WATER RESOURCES DEVELOPMENT ACTS: STATUS OF PAST PROVISIONS AND FUTURE NEEDS

Committee on Transportation and Infrastructure · Subcommittee on Water Resources and Environment House December 5, 2023

Witnesses (2)

  • Hon. Michael L. Connor, Assistant Secretary of the Army for Civil Works, Department of the Army
  • Lieutenant General Scott A. Spellmon, Chief of Engineers and Commanding General, U.S. Army Corps of Engineers, oral statement

From the witness list in the published hearing record.

Full text of the official published hearing record. Extracted from the source document — verify against the official record for citation.

- WATER RESOURCES DEVELOPMENT ACTS: STATUS OF PAST PROVISIONS AND FUTURE NEEDS

[House Hearing, 118 Congress]
[From the U.S. Government Publishing Office]

 WATER RESOURCES DEVELOPMENT ACTS: STATUS 
 OF PAST PROVISIONS AND FUTURE NEEDS

=======================================================================

 (118-36)

 HEARING

 BEFORE THE

 SUBCOMMITTEE ON
 WATER RESOURCES AND ENVIRONMENT

 OF THE

 COMMITTEE ON
 TRANSPORTATION AND INFRASTRUCTURE
 HOUSE OF REPRESENTATIVES

 ONE HUNDRED EIGHTEENTH CONGRESS

 FIRST SESSION

 __________

 DECEMBER 5, 2023

 __________

 Printed for the use of the
 Committee on Transportation and Infrastructure
 
[GRAPHIC NOT AVAILABLE IN TIFF FORMAT] 

 Available online at: https://www.govinfo.gov/committee/house-
 transportation?path=/browsecommittee/chamber/house/committee/
 transportation

 __________

 U.S. GOVERNMENT PUBLISHING OFFICE 
59-459 PDF WASHINGTON : 2025 
 
----------------------------------------------------------------------------------- 

 COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

 Sam Graves, Missouri, Chairman
 
Rick Larsen, Washington, Eric A. ``Rick'' Crawford, 
 Ranking Member Arkansas
Eleanor Holmes Norton, Daniel Webster, Florida
 District of Columbia Thomas Massie, Kentucky
Grace F. Napolitano, California Scott Perry, Pennsylvania
Steve Cohen, Tennessee Brian Babin, Texas
John Garamendi, California Garret Graves, Louisiana
Henry C. ``Hank'' Johnson, Jr., Georgiavid Rouzer, North Carolina
Andre Carson, Indiana Mike Bost, Illinois
Dina Titus, Nevada Doug LaMalfa, California
Jared Huffman, California Bruce Westerman, Arkansas
Julia Brownley, California Brian J. Mast, Florida
Frederica S. Wilson, Florida Jenniffer Gonzalez-Colon,
Donald M. Payne, Jr., New Jersey Puerto Rico
Mark DeSaulnier, California Pete Stauber, Minnesota
Salud O. Carbajal, California Tim Burchett, Tennessee
Greg Stanton, Arizona, Dusty Johnson, South Dakota
 Vice Ranking Member Jefferson Van Drew, New Jersey,
Colin Z. Allred, Texas Vice Chairman
Sharice Davids, Kansas Troy E. Nehls, Texas
Jesus G. ``Chuy'' Garcia, Illinois Lance Gooden, Texas
Chris Pappas, New Hampshire Tracey Mann, Kansas
Seth Moulton, Massachusetts Burgess Owens, Utah
Jake Auchincloss, Massachusetts Rudy Yakym III, Indiana
Marilyn Strickland, Washington Lori Chavez-DeRemer, Oregon
Troy A. Carter, Louisiana Chuck Edwards, North Carolina
Patrick Ryan, New York Thomas H. Kean, Jr., New Jersey
Mary Sattler Peltola, Alaska Anthony D'Esposito, New York
Robert Menendez, New Jersey Eric Burlison, Missouri
Val T. Hoyle, Oregon John James, Michigan
Emilia Strong Sykes, Ohio Derrick Van Orden, Wisconsin
Hillary J. Scholten, Michigan Brandon Williams, New York
Valerie P. Foushee, North Carolina Marcus J. Molinaro, New York
 Mike Collins, Georgia
 Mike Ezell, Mississippi
 John S. Duarte, California
 Aaron Bean, Florida

 Subcommittee on Water Resources and Environment

 David Rouzer, North Carolina, 
 Chairman
Grace F. Napolitano, California, Daniel Webster, Florida
 Ranking Member Thomas Massie, Kentucky
John Garamendi, California Brian Babin, Texas
Emilia Strong Sykes, Ohio, Mike Bost, Illinois
 Vice Ranking Member Doug LaMalfa, California
Jared Huffman, California Bruce Westerman, Arkansas
Frederica S. Wilson, Florida Brian J. Mast, Florida
Patrick Ryan, New York Jenniffer Gonzalez-Colon,
Val T. Hoyle, Oregon Puerto Rico
Hillary J. Scholten, Michigan Burgess Owens, Utah
Julia Brownley, California Chuck Edwards, North Carolina
Mark DeSaulnier, California Eric Burlison, Missouri
Greg Stanton, Arizona John James, Michigan, Vice 
Chris Pappas, New Hampshire Chairman
Seth Moulton, Massachusetts Derrick Van Orden, Wisconsin
Troy A. Carter, Louisiana Brandon Williams, New York
Eleanor Holmes Norton, Mike Collins, Georgia
 District of Columbia Mike Ezell, Mississippi
Rick Larsen, Washington (Ex Officio) John S. Duarte, California
 Sam Graves, Missouri (Ex Officio)

 CONTENTS

 Page

Summary of Subject Matter........................................ vii

 STATEMENTS OF MEMBERS OF THE COMMITTEE

Hon. David Rouzer, a Representative in Congress from the State of 
 North Carolina, and Chairman, Subcommittee on Water Resources 
 and Environment, opening statement............................. 1
 Prepared statement........................................... 3
Hon. Grace F. Napolitano, a Representative in Congress from the 
 State of California, and Ranking Member, Subcommittee on Water 
 Resources and Environment, opening statement................... 4
 Prepared statement........................................... 5
Hon. Rick Larsen, a Representative in Congress from the State of 
 Washington, and Ranking Member, Committee on Transportation and 
 Infrastructure, opening statement.............................. 7
 Prepared statement........................................... 8

 WITNESSES

Hon. Michael L. Connor, Assistant Secretary of the Army for Civil 
 Works, Department of the Army, oral statement.................. 9
 Prepared statement........................................... 11
Lieutenant General Scott A. Spellmon, Chief of Engineers and 
 Commanding General, U.S. Army Corps of Engineers, oral 
 statement...................................................... 13
 Prepared statement........................................... 14

 SUBMISSIONS FOR THE RECORD

Report, ``Water Resources Development Act of 2020, Section 221--
 Study on Water Supply and Water Conservation at Water Resources 
 Development Projects,'' by U.S. Army Corps of Engineers, August 
 2023, Submitted for the Record by Hon. Grace F. Napolitano..... 4
Submissions for the Record by Hon. David Rouzer:
 Statement of the American Society of Civil Engineers......... 55
 Letter of October 24, 2023, to Hon. Sam Graves, Chairman, and 
 Hon. Rick Larsen, Ranking Member, Committee on 
 Transportation and Infrastructure, from Sean O'Neill, 
 Senior Vice President, Government Affairs, Portland Cement 
 Association................................................ 61

 APPENDIX

Questions to Hon. Michael L. Connor, Assistant Secretary of the 
 Army for Civil Works, Department of the Army, and Lieutenant 
 General Scott A. Spellmon, Chief of Engineers and Commanding 
 General, U.S. Army Corps of Engineers, from:
 Hon. David Rouzer............................................ 63
 Hon. Brian Babin............................................. 64
 Hon. Jenniffer Gonzalez-Colon................................ 64
 Hon. Patrick Ryan............................................ 66
 Hon. Garret Graves........................................... 66
Questions to Hon. Michael L. Connor, Assistant Secretary of the 
 Army for Civil Works, Department of the Army, from:
 Hon. David Rouzer............................................ 67
 Hon. Doug LaMalfa............................................ 68
 Hon. Mark DeSaulnier......................................... 68
 Hon. Chris Pappas............................................ 69
 Hon. Garret Graves........................................... 69
Questions to Lieutenant General Scott A. Spellmon, Chief of 
 Engineers and Commanding General, U.S. Army Corps of Engineers, 
 from:
 Hon. Rick Larsen............................................. 70
 Hon. Chris Pappas............................................ 70
 Hon. Garret Graves........................................... 70

[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]

 December 1, 2023

 SUMMARY OF SUBJECT MATTER

 TO: LMembers, Subcommittee on Water Resources and 
Environment
 FROM: LStaff, Subcommittee on Water Resources and 
Environment
 RE: LSubcommittee Hearing on ``Water Resources 
Development Acts: Status of Past Provisions and Future Needs''
_______________________________________________________________________

 I. PURPOSE

 The Subcommittee on Water Resources and Environment of the 
Committee on Transportation and Infrastructure will meet on 
Tuesday, December 5, 2023, at 10:00 a.m. ET in 2167 Rayburn 
House Office Buildings to receive testimony at a hearing 
entitled ``Water Resources Development Acts: Status of Past 
Provisions and Future Needs.'' The hearing will provide Members 
with an opportunity to review implementation of United States 
Army Corps of Engineers (Corps) projects and policies that were 
included in previous Water Resources Development Acts (WRDAs), 
including WRDA 2022, and hear Administration testimony and 
proposals for WRDA 2024.

 II. BACKGROUND

THE UNITED STATES ARMY CORPS OF ENGINEERS_CIVIL WORKS

 The mission of the Corps is to ``deliver vital engineering 
solutions, in collaboration with [their] partners, to secure 
our Nation, energize our economy, and reduce disaster risk.'' 
\1\ The Corps is the Federal Government's lead water resource 
development and management agency.\2\ Its water resource 
program dates back to 1824 when it was established for the 
purpose of improving river navigation.\3\ The role of the Corps 
has evolved and expanded since then to include other main water 
resource responsibilities.
---------------------------------------------------------------------------
 \1\ Corps, Mission and Vision, (last accessed Oct. 10, 2023), 
available at https://www.usace.army.mil/About/Mission-and-Vision/.
 \2\ Corps, About Corps Water Resources Planning, (last accessed 
Oct. 10, 2023), available at https://planning.erdc.dren.mil/toolbox/
guidance.cfm?Id=0&Option=Planning%20Fundamentals
&Type=About#::text=The%20U.%20S.%20Army%20Corps%20of,money%20for%20impr
oving
%20river%20navigation.
 \3\ Id.
---------------------------------------------------------------------------
 Today, the Corps' primary civil works responsibilities are 
to support coastal and river navigation, address flood risk 
management and storm damage, and protect and restore aquatic 
ecosystems.\4\ Specifically, through its eight divisions and 38 
district offices, the Corps manages 14,000 miles of levees, 740 
dams, 12,000 miles of inland intracoastal waterways, 218 lock 
chambers, and 13,000 miles of navigation channels.\5\
---------------------------------------------------------------------------
 \4\ See generally Anna Norman & Nicole Carter, Cong. Rsch. Serv. 
(IF113322), Water Resources Development Acts: Primer, (updated July 20, 
2023), available at https://www.crs.gov/reports/pdf/IF11322/IF11322.pdf 
[hereinafter CRS Report IF113322].
 \5\ Corps, Value to the Nation, (last accessed Oct. 10, 2023), 
available at https://www.iwr.usace.army.mil/Missions/Value-to-the-
Nation/.
---------------------------------------------------------------------------
 The Corps also provides outdoor recreation opportunities, 
offers water supply storage to state and local partners, 
assists in emergency response, and is a leading producer of 
hydropower in the United States.\6\ In fact, the Corps is the 
largest owner-operator of hydroelectric power plants in the 
United States, which produce approximately 25 percent of the 
Nation's total hydropower output.\7\
---------------------------------------------------------------------------
 \6\ Id.
 \7\ Id.
---------------------------------------------------------------------------
 The Corps' infrastructure portfolio is currently valued at 
$206 billion.\8\ This valuation is referred to as its ``capital 
stock'' and includes all water resources infrastructure built 
by the Corps since 1928.\9\ The estimated capital stock value 
increased $6.6 billion on average each year until 1982, when it 
peaked at $357 billion.\10\ The Corps has reported that 
deterioration, general wear and tear of infrastructure assets, 
and asset retirements have contributed to a decline in the 
value of the capital stock.\11\ Furthermore, the Corps has a 
construction backlog exceeding $100 billion, in addition to 
various authorized but unfunded studies and operation and 
maintenance activities.\12\
---------------------------------------------------------------------------
 \8\ Corps, Capital Stock: Summary, (last accessed Oct. 10, 2023), 
available at https://www.iwr.usace.army.mil/Missions/Value-to-the-
Nation/Fast-Facts/Capital-Stock/Summary/.
 \9\ Id.
 \10\ Id.
 \11\ Id.
 \12\ CRS Report IF113322, supra note 4.
---------------------------------------------------------------------------
 To achieve its civil works mission, the Corps plans, 
designs, and constructs water resources development projects, 
typically in partnership with, and utilizing the financial 
support of, non-Federal interests, commonly referred to as 
project sponsors. The Corps' planning process seeks to balance 
economic development and environmental considerations as it 
addresses National, regional, and local water resources issues.

WATER RESOURCES DEVELOPMENT ACTS

 Congress generally authorizes Corps' studies, projects, and 
programs and makes changes to agency policies through 
legislation referred to as Water Resources Development Acts 
(WRDAs). Congress has developed and enacted WRDAs 
intermittently since the 1980s and has biennially enacted a 
WRDA since 2014.\13\
---------------------------------------------------------------------------
 \13\ Id.
---------------------------------------------------------------------------
 Authorizing provisions in WRDAs can be project-specific, 
programmatic, or general directives for the Corps. Project-
specific authorizations most often fall into one of three broad 
categories: project studies, construction projects, or 
modifications to existing projects. Furthermore, water resource 
projects typically require two types of Congressional 
authorization: (1) authority to study the feasibility of the 
project and (2) authority to construct (and operate and 
maintain, as applicable) the project.\14\
---------------------------------------------------------------------------
 \14\ Id.
---------------------------------------------------------------------------

IDENTIFYING WATER RESOURCE NEEDS

 Generally, the first step in developing a project through 
the Corps is to study the feasibility of the proposed project, 
which typically requires Congressional authorization. Once 
authorized, the Corps enters into a cost-sharing agreement with 
a non-Federal project sponsor to initiate the feasibility study 
process. The cost of a feasibility study is usually split 
evenly between the Federal Government--which is subject to 
appropriations--and the non-Federal project sponsor.\15\
---------------------------------------------------------------------------
 \15\ CRS Report IF113322, supra note 4.
---------------------------------------------------------------------------
 Since February 2012, the Corps' feasibility studies have 
been guided by the ``3x3x3 rule,'' which states that 
feasibility reports should, generally, be produced within three 
years; with a Federal cost of no more than $3 million; and 
involve all three levels of Corps review--district, division, 
and headquarters--throughout the study process.\16\ This 
concept, enacted as section 1001 of the Water Resources Reform 
and Development Act (WRRDA) of 2014, also allows for a waiver 
of the 3x3x3 process for project studies determined to be 
complex based on size, scope, or significance.\17\
---------------------------------------------------------------------------
 \16\ Corps, Smart Planning Feasibility Studies, (Sept. 2015), 
available at https://planning.erdc.dren.mil/toolbox/library/smart/
SmartFeasibility_Guide_highres.pdf.
 \17\ 33 U.S.C. 2282c.
---------------------------------------------------------------------------
 During the feasibility study phase, the Corps' district 
office prepares a draft study report containing a detailed 
analysis on the economic costs and benefits of carrying out the 
project and identifies any associated environmental, social, or 
cultural impacts. The feasibility study typically describes, 
with reasonable certainty, the economic, social, and 
environmental benefits and detriments of each project 
alternatives being considered, and identifies the engineering 
features, public acceptability, and the purposes, scope, and 
scale of each.\18\ It also contains the views of other Federal 
and non-Federal agencies on project alternatives, a description 
of non-structural alternatives to the recommended plans, and a 
description of the anticipated Federal and non-Federal 
participation in the project.\19\
---------------------------------------------------------------------------
 \18\ Id.
 \19\ Id.
---------------------------------------------------------------------------
 After a full feasibility study is completed, the results 
and recommendations of the study are submitted to Congress in 
the form of a Report of the United States Army Corps of 
Engineers Chief of Engineers (more commonly referred to as a 
Chief's Report).\20\ If the results and recommendations on the 
proposed project are favorable, then the next step is 
Congressional authorization for construction of the project, 
which is typically given in a WRDA.
---------------------------------------------------------------------------
 \20\ See e.g., Corps, Planner's Library, (last accessed Oct. 10, 
2023), available at https://planning.erdc.dren.mil/toolbox/
library.cfm?Option=Direct&Group=Main&Item=Chief%20Report
&Sub=None&Sort=Default.
---------------------------------------------------------------------------

ADDITIONAL CORPS AUTHORITIES

 Congress has granted the Corps programmatic authorities--
Continuing Authorities Programs (CAPs)--that enable the Corps 
to undertake small-scale projects with limited scope and cost 
without requiring project-specific Congressional 
authorization.\21\ These projects typically require a cost-
share with a non-Federal project sponsor.\22\
---------------------------------------------------------------------------
 \21\ See generally Anna Norman, Cong. Rsch. Serv. (IF11106), Army 
Corps of Engineers: Continuing Authorities Programs, (updated Mar. 15, 
2023), available at https://www.crs.gov/reports/pdf/IF11106/IF11106.pdf 
[hereinafter CRS Report IF11106].
 \22\ Id.
---------------------------------------------------------------------------
 There are currently nine CAP categories:
 LStreambank erosion and shoreline protection; \23\
---------------------------------------------------------------------------
 \23\ See the Flood Control Act of 1946, 33 U.S.C. 701r Sec. 14.
---------------------------------------------------------------------------
 LBeach erosion control; \24\
---------------------------------------------------------------------------
 \24\ See the Act of August 13, 1946, 33 U.S.C. 426g Sec. 3.
---------------------------------------------------------------------------
 LNavigation improvement; \25\
---------------------------------------------------------------------------
 \25\ See the River and Harbor Act of 1960, 33 U.S.C. 577 Sec. 107.
---------------------------------------------------------------------------
 LMitigation of shore damage by Federal navigation 
projects; \26\
---------------------------------------------------------------------------
 \26\ See the River and Harbor Act of 1968, 33 U.S.C. 426i Sec. 11.
---------------------------------------------------------------------------
 LRegional sediment management/beneficial use of 
dredged material; \27\
---------------------------------------------------------------------------
 \27\ See the WRDA 1992, 33 U.S.C. 2326 Sec. 204.
---------------------------------------------------------------------------
 LFlood control; \28\
---------------------------------------------------------------------------
 \28\ See the Flood Control Act of 1948, 33 U.S.C. 701s Sec. 205.
---------------------------------------------------------------------------
 LAquatic ecosystem restoration; \29\
---------------------------------------------------------------------------
 \29\ See the WRDA 1996, 33 U.S.C. 2330 Sec. 206.
---------------------------------------------------------------------------
 LRemoval of obstructions and clearing channels for 
flood control; \30\ and
---------------------------------------------------------------------------
 \30\ See the Act of August 28, 1937, 33 U.S.C. 701g Sec. 2.
---------------------------------------------------------------------------
 LProject modifications for improvement of the 
environment.\31\
---------------------------------------------------------------------------
 \31\ See the WRDA 1986, 33 U.S.C. 2309a Sec. 1135.

 Congress has also provided authority for the Corps to 
assist with the planning, design, and construction of drinking 
water and wastewater projects in specified areas, known broadly 
as Environmental Infrastructure (EI) assistance.\32\ The EI 
programs support publicly owned and operated facilities, such 
as distribution and collection works, stormwater collection and 
recycled water distribution, and surface water protection and 
development projects.\33\
---------------------------------------------------------------------------
 \32\ WRDA of 1992, Pub. L. No. 102-580, 106 Stat. 4835, Sec. 219.; 
WRDA of 1999, Pub. L. No. 106-53, 113 Stat. 352, Sec. 552.; WRDA of 
2022, Pub. L. No. 117-263, 136 Stat. 3819, Sec. 8376.
 \33\ Corps, Environmental Infrastructure, (last accessed Oct. 10, 
2023), available at https://www.nap.usace.army.mil/Missions/Civil-
Works/Environmental-Infrastructure/.
---------------------------------------------------------------------------

 III. WRDA 2022

 WRDA 2022 was signed into law as Division H of the James M. 
Inhofe National Defense Authorization Act for Fiscal Year 2023 
(P.L. 117-263) and authorized 25 new projects, six 
modifications to existing projects, 94 new studies, 12 project 
modification studies, and 155 EI projects.\34\ This legislation 
was principally focused on local priorities and projects, but 
also included some broader policy and programmatic changes.
---------------------------------------------------------------------------
 \34\ WRDA of 2022, Pub. L. No. 117-263, 136 Stat. 2395, 33 U.S.C. 
2201 note.
---------------------------------------------------------------------------
 Specifically, WRDA 2022 authorized additional resources to 
increase coastal resiliency, improve flood mitigation, and 
respond to flooding events. For example, it increased the CAP 
Federal project cost limit for streambank and shoreline erosion 
projects from $5 million to $15 million.\35\ It also expanded 
the scope of eligible work when repairing non-Federal flood 
control projects (levees, dunes, beaches, dams) to include work 
that increases resilience and addresses deficiencies of the 
assets, in addition to repairing damage.\36\
---------------------------------------------------------------------------
 \35\ Id. at Sec. 8103.
 \36\ Id. at Sec. 8102.
---------------------------------------------------------------------------
 This legislation also focused on improving the delivery of 
water resource projects and meeting water resource needs in 
communities across the United States. For example, it contained 
provisions designed to analyze how long water infrastructure 
permitting takes.\37\ It also directed the Corps to expedite 
the completion of 25 authorized feasibility reports, two Post-
Authorization Change Reports (PACRs), two authorized watershed 
and river basin assessments, one determination related to the 
maintenance of a Corps navigation project, and modifications to 
the scope of five authorized feasibility studies.\38\ In 
addition, WRDA 2022 established two separate committees: one 
for state and local partners to provide guidance to the Corps 
on how to more efficiently and effectively complete projects, 
and another to provide advice and recommendations to the Corps 
on water resource assistance to Indian Tribes and other 
economically disadvantaged communities in rural and urban 
areas.\39\
---------------------------------------------------------------------------
 \37\ Id. at Sec. 8134.
 \38\ Id. at Sec. Sec. 8202 and 8203.
 \39\ Id. at Sec. Sec. 8150 and 8115.
---------------------------------------------------------------------------
 In preparation for issuing guidance for implementing WRDA 
2022, the Corps opened a 60-day public comment period on 
January 20, 2023, to receive feedback from stakeholders.\40\
---------------------------------------------------------------------------
 \40\ Water Resources Development Act Comment Period and Stakeholder 
Sessions, 88 Fed. Reg. 3729 (Jan. 20, 2023).
---------------------------------------------------------------------------

 IV. WRDA 2024

PENDING CHIEF'S REPORTS:

 Currently, the Committee is in possession of three Chief's 
Reports for possible inclusion in WRDA 2024: Gulf Intracoastal 
Waterway, Texas (navigation and storm risk management); Seagirt 
Loop, Baltimore, Maryland (navigation); and Rhode Island 
Coastline, Rhode Island (coastal storm risk management).

ANNUAL 7001 REPORTS:

 Section 7001 of WRRDA 2014 (P.L. 113-121) requires the 
Corps to transmit an annual report to the authorizing 
committees that identifies, for potential Congressional 
authorization, completed feasibility reports, proposed 
feasibility studies submitted by non-Federal interests through 
a public comment period, proposed modifications to authorized 
water resources development projects or feasibility studies, 
and proposed modifications to environmental infrastructure 
program authorities. This report is entitled ``Report to 
Congress on Future Water Resources Development'' and is due by 
February 1st of each year. As of November 30, 2023, the 
Committee has not officially received the 2023 Section 7001 
Report. The non-Federal proposal submission period for the 2024 
Section 7001 Report was open from January 20, 2023, through 
March 21, 2023.\41\
---------------------------------------------------------------------------
 \41\ Proposals by Non-Federal Interests for Feasibility Studies, 
Proposed Modifications to Authorized Water Resources Development 
Projects and Feasibility Studies, etc., 88 Fed. Reg. 29109 (May 5, 
2023).
---------------------------------------------------------------------------

 V. WITNESSES

 LHon. Michael L. Connor, Assistant Secretary, 
United States Army (Civil Works)
 LLt. Gen. Scott Spellmon, Chief of Engineers and 
Commanding General, United States Army Corps of Engineers

 
WATER RESOURCES DEVELOPMENT ACTS: STATUS OF PAST PROVISIONS AND FUTURE 
 NEEDS

 ---------- 

 TUESDAY, DECEMBER 5, 2023

 House of Representatives,
 Subcommittee on Water Resources and Environment,
 Committee on Transportation and Infrastructure,
 Washington, DC.
 The subcommittee met, pursuant to call, at 10:01 a.m. in 
room 2167 Rayburn House Office Building, Hon. David Rouzer 
(Chairman of the subcommittee) presiding.
 Mr. Rouzer. The Subcommittee on Water Resources and 
Environment will come to order.
 I ask unanimous consent that the chairman be authorized to 
declare a recess at any time during today's hearing.
 Without objection, so ordered.
 I also ask unanimous consent that Members not on the 
subcommittee be permitted to sit with the subcommittee at 
today's hearing in order to ask questions.
 Without objection, so ordered.
 As a reminder, if Members wish to insert a document into 
the record, please also email it to [email protected]. 
Again, that's [email protected]
 I now recognize myself for the purposes of an opening 
statement.

