infrastructure 
asset out of its annual road budget.
 That is still true today. Maryland transportation officials 
estimate it will cost up to $1.9 billion to replace the bridge. While 
U.S. DOT has provided $60 million in ER funds to date, that is a 
fraction of the total need.
 Prior to collapse, the Key Bridge carried 34,000 vehicles per day. 
Traffic diversion is increasing vehicle crossings in the Fort McHenry 
and Harbor tunnels by 18 percent and truck drivers carrying hazardous 
materials currently must add 25 miles to get through Baltimore via 
alternate routes, including communities that did not expect hazardous 
materials and trucks to be going through them.
 This Committee has a role to help rebuild this critical economic 
artery quickly and efficiently--including ensuring the project can 
advance without a cost share from Maryland.
 Finally, I welcome back to this Committee Chair Homendy. 
Congratulations on your reconfirmation last night. The NTSB's thorough 
investigation of this catastrophe will help answer questions about how 
to prevent future allisions, shore up bridges, save lives and protect 
our critical infrastructure. I look forward to what Chair Homendy is 
able to share about this incident based on the NTSB's preliminary 
findings released yesterday afternoon.
 Thank you to each of our witnesses for being here today and for 
your testimony.

 Mr. Graves of Missouri. So, I would ask unanimous consent 
that the witnesses' full statements be included in the record.
 And without objection, that is so ordered.
 I would ask unanimous consent that the record of today's 
hearing remain open until such time as our witnesses have 
provided answers to any questions that may be submitted to them 
in writing.
 And without objection, that is also so ordered.
 I would also ask unanimous consent that the record remain 
open for 15 days for any additional comments and information 
submitted by Members or witnesses to be included in the record 
of today's hearing.
 And without objection, that is so ordered.
 So, your written testimony has obviously been included in 
the record, so, the committee asks that you try to limit your 
oral remarks to 5 minutes.
 And with that, Vice Admiral Gautier, you are recognized for 
5 minutes. Thanks for being here.

TESTIMONY OF VICE ADMIRAL PETER GAUTIER, DEPUTY COMMANDANT FOR 
OPERATIONS, U.S. COAST GUARD; MAJOR GENERAL WILLIAM H. GRAHAM, 
 DEPUTY CHIEF OF ENGINEERS, DEPUTY COMMANDING GENERAL, AND 
 DEPUTY COMMANDING GENERAL FOR CIVIL AND EMERGENCY OPERATIONS, 
 U.S. ARMY CORPS OF ENGINEERS; HON. SHAILEN BHATT, 
ADMINISTRATOR, FEDERAL HIGHWAY ADMINISTRATION, U.S. DEPARTMENT 
 OF TRANSPORTATION; AND HON. JENNIFER HOMENDY, CHAIR, NATIONAL 
 TRANSPORTATION SAFETY BOARD

TESTIMONY OF VICE ADMIRAL PETER GAUTIER, DEPUTY COMMANDANT FOR 
 OPERATIONS, U.S. COAST GUARD

 Admiral Gautier. Thank you, Chairman Graves, Ranking Member 
Larsen, distinguished members of the committee. Good morning.
 Thank you, first off, for your kind words about the Coast 
Guard in your opening remarks, and I appreciate the opportunity 
to testify before the committee.
 In the early hours of March 26, the containership Dali 
struck and collapsed the Francis Scott Key Bridge. Six 
individuals lost their lives. Baltimore lost a landmark part of 
its skyline, and the region suffered a blockage of a crucial 
waterway. We continue to honor the memory of those victims.
 Today, at the 51-day point, over 6,000 tons of steel and 
concrete have been removed from the wreckage field, access has 
been restored to the Port of Baltimore, with more than 35 large 
commercial vessels sailing through a limited access channel, 
and 375 additional commercial and recreational vessels have 
used 3 shallower, temporary access channels, the first of which 
was established just 6 days after the bridge collapsed.
 The hazardous materials aboard the motor vessel Dali were 
stabilized, as was the ship itself, and I will report today 
that Unified Command believes that the Dali will be able to be 
refloated and removed from that site--early next week is what 
they are looking at.
 Particularly notable, countless complex steps in this 
operation have been completed without a single worker injury. 
These monumental efforts were made possible through the 
exemplary unity of effort of the Unified Command, rapid 
mobilization of personnel and resources, strong coordination, 
and trusted partnerships. The Unified Command formed within the 
first few hours, per the National Response Framework, our 
national doctrine for response to disasters and emergencies. 
The Coast Guard, Army Corps of Engineers, Maryland State 
Police, Maryland Transportation Authority, Maryland Department 
of the Environment, and Witt O'Brien's, which represented the 
owners and operators of the Dali, have effectively leveraged 
each other's jurisdictions, authorities, and capabilities to 
get us where we are today.
 The Coast Guard is proud to be part of this response. Our 
women and men serve on the front lines of a Nation whose 
economic prosperity and national security are inexorably linked 
to our maritime transportation system. We exercised 6 of our 11 
statutory missions in this response from the early hours of the 
search and rescue response to restoring vessel traffic by 
setting aids to navigation.
 The Coast Guard's broad authorities positioned the Service 
to coordinate activities to assure the safety, security, and 
stewardship of our waterways, but we are also successful 
through partnerships and continuously exercising, operating, 
and coordinating with Federal, State, and local industry 
partners. One prime example, Chairman, you mentioned is the 
fantastic work on the quick notification by the pilots to the 
MTA dispatch, which inevitably saved countless numbers of 
lives.
 But the work is not done. The Unified Command remains 
sharply focused on the full restoration of the MTS. Active 
investigations continue in parallel with the response, 
including the Coast Guard's Marine Board of Investigation, our 
highest level of marine casualty investigation, to determine 
the incident's causal factors and support the development of 
preventative recommendations.
 Our investigation is in cooperation with the NTSB, which 
has taken the lead on the safety investigation. And the Coast 
Guard investigation is also moving concurrently and separately 
from the Department of Justice's criminal investigation.
 While we look forward to the results of these 
investigations, it is evident, looking more broadly, that the 
size and complexity of ships has grown over the years, placing 
greater demands on our marine transportation infrastructure 
that may not have kept pace with the increased risks that these 
vessels pose.
 It is time for us to more broadly understand these risks, 
so, as Deputy Commandant for Operations, I will be convening a 
nationwide board of inquiry under title 46, U.S. Code, led by 
my Assistant Commandant for Prevention Policy, Rear Admiral 
Wayne Arguin. The purpose will be to assess the efficacy of the 
Coast Guard suite of risk management tools, evaluate how 
recently they have been used within major ports, and establish 
a holistic, national level approach to develop risk profiles, 
identify ways to address vulnerabilities, and propose actions 
to reduce the risk of major incidents. This board of inquiry is 
a necessary step to bolster our MTS resiliency and assure the 
safe and secure and efficient flow of commerce on our 
waterways. The Coast Guard is ready to lead this effort.
 Thank you for this opportunity and for your enduring 
support of the Coast Guard, and I look forward to your 
questions.
 [Admiral Gautier's prepared statement follows:]

 
Prepared Statement of Vice Admiral Peter Gautier, Deputy Commandant for 
 Operations, U.S. Coast Guard
 Good morning, Chairman Graves, Ranking Member Larsen, and 
distinguished members of the committee. I am grateful for the 
opportunity to testify before this committee regarding a unified 
response to the Motor Vessel (M/V) DALI's allision with the Francis 
Scott Key Bridge in Baltimore, Maryland. First and foremost, I offer my 
heartfelt condolences to the families and loved ones of the six 
individuals who lost their lives. The Coast Guard has strong ties 
throughout Maryland and the Baltimore community, and our sympathies are 
with all those impacted by this horrible incident.
 The Coast Guard serves on the front lines for a nation whose 
economic prosperity and national security are inextricably linked to 
the Marine Transportation System (MTS) and its maritime interests. The 
Coast Guard assures the safety, security, and stewardship of the 
nation's MTS, an integrated network that consists of 95,000 miles of 
U.S. coastline, 25,000 miles of navigable channels, 50,000 aids to 
navigation, 1,400 intermodal connections, and 361 ports. This 
responsibility is paramount for the Service. The vast system of ports 
and waterways that make up the MTS support $5.4 trillion of annual 
economic activity and account for employment of more than 30 million 
Americans. Your Coast Guard saves mariners in distress, enforces safety 
regulations, inspects vessels, maintains aids to navigation, and 
provides vessel traffic services to keep commerce flowing in a safe, 
secure, and efficient MTS.
 To safeguard the nation's uninterrupted access to domestic and 
global supply chains from major MTS disruptions the Coast Guard 
organizes and leads unified responses under the National Response 
Framework (NRF). While the Coast Guard's broad authorities position the 
Service to coordinate activities aimed at restoring the flow of 
commerce, it is the strength of our partnerships that assures our 
mission success. Continuously training, exercising, and coordinating 
with federal, state, local, and industry partners are key Service 
priorities and set the stage for successful operations, like the 
complex and challenging response to the Francis Scott Key Bridge 
collapse.
 Initial Events and Coast Guard Response
 On the morning of Tuesday, March 26, 2024, the M/V DALI, a 
Singapore-flagged container ship, was transiting the Patapsco River 
outbound from Seagirt Marine Terminal in Baltimore. At approximately 
1:30 AM, the M/V DALI lost electrical power, propulsion, and steering, 
resulting in the vessel striking the Francis Scott Key Bridge, 
immediately collapsing three bridge span sections into the water. The 
central bridge span collapsed across the main navigation channel, 
blocking the channel to shipping and partially landing on the vessel's 
bow.
 Due to the rapid notification of the ship's loss of power by the 
pilot onboard M/V DALI, the Maryland Transportation Authority (MDTA) 
quickly halted automobile traffic on the bridge immediately before the 
allision. Eight construction workers were on the bridge at the time; 
one was able to run off the bridge, one was rescued from the water, and 
the remainder were missing. Coast Guard Sector Maryland-National 
Capital Region (NCR) immediately responded with search and rescue (SAR) 
teams, which arrived on scene within minutes. Coast Guard SAR teams 
searched alongside our state and local partners for the remaining 
victims, using all available resources--including boats, cutters, and 
helicopters. The Coast Guard suspended SAR operations after more than 
18 hours of searching when it was apparent that no missing workers 
survived the collapse, and operations transitioned to recovery of 
remains. The six deceased construction workers were eventually 
recovered from the wreckage during salvage operations.
 While conducting SAR operations, the Coast Guard also closed the 
Port of Baltimore waterway, established a safety zone, and coordinated 
with the Federal Aviation Administration to implement area flight 
restrictions to ensure the safety of the general public around the 
wreck site. Responding agencies formed a UC and began a major operation 
to stabilize the site and evaluate risks to public health and the 
environment. The Coast Guard's proactive environmental response 
included deployment of 3,250 feet of containment boom around the M/V 
DALI.
 As the initial response continued, Coast Guard surged deployable 
specialized teams--including a Salvage Engineering Response Team, 
Atlantic Strike Team, Incident Management Assistance Team, and a Public 
Information Assistance Team--to lead and support efforts to ensure 
vessel stability, incident site safety, and comprehensive damage 
evaluation. The Coast Guard continues to apply its range of 
capabilities, authorities, and resources to support the unified effort 
surging more than 200 personnel to the UC since the incident.
 Overview of Unified Command Responsibilities
 The UC leading the response leverages federal and state agencies' 
complementary jurisdictions, authorities and capabilities in a way that 
achieves unity of effort towards accomplishing common objectives. The 
UC is comprised of the Coast Guard, U.S. Army Corps of Engineers 
(USACE), Maryland State Police (MSP), MDTA, Maryland Department of the 
Environment (MDE), and Witt O'Brien's, which represents the owner and 
operating companies of the M/V DALI.
 The UC was established in alignment with the NRF, National Incident 
Management System (NIMS) Incident Command System (ICS), as well as the 
National Oil and Hazardous Substances Pollution Contingency Plan (NCP). 
NIMS/ICS is utilized to provide a common method for developing and 
implementing tactical plans to efficiently and effectively manage the 
response to natural and man-made incidents.
 The UC established a comprehensive response organization, and 
aligned objectives and actions around operational priorities, 
including:
 Ensuring safety of the public and first responders;
 Achieving accountability for missing persons;
 Protecting the environment;
 Safely restoring transportation infrastructure and 
commerce; and
 Supporting the investigations.

 Additionally, the UC established a critical operational path to 
achieve five milestones:
 Milestone 1: Complete salvage assessment and engineering;
 Milestone 2: Restore navigation;
 Milestone 3: Remove the M/V DALI;
 Milestone 4: Clear remaining wreckage; and
 Milestone 5: Prevent and respond to pollution 
(continuous)

 Consistent with the President's direction to re-open the Port of 
Baltimore as soon as possible, the UC worked aggressively towards 
safely and efficiently restoring maritime commerce to and from the Port 
of Baltimore to minimize economic and social impacts to the region and 
nation. Continuous coordination and communication amongst UC members, 
with elected leaders at the federal, state and local levels, and the 
general public was essential to meeting the UC's objectives safely and 
rapidly.
 Leveraging its combination of authorities, assets, and response 
capabilities, the Coast Guard is leading operations to stabilize and 
refloat the M/V DALI while preventing threats to the environment under 
its Federal On-Scene Coordinator (FOSC) authority and impacts to the 
Port of Baltimore and MTS under its Captain of the Port (COTP) 
authority. USACE is leading operations to remove bridge wreckage from 
the federal channel by mobilizing resources, including the U.S. Navy 
Supervisor of Salvage (SUPSALV), through its responsibility to maintain 
federal channels for vessel navigation.
 Partnership with State of Maryland leadership is vital to this 
response. MDTA has primary jurisdiction over the bridge and is 
overseeing bridge wreckage salvage and removal from the waterways 
outside of the federal channel. MSP is the lead authority for victim 
recovery and is working directly with victims' families. MDE continues 
to provide oversight to prevent environmental threats in coordination 
with the Coast Guard.
 Accomplishments to Date
 The UC made significant progress toward meeting objectives through 
outstanding unity of effort, rapid mobilization of personnel and 
resources, and strong coordination and communication. The dedication, 
professionalism, and determination of responders resulted in major 
objectives being met ahead of schedule and with no injuries to 
personnel. Presently, more than 350 uniformed and civilian workers from 
53 federal, state, and local agencies across the U.S. are deployed to 
Baltimore to support ongoing recovery and salvage efforts. In addition, 
553 contract specialists are actively involved in various roles related 
to dive, crane, and vessel operations. More than 1,000 individuals 
contributed to the Francis Scott Key Bridge response mission thus far.
 To address the estimated 50,000 tons of wreckage at the Francis 
Scott Key Bridge site, the UC assembled a substantial fleet of 
specialized vessels and equipment, including four Coast Guard cutters, 
more than 10 Coast Guard boats, 36 barges, 27 tugboats, 22 floating 
cranes, 10 excavators, one dredger, and one skimmer. Progress in the 
salvage effort is impressive, with thousands of tons of wreckage and 
debris removed from the site for disposal or recycling and 183 
containers removed from the bow of the M/V DALI.
 Within the broader unified effort, the Coast Guard facilitated 
significant progress in re-opening the Port of Baltimore and restoring 
the MTS. The UC established three alternate channels with controlling 
depths of 11-feet, 14-feet, and 20-feet. On April 25th, as a result of 
the extraordinary efforts of the USACE, Navy SUPSALV, and their 
contractors, a fourth limited access channel with a 48-foot controlling 
depth was established, with the full opening of the channel to its pre-
incident specifications projected by the end of May. As of May 13th, 
365 commercial vessels transited the four alternate channels, including 
all of the vessels that were in port during the incident.
 Coast Guard Investigation
 Upon receiving notification of the major marine casualty on the 
morning of March 26th, Coast Guard investigating officers from Sector 
Maryland-NCR deployed to the incident and commenced a preliminary 
investigation to secure vital evidence, including perishable data from 
the M/V DALI's voyage data recorder (VDR). In accordance with existing 
agreements, Coast Guard and the National Transportation Safety Board 
(NTSB) agreed to proceed with the NTSB serving as the Lead Federal 
Agency for the concurrent safety investigations due to the multi-modal 
nature of the incident \1\.
---------------------------------------------------------------------------
 \1\ NTSB was designated the lead Federal agency pursuant to the 
``Memorandum of Understanding Between the National Transportation 
Safety Board and the United States Coat Guard Regarding Investigations 
and Related Matters,'' dated June 17, 2021.
---------------------------------------------------------------------------
 On March 26, 2024, I convened a Marine Board of Investigation 
(MBI), the Coast Guard's highest level of marine casualty 
investigation, to secure proper resources and assign our most 
experienced investigators, marine inspectors, and engineers to this 
critical task. MBI members deployed to the M/V DALI and assumed the 
lead for the Coast Guard marine casualty investigation on the morning 
of March 27th.
 Under International Maritime Organization (IMO) protocols for 
marine casualty investigations, the Coast Guard also invited foreign 
flag administrations with interests in the incident to participate in 
the investigations. As a result, investigators from Singapore (the flag 
administration of the M/V DALI) and India (the flag administration for 
the majority of M/V DALI's crew) deployed on-scene and participated in 
fact-finding efforts. The MBI continues to evaluate evidence to 
determine the incident's causal factors and support development of 
immediate safety measures and preventative recommendations.
 Port Recovery
 In addition to immediate response and investigation activities, the 
UC is leading efforts for port recovery and restoration of economic 
activity in the region. In collaboration with interagency partners and 
the maritime industry, the Coast Guard established a system for 
assessing and mitigating long-term disruptions of the MTS. That system 
was activated and is in action in the port of Baltimore.
 Every Coast Guard COTP is required to maintain an all-hazards MTS 
Recovery Plan. These plans set the foundation for safe, timely, and 
efficient restoration of the MTS following a significant disruption. 
While these plans are most frequently used following natural disasters, 
they apply to any incident that disrupts the MTS, such as the Francis 
Scott Key Bridge collapse. Included in the plan is a joint protocol to 
determine potential national-level needs and priorities developed by 
the Coast Guard and U.S. Customs and Border Protection. Informed by 
this protocol, the UC considers the following (in order) when 
developing recovery priorities: national response and recovery 
supplies; national defense materials; other national priority cargo; 
local response and recovery supplies; local energy cargo; local 
consumption food; and any other local priority cargoes. The protocol 
does not make operational decisions or establish regional and local 
priorities, which are being conducted by the UC.
 The Marine Transportation System Recovery Unit (MTSRU) within the 
UC coordinates port recovery efforts by engaging industry stakeholders, 
identifying broader impacts, and recommending courses of action to 
prioritize vessels and cargo activities. Several incident-specific 
factors inform their recommendations, including vessel characteristics 
such as cargo, draft, height, tonnage, maneuverability; waterway 
restrictions such as draft restrictions, tides, air gaps for vertical 
clearance, visibility, sea state concerns, tug and pilotage 
requirements; and facility restrictions such as berth availability, 
power availability, security, labor availability. For this response, 
the UC used the MTS recovery process to enable the flow of limited 
commercial traffic into and out of the port while also managing complex 
salvage operations. Immediately following this incident, the shipping 
industry independently identified alternative ports or transportation 
modes to re-route traffic and sustain supply chains given the expected 
long-term closure, limiting a need for commercial transits through the 
port during salvage operations.
 The UC's timely and transparent communications with the public and 
community stakeholders was critical to recovery efforts. The UC 
routinely broadcasts waterway status to the port community through 
Marine Safety Information Bulletins, which provide information on 
accessing USACE hydrographic survey data, controlling depths for the 
various alternate channels, transit requirements for deep draft 
vessels, and other restrictions and limitations such as weather.
 As the salvage work progresses, UC continues to leverage the MTSRU 
to engage with port stakeholders, share information on waterway status, 
identify any emerging factors that could affect port recovery efforts, 
and mitigate impacts wherever possible.
 Conclusion
 Through the UC, the Coast Guard is applying its full array of 
authorities, capabilities, and resources to re-open the Port of 
Baltimore safely and efficiently. Our ongoing collaboration with 
international, federal, state, local, and industry partners is 
essential to facilitating a timely recovery. We are grateful for the 
tremendous contributions of responders and driven each day by the trust 
and support of surrounding communities. While encouraged by progress 
made to date, the Coast Guard remains focused on the work still needed 
to restore the affected portions of the MTS.
 Thank you for the opportunity to testify today. I look forward to 
your questions.

 Mr. Graves of Missouri. Next, we have Major General Graham.
 Thanks for being here. You are recognized for 5 minutes.

 TESTIMONY OF MAJOR GENERAL WILLIAM H. GRAHAM, DEPUTY CHIEF OF 
 ENGINEERS, DEPUTY COMMANDING GENERAL, AND DEPUTY COMMANDING 
GENERAL FOR CIVIL AND EMERGENCY OPERATIONS, U.S. ARMY CORPS OF 
 ENGINEERS

 General Graham. Chairman Graves, Ranking Member Larsen, 
distinguished members of the committee, thank you for the 
opportunity to testify before you today to discuss the 
emergency response by the U.S. Army Corps of Engineers to the 
collapse of the Francis Scott Key Bridge.
 On behalf of the Corps, please allow me to begin today by 
offering our heartfelt condolences to the families of the six 
individuals lost to this tragedy. From the outset, we were 
committed to supporting the efforts to recover their loved 
ones. Our thoughts and prayers continue to be with them.
 Soon after this tragic event occurred, Maryland Governor 
Wes Moore declared a state of emergency, and the Corps' 
Baltimore district commander, Colonel Estee Pinchasin, 
activated the district's emergency operations center. Our 
state-of-the-art survey vessels, which usually serve to verify 
the depth and width of the Federal channels, were deployed to 
support the initial search and rescue dive operations. Our 
support then evolved as the Army Corps joined a multi-agency 
effort across all levels of Government to form a Unified 
Command. I have been in a good many disaster responses over the 
years, and this Unified Command team, led by Coast Guard 
Captain David O'Connell, is one of the best I have ever seen.
 The guidance from the President was clear from the 
beginning: clearing the wreckage from the Federal channel was 
the Army Corps' top priority. We needed three things to 
immediately execute this mission: authority, current funding, 
and the right contracting capacity.
 Authority. We used the authority for the Baltimore Harbor 
and Channels Project. Congress authorized the Army Corps to 
construct and maintain a 50-foot-deep channel. That channel was 
now fully blocked by the wreckage of the Key Bridge.
 Funding. We initially used available fiscal year 2023 and 
fiscal year 2024 funding for that Baltimore Harbor and channel 
project. Additional funds, as discussed earlier by Ranking 
Member Larsen, have been provided through internal emergency 
reprogramming actions using aged, unused funding just from 
Harbor Maintenance and Trust Fund projects. The Army Corps has 
not used this emergency reprogramming authority at this scale 
for over 15 years.
 The third thing we needed was contracting capacity. The 
Army Corps has a standard interagency agreement with the Navy 
Supervisor of Salvage and Diving. Led by Captain Sal Suarez and 
Director Paul Hankins, SUPSALV are true, world-class 
professionals. They have a suite of contracting tools that give 
us access to superb salvage companies. In this case, the 
contractor they are using is Donjon Marine from Newark, New 
Jersey.
 The Army Corps turns to Navy SUPSALV often to leverage 
their unique expertise. I last worked with SUPSALV in 2022 
during Hurricane Ian response in central Florida. Navy SUPSALV 
helped us pump the upper Kissimmee River backwards for a few 
days, saving around 12,000 homes south of Orlando from 
flooding. They are true professionals who know how to deliver 
outstanding results.
 With these three elements in place, we embarked on the 
complex task of determining how to begin clearing the 
approximately 50,000 tons of concrete, asphalt, and steel from 
the Patapsco River. For context, that is over 200 Statues of 
Liberty worth of material. After conducting extensive 
engineering analysis, the Army Corps, in collaboration with our 
partners, developed an ambitious but feasible timeline. Our 
plan was to initially clear a 35-foot-deep, limited access 
channel by the end of April, and restore the full 50-foot 
Federal navigation channel by the end of May.
 Certified by the Coast Guard, the limited access channel 
was opened to one-way vehicle traffic on April 25, a week ahead 
of schedule. This channel could support approximately 70 
percent of the port traffic, particularly the car carriers that 
are so important to Baltimore. To open up the full channel, we 
first had to execute the most difficult task, that of removing 
the section of bridge that had collapsed onto the bow of the 
Dali. I am delighted to report that on Monday of this week, the 
team successfully used precision demolitions to cut the bridge 
away from the ship.
 Today, operations continue to remove the Dali from the 
southern edge of the Federal channel. This will facilitate the 
removal of the remaining bridge wreckage from the river. We 
remain on track to open the full 700-foot-wide by 50-foot-deep 
Federal channel by the end of May.
 In closing, we are tremendously proud to be part of this 
stellar unified team who, as mentioned earlier, is safely 
removing the bridge wreckage from the Federal channel, allowing 
the Port of Baltimore to resume its role as a key supply chain 
node and vital economic engine.
 Thank you, Chairman Graves, Ranking Member Larsen, and 
members of the committee, and I look forward to answering your 
questions.
 [General Graham's prepared statement follows:]

 
Prepared Statement of Major General William H. Graham, Deputy Chief of 
Engineers, Deputy Commanding General, and Deputy Commanding General for 
 Civil and Emergency Operations, U.S. Army Corps of Engineers
 Chairman Graves, Ranking Member Larsen and distinguished members of 
the Committee, thank you for the opportunity to testify before you 
today to discuss the ongoing challenging emergency response to the 
collapse of the Francis Scott Key Bridge in Baltimore, Maryland and, 
specifically, the role of the U.S. Army Corps of Engineers (Corps) in 
the recovery effort.
 I am Major General Butch Graham, the Corps' Deputy Chief of 
Engineers, Deputy Commanding General, and Deputy Commanding General for 
Civil and Emergency Operations.
 On behalf of the Corps, please allow me to begin today by offering 
our heartfelt condolences for the families of the six individuals lost 
to this tragedy. From the outset of this response, we were committed to 
supporting the effort to recover their loved ones and our thoughts and 
prayers are with them.
 We also extend our sympathy to the people of Baltimore, the State 
of Maryland, and the surrounding areas, particularly those whose 
livelihoods depend on the vitality of the Port of Baltimore. Along with 
our partners in the Unified Command, we are working tirelessly to 
restore the uninterrupted flow of critical commerce in and out of 
Baltimore, and we are incredibly proud of the progress that has been 
made over the past six weeks.
 The Incident
 When the Singaporean-flagged container ship, the Motor Vessel Dali, 
struck the Key Bridge in the early hours of March 26, we as a Nation 
were confronted with many challenges. The Dali's collision destroyed a 
supporting pier and caused a nearly one-mile-long span of the 1.6-mile 
bridge to fall into the Patapsco River below, raining down 
approximately 50,000 tons of concrete, asphalt, and steel. Two 
construction workers survived and were injured, while another six 
perished.
 The bridge's collapse crippled Interstate 695, a major 
transportation route used by an estimated 12 million motor vehicles 
each year, and obstructed the Fort McHenry Federal Navigation Channel, 
blocking access to the Port of Baltimore.
 Soon after the incident, Maryland Governor Wes Moore declared a 
State of Emergency, and the Corps' Baltimore District Commander, 
Colonel Estee Pinchasin, activated the district's Emergency Operations 
Center. The Corps team joined the multi-agency effort across all levels 
of government to form a Unified Command and Incident Command Post to 
begin the difficult task of determining how to begin clearing the 
wreckage and restoring vessel transit through the federal navigation 
channel.
 Corps Authority
 Congress authorized the Baltimore Harbor and Channels, Maryland and 
Virginia project, and the Corps' operation and maintenance of the 700-
foot-wide and 50-foot-deep channel, in various Rivers and Harbors and 
Water Resources Development Acts.
 Additionally, the Rivers and Harbors Appropriation Act of 1899, as 
amended, (33 USC 409, 411-415) authorizes the Secretary of the Army to 
remove sunken vessels or similar obstructions/hazards from navigable 
waters of the United States. Implementing regulations, 33 CFR Part 245, 
allow the District Commander to fully restore the federal navigation 
channel in emergency situations where an obstruction impedes or stops 
navigation for safety and navigation.
 Partnership
 Utilizing our various authorities, the Baltimore District survey 
teams sprang into action within hours of the incident. The debris 
vessel, REYNOLDS, and survey vessel, CATLETT, were deployed to support 
the Maryland Transportation Authority Police, the initial incident 
commander in the first twenty-four hours of the response. These 
vessels, along with Baltimore District structural engineers with urban 
search and rescue experience, supported the search and rescue dive 
operations. This support continued as the Unified Command was 
established and the U.S. Coast Guard became the Federal On-Scene 
Coordinator. By the end of the first day, the mission shifted from 
search and rescue to recovery operations, and the Corps began clearing 
floating debris from the channel. Survey crews from the Philadelphia 
District provided supplemental support for this monumental effort.
 For its part in the salvage effort, the Corps utilized an existing 
interservice support agreement under the Economy Act to partner with 
the United States Navy Supervisor of Salvage and Diving (SUPSALV). The 
Baltimore District coordinated with SUPSALV for mobilization under this 
interagency agreement, starting with $3 million from Baltimore Harbor 
and Channels 50-foot Project Operations and Maintenance funds. This 
cost-reimbursable agreement allowed SUPSALV to immediately execute a 
delivery order to mobilize assets for this salvage mission. Donjon 
Marine (Donjon) is SUPSALV's emergency salvage contractor for this 
geographic area.
 Operations
 Partnering with the U.S. Navy has been crucial to ongoing 
operations, offering both technical expertise and additional resources 
with its salvage capabilities. This collaboration between the Army and 
the Navy enabled a rapid emergency response, and I want to underscore 
how quickly this mobilization occurred--SUPSALV coordinated with Donjon 
to mobilize wreckage removal assets and support deep-water channel 
remediation and restoration within hours of the bridge falling.
 Donjon secured the Chesapeake-1000, one of the largest floating 
cranes on the Eastern Seaboard, with a maximum lift capacity of 1,000 
tons, which has proved to be an invaluable resource. To begin lifting 
the debris, however, it was critical to understand how the wreckage 
fell and what the conditions were like under the water. By partnering 
with SUPSALV, we brought in commercial dive companies to survey and map 
the underwater hazards and develop and safely execute the underwater 
salvage plan.
 I cannot overstate the danger these divers faced--the Patapsco 
River is unforgiving, incredibly murky, and very cold. Salvage divers 
could, at most, see a foot in front of them. These perilous natural 
conditions were compounded by the jagged, twisted rubble of steel, 
concrete, and exposed rebar, adding the risk of impalement and snagged 
air supply hoses.
 Through the courageous, methodical work of these divers and our 
survey crews, we began to develop a clearer understanding of the 
operational landscape. SUPSALV's initial salvage plan focused on 
clearing the Fort McHenry Channel, but the overall salvage operation 
has three lines of effort: (1) the Corps and SUPSALV's efforts, through 
Donjon, to clear the federal navigation channel; (2) the Maryland 
Transportation Authority's work, through its contractor, Skanska-
Corman-Mclean, to clear the areas outside of the channel; and (3) the 
Dali's owner, Grace Ocean Private Limited, and operator, Synergy Group, 
and their contractor, Resolve Marine's, efforts to clear cargo from the 
vessel, enabling the unified team to ultimately clear remaining 
wreckage from the vessel.
 After the initial planning and scoping, the Unified Command 
established three principal priorities to be accomplished concurrently: 
(1) clear the federal navigation channel; (2) refloat and move the 
vessel; and (3) clear the remaining wreckage from the entire waterway.
 Clearing the Federal Channel
 Dive and survey operations continued over the course of the first 
week using highly sophisticated three-dimensional (3-D) sonar and LiDAR 
imagery captured by the Navy's CODA Octopus 3-D imaging system, which 
enabled us to map the wreckage field. We learned how challenging the 
rigging and lifting process would be due to the tangled state of the 
wreckage and that much of it was submerged below the mudline, in some 
cases buried up to 30 feet deep. Additionally, the steel was under 
tension and compression, presenting an engineering challenge and safety 
hazard. As a result, the wreckage would need to be re-evaluated after 
removing each piece.
 Once the wreckage was mapped, the northern side of the channel, 
opposite of the Dali, could be cleared to create a smaller, temporary 
one-way channel. We planned for this ``Limited Access Channel'' to have 
a width of 280 feet and a depth of 35 feet, which would allow for more 
than half of the vessels trapped in the Port of Baltimore to depart. 
Significant commercial and marine traffic could resume, bringing cargo 
and commodities into the port even as the salvage effort continued.
 After stabilizing the vessel, cutting and rigging wreckage, and 
extensive engineering analyses, in collaboration with industry 
partners, we developed an ambitious, but feasible, timeline to reopen 
the navigation channel. We could clear the Limited Access Channel by 
the end of April and restore the full federal navigation channel by the 
end of May. The President announced this plan to the American people 
during his April 5 site visit. With this timeline in mind, the Unified 
Command pressed forward, paying careful attention to site safety and 
environmental concerns while prioritizing victim recovery.
 Within the federal channel, we identified five principal sections 
of truss, the steel supporting structure of the Key Bridge, numbered 
zero (on the northern side) to four (on the southern side and laying 
atop the Dali). To open the Limited Access Channel, we had to remove 
truss sections zero and one.
 On April 6, we began with diving, rigging, and cutting, and by 
April 14, the Chesapeake-1000 lifted the 440-ton piece of truss section 
one. Two days later, salvors lifted the second half of section one. 
Section zero, weighing nearly 1,000 tons, was lifted in three pieces as 
teams removed the final piece late into the night of April 22. 
Additionally, prior to these lifts the Corps' Engineer Research and 
Development Center worked with the Association of Maryland Pilots to 
develop and test simulations that projected the viability of the 
Limited Access Channel.
 The Corps was able to clear the Limited Access Channel a week early 
and above scope at 300 feet in width by 38 feet deep. After the U.S. 
Coast Guard's assessments, the Limited Access Channel was open to one-
way vessel traffic on April 25, capable of supporting approximately 80 
percent of the types of vessels that the port served prior to the 
collapse.
 Refloating and Moving the Motor Vessel Dali
 Concurrently, while salvage operations were taking place in and 
around the federal channel, work had begun to refloat and move the 
Dali. This involved removing about four percent of the nearly 4,700 
containers on the ship, along with removing obstructions from the bow 
of the ship. To remove the largest section of truss from the Dali, the 
Unified Command approved a controlled demolition technique involving 
precision cutting using small charges to break the section safely and 
efficiently into more manageable, liftable pieces. As of the date of 
this testimony, the Corps is on track to complete the removal of 
section four by mid-May and to restore two-way traffic to the federal 
channel by the end of May 2024.
 Clearing the Remaining Wreckage (Federal Channel and Adjacent Areas)
 Currently, work continues to remove all remaining wreckage across 
the full federal channel. On April 20, a 200-ton wreck grab claw 
arrived onsite that, when rigged to the Chesapeake-1000, removes 
greater amounts of wreckage from the riverbed, increasing efficiency. 
All recovered wreckage is moved via barge from the incident site to a 
location approximately two miles to the east known as Sparrows Point. 
Skanska-Corman-Mclean, Maryland's contractor, leased ten acres of 
property on Sparrows Point to establish a wreckage processing operation 
there.
 Once wreckage is deposited, Maryland assumes ownership, and its 
contractor is responsible for breakdown, processing, and recycling 
disposal. Much of the wreckage, specifically within the federal 
channel, is buried deep in the mud, and the lifts of the wreckage are 
mixed with mud and smaller pieces of steel, concrete, and asphalt. 
Donjon has been handling this mixed wreckage for offload and further 
separation and processing.
 Outside of the federal channel, temporary alternate channels at 
Sollers and Hawkins Points, to the north and south of the federal 
channel respectively, were opened by the Coast Guard on April 1. 
Shallow-draft vessels and other smaller craft, in coordination with the 
U.S. Coast Guard, have been transiting these channels since that time. 
A third temporary alternate channel, Fort Carroll, with a 20-foot 
depth, was similarly opened by the Coast Guard on April 18 and remains 
in operation. The Maryland Transportation Authority's efforts to clear 
wreckage from outside the federal channel continue as of the date of 
this testimony.
 Salvage Operations Funding
 Acknowledging the emergency nature of this disaster and the 
critical need to reopen the federal channel quickly, the Corps used the 
Fiscal Year 2024 funds appropriated to support the operation and 
maintenance of the Baltimore Harbor and Channels 50-foot project to 
initiate the salvage efforts.
 The Corps obtained additional funds through an internal emergency 
reprogramming of unused Operation and Maintenance funds from prior year 
appropriations to continue to support this mission utilizing prior-
year. We are taking great care to ensure these reprogramming efforts 
will not negatively impact other Corps projects. So far, the Corps has 
obligated approximately $37M on wreckage removal and emergency 
response.
 Closing
 In closing, I'd like to thank the Committee for having me here 
today. I'm incredibly proud of our Corps team members, our partners in 
the Unified Command (U.S. Coast Guard, Maryland Department of the 
Environment, Maryland Transportation Authority, Maryland State Police), 
as well as all other associated agencies and industry partners, and for 
having zero safety incidents on any of the salvors thus far.
 From day one, this entire mission was about a commitment to get the 
job done right and safely, deliver for the people of Baltimore and the 
Nation, and honor the families whose loved ones were taken from them. I 
believe we have continued to deliver on that promise, and I will be 
forever proud of the work we have accomplished together. This challenge 
is immense, but with a unified effort, it is not insurmountable.
 Thank you again for the opportunity to be here today, and I look 
forward to your questions.