 OPENING STATEMENT OF HON. DAVID ROUZER OF NORTH CAROLINA, 
 CHAIRMAN, SUBCOMMITTEE ON WATER RESOURCES AND ENVIRONMENT

 Mr. Rouzer. First, I want to thank our witnesses for being 
here today. And I want to apologize for the quick adjournment 
of the subcommittee a few weeks ago when we had a few things 
going on outside of all of our control. But in any event, I'm 
very grateful to have you with us today as we begin work on the 
2024 Water Resources Development Act.
 It is helpful for the committee to hear directly from the 
Army Corps at the beginning of the WRDA process because these 
bills are the primary way Congress guides the Corps' projects 
and priorities.
 And as we all know, the Corps is the Federal Government's 
lead water resources development and management agency. Next 
year will mark the bicentennial anniversary of its first Civil 
Works mission, which was to improve the safety and navigability 
of the Ohio and Mississippi Rivers. Over the past 200 years, 
the Corps has expanded its primary missions to include flood 
mitigation, coastal protection, emergency response, and 
ecosystem restoration.
 Whether urban or rural, inland or coastal, meeting the 
water resources needs in communities across the country is 
vital to our security, safety, and economic stability. Well-
functioning and reliable navigation systems allow for the 
movement of more than 2 billion tons of cargo each year, levees 
and dams help protect communities and critical industries from 
flooding, and coastal restoration projects address erosion and 
minimize the impacts of storm damage on seaside communities, 
which is particularly important for my constituents in North 
Carolina's Seventh Congressional District.
 For example, in Brunswick County, the Corps is undertaking 
a study to address beach nourishment needs for the next 50 
years in Oak Island and Holden Beach. In Wrightsville Beach, 
the renourishment project is set to finally move forward this 
month thanks to the Corps' emergency exception allowing them to 
use the historic Masonboro Inlet borrow site for sand. 
Additionally, the town of Surf City anticipates receiving its 
overdue beach nourishment upon the Corps' approval of funding.
 By authorizing projects and studies and providing direction 
on programmatic changes, WRDA has better enabled the Corps to 
achieve its key Civil Works missions. Since 2014, Congress has 
enacted a WRDA bill every 2 years with strong bipartisan 
support, and we are going to continue that. This consistency 
during the past decade has allowed Congress to respond to local 
water resources needs more effectively. It also imparts 
confidence that we can address water infrastructure needs that 
may arise in the future, regardless of partisan discord that we 
my find here in Washington.
 Through these bipartisan bills, Congress has authorized new 
projects and studies across the country. We have also 
streamlined processes at the Corps, improved project delivery, 
expanded opportunities for non-Federal project sponsors to 
develop and execute water resource projects, and enhanced the 
Corps' ability to respond to emergencies and disasters, to name 
a few.
 For my district, in WRDA 2022, we were able to authorize 
the North Carolina National Coastal Mapping Study to map inland 
and coastal waterways and identify potential hazards, such as 
debris and sedimentation, that can lead and most often does 
lead to increased flood risk. This study will lead the way in a 
larger nationwide effort to invest in flood resilience, and I 
am pleased funding for such was included in the House Energy 
and Water Appropriations bill.
 Additionally, it is important to emphasize that the success 
of previous WRDAs is due in large part to the strong 
participation from all Members, not just of this committee, but 
throughout the House. Coordination with the Corps and 
constructive feedback from non-Federal partners, as well as 
other stakeholders, has been critically important as well. I 
look forward to continuing this bipartisan tradition with WRDA 
2024.
 So, it is in that spirit that we are very, very pleased to 
have Assistant Secretary Connor and Lieutenant General Spellmon 
here before the subcommittee today to discuss their efforts to 
implement WRDA 2022, as well as other priorities, as we move 
towards WRDA 2024.
 [Mr. Rouzer's prepared statement follows:]

 
 Prepared Statement of Hon. David Rouzer, a Representative in Congress 
 from the State of North Carolina, and Chairman, Subcommittee on Water 
 Resources and Environment
 I'd like to first thank our witnesses, Assistant Secretary Connor 
and Lieutenant General Spellmon, for joining us today as we begin work 
on the 2024 Water Resources Development Act (WRDA). It's helpful for 
the Committee to hear directly from the Army Corps at the beginning of 
the WRDA process because these bills are the primary way Congress 
guides the Corps' projects and priorities.
 As we all know, the Corps is the federal government's lead water 
resource development and management agency. Next year will mark the 
bicentennial anniversary of its first civil works mission, which was to 
improve the safety and navigability of the Ohio and Mississippi Rivers. 
Over the last 200 years, the Corps has expanded its primary missions to 
include flood mitigation, coastal protection, emergency response, and 
ecosystem restoration.
 Whether urban or rural, inland or coastal, meeting the water 
resource needs in communities across the country is vital to our 
security, safety, and economic stability. Well-functioning and reliable 
navigation systems allow for the movement of more than two billion tons 
of cargo each year, levees and dams help protect communities and 
critical industries from flooding, and coastal restoration projects 
address erosion and minimize the impacts of storm damage on seaside 
communities, which is particularly important for my constituents in 
North Carolina's Seventh Congressional District.
 For example, in Brunswick County, the Corps is undertaking a study 
to address beach nourishment needs for the next 50 years in Oak Island 
and Holden Beach. In Wrightsville Beach, the renourishment project is 
set to finally move forward in November thanks to the Corps' emergency 
exception allowing them to use the historic Masonboro Inlet borrow 
site. Additionally, the Town of Surf City anticipates receiving its 
overdue beach nourishment upon Corps approval of funding.
 By authorizing projects and studies, and providing direction on 
programmatic changes, WRDAs better enable the Corps to continue working 
to achieve its key civil works missions. Since 2014, Congress has 
enacted a WRDA bill every two years with strong bipartisan support. 
This consistency over the last decade has allowed Congress to respond 
to local water resource needs more effectively. It also imparts 
confidence that we can address water infrastructure needs that may 
arise in the future, regardless of partisan discord in Washington.
 Through these bipartisan bills, Congress has authorized new 
projects and studies across the country. We've also streamlined 
processes at the Corps, improved project delivery, expanded 
opportunities for non-federal project sponsors to develop and execute 
water resource projects, and enhanced the Corps' ability to respond to 
emergencies and disasters, to name a few.
 For my district, in WRDA 2022, we were able to authorize the North 
Carolina National Coastal Mapping Study to map inland and coastal 
waterways and identify potential hazards, such as debris and 
sedimentation, which can lead to increased flood risk. This study will 
lead the way in a larger nationwide effort to invest in flood 
resilience, and I am pleased funding for such was included in the House 
Energy and Water Appropriations bill.
 Additionally, it's important to emphasize that the success of 
previous WRDAs is due in large part to the strong participation from 
Democrat and Republican member offices, coordination with the Corps, 
and constructive feedback from non-federal partners and other 
stakeholders. I am proud to have played a role in many of those bills 
and look forward to continuing this bipartisan tradition with WRDA 
2024.
 In that spirit, we are very pleased to have Assistant Secretary 
Connor and Lieutenant General Spellmon here before the Subcommittee 
today to discuss their efforts to implement WRDA 2022 and other 
priorities as we move towards WRDA 2024.

 Mr. Rouzer. I now recognize my great friend and colleague, 
Ranking Member Napolitano, for 5 minutes for her opening 
statement.
 Mrs. Napolitano.

 OPENING STATEMENT OF HON. GRACE F. NAPOLITANO OF CALIFORNIA, 
RANKING MEMBER, SUBCOMMITTEE ON WATER RESOURCES AND ENVIRONMENT

 Mrs. Napolitano. Thank you very much, Mr. Chairman. Thank 
you for your kind words and for holding today's hearing.
 Through the biennial enactment of Water Resources 
Development Acts, WRDA, this committee is addressing the water-
related needs of our States and local communities. All the 
WRDAs are a shining example of how Congress can efficiently and 
effectively meet the bipartisan needs of our communities when 
we decide that we can work together rather than apart.
 I look forward to continuing my relationship with you, Mr. 
Chairman, with Chairman Graves, and Ranking Member Larsen to 
get it done. I also want to thank Assistant Secretary Connor 
and General Spellmon for their testimony, and I also want to 
give a welcome to Mr. Connor's daughter, Gabriela.
 The Corps plays a critical role in addressing the water 
resources challenges of the Nation, protecting our communities 
from flooding, restoring our environment and ecosystems, and 
maintaining our Nation's economy by supporting ports and 
harbors.
 Timely implementation of past WRDA provisions can help make 
communities more resilient to stronger storms and higher seas 
and, of course, longer droughts. And this is especially true 
related to the water supply and water conservation needs of 
this country.
 Over the past decade, I have championed several provisions 
to enhance the WRDA authority and flexibility of the Corps to 
address the local water supply and water conservation needs 
while balancing the efforts with other authorized purposes of 
Corps projects.
 For too long, we have seen the Corps revert back to the 
position that water supply and water conservation are not 
primary missions of the Corps, meaning that these objectives do 
not get the same attention and budgetary priority as other 
mission areas.
 The Corps restates that arbitrary stance in its report on 
water supply and conservation that I requested in WRDA 2020 and 
was submitted to Congress in September. I ask unanimous consent 
that this report be included as part of today's hearing record.
 Mr. Rouzer. Without objection.
 [The information follows:]

 
 Report, ``Water Resources Development Act of 2020, Section 221--Study 
 on Water Supply and Water Conservation at Water Resources Development 
Projects,'' by U.S. Army Corps of Engineers, August 2023, Submitted for 
 the Record by Hon. Grace F. Napolitano
 The 22-page report is retained in committee files and is available 
online at https://usace.contentdm.oclc.org/utils/getfile/collection/
p16021coll5/id/37142.

 Mrs. Napolitano. Mr. Chairman, much of the country is now 
facing similar water supply challenges that we have long felt 
in the West. In my view, that necessitates rethinking the role 
the Corps can play to help communities facing water 
insecurity--not to supplant State and local water efforts, but 
to support them.
 If the Corps or the Office of Management and Budget is 
using arbitrary, policy-level factors to shut down the 
consideration of congressionally authorized water supply and 
water conservation elements in water resources projects, we 
should all be concerned. If the Corps or OMB is using 
artificial barriers to exclude from consideration worthy 
projects with substantial State and local support, then 
Congress needs to revisit how authorized water supply and water 
conservation elements are ranked among the historic priorities 
and missions of the Corps. This is an issue that I have 
followed for a long time and something I want to continue to 
discuss with stakeholders and partners in Congress as we 
develop a new WRDA bill for 2024.
 We will all see on the news the challenges of dividing up 
the Colorado River water and efforts made by the States and the 
Federal Government to find solutions for the future. With water 
supply as mission area, the Corps should be part of the 
solution as well.
 In WRDA 2022, Congress also authorized provisions to ensure 
the Corps was forward-thinking in addressing the challenges of 
climate change. For example, I coauthored the Managed Aquifer 
Recharge Study--that is a word--to direct the Corps to conduct 
a national assessment of managed aquifer recharge projects.
 WRDA 2022 also directed the Corps to prioritize the update 
of water control manuals--my favorite subject--for the Corps' 
projects that include water supply or water conservation as 
authorized purposes. These are commonsense measures that help 
States like California prepare for the world of climate change 
and severe drought.
 I am also particularly thankful that in WRDA 2022, we were 
able to make a commitment to address the needs of Tribal and 
disadvantaged communities, building on similar provisions from 
2020. Full implementation of these provisions is critical to 
address legacy challenges faced by Tribal and disadvantaged 
communities in seeking assistance or partnering with the Corps 
to address local water resource challenges.
 The Corps has great resources and technical expertise, and 
we must ensure that all communities are able to access their 
assistance.
 Mr. Chairman, this is a WRDA which will be the sixth 
biennial bill since the committee returned to regular passage 
of WRDA bills in 2014. I look forward to continuing to work 
with you and all of our bipartisan colleagues on another 
successful WRDA this Congress.
 And I yield back.
 [Mrs. Napolitano's prepared statement follows:]

 
 Prepared Statement of Hon. Grace F. Napolitano, a Representative in 
Congress from the State of California, and Ranking Member, Subcommittee 
 on Water Resources and Environment
 Thank you, Mr. Chairman, for holding today's hearing.
 Through biennial enactment of Water Resources Development Acts, 
this committee is addressing the water related needs of our states and 
local communities. WRDAs are a shining example of how Congress can 
efficiently and effectively meet the bipartisan needs of our 
communities when we decide it is better to work together than apart.
 I look forward to continuing my partnership with you, with Chairman 
Graves, and with Ranking Member Larsen to get this done. I also want to 
thank Assistant Secretary Connor and General Spellmon for their 
attendance and testimony.
 The Corps plays a critical role in addressing the water resources 
challenges of this nation, protecting our communities from flooding, 
restoring our environment and ecosystems, and maintaining our nation's 
economy by supporting our ports and harbors.
 Timely implementation of past WRDA provisions can help make 
communities more resilient to stronger storms, higher seas, and longer 
droughts--and this is especially true related to the water supply and 
water conservation needs of the nation.
 Over the past decade, I have championed several provisions to 
enhance the authority and flexibility of the Corps to address local 
water supply and water conservation needs, while balancing these 
efforts with the other authorized purposes of Corps' projects.
 For too long, we've seen the Corps revert to the position that 
water supply and water conservation are not ``primary missions of the 
Corps''--meaning that these objectives do not get the same attention 
and budgetary priority as other mission areas. The Corps restates that 
arbitrary stance in its report on water supply and water conservation 
that I requested in WRDA 2020 and was submitted to Congress in 
September of this year.
 I ask unanimous consent that this report be included as part of 
today's hearing record.
 Mr. Chairman, much of the country is now facing similar water 
supply challenges as we have long felt in the West. Therefore, it is 
prudent that we rethink the Corps' role in helping communities facing 
water insecurity--not to supplant state and local efforts, but to 
support them.
 If the Corps or the Office of Management and Budget is using 
arbitrary, policy-level factors to shut down the consideration of 
Congressionally-authorized water supply and water conservation elements 
in water resources projects, we should all be concerned.
 If the Corps or OMB is using artificial barriers to exclude from 
consideration worthy projects with substantial state and local support, 
then Congress should revisit how authorized water supply and water 
conservation elements are evaluated within the other historic 
priorities and missions of the Corps.
 This is an issue that I have followed for a very long time, and 
something I continue to discuss with stakeholders and partners in 
Congress as we develop a new WRDA bill for 2024.
 Mr. Chairman, the last few WRDAs included significant policy wins 
for how the Corps develops and implements projects.
 For example, in WRDA 2022, Congress directed the Corps to be more 
forward-thinking in addressing the challenge of climate change.
 For example, I co-authored the Managed Aquifer Recharge Study to 
direct the Corps to conduct a national assessment of managed aquifer 
recharge projects.
 WRDA 2022 also directed the Corps to prioritize the update of water 
control manuals for Corps' projects that include water supply or water 
conservation as authorized purposes. These are common sense measures to 
help states like California prepare for the world of climate change and 
severe drought.
 I am also particularly thankful that in WRDA 2022 we were able to 
make a commitment to address the needs of tribal and disadvantaged 
communities, building on similar provisions from WRDA 2020. Fully 
incorporating these changes into the Corps' culture is critical to 
address the historic challenges faced by Tribal and disadvantaged 
communities in working with the Corps.
 The Corps has great resources and technical expertise, and we must 
ensure that all communities are able to access their assistance.
 Mr. Chairman, the next WRDA would be the sixth biennial bill since 
the Committee returned to regular passage of WRDA bills in 2014. Last 
Congress, we worked together with friendship and collegiality through 
hearings and meetings for a bipartisan accomplishment.
 I look forward to working with you on another successful WRDA this 
Congress.
 Let's get to work, and I yield back.

 Mr. Rouzer. I thank the gentlelady.
 I now recognize the ranking member of the full committee, 
Mr. Larsen, for 5 minutes for an opening statement.

 OPENING STATEMENT OF HON. RICK LARSEN OF WASHINGTON, RANKING 
 MEMBER, COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

 Mr. Larsen of Washington. Thank you, Chair, thank you, 
Ranking Member Napolitano, for holding this hearing. I want to 
welcome back the panel as well, and thanks for your flexibility 
in coming back.
 Since 2014, this committee has honored its commitment to 
meet local water resource needs around the country, carried out 
by the Army Corps through the bipartisan and biennial enactment 
of the Water Resources Development Acts. Predictable WRDA 
enactment supports projects that address local water resource 
challenges, creating jobs in construction and supporting 
industries and the businesses that benefit directly from Corps' 
projects.
 Regular enactment of WRDAs also allows for the 
implementation of critical and timely policy reforms that 
improve the function and flexibility of the Corps to respond to 
local water resources challenges, including section 214, of 
which I will have a question for you on its implementation.
 WRDA 2022 provides a good blueprint for future WRDAs. This 
legislation successfully authorized the construction of 25 new 
projects covering every facet of the Corps' missions, as well 
as almost 100 new feasibility studies for future water resource 
development projects.
 WRDA 2022 also authorized a historic total of more than 
$6.5 billion in environmental infrastructure assistance for 
community-driven projects, including $200 million for water and 
wastewater infrastructure requested by local officials in 
western Washington State. These Federal, State, and local 
partnerships are critical to help address the growing water and 
wastewater infrastructure needs throughout the country.
 Lastly, WRDA 2022 continued to expand America's 
navigational capacity, strengthen its supply chains, ensure our 
communities are resilient to the challenges posed by climate 
change, and increase the coordination between the Corps and 
Tribal, minority, and economically disadvantaged communities.
 Beyond the regular enactment of WRDAs, Congress also needs 
to provide sufficient funding for project planning, 
construction, and operation and maintenance so communities can 
quickly realize the benefits of water resource improvements.
 The Bipartisan Infrastructure Law is a great example of how 
this should work. The BIL provided a massive downpayment, a 
total of about $17 billion, for critical WRDA projects. The 
Corps has shown exactly how and where they spent that money. 
Nearly all of it has been allocated. These BIL dollars are hard 
at work, making a positive im--American jobs--and the U.S. 
economy.
 Now the Congress must ensure the seamless implementation of 
critical water resource development projects while providing 
the Corps with sufficient funds to carry out its missions.
 So, I look forward to the continued partnership with Chair 
Graves, Chair Rouzer, and Ranking Member Napolitano as well, in 
developing a new bipartisan WRDA 2024. And I welcome the 
leadership of the Corps here today as part of that discussion.
 With that, I yield back.
 [Mr. Larsen of Washington's prepared statement follows:]

 
 Prepared Statement of Hon. Rick Larsen, a Representative in Congress 
 from the State of Washington, and Ranking Member, Committee on 
 Transportation and Infrastructure
 Thank you, Chairman Rouzer and Ranking Member Napolitano, for 
holding this hearing.
 I want to welcome back the panel as well, and thanks for your 
flexibility in coming back.
 Since 2014, this Committee has honored its commitment to meet local 
water resources needs across the country, carried out by the Army Corps 
of Engineers (Corps), through the bipartisan and biennial enactment of 
Water Resources Development Acts (WRDAs).
 Predictable WRDA enactment supports projects that address local 
water resources challenges creating jobs in construction and supporting 
industries and the businesses that benefit directly from Corps' 
projects.
 Regular enactment of WRDAs also allows for the implementation of 
critical and timely policy reforms that improve the function and 
flexibility of the Corps to respond to local water resources 
challenges, including section 214 on which I will have a question for 
you regarding its implementation.
 WRDA 2022 provides a good blueprint for future WRDAs.
 This legislation successfully authorized the construction of 25 new 
projects, covering every facet of the Corps' missions, as well as 
almost 100 new feasibility studies for future water resources 
development projects.
 WRDA 2022 also authorized a historic total of more than $6.5 
billion in environmental infrastructure assistance for community-driven 
projects, including $200 million for water and wastewater 
infrastructure requested by local officials in western Washington 
state.
 These federal, state and local partnerships are critical to help 
address the growing water and wastewater infrastructure needs 
throughout the country.
 Lastly, WRDA 2022 continued to expand America's navigational 
capacity, strengthen its supply chains, ensure our communities are 
resilient to the challenges posed by climate change, and increase the 
coordination between the Corps and Tribal, minority, and economically 
disadvantaged communities.
 Beyond the regular enactment of WRDAs, Congress also needs to 
provide sufficient funding for project planning, construction, and 
operation and maintenance so that communities can quickly realize the 
benefits of water resources improvements.
 The Bipartisan Infrastructure Law (BIL) is a great example of how 
this should work. The BIL provided a massive downpayment--a total of 
about $17 billion--for critical WRDA projects.
 The Corps has shown exactly how and where they spent that money--
nearly all of it has already been allocated.
 These BIL dollars are hard at work, making a positive impact on 
communities, and creating and supporting good-paying American jobs and 
the U.S. economy.
 Now, Congress must ensure the seamless implementation of critical 
water resources development projects, while providing the Corps with 
sufficient funds to carry out its mission.
 I look forward to a continued partnership with Chairman Graves, 
Chairman Rouzer, and Ranking Member Napolitano, in developing a new, 
bipartisan WRDA 2024, and welcome the leadership of the Corps here 
today as part of that discussion.

 Mr. Rouzer. I thank the gentleman.
 I would now like to again welcome our witnesses. I really 
appreciate you coming back today. Your testimony is critically 
important to us as we move forward.
 So, we have the Honorable Michael L. Connor, Assistant 
Secretary of the Army for Civil Works, and then, of course, 
Lieutenant General Scott Spellmon, Chief of Engineers and 
Commanding General of the United States Army Corps of 
Engineers.
 So, we all are familiar with the lighting system. I won't 
belabor that. Obviously, green means go, yellow means running 
out of time, and red means try to conclude your remarks.
 And a little advisory to the Members. I anticipate we are 
going to have a number of Members come today representing both 
sides of the aisle, and to make sure we can accommodate 
everybody in a timely manner, try to keep your questions to 5 
minutes. And if you ask a final question with no time left, I 
am going to gavel you down, so, just know that upfront. So, 
think about how many questions you have and how long it takes 
to get them answered, and use your time to your best advantage.
 I ask unanimous consent the witnesses' full statements be 
included in the record.
 Without objection, so ordered.
 I ask unanimous consent that the record of today's hearing 
remain open until such time as our witnesses have provided 
answers to any questions that may be submitted to them in 
writing.
 Without objection, so ordered.
 I also ask unanimous consent that the record remain open 
for 15 days for any additional comments and information 
submitted by Members or witnesses to be included in the record 
of today's hearing.
 Without objection, so ordered.
 As your written testimony has been made part of the record, 
the subcommittee asks that you, the witnesses, limit your oral 
remarks to 5 minutes.
 With that, Assistant Secretary Connor, you are recognized 
for 5 minutes.

TESTIMONY OF HON. MICHAEL L. CONNOR, ASSISTANT SECRETARY OF THE 
 ARMY FOR CIVIL WORKS, DEPARTMENT OF THE ARMY; AND LIEUTENANT 
 GENERAL SCOTT A. SPELLMON, CHIEF OF ENGINEERS AND COMMANDING 
 GENERAL, U.S. ARMY CORPS OF ENGINEERS

TESTIMONY OF HON. MICHAEL L. CONNOR, ASSISTANT SECRETARY OF THE 
 ARMY FOR CIVIL WORKS, DEPARTMENT OF THE ARMY

 Mr. Connor. Thank you.
 Chairman Rouzer, Ranking Member Napolitano, distinguished 
committee members, thank you for the opportunity to discuss the 
implementation of WRDA 2022 and the administration's priorities 
for WRDA 2024.
 The Army Corps of Engineers Civil Works program is the 
Nation's largest water resources program. It serves three 
primary missions: flood and storm damage risk reduction, 
commercial navigation, and aquatic ecosystem restoration. The 
program also addresses a host of other missions authorized and 
funded by Congress, including regulatory permitting, 
recreation, hydropower production, water supply, disaster 
response, and radiological cleanup, the FUSRAP program.
 This is a massive set of responsibilities, and the Civil 
Works program contributes significantly towards the Nation's 
well-being, supporting the economy, and protecting and 
improving the lives of Americans. We appreciate the substantial 
resources now in hand through the Bipartisan Infrastructure Law 
disaster supplementals and annual appropriations to advance the 
President's Investing in America agenda.
 The water resources challenges of today and tomorrow are 
not like those of yesterday. Climate change-driven weather 
extremes are increasingly the norm, creating risk to 
communities, the economy, and natural systems. As a result, the 
Army's Civil Works program needs to continue to evolve, 
modernize, and partner with sponsors and communities in 
different ways to effectively meet its mission responsibilities 
and new challenges.
 We look forward to working closely with Congress in 
developing the next WRDA to ensure we have the tools, 
processes, and resources in place to, one, better assess risks 
and innovate our approach to effectively address those risks; 
two, improve our processes to appropriately and equitably serve 
a broader set of communities; and three, develop projects for 
consideration by Congress that provide multiple benefits, have 
community acceptance, and include well-developed cost 
estimates.
 Before elaborating on evolving needs, we know the community 
is focused on implementation of recent WRDAs. Following the 
passage of WRDA 2022, the Army and Corps of Engineers gathered 
public input on implementation of its provisions. Army Civil 
Works and the Corps are developing implementation guidance for 
12 of those provisions. In the past week, I finalized and 
signed three of those guidance documents.
 There are also several provisions in WRDA 2022 to address 
droughts. I will continue to work with the Corps to develop 
meaningful near-term activities to address drought-related 
issues while advancing long-term drought resilience. We are in 
the water availability business even while others provide 
direct supply.
 I should note that drought is not just an issue impacting 
the arid West. This is the second year in a row the Mississippi 
River has experienced extreme low water due to severe drought 
across parts of the central United States. The Corps has been 
continually dredging to keep the channel open in the 
Mississippi River for safe navigation to support the Nation's 
supply chains. We have also been working closely with the State 
of Louisiana to provide emergency drinking water systems for 
the State's southern residents impacted by saltwater intrusion 
as a result of those low flows.
 Now, as we look to a WRDA 2024, the Corps is committed to 
help communities improve their resilience to the evolving set 
of challenges we see in water resources management. Key tools 
include our technical assistance programs and water resources 
projects, and it goes without saying that much of the Army's 
work can only be accomplished through a foundation of 
partnerships between the Corps and local communities, as well 
as the States.
 As highlighted earlier, the Army is committed to advancing 
the President's Investing in America agenda, including 
advancing environmental justice and delivering on the Justice40 
initiative to ensure Federal investment funds are provided to 
marginalized communities impacted by years of underinvestment. 
The Corps has increased partner engagement through its Planning 
Assistance to States, Flood Plain Management Services, and 
Tribal Partnership Program, as well as studies for flood and 
coastal storm risk management and aquatic ecosystem 
restoration.
 My office is also working to improve our nation-to-nation 
consultations to ensure Tribal nations have meaningful 
involvement on Federal actions which affect their interests. We 
welcome the tools provided in recent WRDAs to make better use 
of these programs and will continue to be engaged with Congress 
as new needs emerge.
 I will also continue to implement innovative and modernized 
authorities to carry out measures to address sea level rise, 
beneficial use of dredge material, natural and nature-based 
solutions, and deliver on the growing demand for environmental 
infrastructure and multipurpose projects.
 Thank you for the opportunity. I look forward to addressing 
your questions.
 [Mr. Connor's prepared statement follows:]

 
 Prepared Statement of Hon. Michael L. Connor, Assistant Secretary of 
 the Army for Civil Works, Department of the Army
 Chairman Rouzer, Ranking Member Napolitano, and distinguished 
members of the committee, thank you for the opportunity to be here 
today to discuss the implementation of the Water Resources Development 
Act (WRDA) of 2022 and the Army's priorities for WRDA 2024.
 The U.S. Army Corps of Engineers Civil Works Program is the 
Nation's largest water resources program. It serves three main 
missions: flood and storm damage reduction, commercial navigation, and 
aquatic ecosystem restoration. The Civil Works Program also addresses a 
host of other water resource and infrastructure needs as authorized and 
funded by Congress. Our civil works projects have contributed 
significantly toward the Nation's well-being, supporting the economy 
and protecting and improving the lives of Americans with innovative 
water management processes to facilitate commercial navigation and 
address flood risk and drought.
 The Army works with our Nation's coastal ports to maintain their 
channels; operates and maintains the inland waterways of commerce; 
supports Tribal, state, and local flood and coastal storm damage risk 
management reduction activities; restores significant aquatic 
ecosystems; and operates and maintains multipurpose dams, as well as 
the reservoirs behind them. There are about 250 million day-visits a 
year for recreation at Corps' lands and reservoirs, making the Corps 
one of the top Federal recreation providers.
 The infrastructure that the Army maintains includes 13,000 miles of 
coastal navigation channels (including the channels of the Great 
Lakes), 12,000 miles of inland waterways, 715 dams, 241 locks at 195 
navigation sites, 14,700 miles of levees, and hydropower plants at 75 
locations with 353 generating units. These projects help provide risk 
reduction from flooding in our river valleys and along our coasts, 
facilitate the movement of approximately two billion tons of waterborne 
commerce, and provide up to 24 percent of the Nation's hydropower.
 It's important to note that the water resources challenges of today 
and tomorrow are not like those of yesterday. Weather extremes are 
increasingly the norm, creating risk to communities, the economy, and 
natural systems. As a result, understanding vulnerabilities and 
increasing our preparedness is of paramount importance.
 Following the passage of WRDA 2022, and as required by WRDA 2014, 
the Army and the Corps held a 60-day public comment period as well as 
four listening sessions, one which was focused on Tribal Leaders, to 
gather input on implementation of all provisions. Army Civil Works and 
the Corps are developing implementation guidance for 12 provisions and 
working with appropriate Corps teams to guide implementation of project 
specific provisions, such as Section 8155 (Continuation of 
Construction) and Section 8106 (Scope of Feasibility Studies) of WRDA 
2022. The implementation guidance is in the final stages of review, and 
I anticipate issuing the guidance soon.
 Through the 94 feasibility studies and 25 construction projects 
authorized in WRDA 2022, the Corps can continue to address water 
resources challenges and critical infrastructure needs within the 
commercial navigation, flood and storm damage reduction, and aquatic 
ecosystem restoration mission areas.
 WRDA 2022 also calls for the standing up of four federal advisory 
groups to the Secretary. The groups include:
 Managed Aquifer Recharge Working Group (Section 8108)
 Tribal and Economically Disadvantaged Communities 
Advisory Committee (Section 8115)
 Non-Federal Interests Advisory Committee (Section 8150)
 Western Water Cooperative Committee (Section 8158)

 To date, significant progress has been made in developing the plans 
to stand-up the committees. Three advisory committees have been 
identified by the Department of Defense (DoD) as being subject to the 
Federal Advisory Committee Act and a determination on the fourth 
committee is under DoD review.
 I recognize the opportunities provided through WRDA 2022 to address 
drought, and I will continue to work with the Corps to develop 
meaningful near-term activities to address drought-related issues while 
advancing long-term drought resilience through robust forward-thinking 
actions. This legislation strengthens the Nation's capabilities and 
challenges posed by drought. This is the second year the Mississippi 
River has experienced severe low water after a summer of intense heat 
and lower-than-average rainfall which has triggered drought across 
parts of the central U.S. The Corps is working to keep the channel open 
for safe navigation to support the Nation's economy and maintain a 
robust supply chain to move goods to market.
 Also, Section 8311 (Acequias Irrigation Systems) of WRDA 2022 
changes the non-Federal cost share for a Tribal community as well as 
supports research, development, and training for innovative management 
solutions, including those for controlling invasive aquatic plants that 
affect acequias. This will ensure greater resiliency and address 
threats from changing hydrological and climatic conditions.
 As we look to a WRDA for 2024, the U.S. Army Corps of Engineers is 
committed to the national effort to help communities improve their 
resilience to extreme weather events, through its technical assistance 
programs and water resources projects, a mission of increasing 
importance with our changing climate. Much of the Army's work can only 
be accomplished through a foundation of partnerships between the Corps 
and local communities, which allow us to work together to help develop, 
manage, restore, and protect the Nation's water resources and the 
environment.
 Moving forward, my priorities are:
 to maintain the Nation's inland waterways and coastal 
ports to support supply chains and economic growth,
 to build innovative, climate-resilient infrastructure to 
reduce risk to communities and aquatic ecosystems,
 to modernize the civil works' programs to better serve 
the needs of our Nation, including tribal and disadvantaged 
communities,
 to invest in research and development to deliver water 
resource solutions, and
 strengthen communications and relationships to solve 
water resource challenges.