 Mr. Graves of Missouri. Thank you.
 Next, Administrator Bhatt, you are recognized for 5 
minutes.

TESTIMONY OF HON. SHAILEN BHATT, ADMINISTRATOR, FEDERAL HIGHWAY 
 ADMINISTRATION, U.S. DEPARTMENT OF TRANSPORTATION

 Mr. Bhatt. Thank you, Chairman Graves, Ranking Member 
Larsen, and members of the committee, thank you for the 
opportunity to appear before you today.
 The collapse of the Francis Scott Key Bridge on March 26 
was a tragic event for Baltimore, Maryland, and the entire 
Nation. While the collapse of the bridge itself was shocking, 
we must not lose sight of the devastating impact this tragedy 
has had on the victims and their families. The six victims were 
fathers, husbands, and friends in their homes and communities, 
and they were valued members of the construction workforce. We 
will always mourn these six individuals who lost their lives 
while working to strengthen our transportation system.
 I also want to thank the emergency responders who acted 
quickly to save lives.
 I have had the opportunity to visit the site of the bridge 
collapse, and while I have been engaged in a number of bridge-
related incidents during my career, I have never seen anything 
at this scale. It is a monumental task to clean up the site and 
rebuild. And yet, as I appear before the committee today, I 
have a great feeling of optimism, witnessing the ability of 
industry and Government entities to work together in times of 
calamity, as they have done in the weeks since the bridge 
collapse. Immediately following this catastrophic event, the 
Federal Highway Administration mobilized internally across 
multiple offices and externally with local, State, and Federal 
partners to support the response.
 President Biden has been clear in this administration's 
commitment to reconstruct the bridge. Under Secretary 
Buttigieg's leadership, FHWA is actively coordinating with 
other operating administrations and offices within the United 
States Department of Transportation, the Maryland Department of 
Transportation, which includes the Maryland Transportation 
Authority and State Highway Administration, the city of 
Baltimore, U.S. Coast Guard, the U.S. Army Corps of Engineers, 
and others to mitigate supply chain impacts, manage traffic, 
reopen the port, and ultimately reconstruct the bridge.
 FHWA is actively supporting the National Transportation 
Safety Board's investigation of the collapse. FHWA has been in 
direct communication with MDOT, Maryland DOT, regarding all 
possible options for reconstructing the bridge, and is 
committed to supporting these efforts so that the bridge can be 
reconstructed as quickly and safely as possible. It is critical 
that we reconstruct this vital connection for people and goods 
traveling along the east coast. Ensuring that the I-695 
corridor is open, operational, and safe for the traveling 
public at the earliest possible moment is a top priority.
 On March 28, within hours of receiving the request for 
funding assistance from Maryland DOT, FHWA announced the 
immediate availability of $60 million in quick release 
emergency relief funds. These funds serve as a downpayment 
towards initial costs, and additional Emergency Relief Program 
funding will be made available as work continues. The 
administration is asking Congress to join it in demonstrating a 
commitment to aid in recovery efforts by authorizing a 100-
percent Federal cost share for rebuilding the bridge, 
consistent with past catastrophic bridge collapses.
 FHWA continues to provide wide-ranging technical assistance 
to Maryland DOT regarding contract procurement for debris 
removal, procurement for reconstruction operations, and project 
delivery strategies to reconstruct the bridge quickly and 
safely.
 FHWA also is working with Maryland DOT to ensure that the 
new bridge will be built to current design standards and in 
accordance with all applicable Federal laws.
 On March 26, 2024, the day of the collapse, FHWA met with 
the national transportation liaisons from the U.S. Army Corps 
of Engineers, U.S. Coast Guard, U.S. Fish and Wildlife Service, 
the National Oceanic and Atmospheric Administration, the 
Advisory Council on Historic Preservation, and the EPA to 
discuss each agency's respective emergency procedures and 
considerations to expedite the environmental review and 
permitting processes for the future reconstruction. FHWA 
continues to meet with Federal resource agencies to discuss 
permitting.
 Thank you to the State, local, and Federal entities who 
continue to collaborate in response to this tragic event. 
Whether it is an event of this scale and complexity, or the 
comparatively smaller but still impactful bridge incidents on 
I-95 in Philadelphia and on I-10 in Los Angeles, I am proud to 
lead an agency that is playing a part in showing the country 
what can happen when the Government and industry come together 
with a common goal. There are no Democratic roads or Republican 
bridges. Transportation truly unites us. FHWA will continue to 
do everything it can to support the response. As the President 
has said, we will not rest until the cement has dried on the 
entirety of a new bridge.
 Thank you again for the opportunity to appear before you 
today. I would be happy to answer any questions.
 [Mr. Bhatt's prepared statement follows:]

 
 Prepared Statement of Hon. Shailen Bhatt, Administrator, Federal 
 Highway Administration, U.S. Department of Transportation
 Chairman Graves, Ranking Member Larsen, and Members of the 
Committee, thank you for the opportunity to appear before you today.
 The collapse of the Francis Scott Key Bridge on March 26th was a 
tragic event for Baltimore, Maryland, and the entire Nation. While the 
collapse of the bridge itself was shocking, we must not lose sight of 
the devastating impact this tragedy has had on the victims and their 
families. The six victims were fathers, husbands, and friends in their 
homes and communities, and they were valued members of the construction 
workforce. We will always mourn these six individuals who lost their 
lives while working to strengthen our transportation system. I also 
want to thank the emergency responders who acted quickly to save lives.
 I have had the opportunity to visit the site of the bridge 
collapse, and while I have been engaged in a number of bridge-related 
incidents during my career, I have never seen something on this scale. 
It is a monumental task to clean up the site and rebuild. And yet, as I 
appear before the Committee today, I have a feeling of great optimism 
witnessing the ability of industry and government entities to work 
together in times of calamity as they have done in the weeks since the 
bridge collapse.
 Immediately following this catastrophic event, the Federal Highway 
Administration (FHWA) mobilized internally across multiple offices and 
externally with local, State, and Federal partners to support the 
response. President Biden has been clear in this Administration's 
commitment to reconstructing the bridge. Under Secretary Buttigieg's 
leadership, FHWA is actively coordinating with other operating 
administrations and offices within the United States Department of 
Transportation (USDOT); the Maryland Department of Transportation 
(MDOT), which includes the Maryland Transportation Authority and State 
Highway Administration; the City of Baltimore; U.S. Coast Guard; the 
U.S. Army Corps of Engineers; and others to mitigate supply chain 
impacts, manage traffic, reopen the port, and ultimately reconstruct 
the bridge. FHWA is actively supporting the National Transportation 
Safety Board's investigation of the collapse. FHWA has been in direct 
communication with MDOT regarding all possible options for 
reconstructing the bridge and is committed to supporting these efforts 
so that the bridge can be reconstructed as quickly and safely as 
possible. It is critical that we reconstruct this vital connection for 
people and goods traveling along the East Coast. Ensuring that the I-
695 corridor is open, operational, and safe for the traveling public at 
the earliest possible moment is a top priority.
 On March 28th, within hours of receiving the request for funding 
assistance from MDOT, FHWA announced the immediate availability of $60 
million in ``quick release'' Emergency Relief funds. These funds serve 
as a down payment toward initial costs, and additional Emergency Relief 
program funding will be made available as work continues. The 
Administration is asking Congress to join it in demonstrating a 
commitment to aid in recovery efforts by authorizing a 100 percent 
Federal cost share for rebuilding the bridge, consistent with past 
catastrophic bridge collapses.
 FHWA continues to provide wide-ranging technical assistance to MDOT 
regarding contract procurement for debris removal, procurement for 
reconstruction operations, and project delivery strategies to 
reconstruct the bridge quickly and safely. FHWA also is working with 
MDOT to ensure that the new bridge will be built to current design 
standards and in accordance with all applicable Federal laws. On March 
26, 2024, the day of the collapse, FHWA met with the National 
Transportation Liaisons from the U.S. Army Corps of Engineers, U.S. 
Coast Guard, U.S. Fish and Wildlife Service, the National Oceanic and 
Atmospheric Administration, the Advisory Council on Historic 
Preservation, and the Environmental Protection Agency to discuss each 
agency's respective emergency procedures and considerations to expedite 
the environmental review and permitting processes for the future 
reconstruction. FHWA continues to meet with Federal resource agencies 
to discuss permitting for reconstructing the bridge.
 Thank you to the State, local, and Federal entities who continue to 
collaborate with FHWA in response to this tragic event. Whether it is 
an event of this scale and complexity or the comparatively smaller but 
still impactful bridge incidents on I-95 in Philadelphia and on I-10 in 
Los Angeles, I am proud to lead an agency that is playing a part in 
showing the country what can happen when government and industry come 
together with a common goal. There are no Democratic roads or 
Republican bridges--transportation truly unites us.
 FHWA will continue to do everything it can to support the response. 
As the President has said, we will not rest ``until the cement has 
dried on the entirety of a new bridge.''
 Thank you again for the opportunity to appear before you today. I 
would be happy to answer any questions.

 Mr. Graves of Missouri. Thanks. Now we will go to Chair 
Homendy.

 TESTIMONY OF HON. JENNIFER HOMENDY, CHAIR, NATIONAL 
 TRANSPORTATION SAFETY BOARD

 Ms. Homendy. Thank you. Good morning, Chairman Graves, 
Ranking Member Larsen, and members of the committee.
 With me today is our lead investigator on this accident, 
Marcel Muise, our acting director of marine safety, Eric 
Stolzenberg, and other dedicated NTSB staff. Thank you for the 
opportunity to be here today to discuss our ongoing 
investigation into the collapse of the Francis Scott Key 
Bridge.
 On behalf of the NTSB, I offer our heartfelt condolences to 
the families of all those who were lost in this tragedy, and 
our deepest sympathies to those who were injured or otherwise 
impacted by this event.
 I also want to thank our numerous Federal and State 
partners for their support on-scene and throughout this 
investigation.
 Yesterday, we released our preliminary report which shows 
that the Dali experienced four total power outages. Preliminary 
information indicates that the March 25 blackouts were 
mechanically distinct from those that occurred on March 26. Two 
were related to routine maintenance in port. Two were 
unexpected tripping of circuitbreakers on the accident voyage.
 On the 25th, a blackout occurred when a crewmember 
mistakenly closed an engine damper while he was working on the 
exhaust system in port. This effectively blocked the engine's 
exhaust gases from traveling out of the vessel's stack, causing 
the engine to stall. Vessel power was briefly restored, but 
insufficient fuel pressure to the online generator caused its 
speed to decrease. Its breaker opened, and a second blackout 
occurred.
 While recovering from this second blackout, the crew 
switched to a different transformer and set of breakers from 
those that had been in use for several months. Switching 
breakers is not unusual, but may have affected operations the 
very next day on the accident voyage. So, the configuration of 
the breakers remains under investigation.
 On the 26th, when the ship was about 0.6 miles from the 
bridge, one high-voltage and one low-voltage breaker that were 
powering most of the vessel's equipment and lighting 
unexpectedly tripped. As a result, the vessel lost main 
propulsion. Bridge equipment also lost power, and the voyage 
data recorder lost system feeds. Bridge audio continued to be 
recorded.
 The crew was able to briefly restore power to the vessel, 
but another blackout occurred when a different breaker tripped. 
At this point, the ship was about 0.2 miles from the Key 
Bridge. The crew regained electrical power right before the 
Dali struck pier 17, but they were unable to restore 
propulsion.
 The ship had an emergency generator, which automatically 
started following the first blackout on the 26th. However, the 
generator only powers systems like emergency lighting, 
navigation, radio equipment, alarms, and a steering pump that 
allowed for low-speed limited rudder movements. It does not 
power propulsion, and without the propeller turning, the rudder 
was less effective. They were essentially drifting.
 We are still investigating the exact time the emergency 
generator started. Going forward, this is a complex 
investigation. Our investigators have been on-scene 
consistently since this accident. In fact, they are on board 
the vessel as I testify today. It is unprecedented to be there 
that long. We will continue evaluating the design and operation 
of the Dali's power distribution system, including its 
breakers. Examination of damage to the vessel will continue 
when the ship is clear of debris and moved to a shoreside 
facility.
 We are also working with Maryland as they assess pier 
protection on their other bridges, and we are examining pier 
protection improvements that have been made following other 
bridge collapses resulting from marine vessel strikes that we 
have investigated in the past.
 Lastly, there are a lot of questions regarding the fuel. 
Our investigators found that the ship was running on low-
sulphur marine gas oil at the time of the accident, which it 
had been using since March 21. We directed an independent lab 
to test all fuels stored on the ship, including the fuel that 
was being burned at the time of the accident. The test results 
did not identify any concerns related to the quality of the 
fuel.
 Thank you again for the opportunity to testify, and I look 
forward to answering your questions.
 [Ms. Homendy's prepared statement follows:]

 
 Prepared Statement of Hon. Jennifer Homendy, Chair, National 
 Transportation Safety Board
 Good morning, Chairman Graves, Ranking Member Larsen, and members 
of the committee. As chair of the National Transportation Safety Board 
(NTSB), I thank you for the opportunity to appear before you today to 
discuss the NTSB's ongoing investigation into the cargo vessel Dali's 
striking of Baltimore's Francis Scott Key Bridge and subsequent bridge 
collapse. We offer our heartfelt condolences to the families and 
communities of all those who were lost in this tragedy, and our 
assurance that this investigation will be thorough and impartial.
 The NTSB is an independent federal agency charged by Congress with 
investigating every civil aviation accident in the United States and 
significant events in the other modes of transportation: railroad, 
transit, highway, marine, pipeline, and commercial space. We determine 
the probable causes of the accidents and events we investigate, and 
issue safety recommendations aimed at preventing future occurrences. In 
addition, we conduct transportation safety research studies and offer 
information and other assistance to family members and survivors for 
each accident or event we investigate. We also serve as the appellate 
authority for enforcement actions involving aviation and mariner 
certificates issued by the Federal Aviation Administration (FAA) and US 
Coast Guard, respectively, and we adjudicate appeals of civil penalty 
actions taken by the FAA.
 Our current investigative workload includes over 1,200 active 
investigations in 47 states and Puerto Rico, in addition to supporting 
more than 140 foreign investigations in over 50 countries. Throughout a 
typical year, we work on about 2,200 domestic and 450 foreign cases, 
and we expect the number of cases annually to remain high and continue 
to increase in complexity. Our activities include multiple major 
investigations, such as the in-flight structural failure of a Boeing 
737-9 MAX over Portland, Oregon; the derailment of a Norfolk Southern 
train in East Palestine, Ohio; multiple runway incursions and other 
near-miss incidents at airports across the country; and, of course, the 
tragic collapse of Baltimore's Francis Scott Key Bridge after it was 
struck by the cargo vessel Dali, the subject of today's hearing.
 Some investigations, understandably, get more public attention than 
others, but all the NTSB's investigations are critical for improving 
transportation safety. We owe it to the families of those involved, to 
the communities where events occurred, and to the traveling public to 
find out what happened, why it happened, and to make recommendations to 
help ensure it never happens again. That's exactly what we intend to do 
in the case of this Baltimore bridge collapse.
 Because our investigation into the bridge collapse is ongoing, 
there are limits to what I can say publicly at this time. As I am sure 
you can appreciate, I will not undermine the meticulous work of our 
investigators by speculating prematurely about our eventual analysis 
and findings. What I will share is information about the facts we have 
gathered thus far in our investigation, our fact-gathering process, the 
challenges to date, and the expected direction of our investigation 
based on what we know today. I will also outline how our agency's needs 
relate to this investigation.
 A comprehensive summary of the facts we have gathered thus far is 
available in our preliminary report on this investigation, which was 
released on May 14 and is available to the public at NTSB.gov.\1\ I 
want to stress that these findings are preliminary and, as in any 
investigation, may be subject to change at a later date as new 
information comes to light.
---------------------------------------------------------------------------
 \1\ Marine Investigation Preliminary Report, Contact of Cargo 
Vessel Dali with Francis Scott Key Bridge and Subsequent Bridge 
Collapse [https://www.ntsb.gov/investigations/Pages/DCA24MM031.aspx].
---------------------------------------------------------------------------
 NTSB investigators were on scene in Baltimore and onboard the Dali 
until May 10, just last week--nearly 7 weeks after the accident. It is 
highly unusual for an NTSB investigation that our on-scene fact-
gathering remained underway for so long. This unusual occurrence speaks 
to the immense complexity of this event and, therefore, the immense 
complexity of the investigation. That said, you can be sure the NTSB 
and our expert employees are fully prepared to complete a comprehensive 
investigation on behalf of the American people into the causes of this 
tragedy, and we will do exactly that.
 Our comprehensive investigation is a multimodal effort, drawing on 
the expertise of our Office of Marine Safety, which is leading the 
investigation, as well as our offices of Highway Safety, Research and 
Engineering, and Railroad, Pipeline, and Hazardous Materials 
Investigations.
 Since the inception of the agency in 1967, the NTSB has completed 
more than 2,000 marine investigations. Of those, 311 were major 
investigations resulting in safety recommendations. In addition, 30 
safety studies, other modal investigations, and other Board projects 
have generated marine safety recommendations over the years. In total, 
we have issued 2,636 marine safety recommendations to date, including 
67 recommendations related to bridge collapses due to vessel strikes. 
All 67 of these recommendations are attached for the record.
 Our marine safety investigators boast over a combined 400 years of 
professional expertise in their field, in addition to the decades of 
combined experience possessed by our highway and bridge, data recorder, 
and hazardous materials investigators. This investigation is in good 
hands with their knowledge.
 That said, it is also true that the NTSB badly needs additional 
resources to ensure a major investigation like this does not impede our 
ability to respond to additional accidents and complete simultaneous 
investigations in a timely manner. The Dali investigation provides a 
telling example.
 Our Office of Marine Safety currently has 12 investigators. Half of 
those investigators were deployed to Baltimore and their time will be 
consumed by this investigation for months to come. In the meantime, 
that office is also currently investigating 60 other marine safety 
events and will undoubtedly be called to the scene of additional marine 
casualties in the months ahead. The other NTSB offices involved in this 
investigation--whether as investigators or as staff supporting their 
efforts--must maintain a similar balance.
 The NTSB is deeply grateful to Congress for the additional 
resources provided in our fiscal year 2024 (FY24) appropriations. We 
know that was a heavy lift at a time when very few agencies received an 
increase. I am also extremely grateful to this committee for its 
leadership in including the NTSB in the FAA reauthorization, which 
authorizes funding increases over the next 5 years that will help us 
keep pace with growing costs. I must note, however, that more resources 
are still needed to ensure timely completion of all our investigations.
 The NTSB received a $10.7 million increase in our FY24 
appropriations. However, given the $5.175 million cost of mandatory 
payroll and benefits increases, and the $1.575 million that will be 
required for inflationary operational increases, much of that 
appropriations increase is already accounted for. Subtracting those 
built-in costs leaves an increase of $4 million over FY23. We intend 
for this increase to take us from 435 staff on board today up to 450 by 
the end of FY24, but 4 of those positions will be filled by staff for 
two new Board members. Operationally, that would equate to an increase 
of only 11 positions spread across all our departments, a fraction of 
the need.
 The fact is, we need to add over 50 more investigators today to be 
fully staffed. Our Office of Marine Safety alone needs an additional 5 
positions--and that's without growing the number of Marine safety 
investigators. These positions include our Director of Marine Safety, 
who passed away suddenly in March; one senior investigator to fill a 
vacancy; a Naval architect; a program manager; and a mission support 
specialist.
 In addition, we need 16 more aviation investigators, 10 more 
highway investigators, 10 more pipeline and hazardous materials 
investigators, and 5 more rail investigators. In our research and 
engineering laboratories, we need 12 additional employees and $2.4 
million dollars to replace aging and obsolete equipment that is 
critical to conducting robust and comprehensive investigations. And 
these increases do not even begin to address staffing needs in our 
support offices, who also play a vital role in achieving our mission.
 The NTSB is a small agency relative to our federal partners, both 
in terms of the size of our budget and our workforce. However, as our 
recommendation implementation success rate shows, our impact is 
profound. Everyone at the NTSB plays a role in achieving our mission to 
make transportation safer. The amounts in our reauthorization and 
budget requests represent only a modest downpayment on the investments 
we need to boost transportation safety across all transportation modes 
nationwide.
 When I say that we need more resources, I want to be clear about 
exactly what we are requesting. Our budget request of $150 million for 
FY 2025 is for an increase of $10 million, which the President 
provided. We project that $10 million would allow us to fill just 20 
more positions--still far fewer than we need--and provide much-needed 
program enhancements, including investment in Zero Trust.
 Again, our budget request is a modest investment that would allow 
the agency to advance and grow with the ever-evolving transportation 
industry. To continue as the world's preeminent safety agency, 
completing our investigations and developing recommendations that 
advance safety changes without delays, we must meet the challenges that 
come with increasing growth and innovation in transportation. 
Therefore, it is critical for the agency to have additional resources 
to respond to events without affecting our timeliness, the quality of 
our work, or our independence.
 Thank you again for the opportunity to testify, and I look forward 
to your questions.
 Attachment
 Recommendation Subjects
 Rec #: M-08-010, H-04-029, H-94-009, H-04-030, H-04-031, I-94-003,
I-94-004, I-94-006, I-94-007, I-95-002, M-94-037, R-94-009, R-94-010,
R-94-011, R-94-012, H-94-008, M-94-010, M-94-012, M-94-013, M-94-014,
M-89-069, M-89-070, M-89-071, M-89-072, M-89-073, M-89-074, M-89-075,
M-89-076, M-89-077, M-89-078, M-89-079, M-89-080, M-89-081, M-89-082,
M-89-083, M-89-084, M-81-011, M-81-012, M-81-013, M-81-015, M-81-016,
M-81-017, M-81-018, M-81-019, M-81-020, M-81-021, M-81-022, M-81-023,
H-78-001, H-78-002, H-78-003, H-78-004, H-78-005, M-78-001, H-74-040,
H-74-041, H-74-042, H-74-043, H-72-048, M-74-014, M-74-015, M-74-016,
M-74-019, M-74-001, M-74-003, M-74-004, M-74-005

----------------------------------------------------------------------------------------------------------------
 Date
 Recommendation # Overall Status Closed Subject
----------------------------------------------------------------------------------------------------------------
H-04-029................................. CAAA........................ 12/11/09 TO THE FEDERAL HIGHWAY
 ADMINISTRATION: Revise
 your sufficiency rating
 system, which prioritizes
 bridges for rehabilitation
 and replacement, to
 include the probability of
 extreme events, such as
 vessel impact. (Supersedes
 Safety Recommendation H-94-
 009)
 
H-04-030................................. CAAA........................ 01/11/13 TO THE FEDERAL HIGHWAY
 ADMINISTRATION: Develop an
 effective motorist warning
 system to stop motor
 vehicle traffic in the
 event of a partial or
 total bridge collapse.
 
H-04-031................................. CAA......................... 11/14/13 TO THE AMERICAN ASSOCIATION
 OF STATE AND HIGHWAY AND
 TRANSPORTATION OFFICIALS:
 Once an effective motorist
 warning system has been
 developed, provide
 guidance to the States on
 its use.
 
H-72-048................................. CAA......................... 01/01/80 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION, THE
 AMERICAN ASSOCIATION OF
 STATE HIGHWAY OFFICIALS,
 AND THE INTERNATIONAL
 BRIDGE, TUNNEL AND
 TURNPIKE ASSOCIATION:
 ESTABLISH POLICIES AND
 STANDARDS TO INSURE THAT
 STANDARD TRAFFIC CONTROL
 DEVICES (GATE, SIGNALS,
 SIGNS, AND PAVEMENT
 MARKINGS) ARE INSTALLED ON
 MOVABLE BRIDGES AT
 LOCATIONS WHICH WILL HALT
 TRAFFIC ON A SECTION OF
 THE BRIDGE THAT IS NOT
 SUBJECT TO IMPACT BY LARGE
 MARINE VESSELS. SUCH
 POSITIONING OF WARNING
 SYSTEMS WILL PREVENT
 VEHICLES FROM BEING ON
 THOSE PORTIONS OF SUCH
 BRIDGES WHICH MAY COLLAPSE
 WHEN THEY ARE STRUCK BY A
 MARINE VESSEL.
 
H-74-040................................. CAA......................... 01/01/80 THE NTSB RECOMMENDS THAT
 THE GREATER NEW ORLEANS
 EXPRESSWAY COMMISSION TAKE
 THE FOLLOWING MEASURES:
 ESTABLISH A SYSTEMATIC
 PROGRAM TO IDENTIFY AND
 SURVEY HIGH ACCIDENT
 LOCATIONS ON THE LAKE
 PONTCHARTRAIN CAUSEWAY.
 (THE PROGRAM REQUIRES
 REVIEW OF INDIVIDUAL
 ACCIDENTS.) GUIDELINES FOR
 SUCH A PROGRAM CAN BE
 FOUND IN FEDERAL HIGHWAY
 SAFETY PROGRAM STANDARD
 NO. 9, ``IDENTIFICATION
 AND SURVEILLANCE OF
 ACCIDENT LOCATIONS.''
 
H-74-041................................. CAA......................... 01/01/80 THE NTSB RECOMMENDS THAT
 THE GREATER NEW ORLEANS
 EXPRESSWAY COMMISSION TAKE
 THE FOLLOWING MEASURES:
 EVALUATE THE PRESENT
 BRIDGE BARRIER RAIL SYSTEM
 ON THE WEST SPAN OF THE
 LAKE PONTCHARTRAIN
 CAUSEWAY TO DETERMINE
 IMPROVEMENTS WHICH WILL
 ASSURE A BARRIER SYSTEM
 THAT WILL: (A) PREVENT
 ERRANT VEHICLES FROM
 PENETRATING OR VAULTING
 OVER THE BARRIER, AND (B)
 PROVIDE SAFE REDIRECTION
 OF ERRANT VEHICLES WITH
 AMINIMUM EFFECT ON THE
 VEHICLE AND ITS OCCUPANTS.
 
H-74-042................................. CAA......................... 01/01/80 THE NTSB RECOMMENDS THAT
 THE GREATER NEW ORLEANS
 EXPRESSWAY COMMISSION TAKE
 THE FOLLOWING MEASURES:
 INSTALL A WARNING SYSTEM
 ON THOSE SECTIONS OF THE
 LAKE PONTCHARTRAIN
 CAUSEWAY THAT ARE
 VULNERABLE TO IMPACT BY
 ERRANT MARINE VESSELS. THE
 SYSTEM SHOULD ACTIVATE
 AUTOMATICALLY TO WARN
 MOTORISTS OF DANGER AHEAD,
 SHOULD THE CAUSEWAY SPAN
 COLLAPSES.
 
H-74-043................................. CNLA........................ 08/21/95 THE NTSB RECOMMENDS THAT
 THE LOUISIANA WILDLIFE AND
 FISHERIES COMMISSION:
 MAINTAIN A SAFETY
 INSPECTION PROGRAM WHICH
 WILL INSURE COMPLIANCE
 WITH ITS ``MINIMAL SAFETY
 RULES APPLICABLE TO TUGS
 AND TOWS OPERATING IN LAKE
 PONTCHARTRAIN,'' AS
 ADOPTED ON JULY 20, 1968.
 
H-78-001................................. CR.......................... 12/12/78 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: STUDY AND
 PUBLISH A REPORT ON THE
 COMPLETENESS AND
 EFFECTIVENESS OF ITS
 BRIDGE CLASSIFICATION/
 INSPECTION PROGRAM UNDER
 23 USC 144, 23 CFR 650,
 AND THE AASHTO ``MANUAL
 FOR MAINTENANCE INSPECTION
 OF BRIDGES'' PART 2.5,
 ESPECIALLY AS TO BRIDGES
 OVER NAVIGABLE CHANNELS,
 FOR THEIR ABILITY TO
 SUSTAIN PIER IMPACT AT
 WATER LEVEL AND FOR THE
 DESIGN OF THE TRAFFIC
 CONTROL SYSTEM ON THE
 BRIDGES.
 
H-78-002................................. CAA......................... 12/05/84 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: WORK WITH
 THE U.S. COAST GUARD TO
 DEVELOP SPECIFICATIONS FOR
 THE DESIGN OF DOLPHINS,
 FENDERS, AND OTHER ENERGY
 ABSORPTION AND/OR VESSEL
 REDIRECTION DEVICES FOR
 THE PROTECTION OF BOTH
 BRIDGE AND VESSEL DURING
 AN ACCIDENTAL IMPACT.
 ISSUE THESE DESIGN
 SPECIFICATIONS ALONG WITH
 GUIDELINES AND
 REQUIREMENTS FOR THE
 PLACEMENT OF DOLPHINS,
 FENDERS, AND ENERGY
 ABSORPTION AND REDIRECTION
 DEVICES.
 
H-78-003................................. CAA......................... 04/20/84 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: BRING
 TOGETHER IN ONE PUBLICATON
 ALL GUIDELINES FOR TRAFFIC
 CONTROL AT MOVABLE
 BRIDGES, INCLUDING SIGNS,
 SIGNALS, PAVEMENT
 MARKINGS, AND RESTRAINT
 DEVICES.
 