 The Administration is focused on developing and implementing 
programs and projects that increase infrastructure and ecosystem 
resilience to climate change and decrease climate risk for communities 
based on the best available science and promoting environmental justice 
for disadvantaged, underserved, tribal and rural communities and 
creating good paying jobs that provide the free and fair chance to join 
a union and collectively bargain. We believe in smart investments that 
maximize the resiliency and durability of our water management 
resources; moving into a more sustainable posture by investing in 
infrastructure that delivers benefits across our Nation. This can be 
accomplished through authorizations that address the effects of climate 
change.
 Through the President's Investing in America agenda, the Army Corps 
of Engineers is advancing environmental justice and delivering on the 
Justice-40 Initiative, which is focused on ensuring 40 percent of the 
overall benefits of certain federal investments are reaching 
disadvantaged communities that have been marginalized by years of 
underinvestment. The Corps has increased stakeholder engagement through 
its Planning Assistance to States, Floodplain Management Services, and 
the Tribal Partnership Program, as well as areas such as studies for 
flood and coastal storm risk management and aquatic ecosystem 
restoration. My office is also working to improve our Nation-to-Nation 
consultations to ensure Tribal Nations have meaningful involvement on 
federal actions which have Tribal implications. We are also making a 
concerted effort to strengthen our Tribal relationships through 
partnerships in programs and projects, especially under the Tribal 
Partnership Program. I issued a policy clarification memorandum to the 
Corps to ensure they deliver the Tribal Partnership Program to the 
fullest extent allowed under the current authority. My office recently 
hosted webinars with Tribes and engaged in consultation to discuss our 
efforts and why we are developing comprehensive guidance on the 
program.
 The Bipartisan Infrastructure Law has advanced actions to promote 
climate resilience and environmental justice and strengthening the 
supply chain. These investments are helping Americans in many 
communities across the Nation.
 The Corps Water Infrastructure Financing Program (CWIFP) will 
enable local investment in non-federal dam safety infrastructure by 
offering credit assistance in the form of direct loans and loan 
guarantees for non-federal dam safety projects to maintain, upgrade and 
repair dams identified in the National Inventory of Dams. Priority will 
be given to projects serving economically disadvantaged communities 
through fee waivers and project financing up to 80% of the total 
project costs. This is a significant milestone for the Corps and 
represents a new and innovative way for the Army to support the 
Nation's investment in infrastructure.
 I also am working to support local efforts to respond and adapt to 
sea-level rise, and to increase the beneficial use dredged material and 
incorporate natural and nature-based solutions where appropriate.
 In closing, the Army Civil Works Program is using its significant 
capabilities in an equitable manner to address longstanding 
environmental justice concerns; boost the Nation's economy through 
navigation; and tackle climate change impacts.
 Thank you, Chairman Rouzer, Chairwoman Napolitano and Committee 
Members. I look forward to answering any questions you or other Members 
of the Committee may have.

 Mr. Rouzer. Thank you.
 General Spellmon.

 TESTIMONY OF LIEUTENANT GENERAL SCOTT A. SPELLMON, CHIEF OF 
 ENGINEERS AND COMMANDING GENERAL, U.S. ARMY CORPS OF ENGINEERS

 General Spellmon. Chairman Rouzer, Ranking Member 
Napolitano, Ranking Member Larsen, and distinguished members of 
the subcommittee, I am honored to testify before you today, and 
thank you for the opportunity to discuss implementation of past 
Water Resources Development Acts and future water resources 
needs.
 This past fiscal year, the U.S. Army Corps of Engineers 
obligated $40.7 billion, $18 billion of which went to 
implementing our Civil Works mission. This is the second 
highest program year in our 249-year history, and this could 
not have happened without the tools and authorities given to us 
by this committee and Congress.
 I believe we have good momentum heading into fiscal year 
2024 as well. For example, the Everglades program, we 
anticipate awarding over $1 billion into restoration work for 
fiscal year 2024. On the research and development front, we are 
working to enhance our knowledge in new and powerful 
technologies, such as crowdsourced bathymetry, and achieving a 
better understanding of the sources and control for events like 
harmful algal blooms, and many, many other initiatives.
 Specifically, we want to thank this committee for 
authorization of an R&D account for the Corps. Many other 
Federal agencies enjoy this benefit, and once this is in place, 
it will bring greater transparency, cohesion, and much more 
visibility to our research and development efforts in the Corps 
and to the Army's overarching modernization efforts.
 In our regulatory program, we currently employ 1,300 staff 
members. In fiscal year 2023, these professionals processed 
just over 43,000 section 10 and 404 permits. We rendered just 
under 32,000 of those permit decisions, or 74 percent of them, 
on time. We know that is not good enough.
 We continue to seek ways to improve our metrics with 
further investments in our regulatory viewer and regulatory 
request system. These improvements will help applicants better 
understand permitting requirements and assist our regulators in 
their field analysis so they can make more timely and efficient 
decisions.
 I want to thank the subcommittee for your continued support 
of the Civil Works program. Your commitment to passing biennial 
WRDAs since 2014 has provided the authorizations and tools 
necessary to advance our Civil Works mission and enable 
critical policy transformations to address the Nation's 
changing water resource infrastructure needs.
 In WRDA 2022, Congress authorized 25 new construction 
projects, 94 new feasibility studies, and 131 new environmental 
infrastructure projects. When funded, these initiatives will 
strengthen the supply chain, address the changing climatic 
conditions we are seeing across our project footprints, advance 
environmental justice, invest in Tribal nations, and provide 
much-needed water resource projects to traditionally 
underserved communities.
 WRDA 2022 and prior WRDA authorizations, as well as the 
2024 budget and other recent funding, provides the Corps with 
what the Secretary calls a transformational opportunity to 
deliver water resource infrastructure projects that will 
positively impact communities across our great Nation. I am 
confident WRDA 2024 will build on this progress.
 I will conclude by saying that we do not accomplish 
anything on our own. Delivering successful Civil Works projects 
is a shared responsibility with our non-Federal sponsors, 
project stakeholders, and Congress. In other words, it is a 
team sport. I look forward to continuing our great 
collaboration as we face the challenges of today and tomorrow.
 Thank you again, Chairman Rouzer, Ranking Member 
Napolitano, Ranking Member Larsen, and members of the 
subcommittee. I look forward to answering your questions.
 [General Spellmon's prepared statement follows:]

 
 Prepared Statement of Lieutenant General Scott A. Spellmon, Chief of 
 Engineers and Commanding General, U.S. Army Corps of Engineers
 Chairman Rouzer, Ranking Member Napolitano, and distinguished 
members of the Subcommittee. I am honored to testify before you today 
along with the Honorable Michael Connor, Assistant Secretary of the 
Army for Civil Works, regarding implementation of previous Water 
Resources Development Acts (WRDA) and future water infrastructure 
needs. Most importantly, I look forward to continuing to work with this 
committee, the Congress, and the Administration to help address the 
Nation's water resources challenges.
 Through the Army Civil Works program, the United States Army Corps 
of Engineers (Corps) works with other Federal agencies, States, Tribes, 
and local governments, as well as others, to develop, manage, restore, 
and protect water resources, primarily through the study, construction, 
and operation and maintenance of water-related infrastructure projects. 
The Corps also regulates development affecting waters of the United 
States, including wetlands, and works with other Federal agencies to 
help communities respond to, and recover from, floods and other natural 
disasters.
 The authorizations and funding provided to us by Congress will 
allow us to advance our three main missions of commercial navigation, 
flood and storm damage reduction, and aquatic ecosystem restoration, as 
well as support related project purposes, such as water supply, 
hydropower, and recreation. The Civil Works program is performance-
based and focuses on high-performing projects and programs within these 
three main mission areas. The Corps uses its engineering expertise and 
relationships with project sponsors and stakeholders to develop 
innovative approaches to address some of the most pressing water 
resources challenges facing the Nation. Since 2014, the WRDA has 
provided the U.S. Army Corps of Engineers with biennial authorizations 
to advance the Corps Civil Works missions by enabling critical policy 
transformations to address the changing needs of the Nation's water 
resources infrastructure.
 WRDA 2022 provided the Corps the flexibility to design projects 
that respond to a wider suite of impacts associated with climate 
change. WRDA 2022 also provided flexibility to address the water 
resources needs of urban and rural communities with environmental 
justice concerns. This is a high priority goal of the Administration. 
An important next step for Army Civil Works will be the adoption of 
procedures implementing the Water Resources Principles, Requirements, 
and Guidelines. In partnership with the Assistant Secretary for Army 
for Civil Works, we expect to formally initiate a rulemaking process on 
this issue later this year. This rulemaking will include a focus on 
securing environmental justice and spurring economic opportunity for 
disadvantaged communities that have been historically marginalized, 
underserved, or overburdened by pollution, and may have been left 
behind in the past in terms of infrastructure development.
 The Corps Tribal Nations Program enables the Army to partner with 
Federally recognized American Indian and Alaskan Native tribal 
governments to identify solutions to their water resources challenges, 
which will substantially benefit the people who live in Indian Country 
or in Alaska Native villages. The Corps works with Native American 
Tribes as cost-share partners on Civil Works projects through its 
Tribal Partnership Program, under its Planning Assistance to States 
Program, as well as through specifically authorized Civil Works 
projects. WRDA 2022 supports our trust commitment to Tribal Nations by 
enhancing the breadth and reach of the Tribal Partnership Program, 
strengthening tools to provide Tribal assistance, as well as 
establishing a framework for an advisory committee to further 
facilitate delivery of water resources projects to Tribal Nations. The 
Corps reaffirms its commitment to engage in regular, meaningful, and 
robust consultation with Tribal officials in the development of water 
resources projects and on regulatory actions that have Tribal 
implications.
 WRDA 2022 also included an authorization for the Army Civil Works 
research and development (R&D) program. Through R&D, we are making 
investments to tackle future water resources challenges and advance 
related technological development in support of the three Army Civil 
Works main missions. This investment demonstrates the Administration's 
commitment to engineering innovation to deliver enduring water resource 
solutions for the Nation. This investment will allow the Corps to 
continue addressing the most pressing knowledge gaps that our 
practitioners face while doing their jobs in the field, such as 
operational, data-driven methods to improve navigation channel 
maintenance, the beneficial use of dredged material, and flood and 
storm risk management modeling. Investments proposed by the President's 
Budget for Fiscal Year 2024 include funding to advance longer-term 
research and development by accelerating the Forecast-Informed 
Reservoir Operations Assessment, which will further our understanding 
of atmospheric river impacts on flood risk management, water supply, 
and other water uses; as well as funding to inform and improve our 
overall asset management strategy, with a focus on work that has the 
potential to achieve significant cost savings in the Civil Works 
program. Knowledge gained by the further development of such water 
management tools and strategies will inform the Corps' ability to 
respond to severe climatologic conditions, including adaptation for sea 
level rise and persistent drought.
 In September 2023, we issued our Notice of Funding Availability for 
the Corps Water Infrastructure Financing Program authorized under the 
Water Resources Reform and Development Act of 2014. This program allows 
the Corps to accelerate non-federal investments in water resources 
infrastructure by providing direct loans and loan guarantees to 
creditworthy borrowers in order to maintain, upgrade, and repair non-
federal dams. It is the Corps' first ever loan program and enables 
local investment in infrastructure projects that enhance community 
resilience to flooding, promote economic prosperity, and improve 
environmental quality.
 WRDA 2022 also represents Congress's continued commitment to the 
communities you serve by authorizing numerous projects and studies, 
including those within your districts. Congress authorized 25 
construction projects, 94 feasibility studies, and 131 New 
Environmental Infrastructure projects. Through our studies and 
projects, the Corps evaluates the benefits and costs of options to 
strengthen the supply chain, address the climate crisis, advance 
environmental justice, invest in Tribal Nations, and assist 
traditionally underserved communities.
 My top priorities include identifying the highest priority 
potential investments for the Army Civil Works Program, starting with 
the maintenance of our existing infrastructure, and ensuring that we 
deliver studies and finish quality projects safely, on time, and within 
budget. I am focused on delivering projects that will contribute to the 
effort to enhance the Nation's resilience to climate change. These 
priorities will ensure a better return on taxpayer investment and 
improve the lives of all Americans.
 Thank you, Chairman Rouzer and Members of the Subcommittee. This 
concludes my statement. I appreciate the opportunity to testify today 
and look forward to answering any questions you may have. Thank you.