H-78-004................................. CAAA........................ 04/19/85 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: INCLUDE AS
 PART OF THE FEDERAL-AID
 HIGHWAY PROGRAM MANUAL
 6.8.3.4 PARAGRAPH 5D(3),
 ``SPECIAL PURPOSE
 SURVEILLANCE AND CONTROL
 SYSTEMS,'' A DESCRIPTION
 OF SURVEILLANCE AND
 CONTROL SYSTEMS USED ON
 MULTISPAN BRIDGES OVER
 WIDE NAVIGABLE WATERWAYS.
 
H-78-005................................. CAA......................... 08/23/83 THE NTSB RECOMMENDS THAT
 THE COMMONWEALTH OF
 VIRGINIA: IN REBUILDING
 THE BENJAMIN HARRISON
 BRIDGE, COMPLY WITH THE
 FEDERAL HIGHWAY
 ADMINISTRATION GUIDELINES
 IN PROVIDING AND LOCATING
 WARNING SIGNALS AND GATES
 AND ALL OTHER REQUIRED
 TRAFFIC CONTROL DEVICES.
 
H-94-008................................. CNLA........................ 10/07/97 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: IN
 COOPERATION WITH THE
 AMERICAN ASSOCIATION OF
 STATE HIGHWAY
 TRANSPORTATION OFFICIALS,
 BROADEN THE APPLICATION OF
 RISK-ASSESSMENT AND
 MANAGEMENT PROGRAMS TO
 EXISTING HIGHWAY BRIDGES.
 SUCH PROGRAMS SHOULD
 INCLUDE, AMONG OTHER
 THINGS, A FORMAL
 ASSESSMENT OF THE
 VULNERABILITY OF BRIDGES
 TO VESSEL COLLISION AND
 COLLAPSE.
 
H-94-009................................. CS.......................... 09/09/04 TO THE AMERICAN ASSOCIATION
 OF STATE HIGHWAY
 TRANSPORTATION OFFICIALS:
 In cooperation with the
 Federal Highway
 Administration, broaden
 the application of risk-
 assessment and management
 programs to existing
 bridges. Such programs
 should include, among
 other things, a formal
 assessment of the
 vulnerability of bridges
 to vessel collision and
 collapse. (Superseded by H-
 04-29)
 
I-94-003................................. CAAA........................ 10/27/98 THE NTSB RECOMMENDS THAT
 THE DEPARTMENT OF
 TRANSPORTATION: CONVENE AN
 INTERMODAL TASK FORCE THAT
 INCLUDES THE COAST GUARD,
 THE FEDERAL RAILROAD
 ADMINISTRATION, AND THE
 U.S. ARMY CORPS OF
 ENGINEERS TO DEVELOP A
 STANDARD METHODOLOGY FOR
 DETERMINING THE
 VULNERABILITY OF THE
 NATION'S HIGHWAY AND
 RAILROAD BRIDGES TO
 COLLISIONS FROM MARINE
 VESSELS, TO FORMULATE A
 RANKING SYSTEM FOR
 IDENTIFYING BRIDGES AT
 GREATEST RISK, AND TO
 PROVIDE GUIDANCE ON THE
 EFFECTIVENESS AND
 APPROPRIATENESS OF
 PROTECTIVE MEASURES.
 
I-94-004................................. CAAA........................ 10/27/98 THE NTSB RECOMMENDS THAT
 THE DEPARTMENT OF
 TRANSPORTATION: REQUIRE
 THAT THE FEDERAL RAILROAD
 ADMINISTRATION AND THE
 FEDERAL HIGHWAY
 ADMINISTRATION, FOR THEIR
 RESPECTIVE MODES, USE THE
 METHODOLOGY DEVELOPED BY
 THE INTERMODAL TASK FORCE
 TO CARRY OUT A NATIONAL
 RISK ASSESSMENT PROGRAM
 FOR THE NATION'S RAILROAD
 AND HIGHWAY BRIDGES.
 
I-94-006................................. CAA......................... 04/24/95 THE NTSB RECOMMENDS THAT
 THE DEPARTMENT OF
 TRANSPORTATION: CONSIDER
 THE USE OF RACONS, RADAR
 REFLECTORS, AND OTHER
 DEVICES TO MAKE BRIDGES
 MORE IDENTIFIABLE ON
 RADAR.
 
I-94-007................................. CAAA........................ 05/08/00 THE NTSB RECOMMENDS THAT
 THE U.S. ARMY CORPS OF
 ENGINEERS: COOPERATE WITH
 THE U.S. DEPARTMENT OF
 TRANSPORTATION IN
 DEVELOPING A STANDARD
 METHODOLOGY FOR
 DETERMINING THE
 VULNERABILITY OF THE
 NATION'S HIGHWAY AND
 RAILROAD BRIDGES TO
 COLLISIONS FROM MARINE
 VESSELS, FORMULATING A
 RANKING SYSTEM TO IDENTIFY
 BRIDGES AT GREATEST RISK,
 AND PROVIDING GUIDANCE ON
 THE EFFECTIVENESS AND
 APPROPRIATENESS OF
 PROTECTIVE MEASURES.
 
I-95-002................................. CAA......................... 07/23/98 THE NTSB RECOMMENDS THAT
 THE DOT, OFFICE OF
 INTERMODALISM: ESTABLISH A
 MECHANISM TO ENSURE THAT A
 COMPLETE LIST OF BRIDGES
 VULNERABLE TO IMPACT BY
 COMMERCIAL MARINE TRAFFIC,
 WITH EXACT LOCATIONS, IS
 DISSEMINATED TO ALL
 EMERGENCY RESPONSE
 SERVICES SO THAT ALL
 BRIDGES CAN BE EASILY
 IDENTIFIED IN AN EMERGENCY
 SITUATION.
 
M-08-010................................. CEX......................... 03/19/10 TO THE BOARD OF NEW ORLEANS-
 BATON ROUGE STEAMSHIP
 PILOT EXAMINERS FOR THE
 MISSISSIPPI RIVER: Verify
 that the pilots assigned
 to challenging locations
 such as the Apex dock have
 received adequate training
 in docking and undocking
 large vessels at such
 locations.
 
M-74-001................................. CAA......................... 06/30/76 EXPEDITE THE PROMULGATION
 OF REGULATIONS REGARDING
 VESSEL CONTROL IN THE
 VICINITY OF THE CHESAPEAKE
 BAY BRIDGE AND TUNNEL.
 
M-74-003................................. CUA......................... 06/21/82 PUBLISH AND MAKE AVAILABLE
 TO TOWBOAT OPERATORS
 GUIDELINES FOR SAFE
 OPERATING PROCEDURES FOR
 TOWING OPERATIONS. THESE
 GUIDELINES SHOULD INCLUDE
 METHODS OF PREPLANNING A
 VOYAGE, THE PROPER USE OF
 TOWING HAWSERS, AND
 ACTIONS TO BE TAKEN IN
 VARIOUS EMERGENCY
 SITUATIONS.
 
M-74-004................................. CAA......................... 06/13/77 DETERMINE THE NEED FOR
 ANCHORS ON UNMANNED BARGES
 AND PRACTICAL METHODS OF
 CONTROLLING SUCH ANCHORS
 IN ORDER TO PREVENT DAMAGE
 TO ANY VESSEL, BRIDGE, OR
 OTHER STRUCTURE, OR OTHER
 LOSS TO BYSTANDERS ON THE
 NAVIGABLE WATERS OF THE
 UNITED STATES.
 
M-74-005................................. CAA......................... 05/04/78 PLACE ADDITIONAL EMPHASIS
 IN ITS SEARCH AND RESCUE
 PROCEDURES ON PROTECTING
 BRIDGES FROM VESSEL
 IMPACTS.
 
M-74-014................................. CR.......................... 02/18/86 THE COAST GUARD REQUIRE
 THAT OCEAN-GOING VESSELS
 BE ALIGNED WITH ANY
 CHANNEL BRIDGE OPENING
 BEFORE THE VESSELS REACH A
 POINT EQUAL TO THE SHIP'S
 STOPPING DISTANCE FROM THE
 BRIDGE.
 
M-74-015................................. CUA......................... 07/10/81 THE COAST GUARD REQUIRE
 THAT EVERY MASTER OF AN
 OCEAN-GOING VESSEL INFORM
 HIMSELF OF THE PILOT'S
 PLAN TO MANEUVER HIS SHIP
 IN OR OUT OF A HARBOR AND
 THAT THE MASTER DETERMINE,
 WITH THE PILOT'S
 ASSISTANCE, THE CRITICAL
 ASPECTS OF THE MANEUVER,
 INCLUDING THE PILOT'S PLAN
 FOR EMERGENCIES. THE
 MASTER SHOULD THEN BE
 REQUIRED TO INSTRUCT HIS
 CREW TO INSURE THAT HIGH-
 RISK TASKS RECEIVE
 PRIORITY.
 
M-74-016................................. CAA......................... 06/30/76 THE COAST GUARD EXPEDITE
 THE ISSUANCE OF
 REGULATIONS REQUIRING THAT
 ALL OCEAN-GOING VESSELS BE
 PROVIDED WITH STOPPING
 DISTANCES AND TURNING
 RADII FOR VARIOUS SPEEDS
 AND LOADING CONDITIONS.
 
M-74-019................................. CAAA........................ 04/07/77 THE COAST GUARD, IN
 PROCESSING APPLICATIONS
 FOR HIGHWAY, RAILROAD, OR
 PIPELINE BRIDGE
 CONSTRUCTION, REQUIRE A
 SAFETY IMPACT STUDY AS
 WELL AS THE ENVIRONMENTAL
 IMPACT STUDY. LIFT SPAN
 BRIDGES WITH NARROW
 OPENINGS, SUPPORTS IN
 RELATIVELY DEEP WATER, AND
 LOCATIONS NEAR CURVED
 CHANNELS SHOULD BE
 CONSIDERED RELATIVELY
 HAZARDOUS.
 
M-78-001................................. CAA......................... 09/01/87 EXPEDITE THE SUBMISSION OF
 THE LEGISLATIVE PROPOSAL
 AND URGE CONGRESS TO ENACT
 LEGISLATION, OR AUTHORIZE
 THE COAST GUARD TO
 UNDERTAKE RULEMAKING, TO
 ESTABLISH IN THE
 NAVIGATION RULES FOR
 INLAND WATERS A
 REQUIREMENT FOR VESSELS TO
 PROCEED AT A SAFE SPEED
 IDENTICAL TO THE
 REQUIREMENT ESTABLISHED BY
 RULE 6 OF THE NEWLY
 ADOPTED INTERNATIONAL
 CONVENTION FOR VESSELS ON
 THE HIGH SEAS WHICH BECAME
 EFFECTIVE ON JULY 15,
 1977.
 
M-81-011................................. CAA......................... 05/04/82 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 IMPROVE NAVIGATIONAL AIDS
 FOR VESSELS PASSING UNDER
 THE SUNSHINE SKYWAY
 BRIDGE.
 
M-81-012................................. CR.......................... 08/01/88 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 PROHIBIT VESSELS FROM
 MEETING NEAR THE SHUNSHINE
 SKYWAY BRIDGE.
 
M-81-013................................. CAA......................... 09/01/87 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD: IN
 COOPERATION WITH LOCAL
 PORT AND BRIDGE
 AUTHORITIES, DETERMINE THE
 FEASIBILITY OF INSTALLING
 NONSTRUCTURAL BRIDGE
 PROTECTION DEVICES FOR THE
 SUNSHINE SKYWAY BRIDGE.
 
M-81-015................................. CAA......................... 09/01/87 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD: IN
 COOPERATION WITH THE
 FEDERAL HIGHWAY
 ADMINISTRATION, DEVELOP
 STANDARDS FOR THE DESIGN,
 PERFORMANCE, AND LOCATION
 OF STRUCTURAL BRIDGE PIER
 PROTECTION SYSTEMS WHICH
 CONSIDER THAT THE IMPACT
 FROM AN OFFCOURSE VESSEL
 CAN OCCUR SIGNIFICANTLY
 ABOVE AS WELL AS BELOW THE
 WATER SURFACE.
 
M-81-016................................. CUA......................... 04/13/88 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD: IN
 COOPERATION WITH THE
 FEDERAL HIGHWAY
 ADMINISTRATION, CONDUCT A
 STUDY TO DETERMINE WHICH
 EXISTING BRIDGES OVER THE
 NAVIGABLE WATERWAYS OF
 UNITED STATES PORTS AND
 HARBORS ARE NOT EQUIPPED
 WITH ADEQUATE STRUCTURAL
 PIER PROTECTION.
 
M-81-017................................. CAA......................... 09/01/87 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 DISTRIBUTE A COPY OF THE
 RESULTS OF THE COAST
 GUARD'S STUDIES REGARDING
 BRIDGE AND PIER PROTECTION
 SYSTEMS TO EACH
 APPROPRIATE MEMBER OF THE
 AMERICAN ASSOCIATION OF
 STATE HIGHWAY AND
 TRANSPORTATION OFFICIALS.
 
M-81-018................................. CAA......................... 05/04/83 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: DEVELOP
 STANDARDS FOR THE DESIGN,
 PERFORMANCE, AND
 INSTALLATION OF BRIDGE
 SPAN FAILURE DETECTION AND
 WARNING SYSTEMS.
 
M-81-019................................. CAA......................... 05/04/83 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: ESTABLISH
 CRITERIA TO EVALUATE THE
 NEED FOR INSTALLING BRIDGE
 SPAN FAILURE DETECTION AND
 WARNING SYSTEMS ON
 EXISTING AND PROPOSED
 BRIDGES.
 
M-81-020................................. CAA......................... 12/05/84 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: IN
 COOPERATION WITH THE U.S.
 COAST GUARD, DEVELOP
 STANDARDS FOR THE DESIGN,
 PERFORMANCE, AND LOCATION
 OF STRUCTURAL BRIDGE PIER
 PROTECTION SYSTEMS WHICH
 CONSIDER THAT THE IMPACT
 FROM AN OFF COURSE VESSEL
 CAN OCCUR SIGNIFICANTLY
 ABOVE AS WELL AS BELOW THE
 WATER SURFACE.
 
M-81-021................................. CAAA........................ 11/19/85 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: IN
 COOPERATION WITH THE U.S.
 COAST GUARD, CONDUCT A
 STUDY TO DETERMINE WHICH
 EXISTING BRIDGES OVER THE
 NAVIGABLE WATERWAYS OF
 UNITED STATES PORTS AND
 HARBORS ARE NOT EQUIPPED
 WITH ADEQUATE STRUCTURAL
 PIER PROTECTION.
 
M-81-022................................. CAAA........................ 04/19/85 THE NTSB RECOMMENDS THAT
 THE FEDERAL HIGHWAY
 ADMINISTRATION: USE THE
 RESULTS OF THE STUDY
 CONDUCTED UNDER
 RECOMMENDATION M-81-21 TO
 ADVISE APPROPRIATE BRIDGE
 AUTHORITIES OF THE
 BENEFITS OF INSTALLING
 ADDITIONAL PIER PROTECTION
 SYSTEMS.
 
M-81-023................................. CAA......................... 10/06/92 THE NTSB RECOMMENDS THAT
 THE STATE OF FLORIDA:
 PROVIDE STRUCTURAL PIER
 PROTECTION FOR THE
 CANTILEVER ARM PIERS AND
 THE ANCHOR ARM PIERS OF
 THE SUNSHINE SKYWAY
 BRIDGE.
 
M-89-069................................. CUA......................... 12/08/92 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 REQUIRE OWNERS/OPERATORS
 OF BASCULE BRIDGES TO
 INSTALL CAUTION LIGHTS AND
 DAYLIGHT MARKINGS AT
 ELEVATION POINTS ON BRIDGE
 LEAFS WHERE THEY PROTRUDE
 OVER NAVIGABLE CHANNELS TO
 IDENTIFY TO MARINERS THE
 POINT AT WHICH FULL
 SKYWARD CHANNEL CLEARANCE
 IS NOT AVAILABLE TO
 TRANSITING VESSELS; THE
 LIGHTS SHOULD ACTIVATE
 WHEN THE BRIDGELEAFS ARE
 IN THE NORMAL FULLY OPEN
 POSITION.
 
M-89-070................................. CUA......................... 12/08/92 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 REQUIRE THAT BRIDGE OWNERS/
 OPERATORS PROVIDE IN
 BASCULE BRIDGE PERMIT
 APPLICATIONS THE ANGLE OF
 THE BRIDGELEAF(S), THE
 MAXIMUM VERTICAL CLEARANCE
 AT THE FENDERS AND AT THE
 BRIDGELEAF ENDS, AND THE
 EXTENT OF HORIZONTAL
 CHANNEL CLEARANCE OVER
 WHICH FULL SKYWARD
 CLEARANCE IS AVAILABLE
 WHEN THE BRIDGE LEAFS ARE
 IN THE FULLY OPEN
 POSITION.
 
M-89-071................................. CAA......................... 11/28/94 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 ISSUE A NOTICE TO MARINERS
 STATING THAT BECAUSE SOME
 BASCULE BRIDGE LEAFS
 PROTRUDE OVER THE WATERWAY
 IN THE FULLY OPEN
 POSITION, UNLIMITED
 SKYWARD CLEARANCE MAY NOT
 BE AVAILABLE TO VESSELS
 WITH HIGH FREEBOARD, FULL
 WIDTH SUPERSTRUCTURES FOR
 THE ENTIRE CHARTED
 HORIZONTAL CLEARANCE.
 
M-89-072................................. CUA......................... 11/28/94 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 COORDINATE WITH THE
 NATIONAL OCEANIC AND
 ATMOSPHERIC ADMINISTRATION
 AND THE U.S. ARMY CORPS OF
 ENGINEERS TO INCORPORATE
 THE FOLLOWING INFORMATION
 CONCERNING EACH BASCULE
 BRIDGE ON CHARTS AND IN
 NAUTICAL PUBLICATIONS
 AVAILABLE TO MARINERS OF
 VESSELS OPERATING IN U.S.
 NAVIGABLE WATERS: THE
 VERTICAL HEIGHT FROM THE
 DATUM WATER LEVEL AT THE
 BRIDGE TO THE POINT WHERE
 A BASCULE BRIDGELEAF
 BEGINS TO PROTRUDE OVER
 DRAW FENDERS OR THE EDGE
 OF THE CHANNEL, AND THE
 VERTICAL HEIGHT FROM THE
 DATUM TO THE END OF THE
 FULLY OPEN BASCULE
 BRIDGELEAF.
 
M-89-073................................. CAA......................... 12/08/92 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 COORDINATE WITH THE
 NATIONAL OCEANIC AND
 ATMOSPHERIC ADMINISTRATION
 AND THE U.S. ARMY CORPS OF
 ENGINEERS TO INCORPORATE
 THE FOLLOWING INFORMATION
 CONCERNING EACH BASCULE
 BRIDGE ON CHARTS AND IN
 NAUTICAL PUBLICATIONS
 AVAILABLE TO MARINERS OF
 VESSELS OPERATING IN U.S.
 NAVIGABLE WATERS: THE
 EXTENT OF HORIZONTAL
 CHANNEL CLEARANCE OVER
 WHICH FULLY SKYWARD
 CLEARANCE IS AVAILABLE
 FROM THE RAISED END OF
 FULLY OPEN BASCULE BRIDGE
 LEAF(S).
 
M-89-074................................. CUA......................... 11/28/94 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 COORDINATE WITH THE
 NATIONAL OCEANIC AND
 ATMOSPHERIC ADMINISTRATION
 AND THE U.S. ARMY CORPS OF
 ENGINEERS TO INCORPORATE
 THE FOLLOWING INFORMATION
 CONCERNING EACH BASCULE
 BRIDGE ON CHARTS AND IN
 NAUTICAL PUBLICATIONS
 AVAILABLE TO MARINERS OF
 VESSELS OPERATING IN U.S.
 NAVIGABLE WATERS: THE
 ANGLE OF BASCULE
 BRIDGELEAFS WHEN IN THE
 FULLY OPEN POSITION.
 
M-89-075................................. CUA......................... 11/28/94 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 COORDINATE WITH THE
 NATIONAL OCEANIC AND
 ATMOSPHERIC ADMINISTRATION
 AND THE U.S. ARMY CORPS OF
 ENGINEERS TO INCORPORATE
 THE FOLLOWING INFORMATION
 CONCERNING EACH BASCULE
 BRIDGE ON CHARTS AND IN
 NAUTICAL PUBLICATIONS
 AVAILABLE TO MARINERS OF
 VESSELS OPERATING IN U.S.
 NAVIGABLE WATERS:
 DEPICTIONS SHOWING WHETHER
 A BASCULE BRIDGE OVER A
 NAVIGABLE WATERWAY IS
 SINGLE- OR DOUBLE-LEAF
 AND, IF SINGLE-LEAF, ON
 WHICH SIDE OF THE WATERWAY
 THE BASE PIVOT POINT OF
 THE LEAF IS LOCATED.
 
M-89-076................................. CAA......................... 11/28/94 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 CONDUCT A ONE TIME SURVEY
 OF DRAWBRIDGES TO
 DETERMINE THAT THE GREEN
 NAVIGATION LIGHTS
 ACTIVATE, BUT ONLY WHEN
 DRAWBRIDGES ARE AT THEIR
 NORMAL FULLY OPEN
 POSITIONS.
 
M-89-077................................. CAA......................... 12/08/92 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 CONDUCT PERIODIC
 INSPECTIONS OF DRAWBRIDGES
 OVER U.S. NAVIGABLE WATERS
 TO DETERMINE THAT THEY ARE
 BEING PROPERLY OPERATED
 AND THEIR NAVIGATION
 LIGHTS ARE BEING PROPERLY
 MAINTAINED.
 
M-89-078................................. CUA......................... 05/07/91 THE NTSB RECOMMENDS THAT
 THE FEDERAL RAILROAD
 ADMINISTRATION: AMEND 49
 CFR 219.201 TO INCLUDE
 SERIOUS ACCIDENTS
 INVOLVING RAILROAD BRIDGES
 AND THE OPERATORS OF THESE
 BRIDGES EVEN WHEN A TRAIN
 IS NOT INVOLVED.
 
M-89-079................................. CAA......................... 11/21/90 THE NTSB RECOMMENDS THAT
 THE NATIONAL OCEANIC AND
 ATMOSPHERIC
 ADMINISTRATION, NATIONAL
 OCEAN SERVICE: INCLUDE ON
 STRUCTURES TABLES AND
 CHARTS THE PRECAUTION ON
 BRIDGE AND CABLE
 CLEARANCES CURRENTLY
 CONTAINED IN THE GENERAL
 INFORMATION SECTION OF THE
 COAST PILOT PUBLICATIONS
 SO THAT SUCH CAUTIONARY
 INFORMATION IS READILY
 AVAILABLE TO THE MARINER
 WHILE NAVIGATING.
 
M-89-080................................. CR.......................... 03/06/95 THE NTSB RECOMMENDS THAT
 THE NATIONAL OCEANIC AND
 ATMOSPHERIC
 ADMINISTRATION, NATIONAL
 OCEAN SERVICE: COORDINATE
 WITH THE U.S. COAST GUARD
 TO INCORPORATE ON NATIONAL
 OCEAN SURVEY NAUTICAL
 CHARTS THE FOLLOWING
 INFORMATION CONCERNING
 EACH BASCULE BRIDGE OVER
 U.S. NAVIGABLE WATERS: THE
 VERTICAL HEIGHT FROM THE
 WATER LEVEL DATUM AT THE
 BRIDGE TO THE POINT WHERE
 A BASCULE BRIDGELEAF
 BEGINS TO PROTRUDE OVER
 DRAW FENDERS OR THE EDGE
 OF THE CHANNEL, AND THE
 VERTICAL HEIGHT FROM THE
 DATUM TO THE FULLY OPEN
 END OF THE BASCULE
 BRIDGELEAF.
 
M-89-081................................. CR.......................... 12/08/92 THE NTSB RECOMMENDS THAT
 THE NATIONAL OCEANIC AND
 ATMOSPHERIC
 ADMINISTRATION, NATIONAL
 OCEAN SERVICE: COORDINATE
 WITH THE U.S. COAST GUARD
 TO INCORPORATE ON NATIONAL
 OCEAN SURVEY NAUTICAL
 CHARTS THE FOLLOWING
 INFORMATION CONCERNING
 EACH BASCULE BRIDGE OVER
 U.S. NAVIGABLE WATERS: THE
 EXTENT OF HORIZONTAL
 CHANNEL CLEARANCE OVER
 WHICH FULL SKYWARD
 CLEARANCE IS AVAILABLE
 FROM THE RAISED END OF THE
 FULLY OPEN BASCULE
 BRIDGELEAF(S).
 
M-89-082................................. CR.......................... 03/06/95 THE NTSB RECOMMENDS THAT
 THE NATIONAL OCEANIC AND
 ATMOSPHERIC
 ADMINISTRATION, NATIONAL
 OCEAN SERVICE: COORDINATE
 WITH THE U.S. COAST GUARD
 TO INCORPORATE ON NATIONAL
 OCEAN SURVEY NAUTICAL
 CHARTS THE FOLLOWING
 INFORMATION CONCERNING
 EACH BASCULE BRIDGE OVER
 U.S. NAVIGABLE WATERS: THE
 ANGLE OF BASCULE
 BRIDGELEAFS WHEN IN THE
 FULLY OPEN POSITION.
 
M-89-083................................. CR.......................... 03/06/95 THE NTSB RECOMMENDS THAT
 THE NATIONAL OCEANIC AND
 ATMOSPHERIC
 ADMINISTRATION, NATIONAL
 OCEAN SERVICE: COORDINATE
 WITH THE U.S. COAST GUARD
 TO INCORPORATE ON NATIONAL
 OCEAN SURVEY NAUTICAL
 CHARTS THE FOLLOWING
 INFORMATION CONCERNING
 EACH BASCULE BRIDGE OVER
 U.S. NAVIGABLE WATERS:
 DEPICTIONS SHOWING WHETHER
 A BASCULE BRIDGE OVER A
 NAVIGABLE WATERWAY IS
 SINGLE- OR DOUBLE-LEAF
 AND, IF SINGLE-LEAF, ON
 WHICH SIDE OF THE WATERWAY
 THE BASE PIVOT POINT OF
 THE LEAF IS LOCATED.
 
M-89-084................................. CR.......................... 03/04/93 THE NTSB RECOMMENDS THAT
 THE U.S. ARMY, CORPS OF
 ENGINEERS: COORDINATE WITH
 THE U.S. COAST GUARD TO
 INCORPORATE ON CORPS OF
 ENGINEERS CHARTS THE
 FOLLOWING ADDITIONAL
 INFORMATION CONCERNING
 EACH BASCULE BRIDGE OVER
 U.S. NAVIGABLE WATERS: THE
 VERTICAL HEIGHT FROM THE
 WATER LEVEL DATUM AT THE
 BRIDGE TO THE POINT WHERE
 A BASCULE BRIDGELEAF
 BEGINS TO PROTRUDE OVER
 DRAW FENDERS OR THE EDGE
 OF THE CHANNEL, AND THE
 VERTICAL HEIGHT FROM THE
 DATUM TO END OF THE
 BASCULE BRIDGE LEAF.
 
M-94-010................................. CAA......................... 02/04/02 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD, AS
 THE FEDERAL AGENCY
 RESPONSIBLE FOR NAVIGATION
 SAFETY: COORDINATE A
 COOPERATIVE EFFORT WITH
 THE UNITED STATES ARMY
 CORPS OF ENGINEERS, THE
 BOARD OF COMMISSIONERS OF
 THE PORT OF NEW ORLEANS,
 AND BRIDGE OWNERS TO
 REVIEW CONDITIONS AND
 PRACTICES IN THE INNER
 HARBOR NAVIGATION CANAL,
 IDENTIFY HAZARDS TO THE
 SAFE TRANSIT OF VESSELS
 THROUGH THE CANAL AND LOCK
 SYSTEM, AND IMPLEMENT
 MEASURES TO REDUCE THOSE
 HAZARDS.
 
M-94-012................................. CAA......................... 08/11/00 THE NTSB RECOMMENDS THAT
 THE U.S. ARMY CORPS OF
 ENGINEERS: COOPERATE WITH
 THE U.S. COAST GUARD TO
 REVIEW CONDITIONS AND
 PRACTICES IN THE INNER
 HARBOR NAVIGATION CANAL,
 IDENTIFY HAZARDS TO THE
 SAFE TRANSIT OF VESSELS
 THROUGH THE CANAL AND LOCK
 SYSTEM, AND IMPLEMENT
 MEASURES TO REDUCE THOSE
 HAZARDS.
 
M-94-013................................. CAA......................... 07/14/00 THE NTSB RECOMMENDS THAT
 THE LOUISIANA DEPARTMENT
 OF TRANSPORTATION AND
 DEVELOPMENT: COOPERATE
 WITH THE U.S. COAST GUARD
 TO REVIEW CONDITIONS AND
 PRACTICES IN THE INNER
 HARBOR NAVIGATION CANAL,
 IDENTIFY HAZARDS TO THE
 SAFE TRANSIT OF VESSELS
 THROUGH THE CANAL AND LOCK
 SYSTEM, AND IMPLEMENT
 MEASURES TO REDUCE THOSE
 HAZARDS.
 
M-94-014................................. CAA......................... 09/07/00 THE NTSB RECOMMENDS THAT
 THE BOARD OF COMMISSIONERS
 OF THE PORT OF NEW
 ORLEANS: COOPERATE WITH
 THE U.S. COAST GUARD TO
 REVIEW CONDITIONS AND
 PRACTICES IN THE INNER
 HARBOR NAVIGATION CANAL,
 IDENTIFY HAZARDS TO THE
 SAFE TRANSIT OF VESSEL
 THROUGH THE CANAL AND LOCK
 SYSTEM. AND IMPLEMENT
 MEASURES TO REDUCE THOSE
 HAZARDS.
 
M-94-037................................. CAA......................... 07/25/01 THE NTSB RECOMMENDS THAT
 THE U.S. COAST GUARD:
 REQUIRE THAT ALL BRIDGES
 VULNERABLE TO IMPACT BY
 COMMERICAL MARINE TRAFFIC
 BEAR UNIQUE, READILY
 VISIBLE MARKINGS SO THAT
 WATERWAY AND BRIDGE USERS
 ARE BETTER ABLE TO
 IDENTIFY BRIDGES INVOLVED
 IN AN ACCIDENT WHEN THEY
 REPORT SUCH ACCIDENTS TO
 EMERGENCY RESPONDERS.
 
R-94-009................................. CAA......................... 12/03/96 THE NTSB RECOMMENDS THAT
 THE ASSOCIATION OF
 AMERICAN RAILROADS:
 IMMEDIATELY BEGIN TO
 COLLECT DATA ON VESSEL
 COLLISIONS WITH RAILROAD
 BRIDGES FROM YOUR MEMBERS
 AND, IF APPROPRIATE, TAKE
 STEPS TO INCREASE
 PROTECTION FOR BRIDGES
 IDENTIFIED AS VULNERABLE.
 
R-94-010................................. CAA......................... 12/03/96 THE NTSB RECOMMENDS THAT
 THE ASSOCIATION OF
 AMERICAN RAILROADS:
 COOPERATE WITH THE U.S.
 DEPARTMENT OF
 TRANSPORTATION IN
 DEVELOPING A NATIONAL RISK
 ASSESSMENT PROGRAM FOR
 RAILROAD BRIDGES.
 
R-94-011................................. CAA......................... 03/27/95 THE NTSB RECOMMENDS THAT
 THE AMERICAN SHORT LINE
 RAILROAD ASSOCIATION:
 IMMEDIATELY BEGIN TO
 COLLECT DATA ON VESSEL
 COLLISIONS WITH RAILROAD
 BRIDGES FROM YOUR MEMBERS
 AND, IF APPROPRIATE, TAKE
 STEPS TO INCREASE
 PROTECTION FOR BRIDGES
 IDENTIFIED AS VULNERABLE.
 
R-94-012................................. CAA......................... 03/27/95 THE NTSB RECOMMENDS THAT
 THE AMERICAN SHORT LINE
 RAILROAD ASSOCIATION:
 COOPERATE WITH THE U.S.
 DEPARTMENT OF
 TRANSPORTATION IN
 DEVELOPING A NATIONAL RISK
 ASSESSMENT PROGRAM FOR
 RAILROAD BRIDGES.
----------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------
 
------------------------------------------------------------------------
 Total Number of Recommendations for Recommendation 67
 Subjects Report.