 Mr. Rouzer. Well, thank you both for being here again, and 
thank you very much for your testimony.
 We will now turn to questions for the panel, and I 
recognize myself for 5 minutes.
 Mr. Connor, first, before I get into WRDA, I want to touch 
base quickly on WOTUS. We continue to hear concerns from 
stakeholders on the lack of clarity from the Corps on 
implementation of the revised WOTUS definition. I am aware the 
Corps, along with EPA, recently published some additional 
guidance. And although the Sackett decision emphasizes 
relatively permanent waters, it remains quite unclear how this 
new rule will be interpreted regarding ephemeral streams.
 Does the Corps plan to provide additional clarification on 
this? And if so, when would that be?
 Mr. Connor. Thank you, Mr. Chairman. We are now back in the 
jurisdictional determination business with the issue, and so, 
the conforming rule as of September 8. So, the first stage of 
the implementation aspect of the conforming rule is to move 
forward and start making those jurisdictional determinations. I 
believe we have made 631 approved JDs since the issuance of the 
rule. We have got a backlog of over 4,000.
 Those processes are informing what will ultimately be a 
guidance process, which I think is what you just asked 
specifically about. Will we have guidance ultimately on 
implementing continuous surface connection? Yes, we will, but 
right now, the focus is on working through those jurisdictional 
determinations.
 Most of them that have been done haven't been 
controversial, haven't resulted in any significant discussion 
between ourselves and the Environmental Protection Agency. Some 
of them are. And that is going to inform us as we further 
define what the Supreme Court meant through the continuous 
surface connection test.
 So, bottom line to all of that is: Jurisdictional 
determinations first, do our lessons learned, continue to 
engage with the public, and then look as we get into next year 
doing guidance documents. That is the game plan as it exists 
right now.
 Mr. Rouzer. Well, wouldn't the jurisdictional 
determinations be determinant based on your guidance at the 
national level rather than the other way around?
 Mr. Connor. It's a chicken or the egg type of situation, 
Mr. Chairman. I think we will apply the test, go through as it 
was laid out. It's pretty much a new test that the Supreme 
Court has provided us in the Sackett decision. So, we need to 
dissect all the elements of that opinion as we go through those 
jurisdictional determinations and inform ourselves as we seek 
more long-term guidance.
 Mr. Rouzer. Well, it sounds like very muddy water to me, 
but I have got to move on.
 The committee is currently in receipt of three Chief's 
Reports. The committee has not yet received any Post-
Authorization Change Reports from the Corps. How many Chief's 
Reports and PACRs should we expect for potential inclusion in 
the 2024 WRDA?
 General Spellmon. Mr. Chairman, we are on track to submit 
15 Chief's Reports for Congress' consideration in WRDA 2024 and 
1 Post-Authorization Change Report.
 Mr. Rouzer. Well, as you know, we really need those in 
order to do our work and do it properly.
 Mr. Connor, Surf City, North Carolina, is currently waiting 
to begin a critical beach nourishment project that has been 
long overdue, as you know, and will serve to protect this 
coastal community for decades to come. The Chief's Report for 
Surf City and North Topsail Beach project was completed in 
2010. It was authorized in WRRDA 2014. Project construction was 
funded through the 2019 Disaster Relief Act. Topsail Beach 
ended up withdrawing from the project in 2021, triggering the 
need to authorize a new Surf City-only project in order to use 
those 2019 funds.
 Currently, investigations funds that would ultimately lead 
to construction are waiting for your approval. When can we 
expect Surf City to get this funding and move forward?
 Mr. Connor. Yes, Mr. Chairman. We need to make a decision 
with respect to Surf City. We are going through that process 
within the administration. It's time to ensure that we have the 
resources to do the general reevaluation report.
 So, I will go back and make sure that there is clarity that 
we need to get those funds to move forward. So, hopefully in 
the very near future, I can provide you the specific answer to 
your question about specifically when.
 Mr. Rouzer. Well, I think, as we all know, every day that 
these projects are delayed is another day that these 
communities are at risk, particularly coastal communities. We 
saw that when Hurricane Ian hit Wrightsville Beach last year. 
And I know you are both very familiar with Wrightsville Beach, 
and I greatly appreciate your work to help get that issue 
straightened out, but that renourishment should have been done 
2 years ago. And so, we must take seriously the timeliness of 
these requests and the need to continue protecting the life and 
property of our coastal areas and our coastal citizens.
 With that, I have 2 seconds left. My time has expired.
 I will now yield to Mrs. Napolitano.
 Mrs. Napolitano. Thank you, Mr. Chairman.
 Assistant Secretary Connor, when you last appeared before 
the subcommittee, I asked you about the implementation of the 
set-aside for 12 percent of the Harbor Maintenance Trust Fund 
for donor ports from the WRDA 2020 bill, yet there has been no 
action on this issue.
 The authority for expanded use of donor ports is of 
critical importance to me and the ports in my region in Los 
Angeles and Long Beach. The ports of L.A. and Long Beach 
collect over $200 million a year in harbor maintenance funds 
but only receive 5 percent back for their projects. Incredibly 
unfair, and that is why we negotiated improvements for donor 
ports in WRDA 2020.
 What is the Corps doing to address the inequity and follow 
Congress' direction regarding targets set in WRDA 2020 for 
donor ports?
 Mr. Connor. Thank you, Ranking Member Napolitano. I don't 
know that I have had a discussion of any issue more than I have 
with respect to donor ports, so, I recognize the importance 
across both the House and the Senate with respect to the 
interest in that provision and the provisions of WRDA 2020 that 
were negotiated and enacted into law.
 So, the answer to your question is we did not include 
funding in our 2024 budget for donor ports. That was the one 
part of the 2020 legislation that was left out. We understand 
the importance it has to you and a whole host of other Members. 
So, we have solicited from those donor ports their needs, how 
they would use funding. We want to be prepared should there be 
workplan money in 2024 that we can look to, allocate resources 
towards some of those needs, and we certainly have this under 
consideration given its priority for Congress as we develop our 
next 2025 budget.
 Mrs. Napolitano. Thank you.
 In the water supply and water conservation report submitted 
to Congress in September, the Corps highlights that, regardless 
of congressional authorization, ``priority would remain 
primarily with core authority areas for flood risk management, 
aquatic ecosystem restoration, and navigation, rather than 
water supply, water conservation and other allied purposes.''
 With all the potential benefits of enhanced water 
conservation efforts, can this internal budgetary 
prioritization result in potentially beneficial water supply 
actions not being pursued?
 Mr. Connor. Ranking Member, I think we are pursuing water 
supply in many different ways, and I think important ways. So, 
a few examples I will just identify real quickly. As I 
mentioned to you, looking at our projects for the variety of 
benefits that they can provide is incredibly important. We 
can't just do a flood control project without thinking of water 
supply and environmental restoration.
 We recently did that, as an example of what I mentioned to 
you earlier, which is, we have Prado Dam and Whittier Narrows 
Dam as flood control projects. Earlier this past year, we had 
this strange event in August, Hurricane Hilary, that was coming 
up the west coast. We were prepared to do significant flood 
control actions.
 It ended up being a little bit of a lesser storm, so, we 
pivoted and we operated under our deviations for Prado and 
Whittier Narrows, and we turned it into a water supply event, 
where we metered out the water that did come in so we could 
provide it to the local providers for their managed aquifer 
recharge systems, 19,000 acre-feet that they stored 
underground.
 That is an example of how we can think about holistically 
our projects in a way that we are ensuring we are doing all we 
can to enhance water availability so that water suppliers can 
ensure that they have drought resilience in their systems.
 We are going to continue to have water supply contracts. We 
are looking in other places that are drought stricken how we 
can get water under contract that is not currently under 
contract but through environmental restoration, flood control/
water supply/managed aquifer recharge, as well as direct 
contracts. I think we have got an array of tools to address 
water supply, and that is a priority for the Corps of 
Engineers.
 Mrs. Napolitano. Is the dredging part of it so that there 
would be more catch, dredging of the dams?
 Mr. Connor. I am sorry. Can you repeat the question?
 Mrs. Napolitano. Well, we have long known that sometimes 
the dams get sediment, and the dredging is part of keeping them 
ready for more captured water. My question is: Where are we in 
the projects with the dam dredging?
 Mr. Connor. I believe there was an authorization in WRDA 
2022 with respect to looking at the prospects of removing 
sediment. I am not sure exactly where we are, other than I 
think we are preparing if we have resources to undertake that 
study.
 General Spellmon?
 General Spellmon. Ma'am, real quick. I will tell you, we 
are about to take to the Secretary--another example, to just 
highlight what Mr. Connor mentioned, reallocation studies. So, 
we have got a great one here for Stockton Lake in Missouri we 
will take to the Secretary in March. We are finalizing our data 
now. And just some really new R&D initiatives to help us better 
understand sedimentation in our reservoirs.
 Mrs. Napolitano. Thank you very much.
 I yield back.
 Mr. Rouzer. The gentlelady yields back.
 Mr. Webster, you are recognized.
 Mr. Webster of Florida. Thank you, Mr. Chair.
 A lot of things have been discussed about the availability 
of products and so forth because of the supply chain, and I 
know navigation and freeing channels and so forth is an 
important part of that, I believe it is, to move the cargo.
 What are the highest challenges that you face--I ask this 
to the lieutenant general--in the mission that you have to 
improve that navigation? What would be the, I don't know, 
biggest challenges?
 General Spellmon. Yes, sir. I will start out by saying I am 
responsible for maintaining 577 Federal navigation channels 
across the country at 1,208 ports. The funding and authorities 
that this committee and Congress have given us have been 
extremely helpful. We greatly appreciate, I will add, the 
provision that allows increased draws from the Harbor 
Maintenance Trust Fund to allow us to get after more channels 
and, specifically, more low-use channels.
 This year, at the end of fiscal year 2023, the Harbor 
Maintenance Trust Fund had an end-of-year balance of $10.3 
billion, and we appreciate Congress' direction to allow us to 
have increased draws on that account moving forward.
 Mr. Webster of Florida. So, how are you addressing these 
challenges that exist? Is that just the money? Is that what is 
needed?
 General Spellmon. No, sir. I wouldn't say it is just the 
money. We have--given the investments that Congress has made in 
our navigation program, it has forced us to take scheduling 
with the dredge industry to a whole new level. I think you are 
aware that there are 19 hopper vessels in the United States of 
America working today. Four of them belong to the Army Corps of 
Engineers. I mentioned 577 navigation channels. You can imagine 
the scheduling exercises that we go through.
 We have great, great partners in the dredging industry. We 
have just got to take our scheduling game to the next level.
 Mr. Webster of Florida. So, in your testimony, I think you 
talked about performance-based and focusing on high-performing 
projects. What are the markers you look for to make something a 
high-performing project?
 General Spellmon. Yes, sir. So, in that case, we are 
looking at the amount of cargo that may come in to a port, the 
amount of traffic that transits these navigation channels on a 
monthly, on an annual basis. That is generally what we mean 
when we say performance-based.
 Mr. Webster of Florida. But in a high-performing project 
would be, how does it get to that point? How do you move from a 
performing project to a high-performing project?
 General Spellmon. Yes, sir. And I am happy--I can share 
with you all of our metrics that we use for high-use ports, 
medium-use ports, and low-use ports, how we measure that.
 Mr. Webster of Florida. So, there are three rankings?
 General Spellmon. Yes. Yes, sir.
 Mr. Webster of Florida. OK. Thank you.
 I yield back.
 Mr. Rouzer. The gentleman yields back.
 Mr. Larsen.
 Mr. Larsen of Washington. Thank you. Thank you, Mr. Chair.
 Secretary Connor, the BIL provided a downpayment of about 
$17 billion for backlog of construction, and you said that 
these historic Civil Works funds strengthen the supply chains 
and so on.
 Earlier this year, the Corps announced the obligation of 
most of these funds for ongoing projects. Do you have 
preliminary estimates of the number of jobs created or 
benefited by BIL?
 Mr. Connor. Lots. I wish I had better metrics as far as the 
specific jobs that are anticipated based on the level of 
investments. We can do a little deeper dive on the----
 Mr. Larsen of Washington [interrupting]. That would be 
really helpful for us.
 Mr. Connor. Absolutely.
 Mr. Larsen of Washington. It helps us to continue to make 
the case that we are just not doing investments for their own 
sake, but in addition to flood control or mitigation or coastal 
resilience, we are putting women and men to work as well.
 Mr. Connor. Absolutely. It deserves a deeper dive. 
Obviously, we are keeping all of the contractors, major 
construction entities, skilled laborers busy. But the reality 
is, is these are significantly time-consuming projects that are 
going to go out in a decade, and we need to have the next 
generation of those skilled laborers in place.
 Mr. Larsen of Washington. That's right. And these 
investments from the BIL address the growing backlog of 
authorized construction projects. But how have they helped you 
deal with lingering operation and maintenance obligations as 
well?
 Mr. Connor. I will take a threshold cut at that. I know the 
O&M on aging infrastructure is just tremendously significant. 
The ongoing need for moving dredge material--for dredging and 
then moving dredge material, we got in quite a deficit 
situation. So, between the Bipartisan Infrastructure Law, 
disaster supplementals where we get a little bit ahead of that, 
it has been game changing.
 And then you combine that with what General Spellmon 
mentioned where we coordinate outages with industry partners 
because we have resources that we can plan these outages and 
major rehabilitations, we get our work done quicker. We get it 
done in partnership with industry, and it allows us to plan for 
and do things much more smoothly and keep the economy moving, 
quite frankly.
 Is there anything you would add?
 General Spellmon. Ranking Member Larsen, I would just add 
that, for example, forced outages at our hydropower plants is 
declining. Unscheduled maintenance at our locks, at our gates 
are declining, and I am happy to share those metrics with you, 
but this is making a difference, and I know the Nation and we 
greatly appreciate the investment that is being made.
 Mr. Larsen of Washington. It takes money to do those 
things. Let's keep that in mind as we move forward on whatever 
the next version of BIL is or whatever funding approach we are 
going to take in the future.
 In WRDA 2022, we expanded the section 214 authority, which 
I think we started the 214 authorities probably in 2000, if I 
am not mistaken, and have consistently been reauthorized. We 
made it permanent a few years back, and now we expanded the 
authority to expedite review of entities' permit application, 
to include the evaluation of mitigation banks.
 Can you talk a little bit about how that authority has been 
used? And if so, has it led to faster processing times for 
mitigation bank permits?
 General Spellmon. Yes, sir, I will start.
 This is a very regional problem set. We have some corners 
of the country where there is plenty of mitigation bank space--
--
 Mr. Larsen of Washington [interrupting]. I am not 
surprised, in that section 214 was first started by Brian Baird 
from Washington State, because it is very regional.
 General Spellmon. Yes, sir.
 I will start at 30,000 feet.
 Mr. Larsen of Washington. Sure.
 General Spellmon. Very varied availability across the 
country for mitigation banks. In some corners, we have plenty 
of space. In others, as in Washington State, we are fighting to 
get more options on the table, and what we are doing in Puget 
Sound is a good example of that.
 Mr. Connor. Could I just add, with respect to mitigation 
banking, I think, given the loss of jurisdiction at the Federal 
level, what we do with respect to reinvigorating the rules that 
we have under the 2008 rule of looking at jurisdictional, 
nonjurisdictional wetlands as appropriate mitigation, I mean, 
the goal is to protect and restore wetlands, and I think we can 
do a better job through our mitigation program. So, post-
Sackett, we are looking at those opportunities now.
 Mr. Larsen of Washington. All right. Well, I hope Sackett 
doesn't mess up section 214 implementation too much or at all.
 I have 16 seconds left. I will follow up with a question 
about Federal assumption of maintenance at the Port of Everett 
for the record.
 Thanks a lot.
 Mr. Rouzer. Without objection.
 Mr. Mast.
 Mr. Mast. Thank you, Mr. Chairman.
 Good morning, General.
 General Spellmon. Good morning, sir.
 Mr. Mast. How are you doing?
 You and I end up talking about Lake Okeechobee every time. 
I don't think today will be any different. I appreciate your 
opening remarks, talking a little bit about reducing algal 
blooms and things like that.
 A little bit more open-ended conversation this morning. Can 
we just talk a little bit about where we are at with NMFS? What 
is going on there? What do they want? What do you guys want out 
of it? What is going on between that and the new Lake 
Okeechobee System Operating Manual?
 General Spellmon. Sir, thank you for the question. In 
short, we are not where we want to be. We do not accept the 
biological opinion that was given to us for the Lake Okeechobee 
system.
 Mr. Mast. Just lay that out first, the opinion, as we are--
--
 General Spellmon [interrupting]. Of why, sir? Why?
 Mr. Mast. A short ``what it is that they are saying'' and 
``what is not accepted.''
 General Spellmon. Yes, sir. So, we don't accept the BiOp on 
both its scientific and legal foundation. I will start with the 
legal foundation.
 The biological opinion that science take on listed turtles 
to the Corps based on pollution levels in Lake Okeechobee and 
the surrounding waterways. As you know, Congressman Mast, I 
don't have any discretion on water quality. I do on flows and 
releases. So, that is the legal foundation.
 On the science side, they have tied Lake Okeechobee 
releases to red tide events on Florida's gulf and Atlantic 
coast specific to Lake Okeechobee releases. And so, our 
question, we just asked to see the analysis and the data. How 
do you separate Lake Okeechobee water from the rest of the 
runoff from Florida's 35 coastal counties or Florida's other 
waterways? That is what we have asked to see. We did not make 
progress with our Jacksonville District. We have elevated this 
decision to the Secretary for his consultation with the 
National Marine Fisheries Service.
 Mr. Mast. How would you separate it?
 General Spellmon. I wouldn't separate it.
 Mr. Mast. Just to elaborate on how--to give one example of 
how I could see it, maybe not how you guys would see it or how 
NMFS would see it, right. But you know my coast. You know the 
canals and tributaries to some degree. I might say you might 
separate it by a man-made canal, freshwater versus brackish or 
saltwater. Those would--and I have argued that, that those seem 
like different things to me, and I think scientifically you 
could have that argument. Maybe somebody could argue on the 
other side.
 How would you do it if that is the game that you have to 
play with NMFS? And do you have to play that game with NMFS? If 
you don't play that game with them, does LOSOM just go away?
 General Spellmon. No, Congressman Mast, LOSOM does not go 
away. We are invested. We think--as you know, we believe it is 
a significant improvement from where we have been with LORS. I 
don't know how to separate it. I don't think it should be 
separated. Again, it is not the flow. They are tying it to the 
pollution levels in the lake. And as I mentioned, I don't have 
any discretion on the pollution levels in the lake and the 
impact on red tide and then the subsequent effect on sea 
turtles. Again, that is the primary reason why we don't accept 
this biological opinion.
 Mr. Mast. You do have input on pollution levels if we 
authorize you to do so. That would be correct?
 General Spellmon. Sir, we would follow the direction of 
Congress.
 Mr. Mast. That is good to have that out there.
 Mr. Connor, I saw you nodding your head. Did you have 
something to add to this?
 Mr. Connor. The ball is in my court now to engage at the 
policy level with our friends at NOAA Fisheries. But I do think 
this is a very significant issue that has broader implications, 
and I know the most important thing now is we have got to get 
LOSOM done because it has benefits across the board.
 But I have been in a lot of ESA discussions over my career, 
and not accepting the Corps' view of its discretion about how 
it operates that facility is problematic, quite frankly, and I 
have never had a situation before where that has not been 
accepted, that ``here is the limits of our discretion.'' So, 
that is the issue we have to have.
 Yes, there is a scientific issue about the contribution of 
Lake Okeechobee to potential red tide and those impacts, but we 
will move forward expeditiously, Congressman, because it is an 
important issue for everybody.
 Mr. Mast. I appreciate that.
 I would just make this one other, I guess, observation or 
statement. This administration treats carbon like it is a 
pollutant. Maybe some could argue or agree with that, but I 
think they treat it similar to a pollutant in the way that they 
regulate it and want to penalize it, want to tax people for use 
or production of carbon. It is treated like a vice. If that is 
the case, then I think looking at the quality of water should 
not be a far stretch for the Corps of Engineers.
 We don't have any more time, but I appreciate you all 
engaging in the dialogue with me. Thank you.
 Mr. Rouzer. The gentleman yields back.
 Mrs. Sykes.
 Mrs. Sykes. Thank you, Mr. Chair.
 Thank you for being here. Good to see you after our 
canceled meeting in October.
 I am going to jump right in because I have got a lot of 
questions for you. This is a big deal in Ohio's 13th 
Congressional District where I represent, and I specifically 
want to talk about one of the communities in my district in 
Massillon.
 There is a project in which the Army Corps of Engineers has 
been working on. You just wrapped up a $22 million levee safety 
investment at the dam there, which is very much needed and for 
the safety of our community, and I want to thank you for all 
the work that you have done for the people of Ohio 13 so far.
 But we had one snag here, and I am hoping you can help me 
get some answers. This year, when we were working with 
Massillon, we discovered that the Corps could not help fund a 
gate replacement for their dam. Part of this is because of the 
unique contract where the city and the Corps split the 
maintenance funding 50/50.
 The last water resources bill through WRDA 2022 gave you 
all authority to help repair certain dams if the right 
conditions were met, but, unfortunately, one of the problems 
that cropped up in our conversations was that your office 
hasn't put out any guidance related to your new section 8152 
authority that the WRDA 2022 gave to the Corps for the first 
time.
 So, Assistant Secretary Connor, I just want to ask if you 
and your team are working to get that guidance out the door, 
and when we can expect it so we don't run into issues like this 
again in the future?
 Mr. Connor. Congresswoman, we are doing guidance on 12 
provisions in WRDA 2022, but I don't believe section 8152 is 
one of those provisions. That is something I am going to have 
to look into more closely. I know it has been an issue in your 
district, but at this point in time, we are not preparing 
guidance on that particular provision.
 Mrs. Sykes. Thank you so much for that answer, and we will 
certainly be in contact and remain in contact with you so we 
can settle this once and for all.
 I do want to talk a bit about one of the points that you 
made about your projects being very longstanding, 5-, 10-, 15-, 
20- to 30-year-long projects, and one of those specifically in 
Ohio's 13 was--maybe not your project but one in which you 
helped with--the removal of the Gorge Dam in Cuyahoga Falls 
into Akron.
 I want to mostly talk about the pipeline of talent that you 
have working with you and alongside you and how you are 
developing folks to be prepared to work on those projects that 
exist longer than 10, 15, 20 years.
 General Spellmon. OK, ma'am, if I understand the question, 
it is on project duration based on personnel and manning?
 Mrs. Sykes. Yes.
 General Spellmon. Yes. So, ma'am, I mentioned we just had 
our second highest program in our 249-year history. Today we 
are also at our highest workforce level in the Army Corps of 
Engineers in the past two decades. This morning, just under 
38,455 personnel.
 And you are absolutely correct. We don't do this by 
ourselves. We do it with great partners at the State and local 
level, and there is a great information sharing and great 
cross-development of all these talented STEM professionals in 
each and every one of these projects and certainly something we 
want to do more of.
 Mrs. Sykes. Thank you, sir, for that answer.
 And I want to direct your attention to some of the remote 
personnel that you have suggested. And if you could discuss how 
not having onsite personnel will impact your work emergency 
situations if a lot of this work is being remotely supervised 
and monitored.
 General Spellmon. OK. I think this is a remote work 
question. Congresswoman, post-COVID, the Corps never left work. 
We may have done it from different locations, but we never left 
the workplace. In fact, at the height of the pandemic, we were 
working in nearly every major city across the country and 
building alternate care facilities to help the hospital staffs 
have greater facilities.
 Yes, our districts may look a little different. I know my 
headquarters looks different today than it did 3 years ago. It 
is just that people are working from different locations, other 
headquarters. We are just taking advantage of all the tools 
that Congress and the administration has given us to continue 
delivering our program.
 Mrs. Sykes. And with my final 30 seconds, I am going to 
give you an easy one here. Can you just talk to us about how 
important funding these infrastructure programs are for the 
work that you do and for communities like mine in Ohio's 13th 
Congressional District?
 General Spellmon. Ma'am, I think it makes a huge 
difference. I just mentioned a couple of examples before on the 
hydropower plants. We are seeing fewer forced outages. We are 
seeing fewer unscheduled maintenance periods on our locks. On 
dredging in the State of Ohio, we are getting after those 
channels in a more consistent and timely manner. It has been 
immensely helpful for our program.
 Mr. Connor. If I could just add real quickly, I think the 
biggest value is, we are building capacity. We are building new 
restoration efforts. So, we are not just maintaining the 
systems which we have that are very valuable to many 
communities, but we are building capacity particularly to take 
our ports, harbors, inland waterway system where that is 
America's competitiveness. That is where we can produce more 
jobs and create more opportunities. And so, these resources are 
just invaluable for that effort.
 Mrs. Sykes. Thank you. I yield back.
 Mr. Rouzer. The gentlelady yields back.
 Mr. Burlison.
 Mr. Burlison. Thank you, Mr. Chairman.
 Table Rock Lake is extremely important to southwest 
Missouri. When I was campaigning, I realized that as I was 
interacting with the community leaders. And I want to work well 
with you all on how we can make sure that we have access, 
recreational access, make sure that landowners and resorts are 
working seamlessly together, and making sure that the lake is 
kept beautiful as well.
 But I will say that I am surprised at how many phone calls 
that I get. I get a lot of phone calls. Probably next to 
passport renewals, this is--from issues at the lake from 
individuals is one of the top phone calls that our office gets.
 Now, in fact, one constituent is here in this room today 
because he flew up to our Nation's Capital to have a meeting 
with me to address concerns related to his home and his 
neighbors' homes and a septic tank that is barely, barely on 
Corps land and has been apparently allowed. It was approved 
decades ago, but the Corps is now telling them that they have 
to remove that septic tank.
 Now, look, I know that septic tanks are not that big of a 
deal to you, but to the constituent who is willing to fly to 
their Nation's Capital because just moving that septic tank 
will cost four homeowners $250,000. It's not affordable. And 
then ecologically, I would be hard-pressed to explain the place 
where they would have to move it to, how that would somehow 
improve the quality of the lake. And so, I don't know if you 
want to address that.
 General Spellmon. Sir, first of all, thank you for the 
comments and your constituent who flew here to share his 
concern.
 We have encroachments all over the country. My direction to 
our Southwestern Division regional commander was stop writing 
letters to the landowners where we have encroachment issues. 
Let's knock on doors and talk to people face-to-face. And we 
want to work with everyone. We have resolved a number of these 
already. We have 356 to go, solved 76 recently, and we are just 
going to work through these one by one.
 I agree with you. Does it make sense to move a septic tank? 
Sharing the detail that you just shared with me now, no, it 
doesn't. What we are concerned about is public safety. We want 
to keep homes from being inundated, and that is why we just 
want to have a home-to-home, family-to-family conversation with 
everyone.
 Mr. Burlison. One of the things that I have been trying to 
address is try to figure out a solution to this on a broad 
scale, so that there is a bright line so that individuals who 
are adjacent to the Corps property have options or flexibility 
with the Corps and that it's not this perceived perception that 
their neighbor is getting a better deal than they are getting.
 Are there any kind of changes that we could do in policy 
that would make it sure that it's across the board fair for 
everybody?
 General Spellmon. And thank you for that, sir. And we can 
and we will do better on the communication front.
 Mr. Burlison. OK. The other thing I would say is that one 
of the concerns is, we have parks where the infrastructure has 
been declining over the years. Several of the parks that are 
controlled and managed by the Corps, the bathroom facilities, 
they're just not being kept up-to-date, and that's not for lack 
of trying. Obviously, there are financial reasons and needs.
 Are there any thoughts on how we can maybe address it 
through designating some funds for these kind of improvements 
at a lake?
 Mr. Connor. Congressman Burlison, thank you for your 
advocacy on behalf of our recreation facilities.
 First of all, we have, over the last couple years, 
increased our budget for recreation facilities. I mean, we are 
the second largest recreation provider in the Federal 
Government, more camp sites than the National Park Service, 
which surprises a lot of people. So, we have got to take care 
of these facilities. I have been out to many of them. The staff 
are doing all they can, going to extraordinary means to 
maintain bathrooms to make them more user-friendly and just 
attractive, quite frankly.
 So, there is a fundamental lack of parity with respect to 
the resources available to reinvest from recreation fees into 
facilities. I know there is legislation. I can't comment on 
legislation in this context, but I think that particular 
provision and bringing the Corps' recreational program on 
parity with other Federal agencies is really important to look 
at, and we are open to that conversation and to working with 
you all as you try and work through those issues.
 Mr. Burlison. Thank you. Thank you.
 Mr. Rouzer. The gentleman yields back.
 Mr. Stanton.
 Mr. Stanton. Thank you very much, Mr. Chairman.
 A major component of the recent WRDA bills has been 
authorization for environmental infrastructure assistance, 
including in my State of Arizona. And I expect environmental 
infrastructure assistance will continue to be supported in the 
2024 WRDA.
 In Arizona, more than $37 million in EI funds have been 
allocated to 23 projects to help our communities and Tribal 
nations use wastewater more efficiently, recharge area 
aquifers, and improve water delivery and conservation through 
new wells and pipelines. And we anticipate more projects will 
be funded in 2024. Yet, to date, not one of these projects, 
some of which were funded nearly 2 years ago, have been able to 
break ground.
 General Spellmon, I appreciated our meeting last week and 
your commitment to improving the delivery of these EI funds to 
Arizona's communities as they work to mitigate the impacts of 
the ongoing drought.
 Given the continued focus and interest on EI by Members on 
both sides of the aisle, how is the Corps working to ensure 
that EI projects funded by Congress get out the door to 
communities in a timely and efficient manner?
 General Spellmon. Yes, sir. And, sir, thank you for your 
time last week in meeting with us.
 I share your frustration, as I told you last week, and I 
rightfully have taken some bruising from my boss sitting next 
to me on our inability to deliver this program. You have given 
us $38 million for 17 projects, and I have got 1 project 
partnership agreement to show for it.
 What we are doing, specifically to Arizona, as I shared 
with you last week, we have hired a program manager and two 
project managers, and we are starting twice weekly calls with 
each of these project sponsors to move them along in the pipe. 
We are working with new partners. They are working with us for 
the first time. We are going to get better.
 Mr. Stanton. I appreciate that.
 WRDA 2022 included several provisions that I authored to 
enhance the Corps' ability to tackle drought, wildfire, and 
other natural hazards that impact the Corps' infrastructure and 
water management. Specifically, these provisions directed the 
study of nature-based approaches to minimize risk to Corps' 
water supply facilities in the West, expansion of managed 
aquifers recovery efforts, and an assessment of opportunities 
to partner with non-Federal entities to reduce wildfire risk.
 Can you provide updates on the specific studies and efforts 
to enhance the Corps' ability to proactively respond to these 
disasters and what additional authorities could be beneficial 
to consider in addressing these challenges given the reality of 
climate change and the ongoing drought throughout the West, in 
particular the Colorado River Basin?
 General Spellmon. Sir, I will begin. We have some limited 
success in this field with some work that we have been doing in 
California. I have got to do a better job at my level in 
sharing these best practices across our enterprise where we can 
get greater application, say, in Arizona. I don't think I have 
adequately used all the authorities that you have already given 
me, and we just need to step on the gas and get more of these 
types of features in the ground complementing our traditional 
steel, concrete, compacted dirt construction.
 Mr. Stanton. I appreciate that.
 And, finally, I want to touch upon an important project to 
me personally, a passion project, I have been working on it a 
long time, and that is the Tres Rios Ecosystem Restoration 
project. And I have been working on that since I was a city 
councilman in the city of Phoenix, subsequently mayor of the 
city of Phoenix, and now in my time as Congressman.
 Can you assure me that the Post-Authorization Change Report 
and cost update for this project are on track for completion to 
be included in 2024 WRDA?
 General Spellmon. Congressman Stanton, yes, we are on track 
to have that PACR ready for Congress' consideration in WRDA 
2024.
 Mr. Stanton. All right. Can you ensure me that it will be 
ready on time for that? Again, I only reiterate that because we 
have been here a long time waiting for that.
 General Spellmon. Congressman, we are set to turn that 
assessment in in May, the month of May, fiscal year 2024.
 Mr. Stanton. All right. I appreciate that. I will be 
looking forward very much to receiving that report so we can 
move swiftly forward with including Tres Rios in WRDA.
 With that, I yield back. Thank you.
 Mr. Rouzer. The gentleman yields back.
 Mr. LaMalfa.
 Mr. LaMalfa. Thank you, Mr. Chairman.
 Appreciate you being here from Army Corps. Thank you.
 General Spellmon, first I want to say thanks. We had a 
question, it would have been in October, about extra credits 
left over from the Sutter Butte Flood Control Agency in 
northern California from the projects there that we were 
wondering if that was going to be able to transfer those excess 
credits, and at this point, you have already done so. So, 
appreciate that for other projects in our State of California. 
Thank you for knocking that out.
 A quick question on something I heard a little bit earlier 
in the committee. There's going to be 15 Chief's Reports issued 
this year. Is that what you said?
 General Spellmon. Congressman, that is correct, 15.
 Mr. LaMalfa. OK. Remind me, does a Chief's Report have one 
project card or some have more than one project in them?
 General Spellmon. Sir, one project per Chief's Report.
 Mr. LaMalfa. One per. OK. All right. We always want to move 
the pace and scale up here, so, 15 per year. We have got a lot 
to do.
 I am very concerned, in northern California, as you know, 
we have talked about in the past, with the ability to capture 
water and the amount of water that is flowing out of our State 
and our watersheds. Even in drought years, we have a tremendous 
amount of water that gets away from us.
 So, this year, for example, in mid-January, we had a 
tremendous rain and snowpack. Ninety-five percent of the 
precipitation that was coming towards the delta went straight 
on out to the Pacific Ocean, 95 percent. And what Californians 
are facing is that some municipalities are going to ration 
people down to 42 gallons per day per person. And that is not 
even enough to fill your pet's little wading pool you have in 
your yard. And so, we have a real juxtaposition of issues here 
when we have had such abundant water, almost record snowpack 
this year and then just a few years ago, and yet they continue 
rationing and cutting down to such a minimal level what people 
can use in urban and city settings, as well as agriculture, 
which is being decimated in the San Joaquin Valley and got hit 
really hard in 2022 in northern California as well. And then 
just recently here in mid-October, 77 percent of the water was 
still flowing into the delta straight out to the ocean.
 So, we hear about, well, we can make desal. Well, it takes 
so much energy. Why not capture the water when it is still 
fresh instead of taking it? And then they don't want to give 
the desalination projects, as we saw in the Poseidon down there 
in, what, Huntington Beach, after 20 years. They turned that 
down. So, there is no solution for some of these people.
 So, improvements in what is known as the FIRO, which is 
known as forecast-informed reservoir operations, we have talked 
about this, improved weather runoff forecasts more modernized 
instead of from manuals from the seventies. We can potentially 
keep water in the reservoir sooner and longer above the 
conservation levels that are currently in place.
 So, the Yuba-Feather FIRO was released in December 2022, 
having the final assessment out in 2023 and hopefully 
implementation in this WRDA year in early 2024. How are we 
doing on that?
 General Spellmon. Sir, FIRO in short is a game changer. I 
know you are aware of the success that we experienced at Lake 
Mendocino. Now that we have a template, we are sharing that 
with the other projects that are undergoing the FIRO viability 
assessments and that will accelerate our implementation.
 I would just add----
 Mr. LaMalfa [interrupting]. I am sorry. I am running short 
of time. I hate to do that.
 What do we see on this--on this particular one on timeline?
 General Spellmon. Sir, I am sorry. Is this Mendocino?
 Mr. LaMalfa. No, no. Yuba-Feather.
 General Spellmon. Oh. So, sir, on New Bullards Bar, final 
viability assessment this September. If we find it viable--we 
believe we will--we are going to operate that reservoir on a 
deviation just like we are doing Mendocino while we take up the 
NEPA on the water control manual.
 Mr. LaMalfa. OK. So, we can see that during this rainy 
season we are about to enter here this year?
 General Spellmon. September of next year, sir, we will 
complete the--September of 2024, we will complete the viability 
assessment.
 Mr. LaMalfa. Wow, doggone it. All right. I guess we are 
getting there.
 So, on the Sackett decision v. EPA, the WOTUS rule 2023, 
which became effective in September, we have been--landowners 
are waiting to hear from the Corps or EPA or somebody on 
implementation guidance. So, the rule became effective, was 
sent to district staff.
 Can this committee have a copy of this implementation 
guidance for States that are adhering to the conforming rule in 
the pre-2015 preliminary--excuse me--regulatory regime? Pre-
2015 regulatory regime. Is that something we can get 
immediately for this committee and help inform our people out 
there?
 Mr. Connor. We have the conforming rule which we issued in 
September. We are now working through the jurisdictional 
determinations. We do not have new regulatory guidance at this 
point in time. We will be in the process, over the next months 
and the next year, of developing that guidance. Certainly, that 
will be a public process----
 Mr. LaMalfa [interrupting]. So, where does that leave 
people that are caught in limbo on what the Sackett ruling had 
been to them, on decisions they will make on ponds or building 
on their land or raising--anything they would be doing that has 
an effect here?
 Mr. Connor. Well, there is clarity in the rule now with 
respect--we don't have a significant nexus test. We don't have 
a former definition of adjacent wetlands. We have had to revise 
that as a result of the rule. We no longer include wetlands 
just because of their interstate process. So, we have adjusted 
the rule to be clear in conformance with the Sackett decision. 
So, that provides clarity in and of itself.
 We are working through AJDs. We will publish all the AJDs--
jurisdictional determinations--we do that will provide factual-
based decisionmaking for people to understand. And we are 
moving through--we have done about 634 of these jurisdictional 
determinations since September, so, that's providing a database 
to give clarity for people working through this effort.
 Mr. LaMalfa. OK. I appreciate that, because they need to 
have clarity because they can't get caught in limbo here. And 
would you make sure the Sacramento office understands that, 
because that is where some of the biggest problems have been in 
the past at least, like in Tehama County, on enforcements that 
have been just really out of line, OK?
 Mr. Connor. We are making sure everybody is going to be in 
alignment.
 Mr. LaMalfa. Thank you so much.
 I yield back, Mr. Chairman.
 Mr. Rouzer. The gentleman yields back.
 Ms. Norton.
 Ms. Norton. I thank the chair and ranking member for 
holding today's hearing.
 The District of Columbia is wholly dependent on the Potomac 
River for its drinking water, but natural man-made events could 
render the river unusable for drinking water. This poses a 
grave risk both to the operations of the Federal Government and 
to DC residents.
 The federally owned and operated Washington aqueduct 
produces drinking water from the Potomac River for DC and parts 
of Virginia. However, the aqueduct maintains only a single day 
of backup water supply.
 The Water Resources Development Act of 2022 contained my 
provisions authorizing the Army Corps to conduct a feasibility 
study on a secondary drinking water source and additional 
drinking water storage capacity or capability for the DC area, 
but it is my understanding that the Army Corps has had 
difficulty finding a non-Federal sponsor to share the costs of 
the study, which is understandable because the study affects 
multiple jurisdictions.
 Given the importance of this study to the operations of the 
Federal Government and the cross-jurisdictional nature of this 
study, I will be submitting a provision for inclusion in the 
Water Resources Development Act of 2024 that would require the 
Army Corps to fund 100 percent of the cost of this study.
 Lieutenant General Spellmon, does the Army Corps support 
funding 100 percent of this study?
 General Spellmon. Congresswoman Norton, I would state it 
this way. This is a unique Civil Works project. It does not 
receive any Federal funding. The Washington aqueduct receives 
its resource by local ratepayers through three water suppliers: 
DC Water, Arlington County, and Fairfax Water.
 And I would just give you one update. We do have a very 
talented and willing non-Federal sponsor to help us with this 
study once funds are in receipt, and it is the DC Metropolitan 
Council of Governments. So, we are ready to step off. We just 
needed a new start authority or funding, and we are ready to 
move out. And I agree, this is a much needed investigation.
 Ms. Norton. So, you do support 100 percent funding of this 
study?
 General Spellmon. Yes, ma'am.
 Ms. Norton. I will close by noting that I am deeply 
concerned about the multiple World War I-era munitions found in 
the National Park Service-owned Fort Totten Park in the 
District of Columbia which is located in a residential 
neighborhood and is regularly used. An unexploded ordnance was 
uncovered on the Fort Totten trail in 2020, and two more metal 
canisters were discovered in a different location in Fort 
Totten Park on August 18, 2023.
 I thank the Army Corps for publicly announcing, along with 
the National Park Service, that it is seeking funding to 
conduct a comprehensive investigation of Fort Totten Park for 
munitions and any resulting environmental damage.
 On November 16, 2023, I wrote a letter requesting that 
funding for this important investigation be included in the 
President's fiscal 2025 budget. I urge the administration to 
include this funding.
 And I yield back, Mr. Chairman.
 Mr. Rouzer. The gentlelady yields back.
 Mr. Ezell.
 Mr. Ezell. Thank you, Mr. Chairman.
 I am glad to be part of this process and to support the 
important projects that are going on and been authorized in my 
district by the Water Resources Development Act. Today, I want 
to continue talking about the Lower Mississippi River study 
which was authorized by previous WRDA in response to the 2019 
Bonnet Carre spillway openings.
 Mr. Connor, I am glad we are here to see you again today, 
and your staff have been very, very excellent to work with. I 
also want to thank you for your commitment at a previous 
hearing to include Mississippians as stakeholders in the Lower 
Mississippi River study which will be run by the New Orleans 
District. The local leaders, fishermen, and business owners of 
the Mississippi gulf coast really deserve a seat at the table. 
And I understand that the lower river study will take about 5 
years to complete and will be quite complicated. Hard to 
believe that.
 [Laughter.]
 Mr. Ezell. So, really it is important to get it started as 
soon as possible.
 Do you have any updates on the study?
 General Spellmon. Congressman, yes, I do. So, we are in the 
scoping phase now. We have engagements that are ongoing at the 
moment with all seven States. What we are working is lining up 
the State agencies that will partner with the New Orleans 
District in advancing this work. I want to thank the committee 
for the authority and the funding that we have received. We 
have all we need at the moment to continue moving.
 Mr. Ezell. Thank you.
 Mr. Connor. Can I just add?
 Mr. Ezell. Sure.
 Mr. Connor. It is incredibly important. This is the one of 
the highest priorities we have. This is the most dynamic river 
system in the country. And the thought that we are going to 
continue to operate exactly as we have without updating the 
science, the interactions with the stakeholders, the interests; 
we can't continue to do that. So, it is an incredibly high 
priority. I just wanted to assure you of that, Congressman.
 Mr. Ezell. Thank you very much.
 Do you have any idea when the stakeholder hearings will 
start and if that will be public?
 General Spellmon. Congressman, once we have our agencies 
lined up at the State level, then we will start the public 
scoping meetings with those partners in the room with us. So, I 
expect that to be later in the spring.
 Mr. Ezell. Oh, great. Thank you.
 I kind of want to change the topic just a minute. 
Continuing to hear about how the contractors that are working 
on Civil Works projects are already facing a lot of redtape 
which slows them down on these important water-related 
projects. There is a newly proposed policy that would force 
project developers to guarantee that they have checked every 
material and method before beginning a project.
 I assume your engineers who understand construction are 
already doing this and making good choices about the material 
that is being used. Is that correct?
 General Spellmon. Yes, Congressman. I am not certain I am 
familiar with the specific instance that you are referring to, 
but absolutely, that's a part of our checks.
 Mr. Ezell. OK. We hear so much about it takes so long 
because we have got to check so many boxes. We really need to 
move along. And I know it is a priority, and I appreciate that.
 So, we just want to make sure that some of these new 
regulations do not slow down our construction, and I would 
appreciate any and all the support and help we can get for 
that.
 Thank you, Mr. Chairman. I yield back.
 Mr. Rouzer. The gentleman yields back.
 Mr. Garamendi.
 Mr. Garamendi. Thank you, Mr. Chairman.
 I want to bring up three important issues for California. 
First of all, we have had several discussions about water 
supply already. However, water supply is not an authorized 
project for the Corps of Engineers, at least in reclamation 
States.
 Mr. Connor, would you support adding water supply to the 
authorization for the Corps of Engineers' projects?
 Mr. Connor. I do support adding water supply, yes, sir. I 
think it is incredibly important that we look at all of our 
facilities and try and secure as many benefits and purposes out 
of them. So, flood control is going to be first, but that 
doesn't mean we can't look at water supply as we talked about 
with respect to forecast-informed reservoir operations.
 Mr. Garamendi. Well, then let's get a new law and, for the 
committee members, let's add it to this year's WRDA.
 Permit reforms. Much discussion about permitting, the 
length of time for permitting and the rest. For the State of 
California, we already allow the State CEQA, California 
Environmental Quality Act, to substitute or to be equivalent to 
NEPA for several kinds of projects; for example, airports and 
ports themselves, but not for the Army Corps of Engineers' 
dredging programs.
 Would you support legislation that would allow in 
California the CEQA program, which is equivalent and, in some 
cases, stronger than NEPA, to be the single requirement for the 
environmental review?
 Mr. Connor. I certainly support that in concept. We need to 
be as efficient as we can in our permitting processes. Even as 
we are trying to be more comprehensive and engage more with the 
public and stakeholders, we need to be more efficient. If we 
can use other products, I think that is great.
 Mr. Garamendi. Well, if the CEQA program, that is the 
California Environmental Quality Program, is allowed to be a 
substitute for NEPA for some projects, for some Federal 
projects, we need to add the dredging programs to this so we 
can get on with it more quickly and not have to do duplicate 
work.
 Finally, there is an authorized program for San Francisco 
Bay, the Stockton Channel project. This program has been in 
existence since 2007. The continuation of it is dependent upon 
two things. First of all, the identification of a local 
sponsor. We are working diligently to accomplish that; and, 
secondly, that it not be rescinded.
 Now, each and every year, the Corps is required to go 
through projects that are not moving along. This could be 
considered one such project because of the removal of the 
previous local sponsor. However, if we want to have a real 
brawl, just bring to this committee the termination of this as 
a project. So, please don't do that. We don't need another 
brawl. What we need to do is to work diligently to replace the 
local sponsor. So, heads up, looking forward to avoiding a 
fight here in the final WRDA.
 I thank you for all the work you do on so many different 
projects. I will let it go at that. Thank you very much.
 Mr. Rouzer. The gentleman yields back.
 Mr. Owens.
 Mr. Owens. Thank you.
 The Great Salt Lake is one of Utah's most iconic and 
important ecosystems. Our own State capital is named after the 
lake. Unfortunately, water levels in the lake have been 
declining in recent years. In 2022, we saw the lake at record 
low elevation. These declining water levels threaten economic 
activity, public health, and the great ecosystem.
 The Great Salt Lake provides Utah with the highest density 
of wetland habitat for plants, brine shrimp, reptiles, 
amphibians, mammals like the iconic bison, and birds. 
Additionally, the economic output of the Great Salt Lake is 
$1.2 billion annually and provides over 7,700 jobs. It also 
provides significant amounts of magnesium, salt, and other 
minerals. Nearly 2 million tons of minerals are extracted from 
the lake every year. As you can see, this is why it is so 
important for me and the entire State of Utah.
 This year, Utah saw record amounts of snowpack in our 
beautiful mountains which helped our water levels across the 
State. However, just 1 year is not enough. We need at least a 
decade of record snowpack to help us through our drought and 
the water levels throughout our State. That is why we need to 
work with our Federal, State, and local partners to help 
preserve the important ecosystem and to allow Utah to continue 
to be the fastest growing State in the Union.
 In the last WRDA bill, we began working on this 
partnership, and I want to continue this partnership in the 
most innovative ways. We need to have the Corps recognize the 
importance of the lakes, especially the Great Salt Lake.
 For both of you two gentlemen, first of all, I thank you 
for being here again. I have heard from our State partners that 
we have been informed that it will take nearly a decade for 
funding from the Corps to reach the Great Salt Lake. This is, 
frankly, unacceptable.
 How can we work together to expedite this process?
 Mr. Connor. Thank you for the question. First of all, I 
share your perspective. I had an opportunity last January on a 
very cold day to get out with your director of the Department 
of Natural Resources and spent some time talking about this 
very issue. And at that point in time, that was before the 
hydrology had given us a year's reprieve. But I share your 
views that time is of the essence here given the challenges.
 So, we have entered into a Planning Assistance to States 
agreement with the State of Utah I think a couple of months 
ago. And the idea here is there are several different 
authorities, not just for the Corps but also Bureau of 
Reclamation and other agencies, and what we are trying to do is 
work with the State Department of Natural Resources to figure 
out the best game plan and how we can use our respective 
authorities, reclamation, the State, and the Corps of 
Engineers.
 So, the Planning Assistance to States agreement will help 
us do that, make use of the tools that have been enacted in the 
most recent WRDA bills, combine that with the Bureau of 
Reclamation Basin Study that is going on now where they have 
engaged a bunch of stakeholders, and that is the idea. So, we 
are in the planning, development, organization stage, but we 
are going to make use of those authorities ultimately, 
Congressman.
 Mr. Owens. That being said, is there any way that we can 
have some seat at the table as you guys have this conversation? 
Particularly Utah, I would love to know more what you are doing 
here. Anything we can do to kind of help facilitate that or be 
part of that process?
 Mr. Connor. Absolutely. I think the key is to keep the 
delegations informed. We would be happy to provide ongoing 
updates as part of the process.
 Mr. Owens. I would appreciate if you do that. I think we 
definitely have an interest in that.
 I have heard from the Sacramento District in the State of 
Utah that they are still waiting for headquarters to provide 
Planning Assistance to States funding for these projects. Is 
that what we are dealing with right now then?
 Mr. Connor. Yes. We have got the agreement in place, and I 
know we have resources provided by the Bipartisan 
Infrastructure Law. So, we can follow up on that, Congressman.
 Mr. Owens. OK, OK.
 The 2022 WRDA included a monitoring and assessment program 
for saline lakes like the Great Salt Lake in the Great Basin. 
What is the current status of that program?
 Mr. Connor. I think that is one of the authorities that 
exists that we are trying to figure out how to best use that 
authority. And the planning process is how we are going to get 
to that. I know we don't have any resources specifically 
allocated for that study yet. That is kind of a next phase of 
this whole effort.
 Mr. Owens. OK. I would like to do this. I would like to 
make sure our team is in touch with you guys. The Utah 
delegation would love to be part of this conversation, and I 
think we are innovative enough to impact the rest of the 
country to figure it out. So, I look forward to working with 
you on that.
 And with that, I yield back. Thank you.
 Mr. Rouzer. The gentleman yields back.
 Mr. Huffman.
 Mr. Huffman. Thank you, Mr. Chairman.
 Assistant Secretary Connor and Lieutenant General Spellmon, 
thank you both for your time today. I also want to thank the 
Corps for its inclusion of an environmental infrastructure 
project in my district in the 2023 workplan. It is for the 
Tolowa Dee-ni' Nation, and it is very important. It is going to 
help the Tribe and surrounding community replace aging 
wastewater infrastructure that serves low-income residents on 
the Tribe's land, and we very much appreciate that.
 I look forward to working with the Corps on other 
environmental infrastructure projects in my district. One that 
I want to highlight is the Marin Municipal Water District in 
Marin County. Marin was one of the first to declare a water 
supply emergency during the terrible 2021 drought. And this is 
a district that serves about one-quarter million people, came 