 Mr. Graves of Missouri. Thank you all, and now we will turn 
to questions, and I will let Rick ask the first one.
 Mr. Larsen of Washington. Thank you, Mr. Chair, I 
appreciate that. The first question is for Administrator Bhatt.
 You said that when you look at reconstruction of the 
bridge, you look at current standards consistent with law. Does 
the current law allow, in a circumstance like this, a rebuild 
of a different kind of bridge in order to be eligible for 
either Federal funds or for the cost share?
 Because you could build one under current standards, and 
that could be in violation of what the law under this 
circumstance allows you to do. So, can you walk through that a 
little bit?
 Mr. Bhatt. Thank you for the question, sir.
 Yes, I think what we are examining and working with 
Maryland DOT on--the original bridge was built in the 1970s, a 
truss bridge which was common at the time. Today, most of the 
bridges that are being replaced that are truss bridges are 
being replaced by cable-stayed bridges, different standards.
 Obviously, we are going to want to hear from the NTSB on 
their final results of that investigation. But under the law, 
what we want to do is, when we are replacing a structure of 
that size, we want to build it to current standards. And 
Maryland DOT will be allowed to do that. What we want to make 
sure we are not doing is allowing for any ``betterments'' that 
did not exist that would be then covered by the ER Program.
 Mr. Larsen of Washington. Yes, OK.
 Admiral Gautier, the Corps has expended significant 
resources in the recovery effort. There is no mechanism for 
the--I am sorry, the Coast Guard has. There is no mechanism for 
the Coast Guard to recoup that funding, and you are not 
typically reimbursed for this kind of work. Yet with a 
workforce shortage of about 10 percent, you are closing, you 
are downgrading stations within the Coast Guard--not because of 
this incident, but that is just what is happening in the Coast 
Guard, and we passed a Coast Guard authorization that gets us 
to $14\1/2\ billion for 2025 and $15 billion for 2026, so, we 
are not near the goal of a $20 billion Service for 2030.
 As Congress moves forward with the supplemental 
appropriations for the Key Bridge, how is the Coast Guard 
thinking about being part of that supplemental appropriation to 
get reimbursed to get some cost recovery for your work?
 Admiral Gautier. Yes, thanks, Ranking Member.
 I don't want to get ahead of the administration on the 
plans, the amounts and so on the details of the supplemental, 
but the way you have articulated it, first of all, we have been 
expending operating funds as we do during emergencies like 
this, like we do for hurricane responses and other things. And 
we have been keeping close tabs on those. And so far, we have 
spent about $20 million of direct and indirect funding on this 
particular response.
 But what we see in events like this and others like it is 
that we do what we call burn readiness, right? So, we have to 
have other assets around the area, work harder, to cover for 
the boats, aircraft, people who are working these. We have 
mobilized now--and I visited the command post--on average, we 
have had about 200 individuals at the peak in the command post 
per day. That has gone down. We are mobilizing them from around 
the country. In fact, most of them are from outside Baltimore 
right now.
 And so, there is an opportunity cost from the commands that 
provide those individuals, and I think what this exposes, sir, 
is--and you know us well--is that Coast Guard readiness is 
becoming more and more brittle as we fail to have the kind of 
consistent budgets reaching that $20 billion a year that the 
Coast Guard has articulated. Reaching the $3 billion per year 
on our procurement, construction, and improvement double what 
we actually receive in order to do the necessary 
capitalizations.
 And so, this brittleness in our readiness manifests in a 
whole bunch of different ways, and we really do appreciate 
congressional support and ask for additional support for 
appropriations in the future.
 Mr. Larsen of Washington. Yes, thanks.
 General Graham, now to you. It is kind of the same 
question, but last week the Corps reprogrammed $20 million in 
unused funds from fiscal year 2020, including $1 million out of 
my district and from prior-year funds. Do you have an estimate 
how many more dollars you might need to reprogram, first?
 And second, how are you thinking about a supplemental 
appropriation for cost recovery for the Corps?
 General Graham. Ranking Member Larsen, thank you for that 
question.
 Similar to the Coast Guard, we certainly don't want to get 
ahead of the administration, but right now, we have been able 
to use the project funds. And as your opening statement 
indicated, that dredging work that we had planned to do with 
those funds in this year will still need to be done.
 The emergency reprogramming that I referenced in my opening 
statement, most of that money we didn't need. So, where does 
that money come from? Mainly it is bid savings. A lot of these 
projects had happened during times of COVID, when it was a very 
favorable bid environment, and we were able to go back to those 
funds. A good example of what some of that might be, a 
contractor might put a claim on a project, a request for 
equitable adjustment. And a few years later those claims have 
been adjudicated. And if we didn't have to pay that request, 
then we would unobligate those funds.
 Mr. Larsen of Washington. Yes. Mr. Chairman, I am out of 
time. I just--if you could indulge me for a moment, not for a 
question, but I do want to let Chair Homendy know: I will need 
to absorb your first half of your report. It is rather 
technical. I am not an engineer, but we will absorb it and get 
back to you with some questions on it.
 And just as a data point for the committee, the Skagit 
River Bridge collapse in 2013 cost a total of $19 million for 
the insurer, and took us 10 years to recover $19 million. So, 
we should not be thinking of waiting to recover costs from 
insurance, the insurer of the carrier or the bridge or 
whatever, in order to pay for it. It is going to have to take 
place first because it took 10 years to get $19 million. If 
that is the average time to get $19 million, we will all be 
dead by the time we get the money back from this ocean carrier. 
So, just a point, just a data point for folks. Thanks.
 Mr. Graves of Missouri. Mr. Crawford.
 Mr. Crawford. Thank you, Mr. Chairman. Thank you all for 
your testimony today.
 I want to start by acknowledging the six workers who lost 
their lives as a result of the collapse of the Francis Scott 
Key Bridge. Obviously, our deepest sympathies go out to their 
families and their loved ones.
 Hours after the Francis Scott Key Bridge tragically 
collapsed, President Biden came out and said it was his 
``intention'' that the Federal Government will pay for the 
entire cost of reconstructing that bridge. And further, he had 
``directed his team to move heaven and earth to reopen the port 
and rebuild the bridge as soon as humanly possible.''
 Administrator Bhatt, I have a series of questions here as 
we try to understand the mechanics of the situation before us. 
And if you would, just give me a yes or no response in the 
interest of time.
 While the bridge was located on I-695 prior to its 
collapse, it wasn't actually considered a part of the 
interstate, but rather was Maryland State Route 695. Is that 
correct?
 Mr. Bhatt. Yes.
 Mr. Crawford. The bridge had previously never received any 
Federal funding. Is that correct?
 Mr. Bhatt. Yes.
 Mr. Crawford. I understand that Federal Highways has since 
approved a request by Maryland to designate the bridge as 
interstate. Is that correct?
 Mr. Bhatt. Yes.
 Mr. Crawford. Meaning the Federal share for reconstruction 
under the Emergency Relief Program will now be 90 percent. Is 
that correct?
 Mr. Bhatt. Yes, instead of 80.
 Mr. Crawford. So, what we are talking about here is a delta 
of 10 percent for a bridge that previously never received any 
Federal funding.
 Mr. Bhatt. Yes.
 Mr. Crawford. OK. In your testimony you mentioned that 
authorizing a 100-percent Federal cost share would be 
consistent with past catastrophic bridge collapses. How many 
times has Congress authorized a 100-percent Federal share for a 
fully collapsed bridge?
 Mr. Bhatt. So, the--I think the reference point we are 
using is the I-35W collapse in Minnesota.
 Mr. Crawford. OK. Some say that we need 100 percent Federal 
funding so we can get the rebuilding done quickly, but that is 
not how the ER Program works. It is a reimbursement program, 
correct?
 Mr. Bhatt. Absolutely.
 Mr. Crawford. As I understand it, the ER financing process, 
generally, individual States, the division offices, and the 
program office have a process to make sure that projects are 
ready to receive funding, and work can be completed in a 
specified time period. Is that right?
 Mr. Bhatt. Yes.
 Mr. Crawford. So, it doesn't really matter if a project is 
getting 80 percent Federal share, 90 percent, or even 100 
percent. The reimbursement is based on project progress and 
delivery. Correct?
 Mr. Bhatt. Yes.
 Mr. Crawford. I just want to be clear that nothing is going 
to move faster if this is 100 percent Federal-funded versus 90 
percent or any other percentage. Whether the State contributes 
money or not, the process for awarding Federal reimbursement is 
still the same. Correct?
 Mr. Bhatt. Can I just deviate from the yes-no for a second?
 Mr. Crawford. Go ahead.
 Mr. Bhatt. Yes. However, the 10 percent--so, this is the 
second largest ER request we have ever received; $2.2 billion 
for Katrina was the first one, so, $1.7 to $1.9 billion. So, 
that 10-percent delta is about $170 to $190 million for the 
State of Maryland that, as they are programing out their 
multiyear, multibillion-dollar program, it may not be this 
project, but it may have impacts on other projects.
 Mr. Crawford. OK. Let me just briefly, in the time that I 
have left, let's talk about the regulatory regime that will be 
applied here.
 Are we going to expect any kind of waivers or anything like 
that on NEPA or any other regulatory compliance measures that 
would be customary on any other construction project?
 Mr. Bhatt. So, sir, we would not waive NEPA or any of the 
environmental requirements. But what we have done is 
coordinated with our agencies who issue permits, and it is our 
intention, because the bridge previously existed in this 
relative footprint, that it would be likely a categorical 
exclusion, which would minimize the time.
 Mr. Crawford. Expand on categorical exclusion. What does 
that mean?
 Mr. Bhatt. So, when you go through NEPA, you can either do, 
like, a full environmental impact statement, we could get to a 
finding of ``no significant impact'' on environmental 
assessment. A categorical exclusion is sort of the more time-
limited finding. And the reason we would use that basis here is 
because the bridge previously existed, and we are putting a 
bridge back relatively in the same footprint.
 Mr. Crawford. You are putting it back in the same spot, but 
not necessarily--because you are probably going to use a 
different kind of construction, would there be some associated 
flow studies, for example, to address the new construction?
 Mr. Bhatt. So, that is why we are coordinating with our 
sister agencies who issue the permit, because it is, as I said, 
relatively in that same footprint but probably going to use 
different piers, it is probably going to have a little bit of 
tweaking to the approaches, a different height than was there 
before. So, that is why I can't say definitively that it will 
be a categorical exclusion. It is what we are working towards.
 Mr. Crawford. So, it sounds to me like there is going to be 
a great deal of flexibility in the interest of getting this 
thing restored, rebuilt, and restoring traffic and commerce and 
everything associated with that bridge. Is that correct?
 Mr. Bhatt. I am not sure if flexibility is the right word. 
I think attention from the sister agencies, and understanding 
that there is a desire to move quickly.
 Mr. Crawford. And I am all for that. And I hope that in the 
future that other projects are given the same consideration 
because time is money. And I understand that that is certainly 
the case here, but there are a lot of other projects out there 
pending that have cost millions in regulatory compliance fees 
that have really been delayed as a result. So, thank you.
 And I yield back.
 Mr. Bhatt. Yes, sir.
 Mr. Graves of Missouri. Ms. Norton.
 Ms. Norton. Thank you, Mr. Chairman.
 Administrator Bhatt, Department of Transportation data show 
that traffic crashes rose 29 percent on alternative routes in 
the weeks following the Key Bridge collapse. The same data show 
that it now takes between two and four times longer for drivers 
to travel those alternative routes. That traffic means trucks 
are delayed in reaching their destinations, commuters are late 
getting to their jobs or home to their families, and there is 
more air pollution and wasted fuel.
 How has the loss of the Key Bridge hurt traffic safety and 
reduced mobility for drivers in the Baltimore region?
 Mr. Bhatt. Thank you for the question.
 I think we saw in Philadelphia after I-95--we had that 
bridge collapse--that there was just all kinds of traffic 
moving through neighborhoods and trying to find their way, and 
I think a similar effect is happening in Baltimore.
 Usually, when you have an impact where you remove a 
significant piece of infrastructure, traffic seems to level out 
after a while. That is not happening here in Baltimore to the 
same extent, and I think it is because of just the criticality 
of this artery. It is part of the Northeast Corridor, it is 
important for Maryland, it is important for Baltimore, but it 
is also important for the Northeast Corridor.
 And so, yes, there are trucks and vehicles moving through 
neighborhoods that they would not normally be on, and that is 
why it is so critically important that we move with as much 
speed as possible.
 Ms. Norton. Administrator Bhatt, it is clear that we need 
to restore commerce to the Port of Baltimore and rebuild the 
bridge to improve safety and mobility in the region. The full 
Maryland delegation has proposed legislation to provide 100 
percent Federal share for the cost of the new bridge. I 
wholeheartedly support this legislation.
 What effect would the 100-percent Federal share have on 
efforts to rebuild the bridge quickly?
 Mr. Bhatt. Thank you, Representative, for the question.
 I have spent a lot of time running State DOTs in my career. 
I have been on the private side, so--I was with AECOM before 
this job that works on bridges across the globe. And I would 
just say what the benefit of the 100-percent share brings is 
just it removes an element of uncertainty.
 So, right now, I think Maryland--and I have to commend 
Maryland DOT, just really been consummate professionals 
throughout this process--right now, what they are contemplating 
is an ER shortage that we have told them about, that we have 
$3.7 billion in unmet needs, as the Federal Highway 
Administration, with about $870 million available for 
nationwide ER efforts. And so, we are telling them we believe 
that we will have the ER funding there for you. And then they 
have the uncertainty of the 90 percent versus the 100 percent. 
We did remove the 80 percent uncertainty.
 And so, as you are planning out these multiyear, 
multibillion-dollar construction programs, not knowing whether 
or not that $170 million is going to be there, does it impact 
things right now at this moment? No, they are going to move 
forward. But as they are projecting out and as they are trying 
to build their construction program, other contractors, it just 
is an element of uncertainty. That would be helpful.
 And just to clarify on the 100 percent, obviously, any 
insurance payments, as the ranking member had mentioned, would 
be reapplied. So, I can pretty much with certainty guarantee 
this will not be 100 percent federally funded eventually, 
because we will recoup all of the insurance payments as 
possible, and they will go back in to the ER funds. But as the 
ranking member mentioned, we don't want to wait through all of 
the litigation and the NTSB investigations, insurance issues 
for that.
 Ms. Norton. Thank you, I yield back.
 Mr. Graves of Missouri. Mr. Webster.
 Mr. Webster of Florida. Thank you, Mr. Chairman, for 
putting this together. It is very informative. Thank you, 
witnesses.
 Last week the Army Corps notified congressional offices 
that they would be utilizing the emergency reprogramming 
authority to the program to reprogram approximately $33 million 
of previously appropriated operation and Harbor Maintenance 
Trust Fund dollars for recovery costs imposed by the collapse 
of the Key Bridge.
 Nearly $1 million was reappropriated from projects in 
Florida without any request for input from the congressional 
delegation, the State, or the people. While the recovery effort 
in Baltimore is important, this reprogramming of the funds 
represents a blatant disregard for Florida and desperately 
needed improvements to our water resources and infrastructure.
 General Graham, if these recently reprogrammed funds were 
deemed to be in excess, why did the Corps let these funds sit 
for years and not act sooner to reprogram them towards projects 
locally in Florida?
 And will the Corps plan to reimburse the South Atlantic 
Division for these funds?
 General Graham. Congressman Webster, thank you for that 
question.
 The example I used earlier of some of the funds that we had 
set aside for when a contractor put a claim, that was from 
Jacksonville, and that was from the Jacksonville District, and 
it was Jacksonville Harbor. So, in this case, those funds, I 
think $300,000-some, are no longer needed for the Jacksonville 
Harbor project. So, those funds in particular that we had set 
them aside for a need, and that need didn't materialize, we 
will not seek recoupment for those.
 We did do this work, this emergency reprogramming work, 
Congressman, very rapidly. And we--as I stated in my opening 
statement, we haven't used this authority at this scale for 15 
years, and we are a little clunky at it in terms of our 
notification to you and your staffs. If we--and I will use 
Jacksonville District as an example--if there are some of those 
funds that they do find a need for, we will figure out a way to 
make sure that the projects continue.
 To your first comment on some of those old funds that have 
been sitting out there for a while, why hadn't we cleaned up 
the books sooner? Sir, you are absolutely right. We should 
have.
 Mr. Webster of Florida. As you know better than most, the 
Gulf States fought against the National Contingency Plan 
Unified Command structure response throughout the Deepwater 
Horizon oilspill. The National Incident Commander's Report 
concluded the States' efforts resulted in the political and 
social nullification of the oilspill response doctrine and 
structure governance. It appears that the press reports that 
meetings with Maryland State officials and a number of staff 
member trips to the wreck site--that Maryland embraced the 
National Incident Command structure, and that it has worked 
well within that structure.
 Is the National Incident Command structure still an 
effective and efficient mechanism for coordinating Federal 
interagency and State-local-Federal interactions during the 
incident such as the Dali?
 Admiral Gautier. Congressman, if that is for me, I can't 
agree more with your statement.
 As the chief of staff for Admiral Allen on the Deepwater 
Horizon spill, and now being someone who has been witness to 
the terrific work in the unified effort on this one, it has 
been very, very different in terms of cooperation and 
collaboration. Underpinning that is the absolute necessity and 
the benefit of the Incident Command System under the National 
Incident Management System framework that has served this 
response incredibly well. It is the doctrine of the U.S. Any 
agency, entity--Army Corps, State--can come together with a 
common lexicon, a common way of planning to come together and 
make this work.
 But I would also like to highlight a real difference that 
has made a difference, and that is that elected leadership and 
the operational leadership has been connected in a very 
constructive way, from Governor Moore to Mayor Scott to Members 
of Congress from the Maryland delegation, they have taken it 
upon themselves to get regular updates and a great interest in 
the progress and the response. They have handled for the 
Unified Command a lot of the public affairs and external 
communications in a very constructive way. And they have 
actually provided the trade space for the operational response 
to continue on without pressure, without being rushed. It has 
been very constructive.
 Mr. Webster of Florida. Thank you very much.
 I yield back.
 Mr. Graves of Missouri. Mr. Cohen.
 Mr. Cohen. Thank you, Chairman Graves and Ranking Member 
Larsen, for holding this important hearing on the Federal 
response to the Francis Scott Key Bridge collapse in Maryland.
 Further, I extend my condolences to the families of the six 
individuals who lost their lives during the collapse.
 I thank our esteemed witnesses for appearing here today, 
especially Administrator Bhatt, who was with us in Memphis on 
Monday.
 I appreciate your coming to see the I-55 bridge and the 
urgent need to replace it across the Mississippi River in 
Memphis and West Memphis. That is, of course, as you well know, 
a national treasure to have transportation going across the 
country there at I-40. We had the I-40 bridge--we had a problem 
last year and shut down. The I-55 bridge could have the same 
problem, because it is in the New Madrid earthquake fault zone, 
which is predicted to occur, it has been predicted for about 20 
years, but it is going to occur, and it is more likely sooner 
than later.
 As you all look at the damages to the Key Bridge, which 
were caused partially, I think, because it wasn't built to 
withstand that large of a boat, it could have been maybe--piers 
could have been buttressed and made it more stable, is that 
correct?
 Mr. Bhatt, can you answer that?
 Mr. Bhatt. Thank you, Representative Cohen. And yes, it was 
good to spend some time with you in Memphis looking at that 
bridge.
 I think one of the things we are waiting for--and it was 
great to see the preliminary report from the NTSB, but I think 
we are going to be working closely with the NTSB just to figure 
out exactly what types of protection might be needed for 
bridges and what could have been possible. But again, I don't 
want to step into the NTSB realm.
 Mr. Cohen. I am sorry. Please.
 Ms. Homendy. Thank you, sir. For the Key Bridge, we are, 
obviously, looking at--there were two dolphins on the east 
side, two on the west side. They are rather small, and the 
vessel just sort of bypassed the dolphins. What ended up 
striking the pier was the starboard side of the bow that hit 
the column. The pier protection around the column itself is 
timber, concrete, a little bit of steel, but it is very close 
in to the pier itself.
 Other structures that we are looking at have pier 
protection that comes out farther so that a vessel can't get to 
the column. Other dolphins are much larger. So, we are looking 
at other structures across the United States to see what might 
be good models.
 I think the key here is you have a bridge that was opened 
in 1977, and over time, it's not the bridge that's getting 
larger, it's not the waterway that's getting larger, it's the 
vessels that are getting larger, and not just width, but 
height, with containers. And so, it is important that States 
and other bridge owners are looking at, from a risk assessment 
standpoint, what is now going through, what is the vessel 
traffic, and how is our infrastructure protected.
 Mr. Cohen. So, were there bridges built after 1977 that 
were built in a fashion that they would have been able to 
withstand such an impact?
 Ms. Homendy [to Mr. Bhatt]. You have to----
 Mr. Bhatt. So, thank you, Congressman, for the question. It 
is an important question. We are working with our State DOT 
partners to identify all of the bridges that are subject to 
seagoing vessels. Also, in the Great Lakes region, barge 
traffic on the Mississippi and other waterways.
 I think what this bridge has done is driven home that need 
to look at many of our bridges which are older, and look at 
that protection, and we are going to rely on the NTSB 
recommendations.
 Again, there was a lot of force. I mean, I have heard 
different analogies of the force, the equivalent of a rocket 
ship taking off. And so, we just want to be careful in our 
consideration of how we both protect and build bridges in the 
21st century as they are dealing with these new potential 
threats.
 Mr. Cohen. Thank you. I just would like to urge you, as I 
did in Memphis, that we need to look at preventative measures 
so we don't have another Francis Scott Key Bridge disaster. And 
earthquakes would cause that. And there is no place in the 
United States, I think, more vulnerable than the New Madrid 
fault and the I-55 bridge that was built before there were 
seismic standards. They were not part of the bridge.
 So, it is deficient, needs to be replaced, and I hope that 
you will look in terms, just as this disaster, at bridges that 
we fund under the bipartisan infrastructure bill, be ones that 
might be susceptible to either earth, God-created--I hate to 
say God, I hate to give God the responsibility, but disasters 
that are caused by other than man-made disasters.
 I yield back, and I thank you for coming, and Elvis thanks 
you, too.
 Mr. Graves of Missouri. Mr. Perry.
 Mr. Perry. Thank you, Mr. Chairman.
 I will begin by just offering my condolences to the family. 
And I think it underscores the circumstance, underscores how 
potentially horrific, almost unimaginable, what might be seen 
as mundane work can end up being at a critical moment. It is 
unimaginable, as you can imagine yourself at 2 or 3 o'clock in 
the morning, falling 100, 200 feet into the water, steel and 
concrete crashing around you.
 With that, Administrator Bhatt, the Francis Scott Key 
Bridge was a toll facility that never received any Federal 
funding prior to the collapse. Right?
 Mr. Bhatt. Yes, sir.
 Mr. Perry. And how much revenue did the State of Maryland 
receive or generate from the bridge on an annual basis, if you 
know?
 Mr. Bhatt. Sir, I would have to doublecheck. I don't want 
to give you a false----
 Mr. Perry [interrupting]. OK, I don't know if you would 
have a different figure than I do. I have got about $56.8 
million in 2023, just for your reference. So, that is what they 
were taking in.
 Under the current law and under this administration's plan, 
the bridge would get 100 percent share. So, the Federal 
Government would pay 100 percent of that. And while you say 
that this is consistent with bridge collapse emergencies in the 
past--and I think you are referring to the I-35 collapse--that 
was not a toll bridge, right? That was part of the interstate 
system.
 And so, my questions, I guess, center around payment for 
this. I think we can all agree that we probably and shouldn't 
wait for the insurance companies and the litigators to work it 
out, but Maryland had insurance on the bridge, didn't they?
 Mr. Bhatt. Sir, I am aware of one policy that Maryland has 
for $350 million.
 Mr. Perry. $350 million, right?
 Mr. Bhatt. Yes.
 Mr. Perry. So, that should, by all rights, you would 
assume, be actioned and go towards paying for a portion, 
whatever portion of the bridge reconstruction it would pay for, 
right? It would----
 Mr. Bhatt [interrupting]. Absolutely, sir. We just--I have 
yet to go through and----
 Mr. Perry [interposing]. I understand.
 Mr. Bhatt [continuing]. Have our lawyers figure out exactly 
what is in there. But yes, whatever portion of that $350 
million we would apply.
 Mr. Perry. So, I guess, when you say consistent with past 
emergencies, as you already said, the relief fund is $3.7 
billion behind. We are $35 trillion this month in debt at the 
Federal level. And I wonder if you think it is fair that the 
American taxpayer should not only pay to reconstruct the 
bridge, but then pay tolls after which to use the 
infrastructure they just paid for in their taxes. Is that--
because you are going to set a new precedent here. And is that 
the precedent we are going to set?
 Or is there some plan to recoup the cost of reconstruction 
of the bridge?
 And I think, according to the figures we have heard today, 
upwards of $2 billion, a bridge that originally cost $60.3 
million. Is there some plan to recoup that and send that back 
into the Disaster Relief Fund or to the Highway Trust Fund, 
which continually needs massive infusions from the general fund 
just to stay afloat? What is the plan?
 Mr. Bhatt. Yes, thank you sir, very important questions, 
and I appreciate your interest. So, let me just try to quickly 
go through that.
 Where this was a Maryland State facility before, now it has 
been designated as part of the interstate system. They were 
free before to collect their tolls and use them for maybe Port 
of Baltimore, whatever they were using them for. Now, since 
this has been Federalized as a facility, and going forward when 
the tolls are restored, as part of the interstate system it 
will now--they will have to use those for title 23-eligible 
funding, so, whether it is the maintenance of the existing 
bridge or other title 23 highway purposes in Maryland. So, the 
American taxpayer will be benefiting from those tolls.
 In terms of the precedent, if it was a pre-existing toll 
facility, they are allowed to toll the facility going forward. 
But again, it would be using title 23-eligible expenditures on 
those tolls.
 Mr. Perry. I understand the title 23 expenditures, and 
understand that they would be used for surface transportation 
in Maryland. But you are asking the taxpayers from across the 
country to pay for it. And if you are from Washington State, 
likely you are never going to travel across that bridge, but 
you are sure going to pay for it.
 And as long as we are setting precedent, I think it would 
be appropriate at least to consider reimbursing through the 
tolls the emergency fund or the transportation fund for the 
entire country before all of the money goes right back to the 
State that is going to be receiving it where the bridge 
resides, which arguably I think can be said was not prepared to 
withstand the traffic impact that it had. Meanwhile, it is 
right there. I mean, it is not like it was a surprise that the 
bridge is there, and ships are going under it, and this could 
happen.
 So, with that in mind, with the time that I have already 
expended and expired, I hope you would consider a plan to 
reimburse the taxpayer under horrific debt right now who can't 
afford their groceries, their gas bills, their daycare bills 
for the cost of this bridge for which one State has been 
receiving all the money for its entire existence, and 
apparently is going to receive all the money from the tolls for 
the rest of its existence.
 And with that, Mr. Chairman, I yield the balance.
 Mr. Rouzer [presiding]. Mr. Garamendi, you are recognized.
 Mr. Garamendi. Thank you, Mr. Chairman. Thank you for the 
hearing.
 Witnesses, Vice Admiral and General, you and your teams and 
the support organizations that you have contracted with are 
doing extraordinary work, and we thank you for that.
 The issue before this committee was pretty much laid out by 
the chairman in his opening remarks, and I would suggest that 
we have an opportunity to clarify the responsibilities, some of 
which we heard from the previous Member just a moment ago. A 
couple of things here.
 First of all, the notion--President Biden is correct, OK? 
We will put up the full cost of reconstruction. However, that 
legislation should be written in such a way that the Federal 
Government will be reimbursed for any money received in the 
liability issues, the $350 million that the State of Maryland 
had as an insurance policy on the bridge, as well as whatever 
other payment may come from lawsuits against the shipping 
company and the owners of the ship. So, we should--and this 
should be, really, the work of this committee--is to carefully 
structure the legislation so that the Federal Government, 
ponying up the 100 percent at the outset, would be fully 
reimbursed by any revenues.
 My colleague raised an interesting point about tolls. We 
should consider that, and how that fits into it, and keep in 
mind the entire interstate system, where tolls are collected in 
various places across the United States. So, those are things 
that are out there.
 There is also one other issue that I want to encourage this 
committee to deal with, in addition to recovering whatever 
money might be available from lawsuits, and that is the Limit 
of Liability Act of 1851. It seems as though perhaps even that 
is--precedes the law in Arizona which dealt with a different 
issue. That Limit of Liability Act really has to change, and I 
would urge the committee to take up this issue. I intend to 
present to the committee at the appropriate time a piece of 
legislation to do so, so that the owners of these vessels would 
be held responsible for the cost of their mistakes. And that--
right now, that limited liability would hold that the owner of 
the ship would be limited to $40-some million, even though the 
ship is worth $90 million or more, and the damage is somewhere 
around $2 billion, not including the cost of the recovery 
issues and the expenses that the Coast Guard and the Army Corps 
of Engineers are now incurring.
 So, my point here is to raise this policy issue and, 
really, the work of this committee as we go forward. I think 
the chairman correctly pointed out that we don't need to do 
much for the next couple of months, but this year, we have to 
pass legislation to clarify the ability of the Federal 
Government to receive any funds that are available from various 
lawsuits that are out there.
 And also, this committee should, since it is our 
jurisdictional area, deal with this 1851 law that limits the 
liability of the shipowner to any accident and problem that 
they may cause.
 Now, I don't know if this is an appropriate question for 
the general and the vice admiral, but you are welcome to jump 
in if you would like.
 But I think, Mr. Bhatt--and if you might comment on this 
issue--about how we might structure legislation to recover 
whatever fee, whatever damages may be in the future from either 
insurance or lawsuits.
 You can look for help, but you won't----
 Mr. Bhatt [interrupting]. No, I just--you referenced them, 
and I just--I am taking a lot of answers, so----
 Mr. Garamendi [interposing]. It's all yours.
 Mr. Bhatt. I don't want to--I am happy to share the time.
 So, under the ER Program, under the existing law as it 
states, any insurance moneys that are recouped for any ER event 
across the country do go directly back into the ER fund. So, 
the ranking member mentioned the $19 million Skagit River 
Bridge, and I think it was actually about $16.6 million that 
was recovered through insurance. It went directly back in, but, 
as he said correctly, 10 years after the incident.
 So, whether it is the $350 million insurance policy that 
Maryland has existing or post-investigation and post-legal 
activity going on for as long as that may be, we will recover 
all of that money and send it back in. But as you correctly 
point out, there are some questions about how much liability 
for the shipowner that is out there.
 Mr. Garamendi. That is a question, really, that should be 
addressed to the Coast Guard who might want to comment on it.
 But I am out of time now, so, I will yield.
 Mr. Rouzer. The gentleman's time has expired.
 Mr. Babin, you are recognized.
 Dr. Babin. Sir, thank you, Mr. Chairman, and thank you to 
the witnesses for being here and your testimonies.
 I think there is definitely some resentment among my 
colleagues and the American public about this incident. The 
perception here is really frustrating, and some of you have 
already addressed some of these, but I would like to ask my 
questions.
 If you zoom out, the Singapore-flagged vessel crashes into 
and completely destroys a historic bridge, kills six 
construction workers, and is now trying to avoid liability for 
the incident. People have a lot of questions: Is it safe for 
foreign-flagged vessels to operate in U.S. waterways? Are other 
bridges safe? I have heard a number of questions wondering 
whether their bridges are safe. Was this incident a result of 
foul play or negligence? What can we do to prevent this from 
ever happening again? And who is going to pay for this thing?
 And I appreciate you all for coming and answering 
questions. My first question is for Admiral Gautier. If anyone 
else has thoughts, please feel free to jump in.
 I know this whole response is a great team effort, but 
first off, I am told the Coast Guard is doing a great job 
leading the way in the unified response in Baltimore, so, I 
want to thank you and the Coast Guard for your commitment and 
all the hard work that you and the Coast Guard have done.
 As you all know better than most, the Gulf States fought 
against the National Contingency Plan Unified Command structure 
response throughout the Deepwater Horizon oilspill a few years 
ago in the Gulf of Mexico. The National Incident Commander's 
Report concluded that the Gulf States' effort resulted in the 
political and social nullification of the oilspill response 
doctrine and structure governance.
 It appears from press reports, meetings with Maryland State 
officials, and Member and staff trips to the wreck site, that 
Maryland embraced the National Incident Command structure, and 
that the response has worked well within that structure. Is the 
National Incident Command structure still an effective and 
efficient mechanism for coordinating Federal interagency and 
State-local-Federal interactions during incidents such as the 
Dali allision?
 Admiral Gautier. Congressman, thank you very much, first 
off, for the compliments to the Coast Guard. I just have to 
also acknowledge the leadership of Colonel Pinchasin, Army 
Corps of Engineers; Colonel Butler, Jim Harkins, and Jeff 
Donoho, who are the State incident commanders. It is a 
fantastic leadership team.
 To answer your question, the Incident Command System is 
absolutely a fundamental principle by which this incident 
response has been successful. It is part of U.S. doctrine under 
the National Incident Management System. It is how we respond 
to hurricanes, oilspills, other types of incidents just like 
this. I think we now have a great deal of practice in the 
United States since the Deepwater Horizon in doing this.
 And I think what I will just observe is that this 
particular incident had a very tight connection between the 
operational commanders who were running the incident and 
elected leaders who all shared the same objectives. The elected 
leaders took the time and effort--Governor, mayor, Members of 
Congress--to keep up to date on what was going on and to 
provide the trade space to allow these folks to get on with the 
response.
 Dr. Babin. OK, thank you. The second question I would like 
to address to Administrator Bhatt.
 I would like to talk about the path forward from here for 
the Key Bridge. What is the plan to replace the bridge?
 My constituents are not wanting to pay for this thing. In 
my view, the company or the country responsible for the 
incident should be footing the bill, not the U.S. taxpayer. If 
the U.S. is ultimately going to pay for this bridge, it better 
come out of funds that we have already allocated.
 President Biden and Speaker Pelosi authorized trillions for 
infrastructure, and that should be including bridges. The last 
thing I want to do is to vote to spend another $1 or $2 billion 
on a new bridge. So, Administrator Bhatt, talk to me on what 
you see as a path forward here on the payment for this thing.
 Mr. Bhatt. Thank you, Congressman. And just in terms of the 
rebuild path, Maryland DOT plans to issue their RFP close to 
Memorial Day. They will select a preferred team in August, and 
then they are looking at construction completion in 2028 as a 
preliminary schedule.
 And in terms of the payment, as I have stated, right now, 
there is a preliminary estimate, $1.7 to $1.9 billion. There is 
a $350 million insurance payment that we are working through to 
see what level of that would be applicable. And any funds that 
are recovered through legal activity or insurance payouts will 
go back into the ER funds. We just don't have a path to getting 
there right now in terms of what is eligible.
 Dr. Babin. OK, I am out of time, so, I yield back, Mr. 
Chairman.
 Thank you all.
 Mr. Graves of Missouri [presiding]. Mr. Johnson.
 Mr. Johnson of Georgia. Thank you, Mr. Chairman, for 
holding this very important hearing, and thank you to the 
witnesses for appearing, and thank you for the work that you 
have been doing to ameliorate the harm that has been caused by 
this bridge collapse.
 And I also want to offer my condolences to the families of 
the six construction workers who were killed in this bridge 
collapse.
 And I would like to commend the quick work of the police 
officers who made sure that traffic was stopped and no other 
people were on the bridge who could have been killed as a 
result of this collapse.
 And I also want to recognize the collaboration between 
State and Federal officials and agencies to address this 
situation.
 And I want to get at this issue of perhaps there being some 
people in the country who are not inside the State of Maryland 
who resent having to pay for this bridge reconstruction.
 Administrator Bhatt, can you tell us how this bridge 
collapse impacts interstate commerce?
 Mr. Bhatt. Thank you for your condolences and for the 
question, Congressman.
 I have been the secretary of transportation in Delaware, in 
Colorado, and I was a deputy in Kentucky. And I think that what 
is so critically important for our transportation system is 
that you can drive from New York to Los Angeles across a system 
that is completely uniform, is set to standards.
 And what is happening--I think we have learned through the 
Port of Baltimore--is that that highway system is tied into 
ports. It is the third busiest port in the country. So, there 
are jobs that are being impacted. There are freight movements 
that are being impacted. There are neighborhoods that are being 
impacted.
 And so, yes, this is not just an issue for Maryland. It is 
an issue for the Northeast Corridor and for our national 
economy.
 Mr. Johnson of Georgia. It is actually having an impact on 
prices for consumer goods. Is that correct?
 Mr. Bhatt. Well, that is something that, under the 
leadership of Secretary Buttigieg, we have been closely looking 
at many of the goods that move through there. So, there is a 
lot of coal that moves through that port. There are a lot of 
automobiles and farm equipment. And so, to the extent--now, 
there is--a lot of that traffic has been diverted--and I don't 
want to get outside of the Federal highway lane--to other 
ports. But there are a lot of movements of goods from, say, 
ships that have diverted back to Maryland, and that is adding 
costs for those same vehicles to be finished at the plants 
nearby.
 So, obviously----
 Mr. Johnson of Georgia [interposing]. All right.
 Mr. Bhatt [continuing]. Supply chain is important.
 Mr. Johnson of Georgia. OK, thank you. When is it 
projected, assuming that funding is in place, that the bridge 
can be rebuilt and reopened?
 Mr. Bhatt. Thank you, sir. The projected schedule right now 
is for a progressive design-build team to be selected this 
summer, and for construction to begin next year and run through 
2028.
 Mr. Johnson of Georgia. Thank you. And so, it would be 2029 
before the bridge would reopen for traffic?
 Mr. Bhatt. Yes, 2028, 2029. It will be a progressive 
design-build, so, we will figure out the schedule as we go.
 Mr. Johnson of Georgia. Thank you.
 Chairwoman Homendy, with respect to the causation of this 
cargo vessel losing power and that causing it, this vessel, to 
drift into the bridge, are there any concerns?
 Or does the fact that there was no--there seems to be no 
redundancy in terms of the basic power of the vessel--there is 
no redundancy. You cut it on, you cut it--it gets cut off, 
there is no secondary situation that would kick in. Am I 
correct on that?
 And if I am correct, what are the implications as we move 
forward?
 Ms. Homendy. Yes, I mean, there is certainly redundancy in 
the electrical system and the circuitbreakers. They switched 
circuitbreakers after the power outages in port.
 With respect to the emergency generator, it would not allow 
for regaining propulsion. It really focuses on the critical 
portions of the vessel, which would be radio communication, 
lighting. If you had any sort of--if you wanted to regain 
propulsion through any sort of emergency generator, it would 
literally take a six-story generator on a vessel to do that. 
There is redundancy in, say, cruise ships. But vessels--the 
Dali is not unlike other vessels.
 I think here is really determining, for us, what happened 
with the electrical system on the accident voyage, what 
happened in those two blackouts, which is why we have been 
working very closely with Hyundai, who manufactures the 
equipment, to try to replicate some of the electrical problems 
that we are seeing that day, and continue looking and testing 
each of the components.
 Mr. Johnson of Georgia. Thank you.
 I yield back.
 Mr. Graves of Missouri. Mr. Graves.
 Mr. Graves of Louisiana. Thank you, Mr. Chairman.
 I first want to join others in wishing condolences to the 
families of those who were lost in the bridge collapse.
 And also, I just find it remarkable, the incredible action 
of the law enforcement community that came in and stopped 
traffic. That could have been much worse than it was.
 Last week, I had the opportunity to go out to the bridge. 
And Admiral, I will tell you that--Admiral, it was Gilreath, 
right? Right. Admiral Gilreath, and Captain O'Donnell, and even 
Lieutenant Carter, who was behind you a little while ago, just 
absolutely remarkable.
 General, Colonel, your district commander down there--
Colonel Pinchasin, I believe--yes, she was awesome. I met her 
down in New Orleans, and she and her team did a great job. 
There were folks from DHS that were really, really good. And I 
just--an incredibly thorough briefing, and gave lots of comfort 
that things were under control. And I appreciate all the 
efforts that are underway down there.
 Administrator, I want to ask a question. I want to make 
sure I understand something. You said earlier that what is 
being done on this bridge is consistent with what has been done 
in other bridges in the past for disasters. Is that accurate?
 Mr. Bhatt. Thank you, Representative, I am trying to think 
of what I said----
 Mr. Graves of Louisiana [interrupting]. I wrote down that 
you said consistent with historic bridge disasters. But there 
is not another bridge where you just--where FHWA came in and 
just designated that it is going to be part of the interstate 
system.
 Mr. Bhatt. No, we only learned that it was not part of the 
interstate system in light of this event.
 Mr. Graves of Louisiana. OK. So, that is an anomaly. I 
just----
 Mr. Bhatt [interposing]. Absolutely.
 Mr. Graves of Louisiana. OK, I want to be clear on that.
 And then, secondly, so, you have talked about the use of 
categorical exclusions and doing some type of expedited NEPA. 
Whether you do a CATEX or you do alternative arrangements, I 
want to be clear, I am fully supportive of it. But in the past, 
the Minneapolis bridge, the I-35 bridge, I believe the bridge 
in Washington State and others, similar things have been done.
 Can you cite where there has been environmental damages or 
destruction from that approach, as opposed to going through the 
regular NEPA?
 Mr. Bhatt. So, just trying to think through your question, 
citing environmental damage by using the expedited approach?
 Mr. Graves of Louisiana. Mm-hmm.
 Mr. Bhatt. No, I can't cite environmental damage----
 Mr. Graves of Louisiana [interrupting]. And I can't either. 
And actually, Colonel--excuse me, Major General Graham, sorry 
about that, I demoted you--General, you recall after Hurricane 
Katrina, the levees were built using alternative arrangements. 
Do you remember any type of environmental damages or 
destruction that was caused from doing the alternative 
arrangements?
 General Graham. No.
 Mr. Graves of Louisiana. Yes, I don't think so, either. I 
think it actually worked out really well.