really close to simply running out of water. It was quite dire.
 And so, we have been working since then on some commonsense 
plans that can make us much more resilient and prepared for the 
next drought. And I would urge the Corps to include the 
district's Soulajule Reservoir project in the 2024 workplan. It 
will help increase water yield and provide much needed 
operational flexibility.
 I also want to thank you for your timely dredging of 
Humboldt Bay in my district. The Corps recently repaired and 
rebuilt jetties in the harbor, and the community is very 
thankful for that.
 I am very excited that one of our Nation's first offshore 
wind leasing areas on the west coast--this will be floating 
offshore wind--is going to be on the Humboldt County coast in 
my district. It is going to mean local jobs, clean energy, 
really wonderful developments, but the components that will be 
coming into port will require major updates to the harbor Heavy 
Lift Terminal. That harbor is going to be a very busy place for 
the assembling of these floating platforms and turbines, and we 
are going to need much more regular dredging.
 So, we hope you will continue to be attentive to the needs 
of Humboldt Bay. And, sadly, when we think about those needs, I 
am focusing on the challenge that we face because the Corps has 
only one deep channel dredge in the entire Pacific, the 
Essayons, and it has to serve all deep channel dredging for 
California, Oregon, Washington, and Alaska, and Hawaii. That is 
a heavy burden for any piece of equipment, but it is a 
particular concern for the Essayons because it is now over 40 
years old.
 We included a provision in the 2022 WRDA for the Corps to 
submit a report to Congress on current and future dredge 
capacity and the availability of those assets to meet dredging 
needs nationwide. This provision also included an analysis of 
the Corps' fleet for each region.
 So, I want to just ask you, what is the status of that 
report? And can you share how the Corps plans to handle what 
will surely be expanded dredging needs in the Pacific with just 
this one lonely, aging dredge?
 General Spellmon. Sir, I will check on where we are with 
the review of our work. This is not a surprise to us. As I 
mentioned earlier, we are responsible for 577 Federal 
navigation channels, many of them on the west coast.
 As I shared, we have got, in the Corps, to take our 
scheduling to a higher level just given the limited amount of 
deep draft harbor Federal navigation channel assets that we 
have, about 19 hopper dredges in the United States of America. 
We are working. We have great partners in the dredging 
industry. We just have to improve our scheduling.
 Mr. Huffman. All right. Well, I look forward to hearing how 
you intend to tackle that challenge. I think any way you cut 
it, the Corps is going to have to build a new dredge for the 
Pacific region to replace the Essayons. And we look forward to 
providing you whatever support you need to get that done.
 I want to talk about Coyote Valley Dam in my district as 
well. We have included language in a bunch of different WRDAs 
to direct the Corps to study raising Coyote Valley Dam in 
Mendocino County, and yet it never seems to happen. Right now, 
the Corps is in reconsultation to try to come into compliance 
with the Endangered Species Act. It has got a terrible 
turbidity problem. Many experts believe the only way you are 
going to solve that problem and come into compliance with the 
ESA is to go ahead and raise Lake Mendocino so that you could 
have different outfalls and fix some of the infrastructure 
limitations there.
 Can you just give me a sense of the status of consideration 
of this thing we keep urging you to study that would also be a 
great way to come into compliance with the Endangered Species 
Act?
 Mr. Connor. For all the reasons you just mentioned, this 
should be a priority, but yet we don't have funding identified 
yet, and we don't have a new start. But given the imperative of 
water supply plus the environmental aspects of a dam raise, 
certainly if funding would be made available, this will be a 
priority to get going and work with your folks on seeing what 
we can do about a dam raise at Coyote.
 Mr. Huffman. All right. Thank you.
 Mr. Chairman, I yield back.
 Mr. Rouzer. The gentleman yields back.
 Mr. Babin.
 Dr. Babin. Thank you, Mr. Chairman.
 And good morning, General Spellmon and Assistant Secretary 
Connor.
 I represent Texas' 36th Congressional District, home to 
some of the Nation's most critical ports and waterways, really 
unmatched numbers of chemical plants, refineries, and a number 
of communities that are sensitive to natural disasters that we 
have seen over the years, notably hurricanes.
 General Spellmon, I know you are familiar with my district. 
I hope that we will get you back down there soon to see some of 
the good things that are happening and the work we are doing 
there in the Houston Ship Channel in southeast Texas.
 I would like to thank both of you for your commitment to 
protecting and improving our Nation's water resources and 
infrastructure. As my district relies heavily on the Army 
Corps, we greatly appreciate everything that you do.
 I have a few questions, and I would like to hear from both 
of you, if that is OK.
 First off, I am sure you have spent many hours working on 
and thinking about what we call the Ike dike Texas coastal 
spine project. I'm not going to ask you to get into specifics, 
but I was hoping you could provide us with a very brief 30,000-
foot view of how the project is developing in your perspective.
 General Spellmon. Yes, sir. I recently had the opportunity 
to visit our team out there. This is a bold plan that would 
represent the largest single investment in the Army Corps of 
Engineers' history. To me it is a great example of combining 
traditional concrete, steel, compacted dirt with natural and 
nature-based features.
 During my visit with the non-Federal sponsors and our 
partners in the room, I challenged the team to develop what we 
call an integrated delivery schedule like we have in the 
Everglades, another very large program, to show how we would 
sequence this work over time and inform the associated funding 
decisions. That integrated delivery schedule, sir, is underway, 
and I look forward to sharing that with you soon.
 Dr. Babin. Super. Thank you very much.
 The critical infrastructure there for our national 
security, aviation fuels, jet fuels, anything that is energy, 
this is the epicenter of energy. So, we need the protection. 
Really do.
 OK. I would also encourage you on both the coastal spine 
project and many other vital projects in and near my district 
is to work closely with the local communities in addition to 
local stakeholders as well. That includes towns of all sizes, 
like Beach City, Pearland, Baytown, Beaumont, Houston, et 
cetera. My constituents are paying very close attention to how 
projects might impact their communities and their quality of 
life, so, please leave no stone unturned and please listen 
closely to their concerns.
 My next few questions are about the Army Corps of 
Engineers' nationwide permitting program which was designed to 
allow infrastructure projects with minimal effects to proceed 
with a general permit after streamline review.
 Does the Army Corps support meaningful Federal permitting 
reform legislative initiatives to safeguard the security, 
reliability, and affordability of energy infrastructure, 
including natural gas pipelines? And if so, how is the Corps 
working with Congress or planning to work with Congress to make 
the nationwide permit program general permit process more 
consistent and more effective?
 Secretary.
 Mr. Connor. Thanks. I will take a cut at that first.
 Dr. Babin. Yes, sir.
 Mr. Connor. Absolutely. Permitting efficiency and 
competence to work with all the interested parties is the 
biggest challenging issue I think facing the Army Corps of 
Engineers. We are a regulatory agency. We want to get 
infrastructure moving. We want to do in it in a way that 
doesn't end up in the courts for decades, quite frankly.
 Nationwide permit program, perfect example, broad support. 
We strongly support that effort. We move permits efficiently 
through that process, through the 56 nationwide permits. We are 
currently just beginning the process for the next year 5-year 
permitting program. For the 56 permits that we have in place 
now, they are good for 5 years, and then we have to start the 
process all over again. Certainly, energy infrastructure is a 
part of that message. We want to be efficient with respect to 
pipelines. We are looking at particularly nationwide permit 12. 
We haven't made any decisions about whether or not to revisit 
some of the aspects of that permitting, but rest assured the 
nationwide permit program is viewed very favorably, and we are 
very strongly supportive of it.
 Dr. Babin. Thank you.
 And how does the Corps plan to address litigation over the 
agency's issuance of the nationwide permit program which 
continues to frustrate linear infrastructure development? The 
repeated legal challenges seem to make it seem like there is 
not much certainty or predictability in the permit process. 
Would you agree? And what is going on there?
 Mr. Connor. Well, I know there has been litigation with 
respect to the need to follow NEPA. There has been litigation 
or concerns about endangered species aspects of those. We think 
we have had an effective path forward in the past, but we are 
going to take a look at that as part of this new review as we 
start the process for the next 5-year cycle.
 Dr. Babin. Yes, sir. Thank you very much.
 And I yield back.
 Mr. Rouzer. Ms. Scholten.
 Ms. Scholten. Thank you so much, Mr. Chair. And thank you 
to both of our witnesses for being here today. WRDA is, 
obviously, one of the cornerstone areas of jurisdiction for 
this subcommittee, and this is a very necessary hearing.
 I can't believe I only have 5 minutes to get into 
everything we need to cover about beautiful Michigan's Third 
Congressional District. My district covers miles of gorgeous 
Lake Michigan shoreline, including ports in Muskegon and Grand 
Haven. It is really hard to overstate the importance of these 
harbors to the overall Great Lakes ecosystem and the larger 
Great Lakes economy. But to put a few numbers on it, 
commodities handled by Grand Haven's harbor alone support over 
$3.9 billion in revenue, over 23,000 jobs, and $1.2 billion in 
labor income.
 In addition, if this harbor was not maintained, commodities 
that typically travel by water on ships, including sand, 
gravel, salt, cement, manufactured goods, all those things that 
keep our roads running would then have to be transported by 
train or truck, which would increase annual emissions rates by 
over 10.5 million pounds of harmful particulate matter. The 
cost to our economy, workforce, and environment in west 
Michigan truly cannot be overstated.
 I will have two questions. First, which either of you or 
both of you can chime into, and then my last question in 
particular is for you, Lieutenant General.
 So, I understand that the Army Corps is currently doing 
quite a bit of work in Grand Haven to repair the breakwaters 
and pier heads damaged by high lake levels. Do you see this as 
something the Corps will have to do more often due to climate 
change moving forward? And if so, how can we ensure that these 
structures are regularly maintained?
 General Spellmon. Congresswoman, thank you for that. And on 
top of all the challenges you just maintained, we are seeing 
increased shoaling in many parts of this port. This used to be 
a 3- to 5-year dredging cycle. We now believe it is going to be 
an annual dredging cycle requirement. And what are we going to 
do? We are going to make sure that that is included in our 
budget request moving forward.
 Ms. Scholten. OK. Thank you.
 Mr. Connor, do you have anything to add to that?
 Mr. Connor. Nothing more.
 Ms. Scholten. Yes. Absolutely correct about the increase in 
the shoaling schedule. The Muskegon Harbor has a 2- to 3-year 
dredging cycle currently. Shoaling patterns are changing 
rapidly there, and we agree with you 100 percent this needs to 
happen annually at this point. So, how can that schedule become 
a reality? Can we depend on that happening regularly, annually 
going forward? And what is needed to ensure that it can happen?
 General Spellmon. Congresswoman, what we will do in the 
course to make our best technical argument to the Secretary and 
to the administration to take care of important harbors like 
Muskegon.
 Mr. Connor. On that one I will add, and then I have got to 
make the best case to the administration and the broader 
community given the points you first made of the importance of 
these harbors, the importance of inland waterways to the mode 
of moving materials and supplies and the supply chains. It is 
the most carbon-friendly and most efficient way to move 
material in this country. And if we do that also using those 
waterways, we are more effective in getting goods in and out of 
this country and more effective from an international 
competition standpoint.
 So, there are all kinds of reasons why we need to keep up 
with the new challenges, and we need to maintain these systems 
for the benefit of the entirety of the country, not just the 
communities that they immediately serve.
 Ms. Scholten. Yes, I couldn't agree with you more.
 Let's talk about pricetags. Lieutenant General Spellmon, in 
particular, in the event that my friends on the other side of 
the aisle decide to move forward with the cuts to your funding 
levels that are being proposed or being talked about, what is 
the Corps' plan to finish these projects that we have talked 
about and ensure ongoing dredging happens annually in these 
ports with less funding than you were promised?
 General Spellmon. Congresswoman, as I have been attempting 
to describe during the hearing, we have to improve our schedule 
and schedule management with the U.S. dredging industry. We 
have great partners across all of the dredgers out there. Just 
given the volume of work and the increased sedimentation 
shoaling that we are seeing in places like Muskegon, we have 
got to take our scheduling with industry to the next level.
 Ms. Scholten. Thank you, gentlemen. I can't thank you 
enough for your commitment to this work.
 And I will yield back.
 Mr. Rouzer. The gentlelady leads back.
 Mr. James.
 Mr. James. I would like to thank the chairman for this 
opportunity to speak, and I would like to thank Assistant 
Secretary Connor and Lieutenant General Spellmon for being able 
to make it up to Capitol Hill today to testify in front of the 
committee regarding the state of clean water infrastructure.
 Michigan is the greatest State in the Union, and I echo my 
colleague, Rep. Scholten's love for Michigan, West Michigan, 
but I have the privilege of representing the best congressional 
district in the entire Nation, Michigan's 10th Congressional 
District.
 But speaking for the entire Great Lakes region, with its 
unparalleled natural beauty and economic significance, it faces 
a pressing challenge. It's time for us to address the critical 
need for updating our water infrastructure, especially in Lake 
St. Clair. This isn't just about ensuring the availability of 
clean, safe drinking water. It is about protecting our 
cherished freshwater resources, sustaining our thriving 
economy, and bolstering our national security. The Great Lakes 
have been a wellspring of prosperity and global trade for 
generations. And it is our responsibility to modernize this 
infrastructure, to keep this vital engine of our economy 
running smoothly, while also fortifying the security measures 
that safeguard it.
 We stand at a pivotal moment where our commitment to these 
goals will define the future of the Great Lakes region, and I 
believe that, as we work together, we can achieve and must 
achieve nothing less than success. The Nation's aging water 
infrastructure is in desperate need of modernization and will 
take billions of dollars to make that happen. There is no 
replacement for fresh, safe, and clean water.
 So, with that, as we all know, the PFOS chemicals, the 
forever chemicals in water, represent a major challenge to U.S. 
Army Corps in terms of exposure risk to humans.
 Do you anticipate that the current U.S. Army Corps funding 
will be sufficient to address PFOS issues in the Great Lakes? 
And if so or if not, what percentage of projects going forward 
will you expect to involve PFOS litigation, sir?
 General Spellmon. Congressman James, thank you for that. I 
am very familiar with Lake St. Clair and the Great Lakes and 
all that they provide our Nation.
 I will follow up with you on PFOS and PFOA funding. Our 
environmental budget has skyrocketed in the Army Corps of 
Engineers, and we are very aware of this acute challenge that 
you mentioned. I would like to follow up with you and give you 
a more thorough answer on its application to the State of 
Michigan and the Great Lakes.
 Mr. James. I will hold you to that, sir. And I would like 
that followup to be in my district. I would love to welcome you 
out to Lake St. Clair. We can see it for ourselves. Thank you 
for the work that you are currently doing.
 And for either of you, question 2, with remote lock and dam 
operations, how will the Army Corps of Engineers meet the need 
for onsite personnel in times of emergencies?
 General Spellmon. So, Congressman James, we are really in 
the pilot stage on remote lock operations. We have not employed 
this technology extensively throughout our 234 locks across the 
Nation. To be frank, we are learning as we go. Our next 
significant effort at this will be in the Pittsburgh District. 
And we intend to learn more as we attempt to tie together 
several of our locks and dams on the Allegheny, the 
Monongahela, and the upper Ohio.
 So, we have more to learn here, sir, and we will keep you 
appraised of our efforts as we move forward.
 Mr. James. As I am sure you agree, we have zero margin for 
error when it comes to the safety and security of our dams and 
lock systems.
 Leading into the last question, what is the Army Corps' 
plan to address an unscheduled lock outage caused by, say, a 
cyber attack or failed remote operating system or any things of 
that nature?
 I actually authored and got a bill passed through the House 
for a study on securing our Soo locks in particular. The Soo 
locks are vital to our national security and the economic 
security, and the Army Corps must have the resources it needs 
to defend and protect and ensure the proper maintenance and 
operations.
 What is your plan to address any outage? Because that is 
unacceptable.
 General Spellmon. Yes. Congressman James, first of all, we 
would be a willing participant in any reporting requirements. 
And security at the Soo locks in particular, that is a layered 
approach between ourselves, Federal, State, and local security 
providers, and I would welcome the opportunity in another 
setting to give you a detailed rundown on the current threats 
and the mitigations that we have in place at the Soo.
 Mr. James. Mr. Connor, do you have any comments?
 Mr. Connor. No. Absolutely support the whole efforts with 
respect to funding our cybersecurity efforts and then 
integrating them into these important critical facilities, 
absolutely.
 Mr. James. OK. With that, Mr. Chairman, the only thing I 
have to add is, go Army, beat Navy.
 Mr. Rouzer. The gentleman yields back.
 Mr. Ryan.
 Mr. Ryan. Thank you, Mr. Chair.
 I want to second my colleague's call for Army to deliver a 
crushing blow to Navy in football this weekend in a bipartisan 
manner and welcome either of our distinguished guests here to 
comment on any of their thoughts on how decisively Army will 
defeat Navy this weekend, if you want to be on the record 
during this Army-Navy week.
 General Spellmon. Sir, 35-0 Army.
 Mr. Connor. As a former star wide receiver, I will defer to 
him.
 Mr. Ryan. All right. You have already made--I have the 
privilege of representing the United States Military Academy at 
West Point in the district. So, you made many thousands in my 
district happy with that answer, and I appreciate you being 
here. In all seriousness, thank you for taking the time.
 First question is related to one of my communities in New 
York's 18th Congressional District in the Hudson Valley. Kiryas 
Joel is a community in my district, one of the youngest and 
fastest growing communities in the entire United States. For 
years, Kiryas Joel has been working on a water infrastructure 
project, the Catskill aqueduct project, to ensure that as the 
community rapidly grows, they are able to continue to access 
clean water and are no longer relying on maintaining and 
building new wells in the community.
 This is and has been a priority project for the people of 
my community. While the project has been included in section 
219 environmental infrastructure projects back in 2002's WRDA, 
it has never been awarded funding.
 I want to commend that the Biden administration has put a 
special focus on Justice40 communities so that 40 percent of 
Federal investments flow into disadvantaged communities like 
Kiryas Joel who would qualify due to the rapidly growing size 
in median family income.
 Can either or both of you please explain how the Corps will 
prioritize environmental justice communities like Kiryas Joel 
when prioritizing their environmental infrastructure projects?
 Mr. Connor. With respect to Kiryas Joel, Congressman, thank 
you very much for the interactions you have had with the 
administration in our office because it was in part because of 
those discussions that we included $5 million for environmental 
infrastructure in our 2024 budget, first time that we had ever 
asked for money for the environmental infrastructure program. 
From the looks of things, if we get an energy and water bill, I 
am not quite sure that that will survive the budget process, 
but you have got to start somewhere.
 But if we have discretionary funds for EI as part of the 
2024, you can be assured that we have prioritized economically 
disadvantaged, marginalized communities for allocation of those 
efforts. Most of those moneys are directed to specific 
projects, but to the extent that we have discretion, that will 
be part of the criteria, without a doubt.
 Mr. Ryan. Thank you, Mr. Secretary. And we will continue to 
persistently engage and appreciate the continuing engagement 
with you and your team.
 Second question. In July, across the Hudson Valley, we had 
an extreme flooding event, record-setting rainfall, 
particularly hitting the towns of Highland Falls, Cornwall, and 
Fort Montgomery, as well as West Point proper. While the 
current study, the New York and New Jersey HAT Study, is 
ongoing to look into flooding really from the Port of New York 
and New Jersey up into the Hudson River--that has already been 
authorized in the previous WRDA bill--that would not 
essentially look at events like this where, in this case, a 
brook that runs through the middle of several of these towns 
that is not technically a tributary to the Hudson caused this 
catastrophic flooding, including the loss of a young woman's 
life right in the town of Fort Montgomery.
 So, the question really is, how can we--given the 
incredible volatility and increased frequency of climate 
change--factor in new tributaries and water sources when 
assessing in future studies like this?
 General Spellmon. Congressman, I will start. So, in WRDA 
2022, Congress has helped in section 8106. It allows our non-
Federal sponsors in a study like New York New Jersey HATS where 
we were looking at that from a coastal event, a Superstorm 
Sandy type event, for our non-Federal sponsors to come back to 
the Corps, to come back to the Secretary and look at things 
like the precipitation event that you just described. I know we 
are in the process now of working with the States, with our 
non-Federal sponsors, and the Secretary's office to talk about 
time and resources required to add that additional scope to 
this investigation.
 Mr. Connor. And I would just add on top of that, in 
addition to our sponsors being able to bring that request to 
us, the Corps is doing a lot of great things behind the scenes 
with respect to new modeling, new engineering pamphlets. Our 
behind-the-scenes planning process is where we are directing 
the planning teams to incorporate the best hydrologic 
information, the new extremes that we are seeing that create 
new risks with respect to these facilities.
 So, I think we are getting in place the processes and the 
data and the requirements for our planning teams to use the 
best information so that we can better plan for those extremes 
as we get into those studies.
 Mr. Ryan. Thank you both.
 And I yield back, Mr. Chair.
 Mr. Rouzer. The gentleman yields back.
 Mr. Collins.
 Mr. Collins. Thank you, Mr. Chairman.
 Secretary Connor, good to see you again. General Spellmon.
 As I was sitting here listening to my colleague from 
Michigan espouse about his State, I could not help to be 
reminded of how Georgia has been back to back numerous times. 
No, not the Bulldogs, but for being the number 1 State to do 
business in. And that is kind of where I want to focus on.
 I know the last time that, Secretary, you and I talked, we 
talked a little bit about Augusta, Georgia, and a dam that they 
have got a problem with up there. But this time I want to focus 
on the Savannah Port. As both of you are aware, the Corps 
recently completed construction activities down there on the 
Savannah Harbor expansion project. But, however, in order for 
the Georgia Ports Authority to maintain growth and create well-
paying jobs, they are going to have to expand that harbor again 
to accommodate the ever larger container vessels that are 
demanding--and I like to underline that word--demanding access 
to the Port of Savannah's facilities.
 And as this committee begins development of a Water 
Resources Development Act, we are going to seek authorization 
of a new feasibility study to deepen and widen the harbor. But 
I encourage you, you and your team, to consider using any 
existing authorities to review the completed work so we can 
begin a feasibility study as soon as possible.
 And so, the only thing I really ask--and I would love to 
get some sort of answer from you both--just I need a commitment 
that you will use the existing authorities for conducting an 
assessment on the current project and moving it forward with a 
feasibility study.
 General Spellmon. Congressman Collins, I will start. First 
of all, you are right, section 216 is our review of completed 
Civil Works projects. I would like to come back. I have got 
more homework to do. Technically, the SHEP deepening is not 
complete until I am done with the environmental work upstream 
at New Savannah Bluff Lock and Dam. As you know, that is in 
litigation at the moment. Let me do more homework to see what 
flexibilities we may have under section 216 in advance of an 
additional authority Congress may consider.
 Mr. Connor. Congressman, I wouldn't add anything more to 
that, but this is, obviously, a very significant economic 
enterprise in your State----
 Mr. Collins [interposing]. Right.
 Mr. Connor [continuing]. And for the country as a whole. 
So, we will follow up, absolutely.
 Mr. Collins. General, is there a timeline I can expect?
 Mr. Connor. On the homework, sir, I think I can get back to 
you within a few days. On the litigation, no, sir, I can't.
 Mr. Collins. I mean, my teacher always gave me 1 day.
 General Spellmon. Sir, we will turn this as quickly as we 
can.
 Mr. Collins. All right. I appreciate it. Thank you.
 Mr. Chairman, that is all I have.
 Mr. Rouzer. The gentleman yields back.
 Mr. DeSaulnier.
 Mr. DeSaulnier. Thank you, Mr. Chairman.
 I am not going to get into football rivalries, but good 
luck to everybody. How is that?
 I represent a district in the San Francisco Bay area. I 
have represented the delta--geez, I was just thinking--for a 
very long time in local, State, and now here in the Federal 
Government. It is a complex area. It is a very important 
deepwater port. It is the largest estuary west of the 
Mississippi.
 We have very progressive politics towards carbon capture. 
We have, I think, one of the biggest carbon capture--natural 
carbon capture projects, successful ones, in the delta, 
supplies much of the drinking water for both southern 
California and northern California, transporting that water 
both for urban uses and for the San Joaquin agricultural 
industry that produces one-third to half of all the fruits and 
vegetables in the entire United States. All of that is to say 
it is a complicated area. We have got five oil refineries 
because there are, as I said, very few deepwater ports on the 
west coast.
 Having dealt with your department in all of those 
positions, how do we continue to look at cost benefits as we do 
projects and, in our case, interacting with the State Water 
Project and local government, to make sure we get these 
facilities done efficiently with cost benefit that shows that 
we can deliver these projects quickly?
 We have been in a drought in California, as you know, 
significant impact to the delta. You are very involved with the 
delta conveyance projects, whatever that turns out to be. I am 
not a supporter of the current Governor and previous Governor's 
project, but I think in the end, delta is consistent with the 
work we have done to be smart about long-term cost benefits for 
carbon and the movement of carbon.
 One of the biggest carbon producers in California is the 
movement of water in the State Water Project, which we partner 
with, trying to get that water over the Tehachapis is a 
significant provider.
 So, the question is, how do we look at this in a very 
dynamic area like this where economically it has been very 
beneficial as we look at transitioning those fossil fuel 
industries to renewables, which we are doing aggressively and 
successfully, but using you as an engineering partner, and a 
very important one, to get nonpartisan, nonpolitical analytical 
engineering that is driven by cost benefits, not just in the 
near term but in the complexity of this new environmental and 
economic environment that I would argue--and not to get in the 
parochial who has got the best district, but we have a district 
that is in an area in the bay area that while we have been very 
driven about our environmental stewardship, we have done it 
with good cost benefits based on laws that were signed by 
Ronald Reagan when he was Governor. So, it is not just opinion. 
It is, how do we do this in a way that is really a model in 
many ways for a new economy?
 And lastly, for international trade, you delivering these 
projects has a direct relationship. We spent a lot of time on 
dredging for the Chevron Refinery in Richmond and the 
complexities of doing that to the highest environmental 
standards but still being sensitive to the cost benefit both 
for the public sector and the private sector.
 General Spellmon. Congressman, I will start. First, on the 
topic of comprehensive benefits, this is something Secretary 
Connor has pushed us, rightfully, very hard on. We have had a 
handful of studies, investigations where we were looking beyond 
our traditional widening our aperture to look at things more 
comprehensively, environmental benefits that are difficult to 
measure. In fact, we have some R&D initiatives to help us get 
better metrics on some of the benefits that we traditionally 
have not measured.
 You have our commitment. We are sharing our best practices 
as we work our way through these four or five investigations 
because we want to expand that body of work to just about every 
investigation that we do.
 Mr. Connor. I would just add, I mean, we have very creative 
engineers who love working with their partners to look at all 
the benefits that they can apply to any particular project, and 
it is a more complex world. So, if it is carbon benefits, if it 
is water supply as we are doing flood work, as we are looking 
at environmental restoration, we want to do that.
 And getting to the nonpartisan, my predecessor, Mr. James, 
issued a directive for the Corps to study comprehensive 
benefits. We want to take that now to the next level where we 
identify it. We will quantify where we can. We have to 
understand where there are other benefits, and we want to 
modernize our approach with respect to principles, 
requirements, and guidelines that are essentially our tools for 
developing benefit-cost ratios.
 And so, we need to allow folks to do the creative work by 
having rules in place that allow us to recommend projects that 
define and achieve that broader set of benefits. So, we are in 
the process. We are going to issue a proposed rule hopefully in 
the next week or two that will start this process so we can get 
it done next year.
 It is a great question, Congressman.
 Mr. DeSaulnier. Thank you. Really appreciate it.
 I yield back.
 Mr. Rouzer. The gentleman yields back.
 Mr. Duarte.
 Mr. Duarte. Thank you. Thank you, Mr. Chairman.
 Well, I represent a large portion of the San Joaquin Valley 
from the delta down through very low-lying towns along the San 
Joaquin River. We had huge problems up and down my district 
last year with towns flooding, with a lack of dredging, a lack 
of maintaining of the flood channels, all of which could not be 
improved upon while the flooding was occurring, as you might 
imagine.
 One specific problem we have is the lower San Joaquin River 
feasibility study that runs through Lathrop and the lower San 
Joaquin River right as it enters the delta. It has been 
hamstrung. It doesn't meet your own 3x3x3 rule. It is now 
scheduled to happen in 2027. It has been pending there for a 
number of years. And at least in that case, I want to encourage 
you to look at that, and please advance that as you can.
 But my district is riddled with unmet needs from the Army 
Corps of Engineers. And the irony I find, listening to all my 
friends and colleagues here talk about wetlands issues that 
aren't being handled sufficiently to help commerce and ports 
and drainages, is wetland issues that involve no wetland at 
all.
 And with that, I would like to show a picture of a 
jurisdictional or what you claim to be as a jurisdictional 
vernal pool in the San Joaquin Valley. This one is actually out 
at the Sacramento Valley.
 [Picture displayed.]
 Mr. Duarte. If you can't see it, that is part of the 
message here today.
 Under WOTUS, the Army Corps of Engineers has been claiming 
jurisdiction over topographic swales for decades. It has been 
controversial, and we all thought it would have been cleared up 
back in the Sackett decision, which came down very decisively 
earlier this year, so that the term ``continuous surface water 
connection'' with navigable waters in the United States was 
necessary for you to claim any jurisdiction over these types of 
wetland features through the Clean Water Act. And in January, 
you issued a memo, an initial rulemaking that recognized this 
to some degree and recognized Sackett.
 But then on September 27 of 2023, this year, just a few 
months ago, you signed a memo, Secretary Connor, that said the 
agencies would continue to apply the overbroad pre-Sackett 
interpretations of continuous surface connections from the 
January 2023 rule preamble, and how soon can we expect the 
administration to formally rescind the illegal pre-Sackett 
guidance, acknowledging the Supreme Court's binding 
interpretation of adjacent wetlands and following the law.
 What you are basically saying is that you can daisy-chain 
this kind of a seasonal wetland feature across the entire field 
to the next one.
 Now, I have been involved in these kinds of regulatory 
efforts myself. I have been prosecuted for planting wheat on 
ground just like this one under the WOTUS wetlands rules.
 The Sackett decision said--let me just read you some quotes 
in case you are still vague--waters may fairly be read to 
include only those wetlands that are, quote, ``as a practical 
matter indistinguishable from waters of the United States,'' 
meaning navigable, ``such that it is difficult to determine 
where the water ends and where the wetland begins.''
 That wouldn't be the case in these vernal pools across the 
landscape.
 So, in summary, let me ask and then let you answer. Why is 
the Army Corps of Engineers and EPA completely disregarding the 
findings of the Sackett decision and continuing to regulate 
isolated wetlands that have no surface water connection with 
navigable waters of the United States whatsoever?
 Mr. Connor. That is not a correct statement, Congressman. 
That is not what we are doing. We just issued a conforming rule 
on September 8 that expressly eliminated the significant nexus 
test. It modified the definition now of adjacent wetlands. It 
took out wetlands that are identified as jurisdictional water 
because they are interstate, and we have the eight exemptions 
that we had in the January 2008 rule.
 I haven't issued any substantive guidance with respect to 
interpretation of continuous----
 Mr. Duarte [interrupting]. Your Sacramento office will not 
be regulating this as a jurisdictional wetland under WOTUS at 
this point?
 Mr. Connor. I am not getting into any fact-specific 
situations. I am just telling you we have a conforming rule 
that is consistent with Sackett. We are working through 
jurisdictional determinations right now. We are going to 
ultimately be issuing guidance. That will be a public process. 
But your statement that we are not in conformance with Sackett 
is an incorrect one, sir.
 Mr. Duarte. You are absolutely not in conformance with 
Sackett. Sackett says clearly several times and, in fact, they 
go again, ``In sum, we hold that the Clean Water Act extends to 
only those `wetlands with a continuous surface connection to 
bodies that are `waters of the United States' in their own 
right.' ''
 You are still regulating these wetlands across agricultural 
landscapes up and down California. There is no possible way 
what you are saying and what is the actual on-the-ground truth 
melds with the Sackett decision.
 Mr. Connor. You are offering me a specific determination 
made by the Corps post-September 8. We can have a discussion 
about whether or not we are regulating areas like this, 
Congressman.
 Mr. Duarte. Well, these----
 Mr. Connor [interrupting]. I am happy to have that 
conversation every day.
 Mr. Duarte. Your Sacramento office didn't even get back to 
us with delineations on map--on wetland features that are 
clearly not jurisdictional.
 Mr. Connor. Bring me a specific determination. I am happy 
to----
 Mr. Duarte [interrupting]. They are not issuing 
determinations. They are sitting on their old determinations, 
and we can't get any results out of them.
 Mr. Rouzer. The gentleman's time has expired.
 Ms. Wilson.
 Ms. Wilson of Florida. Thank you, Mr. Chair and Ranking 
Member Napolitano, for convening today's hearing.
 I remember when I first got to Congress 13 years ago, WRDA 
was not on a 2-year cycle. To advocate for the restoration of 
the 2-year cycle, I launched the bipartisan Florida Ports 
Caucus, alongside my friend and fellow Floridian, Congressman 
Bill Posey. Over the last decade, we got on cycle. This 
committee has delivered on the WRDA's goal of protecting our 
water supply, especially in communities vulnerable to the 
threats of climate change like my hometown, Miami-Dade.
 As one of the five cosponsors of the Bipartisan 
Infrastructure Law, I want to highlight the $17 billion in 
supplemental funding to the Corps. Miami-Dade County is already 
reaping the positive outcomes of Biden's infrastructure law and 
the Corps.
 Additionally, I proudly sponsored community projects led by 
Florida International University to improve Biscayne Bay and 
address water issues in neighboring cities.
 But my community still needs help. First, we need funding 
for our section 219 Miami-Dade wastewater infrastructure 
project. We authorized this critical project in WRDA in 2022. 
Now we need to fund it, especially considering the $4 billion 
septic system crisis we are currently facing in south Florida 
that is contributing to the pollution of Miami-Dade's aquifer 
and Biscayne Bay. As many septic tanks risk being compromised 
when it rains, these failing septic systems directly threaten 
disadvantaged communities, especially given rising sea levels.
 Situated at the forefront of the climate crisis and 
surrounded by water, my district is vulnerable to sea level 
change, and we depend on Everglades restoration. Failing to 
pass the WRDA is not an option for us. We cannot afford the 
consequences of neglect, including leaving our water resources 
susceptible to disaster and a rapidly changing climate.
 With that, I have a few questions. Assistant Secretary 
Connor, in your March 15, 2022, memo, you highlighted the need 
for all communities to share the benefits of a healthy 
environment. Within that context of Justice40 highlighting the 
aim to tackle the crucial waste infrastructure issues in 
disadvantaged communities, how are these entwined goals 
considered when determining the spending plan for environmental 
infrastructure?
 Mr. Connor. Congresswoman, thank you for the question. As a 
threshold matter, we have the President's goal of ensuring that 
40 percent of the resources that we have towards environmental-
related infrastructure is benefiting marginalized economically 
disadvantaged communities. So, we have prioritized a number of 
our outreach programs, Planning Assistance to States, Flood 
Plain Management Services, where we are doing more aggressive 
outreach to inform communities of the resources and the 
authorities that we have at the Corps of Engineers to do work 
that will benefit those communities that have been historically 
ignored.
 And then we are certainly looking at modifying our rules, 
as we talked about just a little bit ago, how we assess 
benefits and costs so that we can look at social, 
environmental, as well as economic benefits and make 
determinations and recommendations so that we can incorporate 
those features because, quite frankly, as we only protected the 
highest value properties, that has been our historical 
approach, that has been inequitable.
 And so, we need to better assess the benefits that we can 
have for many communities. So, we are looking at integrating 
that into our planning, as well as through the Bipartisan 
Infrastructure Law, the specific investments that we made that 
didn't always go to the absolute highest benefit-cost projects. 
We looked at, under direction in the law, of how to spread 
those benefits among many communities. So, those are a few 
examples of how we are trying to address this.
 Ms. Wilson of Florida. Can you elaborate on the next 
actionable steps from the August meeting that you had with 
Miami-Dade County about the additional alternative status for 
the feasibility study? Our mayor and I want to expedite these 
projects for WRDA 2024.
 Mr. Connor. With respect to Miami Back Bay and the study 
that we are doing in that context, one, I think we are looking 
at it from a regional perspective, which I think is the proper 
way to assess this. And given the urgency and the risk that 
exists from sea level rise and more powerful storm surges, we 
are trying to look at a phased approach where we are trying to 
do first phase feasibility work, look at critical 
infrastructure, look at nonstructural means that we can take in 
the near term, see if we can get an authorization in place 
through WRDA 2024. And then look at the larger, more strategic 
long-term big infrastructure, and that includes large-scale, 
natural nature-based features, which is very important to the 
local sponsor, as well as just hardened infrastructure that we 
may need to protect the community in a way that they will 
accept. And that is the longer term second phase of the 
approach there that we are taking.
 Ms. Wilson of Florida. Thank you. I yield back.
 Mr. Rouzer. Mr. Van Orden.
 Mr. Van Orden. Thank you, Mr. Chairman.
 As you guys know, the Army Corps of Engineers encompasses a 
tremendous amount of very rural areas. And the Third 
Congressional District in the city of Wisconsin that I 
represent has the largest contiguous sections of the 
Mississippi River of any congressional district in the country. 
You go from lock 2 to lock 11. We have the tributaries of St. 
Croix, Chippewa, Black River, La Crosse, and Wisconsin Rivers 
that all go into there.
 And I have toured all of our locks and dams. I want to make 
sure that our lock and dam operators that are listening 
understand not only do I appreciate their hospitality, but I 
appreciate their professionalism. And I have firsthand 
knowledge of how incredibly important it is to keep these 
things going.
 We just got designated as part of the northern corn belt 
ports--
 [Aside]: What is that? John James from Michigan; whatever, 
dude.
 I speak regularly to Colonel Eric Swenson from the St. Paul 
District, and Jesse Curry from Rock Island, and they have been 
very, very supportive, and I want to start with a good news 
story for you guys.
 We had a lot of flooding back in April, and we contacted 
them, because I have a personal relationship with these two 
gentlemen that are running these districts, and they were 
standing by to help the township of Campbell, and they 
immediately deployed, as soon as Governor Evers called us an 
emergency, these incredible pumps to help get rid of the 
flooding on the island. And due to the direct result of the 
hard work of the men and women of the Army Corps of Engineers, 
you were capable of saving 70 houses in the township of 
Campbell, and I don't know why that wasn't front-page news.
 But here is the issue. I have got 19 whole and partial 
counties in the district, and the problem is that folks don't 
understand what you are capable of doing and what you are 
tasked to do. So, not only is it just the Mississippi River and 
these big-time ports and harbors and all that stuff, you are 
responsible for doing a lot of the work on these inland 
waterways. And my problem with this is that there are a lot of 
anecdotal stories about--I wouldn't say intransigence by the 
Army Corps of Engineers, but I would say a certain lack of 
responsiveness by the Army Corps of Engineers, and sometimes 
people just give up on asking for things. That is one side.
 The other side of the coin is this: They don't know what 
you are capable of doing or why and when.
 So, what I would like to know from you guys is, what is 
your type of outreach to communities in these small counties 
in, for instance, my district in the State of Wisconsin who 
can't afford to have somebody that can go through all these 
crazy regulations and all of these things that are out there 
that say what you can and cannot do?
 So, what specifically, General, is your outreach to smaller 
counties and communities so they know that they can leverage 
your assets?
 General Spellmon. Congressman Van Orden, first, thanks for 
the question.
 Just a bit of context for some of the frustration that your 
constituents are feeling. I command an organization that is 
built, it is manned, it is structured for a $22 billion a year 
construction program--or actually $92 billion. So, it is hard 
for us to get out to these small towns.
 I think what work that we are doing in Arcadia, the work 
that we are doing in the city of La Crosse, we are working hard 
to get out and educate people where we can, and we have the 
bandwidth to do that. I agree with you, we have got to get 
better. We have got to speak in plainer English, and we will 
work hard to get out to the communities that you have 
mentioned. It is just an amazing workload that the team is 
working through at the moment.
 Mr. Van Orden. I get it. You are underresourced and 
overtasked.
 And then I just have one more thing for the Under 
Secretary. Sir, could you read this for me.
 Mr. Connor. Go Navy.
 Mr. Van Orden. Thank you very much.
 And then if you would follow that up with this.
 Mr. Connor. Go Army.
 Mr. Van Orden. That is the root of the problem. The man 
can't read. I was just kidding.
 Hey, thank you very much, sir. Listen, anything I can do to 
help you guys, tell me, because it is critically important to 
the economy for the State of Wisconsin. It is incredibly 
important for the national security of this country that we can 
work collaboratively together. So, I have your phone number and 
you have mine. Thank you very much.
 Mr. Connor. Sir, can I just mention, you have been out to 
our facilities. It raises spirits. People have mentioned this 
to me after you have been out there.
 Mr. Van Orden. They are awesome. All right, thank you very 
much.
 I yield back, sir.
 Mrs. Gonzalez-Colon [presiding]. Thank you, Mr. Van Orden.
 And now we recognize Mr. Moulton for 5 minutes.
 Mr. Moulton. Thank you very much.
 Gentlemen, in 2022, the Massachusetts Department of 
Transportation closed the Hall-Whitaker Bridge in Beverly when 
an inspection revealed major deterioration. The bridge linked 
the critical parts of the city and carried 8,000 cars per day. 
The timeline for the bridge's reconstruction is beyond 
comprehension.
 Let me emphasize to you: This is a bridge barely wider than 
this room. The Chinese would take it down in a night. All 
right. And yet what we are being told is it will take until 
2027 to just get a temporary replacement and 2035 for a final 
replacement. To be honest, I think that's an embarrassment.
 Onerous permitting requirements coupled with a complicated 
swing-span bridge design are apparently to blame, but it is not 
like we have never done any of these things in the past. We 
have been building swing-span bridges for hundreds of years.
 I recognize that the Corps is not responsible for the 
bridge design, but it does serve as the Federal general 
contractor for the bridge rebuild, coordinating approvals for 
multiple Federal agencies before issuing the permits.
 So, General Spellmon, what can the Army Corps do to 
expedite the permitting of the Hall-Whitaker Bridge project to 
reconnect the Ryal Side neighborhood in downtown Beverly as 
soon as possible?
 General Spellmon. Congressman Moulton, thank you for the 
question. We have done a site visit, and we do understand the 
project. We participated in a preapplication meeting that was 
hosted by Massachusetts Department of Transportation. In fact, 
we had a meeting with the MassDOT secretary just last week. We 
are going to proactively complete our work once we have the 
completed application from the builders.
 Mr. Moulton. OK. Well, I appreciate your doing that 
expeditiously, and please do stay in touch closely with me. 
This is a priority of mine. What is framed as an embarrassment 
could actually be a great success story, showing that we can 
still do big things, even small things, small bridges, 
expeditiously.
 When you realize that the root of the permitting problem is 
environmental regulations and yet the proposal here is not to 
replace this bridge with one bridge but literally to build two 
in two different locations, a temporary bridge and then the 
final bridge, it is hard to imagine that building two separate 
bridges is better for this river environment than just ripping 
up one and putting a new one down quickly. So, I hope we can 
not lose the forest for the trees here, get this done quickly 
and expeditiously.
 Shallow-draft ports greatly contribute to local economics 
of smaller cities and towns. My district has 10 shallow-draft 
ports, mostly fishing hubs, who witness increasing challenges 
in securing funding for these smaller ports.
 Mr. Connor, what can the Army Corps do to ensure that 
adequate funding is dedicated to small harbors?
 Mr. Connor. I think the best thing we can do is continue to 
try and follow the plan that was laid out in WRDA 2020 with 
emerging and small harbors, and I think we are in pretty good 
shape with respect to continuing that approach, and if we can 
continue with the percentages as the amount dedicated to the 
Harbor Maintenance Trust Fund, we should continue to be able to 
get at it. But this is a situation where we are probably never 
going to have fully the resources necessary to satisfy all of 
the needs, but I think we are on a good trajectory at this 
point in time.
 Mr. Moulton. OK. Gentlemen, just going back to the northern 
part of my district, we were excited to finally see the 
Merrimack River dredged last year. The work was critical to 
improving navigation and ensuring Plum Island could be 
renourished with sand. Unfortunately, the Army Corps' jetty 
that sits off North Point on Plum Island is creating a gyre 
that exacerbates beach erosion and subjecting more homes to 
potential flooding. The Corps is now conducting its own study 
of the situation, but we must make the necessary changes to the 
jetty itself as soon as possible to secure the coast and 
protect homes and livelihoods.
 Lieutenant General Spellmon, what can the Army Corps do to 
expedite the review, engineering, and construction of the jetty 
renovations to decrease beach erosion on Plum Island?
 General Spellmon. Congressman Moulton, first, we want to 
thank Congress for the $240,000 in fiscal year 2023 funding to 
allow us to get after this effort. We are in the modeling phase 
now. We are going to produce a major maintenance report to look 
at a way, how can we adjust our jetties to get after the 
erosion issues that you describe.
 So, more to follow, sir, on the schedule once we get 
through the modeling phase.
 Mr. Moulton. Any idea how long this is going to take? What 
is the timeline?
 General Spellmon. The report will be complete in the 
spring.
 Mr. Moulton. The report will be complete in the spring. 
Then you have to do----
 General Spellmon [interrupting]. With the recommendation, 
sir. Then we will come back to the Secretary with our cost 
estimate of what it would take for the fix. But I will know 
more----
 Mr. Moulton [interrupting]. So, all the modeling and 
everything will be done by spring?
 General Spellmon. I'm sorry, I didn't understand.
 Mr. Moulton. All the modeling and everything will be done 
by spring?
 General Spellmon. No, sir. The report will be done. 
Modeling will be complete. We will have our recommendations 
ready in the spring. That will inform our next budget 
recommendation.
 Mr. Moulton. OK. Thank you very much.
 Mr. Chairman, I yield back.
 Mr. Rouzer [presiding]. Mrs. Gonzalez-Colon.
 Mrs. Gonzalez-Colon. Thank you, Mr. Chairman.
 And I am happy to see here Secretary Connor, General 
Spellmon. And I think this is important. And I want to say just 
for the record, thank you to the Army Corps of Engineers for 
all their missions and for being so critical in helping rebuild 
our islands after hurricanes, earthquakes, and a lot of floods. 
This is the Federal agency that has best responded to us, and I 
needed to say that on the record.
 In the recent creation of the Task Force for the Virgin 
Islands and Puerto Rico, the VIPR, I know that should help 
speed that rebuilding and overcome implementation obstacles. 
So, I am very happy to see that task force. We know the 
resources are not unlimited, and there is no way to fix every 
foot of shore or riverbank and every square meter of wetland 
all at the same time, and we appreciate the effort your agency 
does.
 So, to that end, one important concern of mine is the 
effect of inflation and supply chain on the ability to complete 
authorized projects. Projects already started or in planning 
stages will end up with a real total cost significantly greater 
than was originally authorized or obligated.
 And my question will be how the Corps addresses this. Do we 
need the whole reauthorization or reappropriation process all 
over again and bring the project to a stop while we do it, or 
reduce the project and leave phases undone, or split those 
phases and have to go through the whole process of 
reauthorization and appropriation all over again? Or how must 
we change that process, how can we change it to make it happen 
fast?
 General Spellmon. Congresswoman, first, we are working 
through the cost increases, and I want to assure you, this is 
just not in Puerto Rico. This is everywhere. The number 1 cost 
driver on all our projects today is qualified tradespeople in 
the construction trades.
 I think what we can do in the immediate term is to be 
completely open with you, with the administration and Congress 
on what we are experiencing. In fact, we are hiring more cost 
engineers in the Army Corps of Engineers. We are working to get 
our way to 500. That is helping.
 As you know, we stood up Task Force Virgin Islands and 
Puerto Rico, and that was to give an added level of leadership 
and oversight to our program and to enhance our communication, 
ma'am, with you and others on what we are experiencing.
 Mrs. Gonzalez-Colon. And I am very happy about that. Just 
feel free, if Congress needs to do any recommendation, altering 
the process, amending the process, that will expedite your time 
for processing this or taking decisions, let us know, because I 
know how difficult it is to comply with all those requirements.
 And one of the other issues, in our case, the Bipartisan 
Budget Act of 2018 was to be funded at 100 percent Federal 
share. However, as mentioned, most of the projects that were 
for the recovery process after Hurricane Irma and Maria will 
be--the real cost will be much higher. So, what happens now? 
What is the difference? Become subject to increase, to double 
share? Does the project stop until we reach that original 
estimate? What do you do in those cases?
 General Spellmon. Yes, ma'am. So, what we are doing now is 
we are working on, in some of the cases, finalizing our cost 
estimate. As you can imagine, as you know, this is a very 
dynamic environment, and everything that you mentioned in the 
preface to your initial question is on the table. How do we get 
after the highest risk portion of these projects and hold off 
on others where we can buy some risk with time?
 We owe you all of these recommendations as we continue to 
mature our designs and our cost estimates. And, Congresswoman, 
I assure you we will keep the lines of communication wide open 
with you and your team.
 Mrs. Gonzalez-Colon. One last question. And I make this 
more for the record, but in that aftermath of the hurricanes, 
we received on the island $2.6 billion in supplemental funding 
for Army Corps projects, exceeding all previous funds 
historically. And since then, we have also received a large 
supplemental fund through the Infrastructure Act and other 
special appropriations.
 But first, we cannot be living under the emergencies 
forever in the case of Puerto Rico. The second, every year 
there are more communities, not just in Puerto Rico but 
nationwide, that plead for projects to address their local 
situation that is deteriorating from diverse factors like sea 
level rise, sedimentation, erosion, among others.
 Does the Army Corps foresee an increase in such 
nonemergency demands? And how do we make sure we can identify 
where to act before there is an emergency, especially in poorer 
jurisdictions where there may not be the resources for a 35-
percent share of cost?
 General Spellmon. Congresswoman, I would say three things. 
First, we will continue to express capabilities for projects in 
nonemergency years so we can get ahead of the exact scenario 
you are describing. We are doing much better in workload 
sharing than we ever had in the past across our 42 districts, 
and I think Task Force Virgin Islands and Puerto Rico is a 
great example of that.
 And I would just end with, Congress is helping. As I 
mentioned, this is a historic time for the Army Corps of 
Engineers, a $92 billion program. The Nation is investing in 
this infrastructure, and we have got to just get it in the 
ground, and we appreciate your leadership.
 Mrs. Gonzalez-Colon. Thank you. I appreciate that.
 I yield back.
 Mr. Rouzer. Thank you, everybody.
 Are there any further questions from members of the 
subcommittee who have not been recognized?
 Seeing none, that concludes our hearing for today.
 I would like to thank each of the witnesses for your 
testimony.
 Before I gavel out, I do have a UC request. I ask unanimous 
consent to enter into the record a statement from the American 
Society of Civil Engineers dated December 5, 2023, to the 
committee regarding priorities for the upcoming WRDA 
legislation.
 Without objection, so ordered.
 [The information follows:]