 And so, my message to you on this is that right now the 
average road project takes somewhere around 7 years and 3 or 4 
months. As you know, the White House has just released new 
rules on NEPA in line with the fiscal--well, attempting to be 
in line with the Fiscal Responsibility Act, but failing on some 
things, but--that would significantly shorten it. But my 
message is that this shouldn't be the exception. Environmental 
damages haven't resulted from using categorical exclusions or 
alternative arrangements.
 Look, I don't know what the traffic impacts are of this 
bridge. We have a bridge at home that is the source of the 
fourth worst traffic problem in America. The Mississippi River 
bridge, I-10, I-10 going from California to Florida, fourth 
worst traffic in America. We have taken 7 years to narrow a new 
bridge alignment down to 32 alignments. Like, you can't make 
this stuff up. This is outrageous. We have urgency there, as 
well.
 Look, I want to be crystal clear. I fully support, fully 
support Federal funding upfront. Let's get this thing built. 
Let's get it done as quickly as possible. I fully support 
categorical exclusion or alternative arrangements. I have been 
in touch with the Governor of Maryland, and I appreciate him 
reaching out, but this is a major anomaly. We have got a toll, 
we have got a responsible party. This isn't a natural disaster, 
and I think that we need to make sure that we are holding the 
responsible party accountable.
 We had a similar incident in Louisiana in the mid-1990s. 
The Bright Field--the Bright Field incident--came and crashed 
into the Riverwalk in Louisiana. That was a Japanese-built 
vessel, it was run by Chinese--or excuse me, it was, I think, 
run by the Chinese and flagged in Liberia.
 Admiral, I want to ask you real quick, can you think of any 
similar incidents with Jones Act vessels that have occurred 
like this?
 Admiral Gautier. Not from deep draft vessels. Certainly, 
there are a number of towing vessels in the rivers----
 Mr. Graves of Louisiana [interrupting]. Sure, some barges 
and much more----
 Admiral Gautier [continuing]. Barges----
 Mr. Graves of Louisiana [continuing]. Minor incidents.
 Chairman, how many--are you aware of anything?
 [Nonverbal response.]
 Mr. Graves of Louisiana. And so, look, one thing I just--I 
want to point out here--and for the record, she is shaking her 
head no.
 One thing I want to point out here. Look, Jones Act 
vessels, U.S.-built, U.S.-crewed, U.S.-flagged. We go through 
annual inspections. A night-and-day difference. And I think 
that is something else we need to take into consideration here.
 Lastly, Administrator, this bridge, it is not going to be 
built back exactly like it was, will it? It is going to be 
wider, you are going to have shoulders, you are going to have a 
different pier configuration, you are going to have different 
tidal influences, you are going to have bumpers, you are going 
to have dolphins and other things protecting the pier 
structures. Is that correct?
 Mr. Bhatt. Yes, sir.
 Mr. Graves of Louisiana. OK, all right. I just want to make 
sure that we are noting that this is actually a different 
bridge that is being reconstructed with effectively waiving or 
providing alternative arrangements or categorical exclusions 
under NEPA.
 I yield back.
 Mr. Graves of Missouri. Ms. Titus.
 Ms. Titus. Thank you, Mr. Chairman. And like everyone here, 
I, too, offer sympathy to the families of those who were lost. 
These people represent sometimes the invisible folks who are on 
the front lines who provide safety and security in our 
infrastructure, and also the harbor workers and police officers 
who were there and made the situation much less terrible than 
it already was.
 I would ask the Chairwoman and Administrator Bhatt about 
one of the things that has been pointed out in the study of the 
bridge. It seems like it didn't have a reliable fender system--
I believe it is called--to protect the piers from the crash. 
And I wonder if you have reviewed bridges in other major ports 
to determine whether or not they have those fenders in place? 
And if not, is there an existing program with funding that 
might be used to retrofit some of those other bridges to be 
sure they don't have the same problem we can be--I hate the 
word, but--proactive about that?
 Ms. Homendy. Thank you for the question. We have actually 
been recommending--we recommended back in 1988 that the Coast 
Guard and the Federal Highways evaluate the adequacy of pier 
protection on bridges over navigable waterways in U.S. ports 
and harbors. That recommendation remains ``closed, 
unacceptable'' because at the time the Coast Guard said they 
did not have the authority to take action on that evaluation.
 But if I--one thing I will say, and I hope that we walk 
away from this in considering, is the Federal Government states 
the bridge owners, they need to evaluate current structures and 
make sure, if you have navigable waterway, that you are doing a 
risk analysis to ensure safety, to ensure there is adequate 
pier protection.
 In this situation, we are looking at pier protection. We 
are looking at, certainly, the dolphins, but then the 
protection around the piers themselves, and then looking at 
different bridges across the United States to see how those 
have been improved over time. In this situation, you have a 
bridge that began operations in 1977. And if it was built 
today, it would be built differently. And so, that has to be 
taken into consideration.
 I will say I am very encouraged by what the Admiral 
announced, their board of inquiry--about looking at ports 
across the United States to make sure there is adequate 
protection. And I assume that it will include some of the 
structures, as well, including bridges. So, that's great.
 Ms. Titus. Administrator Bhatt, would you like to comment 
on that?
 Mr. Bhatt. Thank you, Congresswoman. And yes, we are 
obviously working closely with the NTSB, and I just really 
respect their thoughts and guidance.
 We have already reached out to our State DOT partners, who 
are the owners of these bridges. Similar to when there is any 
kind of bridge tragedy after Minnesota, everybody is reaching 
out to figure out what fracture critical bridges they had. And 
so, we are going to go out. We have already got a preliminary 
list. We are going to continue to identify.
 And again, it is the deep draft vessels. It is the barges. 
It is examining all the threats, and then doing that cost-
benefit analysis of what protections are sort of quickly 
deployable. How do we get these bridges protected, and then how 
do we update design standards, given the ever-changing nature 
of the vessels going underneath them?
 Ms. Titus. Well, can you use--I believe the acronym is 
BFP--Bridge Replacement, Rehabilitation, Preservation, 
Protection, and Construction Program? Is that available with 
any kind of funding, or that can be used to retrofit some of 
these bridges if they don't meet these requirements you are 
talking about?
 Mr. Bhatt. Thank you, Congresswoman, yes. So, in the 
Bipartisan Infrastructure Law, there was $12.5 billion 
allocated for discretionary grant funding and about, I think, 
$30 billion on the formula side. Seismic protection, as has 
been--retrofitting is possible. And this is something that we 
are going to look into as we work with our State partners who 
are applying for those funds.
 Ms. Titus. Well, as you look into it, if you find any 
problems with the program that won't allow it to work towards 
retrofitting in a situation like this or make it more 
difficult, will you let us know, so, if we need to make some 
changes, we can address those legislatively?
 Mr. Bhatt. Yes, ma'am.
 Ms. Titus. Thank you, I yield back.
 Mr. Graves of Louisiana [presiding]. Thank you, the 
gentlelady yields back. The gentleman from North Carolina, Mr. 
Rouzer, is recognized for 5 minutes.
 Mr. Rouzer. Thank you, Mr. Chairman. And I, too, want to 
extend my condolences to the families and all those who were 
injured in this very tragic happening.
 General Graham, I will start with you. Last week, the Corps 
announced it would reprogram appropriated dollars specific to 
other Corps projects towards the efforts at Baltimore Harbor. 
It is our understanding these funds were appropriated in fiscal 
year 2020 or earlier, and have been determined to be more than 
what is needed for those authorized projects. Is that an 
accurate portrayal? Is that correct?
 General Graham. That is accurate.
 Mr. Rouzer. So, this has created a bit of confusion among 
Members and even the committee here. Back home, for example, we 
have got--the Wilmington District has seen several projects 
whose funds have been repurposed. Notably, Wilmington Harbor, 
Morehead City Harbor, and New River Inlet all had hundreds of 
thousands of dollars redirected from their maintenance 
accounts.
 Can you provide the committee with the amount of 
reprogrammed dollars, a list of the projects you are 
reprogramming those funds from, and which districts those 
projects are in?
 General Graham. Absolutely.
 Mr. Rouzer. Because we would greatly appreciate those 
answers as quickly as possible.
 And then the question everybody has got on their mind is: 
How much money is sitting out there that is in an account that 
was appropriated in 2020 or earlier that has been left unused? 
I would like to know the answer to that question, too.
 And then, following up, does the Corps plan to use section 
101(a)(8) authority again in the future?
 And if so, are there any limitations to the number of times 
the Corps can utilize that authority within a specific 
timeframe?
 General Graham. Thank you, Congressman Rouzer. Probably we 
will have to use the emergency reprogramming authority again. 
As I stated in my opening statement, we have not used that 
authority at this scale for 15 years, and we understand that 
Congress put specific amounts of money on specific projects, 
and you intended it to be used for those projects. From these 
instances, as stated earlier, most of these funds were the 
result of bid savings, they were the result of we held onto 
additional money to settle claims with contractors. And so, it 
is relatively a good-news story that we saved the taxpayers 
money.
 To your statement on our accounting procedures, do those 
need to be looked at so that those old funds aren't sitting out 
there? Absolutely, and we are committed to that.
 Mr. Rouzer. Thank you. Following up, given these funds are 
well on their way to being reprogrammed, does the Corps plan to 
return any funds to those districts? What is your plan there?
 And if so, what would that timeline be?
 General Graham. To make sure I understand the question 
correctly, the districts had no uses for these funds, and so, 
as such, we don't plan to return them. If they come up with and 
say we do need some of these, we will work with them to make 
sure that those projects can be delivered.
 Mr. Rouzer. Sure. Well, every district has a disaster of 
some sort at some point, and I suspect that all those Army 
Corps districts around the country like to be able to have a 
little flexibility to tap into funding that was allocated 
specific to projects within their jurisdiction, which is why I 
asked that question.
 And with that, Mr. Chairman, I think that exhausts my line 
of questioning. I yield back.
 Mr. Graves of Louisiana. The gentleman of North Carolina 
yields back. Mr. Carbajal is recognized for 5 minutes.
 Mr. Carbajal. Thank you, Mr. Chair. I recently made a visit 
to the Francis Scott Key Bridge incident with a number of my 
colleagues to see it firsthand.
 Admiral Gautier, the Coast Guard has an obligation to 
respond to all marine casualties, but incidents of this size 
have an outsized impact on Coast Guard resources. This 
incident, unfortunately, comes at a time of strained resources 
and a 10-percent workforce shortage. What is the operational 
strain on the Coast Guard's responding to the bridge collapse, 
and how can Congress help?
 And what is the impact on the workforce?
 Admiral Gautier. Congressman, we have mobilized people from 
across the country. We have activated reservists to staff the 
command post and to respond here. We have used cutters and 
small boats from around the area, helicopters and so on, to do 
this response. So, there is an immediate area impact to 
readiness, certainly.
 But what we know is that, for unplanned incidents like 
this, where we mobilize a lot very quickly, there are also 
readiness impacts that happen well beyond the initial site. And 
so, I think, in terms of--and going into what is likely to be a 
pretty severe hurricane season--I think the main thing here is 
that, in order for the Coast Guard to reconstitute and be ready 
for the next one, we need to have continued and enduring 
financial appropriations support from Congress.
 We spent about $20 million so far in direct and indirect 
costs here, but we know that our readiness in the waterways 
management field is brittle. We are short aids to navigation. 
There is a cutter that is on-scene as the patrol commander that 
is 62 years old, the Coast Guard cutter Sledge. We are working 
to recapitalize that class of cutter and the waterways commerce 
cutter, and this is repeated again and again in terms of 
aircraft recapitalization, major cutter recapitalization 
support for our people.
 Mr. Carbajal. Thank you, Admiral Gautier. The IMO ensures 
minimum global standards for safe shipping practices. The U.S.-
flagged vessels are subject to higher standards and scrutiny. 
This is one of the several reasons I believe it is unacceptable 
that we rely on flag-of-convenience vessels to carry over 98 
percent of our international cargo.
 There is a small minority of my colleagues who believe that 
the Jones Act should be repealed. I am not one of them. How 
would your job of ensuring safety in U.S. waters be made more 
difficult if U.S. vessels sailing in our coastal waterways and 
inland rivers were supplanted by foreign ships with foreign 
mariners?
 Admiral Gautier. Congressman, your question is related to 
safety and the Coast Guard implications of safety. The Jones 
Act has been with us for 100 years. It is pretty foundational 
to how maritime commerce flows in the United States, and the 
Coast Guard has worked very hard to provide an equivalent level 
of safety from foreign-flagged vessels, foreign crews, and IMO 
through established standards.
 But what I really can say here is that the Jones Act is 
crucial for our maritime security elements, in terms of the 
industrial shipbuilding capability in the United States of 
America that the Coast Guard and that the Navy and MARAD and 
others rely on in terms of construct--our U.S.-flagged military 
and public vessels, as well. And we do not want in any way, 
shape, or form to jeopardize that maritime security element of 
the defense industrial complex through shipbuilding.
 Mr. Carbajal. Chair Homendy, it is common practice for 
American mariners working on U.S.-flagged ships to work on 
board a vessel for 2 to 3 months at a time. Mariners sailing on 
flag-of-convenience vessels often remain at sea for longer. In 
the case of the Dali, I understand that the engineers have been 
on board for more than 8 months.
 Since your preliminary report showed at least one mistake 
by the engineer, should we be concerned with the prevalence of 
flag-of-convenience vessels, which operate with lower standards 
operating in and around critical U.S. infrastructure?
 Ms. Homendy. Well, we are still on-scene and evaluating 
everything about this accident. We will look at any sort of 
Federal regulations or IMO standards to make sure they are 
adequate, but it is too early to tell.
 Mr. Carbajal. What about the standards? If they abide by 
lower standards, that shouldn't be of concern?
 Ms. Homendy. I am not saying it is not a concern. I am 
saying we have to evaluate with this particular accident, what 
was in place and whether that was adequate or not.
 Mr. Carbajal. But beyond this incident, is there a concern?
 Ms. Homendy. I will have to get back to you on that for the 
record.
 Mr. Carbajal. Thank you.
 Mr. Chair, I yield back.
 Ms. Maloy [presiding]. The gentleman yields back. The Chair 
recognizes Mr. Bost from Illinois for 5 minutes.
 Mr. Bost. Thank you, Madam Chair. I want to associate 
myself with the comments of concern for the families and the 
prayers for a tragedy such as this, and also to thank the 
people that responded so well and are doing the work.
 But ensuring that our Nation's infrastructure is secure and 
maintained is an important responsibility of our Congress, but 
it is also important to have uniform guidelines in place to 
know how infrastructure is going to be paid for.
 Now, in my district, when local communities reach out for 
assistance with grants to do road work, they know that local 
cost share is at 20 percent. Now, just recently, my district 
had a--on Highway U.S. 51, we had to close--and it is going to 
be closed for quite some time--because a sinkhole opened up, 
and the local community will need to repair the road, and there 
will be a cost connected with that work. However, I don't 
expect the community to try to redesignate the road to be 
considered part of the Interstate Highway System to take care 
of that.
 Mr. Bhatt, despite being located on Interstate 695, the Key 
Bridge was not part of the Interstate Highway System. The 
incident that caused the collapse of the bridge occurred in 
March, and yet the bridge designation wasn't applied to be 
changed until April. Are you aware of any other--aware that--of 
this change, cost share requirement for this road?
 And is it normal for a road change to be designated after 
an incident?
 Mr. Bhatt. Thank you for the question, Representative. This 
is the first time I am aware of redesignating a road.
 Mr. Bost. Me too. Me too. So, can you explain for the sake 
of the taxpayers and the people around this country that also 
have issues how a roadway has a designated change suddenly 
after repair work was identified?
 Because I can tell you the constituents that I represent 
would like to try to figure out how to do that because that is 
why we--look, I am just trying to figure it out because we have 
uniform rules in place. And if we are going to change them, we 
are the ones you come to. Just----
 Mr. Bhatt [interposing]. Yes.
 Mr. Bost. I need answers.
 Mr. Bhatt. Yes. Sorry, Representative, I didn't mean to cut 
you off there.
 Yes, and apologies to the community that had the sinkhole. 
I am sure that is quite an impactful event for that community.
 In this case, this portion of I-695 was part of the NHS. It 
was shielded as part of the interstate since it was built in 
the 1970s. I think we--there was a--so, for mapping purposes, 
it was part of it. There were some standards that were a little 
bit different that, when they applied to have it designated, we 
had to do the process of waivers, and that got it from the 80/
20 share to the 90/10 share. And so, I think our--I think my 
assumption before this incident was that that bridge and that 
section of I-695 was part of the interstate. So, this was just 
at the request of Maryland to have it redesignated as part of 
it.
 And we get those requests. There are parts of the 
interstate system that are shielded, but not necessarily part--
there was an example in Alabama a few years ago.
 Mr. Bost. OK, and you do that just through administrative 
rule, it doesn't require an act of Congress?
 Mr. Bhatt. It does not. They would need to come in and say, 
these are the design exceptions, whether it is the curves or 
some of the other elements that they might have had in there, 
and then our engineers would have to say, yes, this is why we 
would approve those exceptions.
 Mr. Bost. And you have got to understand the concerns of 
uniformity. And I understand--believe me, I am not arguing 
let's not fix it as fast as possible. I am not arguing that, 
hey, whatever the cost is, as we are trying to recoup, as was 
mentioned by several people questioning, insurance is not going 
to pay off overnight. There are going to be arguments, there's 
going to be all of that, and we are going to fight for that, 
and we need to get it fixed quickly. It is just other 
communities around the Nation have issues that come up, and not 
having a set standard on how it is we respond and how we can 
get a response back to our own communities makes it very 
difficult when you do something that isn't normal in this 
situation, and then we just have to have answers. So, I 
appreciate that.
 And with that, I will yield back.
 Ms. Maloy. The gentleman yields back, and I recognize Mr. 
Garcia for 5 minutes.
 Mr. Garcia of Illinois. Thank you, Madam Chair and Ranking 
Member, for hosting this hearing, and thank you to all of the 
witnesses.
 I want to echo the sentiment of other Members who are 
remembering the tragic loss of life of six workers, all of them 
immigrants from Mexico and Central America, all of them seeking 
a better life in this country, meeting a very tragic fate. So, 
as we rebuild the Key Bridge, we must also advocate for 
stronger workplace protections for all, including immigrant 
workers, and this brings me to my first question.
 Administrator Bhatt, the Coast Guard's testimony states 
that eight construction workers were on the bridge at the time 
of the collision, and that one worker was able to run to 
safety. If there had been more time when the ship's loss of 
power was reported and when the collision happened, is there a 
protocol in place for bridge worker evacuation in an event such 
as this collision? And if so, can you describe it?
 Mr. Bhatt. Thank you, Congressman, for the question and for 
your concern for the workers.
 Obviously, all work zones in America are dangerous places, 
and we have rules in place for both the State or the city that 
is procuring the contract and for the companies that are out 
there.
 I want to defer to others here, but what I learned through 
our discussions is that there was a police officer who was 
attempting to reach the work crew on the bridge to evacuate 
them, but just given the proximity of the ship, was unable to 
make it to the crew before the bridge strike.
 Mr. Garcia of Illinois. Do you think the protocol is 
adequate?
 Mr. Bhatt. Sir, I would need to think about that and 
consult with some of our experts. Obviously, this was an 
unprecedented event, so, I just want to evaluate that and get 
back to you for the record.
 Mr. Garcia of Illinois. Chair Homendy?
 Ms. Homendy. Yes. Other bridge structures, they have 
advanced warning systems, and we will look at that as part of 
our investigation.
 But I will just say from the time the pilot's dispatcher 
called MDTA police and the bridge was ordered closed was 52 
seconds--52 seconds. That was the time of--it is almost 
impossible, in that situation, to get a longer time. And if you 
just look at the time from the blackout to the bridge strike, 
it was 4 minutes total.
 But I appreciate your question because it is really tragic, 
what occurred. And we want to prevent that from reoccurring, 
and that is our whole mission, which is why we will look at 
advanced warning systems, as well.
 Mr. Garcia of Illinois. And thank you for that.
 And Administrator Bhatt, if you could get back to me, it 
would be greatly appreciated.
 To Vice Admiral Gautier, the Dali had been inspected by the 
Coast Guard about 6 months prior to the incident with the Key 
Bridge. It is unusual that a major malfunction like this could 
occur with no previous indication of faulty systems after being 
cleared by an inspection only 6 months prior.
 What are the requirements on foreign-flagged, foreign-owned 
vessels to report any malfunctions to the Coast Guard when 
operating at a U.S. port?
 Admiral Gautier. The Coast Guard has a requirement for any 
vessel that suffers an issue to notify on what we call a 
reportable marine casualty, and there are a variety of 
qualifications, sort of circumstances by which you have to 
notify the Coast Guard of those casualties.
 Mr. Garcia of Illinois. Thank you much.
 Lastly, very briefly to all of the panelists who would like 
to chime in, although the NTSB investigation is ongoing and 
recommendations are forthcoming, what is needed from Congress, 
if anything, to improve worker safety?
 Admiral Gautier. So, I will speak first. It is critically 
important for us to have the fulsome results of the 
investigation, I think, before we move ahead with any sorts of 
implementations based on those recommendations.
 I will say, so, the Coast Guard is conducting a Marine 
Board of Investigation in coordination with NTSB in 
cooperation. If we find something in the near term that we 
think is important and urgent enough to do an advisory on, we 
will go ahead and do that.
 Mr. Garcia of Illinois. Thank you.
 Chair?
 Ms. Homendy. Sir, this could happen in any of your 
districts, right? And so, I would say where you have navigable 
waterways, whoever is owning--I keep reiterating this. If you 
own a bridge, if a State owns a bridge or other entity owns a 
bridge, look at the current structure, do a risk assessment. 
You can do that now. You don't have to wait until we issue an 
urgent recommendation or come to the conclusion of our 
investigation. Make sure you are ensuring safety for what is 
going through on that bridge or in the navigable waterways now.
 Mr. Garcia of Illinois. Thank you.
 I yield back, Madam Chair. Thank you for your indulgence.
 Ms. Maloy. The gentleman yields back. The Chair recognizes 
Mr. Westerman for 5 minutes.
 Mr. Westerman. Thank you, Madam Chair, and thank you to the 
witnesses. And my first question is going to be for the Coast 
Guard and the NTSB.
 Obviously, everybody just about has offered their 
condolences to the families of the people who lost their lives. 
But I am thinking, if I were a family member, I would want more 
than condolences. I would have questions that I wanted 
answered. And the first question is, why?
 I think, from the information that we have received so far, 
the explanation would be we had vulnerable infrastructure, and 
we had a ship that lost power. But I think there is a deeper 
question as to why, and also, what are we going to do about 
that so that it doesn't--we don't get a repeat incident?
 If the ship had had a tug escort, would it have hit the 
bridge even after it lost power?
 Ms. Homendy. We are looking into that as part of our 
investigation. I can't answer that right now. It is a question 
that we have, but it is something we are delving into.
 General Graham. The same for the Coast Guard. We don't know 
whether there was sufficient time to have made a difference, or 
whether it would have added to the casualty or not.
 Mr. Westerman. I hope that is something that you are 
looking into and looking at other places around the country 
where these large ships are passing by vulnerable 
infrastructure without tugs. I know Mr. Graves talked about the 
ship in New Orleans, and from my understanding, all those ships 
down there now have tug escorts.
 Mr. Bhatt, you are here to discuss the need for a massive 
bridge reconstruction that will require a years-long effort and 
billions of dollars from the American taxpayer. Meanwhile, 
those very taxpayers have been waiting for over 2 years for 
FHWA to perform repairs to a washed-out gravel road on White 
Rock Mountain in Franklin County, Arkansas, in my district. 
This road provides access to Forest Service concessionaire 
facilities, not to mention critical passage for emergency 
services in the area. The project has already been funded, but 
is apparently so tied up in redtape that my office can't even 
get a clear answer from your agency on when the washout will be 
filled.
 If FHWA is unable to reconstruct a gravel road in less than 
2 years and counting, why should we trust your agency with 
billions in funding for a project of this magnitude?
 Mr. Bhatt. Thank you, Congressman. I am happy to go back 
and take a look and figure out exactly what is going on with 
that project and report back to your office.
 Mr. Westerman. Thank you. And this, I guess, would be for 
the Corps and for Mr. Bhatt, but there is an issue that 
happened in Floyd Bennett Field, which is a National Park 
Service facility in New York City. And you may ask, what in the 
world does that have to do with this project, but I will tell 
you what it has to do.
 This administration used alternative arrangements to waive 
every NEPA and environmental regulation in the Park Service to 
build a migrant camp, and they did that in less than 2 weeks. 
They waived all those regulations. I am wondering if the 
administration has the intent to use alternative arrangements, 
not just CEs but alternative arrangements, to repair this 
bridge, which is obviously very vital infrastructure.
 Mr. Bhatt. Sir, so, we are in close coordination with 
Maryland DOT. We are not going to waive NEPA, but is a strong 
likelihood that we will end up with a categorical exclusion 
because we are replacing a bridge in relatively the same 
footprint that existed before.
 Mr. Westerman. Does the administration have the legal 
authority to waive NEPA to use alternative arrangements to even 
go beyond the CE?
 Mr. Bhatt. Sir, I----
 Mr. Westerman [interrupting]. The answer is yes, and they 
can do that, and it is amazing to me that they would do it on a 
Park Service facility that 1 million visitors in New York City 
use to build a migrant camp. Yet, it doesn't seem to be an 
option on the table to rebuild this vital piece of 
infrastructure. And I hope the administration would not only 
afford this same luxury to critical infrastructure, but also to 
a lot of smaller projects around the country that get tied up 
in the process when the administration has full authority to do 
that.
 Thank you, Madam Chair, and I yield back.
 Ms. Maloy. The gentleman yields back. I recognize Mr. 
Stanton for 5 minutes for questions.
 Mr. Stanton. Thank you, Madam Chair. Thank you to each of 
the witnesses for your hard work in responding to this critical 
emergency in our country. And like every member of this 
committee, I do send my deepest condolences to the families of 
the six human beings, the workers who lost their lives as a 
result of this tragic incident.
 When the Dali crashed into the Francis Scott Key Bridge in 
Maryland, we saw the agencies represented here today jump into 
action. But the road to rebuild is long, and it requires 
coordination between our local, State, and Federal Governments. 
As a former mayor myself, I understand how critical 
intergovernmental cooperation is for efficiency and speedy 
results.
 Administrator Bhatt, to my understanding, one of the ways 
the Federal Highway Administration responded to the disaster 
was by reclassifying the bridge as an interstate. Tell us more 
about the purpose of that reclassification. And how will that 
help with speedy bridge repair?
 Mr. Bhatt. Thank you for the question, Congressman.
 We received a request from Maryland DOT shortly after the 
bridge disaster to reclassify. And so, we went through the 
usual process that we would do for any State DOT that was 
asking to come in. I think our assumption had been that it was 
part of the interstate, since it was shielded and was on maps 
that way.
 Just going back, the difference will be that, instead of 
being part of the NHS, it is now officially part of the 
interstate, and goes from an 80/20 cost share to a 90/10.
 Mr. Stanton. That's great. Another important action taken 
at the outset of the disaster was the quick release of 
Emergency Relief Program funds, a reimbursable program. I 
understand it was $60 million that was released in March. That 
is a sizable amount. How was that $60 million number decided?
 Mr. Bhatt. Thank you, Congressman. So, we have been in 
close contact with Maryland DOT from the early hours.
 Specifically, I think this is a great example of the quick 
release funding being put to work. They actually had a 
contractor who could mobilize very quickly, had cranes in the 
area. And while the Army Corps was focused on the navigable 
channel, that $60 million is helping to clear wreckage 
simultaneously from the nonnavigable waterways.
 Mr. Stanton. Obviously, the cost will be significant above 
and beyond the initial amount. Tell us the role that the 
Emergency Relief Program will play in additional funds for 
bridge repair and any other Federal highway programs that will 
likely need to be utilized in this important work.
 Mr. Bhatt. Yes. And so, as some of the--thank you, 
Congressman--for some of the questions that have come in, the 
first 270 days, the emergency repair work is funded at 100. And 
then longer term, permanent repair work is funded at 90/10. 
Traditionally through this program, the initial estimate is 
around $1.7 to $1.9 billion for the bridge. It will be a 4-year 
construction. And that is that critical piece where Maryland 
will have the certainty that that Federal funding will be 
available so that they can move forward with their procurement.
 Mr. Stanton. That's great. Lastly, it is my understanding 
that one of the primary roles of the Federal Highway 
Administration currently is to also give technical assistance 
to the Maryland Department of Transportation. Is there anything 
you can share with us today regarding those conversations as 
the Federal partners to Maryland DOT?
 Mr. Bhatt. Thank you. And Congressman, I do want to 
recognize our Federal Highway staff that have been on site and 
in close coordination both in Maryland and in headquarters.
 So, we are meeting with them on the emergency work, on 
getting the ER funding on the procurement, on the elements of 
the bridge design that are going to be out there. So, it is a 
really strong partnership that exists.
 Mr. Stanton. We appreciate the work of yourself, FHWA, all 
the other agencies represented today. It is critical that we 
get the bridge rebuilt as soon as possible not only for the 
city of Baltimore, the State of Maryland, but the entire 
economy of the United States of America. So, thank you for your 
work you have already done and the work you will do on this 
important, important project.
 Thank you, I yield back.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize Mr. Mast for 5 minutes for questions.
 Mr. Mast. Thank you, Chairwoman. Thank you all for your 
testimony.
 Mr. Bhatt, would this be an accurate way to categorize you? 
You are in charge of collecting the checks for the future 
project?
 Mr. Bhatt. Sorry, I am in charge of collecting checks for 
the future project?
 Mr. Mast. Money. You are in charge of getting the money for 
the project.
 Mr. Bhatt. Yes.
 Mr. Mast. OK. Have you received any money from any insurer 
yet?
 Mr. Bhatt. No, sir.
 Mr. Mast. Which insurers have you sought moneys from?
 Mr. Bhatt. So, to be clear, the insurance policy that we 
are talking about is an insurance policy for the Maryland 
Department of Transportation. And so, we are working with 
Maryland DOT to work through the elements of that insurance 
policy.
 Mr. Mast. Nothing for any insurance company of Grace Ocean 
Private, Ltd.?
 Mr. Bhatt. So, the Department of Justice is leading efforts 
around the--for the efforts for the United States to recover 
the funds. So, that is not a Federal Highway function.
 Mr. Mast. Nothing also for you in terms of requesting 
anything from insurers of Maersk who chartered that vessel from 
Grace?
 Mr. Bhatt. No, sir. The Federal Highway Administration role 
in this is the debris removal in the nonnavigable waterway, and 
then working with Maryland DOT to rebuild the bridge. We will 
take back any insurance funds that come in and reimburse the ER 
Program.
 Mr. Mast. What has Department of Justice told you to this 
point about--have they requested moneys from any of those 
insurers or any other companies?
 Mr. Bhatt. Sir, I would not be able to comment on 
Department of Justice efforts. I know they are working on it, I 
just--I am not aware.
 Mr. Mast. So, they haven't had any contact with you about 
requesting moneys. You can comment about your involvement, your 
conversation with them, not necessarily what they have done.
 Mr. Bhatt. Specifically, sir, the only email that I have 
received is from DOJ to preserve all of my emails for upcoming 
and likely years-long litigation.
 Mr. Mast. Why is it likely years-long litigation?
 Mr. Bhatt. Again, sir, I can only speak to my efforts 
around bridge building and litigation that occurs when there 
are claims between a contractor and a State, where they don't 
feel that the product meets--that can take years, so, billions 
of dollars and international maritime law, I can only assume, 
will be a fairly lengthy process.
 Mr. Mast. None of us are naive enough to say that insurance 
companies just readily come out and offer us large payouts for 
things that are insured. I would be naive to say that, it is 
just not the state of the world. But in the midst of this 
catastrophe, I guess it is a great word to categorize it.
 Have you seen anything or heard anything from DOJ about 
these insurance companies offering anything or trying to say 
that they do not have liability for this?
 Mr. Bhatt. Sir, to be--I would need to come back to you. I 
would have to check with our chief counsel, our general counsel 
at DOT and other agencies. But I am happy to come back on that 
question.
 Mr. Mast. I appreciate that. Have you heard anything about 
whether they have already executed any type of business 
interruption insurance for the vessel that is not in use right 
now?
 Mr. Bhatt. Sir, I am not aware of that.
 Mr. Mast. OK. And a lot of these questions, again, I 
appreciate you listening to. You don't have the answers for 
them.
 Madam Chairwoman, I would encourage this committee to get 
some of the other entities in here, since we are talking 
significantly across both sides of the aisle about the funding 
for this bridge, the timing for it, the repairs of this bridge, 
things peripheral to that, that we bring in the insurance 
companies for conversation, the shipping companies for 
conversation about this, as well. And I would hope that we 
would do that in the next--maybe next week that we are in 
session.
 But it is certainly sensical that we speak to you all about 
this, but it is also sensical that we speak to the private 
entities that are involved in this, as well. I thank you for 
your testimony.
 I thank you for the time, and I yield back.
 Ms. Maloy. Thank you. The gentleman yields back, and I now 
recognize Mrs. Foushee for 5 minutes for questioning.
 Mrs. Foushee. Thank you, and thank you to the chairs for 
holding this hearing, and thank you to the witnesses for being 
here with us today.
 The tragic events that took place in the early morning 
hours of Tuesday, March 26 were a tragedy not simply for 
Baltimore or Maryland, but for the Nation. I join my colleagues 
in mourning the six lives lost in this catastrophic accident.
 While I have been heartened by the response of the 
Baltimore community who have, at last count, already fundraised 
over half a million dollars to support the families of the Key 
Bridge victims, it is the responsibility of both the Federal 
Government and the private sector to ensure something like this 
never happens again, which is, at least in part, why we are 
here today.
 The Biden administration, the State of Maryland, the Coast 
Guard, and the U.S. Army Corps of Engineers, among others, have 
taken commendable initiative and swift action in responding to 
this crisis, something that has been highlighted by the 
witnesses here today. I want to thank all of you for being 
here. I know your time is valuable, especially in the midst of 
an ongoing situation like this, so, my colleagues and I, we 
greatly appreciate your time and your testimonies.
 I think most of us on this committee understand that this 
matter is going to require expeditious, bipartisan support here 
in Congress if we wish to mitigate. At best, we can get to the 
economic and the supply chain ripple effects of the FSK Bridge 
collapse. However, I believe it is worth noting that there are 
also some significant road safety implications here, as well as 
even further that underscore this need for congressional 
support.
 With the port no longer at full capacity, commercial trucks 
are being forced to take roads through residential areas that 
aren't equipped for that kind of traffic. Chairwoman Homendy 
and Administrator Bhatt, can either of you speak to the traffic 
safety issues to other vehicles on the roads, to pedestrians, 
or to the residential road infrastructure that have either 
already emerged as a result of the FSK Bridge closure or are at 
risk of emerging, should access to the port remain limited?
 Mr. Bhatt. Thank you, Congresswoman. Obviously, there is 
a--thank you for noting the traffic impacts.
 I would just, in the interest of time, I would highlight 
the hazmat traffic that--the hazmat materials are not allowed 
in the tunnels through Baltimore. And so, that was one of the 
critical elements of the Francis Scott Key Bridge, was to 
provide hazmat material to move around. And now what is 
happening is they are rerouting around the north side of 695. 
It goes through neighborhoods, and it is suboptimal from a 
routing perspective. So, that is just one example.
 And then, obviously, as you mentioned, there are trucks and 
other commercial vehicles and just higher levels of traffic 
working their way through residential areas now, as well.
 Ms. Homendy. This is an issue that I would typically defer 
to Federal Highways, just because we are just focused on the 
investigation itself. So, thank you.
 Mrs. Foushee. Thank you.
 I, like many of my colleagues, have been particularly 
concerned about the regional implications on unemployment that 
the bridge collapse and reduction of port operations are having 
on the surrounding community, as the State of Maryland has 
estimated that 270,000 jobs will ultimately be impacted.
 Even so, I have been especially encouraged by the efforts 
thus far of the Biden administration to support the plethora of 
temporarily displaced workers who have had their employment 
either directly or indirectly impacted since the events of 
March 26. For instance, the administration funneled an initial 
tranche of $3.5 million to the region via its Dislocated Worker 
Grant program back in April to support temporary cleanup and 
recovery employment opportunities for those who have lost their 
jobs due to the FSK Bridge incident, with more support funds on 
the way.
 Vice Admiral Gautier and Major General Graham, can you 
speak to the efforts of the U.S. Coast Guard and the Army 
Corps, respectively, about the ongoing efforts to restore 
services and access to the port, given the widespread 
ramifications such efforts will have on employment in the 
region?
 Admiral Gautier. Well, let me go first, because I want to 
do a shout out to the Army Corps of Engineers. Commerce is 
flowing. The depth of the channel has been restored to 48 of 50 
feet. It is narrower than what it typically is, but it is 
sufficient for Coast Guard to put one-way vessel and tug escort 
controls to get traffic in and out.
 And so, we have seen over 20--over 35 deep-draft vessels 
that have transited, over 300 smaller barges and other things 
that have been able to transit in and out. And so, I think what 
we are seeing is that the system is restoring itself to normal 
functions while we work together in Unified Command to make 
sure the full channel width and depth is restored.
 General Graham. And ma'am, I am working with the port in 
the State of Maryland to open up as many alternate channels as 
we could, small craft, and we successfully got to larger and 
larger craft. As Vice Admiral Gautier said, we were able to get 
a 35---now about 40-, 48-foot channel to get those key car 
carriers moving. And we remain committed to getting the full 
channel open by the end of this month.
 Mrs. Foushee. Madam Chair, that is my time. I yield back.
 Ms. Maloy. Thank you. The gentlelady yields back, and I 
recognize Mr. Yakym for 5 minutes of questions.
 Mr. Yakym. Thank you, Madam Chair.
 I, too, want to offer my condolences to the families who 
lost loved ones in this disaster, and I want to thank our 
witnesses not just for being here, but also for the tireless 
work that you and your agencies have done in putting into the 
recovery efforts, and also the investigative matters that you 
have undertaken as we look into this disaster even deeper. So, 
thank you.
 Before I get to my questions about the topic at hand, 
Administrator Bhatt, I feel the need to follow up on a 
conversation we had in December when you were before this 
committee. You may recall that we discussed the NEVI and the 
CFI programs, which have a combined $7\1/2\ billion at their 
disposal to build electric vehicle charging stations. As of the 
December hearing, NEVI had brought just one charging station 
online in 2 years. I asked you how many charging stations you 
expected those programs would bring online in 2024, and you 
promised to follow up with a ``very specific number.''
 But in March, you sent a response that contained no 
specific number, and you noted that hundreds of millions of 
dollars had gone out the door to build 7,500 ports, but there 
was no indication as to how many, if any, of those would be 
brought online this year. And thus far in 2024, NEVI has been 
responsible for six charging stations--again, with roughly 
$7\1/2\ billion at its disposal--and there doesn't appear to be 
any public information for the completed CFI chargers.
 Administrator Bhatt, I want to give you one more chance 
here. How many more NEVI- and CFI-funded charging stations do 
you expect to be brought online for this year?
 Mr. Bhatt. Thank you, Representative, and thank you for the 
followup.
 So, we are working closely with our State DOT partners and 
cities across the Nation. We are also working closely with the 
joint office that has been set up between Department of Energy 
and Department of Transportation. Since that time, there have 
been several States that have brought online NEVI chargers. 
That has been in Vermont, Ohio, Kentucky. Utah is going to have 
their first. So, there are dozens, and I will get you the 
specific number, but dozens that we are anticipating coming 
online just in the next couple of months. Thirty-five of those 
States have their solicitations out.
 And then specifically on CFI, on January 5, we rolled out 
$623 million in grants in January for CFI nationwide. And those 
will--we are working with grant agreements now to get those 
built this year.
 Mr. Yakym. So, again, how many--just give me--how many do 
you think will be brought online this year total, just to give 
a ballpark number?
 Mr. Bhatt. Probably in the hundreds to in the thousands 
range this year.
 And again, I want to differentiate between DFC chargers and 
the level 2 chargers that are obviously replacing ones that are 
existing on the network.
 Mr. Yakym. OK. Yes, well, thank you for that. And I do want 
to make sure that we, as we go throughout the balance of the 
year, we stay in touch on this particular topic, as we--again, 
we have allocated $7\1/2\ billion. And we are, as of just a few 
months ago--a month ago, we were at eight total chargers. And 
we want to make sure that the money that has been appropriated 
by this Congress is spent wisely.
 Turning our attention to the Key Bridge, Administrator 
Bhatt, I want to build on what Mr. Bost talked about with his 
redesignation of the bridge as an interstate system. I share 
his sentiments that we should get this bridge rebuilt quickly, 
but I believe we should also be mindful of new precedents that 
we set and establish as we go through this whole process.
 You mentioned that part of an Alabama highway was 
redesignated as a part of the interstate system. How long did 
that process take from application to approval?
 Mr. Bhatt. This was back in--sir, I would have to go back 
to you on the exact dates, but probably a few weeks.
 And actually, to be clear, I think that was changing the 
main line of the interstate with the bypass. So, maybe not 
exactly apples and apples.
 Mr. Yakym. Maryland's request to redesignate this as an 
interstate was made after the collapse. Is that correct?
 Mr. Bhatt. Yes.
 Mr. Yakym. Does your agency have the authority to 
retroactively designate damaged or destroyed infrastructure as 
a part of the interstate system?
 Mr. Bhatt. Sir, I would have to clarify on our exact 
authority and the retroactive piece. I just know that we 
received the request after the incident, and we went through 
our typical process and designated it as part of the 
interstate.
 Mr. Yakym. Is there any precedent for retroactively 
designating damaged or destroyed infrastructure as a part of 
the interstate system?
 Mr. Bhatt. Sir, I would have to come back to you on that. I 
am not aware.
 Mr. Yakym. Yes, I would very much like to know if your 