 
Statement of the American Society of Civil Engineers, Submitted for the 
 Record by Hon. David Rouzer
 Introduction
 The American Society of Civil Engineers (ASCE) appreciates the 
opportunity to submit a statement to the House Committee on 
Transportation and Infrastructure's Subcommittee on Water Resources and 
the Environment regarding the hearing on ``Water Resources Development 
Acts: Status of Past Provisions and Future Needs.'' We also wish to 
express our appreciation to the committee for its commitment to keeping 
passage of the Water Resources Development Act (WRDA) 2024 on a 
biennial authorization cycle. Doing so ensures greater certainty for 
new and ongoing water resources projects and offers the opportunity to 
make needed updates to federal water resources policy. We are eager to 
work with the committee in the months ahead to find ways to further 
improve our nation's water resources infrastructure systems.
 Passage of the Infrastructure Investment and Jobs Act (IIJA) made 
needed investments in critical infrastructure systems and Congress 
continued its commitment to investing in water resources infrastructure 
policy reforms with the passage of WRDA 2022. These reforms included 
reauthorization of the National Levee Safety Program, a permanent 
extension of the cost share formula for the Inland Waterways Trust 
Fund, and the establishment of a new National Low-Head Dam Inventory. 
However, much work remains to be done in the coming year to improve the 
overall safety of the nation's dams and levees, strengthen our ports 
and inland waterways, and enhance overall infrastructure resilience.
 ASCE's 2021 Report Card for America's Infrastructure
 Infrastructure is the foundation that connects the nation's 
businesses, communities, and people. It serves as the backbone of the 
U.S. economy and is vital to the nation's public health, safety, and 
welfare. Every four years, ASCE publishes the Report Card for America's 
Infrastructure \1\, which grades 17 major infrastructure categories 
using a simple ``A'' to ``F'' school report card format. In March of 
2021, ASCE released the latest version of its Report Card, giving the 
nation's overall infrastructure a grade of ``C-,'' and identifying an 
investment gap of $2.2 trillion. While the overall GPA increased into 
the ``C'' range for the first time since ASCE began grading the 
nation's infrastructure in 1998, much of the nation's critical water 
resources infrastructure remains in the ``D'' range. In the 2021 Report 
Card, dams and levees each received a ``D,'', while inland waterways 
received a ``D+''. The nation's ports were a bright spot in the Report 
Card, with a grade of ``B-''.
---------------------------------------------------------------------------
 \1\ America's Infrastructure Report Card 2021. GPA: C-
---------------------------------------------------------------------------
 To raise these grades, ASCE urges Congress to prioritize the 
repair, replacement, and modernization of our existing infrastructure, 
with a focus on resilience. ASCE also urges Congress to ensure long-
term, consistent investment in our infrastructure systems by passing 
authorization legislation like WRDA every two years.
 Dam Safety
 The United States is home to nearly 92,000 dams, which provide a 
wide range of services, including water storage, flood control, 
irrigation, hydropower generation, and recreation. The average age of 
the nation's dams is roughly 57 years old, with most dams built with a 
life expectancy of about 50 years. Because of their advanced age, many 
dams in the United States were not designed to account for the severe 
changes in weather and increased levels of precipitation brought on by 
climate change.
 As noted previously, the nation's dams earned a ``D'' on the 2021 
Report Card. Advanced age and increased levels of rainfall continue to 
place increased strain on the nation's dams and could ultimately result 
in greater instances of dam failure. This would cost billions of 
dollars, not only in dam repairs, but also in addressing public health 
and safety risks in affected communities, as well as from the diversion 
of limited resources away from other infrastructure needs.\2\ In 
addition, a recent report prepared by the Association of State Dam 
Safety Officials (ASDSO) estimates that the total cost of bringing the 
nation's dams into a state of good repair stands at $157.5 billion.\3\ 
According to ASDSO, these costs will continue to rise as dam 
maintenance, rehabilitation, and repair is deferred. Without adequate 
revenue streams, repairs will continue to be deferred as dam owners 
find it more and more difficult to finance expensive rehabilitation 
projects.\4\ While IIJA provided a significant down payment to address 
the needs of the nation's dams, more must be done at the federal level 
to improve dam safety nationwide.
---------------------------------------------------------------------------
 \2\ Dams--2021.pdf (infrastructurereportcard.org)
 \3\ SCOPE OF WORK (damsafety-prod.s3.amazonaws.com)
 \4\ Ibid.
---------------------------------------------------------------------------
 In 2022, Congress made important improvements to the nation's dam 
safety through WRDA, including the establishment of a National Low-Head 
Dam Inventory to identify small, hard-to-detect structures that span 
across rivers and streams. Flows from low-head dams can produce 
hazardous currents that can pull people underwater. Because these dams 
are not easily identifiable, the public is often unaware of the dangers 
that they pose \5\. A national inventory of low-head dams will allow 
for increased public awareness and greater ability to enhance safety 
measures around these structures. In the interest of public safety, the 
U.S. Army Corps of Engineers (USACE) should move swiftly in its efforts 
to implement the National Low Head Dam Inventory.
---------------------------------------------------------------------------
 \5\ Dams--2021.pdf (infrastructurereportcard.org)
---------------------------------------------------------------------------
 Two critical federal programs which support dam safety are the 
National Dam Safety Program and the High Hazard Potential Dam 
Rehabilitation Grant Program, which fall under the purview of the 
Federal Emergency Management Agency (FEMA). The National Dam Safety 
Program is the primary source of federal funding going directly to 
states to support state-level dam safety programs. Based on current 
state budgets, one dam inspector is responsible for approximately 200 
dams on average, and that number can be even more in some states.\6\ 
Ensuring states have access to adequate federal resources is critical 
to easing increased burdens on state dam safety programs. Funding from 
the program comes largely in the form of National Dam Safety Program 
State Assistance Grants, which are provided to states without 
additional cost sharing requirements. These resources support 
activities such as dam inspection and monitoring, emergency 
preparedness, training, equipment purchases, and staffing needs.\7\ The 
National Dam Safety Program was last reauthorized under WRDA 2018, with 
that authorization having expired on September 30th, 2023.
---------------------------------------------------------------------------
 \6\ The Dam Truth: The 91,000 Dams in the US Earned a ``D'' for 
Safety--Mother Jones
 \7\ State Assistance Grant Program (fema.gov)
---------------------------------------------------------------------------
 Unlike the National Dam Safety Program, the High Hazard Potential 
Dam Rehabilitation Grant Program supports repair and rehabilitation 
projects for the nation's high-hazard dams, which are dams that would 
result in loss of life in the event of a dam failure. ASDSO estimates 
that more than 2,300 high-hazard potential dams have a condition rating 
of deficient due to a lack of investment in dam safety.\8\ Support for 
programs like the National Dam Safety Program and the High Hazard 
Potential Dam Rehabilitation Grant Program is essential to prevent 
potentially catastrophic dam failures.
---------------------------------------------------------------------------
 \8\ Roadmap to Reducing Dam Safety Risks. Association of State Dam 
Safety
---------------------------------------------------------------------------
 However, these programs face significant challenges in the coming 
years. The program must be reauthorized, and the manner in which State 
Assistance Grants are allocated must be reformed to hasten the flow of 
federal funding to states. The High Hazard Potential Dam Rehabilitation 
Program, while not set to expire until 2026, is in need of reforms to 
ensure greater access to grant funds, improve the application process, 
and ensure proper operation and maintenance of high hazard potential 
dams. Often, dam rehabilitation projects that would benefit from these 
grants are deferred because dam operators often cannot afford to take 
on the necessary operation and maintenance commitments, and because 
smaller disadvantaged communities do not have the resources to afford 
cost sharing requirements.
 Currently, there is bipartisan support for these efforts in both 
the House and the Senate. On August 1, 2023, a bipartisan group of 
House Members introduced H.R. 5104, the National Dam Safety Program 
Reauthorization Act. The intent of this legislation is to fully 
reauthorize the program for five years and spur a discussion within the 
Transportation & Infrastructure Committee about including needed 
reforms to the National Dam Safety Program and the High Hazard 
Potential Dam Rehabilitation Program, which are spelled out above, in 
the upcoming WRDA legislation. Bipartisan companion legislation is also 
expected to be introduced in the coming days in the Senate. ASCE urges 
Congress to move swiftly to reauthorize this critical safety program 
and enact the necessary reforms so that state dam safety inspectors 
have the resources they need.
 Levee Safety
 Nearly 17 million people in the U.S. live or work behind a levee. 
The National Levee Database contains nearly 30,000 miles of levees 
around the country, and current estimates identify up to another 10,000 
additional miles of levees outside of the jurisdiction of USACE.
 Every state relies on levees to protect communities from flooding. 
The average age of the nation's levees is over 50 years old, with many 
built using less rigorous standards than those used today. Much like 
the nation's dams, the risk to the nation's levees is further 
exacerbated by increasingly severe weather patterns and heavier 
rainfall brought on by climate change. For moderate- to high-risk 
levees in USACE's portfolio, ASCE estimates that approximately $21 
billion is required to make necessary improvements.\9\ This is of great 
concern given the fact that even well-maintained levees can be breached 
by water seeping underneath them. To address these concerns, the 
National Levee Safety Program, first authorized in 2014, is tasked with 
establishing national levee safety guidelines, supporting the creation 
of state-level levee safety programs, and establishing a levee 
rehabilitation program to support needed repairs for the nation's 
levees. ASCE was very pleased to see Congress reauthorize the National 
Levee Safety Program through 2028 in WRDA 2022. This was a top ASCE 
priority last year, and it will ensure that the program can continue to 
develop and support levee monitoring and inspection activities, levee 
repairs, and the overall safety of the nation's levees.
---------------------------------------------------------------------------
 \9\ Levees--2021.pdf (infrastructurereportcard.org)
---------------------------------------------------------------------------
 Unfortunately, since the establishment of the National Levee Safety 
Program, Congress has appropriated far less than the $79 million 
authorized. While annual appropriations have continued to support the 
development of the National Levee Database, Congress only provided $15 
million for the National Levee Safety Program in FY 2020 and has not 
provided additional appropriations since. For the program to reach its 
full potential, Congress must provide adequate resources.
 Ports
 The nation's more than 300 coastal and inland ports serve as 
significant economic drivers and places of employment, enabling goods 
to reach consumers and the nation to participate in the global economy. 
Recent years have demonstrated the critical role these facilities play 
in a functioning supply chain. Ports and port tenants plan to spend 
$163 billion between 2021 and 2025, concentrating on investments 
related to capacity and efficiency as vessel size increases and tonnage 
grows.\10\ However, there remains a funding gap of over $12 billion for 
waterside infrastructure such as dredging over the next 10 years, with 
additional billions needed for landside infrastructure.
---------------------------------------------------------------------------
 \10\ Ports--2021.pdf (infrastructurereportcard.org)
---------------------------------------------------------------------------
 Ports earned a ``B-'' on ASCE's 2021 Report Card, which recognized 
the positive measures included for ports in the 2020 WRDA legislation. 
Specifically, WRDA 2020 included full utilization of the $10 billion 
balance of the Harbor Maintenance Trust Fund (HMTF) by allowing $500 
million to be appropriated in FY 2021, with an increase of $100 million 
annually until it is fully expended by 2030. The full expenditure of 
the HMTF was a long-time ASCE priority and ASCE was pleased to see 
Congress finally address this issue.
 WRDA 2022 maintained a strong commitment to the nation's ports and 
harbors. The law authorized dredging projects in underserved community 
harbors and required USACE to develop criteria for the evaluation and 
ranking of maintenance dredging requirements for small, remote, and 
subsistence harbors. ASCE supported these efforts to enhance investment 
in dredging activity. Efforts to address challenges in underserved 
harbor communities have the potential to help enhance economic 
activity, advance environmental justice, and create new job 
opportunities.
 Inland Waterways
 As the nation's ``water highway'', the country's inland waterway 
network spans 12,000 miles and serves an important purpose in the 
movement of a variety of goods, such as agricultural products. This 
infrastructure, which includes locks, dams, and navigation channels, 
has benefited from recent boosts in federal investment and an increase 
in user fees. However, the system still reports a $6.8 billion backlog 
in construction projects and ongoing lock closures \11\, which harm the 
industries that rely on waterways to transport goods.
---------------------------------------------------------------------------
 \11\ Inland-Waterways-2021.pdf (infrastructurereportcard.org)
---------------------------------------------------------------------------
 Inland waterways, on which about 830 million tons of cargo are 
moved annually, earned a ``D+'' in the 2021 Report Card. As with ports, 
WRDA 2022 included measures that ASCE considered positive for inland 
waterways. ASCE appreciated the permanent extension of the Inland 
Waterways Trust Fund's (IWTF) cost share, adjusted in 2020 from 50% 
general revenue-50% IWTF to 65%-35% for construction and rehabilitation 
projects. The IWTF, which finances construction and rehabilitation 
efforts, is supported by a 29-cents per gallon tax on barge fuel. The 
general fund-IWTF cost share formula of 65%-35% was set to expire 
within the decade, and the removal of that sunset provision offers a 
measure of certainty for future construction and rehabilitation 
projects. While ASCE continues to support further adjusting of the cost 
share requirement to a 75%-25% split, the provision that makes the cost 
share formula permanent is still a positive step in supporting 
construction efforts and reducing the inland waterways project backlog.
 The IIJA invests $17 billion in inland waterways and ports, which 
can help reduce the funding gap of $25 billion over 10 years referenced 
in the 2021 Report Card. However, additional funding for inland 
waterways projects is still needed, partly because of complicating 
factors such as inflation, worker shortages, and geopolitical 
conflicts, which impact the steel market. Dependable funding can also 
contribute to reliably planned construction timelines. Unscheduled 
maintenance closures are costly interruptions to the inland waterway 
system because they drive traffic away from rivers and force shippers 
to rely on trucks, which are more costly and environmentally harmful to 
operate.
 Stormwater Infrastructure Financing
 Stormwater infrastructure can take many forms, including piped 
systems, detention basins, ditches, canals, channels, and roadway 
conveyance systems. In recent years, green stormwater infrastructure 
has been introduced in new developments and coupled with traditional 
``gray infrastructure'' to maximize the benefits from natural 
hydrologic cycles using vegetation, soils, site grading, and natural 
filtration processes. Green infrastructure provides benefits by 
reducing runoff, minimizing erosion, and contributing to water quality 
improvements; examples include rain gardens, constructed wetlands, 
vegetative roadway bioswales, and permeable pavements.
 In 2021, ASCE's Report Card for America's Infrastructure assessed 
the nation's stormwater infrastructure for the first time and assigned 
a grade of ``D,'' meaning the infrastructure is in poor condition and 
at risk. The effects of climate change are producing more severe and 
unpredictable weather patterns, including increased levels of 
precipitation. This, coupled with the increased frequency of rainfall 
events, places increased strain on stormwater infrastructure systems 
nationwide. The results have been increased urban flooding, which has 
resulted in billions of dollars in direct damages, as well as hazards 
to public safety.\12\ When stormwater systems become overwhelmed, they 
begin to affect the functionality of other infrastructure systems. 
These effects may include flash floods, sinkholes, collapsed roadways, 
and inundation of wastewater infrastructure leading to polluted 
waterways.\13\
---------------------------------------------------------------------------
 \12\ https://infrastructurereportcard.org/wp-content/uploads/2020/
12/Stormwater-2021.pdf
 \13\ Ibid.
---------------------------------------------------------------------------
 Programs like the Clean Water State Revolving Fund program and the 
Water Infrastructure Finance and Innovation Act can support stormwater 
infrastructure projects. However, lower funding levels and competing 
water infrastructure priorities reduce the effectiveness of these 
funding sources. The growing challenge posed by urban flooding on 
overstrained stormwater infrastructure systems requires a more 
dedicated approach.
 Proposed Solutions
 WRDA provides a unique opportunity to take necessary action to 
strengthen the nation's infrastructure. A biennial WRDA cycle provides 
federal agencies and communities throughout the country predictability 
to plan and make progress on infrastructure projects. To ensure the 
safety and extend the life of critical infrastructure, and support more 
water infrastructure projects, we urge Congress to support the 
following priorities:
 Reauthorization of the National Dam Safety Program and 
needed reforms to the High Hazard Potential Dam Rehabilitation Program. 
These two programs serve as the backbone of federal efforts to ensure 
the safety and resilience of the nation's dams. Congress has 
demonstrated its willingness to support these programs through needed 
investments in the IIJA and must continue to build on these investments 
to improve dam safety and protect downstream communities. We ask that 
WRDA 2024 include:
 + A five-year reauthorization of the National Dam Safety 
Program, ensuring that program can continue to support state-level 
programs through 2028.
 + The removal of unnecessary limitations in the existing law 
prohibiting states from receiving State Assistance Grant funding 
totaling more than 50% of the cost of implementing state dam safety 
programs. States are already required to make reasonable efforts to 
fund their own programs, and removing this limitation will allow for 
annual appropriations and IIJA funds to flow more freely to states.
 + A new definition of ``small underserved community'' for the 
High Hazard Potential Dam Rehabilitation Program, and waiving of the 
35% non-federal cost share requirements for grant-eligible communities 
that fall under this definition. This will provide greater protection 
for communities that own or could be significantly impacted by a dam 
failure, but do not have sufficient resources to afford the required 
match.
 + Ensure that operation and maintenance responsibility for high-
hazard potential dam projects falls on dam owners and not smaller grant 
subrecipients.
 Language requiring an update from USACE on efforts to 
implement the National Low Head Dam Inventory, which was authorized in 
WRDA 2022.
 Creation of a program dedicated to financing stormwater 
infrastructure projects.
 Continuing to allow for the use of the unspent balance of 
the Harbor Maintenance Trust Fund and spend down this balance on port 
projects.
 Ensuring full use of the Inland Waterways Trust Fund 
continues to be appropriated.

 ASCE urges Congress to maintain a bipartisan two-year cycle and 
pass WRDA 2024. This is critical to provide predictability to federal 
agencies for planning and review of projects and priorities and to be 
able to better respond to increasingly unpredictable threats, such as 
climate change. A regular WRDA schedule is also essential for members 
of the civil engineering community who rely on support from Congress, 
for USACE, and for other agencies to ensure design, development, and 
construction of critical infrastructure moves forward in a timely and 
efficient manner. This helps to ensure infrastructure remains resilient 
in the face of evolving challenges, and that communities have access to 
needed services and protection from potential hazards.
 Conclusion
 ASCE appreciates the opportunity to provide the committee with this 
statement on its priorities for the upcoming WRDA legislation. We 
strongly believe that our nation must prioritize needed investments in 
our nation's water resources infrastructure to ensure public safety, a 
strong economy, and the protection of environmental resources. Support 
for our nation's dams, levees, ports, and inland waterways is needed to 
close the growing funding gap and to ensure the U.S. has world-class 
21st Century infrastructure. We look forward to working with the 
committee over the coming months as the WRDA process unfolds.

 Mr. Rouzer. Seeing that we have no other questions for the 
hearing today, the subcommittee stands adjourned.
 [Whereupon, at 12:27 p.m., the subcommittee was adjourned.]

 Submissions for the Record

 ---------- 

Letter of October 24, 2023, to Hon. Sam Graves, Chairman, and Hon. Rick 
Larsen, Ranking Member, Committee on Transportation and Infrastructure, 
from Sean O'Neill, Senior Vice President, Government Affairs, Portland 
 Cement Association, Submitted for the Record by Hon. David Rouzer
 October 24, 2023.
The Honorable Sam Graves,
Chairman,
Transportation and Infrastructure Committee, Washington, DC 20515.
The Honorable Rick Larsen,
Ranking Member,
Transportation and Infrastructure Committee, Washington, DC 20515.
 Dear Chairman Graves and Ranking Member Larsen:
 The Portland Cement Association (PCA), which represents the 
majority of U.S. cement manufacturers, appreciates the Water Resources 
and Environment Subcommittee holding today's hearing entitled Water 
Resources Development Acts: Status of Past Provisions and Future Needs. 
We welcome the opportunity to share the cement industry's perspective.
 Our nation's waterways play a critical role in the movement of 
cement from manufacturing plants to market. Annually, the cement 
industry ships approximately 35 percent of our product from plants to 
terminals by barge, demonstrating, that these systems are vital for 
American commerce. Additionally, water infrastructure construction is a 
critical market for cement in the United States. For every billion 
spent on water infrastructure construction, approximately 211,000 
metric tons of cement will be consumed.
 The cement industry has set a goal of carbon neutrality by 2050. A 
key component of reducing the carbon footprint of cement in the shorter 
term is increasing the amount of lower-carbon cements used in 
infrastructure projects in the United States. Portland cement is made 
by intergrinding clinker, the main energy intensive ingredient, with 
gypsum to a fine powder. Replacing a portion of the clinker in portland 
cement with ground limestone or supplementary cementitious materials 
(SCMs) reduces its embodied carbon. These cements give specifiers, 
architects, engineers, producers, and designers a lower carbon way to 
execute any structure with virtually no modifications to mix design or 
placing procedures while maintaining the resilience and sustainability 
provided by portland cement with a lower carbon footprint.
 According to the U.S. Geological Survey data, nearly 25 percent of 
all the cements used in the United States in 2022, and 45% percent of 
cement consumed in the first 5 months of 2023, were lower-carbon 
cements, including portland-limestone cements, up from less than five 
percent just two years ago.\1\
---------------------------------------------------------------------------
 \1\ https://www.usgs.gov/centers/national-minerals-information-
center/cement-statistics-and-information
---------------------------------------------------------------------------
 One of the largest purchasers of cement in the United States is the 
federal government. However, in some ways federal agencies are slowing 
greater use of these lower-carbon cements, including the U.S. Army 
Corps of Engineers (Corps). The Corps follows the Unified Facilities 
Guide Specifications (UFGS), which are model specifications used in 
specifying construction for Corps projects. The UFGS are not updated on 
a regularly scheduled basis. Instead, updates to sections of the UFGS 
are typically only initiated when a Criteria Change Request is made. 
There are references to acceptable cement types in 80 sections of the 
UFGS; however, very few references to portland-limestone cement or 
ternary blended cements are included.
 The Water Resources Development Act should direct the Corps to 
update the UFGS on a regular basis to both drop references to 
construction materials that are no longer defined in national standards 
specifications and include references to portland-limestone cement and 
ternary blended cements, that are market ready and recognized by 
consensus-based standards setting organizations. Doing so will not 
dictate the cements used by the Corps but simply ensure the UFGS is 
kept current with the materials available to be used in Corps projects 
and advance the uses of lower-carbon cements where appropriate.
 We look forward to working with the Transportation and 
Infrastructure Committee to continue the biennial process of passing a 
Water Resources Development Act to not only advance critical water 
infrastructure projects but also advance policies to ensure the most 
impactful results in the delivery of those projects. If you have any 
questions, please do not hesitate to reach out to Sean O'Neill.
 Sincerely,
 Sean O'Neill,
 Senior Vice President, Government Affairs, Portland Cement 
 Association.