agency was within its authority to retroactively designate this 
as an interstate, as opposed to its former designation as a 
part of the State highway system. So, thank you.
 And with that, Madam Chair, I yield back.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize Mr. DeSaulnier----
 Mr. DeSaulnier [interposing]. Thank you.
 Ms. Maloy [continuing]. For 5 minutes for questions.
 Mr. DeSaulnier. Thank you, Madam Chair, and thank you to 
all the witnesses. Just a horrible event.
 Ms. Homendy or all of you, but--I want to direct this 
question to you. In 2007, near the district I represent in the 
bay area, there was a similar incident with the San Francisco 
Bay Bridge. It is the second busiest toll bridge after the 
George Washington Bridge in the United States, but it is the 
terminus of Interstate 80. So, what happened there was the 
fender system--and California had gone further--kept the bridge 
from being damaged, but it still had to be shut down so that 
you and Caltrans could go through and make sure it was safe. 
Plus, it is seismically vulnerable.
 So, what do we do in cases like that in 2007, where we--
lessons learned are looked at and, sort of consistent with some 
of the other questions, irrespective of whether it is part of 
the Federal highway system, and just making sure that State 
departments of transportation, that they know what the best 
practices are for their area?
 Ms. Homendy. Well, for our role as part of an investigation 
agency, we continue to share lessons learned as part of any 
investigation, including with State departments of 
transportation. Certainly, we have conducted a number of 
investigations involving vessel strikes on bridges, and have 
shared those lessons learned and continue to do so, and to 
continue to advocate even for recommendations that have been 
``closed, unacceptable.''
 But I will say that the Federal Highway Administration also 
has close contact, where they're State partners, to continue to 
highlight safety issues and risk assessment, as well.
 Mr. DeSaulnier. Yes, Vice Admiral, this happened very close 
to your admiral's--the regional--his home was beautiful on 
Treasure Island. But in that instance also they were required 
to have bar pilots come in. So, it is the--Oakland is the 
fourth busiest port in the United States, a lot of traffic goes 
through there. But again, we have got lots of bridges, and the 
Bay Bridge closest to it. So, a lot of the operations of that 
port, they work closely with the Coast Guard to make sure that 
the management of the transportation system works, and it works 
properly in terms of the whole transportation system. So, in 
this case, a heavily traveled bridge.
 How does your Department and the Coast Guard coordinate--
again, on your experience--around the world on how to make sure 
that these structures that are run by State transportation 
agencies, particularly if they are not part of the interstate, 
has the best information about the dangers of marine traffic, 
commercial marine traffic?
 Admiral Gautier. Yes, thank you, Congressman. I am familiar 
with the Cosco Busan incident that you are referring to----
 Mr. DeSaulnier [interposing]. Right.
 Admiral Gautier [continuing]. Many years of operations 
there in the bay area.
 So, we are doing a Marine Board of Investigation, just like 
we did in the Cosco Busan. We do an investigation of findings 
of fact, and then we recommend and take remedial actions based 
on that. But I think what we are talking about here is a little 
bit different in terms of the system as you have mentioned it.
 And so, the Coast Guard does have a set of tools, risk 
management tools, that we get together with stakeholders in any 
given port to evaluate the totality of the risk if something 
changes, like if a channel becomes deeper or if a new bridge 
gets built, and so on. One comes to mind as a port and 
waterways risk assessment. One was done in Baltimore, but not 
since 2001.
 So, as a result of this incident, the Coast Guard is 
initiating a board of inquiry under my signature, which will 
look at how the Coast Guard does these assessments, how recent 
they are in the ports around the country, and to examine the 
top 10 ports for some lessons learned, including bridge, bridge 
fendering systems, hazards to navigation, and so on, together 
with stakeholders so we can draw some conclusions, and then 
move out with a refined toolkit to other ports around the 
country.
 Mr. DeSaulnier. Coming back to Ms. Homendy, part of just 
the most recent report about human error on the boat reminds me 
of some of our discussions about the aviation industry. There 
is a lot of pressure on these companies to move product and 
show a profit. Are you concerned the same thing, that we are 
not providing enough oversight to the people who are running 
the ships in the system, and they are being overworked, so, 
they are missing things, whether it is people who are mechanics 
repairing the ships or people who are operating the ships?
 Ms. Homendy. Well, with respect to what occurred in port on 
March 25, there was routine maintenance going on on the vessel. 
And it was not something that stood out to us as--I mean, there 
is human error in everything we do, routine maintenance and, 
too, if we are working on our cars in our garage. Sometimes we 
make mistakes. In this case, a damper was closed and an engine 
failed. So, in these situations, the crew took action to get 
everything back up and running, and on the next day, they were 
on a different set of breakers and a different transformer.
 So, we will look at that as part of the investigation, 
including any sort of human error that occurred on the 25th or 
the 26th.
 Mr. DeSaulnier. And I wasn't inferring a blame on the 
crew's part, just the pressure on the company to make profits.
 Thank you, Madam Chair.
 Ms. Maloy. Thank you. The gentleman yields, and I recognize 
Mr. LaMalfa for 5 minutes for questions.
 Mr. LaMalfa. Thank you, Madam Chair, and I appreciate 
panelists coming here today. I have been looking forward to 
this hearing on this topic here. We have a lot of bridge 
history in this country, especially in recent years, and 
expediting the reconstruction of this is critical, I am 
certain, to Baltimore and the eastern seaboard, as it would be 
in any area of the country with an artery like that.
 So, what I am especially interested in is what is being 
done--and anybody on the panel that wants to weigh in--to truly 
expedite this process. Because when I--when you read about it, 
when you get information about it, it sounds like there is a 
lot of preliminaries that are, of course, necessary with the 
demolition of the old bridge and such.
 But where I get frustrated is a bog down of studies and 
NEPA and things of that nature with an already existing 
structure. This is not a pristine area. And so, what is being 
done to make a concurrent effort to do that stuff and get 
categorical exclusions, but also at the same time be moving 
forward as quickly as possible?
 And some examples I have of successes, as just Mr. 
DeSaulnier alluded to in California now, there was the Bay 
Bridge 1989 earthquake during the World Series, you may 
remember, where about a 250-ton chunk of that collapsed. And I 
am not sure how quickly they got that put back up, but it 
wasn't terribly long when they put their minds to it.
 On the obverse side of that coin, you have the actual 
replacement of the Bay Bridge took 24 years. In 1989, when you 
decided there was a problem with the bridge--it was decided--it 
wasn't completed until 2013. They started construction in 2002 
and completed it in 2013. So, that is an 11-year actual 
construction time, but a 24-year decision to actually--and to 
completion.
 The 1994 Northridge earthquake knocked down significant 
chunks of freeway in southern California, and the initial 
estimates, I believe at the time, by Caltrans or others was 
like, oh, this is going to take 3 years, which would just put a 
giant crimp in movement and commerce in southern California. 
So, the State and the Governor, Governor Wilson, put out a call 
for shortening that timeline from basically 3 years to 140 
days. And one of the people involved was this company called 
C.C. Myers Construction Company. They got it done not just in 
140 days, but 66 days, with a large incentive, a large bonus 
possible.
 So, on one hand--and then the MacArthur Maze in Oakland 
during--not my time here, but there was a problem there. I 
believe that was the fire. Anyway, they got that done in 27 
days with a bonus involved, as well, with the C.C. Myers 
Company. Unfortunately, they are out of business now. Mr. Myers 
passed.
 So, what can be done as far as incentives to actually speed 
up the process and not take 6 years of paralysis of Baltimore, 
but set aside bureaucracy and get it done in 3, let's say, OK? 
I mean realistically. So, anybody on the panel.
 Mr. Bhatt. So, Congressman, just--and thank you for your 
question and your examples that you have provided.
 I would just say that we share your desire to reopen the 
bridge as quickly as possible. I would say that Federal 
Highways worked with Maryland to get a programmatic CE for the 
debris removal in April so that they weren't waiting around for 
an approval to get the debris out of the channel. And we are 
working. They are going to issue their RFP later this month, 
hopefully get somebody under contract by August, which is 
within 5 months of the incident, and we will hopefully be able 
to get them to a categorical exclusion. And they are looking at 
4 years of construction.
 So, the plan right now is for that bridge to be reopened in 
2028, which--I don't know that there is any other authority 
that we could exert to get that done any faster.
 Mr. LaMalfa. OK, thank you.
 Currently, the movement of goods and commerce is very 
important. So, is there anybody--I mean, Ms. Homendy or 
others--a look at maybe providing a waiver for trucker hours? 
Because they are going to have to face 2 or 3 hours of delays. 
Is there a way that a trucker's hours can be--have flexibility 
for time of duty on that, as well as the ability to use the 
tunnels there for--ordinarily what trucks wouldn't be allowed 
to do.
 Mr. Bhatt. Thank you, sir. That would actually be under 
U.S. Department of Transportation and FMCSA working with the 
State. They can make waiver requests for truck weight and 
also--I am not sure on the trucker hours. I will be happy to 
get back to you for the service hours, but certainly----
 Mr. LaMalfa [interrupting]. Yes, please look into that. If 
locals are saying that would be helpful in order to complete--
you wouldn't want to run out by 2 hours or something with what 
the initial delay would be.
 But also, is there an issue of the tunnel being available 
to all types of trucking and others, restrictions on certain 
types of trucking that could be helpful? Could you have a 
waiver on maybe hazardous materials, having a certain time of 
day that they could access it, for example, that maybe they 
can't otherwise?
 I am just looking for ways for flexibility. That is what I 
would be asking. Would those be possible thoughts, do you 
think?
 [Pause.]
 Ms. Maloy. The gentleman's time has expired.
 Mr. LaMalfa. OK, thank you. Can he answer that?
 Ms. Maloy. Yes, quickly.
 Mr. LaMalfa. Thank you.
 Mr. Bhatt. I am happy to follow up with your office, sir, 
on those questions.
 Mr. LaMalfa. All right, thank you.
 Thank you, Madam Chair.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize Mrs. Sykes for 5 minutes for questions.
 Mrs. Sykes. Thank you, Madam Chair, and thank you to 
Chairman Graves and Ranking Member Larsen for convening this 
full committee hearing today.
 And to our witnesses, thank you for your testimony and for 
working diligently to respond to the tragedy that struck the 
Francis Scott Key Bridge in March.
 And I join my colleagues in expressing my sympathy to the 
families who lost loved ones and lives, as well as the greater 
Baltimore and Maryland community.
 Coming from Ohio, this is really important. We have the 
Nation's second highest number of bridges, and this is a very 
important conversation for us. And even just last week, we 
presented two checks to our county engineer and county 
executive for nearly $10 million to replace a decommissioned 
over-70-year-old bridge that was identified as critical 
infrastructure. So, bridge security and safety is very 
important to us in Ohio's 13th district and across the State of 
Ohio.
 But I want to highlight something different. Less than 2 
months after this disaster struck in Maryland, the majority on 
this committee was able to organize and hold a very timely and 
necessary hearing on the incident. And this hearing and the 
witnesses today are a perfect example of Federal Government 
fulfilling its role to support State and local efforts from 
disasters with Federal dollars and resources when they are 
needed most. This partnership between governing bodies is what 
I hoped to see more of when I was elected to Congress 2 years 
ago.
 So, you all can understand my disappointment when, in the 
over a year since the train derailment devastated the community 
of East Palestine and its way of life, the majority on this 
committee has not shown the same sense of urgency and has yet 
to notice a hearing to discuss the state of rail safety in 
Ohio. What about the people of Ohio and East Palestine who have 
been begging us--this question is to the majority--who have 
been begging us to do something on rail safety?
 And even on the Committee on Transportation and 
Infrastructure Subcommittee on Railroads, Pipelines, and 
Hazardous Materials, the subcommittee would not hold a hearing 
to discuss the Norfolk Southern train derailment or the broader 
issue of rail safety, leaving Democrats to host a rail safety 
roundtable without Members of the majority present.
 And while I don't represent East Palestine geographically, 
I am the only Ohioan on this committee, and East Palestine does 
not currently have a Member of the United States House of 
Representatives serving in Congress. So, I have no problem 
speaking up for my neighbors to the east of me.
 And since the derailment in East Palestine, two additional 
trains have derailed in Ohio alone, and many others across the 
country. And the communities, local and State, are still 
burdened with contaminated local waterways and some airways 
across the Nation.
 Even more recently, on March 2 of this year, three trains 
crashed and derailed in eastern Pennsylvania, leaving at least 
seven crewmembers injured, with the estimated damages to the 
equipment and track to be about $2.5 million. Emergency 
personnel responding to the scene found diesel fuel had spilled 
from one of the train cars, but containment booms were deployed 
to clean up the spill before the situation worsened. It was by 
luck that a derailment of those three trains was not worse, or 
anything like we saw in eastern Ohio.
 It is very clear that the issue of train derailments is not 
going away, and turning a blind eye to the issue is clearly not 
the path that Congress or this committee should take. Americans 
across the political spectrum, including the former President, 
the Biden-Harris administration all agree we must pass 
commonsense rail safety legislation to prevent future train 
derailments and keep our community safe.
 I am proud that Ohio Democrats and Republicans came 
together to introduce the bipartisan RAIL Act last year, and 
now it is time for the House Republican majority to pass the 
RAIL Act to protect Ohioans and communities across the country. 
The RAIL Act would implement effective measures to keep our 
communities safe, hold railroad corporations accountable, and 
ensure that no American living close to our 140,000 miles of 
railroad track has to worry about the threat of a toxic train 
derailment in their backyard.
 Finally, I would like to take a moment to recognize the 
administration, our State and local partners in the State of 
Ohio, and public servants who are continuously uplifting East 
Palestine, even though this committee and the United States 
House of Representatives has turned a blind eye and turned 
their back to the people of Ohio.
 And I would also like to take a moment to recognize Ms. 
Homendy and thank her and the rest of the National 
Transportation Safety Board for their investigation into the 
cause of the Norfolk Southern train derailment, and their work 
in investigating other accidents across the country with, no 
doubt, fewer people than you need.
 You have continued to fill in the gap where Congress has 
refused to act, holding hearings and townhalls with residents 
in East Palestine, providing preliminary information that we 
could act upon, and a sense that people in the administration 
and the Federal Government do care about them, even if this 
committee and this Congress has refused to. I look forward to 
reviewing the Board's findings and hopefully considering their 
recommendations as we look to rail safety in America. And thank 
you again for filling in the gaps where this committee has 
failed the people of East Palestine.
 Thank you, Mr. Chair, I yield back.
 Ms. Maloy. The gentlelady yields back, and I recognize Mr. 
Burlison for 5 minutes for questions.
 Mr. Burlison. Thank you.
 Ms. Homendy, it was just mentioned about the derailment in 
East Palestine, and we have had some other derailments that 
have made the news. But overall, would it not be accurate to 
say that trains and that--ultimately, they are more safe? It is 
probably the safest mode of transportation for goods and 
services, goods to be transported.
 Ms. Homendy. For transportation, over 40,000 people are 
dying on our Nation's roads. So, as far as transporting goods 
and people, rail is incredibly safe. It doesn't mean that a 
tragedy doesn't occur, and that is where we come in and 
investigate.
 Mr. Burlison. OK, so, I think it would be dangerous if we 
started trying to steer activity more away from rail because of 
these events. How many people died in East----
 Ms. Homendy [interrupting]. I would like more things to go 
on rail.
 Mr. Burlison. Right. How many people died in East 
Palestine?
 Ms. Homendy. No one died in East Palestine.
 Mr. Burlison. I think it is important to note that. While 
it might have been an environmental hazard, I think it is 
important to recognize the actual numbers.
 Mr. Barrett--or is it Barat--or Bhatt, sorry, Mr. Bhatt. My 
question has to do with the Francis Scott Key Bridge, which has 
been the subject for this entire hearing. As I understand, 
there are about 15,000 jobs that are dependent on the port and 
another 140,000 that are linked to the port. Many of the 
individuals are worried that they could lose their jobs because 
of no longer having access because of the collapse of the 
bridge. How long will it take to construct the new bridge?
 Mr. Bhatt. Thank you, Congressman, for the question. And 
yes, the port--and I think that is part of the critical efforts 
of the Army Corps and the Coast Guard to get that port reopened 
so that those jobs can resume. I think the bridge itself, once 
the port reopens, is on a 2028 schedule right now is the 
preliminary estimate to get that bridge back open.
 Mr. Burlison. So, a 4-year estimate. What about the cost 
for the bridge?
 Mr. Bhatt. So, right now, the way that the RFP is being 
structured, it will be a progressive design-build. So, you go 
in and you say, ``This is the structure that we need to 
build,'' and then the benefits of progressive design-build is 
they can bring in different elements. So, that is why the cost 
and the schedule will update as the different elements come in. 
But right now it is estimated at $1.7 to $1.9 billion.
 Mr. Burlison. Have there been any environmental concerns or 
any other issues that we might be able to look to sign any 
waivers that might expedite the construction of the bridge?
 Mr. Bhatt. Yes. So, on the environmental side, and through 
NEPA, that is why we are likely going to get to a categorical 
exclusion, because we are putting a bridge back where one 
existed relatively within the same footprint. We will work with 
our permitting agencies to make sure that we are not missing 
anything, but that is our plan.
 Mr. Burlison. And you served as the head of transportation 
for the State of Colorado prior to this role. Is that correct?
 Mr. Bhatt. And Delaware.
 Mr. Burlison. OK. And so, in that role, what is your 
experience? I know we just had the--a new rule that--or 
Executive order that was put in place under this administration 
that requires project labor agreements for anything, I think it 
is, above $35 million. Is that the cost?
 Mr. Bhatt. I would have to come back on the exact numbers.
 Mr. Burlison. So, in your experience in--on both the State 
level and the Federal level, do requiring project labor 
agreements improve the timeline of projects?
 Mr. Bhatt. Sir, I would need to come back to you with 
specific examples on the timeline and the----
 Mr. Burlison [interrupting]. What about the costs?
 Mr. Bhatt. Again, sir, I don't want to speculate. I want to 
come back with specific data.
 Mr. Burlison. And I am not trying to press on you. We had a 
great conversation before. But surely, you have enough years of 
experience to understand the distinction and the difference 
between the costs of a project, whether or not a project labor 
agreement is required.
 Mr. Bhatt. Yes. The one project I would think about--and it 
wasn't a PLA that was required, but we did do what I would call 
the first sort of local hiring preference in Denver when we 
replaced the I-70 viaduct. And the goal is--and I think it is 
similar to where the administration is here--is trying to 
create good-paying jobs and create a workforce for the future 
and ensure that we are building the Nation's infrastructure and 
building out great jobs----
 Mr. Burlison [interrupting]. But if the taxpayer were going 
to get more bang for their buck, if they are going to get more 
bridges, more roads, it would be without a project labor 
agreement.
 Mr. Bhatt. Again, sir, I want to come back to you with the 
specific data on that.
 Mr. Burlison. I think the answer is yes.
 Thank you, my time is expired.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize Mr. Menendez for 5 minutes for questions.
 Mr. Menendez. Thank you, Madam Chair.
 And just quickly following up, I had the opportunity to 
visit the Portal North Bridge, which runs through New Jersey, a 
critically important part of the Gateway Program, to mark the 
50-percent completion of the project. It is largely being built 
by labor. It is on time and on budget. So, I thank my friends 
in labor for the incredible work that they do to continue to 
develop and build our critical infrastructure.
 I want to thank all of our witnesses today for their 
testimony, their ongoing work regarding the Francis Scott Key 
Bridge collapse.
 I want to join my colleagues in recognizing the six workers 
who lost their lives during this tragic accident, immigrants 
who are making not just our infrastructure stronger, but our 
Nation stronger. My thoughts are with their families and the 
communities that they were a part of.
 New Jersey's Eighth Congressional District is home to the 
largest port on the east coast. Following the collapse of the 
Key Bridge, the Port of New York and New Jersey was ready to 
accommodate additional vessels to ensure our supply chain 
remained intact. This is thanks in large part to the Port 
Authority of New York and New Jersey, their dedicated teams, 
the operators of our ports, and the incredible men and women of 
ILA who keep our region moving.
 Administrator Bhatt, your testimony notes that the Federal 
Highway Administration will work to ensure that the new bridge 
is built to current design standards. Can you describe how 
design standards have changed since the Key Bridge was built in 
1977 and the challenges posed by increasingly large vessels 
calling at our ports?
 Mr. Bhatt. Thank you Congressman, for the question.
 I think just--if you look at the bridge, it was a truss 
bridge, and they are very strong and made of steel. And that 
was the prevailing design at that time. When you look at many 
of the truss bridges that are being replaced today, they are 
being replaced by cable-stayed bridges, for the most part. 
There are a lot of advantages from cost, strength. You can 
precast the concrete sections, bring them into place. And so, I 
think that is probably the likely design that will come 
forward.
 With regard to design standards, obviously, there is 
vertical load and lateral load that we have to account for. And 
then I think specifically what the Francis Scott Key Bridge has 
brought forward, and what we are going to be working very 
closely with Chair Homendy--and I echo her call to any bridge 
owner to begin examining their bridges right now--is what is 
the appropriate level of protection that we need to design so 
that we don't have another similar situation.
 Mr. Menendez. And taking into consideration the size of the 
vessels that are coming through our ports and through our 
channels, given that they have increased in size over--
definitely since 1977, that would be part of the analysis, is 
that correct?
 Mr. Bhatt. Absolutely, sir, yes.
 Mr. Menendez. Yes, I appreciate that.
 The Port Infrastructure Development Program provides grants 
to support efforts to improve port and related infrastructure 
and meet our supply chain needs. Between 2019 and 2023, this 
program received $9 billion in applications, but only received 
$2.25 billion in appropriations over 5 years in the 
Infrastructure Investment and Jobs Act.
 Mr. Bhatt, should we be doing more to invest in landside 
infrastructure?
 Mr. Bhatt. Thank you, Representative. I have been actually 
at a bunch of ports just this week. I served on the port board 
in Wilmington, Delaware. And I would say there is a critical 
need for infrastructure everywhere, including for the one that 
you mentioned.
 Mr. Menendez. And how would increased appropriations to the 
Port Infrastructure Development Program potentially help 
prevent future tragedies?
 Mr. Bhatt. Sir, I would want to consult with the folks at 
MARAD to get you a specific answer to that question.
 Mr. Menendez. OK, fair enough.
 To Chair Homendy, I understand that you are limited today 
in what you can share regarding this particular incident, but 
can you touch on what features may be implemented on both new 
and existing bridges to better protect them from potential 
impacts like what we saw in Baltimore?
 Ms. Homendy. Yes, this is what we are looking at as part of 
our investigation, and we are working with Maryland to evaluate 
their other bridges. And then we are looking at other areas in 
the United States where bridge owners have improved bridge 
infrastructure after a vessel strike, including any sort of 
fender systems, pier protection, dolphins. That is exactly what 
we are looking at. We don't have recommendations today on that.
 But again, I would stress that States and bridge owners 
should be evaluating, especially with older bridges, what is 
going through as far as in their navigable waterways now, what 
is the risk, and how should they address that.
 Mr. Menendez. And quickly, a followup. Do you anticipate or 
have a sense of timing of when those recommendations might be 
made available, just given sort of the timely importance of 
making sure that the existing infrastructure throughout the 
country is up to date?
 Ms. Homendy. So, we often issue urgent safety 
recommendations--and we may in this case decide to issue an 
urgent safety recommendation--at any time, including before we 
issue a final report. We are aiming for 18 months on a final 
report. But again, we may have updates to the investigation 
that we release, and we may issue urgent safety 
recommendations, as well.
 Mr. Menendez. I think this might make sense in this 
instance to ensure that people feel secure when they are 
crossing any types of these bridges.
 Thank you, Madam Chair, I yield back.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize Mr. Ezell for 5 minutes for questions.
 Mr. Ezell. Thank you, Madam Chairman, and thank you all for 
being here today. I appreciate all of you and your hard work 
and dedication.
 Vice Admiral, we have a town in my county named after you, 
but we pronounce it a little different there in south 
Mississippi. So, Gautier is the way we say it, but we will just 
leave that to us. So, anyway, as you know, one of the few 
remaining United States shipbuilders is in my county district, 
Huntington Ingalls. And what can be done to encourage the 
greater use of United States-flagged vessels to ensure that 
ships coming through our ports are held to the highest 
mechanical standards?
 Admiral Gautier. Yes, thanks, Congressman. I think I might 
be named after somebody who grew up in that town.
 But the Coast Guard works very hard to assure that, with 
the number of foreign-flagged vessels that call on U.S. ports 
every single day, that we maintain an equivalent level of 
safety. We do this through the International Maritime 
Organization. Actually, they are meeting this week on a number 
of issues of emerging technologies.
 So, we have done things like worked on the standards of 
training, watchkeeping, and certification for all mariners, 
U.S. and international, and we want to do this in a way, sir, 
that doesn't disadvantage our U.S. mariners so we can have the 
equivalent levels that global shipping and global crews on 
vessels have to adhere to.
 Mr. Ezell. Thank you. Additionally, do you think this 
incident could be a cause for recommending harbor tugs escort 
large ships through larger channels?
 And if so, do you think this incident could have been 
avoided?
 Admiral Gautier. It may be, but we don't know yet. It is 
too early in the investigation to understand whether tugs would 
or would not have helped in this circumstance.
 Although what I will say is that there are some areas in 
some ports around the U.S. that have tug escort requirements 
for a variety of reasons, and they are all different. For 
example, under the Verrazzano Bridge, for example, the State of 
California, for tank vessels entering into the San Francisco 
Bay area, those determinations are typically made by harbor 
safety committees, with all stakeholders getting together to 
understand the totality of risks, not just the Coast Guard, and 
then agreeing on what tug requirements might be particular to 
that area of risk.
 Mr. Ezell. Very good.
 Administrator Bhatt, I noticed in the DOT fiscal year 2025 
appropriations budget request that there were no additional 
funds provided beyond the annual $100 million authorization in 
the emergency relief fund. Given the backlog of requests and 
unmet needs, especially in Mississippi, how do you anticipate 
fulfilling the request for all highway projects and this 
bridge?
 Mr. Bhatt. Thank you, Congressman, for that question. I 
know that the OMB director was part of a tour of the site a few 
weeks ago.
 I don't want to get ahead of the administration, but I 
believe that, generally speaking, the ER backlog has been 
topped up through supplementals historically, and I believe 
that may be part of the discussion.
 Mr. Ezell. Thank you. Continuing with you, along with 
ensuring the process moves along quickly, how do you plan to 
coordinate with the State of Maryland and other stakeholders to 
ensure that proper funds are obligated quickly?
 Mr. Bhatt. Thank you, Congressman. It is absolutely top of 
mind. And having worked in the private sector, I know that 
projects delivered on time and on budget are always our target. 
And so, we are moving with great speed, working in close 
coordination with them to make sure that they are hitting all 
of the timelines. And they have set an aggressive schedule, as 
well.
 Mr. Ezell. Very good.
 Chair Homendy, it has been reported, the actions taken by 
the vessel and the State police who took swift action to 
minimize the casualties. In the future, how can we better 
improve the communication between vessels, people on the 
bridge, and emergency responders?
 Ms. Homendy. Well, that is part of our investigation, and 
we will look at that. It was key, when the pilots reached out 
to the dispatchers, and the dispatchers called MDTA police, it 
was a very quick notification to shut down operations on the 
bridge. And everyone just involved in that was--it was a heroic 
effort, certainly. So, we will look at that as part of our 
investigation to determine what should be the standard going 
forward.
 Mr. Ezell. Thank you. And thank you all again for being 
here today.
 And Madam Chairman, I yield back.
 Ms. Maloy. Thank you. The gentleman yields, and I recognize 
Mr. Auchincloss for 5 minutes for questions.
 Mr. Auchincloss. Thank you, Madam Chair.
 Some of my colleagues today have indicated their support 
for the concept of Federal moneys being repaid through tolling 
on the bridge. I would associate myself with that concept and 
with interest in that concept. I think in general, tolling on 
critical infrastructure is an appropriate way to fund it in the 
long run. And I would encourage the relevant agencies in 
Congress to consider that not just for this bridge, but for all 
bridges going forward as we think about how to responsibly fund 
critical infrastructure and address the backlog.
 Vice Admiral, I appreciate your testimony, and I appreciate 
also, the unified response in Baltimore that you have been part 
of. And I am concerned, though, about the strain on the Coast 
Guard, and whether that is going to further exacerbate the 
Service's challenges in operating with a budget and workforce 
deficit.
 Since the surge in Baltimore wasn't anticipated, there will 
be downstream effects on other Coast Guard missions and 
stations. If the Service does not receive additional resources 
from Congress, what are the likely short- and long-term 
consequences for operations in a place like Massachusetts?
 Admiral Gautier. Congressman, as you know, we surge 
resources to the top priorities at the moment, whether that be 
a bridge collapse or a hurricane response, or a search and 
rescue case.
 But to your point, more often we do that and with 
insufficient budget to make sure that we can do things like 
recapitalize our assets. And to close this urgent workforce gap 
that we have in enlisted ranks, our ability to do that is going 
to be eroded over time.
 Mr. Auchincloss. So, articulate the tradeoffs that we might 
have to make. What should Congress understand about tradeoffs 
that have to happen if you are not resourced appropriately?
 Admiral Gautier. So, take, for example, this near 10-
percent enlisted workforce shortfall. If we do not have the 
resourcing or the--I am sorry, the recruiting and retention 
capability within the Coast Guard in order to get that back up 
to normal, then we are going to have to continue on doing the 
sorts of things that we have done like not completely staffing 
certain stations around the country where there might be some 
redundancies. We might not----
 Mr. Auchincloss [interrupting]. And then what does that 
mean for your mission set? So, can you not do, for example, law 
enforcement for recreational boating? Can you not do a legal 
fisheries law enforcement? Like, what are some of the missions 
that might get eroded if you don't have the resourcing?
 Admiral Gautier. That's right. We are going to have to make 
tough choices to deliberately back off of doing certain things 
that we would normally do, like some recreational boardings, 
like some fisheries law enforcement boardings, like some lower 
priority aids to navigation around the country.
 Mr. Auchincloss. Good. I think it is important to be 
specific about the tradeoffs, because I want Congress to 
understand that you can't get something for nothing, and we 
have to fund the Coast Guard's vital 11 missions.
 I know you are also, conducting an Atlantic Coast Port 
Access Route Study, one of the goals of which is to reduce the 
risk of marine casualties and increase the efficiency of vessel 
traffic on the Atlantic coast. How is the Coast Guard 
reevaluating this study in light of the Baltimore accident?
 And how should ports evaluate potential risks to their 
infrastructure going forward?
 Admiral Gautier. I think Baltimore is a sober reminder of 
the consequences when you have large vessels, and then you have 
a mishap, and then you have some critical infrastructure, and 
then we have the results that we have seen.
 What we are doing in terms of the port access route study 
is exactly to prevent those sorts of circumstances. As we know 
that there will be more fixed objects--i.e., wind turbines, 
wind farms offshore starting in New England and then working 
down to other parts of the country--we need to have assurances 
that there are shipping lanes that will be free from the 
construction of offshore wind farms so that maritime 
transportation can continue at low risk to collisions and 
allisions.
 Mr. Auchincloss. I appreciate it, and I will yield back.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize Mr. Williams for 5 minutes for questions.
 And I apologize for skipping you earlier. Sorry.
 Mr. Williams of New York. That is all right. Thank you, 
Madam Chairman.
 Thank you all for being here and for your expert testimony. 
I have read through the accident report, such as it is, and 
would like to follow up on some details of that, just to try to 
understand it.
 And maybe, Madam Chairwoman, I will start with you. Do we 
know--I am sure we do--are we looking at the manufacturers of 
HR1, LR1 breakers, the tie bus, the transformer, the control 
system, all of those things that appear in the switchboard 
cabinet? In your report, you have the inspector that is taping 
those shut. Have we identified the manufacturer of all of those 
components, including the subassemblies and the things that are 
inside?
 Ms. Homendy. Yes. So, we are currently working with 
Hyundai, who manufactured many of the components, and they are 
a party to our investigation and have come to Baltimore to work 
with us to do testing on board the vessel. And our engineers 
are back on board the vessel today.
 Mr. Williams of New York. So, I understand that Hyundai 
would assemble the control system--the panel, if you will--like 
a panel shop would. But the individual components inside, 
whether that is a PLC or a SCADA system or sensors, actuators, 
whatever those things are, are we looking all the way down into 
the components, the whole supply chain that made up all those 
components?
 Ms. Homendy. We are.
 Mr. Williams of New York. And is there--when you represent 
the transformer, the ICMS, the integrated control and 
monitoring system, you are saying all of that comes from 
Hyundai?
 Ms. Homendy. Not every----
 Mr. Williams of New York [interrupting]. This is----
 Ms. Homendy [continuing]. Not every single feature or 
sensor comes from Hyundai. But if we are looking at any sensors 
or pumps or any other component on the vessel, then we will 
work with whoever that manufacturer is.
 Mr. Williams of New York. Is there an investigation into 
cybersecurity that is being evaluated for all these components?
 Ms. Homendy. Well, currently we have no evidence at this 
time to suggest that this was a cybersecurity threat. It has 
been stated at Unified Command that the Coast Guard and FBI 
also did not believe this was a cybersecurity issue. We have a 
memorandum of understanding with the FBI that, if there is any 
evidence of that, we have to turn this over immediately to 
them.
 Mr. Williams of New York. Is there a criminal investigation 
going on at all?
 Ms. Homendy. I am aware that there is some work being done 
by the Department of Justice, but that is not within the NTSB's 
purview.
 Mr. Williams of New York. So, in a cybersecurity or a cyber 
attack, there is a lot of concern about embedded systems 
embedded into what is called a real-time operating system, or 
inside the control logic, or inside the control elements there. 
That would require an enormous amount of sophisticated 
forensics to evaluate. And I would think--which would require 
dismantling that whole switchboard and doing a component-by-
component search. Is that kind of investigation underway?
 Ms. Homendy. Our investigators have over 400 years of 
experience who are investigating this accident itself, and they 
go where the evidence takes them.
 As far as anything the Department of Justice or FBI is 
doing, that is not something I can speak to.
 Mr. Williams of New York. Well, in terms of 400 years of 
experience, it is probably just the last 5 that are relevant in 
terms of cybersecurity, particularly in industrial controls.
 Ms. Homendy. Right. My point, though, is they have 
significant expertise on----
 Mr. Williams of New York [interposing]. I understand.
 Ms. Homendy [continuing]. Safety----
 Mr. Williams of New York [interrupting]. I understand your 
point, and I have significant expertise, as well.
 And so, the point of my question is, as we have seen in 
embedded systems and in very integrated components from a wide 
variety of vendors, that understanding the entire supply chain, 
understanding and evaluating things all the way down to the 
operating system or even the BIOS and other features deep in 
the systems is critically important.
 As I read through the accident report, it is not clear to 
me that anybody knows why those breakers tripped, why the 
transformer tripped offline, what dumped the bus. And it seems 
like, until we know the origin of the actual accident, that all 
of these things should be taken as likely or at least possible. 
Would you agree?
 Ms. Homendy. Yes. This is a preliminary report, and what we 
released yesterday was preliminary. We are still conducting our 
investigation. And we go where the evidence takes us.
 Mr. Williams of New York. And that includes a forensics on 
the actual components that are there, which would require 
significant disassembly and evaluation, in my opinion.
 Ms. Homendy. We will follow the evidence, and anything 
security-wise, if we find anything, we will turn it over 
immediately to the criminal authorities.
 Mr. Williams of New York. Thank you very much.
 I yield back.
 Ms. Homendy. Thank you.
 Ms. Maloy. Thank you. The gentleman yields back, and I 
recognize myself for 5 minutes for questioning.
 You have all been sitting here for a long time. You have 
been pretty thoroughly questioned. I just want to wrap up with, 
is there anything any of you want to highlight for your 
respective agencies that will be helpful to this committee that 
you haven't already covered?
 I will start with Vice Admiral Gautier and we will move 
down the line.
 Admiral Gautier. Congresswoman, a factual statement. I 
think that this has been pretty thoroughly questioned.
 In terms of the--I have been asked several questions in 
terms about Coast Guard resourcing, and I think it bears 
repeating from our perspective, we are incredibly proud of the 
folks in the field who have responded. They have done an 
amazing job with their counterparts to do this.
 We cannot guarantee over time that the Coast Guard is going 
to be able to perform at that level--whether that be a search 
and rescue case, or a patrol in Asia, or patrolling for the 
potential for mass migration in the Caribbean--without 
substantial support and enduring support from Congress and the 
appropriations side in terms of recapitalizing our aging assets 
and improving our procurement, construction, and improvement 
support from Congress, the things that help the people in terms 
of training that leads us to successful operations like this.
 So, I appreciate the opportunity to convey that to you.
 Ms. Maloy. Major General Graham?
 General Graham. Thank you. Thank you for that question and 
the opportunity to be here today.
 Probably two points I would just like to wrap up with. We 
talked a lot about safety of the general public. I just want to 
commend the teams on site, from the Coast Guard to the port to 
the various agencies--knock on wood right now--it has been an 
amazingly safe operation. It was probably some of the riskiest 
diving operations you can have, tethered divers going down, 
water you certainly can't see to the end of your fingers with. 
We were guiding them by sonar, really. Steel sticking out. And 
they did it amazingly safely. The job is not over yet, and our 
commitment is to continue that safety record until the Federal 
channel is completely cleared.
 There was a lot of discussion on the resiliency of 
infrastructure. About 3 weeks after the Dali hit the bridge, 
some barges broke away on the Ohio River near Pittsburgh, and 
they bounced off of two of the locks and dams that the Corps 
runs on the upper reaches of the Ohio River. And the 
infrastructure withstood those strikes because it was designed 
to withstand those strikes.
 Right now we are trying to stretch taxpayers' dollars as 
far as we can, and we are looking at some of the gates on those 
structures to see if we can go from steel to fiber reinforced 
polymers. And one of the things we are taking a look at is to 
see, well, if we do build them from fiber reinforced polymer, 
will they withstand barge strikes and whatnot as well as steel 
does. And so, all that is to make a shameless plug for research 
and development funding that we agencies need to continue to 
advance the state of engineering. Thank you.
 Ms. Maloy. Thank you. Shameless plug noted.
 Mr. Bhatt?
 Mr. Bhatt. Thank you, Madam Chair. I would just end where I 
started, which is: I have been around a number of these sort of 
bridge disasters or disasters, and just the confidence I feel 
that this response, whether it is through the Unified Command 
or the Army Corps or the Coast Guard, Federal Highways, all the 
various parts of U.S. DOT, I feel like it has just been such an 
exemplary response and a message to send to the American people 
that, when disaster strikes, the Government is there, working 
in close coordination with the private sector.
 I appreciate a lot of the questions from the majority 
around the funding of the bridge. I appreciate their concern 
for fully funding it, open to looking at the different 
methodologies that they brought forward.
 I would just highlight, from a Federal Highways 
perspective, that there is $3.7 billion, including the bridge, 
of unmet need across the country in red States and blue States, 
and the ER Program, as it is designated, we want to follow the 
law, and it doesn't really matter the color of the State. We 
are going to show up, and we want to make sure that the funding 
is available for ER Programs across the country.
 Ms. Maloy. Thank you.
 Ms. Homendy?
 Ms. Homendy. Thank you. First of all, let me thank this 
committee.
 On a bipartisan basis you led the effort to reauthorize the 
NTSB as part of FAA reauthorization. So, thank you very much 
for that.
 You also led the way on fully funding the NTSB, along with 
House appropriators, for our request for fiscal year 2024. We 
hope you will do the same for fiscal year 2025.
 But our fiscal year 2024 funding came in a little bit 
lower. Again, we fully appreciate it because it is higher than 
we receive now. But if you just look at this investigation, we 
have 12 people in our Office of Marine Safety. They need an 
additional five. That doesn't include all the other modes 
within the NTSB that need people and the supporting offices, as 
well as dealing with unfunded mandates, lab equipment, and 
training needs. So, the $10.7 million that we got in an 
increase in fiscal year 2024 actually translated into a little 
over $5 million, because we had to take on a 5.2-percent pay 
raise. Well deserved, but we have to think about the impact on 
the smaller agencies there.
 And so, we have about $5 million, and we have to figure 
out, OK, what 11 positions out of the hundreds can we fund. So, 
for the Office of Marine Safety itself, 12 people on their 
staff, half of which are dedicated to this particular accident, 
and they have over 60 other cases, and what happens is those 
get pushed a little bit so they could focus on the next major 
one. So, any support you can provide for fiscal year 2025 is 
really appreciated.
 Ms. Maloy. Thank you. One more really quick question.
 Major General Graham, does the Corps have an updated 
timeline for when the full Federal navigation channel will 
open?
 General Graham. Our commitment is to have it fully open by 
the end of this month. Sooner, if possible.
 Ms. Maloy. OK, thank you. I am way over my time, but they 
gave me the gavel, so, nobody is stopping me. Thank you.
 I yield back. Are there any further questions from any 
members of the committee who have not been recognized?
 Seeing none, that concludes our hearing for today.
 I would like to thank each of the witnesses for your 
testimony.
 And the committee stands adjourned.
 [Whereupon, at 1:08 p.m., the committee was adjourned.]

 Submissions for the Record

 ---------- 

 Letter of May 15, 2024, to Hon. Sam Graves, Chairman, and Hon. Rick 
Larsen, Ranking Member, Committee on Transportation and Infrastructure, 
from Hon. Kweisi Mfume, Member of Congress, Submitted for the Record by 
 Hon. Rick Larsen
 Congress of the United States,
 House of Representatives, 
 Washington, DC 20515, 
 May 15, 2024. 
The Honorable Sam Graves,
Chairman,
Committee on Transportation and Infrastructure, U.S. House of 
 Representatives, Washington, DC 20515.
The Honorable Rick Larsen,
Ranking Member,
Committee on Transportation and Infrastructure, U.S. House of 
 Representatives, Washington, DC 20515.
 Dear Chairman Graves and Ranking Member Larsen:
 Our nation experienced a terrible tragedy in the early morning of 
March 26, 2024, when a large cargo ship, by the name of the Dali, 
collided into and collapsed the Baltimore Francis Scott Key Bridge into 
the Patapsco River--leading to the tragic loss of six lives and 
contributing to a major disruption of the nation's supply chain.
 This unimaginable disaster claimed the lives Dorlian Castillo 
Cabrera, Miguel Luna, Maynor Yassir Suazo Sandoval, Alejandro Hernandez 
Fuentes, Carlos Hernandez, and Jose Mynor Lopez.
 The six hardworking men who were taken from us too soon were 
husbands, fathers, and brothers, and their passing serves as a solemn 
reminder to cherish the lives of those we care about so deeply. These 
men gave their heart, sweat, and soul to our country. Their families 
can never be reminded enough of our condolences, prayers, or 
sympathies.
 In this time of great tragedy, I commend the heroic, fast-acting 
first responders who jumped into action within minutes of the Dali's 
mayday call. I, and others, are exceedingly grateful for their 
coordinated and skillful efforts, which prevented further loss of life.
 I would be remiss if I didn't also acknowledge the efforts of the 
Unified Command team, who were some of the first boots on the ground, 
and have responded to this crisis with calmness, diligence, and 
precision. Their hard work to reopen the Patapsco River's main shipping 
channel expeditiously is awe-inspiring.
 Amidst the trials and tribulations of this tragedy, our unified 
Team Maryland composed of the Governor, all members of our 
Congressional delegation, and the Mayor and County Executive of 
Baltimore, has never ceded to the challenges we have faced.
 However, this isn't a ``Baltimore issue,'' it's an ``American 
issue,'' and I am appreciative of all the support from my congressional 
colleagues, on both sides of the aisle, and from all corners of the 
nation.
 The billions of dollars of products and commodities that flow into 
and out of the Port of Baltimore each year cannot be understated. The 
closure of the Port's main shipping channel strains the Nation's supply 
chain, impacting the shipments of automobiles, farming and machinery 
equipment, sugar, coal, and aluminum nationwide.
 That is why I, along with the entire Maryland Congressional 
delegation, introduced H.R. 7961, the Baltimore BRIDGE Relief Act. This 
bicameral, bipartisan legislation would authorize the federal 
government to fully fund the replacement of the Francis Scott Key 
Bridge and its approaches in Baltimore, Baltimore County, and Anne 
Arundel County, Maryland. Equally as important, there is also a 
liability section in the Baltimore BRIDGE Relief Act that restates a 
preexisting regulation requiring the federal government to be 
reimbursed to the full amount received from any compensation derived 
from insurance claims or any other source of compensation related to 
the bridge collapse.
 While the exact contents of potential legislation have not yet been 
finalized, the Maryland delegation stands united in our commitment to 
securing funding that covers 100 percent of the Francis Scott Key 
Bridge rebuild.
 With so much at stake, it is imperative to have a successful 
American response to this disaster. I urge my colleagues on both sides 
of the aisle to keep these important details in mind when responding to 
this national disaster.
 Sincerely,
 Kweisi Mfume,
 Member of Congress.

 
 Report, ``The Impacts of Project Labor Agreements on Competition, 
 Costs, Apprenticeships, and Diversity: Evidence from Port of Seattle 
 Projects,'' Frank Manzo IV, M.P.P. and Robert Bruno, Ph.D., May, 7, 
 2024, Submitted for the Record by Hon. Rick Larsen
 The 28-page report is retained in committee files and is available 
online at https://illinoisupdate.com/wp-content/uploads/2024/02/ilepi-
pmcr-port-of-seattle-pla-study-final.pdf

 
Statement of Rear Admiral Benjamin K. Evans, Director, Office of Coast 
Survey, National Oceanic and Atmospheric Administration, Submitted for 
 the Record by Hon. Daniel Webster
National Oceanic and Atmospheric Administration's (NOAA's) Response to 
 the DALI/Francis Scott Key Bridge Allision
 NOAA had a significant presence at the Unified Command for the 
Francis Scott Key Bridge incident.
 Upon learning of the bridge collapse in the middle of the night, 
NOAA's National Weather Service (NWS) forecasters were proactive, 
preparing to send a forecaster to assist the effort. The Maryland 
Emergency Operations Center is under construction, so NWS staff drove 
in the middle of the night to the Francis Scott Key Bridge area, 
knowing their forecast decision support services would be needed. The 
call for forecast support from the Maryland Department of Emergency 
Management (MDEM) came first thing in the morning, and the NWS 
forecaster was immediately on site to provide the needed forecast 
decision support services. NWS meteorologists were deployed to 
Maryland's Emergency Operations Center from March 26-March 31 to 
provide forecasts for first responders as well as other weather 
information to support response efforts. Forecasts supporting the 
operation continued, with on-site support no longer required after 
March 31. Russell J. Strickland, Secretary, Executive Office of 
Maryland Department of Emergency Management and current President of 
the National Emergency Managers Association, was extremely appreciative 
of the NWS efforts to support the response.
 NOAA's Office of Response and Restoration's (OR&R) Disaster 
Preparedness Program activated the National Ocean Service Incident 
Management Team to collect information and enhance coordination across 
NOAA's National Ocean Service on personnel, mission, infrastructure, 
and response activities to support messaging up to NOAA leadership and 
beyond. The NOAA Mid-Atlantic Scientific Support Coordinator responded 
on-scene to support USCG hazmat and pollution assessment and develop 
protection strategies and contingency plans. The OR&R Emergency 
Response Division Scientific Support Team completed hazmat assessments 
that informed the risk and reactivity for the 56 Dangerous Goods 
containers on board. Detailed assessments were specifically conducted 
for the 13 containers located in the forward stacks crushed by the 
collapsing bridge and identified as containing hazardous materials. At 
the request of the USCG Federal On-Scene Coordinator, the Scientific 
Support Team also produced oil trajectory forecasts every 48 hours for 
the seven week response for situational awareness to plan how to 
respond should a worst case scenario from the M/V DALI have occurred.
 At the request of the USCG, the Office of Coast Survey Navigation 
Response Team-New London (NRT-NL) deployed to Baltimore, accompanied by 
the Mid-Atlantic Navigation Manager. NRT-NL arrived on March 29 and 
began conducting hydrographic surveys through March 31 to identify safe 
shallow-draft channels through the remaining spans of the bridge. The 
team collected 157 linear nautical miles of multi-beam data, which was 
processed each night and provided to Unified Command. The team also 
collected laser scan data of the undamaged bridge spans to determine 
the height and width available to vessels transiting the alternate 
route. This data allowed USCG to identify and buoy a safe alternate 
route for vessel traffic. The Office of Coast Survey data was provided 
to the USACE, all of which was to aid in calculations for how much 
material needed to be removed. NRT-NL returned to Baltimore on April 17 
to conduct additional multibeam sonar surveys to create high resolution 
bathymetric maps of the increasingly deeper channels as the salvage 
teams worked to remove materials.
 Coast Survey rapidly integrated all available data into a new NOAA 
Electronic Navigational Chart which was made publicly available on 
April 3rd. The rapid response required testing a new mode of operation 
for chart production. Historically, chart updates have taken weeks or 
months, but the new mode of operations allowed for daily chart updates.
 The National Geodetic Survey and the Office of Marine and Aviation 
Operations NOAA King Air conducted two mission flights under their own 
authority on March 28 and March 29, collecting 5 cm resolution imagery 
of the bridge and surrounding channel in support of NOAA nautical 
charting needs, hazardous material removal, marine debris collection, 
and other coastal management needs, which was immediately shared with 
Unified Command. The high resolution imagery served as the baseline 
coastal dataset for the event and helped inform debris removal needs. 
This data is further anticipated to support future engineering needs.
 On April 4th, the Center for Operational Oceanographic Products and 
Services (CO-OPS) deployed a temporary Real-Time Currents Buoy (CURBY) 
to provide real-time measurements for currents and key meteorological 
parameters [https://tidesandcurrents.noaa.gov/ports/
ports.html?id=cb1501&mode=show_all] (wind, air temperature, water 
temperature, air pressure and salinity) for Unified Command decision 
support. A longstanding bridge air gap system and a standalone 
meteorological station affixed to the structure were destroyed in the 
incident. An additional standalone meteorological station on a concrete 
dolphin adjacent to the bridge and water level observations from a 
nearby NOAA National Water Level Observation (NWLON) station remained 
operational providing uninterrupted data for recovery and salvage 
efforts. On June 4th, CO-OPS installed a temporary Hawkins Point 
meteorological station [https://tidesandcurrents.noaa.gov/ports/
ports.html?id=
8574731&mode=show_all] on the western section of the bridge that 
remains standing. These new meteorological observations have been 
integrated into NOAA's Chesapeake Bay Physical Oceanographic Real Time 
System (PORTS) [https://tidesandcurrents.noaa.gov/ports/
index.html?port=cn].