 Appendix

 ---------- 

 Questions from Hon. David Rouzer to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army, and 
Lieutenant General Scott A. Spellmon, Chief of Engineers and Commanding 
 General, U.S. Army Corps of Engineers

 Question 1. The Section 7001 Report identifies new water resource 
proposals and studies from non-Federal interests. In the Water 
Resources Development Act (WRDA) of 2020, Congress directed the Army 
Corps of Engineers (Corps) to provide assistance to non-Federal 
interests in developing project submissions for the report. Have you 
seen an increase in participation from community partners in the 
Section 7001 process? If so, please describe.
 Answer. A response was not received at the time of publication.

 Question 2. The Section 7001 Report is consistently delayed. What 
is the cause of the delay year after year? When do you expect the 2024 
report to be transmitted to Congress?
 Answer. A response was not received at the time of publication.

 Question 3. Please provide an update on implementation guidance for 
WRDA 2022, as well as for other previous WRDA bills. How is the Corps 
prioritizing the issuance of guidance related to each of the WRDA 
bills?
 Answer. A response was not received at the time of publication.

 Question 4. Section 1154(a) of WRDA 2018 directs the Secretary to 
compile and publish a complete list of all Corps projects that are 
authorized for construction but have not been completed; a complete 
list of all feasibility studies that Congress has authorized the 
Secretary to carry out for which a Report of the Chief of Engineers has 
not been issued; a complete list of all environmental infrastructure 
projects authorized by Congress under Section 219 of WRDA 1992 (106 
Stat. 4835); and a complete list of major Federal operation and 
maintenance needs of projects and properties under the control of the 
Corps.\1\ This report is required to be published every two years, 
starting in 2020. However, no report has been issued to date.
---------------------------------------------------------------------------
 \1\ Letter from Rep. Sam Graves, Chairman, H. Comm. on Transp. and 
Infrastructure, et. al, to the Hon. Michael L. Connor, Ass't Sec'y of 
the Army for Civil Works, U.S. Dep't of the Army, and Lieutenant 
General Scott Spellmon, Chief of Engineers and Commanding General, U.S. 
Army Corps of Engineers (Oct. 19, 2023) (on file with Comm.).
---------------------------------------------------------------------------
 What is the cause of the delay? When do you expect this report to 
be issued? Once the inaugural report is published, will the Corps 
maintain a two-year report cycle, as required by law?
 Answer. A response was not received at the time of publication.

 Question 5. When the Corps builds out its Federal dredging 
operations, what goal is it pursuing and what metric informs that goal? 
Does the Corps measure its minimum fleet in terms of number of vessels 
or total dredge capacity? Please describe any additional metrics the 
Corp utilizes to measure its minimum fleet.
 Answer. A response was not received at the time of publication.

 Question 6. What is the Corps' intention with respect to the Hopper 
Dredge McFarland once its replacement is delivered and placed into 
service?
 Answer. A response was not received at the time of publication.

 Question 7. As you know, Texas placed a chain of marine buoys on 
the Rio Grande at Eagle Pass to deter illegal migration. On October 19, 
2023, 20 Committee Members wrote to you both regarding the lawsuit the 
Department of Justice (DOJ) brought against the State of Texas. Did the 
White House--or any other Executive Branch Agency--instruct you to use 
Section 10 of the Rivers and Harbors Act to address this issue? If yes, 
please describe the direction you were given and by whom.
 Answer. A response was not received at the time of publication.

 Question 8. As part of its regulatory responsibilities under 
Section 404 of the Clean Water Act and Section 10 of the Rivers and 
Harbors Act, the Corps maintains Nationwide permits (NWPs) for projects 
with minimal environmental impacts.\2\ NWPs are an important tool for 
building infrastructure in the country.
---------------------------------------------------------------------------
 \2\ See CWA, Pub. L. No. 92-500, 86 Stat. 816; Rivers and Harbors 
Appropriation Act of 1899, 33 U.S.C. Sec. 403.
---------------------------------------------------------------------------
 Why is the Corps undergoing a re-write of NWPs, and what is the 
status of this effort? How will the rewrite comport with the Supreme 
Court decision in Sackett?
 Answer. A response was not received at the time of publication.

 Question 9. Recently, changes made in the Nashville District have 
attempted to treat reservoirs, particularly Center Hill Reservoir, 
differently than other Corps reservoirs Nationwide. Specifically, the 
changes have been designed to restrict access to the tailwaters of this 
reservoir upon only certain users, while the regulation cited is a 
Federal regulation with Nationwide application. Public access to the 
river for recreational activities, including kayaking and canoeing, is 
vital. However, these policy changes may not have been based on 
objective data, and not considered in the Master Plan or Corps' NEPA 
analysis, deviating from the Master Plan's stipulations. How does the 
Corps justify this noncompliance with Federal laws, which denies equal 
access for all users?
 Answer. A response was not received at the time of publication.

 Question from Hon. Brian Babin to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army, and 
Lieutenant General Scott A. Spellmon, Chief of Engineers and Commanding 
 General, U.S. Army Corps of Engineers

 Question 1. The Matagorda Ship Channel Improvement Project was 
authorized for construction in section 401(1)(8) of WRDA 2020 (P.L. 
116-260). Since authorization, the ASA(CW) withdrew his Record of 
Decision for the Matagorda Ship Channel Improvement Project Feasibility 
Report and Environmental Impact Statement (EIS) in December 2022 due to 
a recent identification of a discrepancy concerning the quantity of 
material to be dredged for deepening the project and the quantity of 
such material that was evaluated in the EIS. The Matagorda Ship Channel 
is one of the top 100 ports in the U.S. for tonnage and is critical to 
maintaining the U.S. as a global economic driver.
 The requirement to prepare a Supplemental NEPA document has the 
potential to significantly delay initiation of construction of the 
project. To have a complete understanding of the impacts to the project 
schedule, we request the ASA(CW) provides an update on the schedule to 
complete the Supplemental NEPA document, and identify of any issues/
concerns that could delay completion of the Supplemental NEPA document.
 Answer. A response was not received at the time of publication.

Questions from Hon. Jenniffer Gonzalez-Colon to Hon. Michael L. Connor, 
 Assistant Secretary of the Army for Civil Works, Department of the 
Army, and Lieutenant General Scott A. Spellmon, Chief of Engineers and 
 Commanding General, U.S. Army Corps of Engineers

 Question 1. In the hearing today we discussed the matter of the 
effect of inflation and supply chain on the ability to complete 
authorized projects, including those for recovery after Hurricane 
Maria, launched under the auspices of the Bipartisan Budget Act of 
2018, that at that time were to be funded at 100% federal share. 
However, for most if not all, the real cost will be much greater than 
what was estimated in 2018:
 Question 1.a. What happens now? Does the difference become subject 
to increased local shares?
 Answer. A response was not received at the time of publication.

 Question 1.b. Does the project stop when we reach that original 
estimate until we explicitly approve more?
 Answer. A response was not received at the time of publication.

 Question 2. Constituents from the contractors and construction 
sectors have been bringing up those challenges as well as workforce 
factors: that the scope of the projects already authorized is so large 
it exceeds the capacity of the Puerto Rico construction sector to 
perform them all in time and at a reasonable cost:
 How is the Corps dealing with this in their contracting? Is there a 
way Congress could address this need, such as for example added labor 
waivers?
 Answer. A response was not received at the time of publication.

 Question 3. As I understand it, the Puerto Rico Coastal Storm Risk 
Management project is due to have a final Chief's Report in May of 
2024.
 This will really involve only a small number of potential locations 
that could benefit, for example in Rincon.
 Here we have found competing stakeholder concerns. The first was 
residents who did NOT want rock or concrete walls but to seek a more 
natural shore barrier, in response the study was extended to find 
alternatives. Now we have other residents and businesses who do NOT 
want the next alternative which is retreat from the coast since it 
means expropriation or loss of property value.
 Question 3.a. How do we balance this? What is the experience in 
these situations?
 Answer. A response was not received at the time of publication.

 Question 3.b. To have it be paid and done by the Corps, it must 
meet a cost/benefit standard, and if not, if everyone rejects anything 
that's not the ideal, then the choice of no action prevails. Is that 
right?
 Answer. A response was not received at the time of publication.

 Question 4. One thing I have to keep telling my mayors and local 
community leaders is that their project or site is, as you say it, ``in 
the queue'' be it for approval of new start or for the funding to be 
put in the budget request. This can mean years sometimes.
 Question 4.a. How has the queue been moving lately, has it been 
getting faster, slower?
 Answer. A response was not received at the time of publication.

 Question 4.b. Is there anything the Congress can do to help the 
Corps give those communities some sense of certainty?
 Answer. A response was not received at the time of publication.

 Question 5. Often a project winds up ``in the queue'' for specific 
approval because while it may have been originally conceived under the 
continuing authorities program, it ended up exceeding the dollar limit 
or the cost-to-benefit calculation.
 Is it necessary for us to legislate at some point a higher total 
resource level and higher authorizations for those programs, and/or to 
raise the thresholds for projects to come under them?
 Answer. A response was not received at the time of publication.

 Question 6. Is there any outlook for other Chief's Reports in 
Puerto Rico over the next two years? What what would be the Corps' 
outlook for ``New Starts'' in Puerto Rico in the next two years?
 Answer. A response was not received at the time of publication.

 Question 7. In the aftermath of Hurricane Maria, Puerto Rico 
received over $2.6 Billion in supplemental funding for USACE projects, 
exceeding all previous funds historically. Since then, we have also 
received large supplemental funds through the Infrastructure Act and 
other special appropriations. But (a) we cannot be living under 
emergencies forever and (b) every year there are more communities not 
just in Puerto Rico but Nationwide that plead for projects to address 
their local situation that is deteriorating for diverse factors like 
sea level rise, sedimentation or erosion.
 Question 7.a. Does the Corps foresee an increase in such ``non-
emergency'' demands?
 Answer. A response was not received at the time of publication.

 Question 7.b. How do we make sure we can identify where to act 
before there is an emergency, especially in poorer jurisdictions where 
there may not be a nonfederal partner with the resources for a 35% 
share of cost?
 Answer. A response was not received at the time of publication.

 Questions from Hon. Patrick Ryan to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army, and 
Lieutenant General Scott A. Spellmon, Chief of Engineers and Commanding 
 General, U.S. Army Corps of Engineers

 Question 1. How is the Army Corps preparing for Section 8106 at the 
staff level to ensure ERDC has the resources needed to support 
districts in multi-hazard flood analysis?
 Answer. A response was not received at the time of publication.

 Question 2. What timeline is the Corps on for the NYNJHATS, and 
will you need additional funds to complete a more comprehensive study? 
If so, how much?
 Answer. A response was not received at the time of publication.

 Question 3. How is the Corps incorporating the comments received 
during the public comment period on the NYNJHATS?
 Answer. A response was not received at the time of publication.

 Question 4. What elements of Sec 8106 of WRDA 2022 can the district 
move forward with, absent implementation guidance?
 Answer. A response was not received at the time of publication.

 Question 5. Is the Army Corps committed to issuing a supplemental 
DEIS with new or modified alternatives based on Sec 8106 analysis?
 Answer. A response was not received at the time of publication.

Questions from Hon. Garret Graves to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army, and 
Lieutenant General Scott A. Spellmon, Chief of Engineers and Commanding 
 General, U.S. Army Corps of Engineers

 Introduction to questions: Section 203 of WRDA 86 (33 U.S.C. Sec. 
2231) authorizes, with conditions, a non-Federal interest to undertake 
a feasibility study of a proposed water resources development project. 
Section 204 of WRDA 86 (33 U.S.C. Sec. 2232) authorizes, with 
conditions, a non-Federal interest to construct a water resources 
development project. Please provide an update to the Committee with 
answers to the following questions:
 Question 1. How many 203 feasibility studies have been initiated 
since the passage of WRDA '86?
 Answer. A response was not received at the time of publication.

 Question 2. Of those 203 studies that have been initiated, which 
projects have resulted in ASA approval and submission to Congress? 
Which projects initiated under Section 203 have not been approved and 
submitted to Congress?
 Answer. A response was not received at the time of publication.

 Question 3. Of those that have been submitted to Congress, which 
projects have been authorized?
 Answer. A response was not received at the time of publication.

 Question 4. Of those projects authorized, which projects have 
subsequently been constructed?
 Answer. A response was not received at the time of publication.

 Question 5. If there are any studies that have been authorized by 
Congress but not yet completed, what is their current status?
 Answer. A response was not received at the time of publication.

 Question 6. Section 203 also allows a non-federal sponsor to 
prepare a feasibility study for modification to an existing water 
resources development project. Has this authority ever been used by a 
non-federal sponsor for any post-authorization studies? If so, what are 
those projects and what is the current status?
 Answer. A response was not received at the time of publication.

 Question 7. How many 204 projects has the Corps of Engineers been 
involved with since establishment of the authority in WRDA '86 and what 
are those projects?
 Answer. A response was not received at the time of publication.

 Question 8. Of the 204s that have been initiated, what projects 
have been authorized by Congress?
 Answer. A response was not received at the time of publication.

 Question 9. Of the 204s that have been authorized, which projects 
have been completed?
 Answer. A response was not received at the time of publication.

 Question 10. Of the 204s that have been completed, which projects 
have been reimbursed for the federal share, and which projects has the 
local sponsor funded entirely?
 Answer. A response was not received at the time of publication.

 Questions from Hon. David Rouzer to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army

 Question 1. On May 25, 2023, the Supreme Court issued a decision in 
the case of Sackett v. Environmental Protection Agency (Sackett), which 
clarified Federal jurisdiction under the Clean Water Act (CWA). Members 
of Congress, representing communities across the Nation, continue to 
hear from their constituents that infrastructure projects are being 
delayed because Army Corps Districts do not have the requisite 
direction to implement Sackett.
 Please detail your next planned step for providing clarity to the 
Army Corps districts on how to implement Sackett. Please provide the 
timeline for taking this next step.
 Answer. A response was not received at the time of publication.

 Question 2. In response to questioning during the hearing, you 
suggested the Army Corps of Engineers (Corps) is focused on issuing 
approved jurisdictional determinations (AJDs), and then plans to use a 
select number of ``controversial'' \1\ AJDs that have been elevated for 
coordination with Environmental Protection Agency (EPA) to inform some 
type of ``guidance process'' \2\ potentially slated for next year.
---------------------------------------------------------------------------
 \1\ Water Resources Development Acts: Status of Past Provisions and 
Future Needs: Hearing Before the Subcomm. on Water Resources and the 
Environment of the H. Comm. on Transp. and Infrastructure, 118th Cong. 
(2023) (statement of Assistant Secretary Connor) [hereinafter WRE 
Hearing].
 \2\ Id.
---------------------------------------------------------------------------
 Question 2.a. How many jurisdictional determinations (JDs) have 
been elevated for coordination with EPA?
 Answer. A response was not received at the time of publication.

 Question 2.b. How will the Corps use these JDs to develop guidance? 
Further, what is the Corps' plan to ensure public engagement while 
developing this guidance? Additionally, what is the Corps' timeline for 
developing this guidance?
 Answer. A response was not received at the time of publication.

 Question 2.c. Specifically, you indicated that you plan to have 
guidance on implementing ``continuous surface connection.'' What other 
concepts from the 2023 Conforming Rule do you plan to issue guidance 
on? \3\ Please describe how the JDs are informing development of that 
guidance.
---------------------------------------------------------------------------
 \3\ See Revised Definition of ``Waters of the United States''; 
Conforming, 88 Fed. Reg. 61964 (Sept. 8, 2023), available at https://
www.govinfo.gov/content/pkg/FR-2023-09-08/pdf/2023-18929.pdf.
---------------------------------------------------------------------------
 Answer. A response was not received at the time of publication.

 Question 2.d. How will the continuous surface connection standard 
be applied to roadside and similar ditches that are ordinarily dry, and 
only transport water during a significant rain event?
 Answer. A response was not received at the time of publication.

 Question 3. During the hearing, you indicated there was a backlog 
of over 4,000 AJD requests pending before the Corps.\4\ You highlighted 
that the Corps has processed only about 600 since September 8, 2023, 
under the new regulatory regime.\5\
---------------------------------------------------------------------------
 \4\ WRE Hearing, supra note 1.
 \5\ Id.
---------------------------------------------------------------------------
 Question 3.a. Please provide the Committee with the Corps' plan for 
addressing this backlog, including the projected timeline for 
eliminating this backlog.
 Answer. A response was not received at the time of publication.

 Question 3.b. What additional resources does the Corps need to 
eliminate this backlog and return to processing AJDs in a timely 
fashion?
 Answer. A response was not received at the time of publication.

 Question 4. In certain districts, we hear that it is taking the 
Corps staff an equal amount of time to process preliminary 
jurisdictional determinations (PJDs), under which the landowner 
concedes jurisdiction to expedite the permitting process, as it is an 
AJD. This would represent private landowners relinquishing their 
property rights by filing a PJD to expedite the process and give the 
Corps the authority to regulate all waterbodies within the proposed 
project. Should processing PJDs take the same amount of time as AJDs?
 Answer. A response was not received at the time of publication.

 Question 4.a. If yes, please describe why.
 Answer. A response was not received at the time of publication.

 Question 4.b. If not, what are you doing to ensure this practice 
does not continue across all 38 Districts? Why is it taking some 
Districts nearly a year to process PJDs?
 Answer. A response was not received at the time of publication.

 Question from Hon. Doug LaMalfa to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army

 Question 1. I wanted to ask about the status of Section 165(a) 
Pilot Program for Water Resources Projects for Small or Disadvantaged 
Communities passed in the 2020 WRDA.
 Assistant Secretary Connor, what lessons have been learned that 
will make this new pilot program more streamlined and efficient?
 Answer. A response was not received at the time of publication.

 Questions from Hon. Mark DeSaulnier to Hon. Michael L. Connor, 
Assistant Secretary of the Army for Civil Works, Department of the Army

 Question 1. The construction and operation of the Delta Conveyance 
Project (DCP) will have profound environmental effects on the 
Sacramento-San Joaquin Delta. The Delta is a unique and prized National 
Heritage Area, and as proposed, I am told the project could 
significantly alter the Delta landscapes and waterways, impact family 
farms and agricultural operations, and have other noise, air quality, 
and environmental effects associated with its disruptive 13 plus years 
of construction and ensuing operations. What steps are you taking to 
ensure these negative impacts are fully considered as you exercise your 
role as the lead federal agency to assure federal compliance with the 
National Environmental Policy Act?
 Answer. A response was not received at the time of publication.

 Question 2. The EPA Region IX office has reviewed current and past 
iterations of the DCP and recommends analysis and disclosure of the 
project's secondary effects, including, but not limited to: changes in 
the salinity gradient and the location and volume of the low salinity 
zone in all seasons; adverse effects on water quality including the 
amplification of water quality impairments; disruption of migratory 
corridors for salmonids and sturgeon; degradation of aquatic life 
beneficial uses; disruption and loss of ecosystem processes; reductions 
in cold water supply for migratory fishes in the upper watershed; and 
changes to river hydrology. What steps are you taking to ensure that 
these concerns are addressed ahead of any work beginning and that these 
secondary and cumulative effects receive full consideration?
 Answer. A response was not received at the time of publication.

 Question 3. There has been significant concern expressed by the 
constituents I represent and many others in the surrounding areas that 
lead agencies were not sufficiently sensitive to the needs of the 
communities most affected by the impacts of the project. Please 
describe the ongoing efforts that the Corps will undertake to assure 
that the concerns of those in communities impacted by the construction 
and operation of the project will be solicited and addressed.
 Answer. A response was not received at the time of publication.

 Question 4. The proposed DCP will require issuance of Corps of 
Engineers section 408 permits for crossings and alterations of portions 
of levee systems that were federally constructed. I am told that the 
proposed crossings and alterations may cause subsidence problems, 
threatening the integrity and proper functioning of these critical 
flood risk reduction systems. Many think it would be better to invest 
in maintaining and improving these existing levees, to better protect 
the structural integrity of the region's water supply infrastructure. 
How will you assure that all alternatives are actively considered in 
the proposed DCP?
 Answer. A response was not received at the time of publication.

 Questions from Hon. Chris Pappas to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army

 Question 1. I have secured funding through the last two WRDAs to 
advance and expedite projects at Portsmouth Harbor, the Piscataqua 
River, and Rye Harbor. These harbor dredging projects are cost-
effective efforts to ensure the continued economic viability of our 
ports and regional waterways. Our communities have expressed 
frustration about the lack of clarity on how Army Corps prioritizes 
maintenance dredging projects. For small harbors like those in New 
Hampshire, the uncertainty of when harbor dredging may take place has a 
significant drag on our harbor authority, ports, and other 
stakeholders' ability to make long-term plans. As part of WRDA 2022, I 
helped secure a provision requiring the Army Corps of Engineers to 
develop clear criteria for evaluating and ranking maintenance dredging 
needs for small, remote and subsistence harbors, like those in New 
Hampshire.
 Can you provide an update on the implementation of this provision? 
How will including such criteria in the Corps' annual Civil Works 
Direct Program Development Policy Guidance provide improved structure 
and transparency for small projects like those in New Hampshire?
 Answer. A response was not received at the time of publication.

 Question 2. WRDA 2022 also includes several provisions to improve 
coastal resilience, a priority for the communities I represent on New 
Hampshire's seacoast. In addition to authorizing the Corps to modify 
shore protection projects during emergency restoration activities to 
increase resiliency, Section 8103 of the bill also gives the Army Corps 
the authority to carry out studies and projects that reduce flood and 
hurricane and storm damage hazards. While I am glad to see this policy 
change, one broad concern I frequently hear from stakeholders is that 
they struggle to easily identify and understand what financial and 
technical federal support they may be eligible to receive. To address 
this challenge, I introduced a bill, the Increasing Community Access to 
Resiliency Grants Act, which requires NOAA to provide states and 
localities with easier access to mitigation grants, both within NOAA 
and across all federal agencies. I am pleased that the bill was signed 
into law as part of the Fiscal Year 2023 NDAA. However, I also know 
that outreach to stakeholders is a key pillar in helping communities 
access relevant information.
 Assistant Secretary Connor, how does the Army Corps work with, and 
conduct outreach to, communities to help them identify and develop 
projects, such as those that will improve coastal resiliency?
 Answer. A response was not received at the time of publication.

 Question from Hon. Garret Graves to Hon. Michael L. Connor, Assistant 
 Secretary of the Army for Civil Works, Department of the Army

 Question 1. Please share any details you have about the USACE 
implementation of Section 8149 of WRDA 2022? Relatedly, how will USACE 
work with the other federal agency that provides the funds to determine 
if the funds are eligible? That provision should give flexibility by 
allowing non-federal sponsors to leverage certain funds with a federal 
imprint for their cost share. Funding with a similar purpose to the 
USACE's project mission, such as for coastal protection and restoration 
from GOMESA or coastal restoration from the RESTORE Act, should be able 
to be leveraged with USACE projects.
 Answer. A response was not received at the time of publication.

 Questions from Hon. Rick Larsen to Lieutenant General Scott A. 
Spellmon, Chief of Engineers and Commanding General, U.S. Army Corps of 
 Engineers

 Implementation of Everett Harbor Provision: WRDA 2022 added two 
projects in Washington State for consideration of federal assumption of 
maintenance. Port of Everett and Port Townsend will both benefit from 
carrying out channel improvements on their own and remain important for 
federal navigation needs.
 Question 1. Has the Corps begun an assessment of either of these 
navigation channel projects?
 Answer. A response was not received at the time of publication.

 Question 2. When can we expect a final report recommending (or not) 
federal assumption of maintenance of the channel?
 Answer. A response was not received at the time of publication.

 Question 3. Everett Harbor and the Snohomish River provide a 
critical passageway for Navy and Coast Guard exports and access. Can 
you commit to considering these nationally significant aspects of the 
project when evaluating the economic justification for the channel 
improvements?
 Answer. A response was not received at the time of publication.

 Question from Hon. Chris Pappas to Lieutenant General Scott A. 
Spellmon, Chief of Engineers and Commanding General, U.S. Army Corps of 
 Engineers

 Question 1. Many harbor dredging projects must occur on a recurring 
basis to address shoaling. Clear expectations on when future 
maintenance dredges will occur is critical for local stakeholders. For 
example, the Simplex/Tyco shoal in the Piscataqua River has 
traditionally been dredged every seven to ten years. These shoals were 
last dredged in 2013. I am concerned about delays in completing these 
maintenance dredging projects, as shoaling can create significant 
safety issues for vessels. In addition to the language requiring the 
development of clear criteria for evaluating and ranking maintenance 
dredging needs for small harbors, I also secured language in WRDA 2022 
directing the Army Corps to specifically expedite this Piscataqua River 
project. While I am glad that the Corps will soon begin mobilization on 
this project, I remain concerned that small projects like this are 
seeing delays and not receiving the attention they deserve.
 Lieutenant General Spellmon, will the Corps commit to work with the 
Pease Development Authority, which manages our state's harbors, to 
determine the timing for future dredging work?
 Answer. A response was not received at the time of publication.

 Questions from Hon. Garret Graves to Lieutenant General Scott A. 
Spellmon, Chief of Engineers and Commanding General, U.S. Army Corps of 
 Engineers

 Introduction to questions: Section 403 (a)(4) of WRDA 2020 
authorized the Port Fourchon Belle Pass Channel Deepening Project. As 
we understand it, the feasibility report for this project was drafted 
by the non-Federal sponsor under Section 203 of WRDA '86 and approved 
by the Secretary in a review assessment dated April 2020. The 
Secretary's review assessment contained four conditions that the 
Secretary required to be addressed prior to project construction 
related to updated cost estimate, the dredge material plan, the real 
estate plan, and environmental compliance.
 House Report 117-347 to H.R. 7776, WRDA 2022, directed the 
Secretary to negotiate and complete a Project Management Plan (PMP) 
that is satisfactory to the Secretary and non-Federal sponsor by the 
end of Fiscal Year 2022. We understand the first PMP that was presented 
was rejected by the non-Federal sponsor as requiring review that is 
outside of the scope of the Secretary's four items to be addressed. We 
understand a second PMP was proposed, which the non-Federal sponsor 
signed in October 2022, with reservations still remaining over the 
scope of work. The PMP calls for a Letter Report to be completed by the 
District in April 2024, and the draft Report is to be submitted to the 
Secretary in June 2024.
 Question 1. Please provide an update as to the status of the PMP, 
an explanation as to how the PMP addresses the four items referenced as 
conditions by the Secretary, and the Corps' explanation as to how those 
conditions are being reviewed.
 Answer. A response was not received at the time of publication.

 Question 2. Please also provide an update as to whether any 
Vertical Team meetings have taken place on this project that has 
included the non-Federal sponsor, as requested by the non-Federal 
sponsor.
 Answer. A response was not received at the time of publication.
 