 Appendix

 ---------- 

 Question to Vice Admiral Peter Gautier, Deputy Commandant for 
 Operations, U.S. Coast Guard, from Hon. Sam Graves

 Question 1. With bridge safety at the forefront of everyone's mind, 
including in the Midwest just north of my district where a barge struck 
the Fort Madison Bridge and shut down operations for a few hours, do 
you think an evaluation of the Truman-Hobbs list of bridges makes sense 
and should Congress look for resources to fund those critical 
infrastructure assets? Please explain your position.
 Answer. A response was not received at the time of publication.

 Question to Vice Admiral Peter Gautier, Deputy Commandant for 
 Operations, U.S. Coast Guard, from Hon. Bruce Westerman

 Question 1. What challenges do you envision during the period of 
construction relative to maintaining the shipping channel? For example, 
will construction of the new bridge be particularly challenged by the 
circumstances in the shipping channel?
 Answer. A response was not received at the time of publication.

 Questions to Vice Admiral Peter Gautier, Deputy Commandant for 
 Operations, U.S. Coast Guard, from Hon. Patrick Ryan

 Question 1. What challenges do you envision during the period of 
construction relative to maintaining the shipping channel? For example, 
will construction of the new bridge be particularly challenged by the 
circumstances in the shipping channel?
 Answer. A response was not received at the time of publication.

 Question 2. Is it important that the new bridge be taller and/or 
have a wider clear span to accommodate future maritime needs? If so, 
how do those maritime requirements reconcile with the desire to limit 
NEPA to a categorical exclusion?
 Answer. A response was not received at the time of publication.

Question to Major General William H. Graham, Deputy Chief of Engineers, 
Deputy Commanding General, and Deputy Commanding General for Civil and 
 Emergency Operations, U.S. Army Corps of Engineers, from Hon. Bruce 
 Westerman

 Question 1. What challenges do you envision during the period of 
construction relative to maintaining the shipping channel? For example, 
will construction of the new bridge be particularly challenged by the 
circumstances in the shipping channel?
 Answer. Bridge construction during maintenance dredging within the 
federal channel will require coordinated operations between bridge 
construction crews, the port, the US Coast Guard, and the Corps. Post 
construction surveys also will be necessary to update NOAA's nautical 
charts.
 A similar successful model is the recent Arthur Ravenel Jr. Bridge 
construction across the Cooper River in Charleston, SC, which allowed 
the port to be at 100% operational during construction operations.

 Questions to Major General William H. Graham, Deputy Chief of 
Engineers, Deputy Commanding General, and Deputy Commanding General for 
Civil and Emergency Operations, U.S. Army Corps of Engineers, from Hon. 
 Patrick Ryan

 Question 1. What challenges do you envision during the period of 
construction relative to maintaining the shipping channel? For example, 
will construction of the new bridge be particularly challenged by the 
circumstances in the shipping channel?
 Answer. Bridge construction during maintenance dredging within the 
federal channel will require coordinated operations between bridge 
construction crews, the port, the US Coast Guard, and the Corps. Post 
construction surveys also will be necessary to update NOAA's nautical 
charts.
 A similar successful model is the recent Arthur Ravenel Jr. Bridge 
construction across the Cooper River in Charleston, SC, which allowed 
the port to be at 100% operational during construction operations.

 Question 2. Is it important that the new bridge be taller and/or 
have a wider clear span to accommodate future maritime needs? If so, 
how do those maritime requirements reconcile with the desire to limit 
NEPA to a categorical exclusion?
 Answer. The Federal Highway Administration (FHWA) would be the lead 
federal agency for the new bridge and NEPA compliance. The US Coast 
Guard has the primary responsibility to issue permits for bridges over 
navigable waterways, ensuring the safe navigability into and out of the 
Port of Baltimore. As plans and designs are finalized, the FHWA, USCG, 
and the Corps will continue to work with State and Federal agencies 
involved in bridge construction to address any potential impacts during 
or after construction to the federal channel.

 Questions to Hon. Shailen Bhatt,\\ Administrator, Federal 
 Highway Administration, U.S. Department of Transportation, from Hon. 
 Eric A. ``Rick'' Crawford
---------------------------------------------------------------------------

 \\ Administrator Bhatt resigned from the Federal Highway 
Administration (FHWA) effective September 10, 2024. These responses are 
provided on behalf of FHWA.
---------------------------------------------------------------------------
 Question 1. Administrator Bhatt, during the hearing, you confirmed 
that the Federal Highway Administration (FHWA), on April 29, 2024, 
approved a request by the Maryland Department of Transportation (MDOT) 
to designate a segment of highway including the Francis Scott Key 
Bridge (``the Bridge'') as part of the Interstate System.
 I understand that MDOT sought a concurrent process for its request 
to designate the Bridge as part of the Interstate System, meaning it 
submitted requests to both FHWA and the American Association of State 
Highway and Transportation Officials (AASHTO) at the same time.
 Question 1.a. Are such requests routinely submitted and/or 
considered concurrently?
 Answer. Approval of modifications to the Interstate Highway System 
are made by the Administrator. This includes the numbering of segments 
on the Interstate Highway System. FHWA regulations on Interstate System 
modifications require States to coordinate proposed numbering of 
Interstate Highway System segments with the Route Numbering Committee 
of the American Association of State Highway and Transportation 
Officials (AASHTO). FHWA considers that committee's decisions in route 
numbering approvals. The AASHTO Route Numbering Committee's decisions 
are made via a rolling review process.

 Question 1.b. If yes, please provide examples.
 Answer. FHWA does not track specific dates of the submission of 
requests to AASHTO. States often submit their proposed numbering 
schemes to AASHTO in advance of submitting modification requests to 
FHWA. However, sometimes the submissions to AASHTO and FHWA occur close 
in time.

 Question 2. Due to the collapse of the Bridge, the MDOT letter 
requesting the Bridge be designated as part of the Interstate System 
asked FHWA for ``expedited approval.'' Understanding that the MDOT 
request was submitted to FHWA on April 19, 2024, and subsequently 
approved on April 29, 2024, that represents a ten-day timeline.
 Question 2.a. Is that considered an ``expedited process?''
 Answer. ``Expedited process'' is an informal term that States use 
when they would like to have a modification request considered more 
quickly. This can occur for a number of reasons, but often it is 
because a governor or local officials would like to hold an event (such 
as a ribbon cutting) to commemorate the opening of an Interstate 
Highway segment. FHWA works closely with States to support their 
timelines, when possible.

 Question 2.b. How often has FHWA approved such requests 
accommodating an expedited process?
 Answer. FHWA does not track requests for an expedited process, but 
they are not common. As noted above, FHWA works closely with States to 
support their timelines, when possible.

 Question 2.c. Please explain and provide examples.
 Answer. FHWA processed an expedited request by the State of Indiana 
to add a section of congressionally designated future I-69. The State 
held an event on August 6, 2024 to commemorate the opening of the last 
section of the I-69 corridor between Evansville and Indianapolis

 Question 3. Please detail FHWA's typical process and timeline for 
approval of Interstate designations.
 Question 3.a. Does this process typically take weeks, months, or 
years?
 Answer. Once the highway segment meets all standards of a highway 
on the Interstate System and is a logical addition or connection to the 
Interstate System, the State can request the segment's addition to the 
Interstate Highway System. The duration of the approval process varies, 
depending on the complexity of the request. In addition to working with 
the requestor, FHWA coordinates with AASHTO on the route number, as 
noted above.

 Question 3.b. Please provide examples.
 Answer. The length of the approval process varies, depending on the 
complexity of the request. Below are some recent examples:

------------------------------------------------------------------------
 Received Approval
------------------------------------------------------------------------
New York I-86................... June 2024......... Pending.
Indiana I-69.................... June 2024 (revised July 2024.
 version).
Maryland I-695.................. April 2024........ April 2024.
Nevada I-11..................... February 2023..... November 2023.
Indiana I-69.................... September 2022.... December 2022.
Texas I-69E..................... June 2022......... September 2022.
North Carolina I-587............ May 2021.......... November 2021.
Arkansas I-555.................. January 2021...... April 2021.
------------------------------------------------------------------------

 Question 4. Are there other instances of a facility being 
designated as part of the Interstate System when that facility no 
longer exists?
 Question 4.a. If yes, please provide examples.
 Answer. In the case of the segment of I-695 that included the 
Francis Scott Key Bridge, part of the facility still exists (the 
designation was for an 18.8-mile segment). FHWA is unaware of any 
examples of a designation where no facility exists.

 Question 5. Historically, has FHWA retroactively designated 
facilities as part of the Interstate System following either a natural 
disaster or a catastrophic failure from any external cause?
 Question 5.a. If yes, please explain and provide examples.
 Answer. FHWA is not aware of any examples, or requests by States to 
make such a designation. The portion of MD-695 that included the 
Francis Scott Key Bridge was signed as an Interstate, and anyone using 
the facility before the bridge collapsed would have thought it was 
already on the Interstate System. States request modifications only a 
few times a year, and none of the recent requests were under similar 
circumstances.

 Question 6. I understand that prior to its collapse, the Bridge was 
a toll facility. How much revenue did tolls on this facility generate 
in 2023?
 Answer. FHWA does not track toll revenue for specific facilities. 
For the most accurate responsive information, we defer to the source, 
the Maryland Transportation Authority (MDTA), which reported toll 
revenue for the Francis Scott Key Bridge for fiscal year 2023 of 
approximately $56 million.

 Question 7. In your testimony, you discussed how discretionary 
funding may be pursued to repair the Bridge. Please provide a 
comprehensive list of the existing programs, discretionary and formula, 
for which bridge projects are eligible for funding.
 Answer. Bridge projects are eligible for funding under a number of 
FHWA formula programs, subject to program-specific requirements: the 
Surface Transportation Block Grant Program (STBG), the National Highway 
Performance Program (NHPP), the Bridge Formula Program (BFP), and the 
Promoting Resilient Operations for Transformative, Efficient, and Cost-
Saving Transportation Program (PROTECT) Formula Program. Bridge 
construction is also an eligible expense for a number of discretionary 
grant programs, subject to program-specific requirements, including:
 National Infrastructure Project Assistance Program 
(MEGA);
 Rebuilding American Infrastructure with Sustainability 
and Equity (RAISE);
 Bridge Investment Program (BIP);
 Infrastructure for Rebuilding America Program (INFRA);
 PROTECT;
 Rural Surface Transportation Grant Program (RURAL);
 Reconnecting Communities Pilot Program; and
 Competitive Highway Bridge Program (CHBP).

 Question 8. I appreciate the Federal Motor Carrier Safety 
Administration's (FMCSA's) efforts to provide regulatory relief for 
commercial motor vehicle drivers following the collapse of the Bridge. 
I understand FMCSA has extended this relief since its initial issuance 
in late March. How has this regulatory relief helped maintain commerce?
 Answer. FHWA has conferred with FMCSA to provide this response. The 
relief both supported the unprecedented emergency work relating to the 
Francis Scott Key Bridge, as well as supply chains impacted by the 
collapse that relied on the Port of Baltimore or Baltimore's nationally 
significant freight infrastructure. For example, the relief allowed 
motor carriers engaged in emergency-related activities, such as salvage 
and recovery operations, to conduct the necessary work of removing 
bridge debris, without violating Federal requirements, including hours 
of service. Additionally, it helped in the efficient and safe rerouting 
of freight flows to other East Coast ports because of the collapse and 
the transport of critical fuel products to and from the Port of 
Baltimore that support the surrounding megaregion, especially regional 
industries, military bases, and aircraft operations at BWI Airport. 
Fuel and other hazardous material commodities experienced the most 
transportation impacts as the FSK Bridge was the key hazardous 
materials route through Baltimore along the I-95 corridor, and 
rerouting around the region significantly added to travel times. The 
two additional hours of service helped fuel-related businesses to 
complete their runs in the region efficiently and with a level of 
flexibility until adjustments in operations were made to accommodate 
new travel times in the region.
 Data indicates that diversion routes (as of mid-May) were taking 2 
to 4 times longer for some traffic and trucks compared to prior to the 
bridge collapse. Collisions also increased along alternate routes. I-95 
experienced an increase in traffic (on average) of 12% following the 
collapse of the bridge. More recent data shows some of this is 
improving but still remains elevated. This is likely to change as 
commodities and freight begin to fully return to Baltimore. FMCSA is 
actively monitoring these impacts and working with the State of 
Maryland, Maryland Motor Truck Association, and other stakeholders to 
assess travel impacts and truck parking challenges.

 Question 9. You mentioned at the hearing that the Bridge rebuilding 
process would likely utilize a FHWA Categorical Exclusion (CE).
 Question 9.a. Can you detail exactly which CEs FHWA will be using?
 Answer. On July 23, 2024, FHWA determined the reconstruction of the 
Francis Scott Key Bridge is appropriately classified as a Categorical 
Exclusion (CE) in accordance with Council on Environmental Quality 
(CEQ) regulations and 23 CFR 771.117(c)(9) and 23 CFR 771.117(d)(13). 
The Project, which proposes rebuilding the Francis Scott Key Bridge 
connection along I-695 over the Patapsco River, does not involve any 
significant environmental impacts.
 The Project will benefit socioeconomic resources by restoring 
community connectivity and commerce across the Patapsco River. The 
anticipated impacts to natural resources are minimal and will comply 
with the required permits and stormwater management approval to further 
minimize impacts. Unanticipated impacts to cultural resources, if any, 
will be addressed per the Section 106 Programmatic Agreement for the 
project. The Project will not provide additional capacity or provide 
new access points. As a result, the Project will not induce significant 
foreseeable alterations in land use or affect development and growth 
beyond what is already expected to occur.

 Question 9.b. Please provide an explanation of which CEs have been 
used previously for similar projects.
 Answer. Similar projects involving a bridge collapse over a 
navigable waterway were also processed as categorical exclusions due to 
the limited scope of the bridge replacements within existing rights-of-
way along similar alignments as the previous structures. Example 
projects include the I-35W Bridge over the Mississippi River in 
Minneapolis, Minnesota, and the I-10 Bridge over Escambia Bay in 
Florida.

 Question 9.c. If no similar projects have been permitted to use 
CEs, please provide an explanation of exactly how this Bridge project 
differs from previous projects.
 Answer. As noted above, similar projects involving a bridge 
collapse over a navigable waterway have also been processed as CEs.

 Questions to Hon. Shailen Bhatt,\\ Administrator, Federal 
 Highway Administration, U.S. Department of Transportation, from Hon. 
 Bruce Westerman
---------------------------------------------------------------------------

 \\ Administrator Bhatt resigned from the Federal Highway 
Administration (FHWA) effective September 10, 2024. These responses are 
provided on behalf of FHWA.
---------------------------------------------------------------------------
 Question 1. Maryland transportation officials stated in a public 
forum last week that the bridge replacement would be handled under a 
categorical exclusion--is that true, and how did FHWA arrive at that 
determination? What restrictions will a categorical exclusion place on 
the design of the new bridge and is it realistic?
 Answer. The project is currently proceeding with a Categorical 
Exclusion (CE), since the Maryland Department of Transportation (MDOT) 
has limited the project scope of the bridge replacement to occur within 
existing Maryland Transportation Authority (MDTA) right-of-way along 
the current centerline of the bridge and its approaches. Reconstruction 
is expected to begin within two years of Governor Moore's declaration 
of a state of emergency. FHWA approved the CE for reconstruction of the 
Francis Scott Key (FSK) Bridge on July 23, 2024. The CE provides the 
appropriate level of information to allow for a streamlined permitting 
approach with the respective resource agencies. As the project 
progresses to final design, FHWA may change the NEPA class of action 
and require a higher level of documentation, based on level of impacts 
or other criteria established in FHWA's NEPA regulations.

 Question 2. What is the likelihood that FHWA might require a higher 
degree of NEPA study later in the process, such as after MD has 
selected a design-builder?
 Answer. As the project progresses to final design with the selected 
design-builder, re-evaluations may be necessary to determine whether 
supplemental analysis and documentation is needed. A re-evaluation is a 
review conducted by FHWA of any proposed change in action, affected 
environment, anticipated impact, applicable requirements, or mitigation 
measures as they relate to the environmental document or decision. As 
noted above, as the project progresses to final design, FHWA may change 
the NEPA class of action and require a higher level of documentation, 
based on level of impacts or other criteria established in FHWA's NEPA 
regulations.

 Question 3. Is it important that the new bridge be taller and/or 
have a wider clear span to accommodate future maritime needs? If so, 
how do those maritime requirements reconcile with the desire to limit 
NEPA to a categorical exclusion?
 Answer. The U.S. Coast Guard (USCG) has jurisdiction over the 
replacement bridge's vertical clearance and a clear navigation span 
width. This determination is made by the USCG independent of the NEPA 
process considering maritime needs.
 FHWA and the Maryland Department of Transportation (MDOT) used the 
USCG determined minimum vertical and horizontal clearance for the 
approved CE. The USCG determination for the minimum vertical and 
horizontal clearance did not change the CE determination and approval 
since the new bridge is expected to be built within the existing right-
of-way on the same alignment.

 Questions to Hon. Shailen Bhatt,\\ Administrator, Federal 
 Highway Administration, U.S. Department of Transportation, from Hon. 
 Patrick Ryan
---------------------------------------------------------------------------

 \\ Administrator Bhatt resigned from the Federal Highway 
Administration (FHWA) effective September 10, 2024. These responses are 
provided on behalf of FHWA.
---------------------------------------------------------------------------
 Question 1. Has a categorical exclusion been granted for 
reconstruction of the Francis Scott Key Bridge? If so, how did FHWA 
arrive at that determination? What restrictions will a categorical 
exclusion place on the design of the new bridge and is it realistic?
 Answer. The project is currently proceeding with a Categorical 
Exclusion (CE), since the Maryland Department of Transportation (MDOT) 
has limited the project scope of the bridge replacement to occur within 
existing Maryland Transportation Authority (MDTA) right-of-way along 
the current centerline of the bridge and its approaches. Reconstruction 
is expected to begin within two years of Governor Moore's declaration 
of a state of emergency. FHWA approved the CE for reconstruction of the 
Francis Scott Key (FSK) Bridge on July 23, 2024. The CE provides the 
appropriate level of information to allow for a streamlined permitting 
approach with the respective resource agencies. As the project 
progresses to final design, FHWA may change the NEPA class of action 
and require a higher level of documentation, based on level of impacts 
or other criteria established in FHWA's NEPA regulations.

 Question 2. What is the likelihood that FHWA might require a higher 
degree of NEPA study later in the process, such as after Maryland has 
selected a design-builder?
 Answer. As the project progresses to final design with the selected 
design-builder, re-evaluations may be necessary to determine whether 
supplemental analysis and documentation is needed. A re-evaluation is a 
review conducted by FHWA of any proposed change in action, affected 
environment, anticipated impact, applicable requirements, or mitigation 
measures as they relate to the environmental document or decision. As 
noted above, as the project progresses to final design, FHWA may change 
the NEPA class of action and require a higher level of documentation, 
based on level of impacts or other criteria established in FHWA's NEPA 
regulations.

 Questions to Hon. Jennifer Homendy, Chair, National Transportation 
 Safety Board, from Hon. Jefferson Van Drew

 Question 1. In your tenure as Chair of the National Transportation 
Safety Board, could you please explain how these protective structures 
such as ``dolphins'' and ``fenders'' can effectively ensure that an 
incident like the Francis Scott Key Bridge Incident does not occur?
 Answer. Cell dolphins and pier fenders are intended to passively 
protect bridge piers from errant (off course) vessel impact damage 
through course redirection and energy absorption. Design guidelines for 
these protective structures are based on several factors, including a 
vessel's size and speed as well as the density of vessel traffic 
normally operating under a given bridge.
 The NTSB has investigated numerous marine accidents in which pier 
fenders have limited damage from inland barge tows--and, in some cases, 
larger ocean-going vessels--that were off course (see Appendix: 
Miscellaneous Reports and Guidelines). Although we have investigated 
marine accidents involving inland tows and protective cell dolphins, we 
have not investigated any accidents involving larger ocean-going 
vessels striking dolphins near a bridge.
 Dolphins and fenders are only two components that may be used to 
protect a bridge and, as such, should be considered holistically as one 
part of a systemwide analysis of how best to protect a pier. Many 
factors, such as crew/pilot navigation errors, severe weather, or loss 
of critical vessel systems, such as propulsion or steering, can result 
in a vessel impacting a bridge. Countermeasures to address these 
factors need to be examined, taking into consideration the 
effectiveness, timeliness, and practicality of their implementation.

 Question 2. Would proper implementation of these protective devices 
have been effective if they were in place on the Franscis Scott Key 
Bridge?
 Answer. The dolphins and fendering system used to protect the 
Francis Scott Key Bridge were designed and installed using the 
engineering judgement available in the late 1970s. Much has changed 
since that time, most notably the size (height, length, width, and 
weight) of cargo and cruise vessels, and the guidance used to design 
and place pier-protection structures. Although a dolphin designed today 
may effectively counter a strike by an ocean-going cargo vessel like 
the Dali, there is no guarantee that the dolphin would be able to 
protect a bridge from all future vessels calling on Baltimore.
 We are evaluating the adequacy of the Key Bridge's existing 
protection as part of our investigation and examining whether 
alternative dolphin designs could have provided better protection, 
given constraints such as the navigation channel width and horizontal 
clearance between the supporting piers.
 It is critical--for the Port of Baltimore and all ports with 
bridges over navigable channels in the nation--to examine the issue of 
bridge protection using a Safe Systems approach, where all stakeholders 
share the responsibility of building and reinforcing multiple layers of 
prevention and protection. A variety of solutions must be considered to 
create an effective, long-term safety solution--an approach the NTSB 
has been promoting for decades.

 Question 3. Given the expansive list of bridges in urgent need of 
repair nationwide, would you prioritize defensive feature installation 
on these projects and how can this be done in the most cost-effective 
manner?
 Answer. Although there are thousands of highway bridges within the 
United States that could benefit from maintenance, the number of 
bridges over navigable waterways used by large ocean-going vessels is 
far fewer. However, providing physical protection for even a subset of 
bridges would be costly and take many years to accomplish. The 
vulnerability of a given bridge is based on its unique specifications, 
including the bridge design, location, water depth at its supports 
relative to the channel, and the span's width and vertical clearance. 
The expense and long timeframe necessary to implement such protection 
make it imperative to understand fully the risks that increasingly 
larger vessels pose to the nation's critical port and navigable 
waterway infrastructure. Potential countermeasures to these risk 
factors include crew training and decision-making; modifications to 
port operations, including tug escorts; enhanced reliability of vessel 
propulsion, steering and electrical power systems; and the use of 
technology to aid in ship maneuvering.
 Appendix: Miscellaneous Reports and Guidelines
Support Pier Contacts
 1993: Chris/Judge William Seeber Bridge, New Orleans, 
Louisiana, May 28, 1993. Report NTSB HAR-94-03.

 Towboat Chris, pushing the empty hopper barge DM 3021, collided 
with a support pier of the eastern span of the Judge William Seeber 
Bridge in New Orleans, Louisiana. The Judge William Seeber Bridge, 
known locally as the Claiborne Avenue bridge, carries Highway Route 39 
over the New Orleans Inner Harbor Navigation Canal, known locally as 
the Industrial Canal. The impact severed bent 21, causing two approach 
spans (about 145 feet of bridge deck) and the two-column bent to 
collapse onto the barge and into the shallow waters of the canal. Two 
automobiles carrying three people fell with the four-lane bridge deck, 
resulting in one death and serious injuries to the other two people. 
(See Safety Recommendation M-94-12)

 1996: Julie N/Portland-South Portland (Million Dollar) 
Bridge, Portland, Maine, September 27, 1996.

 The 560-foot-long Liberian tankship Julie N, carrying a cargo of 
heating oil, collided with the south bascule pier of the Portland-South 
Portland (Million Dollar) Bridge in Portland, Maine, on September 27, 
1996. (See Vessel Operations Group Factual Report and Postaccident 
Testing for Alcohol and Other Drugs in the Marine Industry and the 
Ramming of the Portland-South Portland [Million Dollar] Bridge at 
Portland, Maine, by the Liberian Tankship Julie N on September 27, 
1996).

 2002: U.S. Towboat Robert Y. Love Allision with 
Interstate 40 Highway Bridge Near Webbers Falls, Oklahoma, May 26, 
2002.

 Towboat Robert Y. Love, pushing two empty asphalt tank barges, 
was traveling northbound on the McClellan-Kerr Arkansas River 
Navigation System, near Webbers Falls, Oklahoma. As the tow approached 
the Interstate 40 highway bridge at mile 360.3, it veered off course 
and rammed a pier 201 feet west of (outside) the navigation channel. 
The impact collapsed a 503-foot section of the bridge, which fell into 
the river and onto the barges below. According to witnesses, highway 
traffic continued to drive into the void in the bridge created by the 
collapsed spans. When traffic stopped, eight passenger vehicles and 
three truck tractor-semitrailer combinations had fallen into the river 
or onto the collapsed portions of the bridge.

 2015: Gayle Force/Norfolk Southern Bridge #7, Chesapeake, 
Virginia, April 26, 2015.

 The starboard bow of the Gayle Force struck the southeast 
fendering dolphin and concrete piers supporting the NS#7 bridge span. 
The barge was making a speed of 4.4 knots when it struck the bridge. 
The timber dolphin was crushed and deformed, and the piers shifted 
laterally 15 inches toward the north.
Fender Contacts--Protected/Probably Protected
 2007: Allision of Hong Kong-Registered Containership M/V 
Cosco Busan with the Delta Tower of the San Francisco-Oakland Bay 
Bridge San Francisco, California November 7, 2007.

 Containership M/V Cosco Busan impacted the fendering system at 
the base of the Delta tower of the San Francisco-Oakland Bay Bridge.

 2016: Allision of Kodiak Tow with North Landing Bridge.

 Tugboat Kodiak impacted the North Landing Bridge at mile marker 
20.2 in Chesapeake, Virginia. Just before the allision, the tow had run 
over a mooring dolphin located on the north side of the river 750 yards 
from the bridge.

 2019: Contact of Tanker Dank Silver with Sunshine Bridge.

 Bulk liquid cargo vessel Dank Silver was transiting downbound on 
the Mississippi River, near Donaldsonville, Louisiana, when it struck 
the fender of the western pier to the main (channel) span of the 
Sunshine Bridge.
Dolphins/Protection Cells
 2002: U.S. Towboat Robert Y. Love Allision with 
Interstate 40 Highway Bridge Near Webbers Falls, Oklahoma.

 Although the Oklahoma Department of Transportation installed 
pier protection cells inside the navigation channel, the I-40 bridge 
accident occurred outside the navigation channel. Such occurrences 
demonstrate that most bridges over navigable water can be struck either 
within or outside the regular navigation channel by barge tows and 
individual commercial vessels, thus increasing the complexity of bridge 
protection.

 2019: Barge Breakaway and Contact with Interstate 10 
Bridge.

 The protective cell dolphins absorbed most of the barge's 
momentum. Damage to the western cell just outside the channel consisted 
of crushed and splintered wooden fendering, a collapsed cap, and 
fractured concrete exterior on the northeast side that caused the cell 
to crumple and fold inward. Erosion from floodwaters removed the 
interior dirt that helped anchor the protective cell and provide 
absorbing energy from impacts. Damage to the eastern cell closest to 
the channel consisted of crushed and splintered wooden fendering and 
exterior fractures on the northwest side, including an inward-collapsed 
concrete bulkhead. The entire cell also shifted from the impact, and 
erosion occurred around the base.

 2019: Contact of Dewey R Tow with CSX Railroad Bridge 
Protection Cell.

 As the Dewey R neared the bridge, a freight train carrying 
vehicles passed over the CSX Railroad Bridge, and the pilot stated that 
the shiny surfaces on the sides of the train cars and vehicles 
reflected the light from his spotlights and created a visual 
distraction. At 0123, the bow of the lead barge ATC 3404 struck the 
protection cell on the south side of the bridge at a speed of 5.75 mph. 
The southern protection cell was displaced over 4 feet in the direction 
of the pier. An engineering firm determined the protection cell to be 
extensively damaged with a fractured sheet pile that split open and 
exposed the concrete within the cell. Also, several pieces of its 
fendering system had been dislodged and were no longer in place. The 
south corner of the bridge's concrete pier was also damaged, with an 
approximate 12-square-foot shallow concrete spall adjacent to the 
displaced protection cell, buckled vertical posts, and damaged fenders.

 2020: Contact of William C Tow with Rock Island Railroad 
Bridge Protection Cell.

 Once the vessel had passed through the bridge, there were only 
about 1,200 feet for the pilot to maneuver the approximately 662-foot-
long tow back to the center of the channel before reaching the Rock 
Island Railroad Bridge protection cell near the left descending bank. 
The pilot attempted to move the tow to starboard, but, since the 
following current was pushing against the tow, it continued toward the 
left descending bank. When the pilot determined there was not enough 
time to move the vessel to avoid striking the bridge, he reversed both 
engines to slow the vessel, which reduced the force of the impact but 
did not prevent the barges from hitting the bridge's protection cell.
Other
 AASHTO Guide Specification and Commentary for Vessel 
 Collision Design of Highway Bridges 2009 (2nd 
 Edition)
 Fenders
 + p. 97, C7.3.1: ``In general, fender systems are adequate to 
absorb the collision energy and loads associated with medium to small 
vessels at low impact speeds and at oblique angles. For larger vessels 
and higher impact speeds, other types of protection are usually 
required. Exceptions occur for those bridges with very massive pier 
structures and high shear and overturning resistance.''

 Piles
 + p. 104, C7.3.2: ``[Piles] are designed to elastically resist 
the mooring and berthing forces imparted by merchant vessels. In 
contrast to mooring operations in which the relatively low impact 
energies can be absorbed elastically by piles, the far greater energies 
associated with ship collision can usually only be absorbed by plastic 
deformation and crushing of the pile structure.''

 Dolphins
 + p. 114, C7.3.3: ``The circular shape of the dolphins can help 
deflect aberrant vessels away from the pier. The cell should, however, 
be designed for the maximum loading case of a head-on impact. If the 
dolphin is stronger than the vessel, then the vessel will absorb most 
of the impact energy through the crushing of its bow. If the dolphin is 
weaker than the vessel, then the dolphin absorbs most of the energy by 
large translational (sliding) and rotational deformations.''
 Outerbridge Crossing, Perth, Australia (p. 118)
 1979: ``A loaded 45,000-DWT tanker struck Cell No. 
4 head-on in front of main pier `D' at an estimated collision speed of 
2.5 knots. The collision took place during dense fog conditions and 
while the vessel was proceeding upstream under a two-tug escort. Only 
the center dolphin was hit during the impact, and the ship continued 
forward 50 ft before it was dragged to a stop. The ship suffered only 
minor damage to its bow. An inspection after the accident revealed that 
the steel sheet piling of Dolphin No. 4 had burst open, spilling out 
sand, and that the piling on the ship impact side had been pulled out. 
The remaining pilings of the cell were bent over at the river bottom. 
The 45-ft diameter by 5-ft thick concrete cap was found completely 
intact but displaced 50 ft due to the collision.''
 1987: ``The dolphin protection of the same main 
pier of the Outerbridge Crossing was again tested when a 48,000-tanker 
collided with and destroyed Cell No. 5. The cell was 45 ft in diameter 
and similar to Cell No. 4 described above.''
 Sunshine Skyway Bridge, Tampa Bay, Florida (p. 119-
120)
 ``The Sunshine Skyway Bridge pier protection system 
developed by Greiner, Inc. for the Florida Department of Transportation 
utilizes a combination of dolphin and island protection. The main piers 
are protected by islands whereas the five approach piers on each side 
of the main piers are protected by a dolphin system. The use of 
dolphins to protect the high-level approach piers was a result of the 
risk analysis which indicated that the high-level approach piers were 
vulnerable to a catastrophic vessel collision. The 60-ft diameter cells 
were designed to withstand a collision from either a loaded 23,000-DWT 
or an empty 87,300-DWT bulk carrier; the 54 ft-4 in. diameter dolphins 
from impacts with a loaded 25,000-DWT barge, or an empty 70,000-DWT 
vessel; and the 47-foot diameter cells to withstand impacts from a 
loaded 15,000-DWT barge or an empty 35,000-DWT ship. All design impact 
speeds were 10 knots.''

 Island Protection
 + p. 126, C7.3.4: ``The construction of protective islands 
around vulnerable bridge piers is considered by most investigators to 
provide the highest level of ship collision protection. The islands 
typically consist of a sand or rock core which is protected by outer 
layers of heavy rock armor to provide protection for the island against 
waves and currents.''
 FHWA Technical Advisory: Pier Protection and Warning 
 Systems for Bridges Subject to Ship Collisions 
 (1983)
 ``Because of the tremendous momentum achieved by modern ocean-
 going vessels even while traveling at low speeds in inland 
 channels, it may be extremely difficult to retrofit some 
 existing bridge piers with protective systems which can 
 successfully withstand the anticipated impact loadings. For 
 this reason, it becomes particularly important to recognize the 
 potential hazards from ship collisions and to locate and design 
 piers on new bridges in such a way that the risks of collision 
 are reduced to an acceptable level.''

 [all]